August 2 3, 201 9 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
)
) TENNESSEE VALLEY AUTHORITY
) Docket No. 52
-047-ESP
) (Clinch River Nuclear Site Early
) Site Permit Application)
) JOINT TRANSCRIPT CORRECTIONS Pursuant to the Commission's "Order (Setting Deadline for Proposed Transcript Corrections
)" of August 19, 2019, t he Tennessee Valley Authority and the staff of the U.S. Nuclear Regulatory Commission hereby provide joint transcript corrections for the August 14, 2019, hearing on the early site permit application for the Clinch River Nuclear Site. Respectfully submitted, /Signed (electronically) by/
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
-14 A44 Washington, DC 20555
-0001 Telephone: (301) 287-9115 Michael.Spencer@nrc.gov
/Executed in accord with 10 CFR 2.304(d)/
Ryan C. Dreke, Esq.
Counsel for Tennessee Valley Authority Office of the General Counsel Tennessee Valley Authority 400 W. Summit Hill Drive, WT 6A-K Knoxville, TN 37902 Telephone: (865) 632
-8960 Fax: 865-632-6147 rcdreke@tva.gov Dated at Rockville, Maryland
, this 23rd day of August 2019 ATTACHMENT Joint Transcript Corrections for the Clinch River ESP Mandatory Hearing Page(s) Line (s) Change 3 9 Insert "WALTER LEE, Director, Nuclear Emergency Preparedness, TVA" under "ALSO PRESENT."
5 4 Delete line (Tamsen Dozier is not TVA staff) 5 5 Delete line (Kenneth Erwin is not TVA staff) 5 7 Change "168" to "153" 5 new After line 7
, add a new line stating "Kenneth Erwin ---- 159" 13 8 Change "Phillip" to "Philip" 14 1 9 Change "Mr. Spencer" to "Mr. Dreke" 19 12 Change "-293 acres-" to "-293,000 acres-"
19 15 Change "-maintains-" to "-maintain-" 21 14 Change "-and analyzing-" to "-and analysis of-"
23 16-17 Change "-site mandatory requirements-"to "-site boundary requirements-"
26 2 Change "-regulator-" to "-regulatory
-" 26 10-11 Change "The application was originally submitted
- was originally submitted had-" to "The application as originally submitted had-" 27 5-6 Change "-application supplements issues had been resolved." to "-application supplements, issues had been resolved."
33 3 Change "-environmental aspects. Was effective-"
to "environmental aspects, and was effective-"
40 19 Change "efforts or" to "efforts of" 42 15 Change "ESP and" to "ESP, and" 43 12 Change "before" to "be for" 44 24 Change "perimeter" to "parameter" 45 4 Change "designed" to "design" 45 11 Change "perimeter" to "parameter"
2 Page(s) Line (s) Change 48 1 3 Change "locality" to "inimicality" 48 19 Change "test" to "tests,"
49 16 Change "construction operation" to "construction and operation" 50 16 Change "federal" to "federally" 51 25 Change "as" to "was" 53 12 Change "1022A" to "102(2)(A)"
53 13 Change "uses systematic" to "uses a systematic" 53 17 Change "1022C" to "102(2)(C)"
53 20 Change "affects" to "effects" 5 4 4 Change "1022C" to 102(2)(C)"
5 4 7 Change "1022E" to "102(2)(E)"
57 20 Change "COL states" to "the COL stage" 59 16 Change "chief level and" to "chief level in" 61 12 Change "prospectus" to "perspective" 62 9 Change "CPL applicant" to "CP applicant" 64 4 Delete "I'm" that precedes the word "TVA
." 64 7 Change "-ESP-" to "-ESPA-"
64 12 Change "-in-" to "-and-"
64 22 Change "-only major features emergency plan, with-" to "only a major features emergency plan with-" 64 23 Change "-the ESP development have-" to "ESPA development has-" 66 16 Change "-dose base-" to "-dose
-based-" 68 2 Change "-planned-" to "-land-"
68 3 Change "It-" to "If-"
3 Page(s) Line (s) Change 68 12 Change "-recognize a formal offsite plants-" to "-recognize that a formal offsite plan-"
69 17-18 Change "-have several magnitudes reduced, likelihood of-" to "-have several magnitudes reduced likelihood of accidents-"
70 15-16 Change "The first refer to as Criteria Alpha. Is that the EPZ-" to "The first, referred to as Criteria Alpha, is that the EPZ-"
70 19 Add the acronym ("PAG") in parentheses after the word "guide" 70 20-21 Change "-referred to as Criteria B, -" to "-referred to as Criteria Bravo, -" 70 25 Change "-main-" to "-mean-"
71 10 Change "-main-to "-mean-"
