ML18018A714

From kanterella
Jump to navigation Jump to search
Forwards Final Embankment Rept:Main Dam, Documenting Const Activities & QC Tests Performed During Const of Structures
ML18018A714
Person / Time
Site: Harris  
Issue date: 08/24/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018A715 List:
References
NUDOCS 8308300284
Download: ML18018A714 (4)


Text

DOCKET 05000400 05000401 NOTES'EGULATOR'llMFORMATIOM DISTRIBUTIOM S'EM (BIDS)

ACCESSION NBR:8308300284 DOC ~ DATE: 83/08/24 NOTARIZED'O FACIL:50-400 Shearon Harris Nuclear Power PlantF Unit 1~ Carolina 50-401 Shear on Harris Nuclear Power Planti Unit 2< Carolina AUTH INANE AUTHOR AFFILIATION MCDUFF,IEGER.A, Carolina Power 8 Light Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTONF H R ~

Office of Nuclear Reactor RegulationF Dit ector

SUBJECT:

Forwards "Final Em~ban mcMtRept:Main Damnp documenting const activities L

UC tests performed during const of structures'ISTRIBUTION CODEe 8001S COPIES RECEIVED:LTR g ENCL /

SIZE ~

I/$

~p zan+

TITLE: Licensing Submittal:

PSAR/FSAR Amdts

& Related Correspondence' RECIPIENT ID CODE/NASE NRR/DL/ADL NRR LB3 LA INTERNAL ELD/HDSl IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFE840 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI /ICSB 16 NRR/DS I/PSB 19 NRR/DSX/ASB 23 RGN2 EXTERNALS ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05

'OPIES LTTR ENCL 1

0 1

0 1

0 3

1 1

?

2 1

1 1

'1 1

1 1

1 1

1 1

1 1

1 1

3

.3 6

1 1

1 1

1 1

RECIPIENT ID CODE/NAYiE NRR LB3 BC BUCKLEYFB 01 IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/HTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DS I/HETB 12 AB 22 EG FILE 04 RQ

/t<I8 BNL(AtlDTS ONLY)

FEh1A REP DIP 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

0 1

1 2

1 1

1 1

1 0

1 1

1 1

1i 1

1 1

0 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 ENCL 46

fl II Il I

4 lt

@MD, Carolina Power & Light Company August 24, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor, Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS ~

1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FINAL EMBANKMENT REPORT, MAIN AND AUXILIARY DAM AND AUXILIARYSEPARATING DIKE

Dear Mr. Denton:

I Carolina Power

& Light Company (CP&L) hereby transmits one (1) original and forty (40) copies of the SHNPP Final Embankment

Report, Main and Auxiliary Dam and Auxiliary Separating Dike.

This report documents the construction activities and the quality control tests performed during construction of the structures.

The information contained in the enclosed report supersedes that contained in FSAR Appendix 2.5F, which was deleted by Amendment No. 9.

Yours very truly, M. A. McDuffie Senior Vice President Engineering

& Construction PS/ccc (5916CllT5) cct Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr J

P O~Reilly (NRC-RII Mr. Travis Payne (KUDZU)

Mr. Daniel F. Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) 8308300284 830824 PDR ADQCK:05000400 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602

~l i O'I

'c i'1

~ ~

' t, J

I' Il I

I 1

)I ll wc ~

J>>

i

~ ~

I~

gill>>

4 Jt

~

I 1 t. J..3 F'JA LIB l, E al 'f<<L" '.

I

'I h,

r JJI11 II ii 1

I 1

~ I~

1 Jt