Category:Letter
MONTHYEARML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule 2024-09-25
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 16, 2010 Thomas Burack, Commissioner Department of Environmental Services 29 Hazen Drive PO Box 95 Concord, NH 03302-0095 SUB..IECT: SEABROOK STATION LICENSE RENEWAL APPLICATION REVIEW
Dear Mr. Burack:
The U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing an application submitted by NextEra Energy Seabrook, LLC, for the renewal of the operating license for Seabrook Station, Unit 1 (Seabrook Station).
Seabrook Station is located 13 miles south of Portsmouth, NH. The application for renewal was submitted by NextEra Energy Seabrook, LLC, in a letter dated May 25, 2010, pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54). The NRC has established that, as part of the staff's review of any nuclear power plant license renewal application, a site-specific Supplemental Environmental Impact Statement (SEIS) to its Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, will be prepared under 10 CFR Part 51, the NRC's regulation that implements the National Environmental Policy Act of 1969, as amended. NextEra Energy Seabrook, LLC, stated that it has no plans to alter current operations over the license renewal period and that Seabrook Station, operating under a renewed license, would use existing plant facilities and transmission lines and would not require additional construction or disturbance of new areas. According to NextEra Energy Seabrook, LLC, any maintenance activities would be limited to previously disturbed areas. The site consists of 889 acres divided into two lots. Lot 1 is approximately 109 acres, is mostly developed, and holds most of the operating facility.
Lot 2 is approximately 780 acres and consists mainly of natural areas available for wildlife resources.
The natural areas are characterized by broad open areas of level tidal marsh veined with man-made linear drainage ditches and tidal creeks. Wooded islands and peninsulas rise from the marsh to elevations of 20 to 30 feet above sea level. The site is on a peninsula of land, which is bordered on the north by the Browns River and on the south by Hunts Island Creek. Estuarine marshlands bound the site to the east. It is estimated that approximately 300 acres of the site are upland and 600 acres are marsh/wetland areas. Please see the maps in Enclosures 1, 2, and 3 for further detail. Seabrook Station is a single unit, pressurized-water reactor plant. Seabrook Station employs a once-through heat dissipation system designed to remove waste heat from the plant. Its circulating water system provides cooling water to the main condensers to remove the heat that is rejected by the turbine cycle and auxiliary system and to the plant's service water system. Water for these systems is carried to and from the Atlantic Ocean to the plant through long tunnels drilled through the underlying bedrock. The tunnels are hydraulically connected to the ocean by way of concrete shafts that extend approximately 6000 feet offshore, with the intake and discharge points approximately 60 feet below sea level. Please see Enclosure 4 for a drawing of the system.
During normal operations, the circulating water system provides a
-continuous flow of approximately 390,000 gallons per minute (gpm) to the main condenser and 21,000 gpm to the service water system. Fresh water is purchased from the Town of Seabrook, and sanitary waste water is discharged back to the town system. As part of the SEIS preparation, the applicable transmission line corridors will be reviewed.
The Seabrook Station 345 kilovolt (kV) switchyard is adjacent to the plant on the north side of the property.
From here, three 345 kV transmission lines connect Seabrook Station to the New England electric grid. These lines deliver power to three substations:
at Scobie Pond, near Derry, New Hampshire; at Tewksbury, Massachusetts; and at Newington, New Hampshire.
The transmission lines include approximately 86 miles of corridor with approximately 1,061 acres of right-of-way in New Hampshire and 662 acres of right-of-way in Massachusetts for the specific purpose of connecting Seabrook Station to the transmission system. Please see the map in Enclosure 5 for further detail. To support the SEIS preparation process, the staff plans to hold two public environmental scoping meetings on August 19, 2010, at the Galley Hatch Conference Center, 815 Lafayette Road, Hampton, NH 03842. The first meeting will convene at 1 :30 p.m. and will continue until 3:30 p.m., as necessary.
The second meeting will convene at 7:00 p.m., with a repeat of the overview portions of the first meeting, and will continue until 9:00 p.m., as necessary.
In addition, during the week of October 4, 2010, the staff plans to conduct a site audit at Seabrook Station. You and your staff are invited to attend both the site audit and the public meetings.
Your office will receive a copy of the draft SEIS along with a request for comments.
The anticipated publication date for the draft SEIS is May 2011. The Seabrook Station license renewal application is available at: http://www.nrc.gov/reactors/operatingllicensinglrenewallapplications/seabrook.html.
-3 If you have any questions concerning the staff's review of this license renewal application, please contact Mr. Jeremy Susco, Project Manager, at (301) 415-2927 or bye-mail at Jeremy. Susco@nrc.gov.
Sincerely. Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosures:
- 1. Area Map, 50-mile radius 2. Area Map, 6-mile radius 3. Site Area Map 4. Intake/Discharge Tunnels and Shafts Diagram 5. Transmission Line Map cc w/encls: Distribution via Listserv Area Map, 50-Mile Radius *Seabrook Station S , Selected Cities ! ' Primary Roads 50-Mile Radius State Boundary '!County Boundary Atlantic Ocean Water Urban Area Federal Lands Department 0 I Defense ENCLOSURE Area Map, 6-Mile Radius SalISbury Merrimac Rive, + N I-Primary Road _ Secondary and Conll&ctlng Road I:IState Boundary 1::1 Seabrook Station Property Boundary Water g; Urban Area ENCLOSURE Site Area Map ,/ ..-'-1 ( j ( ( Legend l::l SU& Bound,,1Y ENCLOSURE Intake/Discharge Tunnels and Shafts Diagram DISCHARGE TUNNEL AND SHAFTS Intake Shaft Atlantic Ocean Discharge Shaft Intake Shafts and Sttuctu_ Th"",lO**
,. D.., Intake Shalto Drawings not to scale ENCLOSURE Transmission Line Map ., . " -pnMarv ROllIn Stati{)n State 8oulldar'f Raymond " II -Atlantic Ocean CQuT1ty Craov Pond WMA fIsh and 'Mldllfe ServIce ENCLOSURE
-If you have any questions concerning the staff's review of this license renewal application, please contact Mr. Jeremy Susco, Project Manager, at (301) 415-2927 or bye-mail at Jeremy.Susco@nrc.gov. Docket No. 50-443
Enclosures:
- 1. Area Map, 50-mile radius 2. Area Map, 6-mile radius 3. Site Area Map Sincerely, IRA! Bo Pham, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation
- 4. Intake/Discharge Tunnels and Shafts Diagram 5. Transmission Line Map cc w/encls: Distribution via Listserv DISTRIBUTION:
HARDCOPY:
DLRRF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource JSusco RPlasse BPham DWrona EMilier ICouret, OPA EDacus,OCA MSpencer, OGC ADAMS Accession No' ML101900093 WRaymond, RI DTifft, RI NMcNamara, RI NSheehan, RI DScrenci, RI JJohnson, RI ABurritt, RI Ir OFFICE LA:DLR SFigueroa 0712/10 PM:RPB1 :DLR JSusco 07/13/10 OGC MSpencer (NLO) 07/14/10 BC:RPB1 :DLR BPham I 07/16/10 OFFICIAL RECORD COPY