ML18360A471

From kanterella
Revision as of 03:17, 22 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Attachment 3: EC 626319, Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. Ii Air Start Receiver Valves
ML18360A471
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/14/2018
From:
Exelon Generation Co
To:
NRC/RGN-III, Office of Nuclear Reactor Regulation
Shared Package
ML18360A500 List:
References
RS-18-146
Download: ML18360A471 (447)


Text

ATTACHMENT 3 EC 626319, "Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. II Air Start Receiver Valves" Clinton Power Station EC 626319 RO Prepared by: Jared Peterson:

Reviewed by: Steve Queen: Approved by: Steve Queen: UNIT: SYSTEM: 01 DC EVAL DETAILS (CC-AA-309-101)

~I **,&~, Page 1 of 3 11/19/fa 11/19/18 -&~ 11/19/18 TITLE: BATTERY COPING TIME EVALUATION TO SUPPORT INADVERTANT ISOLATION OF DIV. II AIR START RECEIVER VALVES Purpose / Scope This evaluation performs a battery coping analysis for Division 1 125V DC Battery 1A (EPN 1DC01 E) and Division 2 125V DC Battery 1 B (EPN 1 DC02E) following a postulated loss of offsite power (LOOP) resulting in a loss of all AC power. The postulated Extended Loss of AC Power (ELAP) occurs during a specific Mode 4 plant configuration that was present on 5/14/18 at 00:30.

  • During this event, the Division 2 EOG was placed in protected status in preparation for removing Division 1 EOG from service to support the Division 1 bus outage. After the Division 1 EOG was removed from service, operations identified that the Division 2 EOG would not have started because manual valves were closed in the supply line to the automatic air start valves. Therefore, during this time, a loss of offsite power would have resulted in a loss of all AC power to both Division 1 and Division 2. (Ref. IR RCR 4138790-08).

For this Technical Evaluation, three specific cases are evaluated:

CASE 1.1: Division 1 DC Loads with 1 SRV Open Continuously for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included . . CASE 1.2: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and with RCIC on Continuously at T=20 hours The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Additionally, RCIC loads are included on the battery starting at T=20 hours. Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

CASE 2.1: Division 2 DC Loads with 1 SRV Open Continuously for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 2 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

Clinton Power Station *EVAL DETAILS (CC-AA-309-101)

EC 626319 RO Page 2 of 3 Additionally, this evaluation documents the results of pick-up and drop-out testing performed on Safety Relief Valve (SRV) solenoids.

Ultimately, the test results were not used in the battery coping assessments.

Detailed Evaluation The details for how this evaluation was performed are contained in Attachments 1, 2, and 3. In summary, the approach used for this evaluation was to 1. Evaluate the battery coping time for each case using ETAP and the load profiles developed in Attachment

2. The ETAP analysis and results are provided in Attachment 1 to this EC. 2. Develop the DIVISION 1 and 2 load profiles for each case (Cases 1.1, 1.2, and 2.1) using the design loads from design basis calculations 19-D-28 and 19-D-29. Procedurally directed load shedding was credited.

Loads that were out of service were riot included.

The details and results are provided in Attachment 2 to this EC. 3. Complete pick-up and drop-out testing for the two solenoid valves on a spare Clinton SRV (a single SRV has two solenoids).

The details and results of this testing are provided in Attachment 3 to this EC. NOTE: Ultimately, due to the high battery margins shown in Attachments 1 and 2, t~ese test results were not used in the battery coping analysis assessments.

Engineering Judgments and Assumptions All engineering judgments and assumptions are detailed in Attachments 1, 2, and 3.

Clinton Power Station EC 626319 RO EVAL DETAILS (CC-AA-309-101)

Page 3 of 3 Conclusions

/ Findings The following table presents the conclusions from each of the three cases evaluated.

It is applicable for the specific Mode 4 plant configuration that was present-on 5/14/18 at 00:30. Case Evaluated CASE 1.1: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that w*ere out of service are not included.

CASE 1.2: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and with RCIC on Continuously at T=20 *hours The Divjsion 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Additionally, RCIC loads are included on the battery starting at T=20 hours. Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

CASE 2.1: Division 2 DC Loads with 1 SRV Open . Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 2 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

References All references are listed in Attachments 1, 2, and 3_. Attachments Conclusions The Division 1 battery would have maintained 1 SRV open continuously and supplied the loads that would have been present during a postulated ELAP for more than 156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br />. The Division 1 battery would have maintained 1 SRV open continuously, RCIC on continuously (starting at T=20 hours), and supplied the loads that would have been present during a postulated ELAP for more than 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. -*The Division 2 battery could have maintained 1 SRV open continuously and supplied the loads that would have been present during a postulated ELAP for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Attachment 1: Division 1 and Division 2 Battery Coping Time Analysis (ETAP) Attachment 2: Division 1 and Division 2 DC Bus Loading Profile . Attachment 3: SRV Solenoid Minimum Pick-up and Drop-out Voltage Test Attachment 1 EC 626319 Attachment 1 . Page 1 of 6 Division 1 and Division 2 Battery Coping Time Analysis Prepared by: 11/19/2018 Reviewed by: I 11/19/2018

  • Division 1 and Division 2 Battery Coping Time Analysis 1.0 Purpose EC 626319 Attachment 1 Page 2 of 6 The purpose of this analysis is to perform a 24-hour battery coping analysis for Division 1 125V DC Battery 1A (EPN 1 DC01 E) and Division 2 125V DC Battery 1 B (EPN 1 DC02E) following a postulated loss of offsite power (LOOP) resulting in a postulated loss of all AC power. The postulated Extended Loss of AC Power (ELAP) occurs during a specific Mode 4 plant configuration that was present on 5/14/18 at 00:30 (Ref. IR 4138790).

The scope of this analysis is to perform a battery sizing and discharge calculation to verify the following:

1.1 The existing batteries are adequately sized to supply the loads that would have been present during for a 24-hour extended Station Blackout (SBO). 1.1 The voltages at 125 \/DC MCC's 1DC13E and 1DC14E are adequate to supply minimum required voltages to the de circuit end devices. This requirement is met by using the MCCs acceptance voltage at ;:;:105 VDC. 2.0 Design Inputs 2.1. Division 1 Battery: C&D Type LCR-25, 58 cells, minimum* 1.81 Vdc per cell (Ref. 5.1, Input 2.2) 2.2. Division 2 Battery: C&D Type LCR-17, 58 cells, minimum 1.81 Vdc per cell (Ref. 5.2, Input 2.2) 2.3. Division 1 Battery Room Minimum Temperature is 65°F (or 18.333°C) (Ref. 5.1, Input 2.7), which correlates to a temperature correction factor (TCF) of 108% per ETAP. 2.4. Division 2 Battery Room Minimum Temperature is 60°F (or 15.556°C) (Ref. 5.2, Input 2.5), which correlates to a temperature correction factor (TCF) of 111.1 % per ETAP. 2.5. Division 1 cable total resistance between battery and 125 VDC MCC 1DC13E is 0.00308 ohm (or 0.00154 ohm per leg) at 40°C (Ref. 5.1, Attachment

12) 2.6. Division 2 cable total resistance between battery and 125 VDC MCC 1DC14E is 0.00202 ohm (or 0.00101 ohm per leg) at 40°C (Ref. 5.2, Attachment
12) 2.7. Division 1 minimum required DC MCC voltage for all DC loads excluding MOV's is 105 VDC (Ref. 5.1 Attachment
12) 2.8. Division 2 minimum required DC MCC voltage for all DC loads excluding MOV's is 105 VDC (Ref. 5.2 Attachment
12) 2.9. Division 1 load duty cycle is provided in Table A and is from Ref. 1, Attachment 3 and Ref. 5.3. 2.10. Division 2 load duty cycle is provided in Table B and is from Ref. 2, Attachment 3 and Ref. 5.3. 2.11. Division 1 battery existing battery capacity is 104.7% (Ref. 5.4) 2.12. Division 2 battery existing battery capacity is 119.1 % (Ref. 5.5) 2.13. Battery ampere per positive plate as a function of time and voltage was obtained from Reference 5.6. 2.14. The battery load profile includes the actual loads that were on the battery at the time of the event and accounts for load shedding that would have occurred at 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> as required by the Division 1 and Division 2 Battery Coping Time Analysis EC 626319 Attachment 1 Page 3 of 6 load shed procedure.

An excel spreadsheet containing the load profile is included in Attachment 2 of this EC. 3.0 Acceptance Criteria 3.1. Calculated number of total positive plates for Division 1 battery ::; 12 plates. 3.2. Calculated number of total positive plates for Division 2 battery::;

8 plates. -3.3. Calculated voltage at 125 voe MCC's 1A (1DC13E) and 1B (1DC14E) ~105.0 voe. This voltage assures that loads on the MCCs have adequate voltage to perform their intended functions (Refs. 5.1 and 5.2). 4.0 Assumptions

4.1. Based

on the test results (Ref. 5.4 and 5.5) the initial battery capacity is conservatively assumed to be 100% at rated temperature (25°C or 77°F). 4.2. One SRV is assumed to be open throughout the event (the full duration of each of the three cases). Its solenoid valve will therefore draw load from a battery continuously.

EC 624344 Rev. 0 shows that at the decay heat levels present at the end of the refueling outage, pressure control would not have to be initiated until about 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after T=O and would take only intermittent use of one SRV. Therefore, assuming that one SRV is continuously open is conservative.

4.3. The battery aging factor is considered to be 100%. This is appropriate for coping studies. The initial capacity of the Div. I and Div. II batteries are 1.04. 7% and 119.1 %, respectively (Refs. 5.4 and 5.5). This ensures that the batteries are at a capacity higher than 100% and considering an aging factor of 100% is conservative and adequate for the battery coping studies. It should be emphasized that as long as the battery capacity is 100%, an aging factor greater than 100% for the battery coping studies is not required.

An aging factor greater than 100% is only recommended when sizing the lead-acid battery to account for battery performance that drops over time due to aging. 4.4. All loads are modeled as constant current for conservative estimation of the battery coping times. Also, the Div. I load "RCIC GLAND SEAL AIR COMPR (COMPT1 OD)" which is a motor load that draw full load current of 55 amps at 120 VDC (see Attachment

2) is modeled as constant current load. This load is modeled conservatively to draw 62._86 (55x120/105) amps assuming the load bus voltage is held at 105 VDC. 5.0 References

5.1. Calculation

19-D-28 Rev. 015 -Review of Division 1 DC System Review 1A. 5.2. Calculation 19-D-29 Rev. 013 -Review of DIV II Direct Current (DC). 5.3. CPS Procedure 4200.01_C002

-DC Load Shedding During a SBO. 5.4. Work Order (WO) 01910395-01 completed 5-4-18 -DIV 1 Battery 1 DC01 E Modified Performance Test. 5.5. Work Order (WO) 01705484-01 completed 5-27-17 -DIV 2 Battery 1 DC02E Modified Performance Test.

Division 1 and Division 2 Battery Coping Time Analysis EC 626319 Attachment 1 Page 4 of 6 5.6. EC 391824 Rev. 000 Attachment 4 -Long Rate Discharge Capacity Curve Cell Type: LCR-13/33. 6.0 Identification of Computer Programs Operation Technology, Inc. Program ETAP 14.1 N, is used to perform the battery sizing and discharge analysis.

7.0 Methodology

The Division 1 and 2 DC systems were modeled in ETAP as shown in Figure 1. The loading during each time interval was modeled as a separate.load.

The loading values for each load are from Attachment 2 of this EC (Tables 1 and 2). The battery analyses were performed by running the ETAP Battery Sizing and Discharge Analysis which calculated the required battery size and battery and bus voltages.

Since the existing capacity of both batteries is greater than 100% based on recent tests, the correction factor for "Aging Compensation" was set equal to 100% and initial capacity was set equal to 100%. Design margin was also set equal to 100% since design margin is for future load additions.

Specific cases of loadings included in this analysis includes:

CASE 1.1: Division 1 DC Loads with 1_ SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

CASE 1.2: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and with RCIC ON fromT= 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> to >24 hours The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Additionally, RCIC is loaded on the battery starting at T=20 hours. Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

CASE 2.1: Division 2 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 2 battery supplies the loads present at the. start.of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

8.0 Results

8.1 Case 1.1 Division 1 and Division 2 Battery Coping Time Analysis EC 626319 Attachment 1 Page 5 of 6 8.1.1 For the Division 1 battery the required number of positive i;,lates was calculated to be 11.343 plates for 156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br /> coping study, whii;;h is significantly less than total number of positive plates (i.e., 12 plates) in the existing battery.

  • 8.1.2 For Division 1 DC MCC 1 A (1DC13E) the bus voltage occurred_

during the first second was calculated to be 112.67 4 VDC. The bus voltage at the end of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br /> are calculated to be 115. 001 VDC and 108.644 VDC, respectively.

Therefore, the DC MCC 1A voltage remained above the minimum required voltage of 105 VDC for the entire discharge period of 156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br />. 8.2 Case 1.2 8.2.1 For the Division 1 battery the required number of positive plates was calculated to be 11.622 plates for 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> coping study, which is significantly less than total number of positive plates (i.e., 12 plates) in the existing battery. 8.2.2 For Division 1 DC MCC 1A (1DC13E) the ~us voltage during the first second was calculated to be 112.674 VDC. The bus voltage at the end of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> are 113.353 VDC and 106.565 VDC, respectively.

Therefore, the DC MCC 1A voltage remained above the minimum required voltage of 105 VDC.for the entire discharge period of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. 8.3 Case2.1 8.3.1 For the Division 2 battery the required number of positive plates was calculated to be 7.958 plates for 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> coping study, which is less than total number of positive plates (i.e., 8 plates) in the existing battery. 8.3.2 For Division 2 DC MCC 1 B (1 DC14E) the bus voltage during the first second was calculated to be 110.037 VDC. The bus voltage at the end of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> are 107.627 VDC and 106.733 voe, respectively.

Therefore, the DC MCC 18 voltage remained above the minimum required voltage of 105 VDC for the entire discharge period -of 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />. 8.4 The ETAP reports and plots for each battery analysis cases are attached (see sections 10.2-10.6). 9 , Conclusions For the specific Mode 4 plant configuration that was present on 5/14/18 at 00:30: 9.1 The Division 1 battery .for Case 1.1 could have maintained 1 SRV open continuously and supplied the loads that would have been present during a postulated extended Station Blackout (SBO) for about 156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br />. Therefore, there was significant margin on the DIV 1 battery for these loads to operate much longer than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. 9.2 The Division 1 battery for Case 1.2 could have maintained 1 SRV open continuously, RCIC ON continuously (starting at T=20 hours), and supplied the loads that would have been present Division 1 and Division 2 Battery Coping Time Analysis EC 626319 Attachment 1 Page 6 of 6 during a postulated extended Station Blackout (SBO) for about 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. Therefore, there was additional margin on the DIV 1 battery for these loads to operate longer than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. 9.3 The*Division 2 battery could have maintained 1 SRV open continuously and supplied the loads that would have been present during a postulated extended Station Blackout (SBO) for about 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />. 9.4 The analysis performed meet the acceptance criteria 3.1-3.3. 9.5 Modeling the load type as constant current load for all load types is conservative.

The battery coping duration can be extended further if the loads are modeled individually with their load type. Most loads are constant impedance load resulting in a reduced load current as the voltage drops with battery discharge and thus will yield a higher battery coping time. 10 Enclosures 10.1 C&D Battery Characteristics 10.2 ETAP Modeled Battery Characteristics Data 10.3 Figure 1 -ETAP Battery One-Line Diagram of DC Divisions 1 and 2 10.4 ETAP Reports for CASE 1.1: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ETAP Report Battery Sizing Calculation for Division 1 Battery 1A ETAP Report Battery Discharge Tabulation for Division 1 Battery 1A ETAP Report Bus Voltage Tabulation During Battery Discharge for Division 1 Battery 1A Battery 1A Discharge, Load Profile, and Bus Plots 10.5 ETAP Reports for CASE 1.2: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and with RCIC on for greater than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ETAP Report Battery Sizing Calculation for Division 1 Battery 1A ETAP Report Battery Discharge Tabulation for Divi~ion 1 Battery ETAP Report Bus Voltage Tabulation During Battery Discharge for Division 1 Battery 1A Battery 1A Discharge, Load Profile, and Bus Plots 10.6 ETAP Reports for CASE 2.1: Division 2 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ETAP Report Battery Discharge Tabulation for Division 2 Battery 1 B ETAP Report Bus Voltage Tabulation During Battery Discharge for Division 2 Battery 1 B ETAP Report Bus Voltage Tabulation During Battery Discharge for Division 1 Battery 1 B Battery 1 B Discharge, Load Profile, and Bus Plots

  • EC 626319 10.1 C&D Battery Characteristic s 0 Note: Capacity may vary 1 -3% from hand drawn curve. w > 0 er: 200 0. 0. ct ..... 190 w 0 e 180 en "' z 170 Q iii en E > z 0 160 0 u.. w j:: 0 IX *c: 150 0. ii: u Q) <I) uJ w 14 0 w < 0 .!: :5 ..J a. a. w > 120 > j::: w iii 110 ..J " > 0 w a. er: IX 100 w "' a. 90 en "' :g en !/) IX ~o 0 ~+ ~-::, 80 0 0::: :::C: LL W ...r J: ot--~t-,W~

c.. 70 ....,~ ..... ,....~o 1~1 1 l! :a:: en <( 60 ::E w I-50 N en > en 40 IX w 3 0 I i ti 3:: 0 ;;::w : u.j~ a. 20 ; iii g; ; er: ct IX : Oww::>:i:

w 10 j0.1-0::0o I-wu..>-::>~w IX 005~0(!) <( 0 0 er: a: er: J: :;;w~wo.ct u 0 20 40 60 80 100 120 140 1 60 1 80 200 220 _.muo.1-:i:

ul~~~ifl~

C o!I AMPS P ER POS I TIVE PLATE UZWl-1-0 u CAPAC I TY FACTOR DATA CELL TYPE: 1 MIN. 15 MIN. 60 MIN. 3 Hr. 8 Hr. 2LCR-1 3 1.000 1.0 95 1.055 1.000 1.0 35 2LCR-15 1.000 1.0 95 1.055 1.000 1.035 LCR-13 1.0 5 0 1.050 1.035 1.050 1.035 LCR-15 1.050 1.050 1.035 1.050 1.035 LCR-17 1.050 1.050 1.035 1.050 1.035 LCR-19 1.143 1.113 1.050 1.050 1.035 LCR-21 1.1 43 1.113 1.050 1.0 50 1.0 35 LC R-23 1.085 1.0 87 1.050 1.050 1.035 LCR-25 1.071 1.055 1.040 1.050 1.035 LCR-27 1.040 1.050 1.025 1.0 30 1.035 LCR-29 1.015 1.0 35 1.015 1.000 1.000 LCR-31 1.005 1.00 5 1.000 1.000 1.000 LCR-33 1.000 1.000 1.000 1.000 1.000 LCU-19 1.14 3 1.113 1.050 1.035 1.000 LCU-27 1.000 1.000 1.000 1.000 1.000 ,. 240 260 280 3 00 320 340 140 K' 13 0 120 110 100 90 80 70 6 0 36 0 Attachment 1 Page 1 of 2 E' I' E F C' J K -C r EC 626319 120 /96,. 1841 '72" ""' " 60 48 40 ( 32 28 u, 24 I., 20 :s 0 16 :::c C: 12 *->i :!:: ' C.) ca C. ' ca (..) 1 10.1 C&D Battery Characteristics Long Rate Discharge Capacity Curve Cell Type: LCR-13/33

""' l'o,.. "-. ' ""-~ "' "' ~. "" ""'l's. A '~ ""-, "' "" "' """ " I',..' ""'" " "' " "'~ "-. " ' """" * "' "' i"...~'" "" "" "~: I"'-. T's. "<: " I"'-. "" ""' "' " " "" ... I'-,. "' "" ""' I') "" "" \ "" "" "' . -I'--.* >s ~j, I"-"' I"-(; " ) N a 'j ,. :: "" "' ""' " " "" "" "" " ' Attachment 1 Page 2 of 2 1.5 2 2.5 3 3.5 4 5 6 7 8 9101112 141618202225

  • Amperes Per Positive EC 626319 10.2 ETAP Modeled Battery Characteristics Data Project: Location:

Contract:

Engineer:

Clinton Flex Study KCI Badar Hussain DIV 1 Battery lA 24-Hour Coping Study Project File: CPS SBO Study Output Report: BATT 1A SIZING 24 Hr -J.8/0f' 200 ISO so 20 Type: AH vs. Amp MFR: C&D Tech Md!: CPS LCR-2J vPC: 2.06n,ll SG: 1.2/J TimeConslanl:

O.OOOOsec011d Tl!mp!rature:

2J.O&:grrl!

ETAP 14.1.0N Study Case: BSlA-24 Battery Characteristics 60 R --Anlp<!t'l.'S per Posiliv.:

Pl ale 80 Date: SN: Attachment 1 Page 1 of 1 11-16-2018 KC I CONSULT Revision:

Base Config.: Normal 10 10 EC 626319 One-Line Diagram OLVl (Edit Mode) DIV I BATT 1A BATT 1A BUS 1DC01A/B DC MCC 1A lALoad(Os-ls) 1ALoad(60s-lh)

= 1A ADS (lh-24h) 10.3 Figure 1 -ETAP Battery One-Line Diagram of DC Divisions 1 and 2 DIV II BATT lB BATT lB BUS 1DC03A/B DC MCC lB = 1ALoad(24h-4Sh) 1BLoad(Os-1s) 1BLoad(60s-lh) lB ADS (lh-24h) 1BLoad(24h-48h)

= lALoad(ls-60s) lALoad (lh-24h) 1A ADS (24h-4 Sh) 1BLoad(ls-60s) 1BLoad(lh-24h) lB ADS (24h-4Sh)

DIV I BATT 1A2 BATT lA BUS2 1DC01A/B2 DC MCC 1A2 = = = 1A2 Load(Os-ls) 1A2 Load(60s-lh) 1A2 ADS (lh-24h) 1A2 Load(20hlls-20h60s) 1A2 Load(20h18s-20h45s) 1A2 Load (24h-4 Sh) 1A2 Load(24h-40h)

= = = = 1A2 Load(ls-60s) 1A2 Load(lh-24h) 1A2 Load (20hSs-20hlls) 1A2 Load(20hl5s-20h18s) 1A2 Load (20h-24h) 1A2 ADS (24h-4Sh) page 1 11:06:55 Nov 17,2018 Project File: CPS SBO Study Attachment 1 Page 1 of 1 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain Filename:

CPS SBO Study DIV I Batteiy IA48-Hom; Coping Study Number of Buses: Number of Converters:

Number of Branches:

Number of Batteries:

Number of Loads: Unit System: Project File: Output File: Voltage Reg. 0 Charger 0 Cable I Batteiy I Motor 0 English CPS SBO Study ETAP 14.1.0N Study Case: BS IA-48 Electrical Transient Analvzer Program Battery Sizing 'Calculation Batteiy ID: DIV I BATT IA Duty Cycle Categoiy:

Normal Duty Cycle from: DC Load Flow Calculation.

