ML062790367

From kanterella
Revision as of 11:49, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Exhibit 2 to Case No. 3-2002-004, Investigation Status Report
ML062790367
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/25/2002
From:
NRC/OI/RGN-III/FO
To:
References
3-2002-004, 3-2002-020, FOIA/PA-2006-0113, RIII-2001-A-0176, RIII-2002-A-0114
Download: ML062790367 (1)


Text

INVESTIGATION STATUS RECORD Facility: Case Number.KEWAUNEE 3-2002-004 Case Agent: Date Opened: ECD: Priority: FAHEY, MARY K (MKF)03/25/2002 10/2002 Normal Docket Number(s):

05000305 Case Type: Reactor Power Status: Field Work In Progress Primary Alleg Source: Ucensee / Ucensee Employee Concern Program Allegation Number(s):

RIII-2001-A-0176 Subject/Allegation:

DELIBERATE FAILURE BY CONTRACTORS TO FOLLOW FFD REGULATIONS Monthly Status Report: 0810512002." At an ARB conducted on August 5, 2002, new allegations (AMS RIII-2002-A-01

14) were.discussed related to this matter. It was determined that Co_, N e3 would be added to this Investigation.

Concern Number 3 is an allegation bwelder, tha Mechanical and Civil Superintendent, for DZNPS a andu ring the outage in 00.1 e to the licensee's investigator about being told about the FFD issue concerning This would be a violation of 10 CFR 26.24(a)(3), which requires in part, that testing for cause shall be initiated as soon as possible.., after receiving credible information that an individual Is abusing alcohol. Additionally, If substantiated, this allegation may be a violation of 10 CFR 50.5, Deliberate Misconduct. (An additional concern (4) of discrimination shall be pursued separately under AMS RIII-2002-A-0114/OI Case No. 3-2002-020).

STATUS: FWP ECD: 09/2002.-7 C- )08)31/2002.

Former DZNPS welde_ _1 August 5, 2002. ovided n concern ab eparatel-he repoeand was unaware of a con has no sense of smell. Wstated that e id not unaware of any concern. and-uJ 6 2002. Former DZNPS welder stated that he reported an FF--D qn ,'after being asked to work forloo" accommodate additional concern. STATUS: FWP interviewed by 01 on formation that they reported an JFD y, but on the same day. denied that cem due to a medical condition In which he report any FFD concern, because he was vided additional documentation by fax on ,was Interviewed on Auoust 29. 2002-i with tlI ECD is beintchanged to ECD: 10/2002.Completion Date: Issue Date: DOJ Action(s):

01 Violation(s):

Total Staff Hours: 223.5 Months Open: 5.3 DOJ Referral Date: Statute of Limitations Date: 11/08/2006 Atomic Energy Act -No Result A Information in this record was deleted in accordance wit t e Freedom of Information Act, exemptions -M!09/20/2002 9:34:02 AM 2 0 02 -0 04 EXHIBIT.-L PAGE I OF I PAGE(S)Page #1