MONTHYEARPNO-III-23-002B, Prairie Island Update to PNO-III-23-002 Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer2023-06-0808 June 2023 PNO-III-23-002B Prairie Island Update to PNO-III-23-002 Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer PNO-III-23-002, Prairie Island Nuclear Power Station Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer2023-06-0101 June 2023 PNO-III-23-002 - Prairie Island Nuclear Power Station Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer PNO-III-15-011, Prairie Island Nuclear Plant: Shutdown of Unit 2 and Notice of Unusual Event2015-12-18018 December 2015 PNO-III-15-011 - Prairie Island Nuclear Plant: Shutdown of Unit 2 and Notice of Unusual Event PNO-III-15-008, Prairie Island Unit 2 Shutdown Due to Trip of Main Power Turbine2015-06-0909 June 2015 PNO-III-15-008: Prairie Island Unit 2 Shutdown Due to Trip of Main Power Turbine PNO-III-15-003, A: Update: Shutdown of Prairie Island Unit 2 Due to Loss of Instrument Air to Containment Building2015-03-26026 March 2015 PNO-III-15-003A: Update: Shutdown of Prairie Island Unit 2 Due to Loss of Instrument Air to Containment Building ML15069A1852015-03-10010 March 2015 PNO-III-15-003 Prairie Island Nuclear Plant: Shutdown of Prairie Island Unit 2 Due to Loss of Instrument Air to Containment Building and Notification of Unusual Event PNO-III-15-001, A: Update: Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage2015-02-17017 February 2015 PNO-III-15-001A: Update: Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage ML15028A0232015-01-27027 January 2015 PNO-III-15-001 - Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage PNO-III-14-012, A Update: Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage2014-12-29029 December 2014 PNO-III-14-012A Update: Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage ML14346A4682014-12-12012 December 2014 PNO-III-14-012 Shutdown of Prairie Island Unit 1 Due to Increasing Trend in Reactor Coolant System Leakage PNO-III-12-014, Notification of Unusual Event at Prairie Island Nuclear Generating Plant2012-11-0101 November 2012 PNO-III-12-014, Notification of Unusual Event at Prairie Island Nuclear Generating Plant ML12234A6382012-08-20020 August 2012 Update to Prairie Island Unit 1 Unplanned Shutdown Due to Both Emergency Diesel Generators Being Declared Inoperable ML12229A3572012-08-16016 August 2012 PNO-lll-12-008 - Prairie Island, Unit 1 Unplanned Shutdown Due to Both Emergency Diesel Generators Being Declared Inoperable PNO-III-11-013, A, Prairie Island Unit 2 Unplanned Shutdown for Greater than 72 Hours (Update)2011-10-20020 October 2011 PNO-III-11-013A, Prairie Island Unit 2 Unplanned Shutdown for Greater than 72 Hours (Update) ML1127804832011-10-0505 October 2011 PNO-III-11-013 - Prairie Island Unit 2 Unplanned Shutdown for Greater than 72 Hours PNO-III-10-002, Prairie Island Units 1 and 2, Fire in a Nonsafety-Related Diesel Generator2010-01-21021 January 2010 PNO-III-10-002, Prairie Island Units 1 and 2, Fire in a Nonsafety-Related Diesel Generator PNO-III-09-003, Prairie Island - Unplanned Unit 1 Shutdown Greater than 72 Hours2009-05-20020 May 2009 PNO-III-09-003: Prairie Island - Unplanned Unit 1 Shutdown Greater than 72 Hours PNO-III-08-007, A - Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours (Update)/ Notification of Unusual Event Due to a Release of a Toxic Gas Deemed Detrimental to Normal Operation of the Plant2008-08-0404 August 2008 PNO-III-08-007A - Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours (Update)/ Notification of Unusual Event Due to a Release of a Toxic Gas Deemed Detrimental to Normal Operation of the Plant ML0821408742008-08-0101 August 2008 PNO-III-08-007, Prairie Island Unit 1, Unplanned Unit 1 Shutdown Greater than 72 Hours/Special Inspection PNO-III-07-016, Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours2007-12-26026 December 2007 PNO-III-07-016: Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours PNO-III-07-005, Prairie Island Non-Credible Bomb Threat2007-03-20020 March 2007 PNO-III-07-005 - Prairie Island Non-Credible Bomb Threat PNO-III-06-003, Prairie Island Technical Specification Required Shutdown of Unit 2 for Greater than 72 Hours2006-02-0606 February 2006 PNO-III-06-003, Prairie Island Technical Specification Required Shutdown of Unit 2 for Greater than 72 Hours PNO-III-05-009, Technical Specification Required Shutdown of Prairie Island Unit 2 for Greater than 72 Hours2005-04-20020 April 2005 PNO-III-05-009, Technical Specification Required Shutdown of Prairie Island Unit 2 for Greater than 72 Hours 2023-06-08
[Table view] |
PRELIMINARY NOTIFICATION February 17, 2015 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-III-15-001A This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated by the Region III staff.
Facility Prairie Island Nuclear Plant Northern States Power Co.
Welch, MN Docket: 50-282 License: DPR-42 Licensee Emergency Classification Notification of Unusual Event Alert Site Area Emergency General Emergency X Not Applicable
SUBJECT:
UPDATE: SHUTDOWN OF PRAIRIE ISLAND UNIT 1 DUE TO INCREASING TREND IN REACTOR COOLANT SYSTEM LEAKAGE Prairie Island Unit 1 was restarted on February 11, 2015. Prairie Island Unit 1 was shut down on January 26, 2015, to repair a leak from one of two reactor coolant pumps. The leak was identified after plant operators observed an increasing trend in the reactor coolant system leakage rate following repairs made to the reactor coolant pump seal in December. The plant shut down prior to the seal leakage reaching the licensee's administrative limit, which was lower than the 1 gallon per minute (gpm) limit specified in the Technical Specifications. The peak leakage measured was 0.596 gpm. The reactor coolant pumps ensure adequate cooling of the reactor when the plant is operating. There was no release to the environment from this event.
After the pump was repaired, plant operators commenced a startup and the reactor was made critical on February 11, 2015. The unit was synchronized to the electrical grid on February 12, 2015, and full power was reached on February 13, 2015. The Resident Inspectors were on site and monitored portions of the startup activities.
This preliminary notification is issued for information only and no further action by the staff is anticipated. State officials have been informed.
The information presented herein has been discussed with the licensee, and is current as of
08:30 am CDT, on February 17, 2015.
ADAMS Accession Number: ML15048A179 CONTACT: Kenneth Riemer 630-829-9628 Kenneth.Riemer@nrc.gov