NL-16-133, Reactor Internals Upflow Modification

From kanterella
Revision as of 11:36, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Reactor Internals Upflow Modification
ML16333A322
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/15/2016
From: Vitale A
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-16-133
Download: ML16333A322 (2)


Text

  • ====* Entergx Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box249 Buchanan, NY 10511-0249 Tel 914 254 6700 Anthony J. Vitale Site Vice President NL-16-133 November 15, 2016 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738

Subject:

Reactor Internals Upflow Modification Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64

Dear Sir or Madam:

The purpose of this letter is to inform you of the status of the reactor internals upflow modification for Indian Point Unit No. 3 (IP3). Indian Point Unit No. 2 (IP2) Licensee Event Report (LER) 2016-004 reported the discovery during a scheduled refueling outage that commenced in March 2016 of degraded baffle-former bolts in the IP2 reactor vessel. Implementation of a project in the IP2 2018 refueling outage to convert reactor flow configuration from downflow to upflow to improve margin for the baffle-former assembly was reported as a corrective action in the LER. In Inspection Report 05000247/2016 and 05000286/2016002, it was stated that "Entergy also planned a long-term corrective action to convert Units 2 and 3 from a "down-flow" baffle configuration to an "up-flow" configuration ... " This is to inform you that an upflow modification for IP3 will not be installed in the upcoming IP3 refueling outage that begins in March 2017.

There are no new commitments made by Entergy contained in this letter. If you have any questions, please contact Mr. Robert Walpole, Manager, Regulatory Assurance at (914) 254-6710.

Sincerely, AJV/gd

NL-16-133 Docket No. 50-286 Page 2 of 2 cc: Mr. Daniel H. Dorman, Regional Administrator, NRC Region I Mr. Douglas V. Pickett, Senior Project Manager, NRC NRR DORL Ms. Bridget Frymire, New York State Department of Public Service Mr. John B. Rhodes, President and CEO, NYSERDA NRC Resident Inspectors