Fourteenth Refueling Outage Owner'S Activity Report
ML061840146
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/21/2006
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6078
Download: ML061840146 (5)


Text

Brltt T. McKinney Sr. Vice President

& Chief Nuclear Officer JUN 2 1 2006 PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com I ii I It I I. -, P U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 1 FOURTEENTH REFUELING OUTAGE OWNER'S ACTIVITY REPORT PLA-6078 Docket No. 50-387 The attached report is for the Susquehanna Unit 1 Fourteenth Refueling Outage, which is the only Unit 1 refueling outage scheduled for the 1 st Inspection Period of the 3rd Inspection Interval for Unit 1.The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-1.By copy of this letter, we are transmitting the Owner's Activity Report to the Commonwealth of Pennsylvania.

If you have any questions, please contact Mr. Rocco R. Sgarro, Manager -Nuclear Regulatory Affairs at (610) 774-7552.Sincerely, B. T. McKinney

Attachment:

Unit 1 Fourteenth Refueling Outage Owner's Activity Report (4 Pages)copy: NRC Region I Mr. A. J. Blamey, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP Commonwealth of Pennsylvania Jý,Otf Page 1 -6/12/2006 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number Owner OAR-1-101 PPL Susquehanna.

LLC. 769 Salem Blvd.. Berwick. PA 18003 (Name and Address of Owner)Susquehanna Steam Electric Station. 769 Salem Blvd.. BerAick. PA 18603 (Name and Address of Plant)Plant Unit No. 1 (if applicable)

Current inspection Interval Commercial service date June 8,1983 Refueling outage no. 14 3rd Current inspection period (1st, 2nd. 3rd, 4th, other)1st (1st. 2nd. 3rd)Edition and Addenda of Section Xl applicable to the Inspection plan, 1998 Edition through the 2000 Addenda Date and revision of Inspection plan September 16, 2005, Revision I Edition and Addenda of Section Xl applicable to replairs and replacements, if different than the inspection plan.NWA CERTIFICATE OF CONFORMANCE I certify that the statments made In this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.Certificate of Authorization No.N/A Cif applicable)

Signed C-D-ALA,.Lj:V Manager -Nuclear Engineering Expiration Date R'A Date /oW-n4 or owner's Desilnee.

Title N/A 5I CERTIFICATE OF INSERVICE INSPECTION I. the Undersigned.

holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of PENNSYLVANIA and employed by OneCIS Insurance Co. of HOUSTON. TX have inspected the items described in this Owner's Report during the period April 24, 2004 to April 12.2006 and state that lo the best of my knov, edge and belief, the Owner has performed ani activities represented by this report in accordance with the requirements of Sectio XI.By Signing this certificate neither the Inspector nor his Employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs.replacements, evaluations and corrective measures describes in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner Injury or property damage or a loss of any kind arising from the connected with this inspection.

/),,1/2,, /-Y3/4.Licommissions MdA 5;5?C41S A &1 A N45/',,- ? -3 / I Inspector's Signature I-National Board, State. Province, and Endorsement Date PPL Susquehanna Unit 1 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Interval:

3 Period: 1 6112/2006 T T I I Examination Category Total Examinations Required for The Third Interal Total Examinations Credited for The First Pertod Total Examnations Credited (%) for The First Period Total Examinations Credited (%) To Data for The Third Interval Remarns B-A 0-D B-G-1 B-G-2 B-K B-L-2 B-M.4-2 B-N-1 B-N-2 B-0 C-A C-B C-C C-G D-A F-A E-A L-A n-A Augmented 2 Augmented 9 B-P C-H D-B 40 60 401 57 12 1 7 33 66 B 2 4 70 33 70 198 1734 84 84 31 1708 5 24 15 9 20 79 8 4 0 7 11 33 0 0 0 10 8 24 41 572 28 21 5 325 0 8 0 100.00%100.00%100.00%100.00%100.00%0%100.00%100,00%100.00r%0%0%0%100.00%100.00%100.00%100,00%100.00%100.00%100.00%45.45%100.00%100.00%100.00%0.00%22.50%33.33%19.70%14.04%33.33%0%100%33.33%.33%0%0%0!1 20.25%24.24%34.291e'-20.20144 33.00%33.33%25.00%18.13%19.03%20.00%33,33%0.00%Note I Note2 Note 3 Note 4 Containment surface exams aie performed each Inspection period Containment concrete exams are performed each Inspection poriod 08sCC BWRVIP In-vessel inspections Class 1 Pressure tests Class 2 Pressure tests Class 3 Pressure tests I ______________ .L .1. J Notes: Note 1 -Total Examinations Required represents all 8-G-1 bolting: Includes bolting which requires inspection only vwhen disassombied Note 2 -Total Examinations Required represents all 8-G-2 bolting; Includes bolting which requires inspection only when disassembled Note 3 -Examination only required if pump is disassembled Note 4 -Examination only required If valve Is disassembled Pagel -1 L, PPL Susquehanna 6/12/2006 TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found Examination Item Number Item Description Flaw Characterization (IWA.3300)

During Schedulod Section XI Category Examination or Test (Yes or No)0 0 0 0 No Pagel -1 PPL Susquehanna TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOP CONTINUED SI=RVICE 6/12/2006 Repair, Code Replacment, Flaw or Relevant Condiltion Found Date Repair / Replacement Plan Coass or Corractimve Item Description Description of Work During Scheduled Soction XI Compete R Number Measure Examination or Test (Yes or No)I R'epacement 4 NPS Pipe Support I MIssing Dolt Replaced Clamp Bolting NO 411r200t3

'0-162.766230.059 3 Replacement 12 NPS. HRC106-1 ESW Pipe Leak Replaced Pipe Section No 6113/2005 05-154.67694A-001 Form R-1 Report of Repair: 06-027.643327-001 Rc 05-147.697768-001 Rc 05-147-726992-001 Rc 05-147-726994-002 no}utine Repair of Aux Boiler OS101B Mutlne Repair of Feedwator Heater 1 E1023 utine Repair of Feedwaler Heater 1Ei02A utine Repair of Feedwater Heater 1 EI02C Form R-2 Report of Alteration:

06.147-764064-002 Reanalyze Wall Thickness, Feedwalet Heater IEI04B 06-147-764066-003 Reanalyze Wall Thickness, Feedwaler Heater tE105B Pagel -1