MONTHYEARNLS2024053, Licensee Guarantees of Payment of Deferred Premiums2024-07-30030 July 2024 Licensee Guarantees of Payment of Deferred Premiums NLS2024055, Data from Metamic Coupon Sampling Program2024-07-29029 July 2024 Data from Metamic Coupon Sampling Program NLS2024052, Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-07-24024 July 2024 Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024051, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2024-07-0303 July 2024 Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2024044, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications NLS2024038, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical.2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. NLS2024035, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications NLS2024025, License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation2024-05-0909 May 2024 License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation NLS2024037, 2023 Annual Radiological Environmental Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Report NLS2024030, Annual Radioactive Effluent Release Report2024-04-25025 April 2024 Annual Radioactive Effluent Release Report NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024029, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications NLS2024031, Notice of Intent to Apply for Subsequent Renewal of Operating License2024-04-22022 April 2024 Notice of Intent to Apply for Subsequent Renewal of Operating License NLS2024036, Nebraska Public Power District 2023 Financial Report2024-04-19019 April 2024 Nebraska Public Power District 2023 Financial Report NLS2024027, Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation2024-04-0303 April 2024 Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation NLS2024024, Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation2024-04-0101 April 2024 Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation NLS2024018, Property Insurance Coverage2024-03-20020 March 2024 Property Insurance Coverage NLS2024017, Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-0012024-03-0808 March 2024 Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-001 NLS2024009, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of2024-03-0808 March 2024 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of NLS2024013, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications NLS2024014, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump NLS2024001, Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-02-16016 February 2024 Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024006, Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-02 NLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 2024-07-30
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20213012021-07-29029 July 2021 NRC Retake Examination Report 05000298/2021301 IR 05000298/20203022020-11-18018 November 2020 NRC Examination Report 05000298/2020302 IR 05000298/20203012020-09-15015 September 2020 NRC Examination Report 05000298/2020301 IR 05000298/20183012018-10-16016 October 2018 NRC Examination Report 05000298/2018301 ML18255A2642018-09-12012 September 2018 NRC Initial Operator Licensing Examination Approval 05000298/2018301 IR 05000298/20173012017-05-19019 May 2017 NRC Examination Report 05000298/2017301 IR 05000298/20153032016-01-0808 January 2016 NRC Examination Report 05000298/2015303 ML15153A2072015-06-0202 June 2015 Notification of NRC Initial Operator Licensing Examination 05000298/2015303 IR 05000298/20153022015-05-15015 May 2015 Er 05000298/2015302; January 27 - May 6, 2015; Cooper Nuclear Station; Initial Operator Licensing Retake Examination Report IR 05000298/20143012014-08-28028 August 2014 Er 050002982014301; 07/28/2014 to 08/20/2014; Cooper Nuclear Station; Initial Operator Licensing Examination Report NLS2013073, Preparation and Scheduling of Operator Licensing Examinations2013-07-0202 July 2013 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20123012013-04-10010 April 2013 Er 05000298/12-301, October 30, 2012 to March 21, 2013; Cooper Nuclear Station; Initial Operator Licensing Examination Report IR 05000298/20113012011-07-0808 July 2011 NRC Examination Report 05000298/2011301 IR 05000298/20093012009-11-0404 November 2009 Er 05000298-09-301, on September 21, 2009, Cooper Nuclear Station, Initial Operator Licensing Examination Report IR 05000298/20083012008-04-0707 April 2008 Er 05000298/2008301; March 17-27, 2008; Cooper Nuclear Station; Initial Operator Licensing Examination Report IR 05000298/20073012007-02-23023 February 2007 Er 05000298-07-301; 1/29-30/2007; Cooper Nuclear Station; Initial Operator Licensing Examination Report ML0708005862007-01-31031 January 2007 Init Exam - 01/2007 - Final Exam ML0715504442005-10-31031 October 2005 10/2005 - Final - Outline IR 05000298/20053012005-06-27027 June 2005 NRC Examination Report 05000298-05-301 ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000298/20033012003-07-0101 July 2003 Er 50-298/03-301, on June 16-20, 2003, Nebraska Public Powers District, Cooper Nuclear Station; Initial Operator Licensing Examinations NLS2002100, Nebraska Public Power District Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.2002-08-0606 August 2002 Nebraska Public Power District Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. 2022-08-10
[Table view] |
Text
H Nebraska Public Power District Always there when you need us NLS2013073 July 2, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Preparation and Scheduling of Operator Licensing Examinations Cooper Nuclear Station, Docket No. 50-298, DPR-46
Reference:
Nuclear Regulatory Commission Regulatory Issue Summary 2013-06,"Preparation and Scheduling of Operator Licensing Examinations"
Dear Sir or Madam:
The purpose of this letter is to transmit to the U.S. Nuclear Regulatory Commission (NRC) a completed NRC Form 536 for Cooper Nuclear Station as requested in the reference above.This letter contains no new commitments.
Should you have any questions or require additional information, please contact me at (402) 825-2904 or Scott DeRosier, Operations Initial Training Superintendent, at (402) 825-5573.Sincerely, 4AY441ZA&A:-7a David W. Van Der Kamp Licensing Manager Jo
Attachment:
NRC Form 536, "Operator Licensing Examination Data" cc: Regional Administrator w/attachment USNRC -Region IV Operations Training Superintendent w/attachment Cooper Nuclear Station Training Manager w/o attachment Cooper Nuclear Station CNS Records w/attachment COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone:
(402) 825-3811 / Fax: (402) 825-5211 www.nppd.com NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Cooper Nuclear Station IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR 4 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS
-INSTANT 3 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS
-UPGRADE 2 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/19/2015 08/01/2016 N/A 07/30/2018 ALTERNATE DATE 10/26/2015 08/08/2016 N/A 08/06/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF l 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)