MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 Mr. Samuel Collins, Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-141 5 ACTIONS TO CLOSE CAL 1-05-001 'B' REACTOR RECIRCULATION PUMP HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354 rc rt .. 0 h)
References:
- 1) 2) PSEG letter LR-N05-0017 from C. Bakken to S. Collins, dated January 9,2005 ' NRC Confirmatory Action Letter (CAL) (1-05-OOI), dated January I I , 2005
Dear Mr. Collins:
As discussed in References 1 and 2 above, PSEG committed to and has implemented a vibration-monitoring program to continuously monitor the
'B' Reactor Recirculation Pump's primary and secondary harmonic parameters (total amplitude, 1X and 2X amplitude, and 1X and 2X phase angle). As stated in Reference 1, PSEG procedures HC.OP-AB.RPV-O003(Q), HC.ER-AP.66-0001 (Z), and HC.OP-AR.ZZ-O008(Q)
Attachment E-4 fulfill this commitment.
Prior to implementing any changes to the vibration monitoring procedures, PSEG committed to notify the NRC and provide sufficient time for the NRC to complete a review of the proposed changes. Further, PSEG committed to replace the 'B' Reactor Recirculation Pump's shaft and inspect the pump's rotating assembly and pressure boundary components (such as the pump casing and cover) at the earlier of the next refueling outage or during an outage of sufficient duration to accomplish pump replacement.
PSEG has scheduled the replacement of the 'B' Reactor Recirculation Pump's rotating assembly during the upcoming 1 3'h Refueling Outage (RFOI 3) in April 2006. 95-2168 REV. 7/99 Mr. Samuel Collins LR-N06-0053 2 To complete the actions specified in Reference 2 and committed by PSEG in Reference 1 , PSEG intends to perform the following activities during RFOl3. The 'B" Reactor Recirculation pump rotating assembly will be replaced with a new rotating assembly.
The replacement is being performed as a design change since the rotating assembly being installed is the new 4th generation assembly that is no longer susceptible to the shaft thermal cracking phenomenon of the early generation assemblies. The rotating assembly replacement will be performed during RF013 and per the current schedule, the replacement is expected to begin on April 16'h. It is PSEG's understanding that the NRC may be present during the rotating assembly removal so PSEG will keep the NRC verbally informed of any schedule changes.
During the removal of the rotating assembly, a visual inspection of the assembly will be performed by the pump vendor (Flowserve).
The visual inspection will be performed as the assembly is transported from the pump casing to a shielded storage container.
The Flowserve personnel will inspect the rotating assembly for the following conditions; general conditions of the visual portions of the exterior of the pump assembly, general conditions of the visual portions of the impeller, any noticeable dents or scratches, any shining metal indicating possible interaction with the pump wearing ring, and any abnormalities outside of previous reactor recirculation pump experience.
Upon removal, the rotating assembly will be placed in its shielded storage container and will remain onsite pending final disposition.
Following the inspection of the rotating assembly, an inspection of the pressure boundary components will be performed. The pressure boundary components will be inspected in accordance with ASME Section XI Acceptance Criteria I WB-35 1 9. As required by Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, PSEG will inform the NRC in writing when the actions addressed in the CAL have been completed (i.e., 'B' Reactor Recirculation pump shaft replaced, rotating assembly and pressure boundary components inspected).
In order to support start-up activities following RFOl3, PSEG requests that NRC provide verbal notification, in advance of NRC written correspondence, that the CAL actions have been satisfied as allowed by Section 4.7.7 of the NRC Enforcement Manual. PSEG also understands that upon confirmation by the NRC that the actions addressed in the CAL have been completed, future changes to PSEG procedures HC.OP-AB.RPV-O003(Q), HC.ER-AP.BB-0001 (Z), and HC.OP- AR.ZZ-O008(Q)
Attachment E-4 will be controlled in accordance with PSEG's administrative processes and the need for NRC approval prior to implementation will be determined in accordance with lOCFR50.59.
-. Mr. Samuel Collins LR-N06-0053 3 Should you have any further questions please contact James Barstow at 856- 339-1 384. Sin yrely, George P. Barnes Site Vice President - Hope Creek
.I Mr. Samuel Collins LR-N06-0053 4 C Mr. S. Bailey, Project Manager Salem
& Hope Creek U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08B2 I 1555 Rockville Pike Rockville, MD 20852 Mr. J. White, Chief, Materials
& Structural Engineering Branch United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 USNRC Senior Resident Inspector - HC (X24) Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625 USNRC Document Control Desk Washington, DC 20555