MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] Category:Map
MONTHYEARML1019303192010-06-0909 June 2010 Map - Vogtle Map ML0915900862009-09-0404 September 2009 Bellefonte SER Chapter 2 Figures Section 1 (2.5.1.1 Thru 2.5.2-8) 5/27/09 ML0732405682007-11-0505 November 2007 Map,Richmond County TC 2006 City of Augusta. ML0732405692007-11-0505 November 2007 Map, Richmond County TC 2006. ML0722108172007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722109012007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722108802007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722105752007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722103732007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722103122007-08-31031 August 2007 Ltr to Governor B. Anoatubby, Chickasaw Nation, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application Review ML0722102942007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722109502007-08-31031 August 2007 Ltr to Chief D. Proctor of the United Keetoowah Band of Cherokee Indians, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application Review ML0722103382007-08-31031 August 2007 Ltr to Chief Tanner of the Chaloklowa Chickasaw Indian People, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0722106332007-08-31031 August 2007 Ltr to Chief W. Steele of Seminole Tribe of Florida, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0722106682007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722104982007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722109372007-08-31031 August 2007 Ltr to Ga Tribe of Eastern Cherokee, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application Review ML0722109952007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0721407912007-08-31031 August 2007 Letter to American Cherokee Confederacy Regarding Vogtle License Renewal Process ML0722103152007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722105512007-08-31031 August 2007 Ltr to Chief Caulder of the Pee Dee Indian Tribe of South Carolina, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0722105902007-08-31031 August 2007 Ltr to Chief J. Webb of the Waccamaw Indian People, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0722107462007-08-31031 August 2007 Ltr to P. Bowlegs of the Seminole Nation of Oklahoma, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0722102862007-08-31031 August 2007 Ltr to Principal Chief A.D. Ellis of the Muscogee (Creek) Nation, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0722110162007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722110042007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722110082007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722108612007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722103472007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0720701132007-08-31031 August 2007 Letter to Cherokee Nation of Georgia Regarding Vogtle License Renewal Process ML0720706912007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722110032007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722110132007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722107442007-08-31031 August 2007 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0722103752007-08-31031 August 2007 Ltr to Chief Bolton of Pee Dee Indian Nation of Upper South Carolina, Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application ML0732407082006-11-27027 November 2006 Map - Plant Vogtle Safe Harbor Agreement ML0722110122004-08-31031 August 2004 Request for Comments Concerning the Vogtle Electric Generating Plant, Units 1 and 2 License Renewal Application Review ML0732405661999-04-0505 April 1999 Map, Traffic Count Map, City of Augusta, Richmond County Georgia. ML0732405641992-06-0808 June 1992 Map, General Highway Map Richmond County Georgia. ML0732405621988-02-16016 February 1988 Map, General Highway Map Columbia County Georgia. ML0732405631987-12-14014 December 1987 Map, General Highway Map Burke County Georgia. 2010-06-09
[Table view] |
Text
August 31, 2007The Honorable Ms. Evelyn Bucktrot, Town King Kialegee Tribal Town Creek Nation of Oklahoma P.O. Box 332 Wetwumka, OK 74883
SUBJECT:
REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRICGENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REVIEW
Dear Ms. Bucktrot:
The U.S. Nuclear Regulatory Commission (NRC) is seeking input for its environmental reviewof an application from Southern Nuclear Operating Company (SNC or the applicant) for the renewal of the operating licenses for the Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), located in Waynesboro, Burke County, Georgia. VEGP is in close proximity to lands that may be of interest to the Creek Nation of Oklahoma. As described below, the NRC'sprocess includes an opportunity for public and inter-governmental participation in the environmental review. We want to ensure that you are aware of our efforts and, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 51, Section 51.28(b), the NRC invitesthe Creek Nation of Oklahoma to provide input to the scoping process relating to the NRC'senvironmental review of the application. In addition, as outlined in 36 CFR 800.8(c), the NRC plans to coordinate compliance with Section 106 of the National Historic Preservation Act of 1966 through the requirements of the National Environmental Policy Act of 1969.Under NRC regulations, the original operating license for a nuclear power plant is issued for upto 40 years. The license may be renewed for up to an additional 20 years if NRC requirements are met. The current operating licenses for VEGP will expire in 2027 and 2029. SNC submitted its application for renewal of the VEGP operating licenses in a letter dated June 27, 2007.The NRC is gathering information for a VEGP site-specific supplement to its "GenericEnvironmental Impact Statement for License Renewal of Nuclear Plants" (GEIS),
NUREG-1437. The supplement will contain the results of the review of the environmental impacts on the area surrounding the VEGP site related to terrestrial ecology, aquatic ecology, hydrology, cultural resources, and socioeconomic issues (among others) and will contain a recommendation regarding the environmental acceptability of the license renewal action.
