ISFSI - Enclosure 4, Confirmatory Order, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (TAC Nos. MF2663 and MF2664)
ML15174A102
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/05/2016
From: Moore S A
Office of Nuclear Material Safety and Safeguards
To:
Wengert T J
References
EA-14-140, TAC MF2663, TAC MF2664
Download: ML15174A102 (15)


Text

7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

) Southern California Edison Company ) ) Docket Nos. 50-361, 50-362, and 72-41 San Onofre Nuclear Generating Station, ) License Nos. NPF-10 and NPF-15 Units 2 and 3 ) EA-14-140

) San Onofre Nuclear Generating Station, ) Independent Spent Fuel Storage Installation )

)

CONFIRMATORY ORDER MODIFYING LICENSES I. Southern California Edison Company (SCE), is the owner and operator of the San Onofre Nuclear Generating Station, Units 2 and 3, including the general-license Independent Spent Fuel Storage Installation (hereinafter "SONGS" or "the facility"), and holder of Facility Operating License Nos. NPF-10, NPF-15, and Docket No. 72-41, issued by the U.S. Nuclear Regulatory Commission ("NRC" or "Commi ssion") under Title 10, "Energy," of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities"; Part 70, "Domestic Licensing of Special Nuclear Material"; and Part 72, "Licensing Requirements for the Independent Storage of Spent Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste." The licenses authorize the operation of SONGS with the conditions specified therein. The facilities are located on the owner's site in San Diego County, California.

II. By application dated August 28, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13242A277), as supplemented by letters dated December 31, 2013 (ADAMS Accession No. ML14007A496), May 15, 2014 (ADAMS Accession No. ML14139A424), and February 10, 2015 (ADAMS Accession No. ML15044A047), SCE requested, under Commission Order EA-13-092, that under the provisions of Section 161A of the Atomic Energy Act of 1954, as amended, the Commission permit the transfer, receipt, possession, transport, import, and use of certain firearms and large-capacity ammunition-feeding devices by security personnel who prot ect a facility owned or operated by a licensee or certificate holder of the Commission that is designated by the Commission. Section 161A confers on the Commission the authority to permit a licensee's security personnel to possess and use firearms, ammunition, or devices, notwithstanding local, State, and certain Federal firearms laws (including regulations) that may prohibit such possession and use. On review of the SCE application for Commission authorization to use Section 161A preemption authority at SONGS, the NRC staff has found the following:

(1) SCE's application complies with the standards and requirements of Section 161A and the Commission's rules and regulations set forth in 10 CFR Part 73, "Physical Protection of Plants and Materials."

(2) There is reasonable assurance that the facilities will operate in conformance to the application; the provisions of the Atomic Energy Act of 1954, as amended; and the rules and regulations of the Commission.

(3) There is reasonable assurance that the activities permitted by the proposed Commission authorization to use Section 161A preemption authority is consistent with the protection of public health and safety, and that such activities will be conducted in compliance with the Commission's regulations and the requirements of this confirmatory order.

(4) The issuance of Commission authorization to use Section 161A preemption authority will not be inimical to the common defense and security or to the health and safety of the public. (5) The issuance of this Commission authorization to use Section 161A preemption authority will be in accordance with the Commission's regulations in 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions."

The findings set forth above are supported by an NRC staff safety evaluation under ADAMS Accession No. ML15027A221.

III. To carry out the statutory authority discussed above, the Commission has determined that the licenses for SONGS must be modified to include provisions with respect to the Commission authorization to use Section 161A preemption authority as identified in Section II of this confirmatory order. The requirements needed to exercise the foregoing are set forth in Section IV below. The NRC staff has found that the license modifications set forth in Section IV are acceptable and necessary. It further concluded that, with the effective implementation of these provisions, the licensee's physical protection program will meet the specific physical protection program requirements set forth in 10 CFR 73.55, "Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors against Radiological Sabotage" (for nuclear power reactors); in 10 CFR 72.212(b)(9), "Conditions of the General License Issued Under § 72.210," and portions of 10 CFR 73.55, "Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors against Radiological Sabotage" (for general-license independent spent fuel storage installations co-located with a reactor at the reactor site).

