Response to RIS 2012-07, Preparation and Scheduling of Operator Licensing Examinations
ML12202A089
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/03/2012
From: Doris Lewis
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N 12-0201, RIS 2012-07
Download: ML12202A089 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG Nuclear LLC JUL 0 3 2012 10 CFR 55.40 LR-N 12-0201 U.S. Nuclear Regulator Commission, ATTN: Document Control Desk, Washington, DC 2055-0001 Hope Creek Generating Station Unit 1 Facility Operating License No. NPF-57 Docket No. 50-354

Subject:

RESPONSE TO RIS 2012-07, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to RIS 2012-07, attached is the completed FORM 536, Operator Licensing Examination Data for Initial Licensed Operator Examinations through CY 2017 and Generic Fundamentals Examinations through 2015.There are no regulatory commitments in this correspondence.

Should there be any questions regarding this matter, please contact Mark Parrish, Hope Creek Operations Training Manager at 856-339-1124.

Sincerely, David P. Lewis Plant Manager Hope Creek Generating Station Attachment

-Form 536, Operator Licensing Examination Data f~joL DCD LR-N 12-0201 Page 2 cc: Mr. W. Dean, Regional Administrator

-Region 1 Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100.King of Prussia, PA 19406-2713 U. S. Nuclear Regulatory Commission Mr. J. Hughey, Project Manager -Hope Creek Mail Stop 08B3 Washington, DC 20555-0001 USNRC Senior Resident Inspector

-Hope Creek (X24)Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering New Jersey Department of Environmental Protection PO Box 420 Trenton, New Jersey 08625 Hope Creek Training Manager (120)Hope Creek Commitment Coordinator (H02)Corporate Commitment Coordinator (N21)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (9-2011) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Information Services Branch OPE RATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mall to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of information and EX(.AMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an informaton collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION Hope Creek Generating Station 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 0 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS

-INSTANT 0.NUMBER OF SENIOR REACTOR 0 OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 2/16/2015 08/15/2016 ALTERNATE DATE 2/23/2015 8/22/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED _NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE DECEMBER-AC JUNSPTMBEDCEBE MARCH JUNE SEPTEMBE 1 EEME ESTIMATED NUMBER OF 13 CANDIDATES NRC FORM 536 (9-2011)