05000498/FIN-2009003-02
From kanterella
Revision as of 20:43, 28 October 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Failure to Perform Radiation Surveys |
Description | A self-revealing noncited violation of 10 CFR 20.1501(a) was identified for failure to perform a radiological survey to determine the potential radiological hazards present when deposting a high contamination area. On October 25, 2008, decontamination technicians were sent into the reactor containment building to remove the decontamination tent from steam generator eddy current testing which was posted as a high contamination area. The technicians were not informed of the expectation to decontaminate the scaffolding and health physics personnel did not follow-up and perform surveys of the deposted area. Subsequently, carpenters were sent in to remove the scaffolding which was still highly contaminated. The licensee was made aware of the situation when one of the carpenters alarmed the personnel contamination monitor and a whole body count revealed approximately 3 millirem intake. The issue was entered into the licensees corrective action program as Condition Report 08-16599. The failure to perform surveys necessary to support deposting a contamination area is a performance deficiency. The finding was greater than minor because it was associated with the Occupational Radiation Safety cornerstone attribute (exposure control) of program and process and affected the cornerstone objective, in that, failure to conduct a radiation survey resulted in unplanned and unintended dose to personnel. Using the Occupational Radiation Safety Significance Determination Process, the finding was determined to be of very low safety significance because it was not an as low as is reasonably achievable finding, there was no overexposure or substantial potential for an overexposure, and the ability to assess dose was not compromised. The finding was self-revealing because the licensee was alerted to the situation when the worker could not pass the personnel contamination monitor. Additionally, this finding had human performance crosscutting aspects associated with work control, in that, the work planning did not appropriately plan work activities by incorporating risk insights and radiological safety H.3(a) (Section 2OS1) |
Site: | South Texas |
---|---|
Report | IR 05000498/2009003 Section 2OS1 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | NCV: Green |
cornerstone | Or Safety |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71121.01 |
Inspectors (proximate) | J Dixon C Smith B Tharakan C Graves G Pick W Walker J Mateychick N Okonkwo J Watkins |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |