ML16036A361

From kanterella
Revision as of 08:52, 18 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NYS000588 - NRC Inspection Report, Indian Point Unit 3, 05000286/2015011 (November 19, 2015) (ML15323A026)
ML16036A361
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/05/2016
From:
State of NY, Office of the Attorney General
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML16036A352 List:
References
RAS 50894, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML16036A361 (20)


Text

NRC Staff Letter Indian Point Nuclear Generating Unit 3 License Renewal Inspection Report 05000286/2015011 November 19 , 2015 (posted to ADAMS on November 30, 2015) (ML15323A026) (disclosed by NYS on December 31, 2015)

Full-text copyrighted ATTACHMENT 8 to State of New York Kwong Declaration dated February 5, 2016

L. Coyl UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

ML15323A026 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME MModes GDental MGray DATE 11/18/2015 11/09/2015 11/19/2015 Distribution w/encl: (via e-mail) DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS GDentel, DRP MDraxton, DRP (actg to 12/12/15) JSchussler, DRP BPinson, DRP BHaagensen, DRP, SRI GNewman, DRP, RI SRich, DRP, RI MModes, DRS MGray, DRS MWentzel, NRR DHochmuth, DRP, AA JJessie, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources i Enclosure U.S. NUCLEAR REGULATORY COMMISSION ii 1.0 1.1 2 a. b. 1.2 a.

3 b. 1.3 a. b.

4 1.4 a. b. 1.5 5 a. The inspector reviewed 59 underground piping examinations implemented for Unit 3 and noted that corrective actions for coating degradation were implemented in 23 cases (39%). The inspector selected a number of the corrective actions and an ultrasonic test report for review. The inspector noted the ultrasonic thickness test (Report IP3-UT-15-line 408 over the discharge canal resulted in thickness readings below nominal of -IP3-2015-04410 recommended the coating be repaired to prevent further corrosion. Condition Reports CR-IP3-2014-02382, -02878, and -03244 were also reviewed. b. 1.6 a.

6 7 b. a.

8 a. a. a.

9 A-1 Attachment A-2 A-3 A-4 ressurized Thermal Shock Pressurized Thermal Shock Reference Temperature