Load Duration:

Duty Cycle Span Diversity Factor: 100 % Load Total 2 2 UPS Inverter 0 0 Impedance Tie PD 0 0 Static Load Lumped Load 7 0 DC Converter 0 Total .Composite CSD 0 C:\Badar\CLINTON DC\CPS SBO Study\BATT IA Sizing 48 HR.DB IS \ Page: Date: 11-17-2018 SN: KCICONSULT Revision:

Base Config.: Normal Total 0 Total 7 Attachment 1 Page 1 of 274 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page:

Date: SN: Revision:

Config.: DIV I Battery IA48-HourCopingStudy Bus and Connected Load Data ,, Bus Connected Load ID V ID Type V FLA DCMCC IA 125.00 IALoad(Os-ls)

Static Load 120.00 280.20 DCMCC IA 125.00 IALoad(ls-60s)

Static Load 120.00 109.20 DCMCC IA 125.00 IALoad(60s-lh)

Static Load 120.00 98.81 DCMCCIA 125.00 I ALoad(l h-24h) Static Load 120.00 12.24 DCMCC IA* 125.00 IALoad(24h-48h)

Static Load 120.00 12.24 DCMCCIA 125.00 IAADS(lh-24h)

Static Load 120.00 0.38 DCMCCIA 125.00 IAADS(24h-48h)

Static Load 120.00 0.38 2 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 2 of274 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Cable Input Data 3 11-17-2018 KCICONSULT Base Nonna! Attachment 1 Page 3 of 274 Cable Connected Buses ohms or micro H / I 000 ft per Conductor ID From To Length(ft)

  1. /Phase T(OC) R L IDCOIA/B BATIIABUS DCMCC IA 10.0 90 0.15400 0.00 Cable resistance listed at the specified temperature EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config.: 4 11-17-2018 KCICONSULT Base Nonna! DIV I Batteiy IA 48-Hour Coping Study Branch/ Converter/

UPS Connections CKT/Branch Connected Bus ID Impedance ID Type From Bus To Bus (ohm) (%) 100 MVAb IDCOIAIB Cable BATTIABUS DCMCC IA 0.00364 2543.13 / Attachment 1 Page 4 of 274 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study ti (s) Duty Cycle Load ID: 1AADS(lh-24h)

Constant Current Load Non-Random Load Random Load 12 (s) Amp Duration (s) Amp 3600.000 86599.980 0.38 tl (s) Load ID: 1AADS(24h-48h)

Constant Current Load Non-,Random Load Random Load t2 (s) Amp Duration (s) Amp 86599.980 561799.980 0.38 ti (s) Load ID: lALoad(Os-ls)

Constant Current Load Non-Random Load Random Load t2 (s) Amp Duration (s) Amp 0.000 1.000 280.20 Load ID: 1ALoad(lh-24h)

Constant Current Load Non-Random Load Random Load ti (s) 3600.000 t2 (s) 86599.980 Amp 12.24 Duration (s) Amp Load ID: lALoad(ls-60s)

Constant Current Load Non-Random Load Random Load tl (s) 1.000 12 (s) 60.000 Amp 109.20 Duration (s) Amp 5 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 5 of274 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config.: DIV I Batteiy IA 48-Hour Coping Study Load ID: 1ALoad(24h-48h)

Constant Cnrrent Load Non-Random Load Random Load tl (s) t2 (s) Amp Duration (s) 86599.980 561799.980 12.24 Load ID: lALoad(60s-lh)

Constant Current Load Amp Non-Random Load Random Load tl (s) 60.000 t2 (s) 3600.000 Amp 98.81 Duration (s) Amp 6 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 6 of 274 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Battery ID: DIV I BATT IA Method: Load Flow Calculation Battery Load Profile for Sizing Non-Random Load Random Load t'l 12 ti !2 (s) (s) Amp (s) (s) Amp 0.000 60.000 280.20 0.000 0.000 0.00 60.000 3600.000 98.81 3600.000 561799.980 12.62 561799.980 0.00 Battery Load Profile for Discharge Non-Random Load Random Load ti 12 ti 12 (s) (s) Amp (s) (s) Amp 0.000 1.000 280.20 0.000 0.000 0.00 1.000 60.000 109.20 60.000 3600.000 98.81 3600.000 561799.980 12.62 561799.980 0.00 7 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 7 of 274 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Project: Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain Filename:

CPS SBO Study

  • for greater than 24 Hrs ETAP 14.1.0N Study Case: BSIA-48 DIV I Battery IA 48-Hour Coping Study Time 1.75 1.00 150.00 15.00 121.42 30.00 101.00 60.00 76.25 120.00 52.00 180.00 40.00 240.00 31.20 300.00 27.50 480.00 18.88 720.00 13.38 960.00 10.70 1200.00 8.74 1440.00 7.40 1920.00 5.70 2400.00 4.70 2880.00 4.00 1.78 MFR: C&D Tech Model: CPS LCR-25 Type: Time vs amp No of Plates: 25 Capacity: . 1800 AH I Min. A Rate: 1800 Battery Characteristics V/Cell: 2.063 Rp: 0.001404 Resistance/Positive Plate Temp: 25 °C Battery sizes given in the library are used. Ampere per Positive Plate as a Function ofTime (minutes) and Voltage (volts) 1.81 # 1.85 1.90 1.95 ---------------

129.75 109.00 83.83 50.34 21.42 109.17 95.50 76.17 47.26 20.78 92.92 83.58 68.75 42.00 19.10 71.83 66.42 56.75 38.27 19.76 49.88 47.00 41.63 29.70 18.00 38.50 36.63 33.00 24.89 14.70 31.63 30.25 27.50 20.00 12.00 26.75 24.80 23.63 17.75 10.80 18.50 17.88 16.75 13.46 8.90 13.13 12.75 12.13 10.00 6.65 10.34 10.10 9.35 7.85 5.35 8.50 8.30 7.74 6.60 4.60 7.30 7.15 6.70 5.65 4.10 5.64 5.50 5.24 4.56 3.30 4.62 4.58 4.38 3.80 2.80 3.88 3.85 3.70 3.25 2.45 # Indicates the curve used in battery sizing.

  • The ampere value is missing in the battery library and this value was estimated based on user entered library data. Page: Date: SN: Revision:

Config.: 8 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 8 of 274 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Section Size for Non-Rand.

Load Calculation Results (I Strings) Section Size for Rand. Load 9 11-17-2018 KC!CONSULT Base Normal # t start 0.000 tend 1.000 Size/String 2.571 1.503 10.507 Total Size # t start 0.000 tend 0.000 Size/String 0.000 Total Size 2 3 0.000 60.000 0.000 9363.333 2.571 1.503 10.507 0.000 Attachment 1 Page 9 of 274 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Attachment 1 Page 10 of 27 4 Project: Location:

Contract:

Clinton Flex Study KCJ* Engineer:

Badar Hussain I Filename:

CPS SBO Study DIV I Battery IA 48-Hour Coping Study Change in Load Load Period Duration of Period Time to End of Section ETAP 14.1.0N Study Case: BS IA-48 Non-Random Loads (I Strings) Capacity at T Min Rate (RT) Required Section Size (Positive Plates/String) (amperes) (amperes) (minutes) (minutes) (Str* Amp/PP) Pos. Values Nea.ValuesSection I -First period only -If A2 is greater than Al, go to Section 2. Al=280 Al-0=280 Ml=l T=M!=l 109.0 Section 1 Sub-Total:

Total: Section 2 -First two periods only -If A3 is greater than A2, go to Section 3. A1=280 2 A2=99 Al-0=280 A2-AI~I81 Ml=l M2=59 T=Ml+M2=60 T=M2=59 66.4 66.8 Section 2 Sub-Total:

Total: Section 3 -First three periods only -If A4 is greater than A3, go to Section 4. Al=280 2 A2=99 3 A3=13 Al-0=280 A2-Al=-181 A3-A2~86 Ml=! T=M!+M2+M3=9,363 M2=59 T=M2+M3=9,362 M3=9,303 T=M3=9,303 u 1.3 1.3 Section 3 Sub-Total:

Total: 2.57 2.57 2.57 4.22 -2.72 4.22 -2.72 1.50 223.68 -144.79 -68.39 223.68 -213.17 10.51 Page: 10 Date: 11-17-2018 SN: KCICONSULT Revision:

Base Config.: Nonna! Required Total Section Size (Positive Plates) Pos._Values Neg.Valu_es::::::::::J 2.57 2.57 2.57 4.22 -2.72 4.22 -2.72 1.50 223.68 -144.79 -68.39 223.68 -213.17 10.51 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIA-48 Page: Date: SN: Revision:

Config'.:

DIV 1 Battery IA 48-Hour Coping Study Battery Sizing Summary Page Battery ID: Duty Cycle Category:

Load Duration:

Voltage Requirements:

System: DIVI BATT IA Normal Duty Cycle Span Nominal Voltage = 125.00 Maximum System Voltage Deviation

= 120 % Minimtun System Voltage Deviation

= 80 % Battery: Battery Charge Voltage= 2.30 V /Cell Battery Minimum Discharge Voltage= 1.81 V/Cell Temperature

= 18 *c (Battery minimum temperature)

Desirable Number of Cells = 58 Correction Factors ('Yo): Temperature 108.0 Design Margin 100 Aging 100 Calculated BatterySize Based on the Curve for 25 Plates: Required Number of Positive Plates Per String Max. Non-Rand.

Load: 10.507 Max Rand. Load: 0.000 Uncorrected:

10.507 Corrected:

11.343 Recommended Ntunber of Total Plates per String: 25 Number of cells: Number of Strings: Rated Voltage: Rated Capacity:

Existing Battery: Number of Strings: Number of Positive Plates per String: Number of Total Positive Plates: 58 119.65 1800 Difference in Total Positive Plates between Existing and Required:

Initial Capacity 100 Total 10.507 0.000 10.507 11.343 Total 108.0 (Corrected by multiplying correction factor) 12 12 0.657 II 11-17-2018 Attachment 1 Page 11 of 274 KCICONSULT Base Nonna!

EC 626319 Project: Location: .Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KCI Badar Hussain CPS SBO Study ETAP 14.1.0N Shtdy Case: BSlA-48 Page: Date: SN: Revision:

Config.: DIV 1 Battery IA 48-Hour Coping Study Battery ID: Number of cells: Number of Strings: Rated Voltage: Rated Capacity:

Duty Cycle Category:

Load Duration:

Voltage Requirements:

System: Battery: Battery Discharge Summary Page DIV I BATT IA 58 1 119.65 1800AH Nonna! Duty Cycle Span Nominal Voltage = 125.00 Maximum System Voltage Deviation

= 120 % Minimmn System Voltage Deviation

= 80 % Battery Charge Voltage = 2.30 V /Cell Battery Minimum Discharge Voltage = 1.81 V/Cell Temperatt\re

= 18 *c (Battery minimmn teniperahtre}

Voltage Drop Calculation Parameters:

Time Step = 1.00 Minute Maximum Voltage Limit = 100.0 % Voltage Drop Calculation Parameters:

Load Duty Cycle -No One-minute Span Correction Factors(%):

Temperature Aging 108.0 100 Initial Capacity Total 100 108.0 12

  • 11-17-2018 Attachment 1 Page 12 of274 KCICONSULT Base Nonna!

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Battery Discharge Tabulation Discharl(e Discharl(e 11-17-2018 Attachment 1 Page 13 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour) v-V+ 0.000 280.2 132.67 119.654 112.674 0.017 109.2 132.75 112.674 114.136 1.000 98.8 134.54 114.139 114.228 2.000 98.8 136.19 114.231 114.231 3.000 98.8 137.83 114.234 114.234 4.000 98.8 139.48 114.237 114.237 5.000 98.8 141.13 114.239 114.239 6.000 98.8 142.77 114.243 114.243 7.000 98.8 144.42 114.248 114.248 8.000 98.8 146.07 114.252 114.252 9.000 98.8 147.71 114.257 114.257 10.000 98.8 149.36 114.261 114.261 11.000 98.8 151.01 114.266 114.266 12.000 98.8 152.65 114.271 114.271 13.000 98.8 154.30 114.275 114.275 14.000-98.8 155.95 114.280 114.280 15.000 98.8 157.59 114.285 114.285 16.000 98.8 159.24 114.290 114.290 17.000 98.8 160.89 114.294 114.294 18.000 98.8 162.54 114.299 114.299 19.000 98.8 164.18 114.304 114.304 20.000 98.8 165.83 114.309 114.309 21.000 98.8 167.48 114.314 114.314 22.000 98.8 169.12 114.319 114.319 23.000 98.8 170.77 114.324 114.324 24.000 98.8 172.42 114.329 114.329 25.000 98.8 174.06 114.334 114.334 26.000 98.8 175.71 114.339 114.339 27.000 98.8 177.36 114.344 114.344 28.000 98.8 179.00 114.349 114.349 29.000 98.8 180.65 114.355 114.355 30.000 98.8 182.30 114.360 114.360 31.000 98.8 183.94 114.365 114.365 32.000 98.8 185.59 114.370 114.370 33.000 98.8 187.24 114.376 114.376 34.000 98.8 188.88 114.381 114.381 35.000 98.8 190.53 114.387 114.387 36.000 98.8 192.18 114.392 114.392 37.000 98.8 193.83 114.398 114.398 38.000 98.8 195.47 114.403 114.403 39.000 98.8 197.12 114.409 114.409 40.000 98.8 198.77 114.414 114.414 41.000 98.8 200.41 114.420 114.420 42.000 98.8_ 202.06 114.426 114.426 43.000 98.8 203.71 114.431 114.431 44.000 98.8. 205.35 114.437 114.437 45.000 98.8 207.00 114.443 114.443 46.000 98.8 208.65 114.449 114.449 47.000 98.8 210.29 114.455 114.455 48.000 98.8 211.94 114.461 114.461 49.000 98.8 213.59 114.467 114.467 50.000 98.8 215.23 114.473 114.473 51.000 98.8 216.88 114.479 114.479 52.000 98.8 218.53 114.485 114.485 53.000 98.8 220.17 114.491 114.491 54.000 98.8 221.82 114.497 114.497 55.000 98.8 223.47 114.503 114.503 56.000 98.8 225.12 114.510 114.510 57.000 98.8 226.76 114.516 114.516 58.000 98.8 228.41 114.522 114.522 59.000 98.8 230.06 114.529 114.529 60.000 12.6 231.70 114.535 115.431 61.000 12.6 231.91 115.433 115.433 62.000 12.6 232.12 115.434 115.434 63.000 12.6 232.33 115.435 115.435 64.000 12.6 232.54 115.436 115.436 65.000 12.6 232.75 115.438 115.438 66.000 12.6 232.96 115.439 115.439 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery 1A48-Hour Coping Study Discharge Discharge 2 11-17-2018 Attachment 1 Page 14 of274 KCICONSULT Base Normal Current Capacity Voltagc(V)

Current Capacity Voltage (V)

Time (Amp) (Amp-Hou.-)

v-V+ Time (Amp) (Amp-Hour)

V-V+ 67.000 12.6 233.17 115.440 115.440 68.000 12.6 233.38 115.441 115.441 69.000 12.6 233.59 115.443 115.443 70.000 12.6 233.81 115.444 115.444 71.000 12.6 234.02 115.445 115.445 72.000 12.6 234.23 115.447 115.447 73.000 12.6 234.44 115.448 115.448 74.000 12.6 234.65 115.449 115.449 75.000 12.6 234.86 115.450 115.450 76.000 12.6 235.07 115.452 115A52 *77.000 12.6 235.28 115.453 115.453 78.000 12.6 235.49 115.454 115.454 79.000 12.6 235.70 115.456 115.456 80.000 12.6 235.91 115.457 115.457 81.000 12.6 236.12 115.458 115.458 82.000 12.6 236.33 115.459 115.459 83.000 . 12.6 236.54 115.461 115.461 84.000 12.6 236.75 115.462 115.462 85.000 12.6 236.96 115.463 115.463 86.000 12.6 237.17 115.464 115.464 87.000 12.6 237.38 115.465 115.465 88.000 12.6 237.59 115.466 115.466 89.000 12.6 237.80 115.466 115.466 90.000 12.6 238.01 115.467 115.467 91.000 12.6 238.22 115.467 115.467 92.000 12.6 238.43 115.468 115.468 93.000 12.6 238.64 115.469 115.469 94.000 12.6 238.85 115.469 115.469 95.000 12.6 239.06 115.470 115.470 96.000 12.6 239.27 115.470 115.470 97.000 12.6 239.48 115.471 115.471 98.000 12.6 239.69 115.472 115.472 99.000 12.6 239.90 115.472 115.472 100.000 12.6 240.11 115.473 115.473 101.000 12.6 240.32 115.473 115.473 102.000 12.6 240.53 115.474 115.474 103.000 12.6 240.74 115.475 115.475 104.000 12.6 240.95 115.475 115.475 105.000 12.6 241.17 115.476 115.476 106.000 12.6 241.38 115.476 115.476 107.000 12.6 241.59 115.477 115.477 108.000 12.6 241.80 1_15.478 115.478 109.000 12.6 242.01 115.478 115.478 110.000 12.6 242.22 115.479 115.479 111.000 12.6 242.43 115.479 115.479 112.000 12.6 242.64 115.480 115.480 113.000 12.6 242.85 115.481 115.481 114.000 12.6 243.06 115.481 115.481 115.000 12.6 243.27 115.482 115.482 116.000 12.6 243.48 115.483 115.483 117.000 12.6 243.69 115.483 115.483 118.000 12.6 243.90 115.484 115.484 119.000 12.6 244.11 115.484 115.484 120.000 12.6 244.32 115.485 115.485 121.000 12.6 244.53 115.486 115.486 122.000 *12.6 244.74 115.486 115.486 123.000 12.6 244.95 115.487 115.487 124.000 12.6 245.16 115.487 115.487 125.000 12.6 245.37 115.488 115.488 126.000 12.6 245.58 115.489 115.489 127.000 12.6 245.79 115.489 115.489 128.000 12.6 246.00 115.490 115.490 129.000 12.6 246.21 115.491 115.491 130.000 12.6 246.42 115.491 115.491 131.000 12.6 246.63 115.492 115.492 132.000 12.6 246.84 115.492 115.492 133.000 12.6 247.05 115.493 115.493 134.000 12.6 247.26 115.494 115.494 135.000 12.6 247.47 115.494 115.494 136.000 12.6 247.68 115.495 115.495 137.000 12.6 247.89 115.495 115.495 138.000 12.6 248.10 115.496 115.496 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study. ETAP Page: 14.LON KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: 3 11-17-2018 Attachment 1 Page 15 of274 KCICONSULT Base Normal DIV 1 Battecy 1A48-Hour Coping Study Discharj?e Discharj?e Current Capacity Voltage (V) Current Capacity VoltaJ?e(V)

Time (Amp) (Amp-Hool')

y. V+ Time (Amp) (Amp-Hool')

v-V+ 139.000 12.6 248.31 115.497 115.497 140.000 12.6 248.53 115.497 115.497 141.000 12.6 248.74 115.498 115.498 142.000 12.6 248.95 115.499 115.499 143.000 12.6 249.16 115.499 115.499 144.000 12.6 249.37 115.500 115.500 145.000 12.6 249.58 115.500 115.500 146.000 12.6 249.79 115.501 115.501 147.000 12.6 250.00 115.502 115.502 148.000 , 12.6 250.21 115.502 115.502 149.000 12.6 250.42 115.503 115.503 150.000 12.6 250.63 115.504 115.504 151.000 12.6 250.84 115.504 115.504 152.000 12.6 251.05 115.505 115.505 153.000 12.6 251.26 115.505 115.505 154.000 12.6 251.47 115.506 115.506 155.000 12.6 251.68 115.507 115.507 156.000 12.6 251.89 .

  • 115.507 115.507 157.000 12.6 252.10 115.508 115.508 158.000 12.6 252.31 115.508 115.508 159.000 12.6 '252.52 115.508 115.508 160.000 12.6 252.73 115.508 115.508 161.000 12.6 252.94 115.507 . 115.507 162.000 12.6 253.15 115.507 115.507 163.000 12.6 253.36 115.507 115.507 164.000 12.6 253.57 115.507 115.507 165.000 12.6 253.78 . , 115.507 115.507 166.000 12.6 253.99 115.507 115.507 167.000 12.6 254.20 115.507 115.507 168.000 12.6 254.41 115.507 115.507

' 169.000 12.6 254.62 115.507 115.507 170.000 12.6 254.83 115.507 . -115.so1 171.000 12.6 255.04 115.507 115.507 172.000 12.6 255.25 115.507 115.507 173.000 12.6 255.46 115.507 115.507 174.000 12.6 255.67 115.507 ** 115.507 175.000 12.6 255.88 115.507 115.507 176.000 12.6 256.10 115.507 115.507 177.000 -12.6 256.31 115.507 115.507 178.000 12.6 256.52 115.507 115.507 179.000 12.6 256.73 115.507 115.507 180.000 12.6 256.94 .. 115.507 115.507 181.000 12.6 257.15 115.507 115.507 182.000 12.6 257.36 115.507 115.507 183.000 12.6 257.57 115.507 115.507 184.000 12.6 257.78 115.506 115.506 185.000 12.6 257.99 115.506 115.506 186.000 12.6 258.20 115.506 115.506 187.000 12.6 258.41 115.506 115.506 188.000 12.6 258.62 115.506 115.506 189.000 12.6 258.83 115.506 115.506 190.000 12.6 259.04 115.506 115.506 191.000 12.6 259.25 115.506 115.506 192.000 12.6 259.46 115.506 115.506 193.000 12.6 259.67 115.506 115.506 194.000 12.6 259.88 115.506 115.506 195.000 12.6 260.09 115.506 115.506 196.000 12.6 260.30 115.506 115.506 197.000 12.6 , 260.51 115.506 115.506 198.000 12.6 260.72 115.506 115.506 199.000 12.6 260.93 115.506 115.506 200.000 12.6 261.14 115.506 115.506 201.000 12.6 261.35 115.506 115.506 202.000 12.6 261.56 115.506 115.506 203.000 12.6 261.77 115.506 115.506 204.000 12.6 261.98 115.506 115.506 205.000 12.6 262.19 115.506 115.506 206.000 12.6 262.40 . /'115.506 115.506 207.000 12.6 262.61 115.505 115.505 208.000 12.6 262.82 115.505 115.505 209.000 12.6 263.03 115.505 115.505 210.000 12.6 263.24 115.505 115.505 EC 626319 Project: Location:

Contract; Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV 1 Batteiy 1A48-Hour Coping Study Discharge Discharge 4 11-17-2018 Attachment 1 Page 16 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 211.000 12.6 263.46 115.505 115.505 212.000 12.6 263.67 115.505 115.505 213.000 12.6 263.88 115.505 115.505 214.000 12.6 264.09 115.505 115.505 215.000 12.6 264.30 115.505 115.505 216.000 12.6 264.51 115.505 115.505 217.000 12.6 264.72 115.505 115.505 21~.000 12.6 264.93 115.505 115.505 219.000 12.6 265.14 115.505 115.505 220.000 12.6 265.35 115.505 115.505 221.000 12.6 265.56 115.505 115.505 222.000 12.6 265.77 115.505 115.505 223.000 12.6 265.98 115.505 115.505 224.000 12.6 266.19 115.505 115.505 225.000 12.6 266.40 . 115.505 115.505 226.000 12.6 266.61 115.505 115.505 227.000 12.6 266.82 115.505 115.505 228.000 12.6 267.03 115.505 115.505 229.000 12.6 267.24 115.505 115.505 230.000 12.6 267.45 115.504 115.504 231.000 12.6 267.66 115.504 115.504 232.000 12.6 267.87 115.504 115.504 233.000 12.6 268.08 115.504 115.504 234.000 12.6 268.29 115.504 115.504 235.000 12.6 268.50 115.504 115.504 236.000 12.6 268.71 115.504 115.504 237.000 12.6 268.92 115.504 115.504 238.000 12.6 269.13 115.504 115.504 239.000 12.6 269.34 115.504 115.504 240.000 12.6 269.55 115.504 115.504 241.000 12.6 269.76 115.504 115.504 242.000 12.6 269.97 115.504 115.504 243.000 12.6 270.18 115.504 115.504 244.000 12.6 270.39 115.504 115.504 245.000 12.6 270.60 115.504 115.504 246.000 12.6 270.82 115.504 115.504 247.000 12.6 271.03 115.504 115.504 248.000 12.6 271.24 115.504 115.504 249.000 12.6 271.45 115.504 115.504 250.000 12.6 271.66 115.504 115.504 251.000 12.6 271.87 115.504 115.504 252.000 12.6 272.08 115.504 115.504 253.000 12.6 272.29 115.503 115.503 254.000 12.6 272.50 115.503 115.503 255.000 12.6 272.71 115.503 115.503 256.000 12.6 272.92 115.503 115.503 257.000 12.6 273.13 115.503 115.503 258.000 12.6 273.34 115.503 115.503 259.000 12.6 273.55 115.503 115.503 260.000 12.6 273.76 115.503 115.503 261.000 12.6 273.97 115.503 115.503 262.000 12.6 274.18 115.503 115.503 263.000 12.6 274.39 115.503 115.503 264.000 12.6 274.60 115.503 115.503 265.000 12.6 274.81 115.503 115.503 266.000 12.6 275.02 115.503 115.503 267.000 12.6 275.23 115.503 115.503 268.000 12.6 275.44 115.503 115.503 269.000 12.6 275.65 115.503 115.503 270.000 12.6 275.86 115.503 115.503 271.000 12.6 276.07 115.503 115.503 272.000 12.6 276.28 115.503 115.503 273.000 12.6 276.49 115.503 115.503 274.000 12.6 276.70 115.503 115.503 275.000 12.6 276.91 115.503 115.503 276.000 12.6 277.12 115.502 115.502 277.000 12.6 277.33 115.502 115.502 278.000 12.6 277.54 115.502 115.502 279.000 12.6 277.75 115.502 115.502 280.000 12.6 277.96 115.502 115.502 281.000 12.6 278.18 115.502 115.502 282.000 12.6 278.39 115.502 115.502 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battety IA 48-Hour Coping Study Discharge Discharge 5 11-17-2018 Attachment 1 Page 17 of 274 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 283.000 12.6 278.60 115.502 115.502 284.000 12.6 278.81 115.502 115.502 285.000 12.6 279.02 115.502 115.502 286.000 12.6 279.23 115.502 115.502 287.000 12.6 279.44 115.502 115.502 288.000 12.6 279.65 115.502 115.502 289.000 12.6 279.86 115.502 115.502 290.000 12.6 280.07 115.502 115.502 291.000 12.6 280.28 115.502 115.502 292.000 12.6 280.49 115.502 115.502 293.000 12.6 280.70 115.502

  • 115.502 294.000 12.6 280.91 115.502 115.502 295.000 12.6 281.12 115.502 115.502 296.000 12.6 281.33 115.502 115.502 297.000 12.6 281.54 115.502 115.502 298.000 12.6 281.75 115.501 115.501 299.000 12.6 281.96 115.501 115.501 300.000* 12.6 282.17 115.501 115.501 301.000 12.6 282.38 115.501 115.501 302.000 12.6 282.59 115.501 115.501 303.000 12.6 282.80 115.501 115.501 304.000 12.6 283.01 115.501 115.501 305.000 12.6 283.22 115.501 115.501 306.000 12.6 283.43 115.501 115.501 307.000 12.6 283.64 115.501 115.501 308.000 12.6 283.85 115.501 115.501 309.000 12.6 284.06 115.501 115.501 310.000 12.6 284.27 115.501 115.501 311.000 12.6 284.48 115.501 115.501 312.000 12.6 284.69 115.501 115.501 313.000 12.6 284.90 115.501 115.501 314.000 12.6 285.11 115.501 115.501 315.000 12.6 285.32 115.501 115.501 316.000 12.6 285.53 115.501 115.501 . 317.000 12.6 285.75 115.501 115.501 318.000 12.6 285.96 115.501 , . 115.501 319.000 12.6 286.17 115.501 115.501 320.000 12.6 286.38 115.501 115.501 321.000 12.6 286.59 115.500 115.500 322.000 12.6 286.80 115.500 115.500 323.000 12.6 287.01 115.500 115.500 324.000 12.6 287.22 115.500 115.500 325.000 12.6 287.43 115.500 115.500 326.000 12.6 287.64 115.500 115.500 327.000 12.6 287.85 115.500 115.500 328.000 12.6 288.06 115.500 .. 115.500 329.000 12.6 288.27 115.500 115.500 330.000 12.6 288.48 115.500 115.500 331.000 12.6 288.69 115.500 115.500 332.000 12.6 288.90 115.500 115.500 333.000 12.6 289.11 115.500 115.500 334.000 12.6 289.32 115.500 115.500 335.000 12.6 289.53 115.500 115.500 336.000 12.6 289.74 115.500 115.500 337.000 12.6 289.95 115.500 115.500 338.000 12.6 290.16 115.500 115.500 339.000 12.6 290.37 115.500 115.500 340.000 12.6 290.58 115.500 115.500 341.000 12.6 290.79 115.500 115.500 342.000 12.6 291.00 115.500 115.500 343.000 12.6 291.21 115.499 115.499 344.000 12.6 291.42 115.499 115.499 345.000 12.6 291.63 115.499 115.499 346.000 12.6 291.84 115.499 115.499 347.000 12.6 292.05 115.499 115.499 348.000 12.6 292.26 115.499 115.499 349.000 12.6 292.47 115.499 115.499 350.000 12.6 292.68 115.499 115.499 351.000 12.6 292.89 115.499 115.499 352.000 12.6 293.11 115.499 115.499 353.000 12.6 293.32 115.499 115.499 354.000 12.6 293.53 115.499 115.499 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BS!A-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 6 11-17-2018 Attachment 1 Page 18 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ ----355.000 12.6 293.74 , . 115.499 115.499 356.000 12.6 293.95 115.499 115.499 357.000 12.6 294.16 115.499 115.499 358.000 12.6 294.37 115.499 115.499 359.000 12.6 294.58 115.499 115.499 360.000 12.6 294.79 115.499 115.499 361.000 12.6 295.00 115.499 115.499 362.000 12.6 295.21 115.499 115.499 363.000 12.6 295.42 115.499 115.499 364.000 12.6 295.63 115.499 115.499 365.0_()0 12.6 295.84 115.499 115.499 366.000 12.6 296.05 115.498 115.498 367.000 12.6 296.26 115.498 115.498 368.000 12.6 296.47 115.498 115.498 369.000 12.6 296.68 115.498 .115.498 370.000 12.6 296.89 115.498 115.498 371.000 12.6 297.10 115.498 115.498 372.000 12.6 297.31 115.498 115.498 373.000 12.6 297.52 115.498 115.498 374.000 12.6 297.73 115.498 115.498 375.000 12.6 297.94 115.498 115.498 376.000 12.6 298.15 115.498 115.498 377.000 12.6 298.36 115.498 115.498 378.000 12.6 298.57 115.498 115.498 379.000 12.6 298.78 115.498 . 115.498 380.000 12.6 298.99 115.498 115.498 381.000 12.6 299.20 115.498 115.498 382.000 12.6 299.41 115.498 115.498 383.000 12:6 299.62 115.498 115.498 384.000 12.6 299.83 115.498 115.498 385.000 12.6 300.04 115.498 115.498 386.000 12.6 300.25 115.498 115.498 387.000 12.6 300.47 115.498 115.498 388.000 12.6 300.68 115.497 115.497 389.000 12.6 300.89 115.497 115.497 390.000 12.6 301.10 115.497 115.497 391.000 12.6 301.31 115.497 115.497 392.000 12.6 301.52 115.497 115.497 393.000 12.6 301.73 115.497 115.497 394.000 12.6 301.94 115.497 115.497 395.000 12.6 302.15 115.497 115.497 396.000 12.6 302.36 115.497 115.497 397.000 12.6 302.57 li5.497 115.497 398.000 12.6 302.78 115.497 115.497 399.000 12.6 302.99 115.497 115.497 400.000 12.6 303.20 115.497 115.497 401.000 12.6 303.41 115.497 115.497 402.000 12.6 303.62 115.497 115.497 403.000 12.6 303.83 115.497 115.497 404.000 12.6 304.04 115.497 115.497 405.000 12.6 304.25 115.497 115.497 406.000 12.6 304.46 115.497 115.497 407.000 12.6 304.67 115.497 115.497 408.000 12.6 304.88 115.497 115.497 409.000 12.6 305.09 115.497 115.497 410.000 12.6 305.30 115.496 115.496 411.000 12.6 305.51 115.496 115.496 412.000 12.6 305.72 115.496 115.496 413.000 12.6 305.93 115.496 . 115.496 414.000 12.6 . 306.14 115.496 115.496 415.000 12.6 306.35 115.496 115.496 416.000 12.6 306.56 115.496 115.496 417.000 12.6 306.77 115.496 115.496 418.000 12.6 306.98 115.496 115.496 419.000 12.6 307.19 115.496 115.496 420.000 12.6 307.40 115.496 115.496 421.000 12.6 307.61 115.496 115.496 422.000 12.6 307.82 115.496 115.496 423.000 12.6 308.04 115.496 115.496 424.000 12.6 308.25 115.496 115.496 425.000 12.6 308.46 115.496 115.496 426.000 12.6 308.67 115.496 115.496 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 7 11-17-2018 Attachment 1 Page 19 of274 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 427.000 12.6 308.88 115.496 115.496 428.000 12.6 309.09 115.496 115.496 429.000 12.6 309.30 115.496 115.496 430.000 12.6 309.51 115.496 115.496 431.000 12.6 309.72 115.496 115.496 432.000 12.6 309.93 115.495 115.495 433.000 12.6 310.14 115.495 115.495 434.000 12.6 310.35 115.495 115.495 435.000 12.6 310.56 115.495 115.495 436.000 12.6 310.77 115.495 115.495 437.000 12.6 310.98 115.495 115.495 438.000 12.6 311.19 115.495 115.495 439.000 12.6 311.40 115.495 115.495 440.000 12.6 311.61 115.495 115.495 441.000 12.6 311.82 115.495 115.495 442.000 12.6 312.03 115.495 115.495 443.000 12.6 312.24 115.495 115.495 444.000 12.6 312.45 115.495 115.495 445.000 12.6 312.66 115.495 115.495 446.000 12.6 312.87 115.495 115.495 447.000 12.6 313.08 115.495 115.495 448.000 12.6 313.29 115.495 115.495 449.000 12.6 313.50 115.495 115.495 450.000 12.6 313.71 115.495 115.495 451.000 12.6 313.92 115.495 115.495 452.000 12.6 314.13 115.495 115.495 453.000 12.6 314.34 115.495 115.495 454.000 12.6

  • 314.55 115.494 115.494 455.000 12.6 314.76 . 115.494 115.494 456.000 12.6 314.97 115.494 115.494 457.000 12.6 315.18 115.494 . 115.494 458.000 12.6 315.40 115.494 115.494 459.000 12.6 315.61 115.494 115.494 460.000 12.6 315.82 115.494 115.494 461.000 12.6 316.03 115.494 115.494 462.000 12.6 316.24 115.494 115.494 463.000 12.6 316.45 il5.494 115.494 464.000 12.6 316.66 115.494 115.494 465.000 12.6 316.87 115.494 115.494 466.000 12.6 317.08 115.494 115.494 467.000 12.6 317.29 115.494 115.494 468.000 12.6 317.50 115.494 115.494 469.000 12.6 317.71 115.494 115.494 470.000 12.6 317.92 115.494 115.494 471.000 12.6 318.13 115.494 115.494 472.000 12.6 318.34 115.494 115.494 473.000 12.6 318.55 115.494 115.494 474.000 12.6 318.76 115.494 115.494 475.000 12.6 318.97 115.494 115.494 476.000 12.6 319.18 115.493 115.493 477.000 12.6 319.39 115.493 115.493 478.000 12.6 319.60 115.493 115.493 479.000 12.6 319.81 115.493 115.493 480.000 12.6 320.02 115.493 115.493 481.000 12.6 320.23 115.493 115.493 482.000 12.6 320.44 115.493 115.493 483.000 12.6 320.65 115.493 115.493 484.000 12.6 320.86 115.493 115.493 485.000 12.6 321.07 115.493 115.493 486.000 12.6 321.28 115.493 115.493 487.000 12.6 321.49 115.493 115.493 488.000 12.6 321.70 115.493 115.493 489.000 12.6 321.91 115.493 115.493 490.000 12.6 322.12 115.493 115.493 491.000 12.6 322.33 115.493 115.493 492.000 12.6 322.54 115.493 115.493 493.000 12.6 322.76 115.493 115.493 494.000 12.6 322.97 115.493 115.493 495.000 12.6 323.18 115.493 115.493 496.000 12.6 323.39 115.493 115.493 497.000 12.6 323.60 115.493 115.493 498.000 12.6 323.81 115.492 115.492 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config,: DIV I Batteiy IA 48-Hour Coping Study Discharj!e Discharl!e 8 11-17-2018 Attachment 1 Page 20 of274 KC!CONSULT Base Normal Current Capacity Voltal!e(V)

Current Capacity Volfal!e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 499.000 12.6 324.02 115.492 115.492 500.000 12.6 324.23 115.492 115.492 501.000 12.6 324.44 115.492 115.492 502.000 12.6 324.65 115.492 115.492 503.000 12.6 324.86 115.492 115.492 504.000 12.6 325.07 115.492 115.492 505.000 12.6 325.28 115.492 115.492 506.000 12.6 325.49 115.492 115.492 507.000 12.6 325.70 115.492 115.492 508.000 12.6 325.91 115.492 115.492 509.000 12.6 326.12 115.492 115.492 510.000 12.6 326.33 115.492 115.492 511.000 12.6 326.54 115.492 115.492 512.000 12.6 326.75 115.492 115.492 513.000 12.6 326.96 115.492 115.492 514.000 12.6 327.17 115.492 115.492 515.000 12.6 327.38 115.492 115.492 516.000 12.6 327.59 115.492 115.492 517.000 12.6 327.80 115.492 115.492 518.000 12.6 328.01 115.492 115.492 519.000 12.6 328.22 115.492 115.492 520.000 12.6 328.43 115.491 115.491 521.000 12.6 328.64 115.491 115.491 522.000 12.6 328.85 115.491 115.491 523.000 12.6 329.06 115.491 115.491 524.000 12.6 329.27 115.491 115.491 525.000 12.6 329.48 115.491 115.491 526.000 12.6 329.69 115.491 115.491 527.000 12.6 329.90 115.491 115.491 528.000 12.6 330.12 115.491 115.491 529.000 12.6 330.33 115.491 115.491 530.000 12.6 330.54 115.491 115.491 531.000 12.6 330.75 115.491 115.491 532.000 12.6 330.96 115.491 115.491 533.000 12.6 331.17 115.491 115.491 534.000 12.6 331.38 115.491 115.491 535.000 12.6 331.59 115.491 115.491 536.000 12.6 331.80 115.491 115.491 537.000 12.6 332.01 115.491 115.491 538.000 12.6 332.22 115.491 115.491 539.qoo 12.6 332.43 115.491 115.491 540.000 12.6 332.64 115.491 115.491 541.000 12.6 332.85 115.490 .. 115.490 542.000 12.6 333.06 115.490 115.490 543.000 12.6 333.27 115.490 115.490 544.000 12.6 333.48 115.490 115.490 545.000 12.6 333.69 115.490 115.490 546.000 12.6 333.90 115.490 115.490 547.000 12.6 334.11 115.490 115.490 548.000 12.6 334.32 115.490 115.490 549.000 12.6 334.53 115.490 115.490 550.000 12.6 334.74 115.490 115.490 551.000 12.6 334.95 115.490 115.490 552.000 12.6 335.16 115.490 115.490 553.000 12.6 335.37 115.490 115.490 554.000 12.6 335.58 115.490 115.490 555.000 12.6 335.79 115.490 115.490 556.000 12.6 336.00 115.490 115.490 557.000 12.6 336.21 115.490 115.490 558.000 12.6 336.42 115.490 115.490 559.000 12.6 336.63 115.490 115.490 560.000 12.6 336.84 115.490 115.490 561.000 12.6 337.05 115.490 115.490 562.000 12.6 337.26 115.490 115.490 563.000 12.6 337.47 115.489 115.489 564.000 12.6 337.69 115.489 115.489 565.000 12.6 337.90 115.489 115.489 566.000 12.6 338.11 115.489 115.489 567.000 12.6 338.32 115.489 115.489 568.000 12.6 338.53 115.489 115.489 569.000 12.6 338.74 115.489 115.489 570.000 12.6 338.95 115.489 115.489 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 9 11-17-2018 Attachment 1 Page21 of274 KC!CONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)
y. V+ 571.000 12.6 339.16 115.489 115.489 572.000 12.6 339.37 115.489 115.489 573.000 12.6 339.58 115.489 115.489 574.000 12.6 339.79 115.489 115.489 575.000 12.6 340.00 115.489 115.489 576.000 12.6 340.21 115.489 115.489 577.000 12.6 340.42 115.489 115.489 578.000 12.6 340.63 115.489 115.489 579.000 12.6 340.84 115.489 115.489 580.000 12.6 341.0S 115.489 l lS.489 581.000 12.6 341.26 11S.489 115.489 582.000 12.6 341.47 115.489 115.489 S83.000 12.6 341.68 llS.489 115.489 S84.000 12.6 341.89 115.489 115.489 585.000 12.6 342.10 115.488 115.488 586.000 12.6 342.31 115.488 115.488 587.000 12.6 342.52 115.488 115.488 588.000 12.6 342.73 115.488 115.488 589.000 12.6 342.94 llS.488 115.488 590.000 12.6 343.lS 115.488 115.488 591.000 12.6 343.36 115.488 115.488 592.000 12.6 343.57 11S.488 115.488 593.000 12.6 343.78 115.488 115.488 S94.000 12.6 343.99 115.488 115.488 595.000 12.6 344.20 115.488 115.488 596.000 12.6 344.41 115.488 11S.488 597.000 12.6 344.62 Il5.488 115.488 S98.000 12.6 344.83 115.488 115.488 599.000 12.6 345.05 115.488 115.488 600.000 12.6 34S.26 115.488 115.488 601.000 12.6 34S.47 115.488 115.488 602.000 12.6 345.68 115.488 llS.488 603.000 12.6 345.89 115.488 11S.488 604.000 12.6 346.10 115.488 llS.488 60S.OOO 12.6 346.31 115.488 115.488 606.000 12.6 346.52 115.487 llS.487 607.000 12.6 346.73 . 115.487 .. 115.487 608.000 12.6 346.94 115.487 115.487 609.opo 12.6 347.15 115.487 115.487 610.000 12.6 347.36 115.487 115.487 611.000 12.6 347.57 115.487 115.487 612.000 12.6 347.78 115.487 115.487 613.000 12.6 347.99 115.487 llS.487 614.000 12.6 348.20 115.487 115.487 615.000 12.6 348.41 115.487 llS.487 616.000 12.6 348.62 115.487 115.487 617.000 12.6 348.83 115.487 115.487 618.000 12.6 349.04 115.487 115.487 619.000 12.6 349.2S 115.487 115.487 620.000 12.6 349.46 115.487 llS.487 621.000 12.6 349.67 115.487 115.487 622.000 12.6 349.88 115.487 llS.487 623.000 12.6 350.09 115.487 11S.487 624.000 12.6 350.30 115.487 115.487 62S.OOO 12.6 350.Sl 115.487 115.487 626.000 12.6 350.72 11S.487 115.487 627.000 12.6 350.93 115.487 115.487 628.000 12.6 351.14 115.486 115.486 629.000 12.6 3Sl.35 115.486 115.486 630.000 12.6 3Sl.56 115.486 115.486 631.000 12.6 3Sl.77 11S.486 115.486 632.000 12.6 351.98 115.486 llS.486 633.000 12.6 352.19 llS.486 115.486 634.000 12.6 3S2.41 115.486 llS.486 63S.000 12.6 352.62 115.486 115.486 636.000 12.6 352.83 11S.486 115.486 637.000 12.6 353.04 115.486 115.486 638.000 12.6 353.25 115.486 115.486 639.000 12.6 353.46 115.486 115.486 640.000 12.6 353.67 115.486 115.486 641.000 12.6 353.88 llS.486 115.486 642.000 12.6 3S4.09 115.486 11S.486 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery 1A48-HourCoping Study Discharge Discharge 10 11-17-2018 Attachment 1 Page 22 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (A;.,p-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 643.000 12.6 354.30 115.486 115.486 644.000 12.6 354.51 115.486 115.486 645.000 12.6 354.72 115.486 115.486 646.000 12.6 354.93 115.486 115.486 647.000 12.6 355.14 115.486 115.486 648.000 12.6 355.35 115.486 115.486 649.000 12.6 355.56 115.485 115.485 650.000 12.6 355.77 115.485 115.485 651.000 12.6 355.98 115.485 115.485 652.000 12.6 356.19 115.485 115.485 653.000 12.6 356.40 115.485 115.485 654.000 12.6 356.61 115.485 115.485 655.000 12.6 356.82 115.485 115.485 656.000 12.6 357.03 115.485 115.485 657.000 12.6 357.24 115.485 115.485 658.000 12.6 357.45 115.485 115.485 659.000 12.6 357.66 115.485 115.485 660.000 12.6 357.87 115.485 115.485 661.000 12.6 358.08 115.485 115.485 662.000 12.6 358.29 115.485 115.485 663.000 12.6 358.50 115.485 115.485 664.000 12.6 358.71 115.485 115.485 665.000 12.6 358.92 115.485 115.485 666.000 12.6 359.13 115.485 115.485 667.000 12.6 359.34 115.485 115.485 668.000 12.6 359.55 115.485 115.485 669.000 12.6 359.76 115.485 115.485 670.000 12.6 359.98 115.484 115.484 671.000 12.6 360.19 115.484 115.484 672.000 12.6 360.40 115.484 115.484 673.000 12.6 360.61 115.484 115.484 674.000 12.6 360.82 115.484 115.484 675.000 12.6 361.03 115.484 115.484 676.000 12.6 361.24 115.484 115.484 677.000 12.6 361.45 115.484 115.484 678.000 12.6 361.66 115.484 115.484 679.000 12.6 361.87 115.484 115.484 680.000 12.6 362.08 115.484 115.484 681.000 12.6 362.29 1,15.484 115.484 682.000 12.6 362.50 115.484 115.484 C 683.000 12.6 362.71 115.484 115.484 684.000 12.6 362.92 115.484 115.484 685.000 12.6 363.13 115.484 115.484 686.000 12.6 363.34 115.484 115.484 687.000 12.6 363.55 115.484 115.484 688.000 12.6 363.76 115.484 115.484 689.000 12.6 363.97 115.484 115.484 690.000 12.6 364.18 115.484 115.484 691.000 12.6 364.39 115.483 115.483 692.000 12.6 364.60 115.483 115.483 693.000 12.6 364.81 115.483 115.483 694.000 12.6 365.02 115.483 115.483 695.000 .12.6 365.23 115.483 115.483 696.000 12.6 365.44 115.483 115.483 697.000 12.6 365.65 115.483 115.483 698.000 12.6 365.86 115.483 115.483 699.000 12.6 366.07 115.483 115.483 700.000 12.6 366.28 115.483 115.483 701.000 12.6 366.49 .. 115.483 115.483 702.000 12.6 366.70 115.483 115.483 703.000 12.6 366.91 115.483 115.483 704.000 12.6 367.12 115.483 115.483 705.000 12.6 367.34 115.483 115.483 706.000 12.6 367.55 115.483 115.483 707.000 12.6 367.76 115.483 115.483 708.000 12.6 367.97 ' . 115.483 115.483 709.000 12.6 368.18 115.483 .. 115.483 710.000 12.6 368.39 115.483 115.483 711.000 12.6 368.60 115.483 115.483 712.000 12.6 368.81 115.482 115.482 713.000 12.6 369.02 115.482 115.482 714.000 12.6 369.23 115.482 115.482 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batte!)' 1 A 48-Hour Coping Study Discharge Discharge 11 11-17-2018 Attachment 1 Page 23 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 715.000 12.6 369.44 115.482 115.482 716.000 12.6 369.65 115.482 115.482 717.000 12.6 369.86 115.482 115.482 718.000 12.6 370.07 115.482 115.482 719.000 12.6 370.28 115.482 115.482 720.000 12.6 370.49 115.482 115.482 721.000 12.6 370.70 115.482 115.482 722.000 12.6 370.91 115.482 115.482 . 723.000 12.6 371.12 115.482 115.482 724.000 12.6 371.33 115.482 115.482 725.000 12.6 371.54 115.482 115.482 726.000 12.6 371.75 115.482 115.482 727.000 12.6 371.96 115.482 115.482 728.000 12.6 372.17 115.482 115.482 729.000 12.6 372.38 115.482 115.482 730.000 12.6 372.59 115.482 115.482 731.000 12.6 372.80 115.482 115.482 732.000 12.6 373.01 115.482 115.482 733.000 12.6 373.22 115.481 115.481 734.000 12.6 373.43 115.481 115.481 735.000, 12.6 373.64 115.481 115.481 736.000 12.6 373.85 115.481 115.481 737.000 12.6 374.06 115.481 115.481 738.000 12.6 374.27 115.481 115.481 739.000 12.6 374.48 115.481 115.481 740.000 12.6 374.70 115.481 115.481 741.000 12.6 374.91 115.481 115.481 742.000 12.6 375.12 115.481 115.481 743.000 12.6 375.33 115.481 115.481 744.000 12.6 375.54 115.481 115.481 745.000 12.6 375.75 115.481 115.481 746.000 12.6 375.96 115.481 115.481 747.000 12.6 376.17 115.481 115.481 748.000 12.6 376.38 115.481 115.481 749.000 12.6 376.59 115.481 115.481 750.000 12.6 376.80 115.481 115.481 751.000 12.6 377.01 115.481 115.481 752.000 12.6 377.22 115.481 115.481 753.000 12.6 377.43 115.481 115.481 754.000 12.6 377.64 115.480 115.480 755.000 12.6 377.85 115.480 115.480 756.000 12.6 378.06 115.480 115.480 757.000 12.6 378.27 115.480 115.480, 758.000 12.6 378.48

