PLA-6078, Fourteenth Refueling Outage Owner'S Activity Report

From kanterella
(Redirected from PLA-6078)
Jump to navigation Jump to search
Fourteenth Refueling Outage Owner'S Activity Report
ML061840146
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/21/2006
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6078
Download: ML061840146 (5)


Text

I ii I Brltt T. McKinney PPL Susquehanna, LLC It II. -,

Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 JUN 2 1 2006 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com P

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 1 FOURTEENTH REFUELING OUTAGE OWNER'S ACTIVITY REPORT PLA-6078 Docket No. 50-387 The attached report is for the Susquehanna Unit 1 Fourteenth Refueling Outage, which is the only Unit 1 refueling outage scheduled for the 1st Inspection Period of the 3rd Inspection Interval for Unit 1.

The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-1.

By copy of this letter, we are transmitting the Owner's Activity Report to the Commonwealth of Pennsylvania.

If you have any questions, please contact Mr. Rocco R. Sgarro, Manager - Nuclear Regulatory Affairs at (610) 774-7552.

Sincerely, B. T. McKinney

Attachment:

Unit 1 Fourteenth Refueling Outage Owner's Activity Report (4 Pages) copy: NRC Region I Mr. A. J. Blamey, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP Commonwealth of Pennsylvania Jý,Otf

Page 1 - 6/12/2006 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-1-101 Owner PPL Susquehanna. LLC. 769 Salem Blvd.. Berwick. PA 18003 (Name and Address of Owner)

Plant Susquehanna Steam Electric Station. 769 Salem Blvd.. BerAick. PA 18603 (Name and Address of Plant)

Unit No. 1 Commercial service date June 8,1983 Refueling outage no. 14 (if applicable)

Current inspection Interval 3rd (1st, 2nd. 3rd, 4th, other)

Current inspection period 1st (1st. 2nd. 3rd)

Edition and Addenda of Section Xl applicable to the Inspection plan, 1998 Edition through the 2000 Addenda Date and revision of Inspection plan September 16, 2005, Revision I Edition and Addenda of Section Xl applicable to replairs and replacements, if different than the inspection plan. NWA CERTIFICATE OF CONFORMANCE I certify that the statments made In this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. N/A Expiration Date R'A Cifapplicable)

Signed C-D-ALA,.Lj:V Manager - Nuclear Engineering Date /

ap*icable) oW-n4 or owner's Desilnee. Title 5IN/A CERTIFICATE OF INSERVICE INSPECTION I. the Undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of PENNSYLVANIA and employed by OneCIS Insurance Co. of HOUSTON. TX have inspected the items described in this Owner's Report during the period April 24, 2004 to April 12.2006 and state that lo the best of my knov, edge and belief, the Owner has performed ani activities represented by this report in accordance with the requirements of Sectio XI.

By Signing this certificate neither the Inspector nor his Employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs.

replacements, evaluations and corrective measures describes in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner Injury or property damage or a loss of any kind arising from the connected with this inspection.

/),,1/2,,* /-Y3/4.Licommissions MdA 5;5?C41S A &1 A N45 /',,- ? -3 / I Inspector's Signature National Board, State. Province, and Endorsement Date I-

PPL Susquehanna Unit 1 6112/2006 TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Interval: 3 Period: 1 T T I I Total Examinations Total Examinations Total Examnations Total Examinations Examination Required for The Third Credited for The First Credited (%) for The Credited (%) To Data Remarns Category Interal Pertod First Period for The Third Interval B-A 40 9 100.00% 22.50%

0-D 60 20 100.00% 33.33%

B-G-1 401 79 100.00% 19.70% Note I B-G-2 57 8 100.00% 14.04% Note2 B-K 12 4 100.00% 33.33%

B-L-2 1 0 0% 0% Note 3 B-M.4-2 7 7 100.00% 100% Note 4 B-N-1 33 11 100,00% 33.33%

B-N-2 66 33 100.00r% .33%

B-0 B 0 0% 0%

C-A 2 0 0% 0%

C-B 4 0 0% 0!1 C-C 70 10 100.00% 20.25%

C-G 33 8 100.00% 24.24%

D-A 70 24 100.00% 34.291e'-

F-A 198 41 100,00% 20.20144 E-A 1734 572 100.00% 33.00% Containment surface exams aie performed each Inspection period L-A 84 28 100.00% 33.33% Containment concrete exams are performed each Inspection poriod n-A 84 21 100.00% 25.00%

Augmented 2 31 5 45.45% 18.13% 08sCC Augmented 9 1708 325 100.00% 19.03% BWRVIP In-vessel inspections B-P 5 0 100.00% 20.00% Class 1 Pressure tests C-H 24 8 100.00% Class 2 Pressure tests 33,33%

D-B 15 0 0.00% Class 3 Pressure tests I ______________ .L .1. J 0.00%

Notes:

Note 1 - Total Examinations Required represents all 8-G-1 bolting: Includes bolting which requires inspection only vwhen disassombied Note 2 - Total Examinations Required represents all 8-G-2 bolting; Includes bolting which requires inspection only when disassembled Note 3 - Examination only required if pump is disassembled Note 4 - Examination only required If valve Is disassembled Pagel - 1

L, PPL Susquehanna 6/12/2006 TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Flaw or Relevant Condition Found Item Number Item Description Flaw Characterization (IWA.3300) During Schedulod Section XI Category Examination or Test (Yes or No) 0 0 0 0 No Pagel -1

PPL Susquehanna 6/12/2006 TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOP CONTINUED SI=RVICE Code Repair, Replacment, Flaw or Relevant Condiltion Found Date Repair / Replacement Plan Coass or Corractimve Item Description Description of Work During Scheduled Soction XI Compete R Number Measure Examination or Test (Yes or No)

I R'epacement 4 NPS Pipe Support I MIssing Dolt Replaced Clamp Bolting NO 411r200t3 '0-162.766230.059 3 Replacement 12 NPS. HRC106-1 ESW Pipe Leak Replaced Pipe Section No 6113/2005 05-154.67694A-001 Form R-1 Report of Repair:

06-027.643327-001 Rc }utine Repair of Aux Boiler OS101B 05-147.697768-001 Rc Mutlne Repair of Feedwator Heater 1E1023 05-147-726992-001 Rc utine Repair of Feedwaler Heater 1Ei02A 05-147-726994-002 no utine Repair of Feedwater Heater 1EI02C Form R-2 Report of Alteration:

06.147-764064-002 Reanalyze Wall Thickness, Feedwalet Heater IEI04B 06-147-764066-003 Reanalyze Wall Thickness, Feedwaler Heater tE105B Pagel - 1