Provided for your information is the VEGP Site Layout (Enclosure 1) and Transmission Line Map (Enclosure 2).
E. Bucktrot-2-To accommodate interested members of the public, the NRC will hold two public scopingmeetings for the VEGP license renewal supplement to the GEIS on September 27, 2007, at theAugusta Technical College Waynesboro Campus, located at 216 Highway 24 South, Waynesboro, GA. There will be two sessions to accommodate interested parties. The first session will convene at 1:30 p.m. and will continue until 4:30 p.m., as necessary. The second session will convene at 7:00 p.m., with a repeat of the overview portions of the first meeting, and will continue until 10:00 p.m., as necessary. Additionally, the NRC staff will host informal discussions one hour before the start of each session. The license renewal application (LRA) and the GEIS are publicly available at the NRC PublicDocument Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible athttp://adamswebsearch.nrc.gov/dologin.htm
. The Accession Number for the LRA isML071840360, and ML071840357 for the environmental report. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail at pdr@nrc.gov
.The VEGP LRA is also available on the Internet atwww.nrc.gov/reactors/operating/licensing/renewal/applications/vogtle.html. In addition, theBurke County Library, located at 130 Highway 24 South, Waynesboro, GA, has agreed to make the LRA available for public inspection.The GEIS, which documents the NRC's assessment of the scope and impact of environmentaleffects that would be associated with license renewal at any nuclear power plant site, can alsobe found at the Burke County Library, on the NRC's website, and at the NRC's PDR.Please submit any comments that the Creek Nation of Oklahoma may have to offer on thescope of the environmental review by October 24, 2007. Written comments should besubmitted by mail to the Chief, Rules and Directives Branch, Division of Administrative Services, Mail Stop T-6D59, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Electronic comments may be submitted to the NRC by e-mail atVogtle_LR_EIS@nrc.gov. At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you.
E. Bucktrot-3-The staff expects to publish the draft supplement to the GEIS in May 2008. The NRC will holdanother set of public meetings in the site vicinity to solicit comments on the draft supplemental environmental impact statement (SEIS). A copy of the draft SEIS will be sent to you for your review and comment. After consideration of public comments received on the draft, the NRC will prepare a final SEIS. The issuance of a final SEIS for VEGP is planned for January 2009. If you need additional information regarding the environmental review process, please contact JP Leous, Environmental Project Manager, at 301-415-2864 or at jpl1@nrc.gov
.Sincerely,/RA Jennifer Davis for/Rani L. Franovich, Branch ChiefEnvironmental Branch BDivision of License RenewalOffice of Nuclear Reactor RegulationDocket Nos. 50-424 and 50-425
Enclosures:
- 1. Site Layout 2. Transmission Line Map cc w/encls: See next page
ML072210575 Document Name: C:\FileNet\ML072210575.wpdOFFICELA:DLRPM:DLR:REBBPM:DLR:REBBBC:DLR:REBBNAMESFigueroaJPLeousSHernandezJDavis forRFranovichDATE08/10/0708/31/07 08/31/0708/31/07 Letter to E. Bucktrot from R. Franovich, dated August 31, 2007
SUBJECT:
REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRICGENERATING PLANT UNITS, 1 AND 2 LICENSE RENEWAL APPLICATION REVIEWDISTRIBUTION
- Email P.T. Kuo (RidsNrrDlr)
R. Franovich (RidsNrrDlrRebb)
E. Benner (RidsNrrDlrReba)Bobbie.hurley@earthtech.comJ. Leous C. Jacobs D. AshleyB. SingalB. AndersonG. McCoyS. Shaeffer V. Lickus W. Maier R. Hannah J. Schlueter RidsOpaMail Vogtle Electric Generating Plant, Units 1 and 2 cc:Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830Mr. N. J. StringfellowManager, Licensing Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295Mr. Jeffrey T. GasserExecutive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295Mr. Steven M. JacksonSenior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684Mr. Reece McAlisterExecutive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334Mr. Harold Reheis, DirectorDepartment of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334Attorney GeneralLaw Department 132 Judicial Building Atlanta, GA 30334Mr. Laurence BergenOglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349Arthur H. Domby, EsquireTroutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216Resident InspectorVogtle Plant 8805 River Road Waynesboro, GA 30830Office of the County CommissionerBurke County Commission Waynesboro, GA 30830Ms. Julie KeysNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708