ML18018B753

From kanterella
Jump to navigation Jump to search
Clarifies 840725 Response to Eddleman Contention 9 Re Environ Qualification Program.Response to 9B Refs Verification Performed by Onsite QA Organization.Commitment to Ensure Required Equipment Installed Not Diminished
ML18018B753
Person / Time
Site: Harris 
Issue date: 08/24/1984
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-84-373, NUDOCS 8408280207
Download: ML18018B753 (4)


Text

I REGULATOR'(

INFORMATION DISTRIBUTION S

~ TEM (RIDS)

ACCESS%'ON NBR:8408280207 DOC ~ DATE: 84/08/24 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power P]anti Unit 1< Carolina AUTH,NAME AUTHOR AFFILIATION ZItlYERNANiS,RE Carolina Power 8 Light Co, RECIP ~ NAME

'ECIPIENT AFFILIATION DENTONiH.R.

Office of Nucleat Reactor Regulationr Director

SUBJECT:

Clarifies 840725 nesponse to Eddl'eman Coptention 9 re environ qualification program. Response to 9B refs verification performed.by onsite QA organization. Commitment to ensure required equipment installed not diminished.

DISTRIBUTION CODE:

A048D COPIES RECEIVED;LTR j ENCL SIZE:-

J TITLE! OR/Licensing Submittal:

Equipment Qualification NOTES:

DOCKET 05000400

'RECIPIENT ID CODE/NANE NRR LB3 BC 12 INTERNAL: ADM/LFtlB GC 13 NRR KARSCHeR NRR/DL DIR 14 NRR/DS I/AEB RGN2 COPIES LTTR ENCL RECIPIENT ID CODE/NAME BUCKLEYzB 01 ELD/HDS1 12 IE FILE 09 NRR/DE/EQB 07 B

oe REG F

04 COPIES LTTR ENCL 1

1 2

1 1

EXTERNAL: ACRS NRC PDR NTIS 15 02 31 8

1 1

LPDR NSIC 03 05 0

TOTAL NUHBER OF COPIES REQUIRED:

LTTR 26 ENCL

r I

'I ff t

g f

4 If I If)<<

I I

I

<<f

@ME, Carolina Power & Light Company AUG 34 1984 SERIAL:

NLS-84-373 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.

1

DOCKET NO. 50-400 ENVIRONMENTAL QUALIFICATION PROGRAM Deax Mx. Denton:

Carolina Power

& Light Company (CP&L) hereby clarifies the July 25, 1984 (NLS-84-343) response to Eddleman Contention 9 concerning the Environmental Qualification program.

The response to 9B references a verification performed by the on-site Quality Assurance (QA) organization.

This verification is performed by vaxious on-site groups involved in the quality of the installation, but not restricted to the site organization known as QA.

This clarification does not diminish CP&L's commitment to ensure that the environmentally-qualified equipment required during an accident is installed in accordance with design documents and vendor qualification reports.

Should you have any questions xegarding this issue, please contact Mr. Pedro Salas at (919) 836-8015.

Yours very truly, S.

immerman Manager Nuclear Licensing Section PS/ccc (482PSA)

Cct Mr. B. C. Buckley (NRC)

Mr. Bob Legrange (NRC-NRR/EQ)

Mr. Amand Masciantonio (NRC-NRR/EQ)

Mr. G. P. Maxwell (NRC-SHNPP)

Mr. J.

P. O'Reilly (NRC-RII)

Chapel Hill Public Library Wake County Public Library Mr. Travis Payne (KUDZU)

Mr. Daniel P.

Read (CHANGE/ELP)

Mr. Wells Eddleman Mr. John D-Runkle Dr. Richard D. Wilson Mr. G. 0. Bxight (ASLB)

Dr. J.

H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB) 8408280207 840824 PDR ADOCK 05000400, A

PDR 411 Fayettevitte Street 8 P. O. Box 1551 8 Raleigh. N. C. 27602

h' P

I

~ ~

j I'