  • 115.480 115.480 759.000 12.6 378.69 115.480 115.480 760.000 12.6 378.90 115.480 115.480 761.000 12.6 379.11 115.480 115.480 762.000 12.6 379.32 115.480 115.480 763.000 12.6 379.53 115.480 115.480 764.000 12.6 379.74 115.480 115.480 765.000 12.6 379.95 115.480 115.480 766.000 12.6 380.16 115.480 115.480 767.000 12.6 380.37 115.480 115.480 768.000 12.6 380.58 115.480 115.480 769.000 12.6 380.79 115.480 115.480 770.000 12.6 381.00 115.480 115.480 771.000 12.6 381.21 115.480 115.480 772.000 12.6 381.42 115.480 115.480 773.000 12.6 381.63 115.480 115.480 774.000 12.6 381.84 115.480 115.480 775.000 12.6 382.05 115.479 115.479 776.000 12.6 382.27 115.479 115.479 777.000 12.6 382.48 115.479 115.479 778.000 12.6 382.69 115.479 115.479 779.000 12.6 382.90 115.479 115.479 780.000 12.6 383.11 115.479 115.479 781.000 12.6 383.32 115.479 115.479 782.000 12.6 383.53 115.479 115.479 783.000 12.6 383.74 115.479 115.479 784.000 12.6 383.95 115.479 115.479 785.000 12.6 384.16 115.479 115.479 786.000 12.6 384.37 115.479 115.479 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain

  • Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV _I Battery IA48-Hour Coping Study Discharge Discharge 12 11-17-2018 Attachment 1 Page 24 of 27 4 KCICONSULT

Base Normal Current Capacity Voltaee(V)

Current Capacity Voltaee (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour) v-V+ 787.000 12.6 384.58 115.479 115.479 788.000 12.6 384.79 115.479 115.479 789.000 12.6 385.00 115.479 115.479 790.000 12.6 385.21 115.479 115.479 791.000 12.6 385.42 115.479 115.479. 792.000 12.6 385.63 115.479 115.479 793.000 12.6 385.84 115.479 115.479 794.000 12.6 386.05 115.479 115.479 795.000 12.6 386.26 115.479 115.479 796.000 12.6 386.47 115.478 115.478 797.000 12.6 386.68 115.478 115.478 798.000 12.6 386.89 115.478 )15.478 799.000 12.6 387.10 115.478 115.478 800.000 12.6 387.31 115.478 115.478 801.000 12.6 387.52 115.478 115.478 802.000 12.6 387.73 115.478 115.478 803.000 12.6 387.94 115.478 115.478 804.000 12.6 388.15 115.478 115.478 805.000 12.6 388.36 115.478 115.478

  • 806.000 12.6 388.57 115.478 115.478 807.000 12.6 388.78 115.478 115.478 808.000 12.6 388.99 115.478 115.478 809.000 12.6 389.20 115.478 115.478 810.000 1°2.6 389.41. 115.478 115.478 811.000 12.6 389.63 115.478 .. 115.478 812.000 12.6 389.84 115.478 115.478 813.000 12.6 390.05 115.478 115.478 814.000 12.6 390.26 ', . 115.478 115.478 815.000 12.6 390.47 115.478 115.478 816.000 12.6 390.68 115.477 115.477 817.000 12.6 390.89 115.477 115.477 818.000 12.6 391.10 115.477 115.477 819.000 12.6 391.31 115.477 115.477 820.000 12.6 391.52 115.477 115.477 821.000 12.6 391.73 115.477 115.477 822.000 12.6 391.94 115.477 115.477 823.000 12.6 392.15 115.477 115.477 824.000 12.6 392.36 115.477 115.477 825.000 12.6 392.57 115.477 115.477 826.000 12.6 392.78 115.477 115.477 827.000 12.6 392.99 115.477 115.477 828.000 12.6 393.20 115.477 115.477 829.000 12.6 393.41 115.477 115.477 830.000 12.6 393.62 115.477 . 115.477 831.000 12.6 393.83 115.477 115.477 832.000 12.6 394.04 115.477 115.477 833.000 12.6 394.25 115.477 115.477 834.000 12.6 394.46 .. 115.477 115.477 835.000 12.6 394.67 115.477 115.477 836.000 12.6 394.88 115.477 115.477 837.000
  • 12.6 395.09 115.476 115.476 838.000 12.6 395.30 115.476 115.476 839.000 12.6 395.51 115.476 115.476 840.000 12.6 395.72 115.476 115.476 841.000 12.6 395.93 115.476 115.476 842.000 12.6 396.14 115.476 115.476 843.000 12.6 396.35 115.476 115.476 844.000 12.6 396.56 115.476 115.476 845.000 12.6 396.77 115.476 115.476 846.000 12.6 396.99 115.476. 115.476 847.000 12.6 397.20 115.476 115.476 848.000 12.6 397.41 115.476 115.476 849.000 12.6 397.62 115.476 115.476 850.000 12.6 397.83 115.476 115.476 851.000 12.6 398.04 115.476 115.476 852.000 12.6 398.25 115.476 115.476 853.000 12.6 398.46 115.476 115.476 854.000 12.6 398.67 115.476 115.476 855.000 12.6 398.88 115.476 115.476 856.000 12.6 399.09 115.476 115.476 857.000 12.6 399.30 115.475 115.475 858.000 12.6 399.51 115.475 115.475 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 13 11-17-2018 Attachment 1 Page 25 of 27 4 KCICONSULT

Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 859.000 12.6 399.72 115.475 115.475 860.000 12.6 399.93 115.475 115.475 861.000 12.6 400.14 115.475 115.475 862.000 12.6 400.35 115.475 115.475 863.000 12.6 400.56 115.475 115.475 864.000 12.6 400.77 115.475 115.475 865.000 12.6 400.98 115.475 115.475 866.000 12.6 401.19 115.475 115.475 867.000 12.6 401.40 115.475 115.475 868.000 12.6 401.61 115.475 115.475 869.000 12.6 401.82 115.475 115.475 870.000 12.6 402.03 115.475 115.475 871.000 12.6 402.24 115.475 115.475 872.000 12.6 402.45 *115.475 115.475 873.000 12.6 402.66 115.475 115.475 874.000 12.6 402.87 115.475 115.475 875.000 12.6 403.08 115.475 115.475 876.000 12.6 403.29 115.475 115.475 877.000 12.6 403.50 115.475 115.475 878.000 12.6 403.71 115.474 115.474 879.000 12.6 403.92 115.474 115.474 880.000 12.6 404.13 115.474 115.474 881.000 12.6 404.35 115.474 115.474 882.000 12.6 404.56 115.474 115.474 883.000 *12.6 404.77 115.474 115.474 884.000 12.6 404.98 115.474 115.474 885.000 12.6 405.19 115.474 115.474 886.000 12.6 405.40 115.474 115.474 887.000 12.6 405.61 115.474 115.474 888.000 12.6 405.82 115.474 115.474 889.000 12.6 406.03 115.474 115.474 890.000 12.6 406.24 115.474 115.474 891.000 12.6 406.45 115.474 115.474 892.000 12.6 406.66 115.474 115.474 893.000 12.6 406.87 115.474 115.474 894.000 12.6 407.08 115.474 115.474 895.000 12.6 407.29 115.474 115.474 896.000 12.6 407.50 115.474 115.474 897.000 12.6 407.71 115.474 115.474 898.000 12.6 407.92 115.473 115.473 899.000 12.6 408.13 115.473 115.473 900.000 12.6 408.34 115.473 115.473 901.000 12.6 408.55 115.473 115.473 902.000 12.6 408.76 115.473 115.473 903.000 12.6 408.97 115.473 115.473 904.000 12.6 409.18 115.473 115.473 905.000 12.6 409.39 115.473 115.473 906.000 12.6 409.60 115.473 115.473 907.000 12.6 409.81 115.473 115.473 908.000 12.6 410.02 115.473 115.473 909.000 12.6 410.23 115.473 115.473 910.000 12.6 410.44 115.473 115.473 911.000 12.6 410.65 115.473 115.473 912.000 12.6 410.86 115.473 115.473 913.000 12.6 411.07 115.473 115.473 914.000 12.6 411.28 115.473 115.473 915.000 12.6 411.49 115.473 115.473 916.000 12.6 411.70 115.473 115.473 917.000 12.6 411.92 115.473 115.473 918.000 12.6 412.13 115.473 115.473 919.000 12.6 412.34 115.472 115.472 920.000 12.6 .412.55 115.472 115.472 921.000 12.6 412.76 115.472 115.472 922.000 12.6 412.97 115.472 115.472 923.000 12.6 413.18 115.472 115.472 924.000 12.6 413.39 115.472 115.472 925.000 12.6 413.60 115.472 115.472 926.000 12.6 413.81 115.472 115.472 927.000 12.6 414.02 115.472 115.472 928.000 12.6 414.23 115.472 115.472 929.000 12.6 414.44 115.472 115.472 930.000 12.6 414.65 115.472 115.472 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery I A 48-Hour Coping Study Discharge Discharge 14 11-17-2018 Attachment*1 Page 26 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 931.000 12.6 414.86 115.472 115.472 932.000 12.6 415.07 115.472 115.472 933.000 12.6 415.28 115.472 115.472 934.000 12.6 415.49 115.472 115.472 935.000 12.6 415.70 115.472 115.472 936.000 12.6 415.91 115.472 115.472 937.000 12.6 416.12 115.472 115.472 938.000 12.6 416.33 115.472 115.472 939.000 12.6 416.54 115.471 115.471 940.000 12.6 416.75 115.471 115.471 941.000 12.6 416.96 115.471 115.471 942.000 12.6 417.17 115.471 115.471 943.000 12.6 417.38 115.471 115.471 944.000 12.6 417.59 115.471 115.471 945.000 12.6 417.80 115.471 115.471 946.000 12.6 418.01 115.471 115.471 947.000 12.6 418.22 115.471 115.471 948.000 12.6 418.43 115.471 115.471 949.000 12.6 418.64 115.471 115.471 950.000 12.6 418.85 115.471 115.471 951.000 12.6 419.06 115.471 115.471 952.000 12.6 419.28 115.471 115.471 953.000 12.6 419.49 115.471 115.471 954.000 12.6 419.70 115.471 115.471 955.000 12.6 419.91 115.471 115.471 956.000 12.6 420.12 115.471 115.471 957.000 12.6 420.33 115.471 115.471 958.000 12.6 420.54 115.471 115.471 959.000 12.6 420.75 115.470 115.470 960.000 12.6 420.96 115.470 115.470 961.000 12.6 421.17 115.470 115.470 962.000 12.6 421.38 115.470 115.470 963.000 12.6 421.59 115.470 115.470 964.000 12.6 421.80 115.470 115.470 965.000 12.6 422.01 115.470 115.470 966.000 12.6 422.22 115.470 115.470 967.000 12.6 422.43 115.470 115.470 968.000 12.6 422.64 115.470 115.470 969.000 12.6 422.85 115.470 115.470 970.000 12.6 423.06 115.470 115.470 971.000 12.6 423.27 115.470 115.470 972.000 12.6 423.48 115.470 115.470 973.000 12.6 423.69 115.470 115.470 974.000 12.6 423.90 115.470 115.470 975.000 12.6 424.11 115.470 115.470 976.000 12.6 424.32 115.470 115.470 977.000 12.6 424.53 115.470 115.470 978.000 12.6 424.74 115.470 115.470 979.000 12.6 424.95 115.469 115.469 980.000 12.6 425.16 115.469 115.469 981.000 12.6 425.37 115.469 115.469 982.000 12.6 425.58 115.469 11.5.469 983.000 12.6 425.79 115.469 115.469 984.000 12.6 426.00 115.469 115.469 985.000 12.6 426.21 115.469 115.469 986.000 12.6 426.42 115.469 ** 115.469 987.000 12.6 426.64 115.469 115.469 988.000 12.6 426.85 115.469 115.469 989.000 12.6 427.06 115.469 115.469 990.000 12.6 427.27 115.469 115.469 991.000 12.6 427.48 115.469 115.469 992.000 12.6 427.69 115.469 115.469 993.000 12.6 427.90 115.469 115.469 994.000 12.6 428.11 115.469 115.469 995.000 12.6 428.32 115.469 115.469 996.000 12.6 428.53 115.469 115.469 997.000 12.6 428.74 115.469 115.469 998.000 12.6 428.95 115.469 115.469 999.000 12.6 429.16 115.468 115.468 1000.000 12.6 429.37 115.468 115.468 1001.000 12.6 429.58 115.468 115.468 1002.000 12.6 429.79 115.468 115.468 EC 626319 Project: Location:

Contract:

Engineer:

  • Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 15 11-l'(-2018 Attachment 1 Page 27 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1003.000 12.6 430.00 115.468 115.468 1004.000 12.6 430.21 115.468 115.468 1005.000 12.6 430.42 115.468 115.468 1006.000 12.6 430.63 115.468. 115.468 1007.000 12.6 430.84 115.468 115.468 1008.000 12.6 431.05 115.468 115.468 1009.000 12.6 431.26 115.468 115.468 1010.000 12.6 431.47 115.468 115.468 1011.000 12.6 431.68 115.468 115.468 1012.000 12.6 431.89 115.468 115.468 1013.000 12.6 432.10 115.467 115.467 1014.000 12.6 432.31 115.466 115.466 1015.000 12.6 432.52 115.464 115.464 1016.000 12.6 432.73 115.463 115.463 1017.000 12.6 432.94 115.462 115.462 1018.000 12.6 433.15 115.460 115.460 1019.000 12.6 433.36 115.459 . 115.459 1020.000 12.6 433.57 115.457 115.457 1021.000 12.6 433.78 115.456 115.456 1022.000 12.6 433.99 115.455 115.455 1023.000 12.6 434.21 115.453 115.453 1024.000 12.6 434.42 115.452 115.452 1025.000 12.6 434.63 115.451 115.451 1026.000 12.6 434.84 115.449 115.449 1027.000 12.6 435.05 115.448 115.448 1028.000 12.6 435.26 115.446 115.446 1029.000 12.6 435.47 115.445 115.445 1030.000 12.6 435.68 115.444 115.444 1031.000 12.6 435.89 115.442 115.442 1032.000 12.6 436.10 115.441 115.441 1033.000 12.6 436.31 115.440 115.440 1034.000 12.6 436.52 115.438 115.438 1035.000 12.6 436.73 115.437 115.437 1036.000 12.6 436.94 115.436 115.436 1037.000 12.6 437.15 115.434 115.434 1038.000 12.6 437.36 115.433 115.433 1039.000 12.6 437.57 115.431 115.431 1040.000 12.6 437.78 115.430 115.430 1041.000 12.6 437.99 115.429 115.429 1042.000 12.6 138.20 115.427 115.427 1043.000 12.6 438.41 115.426 115.426 1044.000 12.6 438.62 115.425 115.425 1045.000 12.6 438.83 115.423 . 115.423 1046.000 12.6 439.04 115.422 115.422 1047.000 12.6 439.25 115.420 115.420 1048.000 12.6 439.46 115.419 115.419 1049.000 12.6 439.67 115.418 115.418 1050.000 12.6 439.88 115.416 115.416 1051.000 12.6 440.09 115.415 115.415 1052.000 12.6 440.30 115.414 115.414 1053.000 12.6 440.51 115.412 115.412 1054.000 12.6 440.72 115.411 .. 115.411 1055.000 12.6 440.93 115.410 115.410 1056.000 12.6 441.14 115.408 115.408 1057.000 12.6 441.35 115.407 115.407 1058.000 12.6 441.57 115.405 115.405 1059.000 12.6 441.78 115.404 115.404 1060.000 12.6 441.99 115.403 115.403 1061.000 12.6 442.20 115.401 115.401 1062.000 12.6 442.41 115.400 115.400 1063.000 12.6 442.62 115.399 115.399 1064.000 12.6 442.83 115.397 115.397 1065.000 12.6 443.04 115.396 115.396 1066.000 12.6 443.25 115.395 115.395 1067.000 12.6 443.46 115.393 115.393 1068.000 12.6 443.67 115.392 115.392 1069.000 12.6 443.88 115.391 115.391 1070.000 12.6 444.09 115.389 115.389 1071.000 12.6 444.30 115.388 115.388 1072.000 12.6 444.51 115.386 115.386 1073.000 12.6 444.72 115.385 115.385 1074.000 12.6 444.93 115.384 115.384 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: ,DIV 1 Battery IA 48-Hour Coping Study Dischar)?e DischarJ?e 16 11-17-2018 Attachment 1 Page 28 of 274 KCICONSULT Base Normal Current Capacity VoltaJ?e(V)

Current Capacity VoltaJ?e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1075.000 12.6 445.14 115.382 115.382 1076.000 12.6 445.35 115.381 115.381 1077.000 12.6 445.56 115.380 115.380 1078.000 12.6 445.77 115.378 .. 115.378 1079.000 12.6 445.98 115.377 115.377 1080.000 12.6 446.19 115.376 115.376 1081.000 12.6 446.40 115.374 115.374 1082.000 12.6 446.61 115.373 115.373 1083.000 12.6 446.82 115.372 115.372 1084.000 12.6 447.03 115.370 115.370 1085.000 12.6 447.24 115.369 115.369 1086.000 12.6 . 447.45 115.368 115.368 1087.000 12.61 447.66 .. 115.366 115.366 1088.000 12.6 447.87 115.365 115.365 1089.000 12.6 448.08 115.364 115.364 1090.000 12.6 448.29 115.362 115.362 1091.000 12.6 448.50 115.361 115.361 1092.000 12.6 448.71 115.360 115.360 1093.000 12.6 448.93 115.358 115.358 1094.000 12.6 449.14 115.357 115.357 1095.000 12.6 449.35 115.355 115.355 1096.000 12.6 449.56 115.354 115.354 1097.000 12.6 449.77 115.353 115.353 1098.000 12.6 449.98 115.351 115.351 1099.000 12.6 450.19 115.350 115.350 1100.000 12.6 450.40 115.349 115.349 1101.000 12.6 450.61 115.347 115.347 1102.000 12.6 450.82 115.346 '115.346 1103.000 12.6 451.03 115.345 115.345 1104.000 12.6 451.24 115.343 115.343 1105.000 12.6 451.45 115.342 115.342 1106.000 12.6 451.66 115.341 115.341 1107.000 12.6 451.87 115.339 115.339 1108.000 12.6 452.08 115.338 115.338 1109.000 12.6 452.29 115.337 115.337 lll0.000 12.6 452.50 115.335 115.335 1111.000 12.6 452.71 115.334 115.334 lll2.000 12.6 452.92 115.333 115.333 1113.000 12.6 453.13 115.331 115.331 lll4.000 12.6 453.34 115.330 115.330 1115.000 12.6 453.55 . 115.329 115.329 1116.000 12.6 453.76 115.327 115.327 1117.000 12.6 453.97 115.326 115.326 1118.000 12.6 454.18 115.325 , . 115.325 lll9.000 12.6 454.39 115.323 115.323 1120.000 12.6 454.60 115.322 115.322 \.. 1121.000 12.6 454.81 115.321 115.321 . 1122.000 12.6 455.02 115.319 115.319 1123.000 12.6 455.23 115.318 115.318 1124.000 112.6 455.44 115.317 115.317 1125.000 12.6 455.65 115.315 115.315 1126.000 12.6 455.86 115.314 115.314 1127.000 12.6 456.07 115.313 115.313 1128.000 12.6 456.28 115.311 115.311 1129.000 12.6 456.50 115.310 115.310 1130.000 12.6 456.71 115.309 115.309 1131.000 12.6 456.92 115.307 115.307 1132.000 12.6 457.13 115.306 115.306 1133.000 12.6 457.34 115.305 115.305 1134.000 12.6 457.55 115.303 115.303 1135.000 12.6 457.76 115.302 115.302 1136.000 12.6 457.97 115.301 115.301 1137.000 12.6 458.18 115.299 115.299 1138.000 12.6 458.39 115.298 115.298 1139.000 12.6 458.60 115.297 115.297 1140.000 12.6 458.81 115.295 115.295 1141.000 12.6 459.02 115.294 115.294 1142.000 12.6 459.23 115.293 115.293 1143.000 12.6 459.44 115.292 115.292 1144.000 12.6 459.65 115.291 115.291 1145.000 12.6 459.86 115.290 115.290 1146.000 12.6 460.07 115.289 115.289 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 17 11-17-2018 Attachment 1 Page 29 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 1147.000 12.6 460.28 115.288 115.288 1148.000 12.6 460.49 115.287 115.287 1149.000 12.6 460.70 115.286 .. 115.286 1150.000 12.6 460.91 115.285 115.285 1151.000 12.6 461.12 115.284 115.284 1152.000 12.6 461.33 115.283 115.283 1153.000 12.6 461.54 115.282 115.282 1154.000 12.6 461.75 I 15.281 115.281 1155.000 12.6 461.96 115.280 115.280 1156.000 12.6 462.17 115.279 115.279 1157.000 12.6 462.38 115.278 115.278 1158.000 *12.6 462.59 115.277 115.277 1159.000 12.6 462.80 115.276 115.276 1160.000 12.6 463.01 115.275 115.275 1161.000 12.6 463.22 115.274 115.274 1162.000 12.6 463.43 115.273 115.273 I 1163.000 12.6 463.64 115.272 115.272 1164.000 12.6 463.86 115.271 115.271 1165.000 12.6 464.07 115.270 115.270 1166.000 12.6 464.28 115.269 115.269 1167.000*