71 13 Change "-insurance-" to "-assurance-"
72 12-13 Change "-in the Chapter 2 of the site safety analysis report. In that, in a future application-" to "-in Chapter 2 of the Site Safety Analysis Report in that, in a future application-"
75 2 Remove comma before and after "plume exposure pathway" 7 5 3 Change "exemption request" to "exemption requests" 7 5 1 1 Change "site. Where" to "site, where" 7 5 1 3 Change "core. And" to "core, and
" 7 6 2 Change "information. The four SMR designs are indicated" to "information from the four SMR designs indicated" 77 8 Change "combined license construction permit" to "combined license or construction permit" 77 9 Change "EPS" to "ESP" 77 13 Change "excavation and safety" to "excavation of safety" 77 22 Change "content" to "context" 78 4 Change "security to" to "security or to" 78 6 Change "cited" to "sited"
4 Page(s) Line (s) Change 78 8 Change "following" to "falling" and change "site." to "site,"
78 9 Change "following" to "falling" 78 10 Change "site. And" to "site, and" 78 14 Change "planning, the plume exposure path rate, EPZ size and" to "planning plume exposure pathway EPZ sizing" 78 15 Change "associate" to "associated" 78 21 Change "planning. In" to "planning in" 78 22 Change "explosion path for" to "exposure pathway" 78 24 Change "TVA is" to "TVA's" 79 5 Change "were used in" to "will use the" 79 6 Change "explosion" to "exposure" 79 10 Change "explosion" to "exposure" 80 9 Delete "and" 80 10 Change "plans. Both of which consists of limit aspects" to "plans, both of which consist of limited aspects" 80 19 Change "or ETE." to "or ETE,"
80 20 Change "Which" to "which" 80 24 Change "plans. The" to "plans, the" 81 1 Change "applicants" to "applicant's" 81 7 Change "features and emergency" to "features emergency" 81 16 Change "EPA" to "EP" 81 18 Change "major feature" to "major features" 81 21 Change "EPA" to "EP" 8 3 13 Change "methodologies" to "methodology's" 8 4 3 Change "SECY 110152" to "SECY 0152" 5 Page(s) Line (s) Change 8 4 4-5 Change "SECY 150077" to "SECY 0077" 8 4 8 Change "to the adapt of an approach" to "to adapt an approach" 8 4 12 Change "use" to "used" 84 16 Change "pathway, EPZ," to "pathway EPZ" 8 4 1 8 Change "environment" to "environmental" 84 24 Change "pathway, EPZ," to "pathway EPZ" 85 3 Change "pathway, EPZ," to "pathway EPZ" 8 5 5 Change "and early" to "in early" 8 6 1 Change "exclusionary" to "exclusion area" 8 6 8 Change "intake" to "intact" 8 6 25 Change "into" to "and to" 8 7 1 4 Change "verified" to "verify" 87 24 Change "NUREG
-0396. Which" to "NUREG
-0396, which" 88 13 Change "pathway, EPZ," to "pathway EPZ" 88 15 Change "site. In" to "site, in" 88 16-17 Change "public. That" to "public, that" 8 9 4 Change "permit, applicants" to "permit applicant's" 89 5 Change "planning and exemptions" to "planning exemptions" 89 7 Delete "to" 89 24 Change "ESP. Unless" to "ESP, unless" 90 15 Change "the request exemptions" to "the requested exemptions" 90 22 Change "protection that" to "protection, that" 91 18 Change "protection that is dose savings" to "protection, that is dose savings," 91 25 Change "present in all" to "present and all"
6 Page(s) Line (s) Change 92 13 Change "Staffs" to "Staff's" 92 16 Change "52.18. And" to "52.18, and" 93 2 Change "major features of emergency" to "major features emergency" 93 7 Change "approach ed" to "approach" 93 14 Change" plan" to "plans" 93 20 Change "plans. Including" to "plans, including" 94 13 Change "28th
" to "2018" 9 8 7 Change "EPS" to "ESP" 98 13 Change "encourage" to "encouraged" 98 15 Change "a conference" to "the conference
" 98 25 Change "EPS" to "ESP" 99 2 Change "pathway for EPZ" to "pathway EPZ" 99 3 Change "request" to "requested" 99 6 Change "license of" to "license or" 99 8 Change "the implementation" to "that implementation" and change "pathway for" to "pathway" 99 10 Change "technology supports" to "technology, supports" 99 11 Change "EPZ. And" to "EPZ and" 99 15 Change "combined license of" to "combined license or" 99 19 Change "combined license of" to "combined license or" 99 24 Change "path for" to "pathway" 100 2 Change "pathway for" to "pathway" 100 10 Change "request" to "requests" 104 14 Change "from based" to "is based" 108 13 Change "about 80 feet about" to "about 80 feet above"
