ML18018B753
| ML18018B753 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/24/1984 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NLS-84-373, NUDOCS 8408280207 | |
| Download: ML18018B753 (4) | |
Text
I REGULATOR'(INFORMATION DISTRIBUTION S~TEM (RIDS)ACCESS%'ON NBR:8408280207 DOC~DATE: 84/08/24 NOTARIZED:
NO FACIL:50-400 Shearon Harris Nuclear Power P]anti Unit 1<Carolina AUTH,NAME AUTHOR AFFILIATION ZItlYERNANiS,RE Carolina Power 8 Light Co, RECIP~NAME'ECIPIENT AFFILIATION DENTONiH.R.
Office of Nucleat Reactor Regulationr Director
SUBJECT:
Clarifies 840725 nesponse to Eddl'eman Coptention 9 re environ qualification program.Response to 9B refs verification performed.by onsite QA organization.
Commitment to ensure required equipment installed not diminished.
DISTRIBUTION CODE: A048D COPIES RECEIVED;LTR j ENCL SIZE:-JTITLE!OR/Licensing Submittal:
Equipment Qualification NOTES: DOCKET 05000400'RECIPIENT ID CODE/NANE NRR LB3 BC 12 INTERNAL: ADM/LFtlB GC 13 NRR KARSCHeR NRR/DL DIR 14 NRR/DS I/AEB RGN2 COPIES LTTR ENCL RECIPIENT ID CODE/NAME BUCKLEYzB 01 ELD/HDS1 12 IE FILE 09 NRR/DE/EQB 07 B oe REG F-04 COPIES LTTR ENCL 1 1 2 1 1 EXTERNAL: ACRS NRC PDR NTIS 15 02 31 8 1 1 LPDR NSIC 03 05 0 TOTAL NUHBER OF COPIES REQUIRED: LTTR 26 ENCL r<<I'I ff t g f 4<<'If I If)<<I I<<I<<f
@ME, Carolina Power&Light Company AUG 34 1984 SERIAL: NLS-84-373 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 ENVIRONMENTAL QUALIFICATION PROGRAM Deax Mx.Denton: Carolina Power&Light Company (CP&L)hereby clarifies the July 25, 1984 (NLS-84-343) response to Eddleman Contention 9 concerning the Environmental Qualification program.The response to 9B references a verification performed by the on-site Quality Assurance (QA)organization.
This verification is performed by vaxious on-site groups involved in the quality of the installation, but not restricted to the site organization known as QA.This clarification does not diminish CP&L's commitment to ensure that the environmentally-qualified equipment required during an accident is installed in accordance with design documents and vendor qualification reports.Should you have any questions xegarding this issue, please contact Mr.Pedro Salas at (919)836-8015.Yours very truly, S.immerman Manager Nuclear Licensing Section PS/ccc (482PSA)Cct Mr.B.C.Buckley (NRC)Mr.Bob Legrange (NRC-NRR/EQ)
Mr.Amand Masciantonio (NRC-NRR/EQ)
Mr.G.P.Maxwell (NRC-SHNPP)
Mr.J.P.O'Reilly (NRC-RII)Chapel Hill Public Library Wake County Public Library Mr.Travis Payne (KUDZU)Mr.Daniel P.Read (CHANGE/ELP)
Mr.Wells Eddleman Mr.John D-Runkle Dr.Richard D.Wilson Mr.G.0.Bxight (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)8408280207 840824 PDR ADOCK 05000400, A PDR 411 Fayettevitte Street 8 P.O.Box 1551 8 Raleigh.N.C.27602 h'P I~~j I'