12.6 464.49 115.268 115.268 1168.000 12.6 464.70 115.267 115.267 1169.000 12.6 464.91 115.266 115.266 1170.000 12.6 465.12 115.265 115.265 1171.000 12.6 465.33 115.264 115.264 II 72.000 12.6 465.54 115.263 115.263 II 73.000 12.6 465.75 115.262 115.262 1174.000 12.6 465.96 115.261 115.261 1175.000 12.6 466.17 115.260 115.260 1176.000 12.6 466.38 115.259 115.259 1177.000 12.6 466.59 115.258 115.258 1178.000 12.6 466.80 115.257 115.257 1179.000 12.6 467.01 115.256 115.256 1180.000 12.6 467.22 115.256 115.256, 1181.000 12.6 467.43 115.255 115.255 1182.000 12.6 467.64 115.254 115.254 1183.000 12.6 467.85 115.253 115.253 1184.000 12.6 468.06 115.252 115.252 1185.000 12.6 468.27 115.251 115.251 1186.000 12.6 468.48 115.250 115.250 1187.000 12.6 468.69 115.249 115.249 1188.000 12.6 468.90 115.248 115.248 1189.000 12.6 469.11 115.247 115.247 1190.000 12.6 469.32 115.246 115.246 1191.000 12.6 469.53 115.245 115.245 1192.000 12.6 469.74 115.244 115.244 1193.000 12.6 469.95 115.243 115.243 1194.000 12.6 470.16 115.242 115.242 1195.000 12.6 470.37 115.241 115.241 1196.000 12.6 470.58 115.240 115.240 1197.000 12.6 470.79 115.239 115.239 1198.000 12.6 471.00 115.238 115.238 1199.000 12.6 471.22 115.237 115.237 1200.000 12.6 471.43 115.236 115.236 1201.000 12.6 471.64 115.235 115.235 1202.000 12.6 471.85 115.234 115.234 1203.000 12.6 472.06 115.233 115.233 1204.000 12.6 472.27 115.232 115.232 1205.000 12.6 472.48 115.231 115.231 1206.000 12.6 472.69 115.230 115.230 1207.000 12.6 472.90 115.229 115.229 1208.000 12.6 473.11 115.228 115.228 1209.000 12.6 473.32 115.227 115.227 1210.000 12.6 473.53 115.226 115.226 1211.000 12.6 473.74 115.225 115.225 1212.000 12.6 473.95 115.224 115.224 1213.000 12.6 474.16 115.223 115.223 1214.000 12.6 474.37 115.222 115.222 1215.000 12.6 474.58 115.221 115.221 1216.000 12.6 474.79 115.220 115.220 1217.000 12.6 475.00 115.219 115.219 1218.000 12.6 475.21 115.218 115.218 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 18 11-17-2018 Attachment 1 Page 30 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ ----1219.000 12.6 475.42 115.217 115.217 1220.000 12.6 475.63 115.216 115.216 1221.000 12.6 475.84 115.215 115.215 1222.000 12.6 476.05 115.214 115.214 1223.000 12.6 476.26 115.213 115.213 1224.000 12.6 476.47 115.212 115.212 1225.000 12.6 476.68 115.211 115.211 1226.000 12.6 476.89 115.210 115.210 1227.000 12.6 477.10 115.209 115.209 1228.000 12.6 477.31 115.208 115.208 1229.000 12.6 477.52 115.208 115.208 1230.000 12.6* 477.73 115.207 115.207 1231.000 12.6 477.94 115.206 115.206 1232.000 12.6 478.15 115.205 115.205 1233.000 12.6 478.36 115.204 115.204 1234.000 12.6 478.58 115.203 115.203 1235.000 12.6 478.79 115.202 115.202 1236.000 12.6 479.00 115.201 115.201 1237.000 12.6 479.21 115.200 115.200 1238.000 12.6 -479.42 115.199 115.199 1239.000 12.6 479.63 11_5.198 115.198 1240.000 12.6 479.84 115.197 115.197

  • 1241.000 12.6 480.05 115.196 115.196 1242.000 12.6 480.26 115.195 115.195 1243.000 12.6 480.47 115.194 115.194 1244.000 12.6 480.68 115.193 115.193 1245.000 12.6 480.89. 115.192 115.192 1246.000 12.6 481.10 115.191 115.191 1247.000 12.6 481.31 115.190 115.190 1248.000 12.6 481.52 115.189 115.189 1249.000 12.6 481.73 115.188 115.188 1250.000 12.6 481.94 115.187 115.187 1251.000 12.6 482.15 115.186 115.186 1252.000 12.6 482.36 115.185 115.185 1253.000 12.6 482.57 115.184 115.184 1254.000 12:6 482.78 115.183 115.183 1255.000 12.6 482.99 115.182 115.182 1256.000 12.6 483.20. 115.181 115.181 1257.000 12.6 483.41 115.180 115.180 1258.000 12.6 483.62 115.179 115.179 1259.000 12.6 483.83 115.178 115.178 1260.000 12:6 484.04 115.177 115.177 1261.000 12.6 484.25 115.176 115.176 1262.000 12.6 484.46 115.175 115.175 1263.000 12.6 484.67 115.174 115.174 1264.000 12.6 484.88 115.173 115.173 1265.000 12.6 485.09 115.172 115.172 1266.000 12.6 485.30 115.171 . 115.171 1267.000 12.6 485.51 115.170 115.170 1268.000 12.6 485.72 115.169 115.169 1269.000 12.6 485.93 115.168 115.168 1270.000 12.6 486.15 115.167 115.167 1271.000 12.6 486.36 115.166 115.166 1272.000 12.6 486.57 115.165 115.165 1273.000 12.6 486.78 115.164 115.164 1274.000 12.6 486.99 115.163 115.163 1275.000 12.6 487.20 115.162 115.162 1276.000 12.6 487.41 115.161 115.161 1277.000 12.6 487.62 115.160 115.160 1278.000 12.6 487.83 115.159 115.159 1279.000 12.6 488.04 115.159 115.159 1280.000 12.6 488.25 115.158 115.158 1281.000 12.6 488.46 115.157 115.157 1282.000 12.6 488.67 115.156 115.156 1283.000 12.6 488.88 115.155 115.155 1284.000 12.6 489.09 115.154 115.154 1285.000 12.6 489.30 115.153 115.153 1286.000 12.6 489.~l 115.152 115.152 1287.000 12.6 489.72 115.151 115.151 1288.000 12.6 489.93 115.150 115.150 1289.000 12.6 490.14 115.149 115.149 1290.000 12.6 490.35 115.148 115.148 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study Discharge Discharge 19 11-17-2018 Attachment 1 Page 31 of 274 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Voltage (V) Time (Amp) (Amp-Houl')

v-V+ Time (Amp) (Amp-Houl')

V-V+ 1291.000 12.6 490.56 115.147 115.147 1292.000 12.6 490.77 115.146 115.146 1293.000 12.6 490.98 115.145 115.145 1294.000 12.6 491.19 115.144 115.144 1295.000 12.6 491.40 115.143 115.143 1296.000 12.6 491.61 115.142 115.142 1297.000 12.6 491.82 115.141 115.141 1298.000 12.6 492.03 115.140 115.140 1299.000 12.6 492.24 115.139 115.139 1300.000 12.6 492.45 115.138 115.138 1301.000 12.6 492.66 115.137 115.137 1302.000 12.6 492.87 115.136 115.136 1303.000 12.6 493.08 115.135 115.135 1304.000 12.6 493.29 115.134 115.134 1305.000 12.6 493.51 115.133 115.133 1306.000 12.6 493.72 115.132 115.132 1307.000 12.6 493.93 115.131 115. 131 1308.000 12.6 494.14 115.130 115.130 1309.000 12.6 494.35 115.129 115.129 1310.000 12.6 494.56 115.128 115.128 1311.000 12.6 494.77 115.127 115.127 1312.000 12.6 494.98 115.126 115.126 1313.000 12.6 495.19 115.125 115.125 1314.000 12.6 495.40 115.124 115.124 1315.000 12.6 495.61 115.123 115.123 1316.000 12.6 495.82 115.122 115.122 1317.000 12.6 496.03 115.121 115.121 1318.000 12.6 496.24 115.120 115.120 1319.000 12.6 496.45 115.119 115.119 1320.000 12.6

  • 496.66 115.118 115.118 1321.000 12.6 496.~7 115.117 115.117 1322.000 12.6 497.08 115.116 115.116 1323.000 12.6 497.29 115.115 115.115 1324.000 12.6 497.50 115.114 115.114 1325.000 12.6 497.71 115.113 115.113 1326.000 12.6 497.92 115.112 115.112 1327.000 12.6 498.13 115.111 115.lll 1328.000 12.6 498.34 115.lll 115. Ill 1329.000 12.6 498.55 115.1 JO 115.110 1330.000 12.6 498.76 115.109 115.109 1331.000 12.6 498.97 115.108 115.108 1332.000 12.6 499.18 115.107 115.107 1333.000 12.6 499.39 115.106 115. 106 1334.000 12.6 499.60 115.105 115. 105 1335.000 12.6 499.81 115.104 115.104 1336.000 12.6 500.02 115.103 115.103 1337.000 12.6 500.23 115.102 115.102 1338.000 12.6 500.44 115.101 115.101 1339.000 12.6 500.65 115.100 115.100 1340.000 12.6 500.87 115.099 115.099 1341.000 12.6 501.08 115.098 115.098 1342.000 12.6 501.29 115.097 115.097 1343.000 12.6 501.50 1i5.096 115.096 1344.000 12.6 501.71 115.095 115.095 1345.000 12.6 501.92 115.094 115.094 1346.000 12.6 502.13 115.093 115.093 1347.000 12.6 502.34 115.092 115.092 1348.000 12.6 502.55 115.091 115 .. 091 1349.000 12.6 502.76 115.090 115.090 1350.000 12.6 502.97 115.089 115.089 1351.000 12.6 503.18 115.088 115.088 1352.000 12.6 503.39 115.087 115.087 1353.000 12.6 503.60 115.086 115.086 1354.000 12.6 503.81 115.085 115.085 1355.000 12.6 504.02 115.084 115.084 1356.000 12.6 504.23 115.083 115.083 1357.000 12.6 504.44 115.082 115.082 1358.000 12.6 504.65 115.081 115.081 1359.000 12.6 504.86 115.080 115.080 1360.000 12.6 505.07 115.079 115.079 1361.000 12.6 505.28 115.078 115.078 1362.000 12.6 505.49 115.077 115:011 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hnssain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 20 11-17-2018 Attachment 1 Page 32 of 27 4 KCICONSULT

Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 1363.000 12.6 505.70 115.076 115.076 1364.000 12.6 505.91 115.075 . 115.075 1365.000 12.6 506.12 115.074 115.074 1366.000 12.6 506.33 115.073 115.073 1367.000 12.6 506.54 115.072 115.072 1368.000 12.6 506.75 ll5.071 115.071 1369.000 12.6 506.96 115.070 115.070 1370.000 12.6 507.17 115.069 115.069 1371.000 12.6 507.38 115.068 115.068 1372.000 12.6 507.59 115.067 115.067 1373.000 12.6 507.80 115.066 115.066 1374.000 12.6 508.01 115.065 115.065 1375.000 12.6 508.22 115.064 115.064 1376.000 12.6 508.44 115.063 115.063 1377.000 12.6 508.65 115.063 115.063 1378.000 12.6 508.86 115.062 115.062 1379.000 12.6 509.07 115.061 115.061 1380.000 12.6 509.28 115.060 115.060 1381.000 12.6 509.49 115.059 115.059 1382.000 12.6 509.70 115.058 115.058 1383.000 12.6 509.91 115.057 115.057 1384.000 12.6 510.12 115.056 115.056 1385.000 12.6 510.33 115.055 115.055 1386.000 12.6 510.54 115.054 115.054 1387.000 12.6 510.75 l15.053 115.053 1388.000 12.6 510.96 l15.052 115.052 1389.000 12.6 511.17 l15.051 115.051 1390.000 12.6 511.38 115.050 115.050 1391.000 12.6 511.59 115.049 115.049 1392.000 12.6 511.80 115.048 115.048 1393.000 12.6 512.01 115.047 l15.047 1394.000 12.6 512.22 115.046 115.046 1395.000 12.6 512.43 115.045 115.045 1396.000 12.6 512.64 l15.044 115.044 1397.000 12.6 512.85 115.043 115.043 1398.000 12.6 513.06 115.042 115.042 1399.000 12.6 513.27 115.041 l15.041 1400.000 12.6 513.48 115.040 l15.040 1401.000 12.6 513.69 115.039 115.039 1402.000 12.6 513.90 l15.038 115.038 1403.000 12.6 514.11 l15.037 115.037 1404.000 12.6 514.32 115.036 115.036 1405.000 12.6 514.53 l15.035 115.035 1406.000 12.6 514.74 115.034 115.034 1407.000 12.6 514.95 115.033 115.033 1408.000 12.6 515.16 l15.032 115.032 1409.000 12.6 515.37 115.031 115.031 1410.000 12.6 515.58 l15.030 115.030 1411.000 12.6 515.80 l15.029 115.029 1412.000 12.6 516.01 l15.028 115.028 1413.000 12.6 516.22 l15.027 115.027 1414.000 12.6 516.43 l15.026 l15.026 1415.000 12.6 516.64 115.025 115.025 1416.000 12.6 516.85 l15.024 115.024 1417.000 12.6 517.06 ll5.023 115.023 1418.000 12.6 517.27 ll5.022 115.022 1419.000 12.6 517.48 ll5.02l 115.021 1420.000 12.6 517.69 115.020 115.020 1421.000 12.6 517.90 ll5.019 ll5.019 1422.000 12.6 518.11 ll5.018 115.018 1423.000 12.6 518.32 115.017 115.017 1424.000 12.6 518.53 115.016 115.016 1425.000 12.6 518.74 ll5.015 115.015 1426.000 12.6 518.95 115.015 115.015 1427.000 12.6 519.16 115.014 ll5.014 1428.000 12.6 519.37 ll5.013 115.013 1429.000 12.6 519.58 115.012 115.012 1430.000 12.6 519.79 115.011 115.011 1431.000 12.6 520.00 ll5.010 ll5.0IO 1432.000 12.6 520.21 ll5.009 ll5.009 1433.000 12.6 520.42 ll5.008 115.008 1434.000 12.6 520.63 115.007 115.007 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV. Open Continuously Attachment 1 Page 33 of 27 4 for greater than 24 Hrs

  • Project: Clinton Flex Study ETAP Page: 21 14.1.0N Location:

KCI Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSIA-48 Revision:

Base Filename:

CPS SBO Study . Config.: Nonna! DIV I Battecy I A 48-Hour Coping Study Dischar2e

  • Dischar2e Current Capacity Volta2e(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hou,*)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1435.000 12.6 520.84 ll5.006 ll5.006 1436.000 12.6 521.05 ll5.005 ll5.005 1437.000 12.6 521.26 ll5.004 ll5.004 1438.000 12.6 521.47 ll5.003 ll5.003 1439.000 12.6 521.68 ll5.002 115.002 1440.000 12.6 521.89 ll5.001 ll5.001 1441.000 12.6 522.10 ll5.000 ll5.000 1442.000 12.6 522.31 ll4.999 ll4.999 1443.000 12.6 522.52 ll4.998 ll4.998 1444.000 12.6 522.73 ll4.997 ll4.997 1445.000 12.6 522.94 ll4.996 ll4.996 1446.000 12.6 523.16 ll4.995 ll4.995 1447.000 12.6 523.37 ll4.994 ll4.994 1448.000 12.6 523.58 ll4.993 114.993 1449.000 12.6 523.79 ll4.992 ll4.992 1450.000 12.6 524.00 114.991 ll4.991 1451.000 12.6 524.21 ll4.990 ll4.990 1452.000 12.6 524.42 ll4.989 ll4.989 1453.000 12.6 524.63 ll4.988 ll4.988 1454.000 12.6 524.84 114.987 ll4.987 1455.000 12.6 525.05 ll4.986 ll4.986 1456.000 12.6 525.26 ll4.985 114.985 1457.000 12.6 525.47 ll4.984 ll4.984 1458.000 12.6 525.68 ll4.983 ll4.983 1459.000 12.6 525.89 ll4.982 ll4.982 1460.000 12.6 526.10 ll4.981 ll4.981 1461.000 12.6 526.31 ll4.980 ll4.980 1462.000 12.6 526.52 ll4.979 114.979 1463.000 12.6 526.73 ll4.978 ll4.978 1464.000 12.6 526.94 ll4.977 ll4.977 1465.000 12.6 527.15 ll4.976 114.976 1466.000 12.6 527.36 ll4.975 ll4.975 1467.000 12.6 527.57 ll4.974 ll4.974 1468.000 12.6 527.78 ll4.973 ll4.973 1469.000 12.6 527.99 ll4.972 114.972 1470.000 12.6 528.20 ll4.971 ll4.971 1471.000 12.6 528.41 ll4.970 ll4.970 1472.000 12.6 528.62 ll4.969 ll4.969 1473.000 12.6 528.83 ll4.968 ll4.968 1474.000 12.6 529.04 ll4.968 114.968 1475.000 12.6 529.25 ll4.966 114.966 1476.000 12.6 529.46 ll4.964 ll4.964 1477.000 12.6 529.67 .. ll4.962 ll4.962 1478.000 12.6 529.88 ll4.960 ll4.960 1479.000 12.6 530.09 ll4.958 .. ll4.958 1480.000 12.6 530.30 114.956 114.956 1481.000 12.6 530.52 114.954 114.954 1482.000 12.6 530.73 114.952 ll4.952 1483.000 12.6 530.94 ll4.949 114.949 1484.000 12.6 531.15 114.947 114.947 1485.000 12.6 531.36 ll4.945 114.945 1486.000 12.6 531.57 . 114.943 114.943 1487.000 12.6 531.78 114.941 114.941 1488.000 12.6 531.99 114.939 114.939 1489.000 12.6 532.20 114.937 ll4.937 1490.000 12.6 532.41 114.935 114.935 1491.000 12.6 532.62 114.933 114.933 1492.000 12.6 532.83 114.931 114.931 1493.000 12.6 533.04 114.929 114.929 1494.000 12.6 533.25 ll4.927 114.927 1495.000 12.6 533.46 ll4.924 ll4.924 1496.000 12.6 533.67 ll4.922 ll4.922 1497.000 12.6 533.88 ll4.920 114.920 1498.000 12.6 534.09 ll4.918 ll4.918 1499.000 12.6 534.30 ll4.916 114.916 1500.000 12.6 534.51 114.914 ll4.914 1501.000 12.6 534.72 ll4.912 ll4.912 1502.000 12.6 534.93 114.910 114.910 1503.000 12.6 535.14 ll4.908 ll4.908 1504.000 12.6 535.35 ll4.906 ll4.906 1505.000 12.6 535.56 ll4.904 ll4.904 1506.000 12.6 535.77 ll4.902 ll4.902 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 22 11-17-2018 Attachment 1 Page 34 of 27 4 KCJCONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1507.000 12.6 535.98 114.900 114.900 1508.000 12.6 536.19 114.897 114.897 1509.000 12.6 536.40 114.895 114.895 1510.000 12.6 536.61 114.893 114.893 1511.000 12.6 536.82 114.891 114.891 1512.000 12.6 537.03 114.889 114.889 1513.000 12.6 537.24 114.887 114.887 1514.000 12.6 537.45 114.885 114.885 1515.000 12.6 537.66 114.883 114.883 1516.000 12.6 537.87 114.881 114.881 1517.000 12.6 538.09 114.879 114.879 1518.000 12.6 538.30 114.877 114.877 1519.000 12.6 538.51 114.875 114.875 1520.000 12.6 538.72 114.873 114.873 1521.000 12.6 538.93 114.871 114.871 1522.000 12.6 539.14 114.869 114.869 1523.000 12.6 539.35 114.867 114.867 1524.000 12.6 539.56 114.864 114.864 1525.000 12.6 539.77 114.862 114.862 1526.000 12.6 539.98 114.860 114.860 1527.000 12.6 540.19 114.858 114.858 1528.000 12.6 540.40 114.856 114.856 1529.000 12.6 540.61 114.854 114.854 1530.000 12.6 540.82 114.852 114.852 1531.000 12.6 541.03 114.850 114.850 1532.000 12.6 541.24 114.848 114.~8 1533.000 12.6 541.45 114.846 114.846 1534.000 12.6 541.66 114.844 114.844 1535.000 12.6 541.87 114.842 114.842 1536.000 12.6 542.08 114.840 .. 114.840 1537.000 12.6 542.29 114.838 114.838 1538.000 12.6 542.50 114.836 114.836 1539.000 12.6 542.71 114.834 114.834 1540.000 12.6 542.92 114.832 114.832 1541.000 12.6 543.13 114.830 114.830 1542.000 12.6 543.34 114.828 114.828 1543.000 12.6 543.55 *. 114.826 114.826 1544.000 12.6 543.76 114.824 114.824 1545.000 12.6 543.97 114.822 114.822 1546.000 12.6 544.18 114.820 114.820 1547.000 12.6 544.39 114.818 114.818 1548.000 12.6 544.60 114.815 114.815 1549.000 12.6 544.81 114.813 114.813 1550.000 12.6 545.02 114.811 114.811 1551.000 12.6 545.23 114.809 114.809 1552.000 12.6 545.45 114.807 114.807 1553.000 12.6 545.66 114.805 114.805 1554.000 12.6 545.87 114.803 114.803 1555.000 12.6 546.08 114.801 114.801 1556.000 12.6 546.29 114.799 114.799 1557.000 12.6 546.50 114.797 114.797 1558.000 12.6 546.71 114.795 114.795 1559.000 12.6 546.92 114.793 114.793 1560.000 12.6 547.13 114.791 114.791 1561.000 12.6 547.34 114.789 114.789 1562.000 12.6 547.55 114.787 114.787 1563.000 12.6 547.76 114.785 114.785 1564.000 12.6 547.97 114.783 114.783 1565.000 12.6 548.18 114.781 114.781 1566.000 12.6 548.39 114.779 114.779 1567.000 12.6 548.60 .. 114.777 114.777 1568.000 12.6 548.81 114.775 114.775 1569.000 12.6 549.02 114.773 114.773 1570.000 12.6 549.23 114.771 114.771 1571.000 12.6 549.44 114.769 114.769 1572.000 12.6 549.65 114.767 114.767 1573.000 12.6 549.86 114.765 114.765 1574.000 12.6 550.07 114.763 114.763 1575.000 12.6 550.28 114.761 114.761 1576.000 12.6 550.49 114.759 114.759 .1577.000 12.6 550.70 114.757 114.757 1578.000 12.6 550.91 . 114.755 114.755 EC 626319 Project: Location:

