ML16068A135 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 02/27/2016 |
From: | NextEra Energy Seabrook |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML160368A128 | List: |
References | |
SBK-L-15120 | |
Download: ML16068A135 (120) | |
Similar Documents at Seabrook | |
---|---|
Category:Report
MONTHYEARL-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024
[Table view]Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program ML21062A1462021-04-21021 April 2021 Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015) L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML19002A1602019-03-12012 March 2019 Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19 ML19101A4552018-11-14014 November 2018 Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA Meeting ML18012A5682018-01-12012 January 2018 Technical Evaluation Report: Storm Surge_Seabrook_January2018 SBK-L-17172, Seventh Annual Update to the License Renewal Application2017-10-18018 October 2017 Seventh Annual Update to the License Renewal Application SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information2017-08-28028 August 2017 Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information ML17191A4122017-07-10010 July 2017 NextEra Service Position Paper: Seabrook Service Water TS 3.7.4 SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information2017-06-28028 June 2017 Flooding Focused Evaluation for Impact of New Flooding Hazard Information L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 ML16279A0502016-07-31031 July 2016 Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary) ML16279A0492016-07-31031 July 2016 Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985) ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events2016-07-26026 July 2016 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events ML16147A1962016-04-29029 April 2016 10 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements Manual ML16117A3122016-04-26026 April 2016 SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root Cause ML16068A1352016-02-27027 February 2016 Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and Basis ML16068A1392016-02-27027 February 2016 Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action Levels ML16068A1312016-02-27027 February 2016 Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis ML16068A1372016-02-27027 February 2016 Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1 SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report2015-11-0707 November 2015 Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report ML15274A2142015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33 SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End2015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End ML15274A2122015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1 ML15208A0492015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights SBK-L-14229, Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... ML14216A4062014-07-24024 July 2014 Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary) ML14216A4052014-07-24024 July 2014 Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation SBK-L-14090, ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report.2014-05-31031 May 2014 ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report. ML14030A5522014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14049A1972014-02-14014 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836 ML13295A2522013-12-17017 December 2013 Review of the 2012 Steam Generator Tube Inspections ML13267A3882013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13260A1612013-07-31031 July 2013 ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report ML13189A1972013-07-0202 July 2013 Third Annual Update to License Renewal Application ML13099A0192013-03-19019 March 2013 Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses. ML12340A4872012-11-21021 November 2012 Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 SBK-L-12101, NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring2012-05-16016 May 2012 NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring ML12179A2822012-03-15015 March 2012 ASR at Seabrook Station, Shear and Lap Splice Testing ML12038A0382012-01-30030 January 2012 Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2 SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation2011-10-31031 October 2011 WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation 2024-05-30 Category:Technical MONTHYEARL-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024
[Table view]Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML18012A5682018-01-12012 January 2018 Technical Evaluation Report: Storm Surge_Seabrook_January2018 SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information2017-08-28028 August 2017 Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 ML16279A0492016-07-31031 July 2016 Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985) ML16279A0502016-07-31031 July 2016 Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary) SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 ML16068A1312016-02-27027 February 2016 Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis ML16068A1392016-02-27027 February 2016 Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action Levels ML16068A1372016-02-27027 February 2016 Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1 ML16068A1352016-02-27027 February 2016 Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and Basis ML14216A4052014-07-24024 July 2014 Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation ML14216A4062014-07-24024 July 2014 Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary) ML14030A5522014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14049A1972014-02-14014 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836 ML13260A1612013-07-31031 July 2013 ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report ML13099A0192013-03-19019 March 2013 Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses. ML12340A4872012-11-21021 November 2012 Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 ML12038A0382012-01-30030 January 2012 Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2 SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation2011-10-31031 October 2011 WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation ML1109702602011-03-28028 March 2011 Nwt 817, Chemistry Control in the Seabrook Thermal Barrier Loop, Final ML1033701672010-11-23023 November 2010 Attachment 3 to SBK-L-10185 -Seabrook Station Response to Request for Additional Information, NextEra Energy Seabrook License Renewal Environmental Report ML0915305402009-04-30030 April 2009 Attachment 5, WCAP-17071-NP, H: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Non-Proprietary ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0709201422007-01-31031 January 2007 LTR-SCS-07-14-NP, Revision 0, Engineering Report, Seabrook, Turbine Trip Without Reactor Trip Transient from the P-9 Setpoint Analysis. SBK-L-05185, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Seabrook Generating Station.2005-08-31031 August 2005 Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Seabrook Generating Station. ML0512201092005-04-22022 April 2005 Slides & Handouts from Meeting with FPL Energy Seabrook, LLC, Regarding Implementation of Technical Specification 3/4.8.1.1 ML0305604472003-02-14014 February 2003 Submittal of Investigation Report on Blind Performance Test Samples ML0303604312003-01-23023 January 2003 Submittal of Investigation Report on Blind Performance Test Samples ML0234702232002-12-0202 December 2002 Response to Request for Corrected Information - Steam Generator Tube ML0232405122002-11-0808 November 2002 Part 2 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube Cracking ML0232404932002-11-0505 November 2002 Part 1 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube Cracking ML0207702312002-03-12012 March 2002 Decommissioning Update March 2002 ML20248L4091998-05-31031 May 1998 Analysis of Seabrook Stations Unit 1,Reactor Vessel Surveillance Capsules U & Y ML20099J2031992-07-16016 July 1992 Analysis of Seabrook Station Unit 1 Reactor Vessel Surveillance Capsule U 2024-05-30 |