7 Page(s) Line (s) Change 10 9 20 Change "SEC" to "SE" 10 9 23 Change "permanent" to "permit" 110 22 Change "management and management" to "management
-and management
-" 110 23 Change "conditions and permit conditions" to "conditions
-permit conditions
-" 110 24 Change "Some of the management" to "Some of them, management" 111 13 Change "de novo" to "the novel" 111 22 Change "meet their" to "meet the" 114 9 Change "-past precedence-" to "-past precedents-"
115 17 Change "There is-" to "There are-"
117 13 Change "ask you a" to "answer your" 119 25 Change "EPS" to "ESP" 120 1 Change "Not two
-miles from outside boundary, nothing" to "Not two
-miles or site boundary, nothing" 120 15-16 Change "dose distance" to "dose at distance" 123 25 Change "then" to "than" 12 8 21 Change "EPA" to "EPZ" 128 22 Change "Staff sees a little difference" to "Staff sees little difference" 130 23-34 Change "boundary EPZ. The situation" to "boundary EPZ, in that situation" 131 10 Change "context" to "contexts" 132 21 Change "MR. SCOTT:" to "COMMISSIONER BARAN:"
133 17-18 Change "here. They" to "here, they" and change "uniqueness" to "uniqueness in" 133 23 Change "to NUREG
-0396" to "in NUREG
-0396" 13 5 2 Change "MS. HART:" to "
M S. MILLIGAN:"
8 Page(s) Line (s) Change 13 9 1 Change "an RAI" to "in an RAI" 141 20 Change "use" to "used" 141 21 Change "a parameters" to "parameters" 146 9-10 Change "Today Ruth Horton and I, TVA Program Manager for Environmental Support and I-" to "Today Ruth Horton, TVA Program Manager for Environmental Support, and I-"
146 23 Change "-Tennessee River Water Shed-" to "-Tennessee River Watershed-"
147 2 Change "-construction and operation of an SMR. And is based on-" to "construction and operation of an SMR, and is based on-"
147 11 Change "NRC's final environment impact statement-" to "NRC's Final Environmental Impact Statement-"
147 15-16 Change "-we have performed-" to "-we would perform-"
150 14-15 Change "-with state
-- with the state-" to "-with the state-"
152 3-5 Change "...which included site visits, public meetings, a readiness review, an environmental audit, were critical to the-" to "...which included site visits, public meetings, a readiness review, and an environmental audit, were critical to the-"
155 8 Change "staff and their" to "staff in their" 156 13 Change "acres. And" to "acres and" 156 20-21 Change "redressed. And" to "redressed and" 158 5 Change "analysis" to "analyses" 158 12 Change "sites. And" to "sites and" 161 4 Change "which as" to "such as" 161 1 3 Change "sites. And" to "sites and" 162 5 Change "SRP" to "E
-SRP" 163 15 Change "postulated acts and impacts" to "postulated accident impacts" 164 7 Change "including" to "including:
"
9 Page(s) Line (s) Change 166 14 Change "wouldn't be subject to" to "would be subject to" 168 7-8 Change "comparable. And" to "comparable and" 169 10 Change "areas. And" to "areas and" 170 16-17 Change "-and this programmatic agreement arrangement-" to "-and with this programmatic agreement-"
174 10 Change "Phillip" to "Philip" 17 6 24-25 Change "and g-water, and the excavation" to "and dewatering the excavation" 17 7 11 Change: "they can do monitoring" to "they committed to do monitoring" 178 25 Change "-addressed properly-" to "-addressed promptly-"
183 1 6 Change "talk about" to "talked about" 18 6 13 Change "framework" to "frameworks" 186 19 Change "framework" to "frameworks"
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of
)
) TENNESSEE VALLEY AUTHORITY
) Docket No. 52
-047-ESP
) (Clinch River Nuclear Site Early
) Site Permit Application)
) CERTIFICATE OF SERVICE I hereby certify that the "Joint Transcript Corrections
" have been filed through the E
-Filing system this 23rd day of August 201 9. /Signed (electronically) by/
Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
-14 A44 Washington, DC 20555
-0001 (301) 287-9115 Michael.Spencer@nrc.gov