Contract:

Engineer:

Filena1.11e:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Discharge Discharge 23 11-17-2018 Attachment 1 Page 35 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1579.000 12.6 551.12 114.753 114.753 1580.000 12.6 551.33 114.751 114.751 1581.000 12.6 551.54 114.749 114.749 1582.000 12.6 551.75 114.747 114.747 1583.000 12.6 551.96 114.745 114.745 1584.000 12.6 552.17 114.743 114.743 1585.000 12.6 552.38 114.741 114.741 1586.000 12.6 552.59 114.739 114.739 1587.000 12.6 552.81 114.737 114.737 1588.000 12.6 553.02 114.735 114.735 1589.000 12.6 553.23 114.733 114.733 1590.000 12.6 553.44 114.731 114.731 1591.000 12.6 553.65 114.729 114.729 1592.000 12.6 553.86 114.727 114.727 1593.000 12.6 554.07 114.725 114.725 1594.000 12.6 554.28 114.723 114.723 1595.000 12.6 554.49 114.721 114.721 1596.000 12.6 554.70 114.719 114.719 1597.000 12.6 554.91 114.717 114.717 1598.000 12.6 555.12 114.715 114.715 1599.000 12.6 555.33 114.713 114.713 1600.000 12.6 555.54 114.711 114.711 1601.000 12.6 555.75 114.709 114.709 1602.000 12.6 555.96 114.707 114.707 1603.000 12.6 556.17 114.705 114.705 1604.000 12.6 556.38 114.703 114.703 1605.000 12.6 556.59 114.701 114.701 1606.000 12.6 556.80 114.699 114.699 1607.000 12.6 557.01 114.697 114.697 1608.000 12.6 557.22 114.695 114.695 1609.000 12.6 557.43 114.693 114.693 1610.000 12.6 557.64 114.691 114.691 1611.000 12.6 557.85 114.689 114.689 1612.000 12.6 558.06 114.687 114.687 1613.000 12.6 558.27 114.685 114.685 1614.000 12.6 558.48 114.684 114.684 1615.000 12.6 558.69 114.682 114.682 1616.000 12.6 558.90 114.680 114.680 1617.000 12.6 559.11 114.678 114.678 1618.000 12.6 559.32 114.676 114.676 1619.000 12.6 559.53 114.674 114.674 1620.000 12.6 559.74 114.672 114.672 1621.000 12.6 559.95 114.670 114.670 1622.000 12.6 560.16 114.668 114.668 1623.000 12.6 560.38 114.666 114.666 1624.000 1.2.6 560.59 114.664 114.664 1625.000 12.6 560.80 114.662 114.662 1626.000 12.6 561.01 114.660 114.660 1627.000 12.6 561.22 114.658 114.658 1628.000 12.6 561.43 114.656 114.656 1629.000 12.6 561.64 114.654 114.654 1630.000 12.6 561.85 114.652 114.652 1631.000 12.6 562.06 114.650 114.650 1632.000 12.6 562.27 114.648 114.648 1633.000 12.6 562.48 114.646 114.646 1634.000 12.6 562.69 114.644 114.644 1635.000 12.6 562.90 114.642 114.642 1636.000 12.6 563.11 114.640 114.640 1637.000 12.6 563.32 114.638 114.638 1638.000 12.6 563.53 114.637 114.637 1639.000 12.6 563.74 114.635 114.635 1640.000 12.6 563.95 114.633 114.633 1641.000 12.6 564.16 114.631 114.631 1642.000 12.6 564.37 114.629 114.629 1643.000 12.6 564.58 114.627 114.627 1644.000 12.6 564.79 114.625 114.625 1645.000 12.6 565.00 114.623 114.623

  • 1646.000 12.6 565.21 114.621 114.621 1647.000 12.6 565.42 114.619 114.619 1648.000 12.6 565.63 114.617 114.617 1649.000 12.6 565.84 114.615 114.615 1650.000 12.6 566.05 114.613 114.613 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 24 11-17-2018 Attachment 1 Page 36 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1651.000 12.6 566.26 114.611 114.611 1652.000 12.6 566.47 114.609 114.609 1653.000 12.6 566.68 114.607

  • 114.607 1654.000 12.6 566.89 114.605 114.605 1655.000 12.6 567.10 114.604 114.604 1656.000 12.6 567.31 114.602 114.602 1657.000 12.6 567.52 114.600 114.600 1658.000 12.6 567,74 114.598 114.598 1659.000 12.6 567.95 114.596 114.596 1660.000 12.6 568.16 114.594 114.594 1661.000 12.6 568.37 114.592 114.592 1662.000 12.6 568.58 114.590 114.590 1663.000 12.6 568.79 114.588 114.588 1664.000 12.6 569.00 114.586 114.586 1665.000 12.6 569.21 114.584 114.584 1666.000 12.6 569.42 114.582 114.582 1667.000 12.6 569.63 114.580 114.580 1668.000 12.6 569.84 . 114.578 114.578 1669.000 12.6 570.05 114.577 114.577 1670.000 12.6 570.26 114.575 114.575 1671.000 12.6 570.47 114.573 114.573 1672.000 12.6 570.68 114.571 114.571 1673.000 12.6 570.89 114.569 114.569 1674.000 12.6 571.10 114.567 114.567 1675.000 12.6 571.31 114.565 114.565 1676.000 12.6 571.52 114.563 114.563 1677.000 12.6 571.73 114.561 114.561 1678.000 12.6 571.94 114.559 114.559 1679.000 12.6 572.15 114.557 114.557 1680.000 12.6 572.36 114.555 114.555* 1681.000 12.6 572.57 114.554 114.554 1682.000 12.6 572.78 114.552 114.552 1683.000 12.6 572.99 114.550 114.550 1684.000 12.6 573.20 114.548 114.548 1685.000 12.6 573.41 114.546 114.546 1686.000 12.6 573.62 114.544 114.544 1687.000 12.6 573.83 114.542 114.542 1688.000 12.6 574.04 114.540 114.540 1689.000 12.6 574.25 114.538 114.538 1690.000 12.6 574.46 114.536 114.536 1691.000 12.6 574.67 114.535 . -114.535 1692.000 12.6 574.88 114.533 114.533 1693.000 12.6 575.10 114.531 114.531 1694.000 12.6 575.31 114.529 114.529 1695.000 12.6 575.52 114.527 114.527 1696.000 12.6 575.73 114.525 114.525 1697.000 12.6 575.94 114.523 114.523 1698.000 12.6 576.15 114.522 114.522 1699.000 12.6 576.36 114.522 114.522 1700.000 12.6 576.57 114.522 114.522 1701.000 12.6 576.78 114.522 114.522 1702.000 12.6 516.99 114.521 114.521 1703.000 12.6 577.20 114.521 114.521 1704.000 12.6 577.41 114.521 114.521 1705.000 12.6 577.62 114.521 114.521 1706.000 12.6 577.83 114.521 114.521 1707.000 12.6 578.04 114.520 114.520 1708.000 12.6 578.25 114.520 114.520 1709.000 12.6 578.46 114.520 114.520 1710.000 12.6 578.67 114.520 . 114.520 1711.000 12.6 578.88 114.519 114.519 1712.000 12.6 579.09 114.519 114.519 1713.000 12.6 579.30 114.519 114.519 1714.000 12.6 579.51 114.519 114.519 1715.000 12.6 579.72 114.519 114.519 1716.000 12.6 579.93 114.518 114.518 1717.000 12.6 580.14 114.518 114.518 1718.000 12.6 580.35 114.518 114.518 1719.000 12.6 580.56 114.518 114.518 1720.000 12.6 580.77 114.517 114.517 1721.000 12.6 580.98 114.517 114.517 1722.000 12.6 581.19 114.517 114.517 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously

  • for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.LON KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Discharge Discharge 25 11-17-2018 Attachment 1 Page '37 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1723.000 12.6 581.40 114.517 114.517 1724.000 12.6 581.61 114.516 114.516 1725.000 12.6 581.82 114.516 114.516 1726.000 12.6 582.03 114.516 114.516 1727.000 12.6 582.24 114.516 114.516 1728.000 12.6 582.46 114.516 114.516 1729.000 12.6 582.67 114.515 114.515 1730.000 12.6 582.88 114.515 114.515 1731.000 12.6 583.09 114.515 114.515 1732.000 12.6 583.30 114.515 114.515 1733.000 12.6 583.51 114.514 114.514 1734.000 12.6 583.72 114.514 114.514 1735.000 12.6 583.93 114.514 114.514 1736.000 12.6 584.14 114.514 114.514 1737.000 12.6 584.35 114.514 114.514 1738.000 12.6 584.56 114.513 . 114.513 1739.000 12.6 584.77 114.513 114.513 1740.000 12.6 584.98 114.513 114.513 1741.000 12.6 585.19 114.513 114.513 1742.000 12.6 585.40 114.512 114.512 1743.000 12.6 585.61 114.512. 114.512 1744.000 12.6 585.82 114.512 114.512 1745.000 12.6 586.03 114.512 114.512 1746.000 12.6 586.24 114.511 . . 114.511 1747.000 12.6 586.45 114.511 114.511 1748.000 12.6 586.66 114.511 114.511 1749.000 12.6 586.87 114.511 114.511 1750.000 12.6 587.08 114.511 114.511 1751.000 12.6 587.29 114.510 114.510 1752.000 12.6 587.50 114.510 114.510 1753.000 12.6 587.71 114.510 114.510 1754.000 12.6 587.92 114.510 114.510 1755.000 12.6 588.13 114.509 114.509 1756.000 12.6 588.34 114.509 114.509 1757.000 12.6 588.55 114.509 114.509 1758.000 12.6 588.76 114.509 114.509

  • 1759.000 12.6 588.97 114.508 114.508 1760.000 12.6 589.18 114.508 114.508 1761.000 12.6 589.39 114.508 114.508 1762.000 12.6 589.60 114.508 114.508 1763.000 12.6 589.81 114.508 114.508 1764.000 12.6 590.03 114.507 114.507 1765.000 12.6 590.24 114.507 114.507 1766.000 12.6 590.45 114.507 114.507 1767.000 12.6 590.66 114.507 114.507 1768.000 12.6 590.87 114.506 114.506 . 1769.000 12.6 591.08 114.506 114.506 1770.000 12.6 591.29 114.506 114.506 1771.000 12.6 591.50 114.506 114.506 1772.000 12.6 591.71 114.505 114.505 1773.000 12.6 591.92 114.505 114.505 1774.000 12.6 592.13 114.505 114.505 1775.000 12.6 592.34 114.505 114.505 1776.000 12.6 592.55 114.505 114.505 1777.000 12.6 592.76 114.504 114.504 1778.000 12.6 592.97 114.504 114.504 1779.000 12.6 593.18 114.504 114.504 1780.000 12.6 593.39 114.504 114.504 1781.000 12.6 593.60 114.503 114.503 1782.000 12.6 593.81 114.503 114.503 1783.000 12.6 594.02 114.503 114.503 1784.000 12.6 594.23 114.503 114.503 1785.000 12.6 594.44 114.502 114.502 1786.000 12.6 594.65 114.502 114.502 1787.000 12.6 594.86 114.502 114.502 1788.000 12.6 595.07 114.502 114.502 1789.000 12.6 595.28 114.502 114.502 1790.000 12.6 595.49 114.501 114.501 1791.000 12.6 595.70 114.501 114.501 1792.000 12.6 595.91 114.501 114.501 1793.000 12.6 596.12 114.501 114.501 1794.000 12.6 596.33 114.500 114.500 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex"Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharj!e Discharj!e 26 11-17-2018 Attachment 1 Page 38 of 27 4 KCICONSULT Base Normal Current Capacity Voltal!e(V)

Current Capacity Voltal!e(V)

Time (Amp) (Amp-Hout')

v-V+ Time (Amp) (Amp-Hout')

V-V+ 1795.000 12.6 596.54 114.500 114.500 1796.000 12.6 596.75 114.500 114.500 1797.000 12.6 596.96 114.500 114.500 1798.000 12.6 597.17 114.499 114.499 1799.000 12.6 597.39 114.499 114.499 1800.000 12.6 597.60 114.499 114.499 1801.000 12.6 597.81 114.499 114.499 1802.000 12.6 598.02 114.498 . 114.498 1803.000 12.6 598.23 114.498 114.498 1804.000 12.6 598.44 114.498 114.498 1805.000 12.6 598.65 114.498 114.498 1806.000 12.6 598.86 114.498 114.498 1807.000 12.6 599.07 114.497 114.497 1808.000 12.6 599.28 114.497 114.497 1809.000 12.6 599.49 114.497 114.497 1810.QOO 12.6 599.70 114.497 114.497 1811.000 12.6 599.91 114.496 114.496 1812.000 12.6 600.12 114.496 114.496 1813.000 12.6 600.33 '114.496 114.496 1814.000 12.6 600.54 114.496 114.496 1815.000 12.6 600.75 114.495 114.495 1816.000 12.6 600.96 114.495 114.495 1817.000 12.6 601.17 114.495 114.495 1818.000 12.6 601.38 114.495 114.495 1819.000 12.6 601.59 114.495 114.495 1820.000 12.6 601.80 114.494 114.494 1821.000 12.6 602.01 114.494 114.494 1822.000 12.6 602.22 114.494 114.494 1823.000 12.6 602.43 114.494 114.494 1824.000 12.6 602.64 114.493 114.493 1825.000 12.6 602.85 114.493 114.493 1826.000 12.6 603.06 114.493 . 114.493 1827.000 12.6 603.27 114.493 114.493 1828.000 12.6 603.48 114.492 114.492 1829.000 12.6 603.69 114.492 114.492 1830.000 12.6 603.90 114.492 114.492 1831.000 12.6 604.11 . 114.492 114.492 1832.000 12.6 604.32 114.491 114.491 1833.000 12.6 604.53 114.491 114.491 1834.000 12.6 604.75 114.491 114.491 1835.000 12.6 604.96 114.491 114.491 1836.000 12.6 605.17 114.491 114.491 1837.000 12.6 605.38 114.490 114.490 183MOO 12.6 605.59 114.490 114.490 1839.000 12.6 605.80 114.490 114.490 1840.000 12.6 606.01 114.490 114.490 1841.000 12.6 606.22 114.489 114.489 1842.000 12.6 606.43 114.489 114.489 1843.000 12.6 606.64 114.489 114.489 1844.000 12.6 606.85 114.489 114.489 1845.000 12.6 607.06 114.488 114.488 1846.000 12.6 607.27 114.488 114.488 1847.000

  • 12.6 607.48 114.488 114.488 1848.000 12.6 607.69 114.488 114.488 1849.000 12.6 607.90 114.487 114.487 1850.000 12.6 608.11 114.487 114.487 1851.000 12.6 608.32 114.487 114.487 1852.000 12.6 608.53 114.487 114.487 1853.000 12.6 608.74 114.486 114.486 1854.000 12.6 608.95 114.486 114.486 1855.000 12.6 609.16 114.486 114.486 1856.000 12.6 609.37 114.486 114.486* 1857.000 12.6 609.58 114.486 114.486 ,1858.000 12.6 609.79 114.485 114.485 ) 1859.000 12.6 610.00 114.485 114.485 1860.000 12.6 610.21 114.485 114.485 1861.000 12.6 610.42 114.485 114.485 -1862.000 12.6 610.63 114.484 114.484 1863.000 12.6 610.84 114.484 114.484 1864.000 12.6 611.05 114.484 114.484 1865.000 12.6 611.26 114.484 114.484 1866.000 12.6 611.47 114.483 114.483 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Dischar)!e Discharl!e 27 11-17-2018 Attachment 1 Page 39 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltal!e (V) Current Capacity Voltal!e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1867.000 12.6 611.68 114.483 114.483 1868.000 12.6 611.89 114.483 114.483 1869.000 12.6 612.10 114.483 114.483 1870.000 12.6 612.32 114.482 114.482 1871.000 12.6 612.53 114.482 114.482 1872.000 12.6 612.74 .. 114.482 114.482 1873.000 12.6 612.95 114.482 114.482 1874.000 12.6 613.16 114.481 114.481 1875.000 12.6 613.37 114.481 114.481 1876.000 12.6 613.58 114.481 114.481 1877.000 12.6 613.79 114.481 114.481 1878.000 12.6 614.00 114.481 114.481 1879.000 12.6 614.21 114.480 114.480 1880.000 12.6 614.42 114.480 114.480 1881.000 12.6 614.63 114.480 114.480 1882.000 12.6 614.84 114.~80 114.480 1883.000 12.6 615.05 114.479 114.479 1884.000 12.6 615.26 114.479 114.479 1885.000 12.6 615.47 114.479 114.479 1886.000 12.6 615.68 114.479 114.479 1887.000 12.6 615.89 114.478 114.478 1888.000 12.6 616.10 114.478 114.478 1889.000 12.6 616.31 114.478 114.478 1890.000 12.6 616.52 114.478 . 114.478 1891.000 12.6 616.73 114.477 114.477 1892.000 12.6 616.94 114~477 114.477 1893.000 . 12.6 617.15 114.477 114.477 1894.000 12.6 617.36 114.477 114.477 1895.000 12.6 617.57 114.476 114.476 1896.000 12.6 617.78 114.476 . ,114.476 1897.000 12.6 617.99 114.476 t'l4.476 1898.000 12.6 618.20 114.476 114.476 1899.000 12.6 618.41 114.475 114.475 1900.000 12.6 618.62 114.475 114.475 1901.000 12.6 618.83 114.475 .. 114.475 1902.000 12.6 619.04 114.475 114.475 1903.000 12.6 619.25 114.475 114.475 1904.000 12.6 619.46 114.474 114.474 1905.000 12.6 619.68 114.474 114.474 1906.000 12.6 619.89 114.474 114.474 1907.000 12.6 620.10 114.474 114.474 1908.000 12.6 620.31 114.473 114.473 1909.000 12.6 620.52 114.473 114.473 1910.000 12.6 620.73 114.473 114.473 1911.000 12.6 620.94 114.473 114.473 1912.000 12.6 621.15 114.472 114.472 1913.000 12.6 621.36 i 14.472 114.472 1914.000 12.6 621.57 114.472 114.472 1915.000 12.6 621.78 114.472 114.472 1916.000 12.6 621.99 114.471 114.471 1917.000 12.6 622.20 114.471 114.471 1918.000 12.6 622.41 114.471 114.471 1919.000 12.6 622.62 114.471 114.471 1920.000 12.6 622.83 114.470 114.470 1921.000 12.6 623.04 114.470 !14.470 1922.000 12.6 623.25 114.470 114.470 1923.000 12.6 623.46 114.470 114.470 1924.000 12.6 623.67 114.469 114.469 1925.000 12.6 623.88 114.469 114.469 1926.000 12.6 624.09 114.469 114.469 1927.000 12.6 624.30 114.469 114.469 1928.000 12.6 624.51 114.468 114.468 1929.000 12.6 624.72 114.468 114.468 1930.000 12.6 624.93 114.468 114.468 1931.000 12.6 625.14 114.468 114.468 1932.000 12.6 625.35 114.467 114.467 1933.000 12.6 625.56 114.467 114.467 1934.000 12.6 625.77 114.467 114.467 1935.000 12.6 625.98 114.467 114.467 1936.000 12.6 626.19 114.466 114.466 1937.000 12.6 626.40 114.466 114.466 1938.000 12.6 626.61 114.466 114.466 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Discharge Discharge 28 11-17-2018 Attachment 1 Page 40 of 274

  • KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V)

Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 1939.000 12.6 626.82 114.466 114.466 1940.000 12.6 627.04 114.466 114.466 1941.000 12.6 627.25 114.465 114.465 1942.000 12.6 627.46 114.465 114.465 1943.000 12.6 627.67 114.465 114.465 1944.000 12.6 627.88 114.465 114.465 1945.000 12.6 628.09 114.464 114.464 1946.000 12.6 628.30 114.464 114.464 1947.000 12.6 628.51 114.464 114.464 1948.000 12.6 628.72 114.464 114.464 1949.000 12.6 628.93 114.463 114.463 1950.000 12.6 629.14 114.463 114.463 1951.000 12.6 629.35 114.463 114.463 1952.000 12.6 629.56 114.463 114.463 1953.000 12.6 629.77 114.462 114.462 1954.000 12.6 629.98 114.462 114.462 1955.000 12.6 630.19 114.462 114.462 1956.000 12.6 630.40 114.462 114.462 1957.000 12.6 630.61 114.461 114.461 1958.000 12.6 630.82 114.461 li4.461 1959.000 12.6 631.03 114.461 114.461 1960.000 12.6 631.24 114.461 114.461 1961.000 12.6 631.45 114.460 114.460 1962.000 12.6 631.66 114.460 114.460 1963.000 12.6 631.87 114.460 114.460 1964.000 12.6 632.08 114.460 114.460 1965.000 12.6 632.29 114.459 114.459 1966.000 12.6 632.50 114.459 114.459 1967.000 12.6 632.71 114.459 114.459 1968.000 12.6 632.92 114.459 114.459 1969.000 12.6 633.13 114.458 114.458 1970.000 12.6 633.34 114.458 114.458 1971.000 12.6 633.55 114.458 114.458 1972.000 12.6 633.76 114.458 114.458 1973.000 12.6 633.97 114.457 114.457 1974.000 12.6 634.18 114.457 114.457 1975.000 12.6 634.40 114.457 114.457 1976.000 12.6 634.61 114.457 114.457 1977.000 12.6 634.82 114.456 114.456 1978.000 12.6 635.03 114.456 114.456 1979.000 12.6 635.24 114.456 114.456 1980.000 12.6 635.45 114.456 114.456 1981.000 12.6 635.66 114.455 114.455 1982.000 12.6 635.87 114.455 114.455 1983.000 12.6 636.08 114.455 114.455 1984.000 12.6 636.29 114.455 .* 114.455 1985.000 12.6 636.50 . 114.454 114.454 1986.000 12.6 636.71 114.454 114.454 1987.000 12.6 636.92 114.454 114.454 1988.000 12.6 637.13 114.454 114.454 1989.000 12.6 637.34 114.453 114.453 1990.000 12.6 637.55 114.453 114.453 1991.000 12.6 637.76 114.453 114.453 1992.000 12.6 637.97 114.453 114.453 1993.000 12.6 638.18 114.452 114.452 1994.000 12.6 638.39 114.452 114.452 1995.000 12.6 638.60 114.452 114.452 1996.000 12.6 638.81 114.452 114.452 1997.000 12.6 639.02 114.451 114.451 1998.000 12.6 639.23 114.451 114.451 1999.000 12.6 639.44 114.451 114.451 2000.000 12.6 639.65 114.451 114.451 2001.000 12.6 639.86 114.450 114.450 2002.000 12.6 640.07 114.450 114.450 2003.000 12.6 640.28 114.450 114.450 2004.ooq 12.6 640.49 114.450 114.450 2005.000 12.6 640.70 114.449 114.449 2006.000 12.6 640.91 114.449 114.449 2007.000 12.6 641.12 114.449 114.449 2008.000 12.6 641.33 114.449 114.449 2009.000 12.6 641.54 114.448 114.448 2010.000 12.6 641.75 114.448 114.448 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 29 11-17-2018 Attachment 1 Page 41 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2011.000 12.6 641.97 114.448 114.448 2012.000 12.6 642.18 114.448 114.448 2013.000 12.6 642.39 114.447 114.447 2014.000 12.6 642.60 114.447 114.447 2015.000 12.6 642.81 114.447 114.447 2016.000 12.6 643.02 114.447 114.447 2017.000 12.6 643.23 114.446 114.446 2018.000 12.6 643.44 114.446 114.446 2019.000 12.6 643.65 114.446 114.446 2020.000 12.6 643.86 114.446 114.446 2021.000 12.6 644.07 114.445 114.445 2022.000 12.6 644.28 114.445 114.445 2023.000 12.6 644.49 114.445 114.445 2024.000 12.6 644.70 114.445 114.445 2025.000 12.6 644.91 114.444 114.444 2026.000 12.6 645.12 114.444 114.444 2027.000 12.6 645.33 114.444 114.444' 2028.000 12.6 645.54 114.444 114.444 2029.000 12.6 645.75 114.443 114.443 2030.000 12.6 645.96 114.443 114.443 2031.000 12.6 646.17 114.443 114.443 2032.000 12.6 . 646.38 114.443 114.443 2033.000 12.6 646.59 114.442 114.442 2034.000 12.6 646.80 114.442 114.442 2035.000 12.6 647.01 114.442 114.442 2036.000 12.6 ~7.22 114.442 114.442 2037.000 12.6 647.43 114.441 114.441 2038.000 12.6 647.64 114.441 114.441 2039.000 12.6 647.85 114.441 114.441 2040.000 12.6 648.06 114.441 114.441 2041.000 12.6 648.27 114.441 114.441 2042.000 12.6 648.48 114.441 114.441 2043.000 12.6 648.69 114.441 114.441 2044.000 12.6 648.90 114.441 114.441 2045.000 12.6 649.11 114.441 114.441 2046.000 12.6 649.33 114.441 114.441 2047.000 12.6 649.54 114.441 114.441 2048.000 12.6 649.75 114.441 114.441 2049.000 12.6 649.96 114.441 114.441 2050.000 12.6 650.17 114.441 114.441 2051.000 12.6 650.38 114.441 114.441 2052.000 12.6 650.59 114.441 114.441 2053.000 12.6 650.80 114.442 114.442 2054.000 12.6 651.01 114.442 114.442 2055.000 12.6 651.22 114.442 114.4,42 2056.000 12.6 651.43 114.442 114.442 2057.000 12.6 651.64 114.442 114.442 2058.000 12.6 651.85 114.442 114.442 2059.000 12.6 652.06 114.442 114.442 2060.000 12.6 652.27 114.442 114.442 2061.000 12.6 652.48 114.442 114.442 2062.000 12.6 652.69 114.442 114.442 2063.000 12.6 652.90 114.442 114.442 2064.000 12.6 653.11 114.442 114.442 2065.000 12.6 653.32 114.442 114.442 2066.000 12.6 653.53 114.442 114.442 2067.000 12.6 653.74 . 114.442 114.442 2068.000 12.6 653.95 114.443 114.443 2069.000 12.6 654.16 114.443 114.443 2070.000 12.6 654.37 114.443 114.443 2071.000 12.6 654.58 114.443 114.443 2072.000 12.6 654.79 114.443 114.443 2073.000 12.6 655.00 114.443 114.443 2074.000 12.6 655.21 114.443 114.443 2075.000 12.6 655.42 114.443 114.443 2076.000 12.6 655.63 114.443 114.443 2077.000 12.6 655.84 114.443 114.443 2078.000 12.6 656.05 114.443 114.443 2079.000 12.6 656.26 114.443 114.443 2080.000 12.6 656.47 114.443 114.443 2081.000 12.6 656.69 114.443 114.443 2082.000 12.6 656.90 114.443 114.443 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge

30. 11-17-2018 Attachment 1 Page 42 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp)* (Amp-Hour)

y. V+ 2083.000 12.6 657.lt lt4.443 lt4.443 2084.000 12.6 657.32 lt4.444 lt4.444 2085.000 12.6 657.53 lt4.444 114.444 2086.000 12.6 657.74 lt4.444 114.444 2087.000 12.6 657.95 lt4.444 lt4.444 2088.000 12.6 658.16 114.444 114.444 2089.000 12.6 658.37 lt4.444 114.444 2090.000 12.6 658.58 lt4.444 114.444 2091.000 12.6 658.79 114.444 114.444 2092.000 12.6 659.00 lt4.444 114.444 2093.000 12.6 659.21 lt4.444 114.444 2094.000 12.6 659.42 114.444 lt4.444 2095.000 12.6 659.63 lt4.444 lt4.444 2096.000 12.6 659.84 lt4.444 lt4.444 2097.000 12.6 660.05 lt4.444 114.444 2098.000 12.6 660.26 lt4.444 lt4.444 2099.000 12.6 660.47 114.444 114.444 2100.000 12.6 660.68 114.445 lt4.445 2101.000 12.6 660.89 114.445 114.445 2102.000 12.6 661.10 lt4.445 lt4.445 2103.000 12.6 661.31 lt4.445 lt4.445 2104.000 12.6 661.52 lt4.445 lt4.445 2105.000 12.6 *661.73 lt4.445 . lt4.445 2106.000 12.6 661.94 lt4.445 lt4.445 2107.000 12.6 662.15 114.445 114.445 2108.000 12.6 662.36 lt4.445 lt4.445 2109.000 12.6 662.57 lt4.445 lt4.445 2110.000 12.6 662.78 lt4.445 lt4.445 21tl.OOO 12.6 662.99 114.445 lt4.445 2112.000 12.6 663.20 lt4.445 114.445 2113.000 12.6 663.41 lt4.445 114.445 2114.000 12.6 663.62 lt4.445 lt4.445 2115.000 12.6 663.83 lt4.446 114.446 2116.000 12.6 664.04 lt4.446 lt4.446 2117.000 12.6 664.26 lt4.446 lt4.446 2118.000 12.6 664.47 lt4.446 lt4.446 21t9.000 12.6 664.68 lt4.446 114.446 2120.000 12.6 664.89 lt4.446 lt4.446 2121.000 12.6 . 665.10 114.446 114.446 2122.000 12.6 665.31 lt4.446 114.446 2123.000 12.6 665.52 114.446 114.446 2124.000 12.6 665.73 114.446 lt4.446 2125.000 12.6 665.94 114.446 .. 114.446 2126.000 12.6 666.15 114.446 114.446 2127.000 12.6 666.36 lt4.446 lt4.446 2128.000 12.6 666.57 lt4.446 114.446 2129.000 12.6 666.78 lt4.446 114.446 2130.000 12.6 666.99 114.446 114.446 2131.000 12.6 667.20 114.447 114.447 2132.000 12.6 667.41 lt4.447 114.447 2133.000 12.6 667.62 114.447 114.447 2134.000 12.6 667.83 114.447 114.447 2135.000 12.6 668.04 lt4.447 lt4.447 2136.000 12.6 668.25 lt4.447 lt4.447 2137.000 12.6 668.46 lt4.447 114.447 2138.000 12.6 668.67 114.447 lt4.447 2139.000 12.6 668.88 114.447 114.447 2140.000 12.6 669.09 114.447 lt4.447 2141.000 12.6 669.30 lt4.447 lt4.447 2142.000 12.6 669.51 114.447 114.447 2143.000 12.6 669.72 lt4.447 lt4.447 2144.000 12.6 669.93 114.447 .. 114.447 2145.000 12.6 670.14 lt4.447 . lt4.447 2146.000 f2.6 670.35 114.448 lt4.448 2147.000 12.6 670.56 lt4.448 lt4.448 2148.000 12.6 670.77 lt4.448 lt4.448 2149.000 12.6 670.98 lt4.448 lt4.448 2150.000 12.6 671.19 lt4.448 lt4.448 2151.000 12.6 671.40 lt4.448 lt4.448 2152.000 12.6 671.62 114.448 lt4.448 2153.000 12.6 671.83 lt4.448 lt4.448 2154.000 12.6 672.04 lt4.448 lt4.448

.EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study* ETAP Page: 14.LON KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study' Discharge Discharge 31 11-17-2018 Attachment 1 Page 43 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2155.000 12.6 672.25 114.448 114.448 2156.000 12.6 672.46 114.448 114.448 2157.000 12.6 672.67 114.448 114.448 2158.000 12.6 672.88 114.448 114.448 2159.000 12.6 673.09 114.448 114.448 2160.000 12.6 673.30 114.448 114.448 2161.000 12.6 673.51 114.449 114.449 2162.000 12.6 673.72 114.449 114.449 2163.000 12.6 673.93 114.449 114.449 2164.000 12.6 674.14 114.449 114.449 2165.000 12.6 674.35 114.449 114.449 2166.(\00 12.6 674.56 114.449 114.449 2167.000 12.6 674.77 114.449 114.449 2168.000 12.6 674.98 114.449 114.449 2169.000 12.6 675.19 114.449 114.449 2170.000 12.6 615.40 114.449 114.449 2171.000 12.6 675.61 114.449 114.449 2172.000 12.6 675.82 114.449 114.449 2173.000 12.6 676.03 114.449 114.449 2174.000 12.6 676.24 114.449 114.449 2175.000 12.6 616.45 114.449 114.449 2176.000 12.6 676.66 114.450 114.450 2177.000 12.6 676.87 114.450 114.450 2178.000 12.6 677.08 114.450 114.450 2179.000 12.6 677.29 114.450 114.450 2180.000 12.6 611.50 114.450 114.450 2181.000 12.6 677.71 114.450 114.450 2182.000 12.6 677.92 114.450 114.450 2183.000 12.6 678.13 114.450 114.450 2184.000 12.6 678.34 114.450 114.450 2185.000 12.6 678.55 114.450 114.450 2186.000 12.6 678.76 114.450 114.450 2187.000 12.6 678.98 114.450 114.450 2188.000 12.6 679.19 114.450 114.450 2189.000 12.6 679.40 114.450 114.450 2190.000 12.6 679.61 114.450 114.450 2191.000 12.6 679.82 114.451 114.451 2192.000 12.6 680.03 114.451 114.451 2193.000 lZ:6 680.24 114.451 114.451 2194.000 12.6 680.45 114.451 114.451 2195.000 12.6 680.66 114.451 114.451 2196.000 12.6 680.87 114.451 114.451 2197.000 12.6 681.08 114.451 114.451 2198.000 12.6 681.29 114.451 114.451 2199.000 12.6 681.50 114.451 114.451 2200.000 12.6 681.71 114.451 114.451 2201.000 12.6 681.92 114.451 114.451 2202.000 12.6 682.13 114.451 114.451 2203.000 12.6 682.34 114.451 114.451 2204.000 12.6 682.55 114.451 114.451 2205.000 12.6 682.76 114.452 114.452 2206.000 12.6 682.97 114.452 114.452 2207.000 ,12.6 683.18 114.452 114.452 2208.000 12.6 683.39 114.452 114.452 2209.000 12.6 683.60 114.452 114.452 2210.000 12.6 683.81 114.452 114.452 2211.000 12.6 684.02 114.452 114.452 2212.000 12.6 684.23 114.452 114.452 2213.000 12.6 684.44 114.452 114.452 2214.000 12.6 684.65 114.452 114.452 2215.000 12.6 684.86 114.452 114.452 2216.000 12.6 685.07 114.452 114.452 2217.000 12.6 685.28 114.452 114.452 2218.000 12.6 685.49 114.452 114.452 2219.000 12.6 685.70 114.452 114.452 2220.000 12.6 685.91 114.453 114.453 2221.000 12.6 686.12 114.453 114.453 2222.000 12.6 686.33 114.453 114.453 2223.000 12.6 686.55 114.453 114.453 2224.000 12.6 686.76 114.453 114.453 2225.000 12.6 686.97 114.453 114.453 2226.000 12.6 687.18 114.453 114.453 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 32 11-17-2018 Attachment 1 Page 44 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2227.000 12.6 687.39 114.453 114.453 2228.000 12.6 687.60 114.453 114.453 2229.000 12.6 687.81 114.453 114.453 2230.000 12.6 688.02 114.453 114.453 2231.000 12.6 688.23 114.453 114.453 2232.000 12.6 688.44 114.453 114.453 2233.000 12.6 688.65 114.453 114.453 2234.000 12.6 688.86 114.453 114.453 2235.000 12.6 689.07 114.454 114.454 2236.000 12.6 689.28 114.454 114.454 2237.000 12.6 689.49 114.454 114.454 2238.000 12.6 689.70 114.454 114.454. 2239.000 12.6 689.91 114.454 114.454 2240.000 12.6 690.12 114.454 114.454 2241.000 12.6 690.33 114.454 114.454 2242.000 12.6 690.54 114.454 114.454 2243.000 12.6 690.75 114.454 114.454 2244.000 12.6 690.96 114.454 114.454 2245.000 12.6 691.17 114.454 114.454 2246.000 12.6 691.38 114.454 114.454 2247.000 12.6 691.59 114.454 114.454 2248.000 12.6 691.80 114.454 114.454 2249.000 12.6 692.01 114.455 114.455 2250.000 12.6 692.22 114.455 114.455 2251.000 12.6 692.43 114.455 114.455 2252.000 12.6 692.64 114.455 114.455 2253.000 12.6 692.85 114.455 114.455 2254.000 12.6 693.06 114.455 114.455 2255.000 12.6 693.27 114.455 114.455 2256.000 12.6 693.48 114.455 114.455 2257.000 12.6 693.69 114.455 114.455 2258.000 12.6 693.91 114.455 114.455 2259.000 12.6 694.12 114.455 114.455 2260.000 12.6 694.33 114.455 114.455 2261.000 12.6 694.54 114.455 114.455 2262.000 12.6 694.75 114.455 114.455 2263.000 12.6 694.96 114.456 114.456 2264.000 12.6 695.17 114.456 114.456 2265.000 12.6 695.38 114.456 114.456 2266.000 12.6 695.59 114.456 114.456 2267.000 12.6 695.80 114.456 114.456 2268.000 12.6 696.01 114.456 114.456 2269.000 12.6 696.22 114.456 114.456 2270.000 12.6 696.43 114.456 114.456 2271.000 12.6 696.64 114.456 114.456 2272.000 12.6 696.85 114.456 114.456 2273.000 12.6 697.06 114.456 114.456 2274.000 12.6 697.27 114.456 114.456 2275.000 12.6 697.48 114.456 114.456 2276.000 12.6 697.69 114.456 114.456 2277.000 12.6 697.90 114.456 114.456 2278.000 12.6 698.11 114.457 114.457 2279.000 12.6 698.32 114.457 114.457 2280.000 12.6 698.53 114.457 114.457 2281.000 12.6 698.74 114.457 114.457 2282.000 12.6 698.95 114.457 114.457 2283.000 12.6 699.16 114.457 114.457 2284.000 12.6 699.37 114.457 114.457 2285.000 12.6 699.58 114.457 114.457 2286.000 12.6 699.79 114.457 114.457 2287.000 12.6 700.00 114.457 114.457 2288.000 12.6 700.21 114.457 114.457 2289.000 12.6 700.42 114.457 114.457 2290.000 12.6 700.63 114.457 114.457 2291.000 12.6 700.84 114.457 114.457 2292.000 12.6 701.05 114.458 114.458 2293.000 12.6 701.27 114.458 114.458 2294.000 12.6 701.48 114.458 114.458 2295.000 12.6 701.69 114.458 114.458 2296.000 12.6 701.90 114.458 114.458 2297.000 12.6 702.11 114.458 114.458 2298.000 12.6 702.32 114.458 114.458 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Dischar2e Dischar2e 33 11-17-2018 Attachment 1 Page 45 of 27 4 KCICONSULT Base Normal Current Capacity Volta2e(V)

Current Capacity Volta2e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour) v-V+ 2299.000 12.6 702.53 114.458 114.458 2300.000 12.6 702.74 114.458 114.458 2301.000 12.6 702.95 114.458 114.458 2302.000 12.6 703.16 114.458 114.458 2303.000 12.6 703.37 114.458 114.458 2304.000 12.6 703.58 114.458 114.458 2305.000 12.6 703.79 114.458 114.458 2306.000 12.6 704.00 114.459 114.459 2307.000 12.6 704.21 114.459 114.459 2308.000 12.6 704.42 114.459 114.459 2309.000 12.6 704.63 114.459 114.459 2310.000 12.6 704.84 114.459 114.459 2311.000 12.6 705.05 114.459 114.459 2312.000 12.6 705.26 114.459 114.459 2313.000 12.6 705.47 114.459 114.459 2314.000 12.6 705.68 114.459 114.459 2315.000 12.6 705.89 114.459 114.459 2316.000 12.6 706.10 114.459 114.459 2317.000 12.6 706.31 114.459 114.459 2318.000 12.6 706.52 114.459 114.459 2319.000 12.6 706.73 114.459 114.459 2320.000 12.6 706.94 114.460 114.460 2321.000 12.6 707.15 114.460 114.460 2322.000 12.6 707.36 114.460 114.460 2323.000 12.6 707.57 114.460 . 114.460 2324.000 12.6 707.78 114.460 114.460 2325.000 12.6 707.99 114.460 114.460 2326.000 12.6 708.20 114.460 114.460 2327.000 12.6 708.41 114.460 114.460 2328.000 12.6 708.62 114.460 114.460 2329.000 12.6 708.84 114.460 114.460 2330.000 12.6 709.05 114.460 114.460 2331.000 12.6 709.26 . 114.460 114.460 2332.000 12.6 709.47 114.460 114.460 2333.000 12.6 709.68 114.460 114.460 2334.000 12.6 709.89 114.461 114.461 2335.000 12.6 710.10 114.461 114.461 2336.000 12.6 710.31 114.461 114.461 2337.000 12.6 710.52 114.461 114.461 2338.000 12.6 710.73 114.461 114.461 2339.000 12.6 710.94 114.461 114.461 2340.000 12.6 711.15 114.461 114.461 2341.000 12.6 711.36 114.461 114.461 2342.000 12.6 711.57 114.461 114.461 2343.000 12.6 711.78 114.461 114.461 2344.000 12.6 711.99 114.461 114.461 2345.000' 12.6 712.20 114.461 114.461 2346.000 12.6 712.41 114.461 114.461 2347.000 12.6 712.62 114.462 114.462 2348.000 12.6 712.83 114.462 114.462 2349.000 12.6 713.04 114.462 114.462 2350.000 12.6 713.25 114.461 114.461 2351.000 12.6 713.46 114.461 114.461 2352.000 12.6 713.67 114.461 114.461 2353.000 12.6 713.88 114.461 114.461 2354.000 12.6 714.09 114.461 114.461 2355.000 12.6 714.30 114.461 114.461 2356.000 12.6 714.51 114.461 114.461 2357.000 12.6 714.72 114.461 114.461 2358.000 12.6 714.93 114.461 114.461 2359.000 12.6 715.14 114.461 114.461 2360.000 12.6 715.35 114.461 114.461 2361.000 12.6 715.56 114.461 114.461 2362.000 12.6 715.77 114.461 114.461 2363.000 12.6 715.98 114.461 114.461 2364.000 12.6 716.20 114.461 114.461 2365.000 12.6 716.41 .* 114.461 114.461 2366.000 12:6 716.62 114.461 114.461 2367.000 12.6 716.83 114.461 114.461 2368.000 12.6 717.04 114.461 114.461 2369.000 12.6 717.25 114.461 114.461 2370.000 12.6 717.46 114.461 114.461 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 34 11-17-2018 Attachment 1 Page 46 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2371.000 12.6 717.67 114.461 114.461 2372.000 12.6 717.88 114.461 114.461 2373.000 12.6 718.09 114.461 114.461 2374.000 12.6 718.30 114.461 114.461 2375.000 12.6 718.51 114.461 114.461 2376.000 12.6 718.72 114.461 114.461 2377.000 12.6 718.93 114.460 114.460 2378.000 12.6 719.14 114.460 114.460 2379.000 12.6 719.35 114.460 .. 114.460 2380.000 12.6 719.56 114.460 114.460 2381.000 12.6 719.77 114.460 114.460 2382.000 12.6 719.98 114.460 114.460 2383.000 12.6 720.19 114.460 114.460 2384.000 12.6 720.40 114.460 114.460 2385.000 12.6 720.61 114.460 114.460 2386.000 12.6 720.82 114.460 114.460 2387.000 12.6 721.03 114.460 114.460 2388.000 12.6 721.24 114.460 114.460 2389.000 12.6 721.45 114.460 114.460 2390.000 12.6 721.66 114.460 .. 114.460 2391.000 12.6 721.87 114.460 114.460 2392.000 12.6 722.08 114.460 114.460 2393.000 12.6 722.29 114.460 114.460 2394.000 12.6 722.50 114.460 114.460 2395.000 12.6 722.71 114.460 114.460 2396.000 12.6 722.92 114.460 114.460 2397.000 12.6 723.13 114.460 114.460 2398.000 12.6 723.34 114.460 114.460 2399.000 12.6 723.56 114.460 114.460 2400.000 12.6 723.77 114.460 114.460 2401.000 12.6 723.98 114.460 114.460 2402.000 12.6 724.19 114.460 114.460 2403.000 12.6 724.40 114.459 114.459 2404.000 12.6 724.61 114.459 114.459 2405.000 12.6 724.82 114.459 114.45~ 2406.000 12.6 725.03 114.459 114.459 2407.000 12.6 725.24 114.459 114.459 2408.000 12.6 725.45 114.459 114.459 2409.000 12.6 725.66 114.459 114.459 2410.000 12.6 725.87 114.459 114.459 2411.000 12.6 726.08 114.459 114.459 2412.000 12.6 726.29 114.459 114.459 2413.000 12.6 726.50 114.459 114.459 2414.000 12.6 726.71 114.459 114.459 2415.000 12.6 726.92 114.459 114.459 2416.000 12.6 727.13 114.459 114.459 2417.000 12.6 727.34 114.459 114.459 2418.000 12.6 727.55 114.459 114.459 2419.000 12.6 727.76 114.459 114.459 2420.000 12.6 727.97 114.459 114.459 2421.000 12.6 728.18 114.459 114.459 2422.000 12.6 728.39 114.459 114.459 2423.000 12.6 728.60 114.459 114.459 2424.000 12.6 728.81 114.459 114.459 2425.000 12.6 729.02 114.459 114.459 2426.000 12.6 729.23 114.459 114.459 2427.000 12.6 729.44 114.459 114.459 2428.000 12.6 729.65 114.459 114.459 2429.000 12.6 729.86 114.458 114.458 2430.000 12.6 730.07 114.458 114.458 2431.000 12.6 730.28 114.458 114.458 2432.000 12.6 730.49 114.458 114.458 2433.000 12.6 730.70 114.458 114.458 2434.000 12.6 730.92 114.458 114.458 2435.000 12.6 731.13 114.458 114.458 2436.000 12.6 731.34 114.458 114.458 2437.000 12.6 731.55 114.458 114.458 2438.000 12.6 731.76 114.458 114.458 .2439.000 12.6 731.97 114.458 114.458 2440.000 12.6 732.18 114.458 114.458 2441.000 12.6 732.39 114.458 114.458 2442.000 12.6 732.60 114.458 114.458 ./

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 35 11-17-2018 Attachment 1 Page 47 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-HouI")

V-V+ Time (Amp) (Amp-HouI")

