ML17024A239

From kanterella
Revision as of 10:16, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Alternatives RAI-AL-3 Lanning 2014_Correspondence Lanning-Entergy to Buckley-Entergy
ML17024A239
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/07/2017
From:
Entergy Operations
To: Keegan E
Division of License Renewal
Elaine Keegan, NRR/DLR, 415-8517
Shared Package
ML17018A143 List:
References
Download: ML17024A239 (5)


Text

BUCKLEY, RICKY N From: LANNING, JIM Sent: Monday, March 31, 2014 5:36 PM To: BUCKLEY, RICKY N Cc: WALZ, ANTHONY P

Subject:

RE: Entergy's Strategic Resource Plan

Rick, From an IRP context we have not studied what we would do if W3 does not receive license extension.

Natural gas combined cycles are the logical choice at this time. They are the most economic resource to serve base load needs. They also offer relatively short development and construction time (about five years). While demand side management could play a supporting role, ELL is already considering DSM to meet other needs.

Biomass, new coal and new nuclear are not currently economic and new coal faces regulatory challenges. From an Amite South perspective there are really no existing merchants that could fill the void with long-term PPAs. Even excluding area planning issues we expect the current level of surplus capacity in MISO South to dwindle with the region needing more capacity (even if we have W3 license extension) by early-to-mid next decade.

Other renewables are not desirable to fill a base load need.

The only concern with natural gas is fuel cost risk and fuel supply security risk that come from making ELL more dependent on one fuel typ.

Thanks, Jim Lanning Richard J. Jim Lanning, Jr.

Entergy Services, Inc.

Office voice (281) 297-3564 Office fax (281) 297-5056 Mobile Voice (281) 728-5771 Email rlannin@entergy.com From: BUCKLEY, RICKY N Sent: Monday, March 31, 2014 4:36 PM To: LANNING, JIM Cc: WALZ, ANTHONY P

Subject:

RE: Entergy's Strategic Resource Plan

Jim, In the unlikely event that the NRC did not renew the Waterford 3 operating license and the 1

plant had to shut down on March 18, 2024 which is their initial operating license expiration date, hypothetically, what alternatives could potentially replace this loss of generation since the IRP assumes license extension for Waterford 3?

For GGNS, NRC determined that the combination of alternatives that could potentially replace the loss of GGNS generation if their license was not renewed as a sfollows:

Natural gas combined cycle = 530 MWe Biomass = 360 MWe Demand-side management = 280 MWe Purchased power = 305 MWe Any insights would be appreciated since we will have to evaluate a combination of alternatives in the Waterford 3 license renewal application.

Thanks, Rick Buckley, CHMM, REM Sr. Project Manager Entergy Nuclear Post Office Box 31995 Jackson, MS 39286-1995 601-368-5823 (Office) 601-927-5132 (Cellular) 601-368-5812 (Fax) rbuckle@entergy.com This e-mail and any attachments thereto are intended only for the use by the addressee(s) named herein and contain proprietary and confidential information. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, or copying of this e-mail and any attachments thereto, is strictly prohibited. If you have received this e-mail in error, please immediately notify me by telephone and permanently delete the original and any copy of any e-mail and any printout thereof.

From: LANNING, JIM Sent: Wednesday, February 26, 2014 10:44 PM To: BUCKLEY, RICKY N Cc: WALZ, ANTHONY P

Subject:

RE: Entergy's Strategic Resource Plan 2

Rick, The IRP requiremment does not dictate that our resource plans have renewable resources in them, but it does require us to evaluate them along with other supply as well as demand side resources.

Jim Sent from my Verizon Wireless 4G LTE smartphone


Original message --------

From: "BUCKLEY, RICKY N" Date:02/26/2014 5:44 PM (GMT-06:00)

To: "LANNING, JIM" Cc: "WALZ, ANTHONY P"

Subject:

RE: Entergy's Strategic Resource Plan

Jim, Does the LPSC requirement have anything to do with renewables?
Thanks, Rick Buckley, CHMM, REM Sr. Project Manager Entergy Nuclear Post Office Box 31995 Jackson, MS 39286-1995 601-368-5823 (Office) 601-927-5132 (Cellular) 601-368-5812 (Fax) rbuckle@entergy.com This e-mail and any attachments thereto are intended only for the use by the addressee(s) named herein and contain proprietary and confidential information. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, or copying of this e-mail and any attachments thereto, is strictly prohibited. If you have received this e-mail in error, please immediately notify me by telephone and permanently delete the original and any copy of any e-mail and any printout thereof.

From: LANNING, JIM Sent: Wednesday, February 26, 2014 1:46 PM 3

To: BUCKLEY, RICKY N; WALZ, ANTHONY P

Subject:

RE: Entergy's Strategic Resource Plan

Rick, The most current completed Strategic Resource Plan (now called an Integrated Resource Plan) for the Entergy System including ELL is the 2012 System IRP. I have attached the report. The Louisiana LPSC has developed an IRP requirement for EGSL and ELL (and other large utilities operating in Louisiana), however, we have just started the process of revising the 2012 System IRP and dont expect to have a draft IRP until late in 2014 and a final report until mid 2015.

Jim Lanning Richard J. Jim Lanning, Jr.

Entergy Services, Inc.

Office voice (281) 297-3564 Office fax (281) 297-5056 Mobile Voice (281) 728-5771 Email rlannin@entergy.com From: BUCKLEY, RICKY N Sent: Wednesday, February 26, 2014 1:34 PM To: LANNING, JIM; WALZ, ANTHONY P

Subject:

Entergy's Strategic Resource Plan Jim or Tony, Could you please tell me who manages the Entergys Strategic Resource Plan that describes the long-term integrated resource plan for the Entergy System and its Operating Companies?

I have a 2009 version but wasnt sure if its the most current.

We are currently working on Waterford 3s license renewal application to extend their current operating license an additional 20 years and one area that I have to address in the environmental report is energy alternatives.

So we typically base our replacement base-load alternatives on generation sources such as coal, natural gas or nuclear that are outlined in the Plan in the event the Waterford 3 license is not renewed.

We are also required to evaluate a combination of alternatives to replace the Waterford 3 facility. So your input into the types of this combination would be appreciated.

Thanks, Rick Buckley, CHMM, REM 4

Sr. Project Manager Entergy Nuclear Post Office Box 31995 Jackson, MS 39286-1995 601-368-5823 (Office) 601-927-5132 (Cellular) 601-368-5812 (Fax) rbuckle@entergy.com This e-mail and any attachments thereto are intended only for the use by the addressee(s) named herein and contain proprietary and confidential information. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, or copying of this e-mail and any attachments thereto, is strictly prohibited. If you have received this e-mail in error, please immediately notify me by telephone and permanently delete the original and any copy of any e-mail and any printout thereof.

5