Tennessee Valley Authority Nuclear Power Group Response to NRC Regulatory Issue Summary 2014-13 Planned Licensing Action Submittals for All Power Reactor Licensees
ML15240A136
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/28/2015
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-15-138, RIS-14-013
Download: ML15240A136 (7)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-138 August 28, 2015 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Tennessee Valley Authority Nuclear Power Group Response to NRC Regulatory Issue Summary 2014-13 Planned Licensing Action Submittals for All Power Reactor Licensees The purpose of this letter is to provide the Nuclear Regulatory Commission (NRC) staff with the Tennessee Valley Authority (TVA) voluntary response to the NRC Regulatory Issue Summary (RIS) 2014-13 that requested power reactor licensees to voluntarily provide information regarding the number of planned licensing actions to be submitted for NRC review in the next three calendar years and the planned power uprates that will be submitted in the next five calendar years.

Enclosures 1, 2, and 3, to this letter provide the estimated licensing actions for Browns Ferry Nuclear Plant Units 1, 2, and 3, Sequoyah Nuclear Plant Units 1 and 2, and Watts Bar Nuclear Plant, Unit 1, respectively. Watts Bar Nuclear Plant, Unit 2 has not received its operating license; therefore planned Watts Bar Unit 2 licensing actions are not included in this submittal. provides the planned power uprate application information for the Browns Ferry Nuclear Plant Units 1, 2, and 3. As noted in RIS 2014-13, licensee responses to this request are not binding and can be updated as needed.

Nuclear Regulatory Commission CNL-15-138 Page2 August 28, 2015 There are no new regulatory commitments contained in this letter. Should you have any questions, please contact Russ Wells at (423) 751-8130 .

. Shea Vice President, Nuclear Licensing ROW: EDS Enclosures

1. Tables of Estimated Licensing Actions for Browns Ferry Nuclear Plant, Units 1, 2, and 3
2. Tables of Estimated Licensing Actions for Sequoyah Nuclear Plant, Units 1 and 2
3. Tables of Estimated Licensing Actions for Watts Bar Nuclear Plant, Unit 1
4. Plans for Power Uprates cc (Enclosures):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector- Sequoyah Nuclear Plant NRC Senior Resident Inspector- Watts Bar Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant NRR Project Manager- Sequoyah Nuclear Plant NRR Project Manager - Watts Bar Nuclear Plant Tracy Orf, NRC Division of Operating Reactor Licensing Technical Assistant, Mail Stop O-C2

ENCLOSURE 1 Table of Estimated Licensing Actions1 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Licensing Licensing Licensing Action Description Projected Outage Comments (As Needed)

Action Action Submittal Related?

Number Date If so, Date Needed 1 Relief Request RR for Unit 2 Reactor Vessel 09/16/2015 No (RR) Circumferential Weld 2 License Revise Technical Specification 09/16/2015 No Amendment (TS) Section 3.3.5.1, Request (LAR) Emergency Core Cooling System (ECCS) Preferred Pump Logic 3 RR RR for Unit 3 Reactor Vessel 09/23/2015 No Circumferential Weld 4 LAR Revise Residual Heat Removal 09/25/2015 No Service Water (RHRSW) TS and Bases for consistency with BFN design bases and rules of usage reflected in TS Section 1.0 5 LAR TS 2.1.1.2, Revise Safety Limit 09/25/2015 Yes, Fall Minimum Critical Power Ratio 2016 (SLMCPR) for BFN Unit 1 6 LAR Revise TS frequency for 10/31/2015 No Augmented IST components 7 LAR Revise TS 5.3.1 related to 12/31/2015 No operator training requirements

_________

1. The projected submittal dates are subject to change as discussed periodically with the NRC Project Manager. Also, operational considerations may result in the addition of licensing actions that are not currently listed.

CNL-15-138 E 1 of 5

ENCLOSURE 1 Table of Estimated Licensing Actions1 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Licensing Licensing Licensing Action Description Projected Outage Comments (As Needed)

Action Action Submittal Related?

