MONTHYEARML21109A3392021-04-16016 April 2021 Clinch River Nuclear Site Espa Review - Best Practices and Lessons Learned Memo ML19261A8602019-09-18018 September 2019 Clinch River Mandatory Hearing on Early Site Permit - Information Regarding Location/Cross References of Hearing Transcript and Transcript Corrections ML18285A0802018-10-12012 October 2018 Notice of Meeting Between with Tennessee Valley Authority to Share with TVA Tribal Concerns Regarding Protection of Cultural Resources at Crn Site and Tribal Participation in Tva'S Section 106 Consultations Under National Historic Preservat ML18206A6772018-08-0202 August 2018 June 5, 2018, Summary of Public Meeting to Discuss the Draft Environmental Impact Statement for an Early Site Permit for the Clinch River Nuclear Site ML18186A5582018-07-20020 July 2018 Memo to ACRS - Clinch River ACRS Transmittal SE for Chapter 13 Section 13.3, Emergency Planning. ML18177A1072018-07-0909 July 2018 Summary Report for the Second Regulatory Audit of Clinch River Nuclear Site Early Site Permit Application; Part 6 Exemptions and Departures, Emergency Planning Exemptions ML18122A3442018-05-22022 May 2018 Summary Report for the Regulatory Audit of Clinch River Nuclear Early Site Permit Application Part 6 Exemptions and Departures, Emergency Planning Exemptions ML18122A2192018-05-0303 May 2018 May 7 - 11, 2018, Audit of Clinch River Nuclear Site Early Permit Application Comparing Offsite Atmospheric Dispersion Using Vector and Scalar Wind Direction ML18102A6112018-04-12012 April 2018 Memo - Clinch River Nuclear Early Site Permit Application Safety Evaluations with No Open Items for Section 2.1, Section 2.2, Section 3.5.1.6, and Section 15.0.3 ML18095A0832018-04-0606 April 2018 4/12/2018 - Audit of Clinch River Nuclear Site Early Permit Application Part 6- Exemptions and Departures, Emergency Planning Exemptions ML17341A2762018-03-23023 March 2018 April 2017, Hydrology and Health Physics Safety Audit Summary for the Tennessee Valley Authority Clinch River Nuclear Site Early Site Permit Application ML19059A3702018-03-23023 March 2018 April 2017, Hydrology and Health Physics Safety Audit Summary for the Tennessee Valley Authority Clinch River Nuclear Site Early Site Permit Application ML17226A0252018-01-11011 January 2018 Clinch River Nuclear Site ESP, Transmittal Memo - Summary Report for the Full Scope Environmental Audit NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy 2021-04-16
[Table view] Category:NRO Safety Evaluation Report (SER)-Delayed
MONTHYEARML17291A1122019-04-0303 April 2019 Clinch River ESP Phase B SE, Section 13.6 ML18290A6852018-11-0909 November 2018 Clinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.4 (Redacted Version) ML17291A5472018-11-0808 November 2018 Clinch River Early Site Permit Safety Evaluation, Section 17.0 ML17289B1482018-11-0808 November 2018 Clinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.3 ML17289B2552018-10-0404 October 2018 Clinch River ESP Phase B SE, Sections 2.5.4 - 2.5.5 ML17289B2542018-10-0404 October 2018 Clinch River ESP Phase B SE, Section 2.5.3 ML17289B2522018-10-0404 October 2018 Clinch River ESP Phase B SE, Section 2.5.1 ML18242A1512018-09-14014 September 2018 Letter - Clinch River Nuclear Site Early Site Permit Application, Chapter 17.5 with No Open Items (Phase C) ML17291A0522018-07-20020 July 2018 Clinch River ESP Phase B SE, Section 13.3 - Conduct of Operations ML18102B1492018-04-30030 April 2018 Clinch River ESP Phase C SE Section 15.0.3 ML18102B1502018-04-30030 April 2018 Clinch River ESP Phase C SE Section 3.5.1.6 ML18102B2032018-04-30030 April 2018 Clinch River ESP Phase C Section 2.1 and 2.2 ML18102A6122018-04-12012 April 2018 Letter - Clinch River Nuclear Early Site Permit Application Safety Evaluations with No Open Items for Section 2.1, Section 2.2, Section 3.5.1.6, and Section 15.0.3 ML18102A6112018-04-12012 April 2018 Memo - Clinch River Nuclear Early Site Permit Application Safety Evaluations with No Open Items for Section 2.1, Section 2.2, Section 3.5.1.6, and Section 15.0.3 2019-04-03
[Table view] |
Text
April 12, 2018 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Robert M. Taylor, Acting Director /RA - A. Bradford for/
Division of New Reactor Licensing Office of New Reactors
SUBJECT:
CLINCH RIVER NUCLEAR EARLY SITE PERMIT APPLICATION SAFETY EVALUATIONS WITH NO OPEN ITEMS FOR SECTION 2.1, GEOGRAPHY AND DEMOGRAPHY, SECTION 2.2, NEARBY INDUSTRIAL, TRANSPORTATION AND MILITARY FACILITIES, SECTION 3.5.1.6, AIRCRAFT HAZARDS, AND SECTION 15.0.3, RADIOLOGICAL CONSEQUENCES OF DESIGN BASIS ACCIDENTS By letter dated May 12, 2016, Tennessee Valley Authority (TVA) submitted an early site permit (ESP) application to the U.S. Nuclear Regulatory Commission (NRC) for the Clinch River Nuclear (CRN) Site located in Oak Ridge, Tennessee.
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluations (SEs) with no open items associated with Section 2.1, Geography and Demography, Section 2.2, Nearby Industrial, Transportation and Military Facilities, Section 3.5.1.6, Aircraft Hazards, and Section 15.0.3, Radiological Consequences of Design Basis Accidents (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML18102B203, ML1818102B149, and ML1818102B150).
Unless otherwise stated in the SEs, the staffs review was based on Revision 1 of the CRN Site ESP application. The SEs are being provided to support a May 15, 2018, meeting of the subcommittee of the ACRS. The ACRS full committee meeting will be held after the subcommittee meeting.
CONTACTS: Allen Fetter, DNRL/LB3 Mallecia Sutton, DNRL/LB3 301-415-8556 301-415-0673
A. Veil The staff concludes that the SEs do not contain any information exempt from public disclosure.
However, the NRC will withhold the SE from public disclosure for 10 business days to allow TVA the opportunity to verify the staffs conclusion that the SE contains no such exempt information.
Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in ADAMS.
The staff will inform the ACRS immediately if TVA requests that any of the information in the SE be withheld from public disclosure.
Docket No.: 52-047
Package: ML18102A611 Memorandum: ML18102A612 SEs:
ML18102B203 (Section 2.1 and 2.2)
ML18102B149 (Section 3.5.1.6)
ML18102B150 (Section 15.0.3) NRO-002 OFFICE DNRL:LB3:PM DNRL:LA DNRL:BWR:BC DNRL: D NAME AFetter SGreen AMuniz (Acting) RTaylor (Acting) (ABradford for)
DATE 4/12/2018 04/12/2018 04/12/2018 4/12/2018