On March 31, 2015 (ADAMS Accession No. ML15092A132) SCE consented to the issuance of this order. The licensee further agreed that this order will be effective 20 days after the date of issuance and that it has waived its right to a hearing on this order.

IV.

Accordingly, under Sections 53, 103 and/or 104b, 161b, 161i, 161o, 161A, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202, "Orders"; 10 CFR Part 50; 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants"; 10 CFR Part 70; and 10 CFR Part 72, IT IS HEREBY ORDERED that:

1. The SCE application for Commission authorization to use Section 161A preemption authority at SONGS is approved, and permission for security personnel to possess and use weapons, devices, ammunition, or other firearms, notwithstanding local, State, and certain Federal firearms laws (including regulations) that may prohibit such possession and use, is granted.
2. The licensee shall review and revise its NRC-approved security plans, as necessary, to describe how the requirements of this confirmatory order and other applicable requirements of 10 CFR Part 73, "Physical Protection of Plants and Materials," to include those of the appendices of Part 73, will be met.
3. The licensee shall establish and maintain a program consistent with Commission Order EA-13-092 such that all security personnel who require access to firearms in the discharge of their official duties are subject to a firearms background check. The Commission is engaged in an ongoing rulemaking to implement the Commission's authority under Section 161A. Subsequent to the effective date of that final rulemaking, the Director, Office of Nuclear Material Safety and Safeguards (NMSS) may take action to relax or rescind any or all of the requirements set forth in this confirmatory order.

The Director, NMSS, may, in writing, relax or rescind this confirmatory order on demonstration by the licensee of good cause.

This confirmatory order is effective 20 days after the date of its issuance.

For further details with respect to this confirmatory order, see the staff's safety evaluation contained in a letter dated January , 2016 (ADAMS Accession No. ML15027A221),

which is available for public inspection at the Commission's Public Document Room (PDR) located at One White Flint North, Public File Area 01-F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available documents created or received at the NRC are accessible electronically through ADAMS in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents stored in ADAMS shoul d contact the NRC PDR reference staff by telephone at 1-800-397-4209 or 301-415-4737 or by e-mail to pdr.resource@nrc.gov.

In accordance with 10 CFR 2.202, any other person adversely affected by this order may submit an answer to this order within 20 days of its publication in the Federal Register. In addition, any other person adversely affected by this order may request a hearing on this order within 20 days of its publication in the Federal Register. Where good cause is shown, consideration will be given to extending the time to answer or request a hearing. A request for extension of time must be directed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, and must include a statement of good cause for the extension.

If a hearing is requested by a person whose interest is adversely affected, the Commission will issue an order designating the time and place of any hearings. If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.

All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.

To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.

Information about applying for a digital ID certificate is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing the E-Submittal server are det ailed in the NRC's "Guidance for Electronic Submission," which is available on the agency's public Web site at http://www.nrc.gov/site-help/e-submittals.html

. Participants may attempt to use other software not listed on the Web site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.

If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC's online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a W eb browser plug-in from the NRC's Web site. Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.

Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or represent ative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.

A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the "Contact Us" link located on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html , by e-mail to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.

Documents submitted in adjudicatory proc eedings will appear in the NRC's electronic hearing docket which is available to the public at http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.

If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which his or her intere st is adversely affected by this order and shall address the criteria set forth in 10 CFR 2.309(d) and (f).

In the absence of any request for hearing or of written approval of an extension of time in which to request a hearing, the provisions specified in Section IV above shall be final 20 days from the date of this order without further order or proceedings. If an extension of time for requesting a hearing has been approved, the provisions specified in Section IV shall be final when the extension expires if a hearing request has not been received.

Dated at Rockville, Maryland, this 5 th day of January 2016.

FOR THE NUCLEAR REGULATORY COMMISSION.

/RA/

Scott Moore, Acting Director, Office of Nuclear Material Safety and Safeguards.