Number Date If so, Date Needed 8 LAR Extend Surveillance 12/31/2015 No Requirement (SR) 3.3.8.2 Channel Calibration from 184 days to 18 months 9 LAR Technical Specification Task 3/31/2016 No Force (TSTF) 523, Managing Gas Accumulation 10 LAR Revise SR 3.1.7.7 re 44 gpm 05/20/2016 No SLC pump flow rate 11 LAR Electric Board Room / Control 05/31/2016 No Bay Chillers 12 LAR TSTF-425, Relocate 06/30/2016 No Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b 13 LAR Add TS 3.0.2 applicability to TS 06/30/2016 No 5.5.2 14 LAR TSTF-522, Ventilation System 06/30/2016 No Surveillance Requirements 15 LAR TS 5.5.12 Primary Containment 09/01/2016 Yes, Spring Applies to all three units Leakage Rate Testing Program 2019

- Change program guideline reference

_________

1. The projected submittal dates are subject to change as discussed periodically with the NRC Project Manager. Also, operational considerations may result in the addition of licensing actions that are not currently listed.

CNL-15-138 E 2 of 5

ENCLOSURE 2 Table of Estimated Licensing Actions1 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Licensing Licensing Licensing Action Description Projected Outage Comments (As Needed)

Action Action Submittal Related?

Number Date If so, Date Needed 1 LAR Revise TS 6.3.1 related to 12/31/2015 No operator training requirements 2 LAR Revise Emergency Diesel 06/30/2016 No Generator (EDG) Frequency Band

_________

1. The projected submittal dates are subject to change as discussed periodically with the NRC Project Manager. Also, operational considerations may result in the addition of licensing actions that are not currently listed.

CNL-15-138 E 3 of 5

ENCLOSURE 3 Table of Estimated Licensing Actions1,2 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390 Licensing Licensing Licensing Action Description Projected Outage Comments (As Needed)

Action Action Submittal Related?

Number Date If so, Date Needed 1 LAR TSTF 372, Addition of LCO 10/30/2015 No 3.0.8, Inoperability of Snubbers 2 LAR ABGTS - TSTF 287 10/30/2015 No 3 LAR TS Tables 3.3.1-1 and 3.3.2-1: 12/31/2015 No Systems 46 and 47 pressure switches 4 LAR Emergency Diesel Generator / 01/31/2016 No Electrical Board TS 3.8.1 Allowed Outage Time 5 LAR TSTF-493, LSSS Setpoint 02/15/2017 No Methodology 6 LAR TSTF-340, AFW Mode 02/17/2017 No Transition 7 LAR Improved TS Rev 4 Upgrade 02/17/2017 No

_________

1. The projected submittal dates are subject to change as discussed periodically with the NRC Project Manager. Also, operational considerations may result in the addition of licensing actions that are not currently listed.

CNL-15-138 E 4 of 5

ENCLOSURE 4 Plans for Power Uprates RIS 2014-13 states:

The licensee is requested to address if they plan to apply for a power uprate (please indicate whether it is a measurement uncertainty recapture (MUR), stretch, or extended power uprate (EPU)) in the next 5 calendar years. (If the answer is no, please skip the next four questions.)

x What percent increase in power from the current licensed thermal power (CLTP) limit does the licensee plan to apply for? (Please write N/A in any unit that does not apply or that is not planned for a power uprate.)

Unit 1______% Unit 2______% Unit 3______% Unit 4______%

x What is the planned increase from the CLTP limit in megawatts thermal?

Unit 1______MWt Unit 2______MWt Unit 3______MWt Unit 4______MWt x What is the expected schedule for filing the application (month/year)? (If the month is not known, please provide the quarter and/or year.)

Unit 1______ Unit 2______ Unit 3______ Unit 4______

x What is the expected date for power ascension with uprated conditions (month/year)?

Unit 1______ Unit 2______ Unit 3______ Unit 4______

TVA Response TVA plans to submit an EPU for the Browns Ferry Nuclear Power Plants Units 1, 2, and 3.

Below is the information requested by NRC:

x What percent increase in power from the current licensed thermal power (CLTP) limit does the licensee plan to apply for? (Please write N/A in any unit that does not apply or that is not planned for a power uprate.)

Unit 1_15__% Unit 2_15__% Unit 3_15__%

x What is the planned increase from the CLTP limit in megawatts thermal?

Unit 1__494_MWt Unit 2__494_MWt Unit 3__494_MWt x What is the expected schedule for filing the application (month/year)? (If the month is not known, please provide the quarter and/or year.)

Unit 1_10/2015_ Unit 2__10/2015_ Unit 3__10/2015_

x What is the expected date for power ascension with uprated conditions (month/year)?

Unit 1_10/2018__ Unit 2_03/2019_ Unit 3_03/2018__

CNL-15-138 E 5 of 5