DISTRIBUTIOM S'EM (BIDS)
ACCESSION NBR:8308300284 DOC DATE: 83/08/24
~ NOTARIZED'O DOCKET FACIL:50-400 Shearon NOTES'EGULATOR'llMFORMATIOMHarris Nuclear Power PlantF Unit 1~ Carolina 05000400 50-401 Shear on Harris Nuclear Power Planti Unit 2< Carolina 05000401 AUTH INANE AUTHOR AFFILIATION MCDUFF,IEGER.A, Carolina Power 8 Light Co ~
RECIP NAME
~ RECIPIENT AFFILIATION DENTONF H R ~ Of fice of Nuclear Reactor RegulationF Dit ector
SUBJECT:
Forwards "Final Em~ban mcMtRept:Main Damnp documenting const activities L UC tests performed during const of TITLE: Licensing CODEe 8001S COPIES RECEIVED:LTR Submittal: PSAR/FSAR Amdts &
g ENCL /I/$structures'ISTRIBUTION Related Correspondence' SIZE ~
~
p zan+
RECIPIENT 'OPIES RECIPIENT COPIES ID CODE/NASE LTTR ENCL ID CODE/NAYiE LTTR ENCL NRR/DL/ADL 1 0 NRR LB3 BC 1 0 NRR LB3 LA 1 0 BUCKLEYFB 01 1 1 INTERNAL ELD/HDSl 1 0 IE F ILE 1 1 IE/DEPER/EPB 36 3 IE/DEPER/IRB 35 1 1 IE/DEQA/QAB 21 1 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 ? 2 NRR/DE/GB 28 2 NRR/DE/MEB 18 1 NRR/DE/HTEB 17 1 NRR/DE/SAB 24 1 NRR/DE/SGEB 25 1 1 NRR/DHFS/HFE840 '1 NRR/DHFS/LQB 32 1 1
NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/DSI/AEB 26 1 1 NRR/DS I/ASB 1 1 NRR/DSI/CPB 10 1 1 NRR/DS I/CSB 09 1 NRR/DSI /ICSB 16 1 NRR/DS I/HETB 12 1 1 NRR/DS I/PSB 19 1 1 AB 22 i NRR/DSX/ASB 23 1 1 EG FILE 04 1 1 RGN2 3 .3 RQ /t< I 8 1 0 EXTERNALS ACRS 41 6 BNL(AtlDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEh1A REP DIP 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 46
fl II Il I
4 lt
@MD, Carolina Power & Light Company August 24, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor, Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~ 1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FINAL EMBANKMENT REPORT, MAIN AND AUXILIARY DAM AND AUXILIARYSEPARATING DIKE
Dear Mr. Denton:
I Carolina Power & Light Company (CP&L) hereby transmits one (1) original and forty (40) copies of the SHNPP Final Embankment Report, Main and Auxiliary Dam and Auxiliary Separating Dike. This report documents the construction activities and the quality control tests performed during construction of the structures. The information contained in the enclosed report supersedes that contained in FSAR Appendix 2.5F, which was deleted by Amendment No. 9.
Yours very truly, M. A. McDuffie Senior Vice President Engineering & Construction PS/ccc (5916CllT5) cct Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Dr. Phyllis Lotchin Mr J P O~Reilly (NRC-RII Mr. John D. Runkle Mr. Travis Payne (KUDZU) Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE/ELP) Mr. G. 0. Bright (ASLB)
Chapel Hill Public Library Dr. J. H. Carpenter (ASLB)
Wake County Public Library Mr. J. L. Kelley (ASLB) 8308300284 830824 ADQCK:05000400 PDR 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602