August 7, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 52-047-ESP

)

(Clinch River Nuclear Site Early )

Site Permit Application) )

NRC STAFF EXHIBIT LIST AND WITNESS CERTIFICATION The staff of the U.S. Nuclear Regulatory Commission hereby provides its exhibit list and witness certification for the mandatory hearing on the early site permit application for the Clinch River Nuclear Site. The exhibit list is included as Attachment 1 and the witness certification is included as Attachment 2.

Respectfully submitted,

/Signed (electronically) by/

Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 (301) 287-9115 Michael.Spencer@nrc.gov Dated at Rockville, Maryland, this 7th day of August 2019

ATTACHMENT 1 NRC STAFF EXHIBIT LIST FOR CLINCH RIVER ESP MANDATORY HEARING Exhibit Number Panel Number/ Document Description/Title ADAMS Accession Sponsoring Number (If Applicable)

Witness(es)

NRC-001 Anna Bradford SECY-19-0064, Staff's Statement in Support of the Uncontested ML19107A241 Hearing for Issuance of an Early Site Permit for Clinch River Nuclear Site (June 21, 2019).

NRC-002 Anna Bradford Draft Early Site Permit for the Clinch River Nuclear Site (June ML19107A159 21, 2019) (public version).

NRC-003 Anna Bradford NON-PUBLIC - Draft Early Site Permit for the Clinch River ML19158A369 Nuclear Site (Aug. 1, 2019) (non-public version)

NRC-004 Anna Bradford Draft Summary Record of Decision, Early Site Permit for the ML19070A028 Clinch River Nuclear Site (June 21, 2019).

NRC-005 Anna Bradford NRC Staff Responses to Commission Prehearing Questions ML19207A235 (June 26, 2019).

NRC-006 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A485 Cover Letter (Jan. 18, 2019). 1 NRC-007 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 1 - ML18003A298 Part 1, Administrative Information (Dec. 15, 2017).

NRC-008 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A358 Part 2, Site Safety Analysis Report (Jan. 18, 2019).

1 As the applicant discussed in its cover letter, [t]he portions of the application that include changes from Revision 1 are identified as Revision 2. The portions of the application that did not change from Revision 1 will remain Revision 1 and are not included in this submittal.

Thus, for some portions of the application, the latest revision is Revision 1.

Exhibit Number Panel Number/ Document Description/Title ADAMS Accession Sponsoring Number (If Applicable)

Witness(es)

NRC-009A Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A478 Part 3, Environmental Report (Jan. 18, 2019) (beginning to page 3.9-3).

NRC-009B Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A478 Part 3, Environmental Report (Jan. 18, 2019) (page 3.9-4 to end).

NRC-010 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 1 - ML18003A485 Part 5, Emergency Planning (Dec. 15, 2017).

NRC-011 Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A479 Part 6, Departures and Exemption Requests (Jan. 18, 2019).

NRC-012 Anna Bradford NON-PUBLIC - Clinch River Nuclear Site Early Site Permit ML19029A855 Application, Rev. 2 - Part 7, Withheld Information (Jan. 18, 2019).

NRC-013A Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A568 Part 8, Enclosures (Jan. 18, 2019) (beginning to end of Appendix B.3 - Rock Pressuremeter Report).

NRC-013B Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A568 Part 8, Enclosures (Jan. 18, 2019) (beginning of Appendix C -

Downhole Geophysical Test Logging Report to page C1153 of the report).

NRC-013C Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A568 Part 8, Enclosures (Jan. 18, 2019) (from page C1154 of the Appendix C - Downhole Geophysical Test Logging Report to the end of the report).

NRC-013D Anna Bradford Clinch River Nuclear Site Early Site Permit Application, Rev. 2 - ML19030A568 Part 8, Enclosures (Jan. 18, 2019) (from Appendix D - Surface Geophysical Test Data to the end of Enclosure 8).

2

Exhibit Number Panel Number/ Document Description/Title ADAMS Accession Sponsoring Number (If Applicable)

Witness(es)

NRC-014A Anna Bradford Final Safety Evaluation Report for the Early Site Permit ML19162A157 Application for the Clinch River Nuclear Site (June 2019) (public version).

