ML18310A225

From kanterella
Revision as of 12:11, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Human Factors Engineering at the U.S. Nuclear Regulatory Commission
ML18310A225
Person / Time
Issue date: 11/26/2018
From: Brian Green
NRC/NRR/DIRS/IRAB
To:
Green B, NRR/DIRS, 301-415-6728
References
Download: ML18310A225 (11)


Text

Human Factors Engineering at the U.S.

Nuclear Regulatory Commission Brian Green, Ph.D.

November 26, 2018

NRC Mission The NRC's mission is to regulate the nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment.

The NRC's regulatory mission covers three main areas: Reactors, Materials, & Waste

Key Activities

  • Licensing

- Ensure the plant and organization are designed for safe operation

- Use Deterministic/Risk-Informed Approaches

  • Operations & Construction Oversight: Inspections

- Ensure plant is constructed as licensed: ITAAC

- Ensure plant is operated as licensed: tech specs, license conditions

  • Enforcement

- Penalties for operating outside of the terms of the license https://www.nrc.gov/about-nrc/regulatory.html#providing

Nuclear Reactor Overview

  • Pressurized Water Reactors (PWR)
  • Boiling Water Reactors (BWR)

Operating Reactor Simulator New Reactor - Simulator Human and Organizational Factors at NRC

  • Operator Licensing

- Operators are knowledgeable, capable, and qualified to safely operating plant

  • Safety Culture

- Organization supports safe operation

  • Human Reliability Analysis

- Qualitative and quantitative assessments to determine probability of errors

  • Human Factors Engineering

- MCR design supports safe operation

- Credited operator tasks feasible/reliable

Human Factors 10CFR50.34(f)(2)(iii) Provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts.

Chapter 18 of Standard Review Plan (NUREG-0800)

NUREG-0711 - Overview

  • HFE Program Management Plant Design
  • Operating Experience Review Operating Experience
  • Functional Requirements Analysis Review and Function Allocation Functional Requirements Analysis and Function Allocation PRA/HRA Probabilistic FSAR/DCD Deterministic
  • Task Analysis Analyses Analyses
  • Staffing and Qualifications Task Important Actions and Errors Treatment of
  • Treatment of Important Human Analysis Detailed Task Requirements Important HAs Actions (Human Reliability Analysis) Staffing and Qualification
  • Procedure Development Procedure Training Program
  • Training Program Development HSI Design Development Development
  • Human-System Interface Design Performance Shaping Factors
  • Human Factors Verification and HSIs to Review &

Human Factors Test Scenarios Verification Validation And Validation Test of Assumptions

  • Design Implementation Design Interim Configurations to Avoid Implementation
  • Human Performance Monitoring Human Help prioritize corrective actions Performance Monitoring

HFE Reviews HFE Program HSI Design Criteria Operator Actions (NUREG-0711) (NUREG-0700) (NUREG-1764)

Review HFE program used Review an HSI design to Review proposed significant for designing a new MCR (or verify that good HFE operator actions.

modifying an existing one). practices are utilized

1. Planning & Analysis: OER, Acceptance Criteria are based Usually focuses on actions FRA/FA, TA, TIHA on good human factors design outside the MCR principles
2. Design: HSI Design, Information displays, user-interface Can operator successfully Procedure Development, interaction and management, perform task within time Training Program Development controls, alarm systems, safety available?

function and parameter monitoring system, group-view display, soft control system, CBP,

3. Verification and Validation Communications, Risk-Informed Scaled HFE workstation/workspace design, Program (like NUREG-0711) maintainability of digital systems
4. Implementation: DI, HPM Feasibility/Reliability of specific tasks

Questions