NRC-014B Anna Bradford NON-PUBLIC - Final Safety Evaluation Report for the Early ML19162A166 Site Permit Application for the Clinch River Nuclear Site (June 2019) (non-public version).

NRC-015A Anna Bradford NUREG-2226, Environmental Impact Statement for an Early ML19073A099 Site Permit (ESP) at the Clinch River Nuclear Site; Final Report, Volume 1, Chapters 1 to 12 (Apr. 2019).

NRC-015B Anna Bradford NUREG-2226, Environmental Impact Statement for an Early ML19073A109 Site Permit (ESP) at the Clinch River Nuclear Site; Final Report, Volume 2, Appendices (Apr. 2019).

NRC-016 Anna Bradford Staff Presentation Slides - Overview (Aug. 2019).

NRC-017 Anna Bradford Staff Presentation Slides - Safety Panel (Aug. 2019).

NRC-018 Anna Bradford Staff Presentation Slides - Environmental Panel (Aug. 2019).

3

ATTACHMENT 2 Witness Certification of Anna Bradford

August 7, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 52-047-ESP

)

(Clinch River Nuclear Site Early )

Site Permit Application) )

CERTIFICATION OF ANNA BRADFORD SPONSORING TESTIMONY IN EXHIBITS NRC-001, NRC-005, NRC-016, NRC-017, NRC-018 INTO THE HEARING RECORD I, Anna Bradford, do declare under penalty of perjury that the statements in SECY 0064, Staff Statement in Support of the Uncontested Hearing for Issuance of an Early Site Permit for Clinch River Nuclear Site (June 21, 2019) (Exhibit NRC-001), NRC Staff Responses to Commission Prehearing Questions (July 26, 2019) (Exhibit NRC-005), Staff Presentation Slides - Overview (August 2019) (Exhibit NRC-016), Staff Presentation Slides - Safety Panel (August 2019) (Exhibit NRC-017), and Staff Presentation Slides - Environmental Panel (August 2019) (Exhibit NRC-018) were prepared under my direction; are true and correct to the best of my information, knowledge, and belief; and are adopted by me as my sworn testimony in this proceeding.

Executed in Accord with 10 CFR 2.304(d)

Anna Bradford Deputy Director Division of Licensing, Siting, and Environmental Analysis Office of New Reactors U.S. Nuclear Regulatory Commission Mail Stop O-7 H4 Washington, DC 20555-001 (301) 415-1560 Anna.Bradford@nrc.gov Executed at Rockville, Maryland this 7th day of August 2019

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

TENNESSEE VALLEY AUTHORITY ) Docket No. 52-047-ESP

)

(Clinch River Nuclear Site Early )

Site Permit Application) )

CERTIFICATE OF SERVICE I hereby certify that the NRC Staff Exhibit List and Witness Certification and Exhibits NRC-001, NRC-002, NRC-004 to NRC-011, NRC-013A to NRC-013D, NRC-014A, and NRC-015A to NRC-018 have been filed as a public submission through the E-Filing system this 7th day of August 2019.

I hereby certify that the Exhibits NRC-003, NRC-012, and NRC-014B have been served on the following persons and entities as a non-public submission through the E-Filing system this 7th day of August 2019.

Christopher C Chandler, Esq. Office of Commission Appellate Ryan C. Dreke, Esq. Adjudication Counsel for the Applicant Mail Stop O-16 B33 Office of the General Counsel U.S. Nuclear Regulatory Commission Tennessee Valley Authority Washington, DC 20555-0001 400 W. Summit Hill Drive E-mail:OCAAmail@nrc.gov Knoxville, TN 37902 E-mail: ccchandler0@tva.gov E-mail: rcdreke@tva.gov Office of the Secretary Mail Stop: O-16 B33 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov

/Signed (electronically) by/

Michael A. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 (301) 287-9115 Michael.Spencer@nrc.gov