V-V+ 2443.000 12.6 732.81 114.458 114.458 2444.000 12.6 733.02 114.458 114.458 2445.000 12.6 733.23 114.458 114.458 2446.000 12.6 733.44 114.458 114.458 2447.000 12.6 733.65 114.458 114.458 2448.000 12.6 733.86 114.458 114.458 2449.000 12.6 734.07 114.458 114.458 2450.000 12.6 -734.28 114.458 114.458 2451.000 12.6 734.49 114.458 114.458 2452.000 12.6 734.70 114.458 114.458 2453.000 12.6 734.91 114.458 114.458 2454.000 12.6 735.12 114.458 114.458 2455.000 12.6 735.33 114.457 114.457 2456.000 12.6 735.54 114.457 114.457 2457.000 12.6 735.75 114.457 114.457 2458.000 12.6 735.96 114.457 114.457 2459.000 12.6 736.17 114.457 114.457 2460.000 12.6 736.38 114.457 114.457 2461.000 12.6 736.59 114.457 114.457 2462.000 12.6 736.80 114.457 114.457 2463.000 12.6 737.01 114.457 114.457 2464.000 12.6 737.22 114.457 114.457 2465.000 12.6 737.43 114.457 114.457 2466.000 12.6 737.64 114.457 114.457 2467.000 12.6 737.85 114.457 114.457 2468.000 12.6 738.06 114.457 114.457 2469.000 12.6 738.27 114.457 114.457 2470.000 12.6 738.49 114.457 114.457 2471.000 12.6 738.70 114.457 114.457 2472.000 12.6 738.91 114.457 114.457 2473.000 12.6 739.12 114.457 114.457 2474.000 12.6 739.33 114.457 114.457 2475.000 12.6 739.54 114.457 114.457 2476.000 12.6 739.75 114.457 114.457 2477.000 12.6 739.96 114.457 114.457 2478.000 12.6 740.17 114.457 114.457 2479.000 12.6 740.38 114.457 114.457 2480.000 12.6 740.59 114.456 1.14.456 2481.000 12.6 740.80 ll4.456 114.456 2482.000 12.6 741.01 114.456 ll4.456 2483.000 12.6 741.22 114.456 114.456 2484.000 12.6 741.43 114.456 114.456 2485.000 12.6 741.64 114.456 114.456 2486.000 12.6 741.85 114.456 114.456 2487.000 12.6 742.06 ll4.456 ll4.456 2488.000 12.6 742.27 114.456 114.456 2489.000 12.6 742.48 114.456 ll4.456 2490.000 12.6 742.69 114.456 114.456 2491.000 12.6 742.90 114.456 114.456 2492.000 12.6 743.ll ll4.456 114.456 2493.000 12.6 743.32 ll4.456 114.456 2494.000 12.6 743.53 ll4.456 114.456 2495.000 12.6 743.74 ll4.456 ll4.456 2496.000 12.6 743.95 114.456 114.456 2497.000 12.6 744.16 ll4.456 114.456 2498.000 12.6 744.37 ll4.456 114-456 2499.000 12.6 744.58 114.456 ll4.456 2500.000 12.6 744.79 114.456 114.456 2501.000 12.6 745.00 114.456 114.456 2502.000 12.6 745.21 ll4.456 ll4.456 2503.000 12.6 745.42 ll4.456 114.456 2504.000 12.6 745.63 ll4.456 114.456 2505.000 12.6 745.85 ll4.455 ll4.455 2506.000 12.6 746.06 114.455 ll4.455 2507.000 12.6 746.27 ll4.455 114.455 2508.000 12.6 746.48 114.455 114.455 2509.000 12.6 746.69 114.455 ll4.455 2510.000 12.6 746.90 114.455 114.455 2511.000 12.6 747.11 114.455 114.455 2512.000 12.6 747.32 114.455 114.455 2513.000 12.6 747.53 114.455 ll4.455 2514.000 12.6 747.74 114.455 114.455 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex .Study ETAP

  • Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 36 11-17-2018 Attachment 1 Page 48 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-~our)

V-V+ Time (Amp) (Amp-Hom*)

V-V+ 2515.000 12.6 747.95 114.455 114.455 2516.000 12.6 748.16 114.455 114.455 2517.000 12.6 748.37 114.455 114.455 2518.000 12.6 748.58 114.455 114.455 2519.000 12.6 748.79 114.455 114.455 2520.000 12.6 749.00 114.455 114.455 2521.000 12.6 749.21 114.455 114.455 2522.000 12.6 749.42 114.455 114.455 2523.000 12.6 749.63 114.455 114.455 2524.000 12.6 749.84 114.455 114.455 2525.000 12.6 750.05 114.455 114.455 2526.000 12.6 750.26 114.455 114.455 2527.000 12.6 750.47 '* 114.455 114.455 2528.000 12.6 750.68 114.455 114.455 2529.000 12.6 750.89 114.455 114.455 2530.000 12.6 751.10 114.454 114.454 2531.000 12.6 751.31 114.454 114.454 2532.000 12.6 751.52 114.454 114.454 2533.000 12.6 751.73 114.454 114.454 2534.000 12.6 751.94 114.454 114.454 2535.000 12.6 752.15 114.454 114.454 2536.000 12.6 752.36 114.454 114.454 2537.000 12.6 752.57 114.454 114.454 2538.000 12.6 752.78 114.454 114.454 2539.000 12.6 752.99 114.454 114.454 2540.000 12.6 753.21 114.454 114.454 2541.000 12.6 753.42 114.454 114.454 2542.000 12.6 753.63 114.454 114.454 2543.000 12.6 753.84 114.454 114.454 2544.000 12.6 754.05 114.454 114.454 2545.000 12.6 754.26 114.454 114.454 2546.000 12.6 754.47 114.454 114.454 2547.000 12.6 754.68 114.454 114.454 2548.000 12.6 754.89 114.454 114.454 2549.000 12.6 755.10 114.454 114.454 2550.000 12.6 755.31 114.454 114.454 2551.000 12.6 755.52 114.454 114.454 2552.000 12.6 755.73 114.454 114.454 2553.000 12.6 755.94 114.454 114.454 2554.000 12.6 756.15 114.454 114.454 2555.000 12.6 756.36 114.453 114.453 2556.000 12.6 756.57 114.453 114.453 2557.000 12.6 756.78 114.453 114.453. 2558.000 12.6 756.99 114.453 114.453 2559.000 12.6 757.20 114.453 114.453 2560.000 12.6 757.41 114.453 114.453 2561.000 12.6 757.62 114.453 114.453 2562.000 12.6 757.83 114.453 114.453 2563.000 12.6 758.04 114.453 114.453 2564.000 12.6 75&.25 114.453 114.453 2565.000 12.6 758.46 114.453 114.453 2566.000 12.6 758.67 114.453 114.453 2567.000 12.6 . 758.88 114.453 114.453 2568.000 12.6 759.09 114.453 114.453 2569.000 12.6 759.30 114.453 114.453 2570.000 12.6 759.51 114.453 114.453 2571.000 12.6 759.72 114.453 i 14.453 2572.000 12.6 759.93 114.453 114.453 2573.000 12.6 760.14 114.453 114.453 2574.000 12.6 760.35 114.453 114.453 2575.000 12.6 760.56 114.453 114.453 2576.000 12.6 760.78 114.453 114.453 2577.000 12.6 760.99 114.453 114.453 2578.000 12.6 761.20 114.453 114.453 2579.000 12.6 761.41 114.452 114.452 2580.000 12.6 761.62 114.452 114.452 2581.000 12.6 761.83 114.452 114.452 2582.000 12.6 762.04 114.452 114.452 2583.000 12.6 762.25 114.452 114.452 2584.000 12.6 762.46 114.452 114.452 2585.000 12.6 762.67 114.452 114.452 2586.000 12.6 762.88 114.452 114.452 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study /

  • Config.: DIV I Battery 1A48-Hour Coping Study Discharge Discharge 37 11-17-2018 Attachment 1 Page 49 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2587.000 12.6 763.09 114.452 114.452 2588.000 12.6 763.30 114.452 114.452 2589.000 12.6 763.51 J . 114.452 114.452 2590.000 12.6 763.72 114.452 114.452 2591.000 12.6 763.93 114.452 114.452 2592.000 12.6 764.14 114.452 114.452 2593.000 12.6 764.35 114.452 114.452 2594.000 12.6 764.56 114.452 114.452 2595.000 12.6 764.77 114.452 114.452 2596.000 12.6 764.98 114.452 114.452 2597.000 12.6 765.19 114.452 114.452 2598.000 12.6 765.40 114.452 114.452 2599.000 12.6 765.61 114.452 114.452 2600.000 12.6 765.82 114.452 114.452 2601.000 12.6 766.03 114.452 114.452 2602.000 12.6 766.24 114.452 114.452 2603.000 12.6 766.45 114.452 114.452 2604.000 12.6 766.66 114.451 114.451 2605.000 12.6 766.87 114.451 114.451 2606.000 12.6 767.08 114.451 114.451 2607.000 12.6 767.29 114.451 114.451 2608.000 12.6 767.50 114.451 114.451 2609.000 12.6 767.71 114.451 114.451 2610.000 12.6 767.92 114.451 114.451 2611.000 12.6 768.14 114.451 114.451 2612.000 12.6 768.35 114.451 114.451 2613.000 12.6 768.56 114.451 114.451 2614.000 12.6 768.77 114.451 114.451 2615.000 12.6 768.98 114.451' 114.451 2616.000 12.6 769.19 114.451 114.451 2617.000 12.6 769.40 114.451 114.451 2618.000 12.6 769.61 114.451 114.451 2619.000 12.6 769.82 114.451 114.451 2620.000 12.6 770.03 114.451 114.451 2621.000 12.6 770.24 114.451 .

  • 114.451 2622.000 12.6 770.45 114.451 114.451 2623.000 12.6 770.66 114.451 114.451 2624.000 12.6 770.87 114.451 114.451 2625.000 12.6 771.08 114.451 114.451 2626.000 12.6 771.29 114.451 114.451 2627.000 12.6 771.50 114.451 114.451 2628.000 12.6 771.71 114.450 114.450 2629.000 12.6 771.92 114.450 114.450 2630.000 12.6 772.13 114.450 114.450 2631.000 12.6 772.34 114.450 114.450 2632.000 12.6 772.55 114.450 114.450 2633.000 12.6 772.76 114.450 114.450 2634.000 12.6 772.97 114.450 114.450 2635.000 12.6 773.18 114.450 114.450 2636.000 12.6 773.39 114.450 114.450 2637.000 12.6 773.60 114.450 114.450 2638.000 12.6 773.81 . 114.450 114.450 2639.000 12.6 774.02 114.450 114.450 2640.000 12.6 774.23 114.450 114.450 2641.000 12.6 774.44 114.450 114.450 2642.000 12.6 774.65 114.450 114.450 2643.000 12.6 774.86 114.450 114.450 2644.000 12.6 775.07 114.450 114.450 2645.000 12.6 775.28 114.450 114.450 2646.000 12.6 775.50 114.450 114.450 2647.000 12.6 775.71 114.450 114.450 2648.000 12.6 775.92 114.450 114.450 2649.000 12.6 776.13 114.450 114.450 2650.000 12.6 776.34 114.450 114.450 2651.000 12.6 776.55 114.449 114.449 2652.000 12.6 776.76 114.449 114.449 2653.000 12.6 776.97 114.449 114.449 2654.000 12.6 777.18 114.449 114.449 2655.000 12.6 777.39 114.449 114.449 2656.000 12.6 777.60 114.449 114.449 2657.000 12.6 777.81 114.449 114.449 2658.000 12.6 778.02 114.449 114.449 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

l CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 38 11-17-2018 Attachment 1 Page 50 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltagc(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 2659.000 12.6 778.23 .. 114.449 114.449 2660.000 12.6 778.44 114.449 114.449 2661.000 12.6 778.65 114.449 114.449 2662.000 12.6 778.86 114.449 114.449 2663.000 12.6 779.07 114.449 114.449 2664.000 12.6 779.28 114.449 114.449 2665.000 12.6 779.49 114.449 114.449 2666.000 12.6 779.70 114.449 114.449 2667.000 12.6 779.91 114.449 114.449 2668.000 12.6 780.12 114.449 114.449 2669.000 12.6 780.33 114.449 114.449 2670.000 12.6 780.54 114.449 114.449 2671.000 12.6 780.75 114.449 114.449 2672.000 12.6 780.96 114.449 114.449
  • 2673.000 12.6 781.17 114.449 114.449 2674.000 12.6 781.38 114.449 114.449 2675.000 12.6 781.59 114.448 114.448 2676.000 12.6 781.80 114.448 114.448 2677.000 12.6 782.01' 114.448 114.448 1678.000 12.6 782.22 114.448 114.448 2679.000 12.6 782.43 114.448 114.448 2680.000 12.6 782.64 114.448 114.448 2681.000 12.6 782.86 114.448 114.448 2682.000 12.6 783.07 114.448 114.448 2683.000 12.6 783.28' 114.448 114.448 2684.000 12.6 783.49 114.448 114.448 2685.000 12.6 783.70 114.448 114.448 2686.000 12.6 783.91 114.448 114.448 2687.000 12.6 784.12 114.448 114.448 2688.000 12.6 784.33 114.448 114.448 2689.000 12.6 784.54 114.448 114.448 2690.000 12.6 784.75 114.448 114.448 2691.000 12.6 784.96 114.448 114.448 2692.000 12.6 785.17 114.448 114.448 2693.000 12.6 785.38 114.448 114.448 2694.000 12.6 785.59 114.448 114.448 2695.000 12.6 785.80 114.448 114.448 2696.000 12.6 786.01 114.448 114.448 2697.000 12.6 786.22 114.448 114.448 2698.000 12.6 786.43 114.447 114.447 2699.000 12.6 786.64 114.447 114.447 2700.000 12.6 786.85 114.447 114.447 2701.000 12.6 787.06 114.447 114.447 2702.000 12.6 787.27 114.447 114.447 2703.000 12.6 787.48 114.447 114.447 2704.000 12.6 787.69 114.447 114.447 2705.000 12.6 787.90 114.447 114.447 2706.000 12.6 788.11
  • 114.447 114.447 2707.000 12.6 788.32 114.447 114.447 2708.000 12.6 788.53 114.447 114.447 2709.000 12.6 788.74 114.447 114.447 2710.000 12.6 788.95 114.447 114.447 2711.000 12.6 789.16 114.447 114.447 2712.000 12.6 789.37 114.447 114.447 2713.000 12.6 789.58 114.447 114.447 2714.000 12.6 789.79 114.447 114.447 2715.000 12.6 790.00 114.447 114.447 2716.000 12.6 790.21 114.447 114.447 2717.000 12.6 790.43 114.447 114.447 2718.000 12.6 790.64 114.447 114.447 2719.000 12.6 790.85 114.447 114.447 2720.000 12.6 791.06 114.447 114.447 2721.000 12.6 791.27 114.447 114.447 ...) 2722.000 12.6 791.48 114.446 114.446 2723.000 12.6 791.69 114.446 114.446 2724.000 12.6 791.90 114.446 114.446 2725.000 12.6 792.11 114.446 114.446 2726.000 12.6 792.32 114.446 114.446 2727.000 12.6 792.53 114.446 114.446 2728.000 12.6 792.74 114.446 114.446 2729.000 , 12.6 792.95 114.446 114.446 2730.000 12.6 793.16 114.446 114.446 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CAS.E 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 39 11-17-2018 Attachment 1 Page 51 of274 KCICONSULT Base Normal Curreri! Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2731.000 12.6 793.37 114.446 114.446 2732.000 12.6 793.58 114.446 114.446 2733.000 12.6 793.79 114.446 114.446 2734.000 12.6 794.00 114.446 114.446 2735.000 12.6 794.21 114.446 114.446 2736.000 12.6 794.42 114.446 114.446 2737.000 12.6 794.63 114.446 114.446 2738.000 12.6 794.84 114.446 114.446 2739.000 12.6 795.05 114.446 114.446 2740.000 12.6 795.26 114.446 114.446 2741.000 12.6 795.47 114.446 114.446 2742.000 12.6 795.68 114.446 114.446 2743.000 12.6 795.89 114.446 114.446 2744.000 12.6 796.10 114.445 114.445 2745.000 12.6 796.31 114.445 114.445 2746.000 12.6 796.52 114.445 114.445 2747.000 12.6 796.73 114.445 114.445 2748.000 12.6 796.94 114.445 114.445 2749.000 12.6 797.15 114.445 114.445 2750.000 12.6 797.36 114.445 114.445 2751.000 12.6 797.57 114.445 114.445 2752.000 12.6 797.79 114.445 114.445 2753.000 12.6 798.00 114.445 114.445 2754.000 12.6 798.21 114.445 114.445 2755.000 12.6 798.42 114.445 114.445 2756.000 12.6 798.63 114.445 .. 114.445 2757.000 12.6 798.84 114.445 114.445 2758.000 12.6 799.05 114.445 114.445 2759.000 12.6 799.26 114.445 114.445 2760.000 12.6 799.47 114.445 114.445 2761.000 12.6 799.68 114.445 114.445 2762.000 12.6 799.89 114.445 114.445 2763.000 12.6 800.10 114.445 114.445 2764.000 12.6 800.31 114.445 114.445 2765.000 12.6 800.52 114.445 114.445 2766.000 12.6 800.73 114.445 114.445 2767.000 12.6 800.94 114.444 114.444 2768.000 12.6 801.15 114.444 114.444 2769.000 12.6 801.36 114.444 114.444 2770.000 12.6 801.57 114.444 114.444 2771.000 12.6 801.78 114.444 114.444 2772.000 12.6 801.99 114.444 114.444 2773.000 12.6 802.20 114.444 114.444 2774.000 12.6 802.41 114.444 114.444 2775.000 12.6 802.62 114.444 114.444 2776.000 12.6 802.83 114.444 114.444 2777.000 12.6 803.04 114.444 114.444 2778.000 12.6 803.25 114.444 114.444 2779.000 12.6 803.46 114.444 114.444 2780.000 12.6 803.67 114.444 114.444 2781.000 12.6 803.88 114.444 114.444 2782.000 12.6 804.09 114.444 114.444 2783.000 12.6 804.30 114.444 114.444 2784.000 12.6 804.51 114.444 114.444 2785.000 12.6 804.72 114.444 114.444 2786.000 12.6 804.93 114.444 114.444 2787.000 12.6 805.15 114.444 114.444 2788.000 12.6 805.36 114.444 114.444 2789.000 12.6 805.57 ll4.444 114.444 2790.000 12.6 805.78 114.443 114.443 2791.000 12.6 805.99 114.443 114.443 2792.000 12.6 806.20 114.443 ll4.443 2793.000 12.6 806.41 114.443 114.443 2794.000 12.6 806.62 ll4.443 114.443 2795.000 12.6 806.83 114.443 114.443 2796.000 12.6 807.04 114.443 114.443 2797.000 12.6 807.25 114.443 114.443 2798.000 12.6 807.46 114.443 114.443 2799.000 12.6 807.67 114.443 114.443 2800.000 12.6 807.88 114.443 114.443 2801.000 12.6 808.09 114.443 114.443 2802.000 12.6 808.30 114.443 114.443 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 40 11-17-2018 Attachment 1 Page 52 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2803.000 12.6 808.51 114.443 114.443 2804.000 12.6 808.72 114.443 114.443 2805.000 12.6 808.93 114.443 114.443 2806.000 12.6 809.14 114.443 114.443 2807.000 12.6 809.35 114.443 114.443 2808.000 12.6 809.56 114.443 114.443 2809.000 12.6 809.77 114.443 114.443 2810.000 12.6 809.98 114.443 114.443 2811.000 12.6 810.19 114.443 114.443 2812.000 12.6 810.40 114.442 114.442 2813.000 12.6 810.61 114.442 114.442 2814.000 12.6 810.82 114.442 114.442 2815.000 12.6 811.03 114.442 114.442 2816.000 12.6 811.24 114.442 114.442 2817.000 12.6 811.45 114.442 114.442 2818.000 12.6 811.66 114.442 114.442 2819.000 12.6 811.87 114.442 114.442 2820.00_9 12.6 812.08 114.442 114.442 2821.000 12.6 812.29 114.442 114.442 2822.000 12.6 812.50 114.442 114.442 2823.000 12.6 812.72 114.442 114.442 2824.000 12.6 812.93 114.442 114.442 2825.000 12.6 813.14 114.442 114.442 2826.000 12.6 813.35 114.442 114.442 2827.000 12.6 813.56 114.442 114.442 2828.000 12.6 813.77 114.442 114.442 2829.000 12.6 813.98 114.442 114.442 2830.000 12.6 814.19 114.442 114.442 2831.000 12.6 814.40 114.442 114.442 2832.000 12.6 814.61 114.442 114.442 2833.000 12.6 814.82 114.442 114.442 2834.000 12.6 815.03 114.441 114.441 2835.000 12.6 815.24 114.441 114.441 2836.000 12.6 815.45 114.441 114.441 2837.000 12.6 815.66 114.441 114.441 2838.000 12.6 815.87 114.441 114.441 2839.000 12.6 816.08 114.441 114.441 2840.000 12.6 816.29 114.441 114.441 2841.000 12.6 816.50 114.441 114.441 2842.000 12.6 816.71 114.441 114.441 2843.000 12.6 816.92 114.441 114.441 2844.000 12.6 817.13 114.441 114.441 2845.000 12.6 817.34 114.441 114.441 2846.000 12.6 817.55 114.441 114.441 2847.000 12.6 817.76 114.441 114.441 2848.000 12.6 817.97 114.441 114.441 2849.000 12.6 818.18 114.441 114.441 2850.000 12.6 818.39 114.441 114.441 2851.000 12.6 818.60 114.441 114.441 2852.000 12.6 818.81 114.441 114.441 2853.000 12.6 819.02 114.441 114.441 2854.000 12.6 819.23 114.441 114.441 2855.000 12.6 819.44 114.441 114.441 2856.000 12.6 819.65 114.440 114.440 2857.000 12.6 819.86 114.440 114.440 2858.000 12.6 820.08 114.440 114.440 2859.000 12.6 820.29 114.440 114.440 2860.000 12.6 820.50 114.440 114.440 2861.000 12.6 820.71 114.440 114.440 2862.000 12.6 820.92 114.440 114.440 2863.000 12.6 821.13 114.440 114.440 2864.000 12.6 821.34 114.440 114.440 2865.000 12.6 821.55 114.440 114.440 2866.000 12.6 821.76 114.440 114.440 2867.000 12.6 821.97 114.440 114.440 2868.000 12.6 822.18 114.440 114.440 2869.000 12.6 822.39 114.440 114.440 2870.000 12.6 822.60 114,440 114.440 2871.000 12.6 822.81 114.440 114.440 2872.000 12.6 823.02 114.440 114.440 2873.000 12.6 823.23 114.440 114.440 2874.000 12.6 823.44 114.440 114.440 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Dischare;e Dischare;e 41 11-17-2018 Attachment 1 Page 53 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltae;e(V)

Current Capacity Voltae;e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hom*)

V-V+ 2875.000 12.6 823.65 114.440 114.440 2876.000 12.6 823.86 ll4.440 ll4.440 2877.000 12.6 824.07 ll4.440 ll4.440 2878.000 12.6 824.28 ll4.439 ll4.439 2879.000 12.6 824.49 ll4.439 114.439 2880.000 12.6 824.70 il4.439 ll4.439 2881.000 12.6 824.91 ll4.439 114.439 2882.000 12.6 825.12 ll4.439 114.439 2883.000 12.6 825.33 ll4.439 114.439 2884.000 12.6 825.54 ll4.439 114.439 2885.000 12.6 825.75 114.439 ll4.439 2886.000 12.6 825.96 ll4.439 ll4.439 2887.000 12.6 826.17 ll4.439 114.439 2888.000 12.6 826.38 ll4.439 ll4.439 2889.000 12.6 826.59 ll4.439 ll4.439 2890.000 12.6 826.80 ll4.439 ll4.439 2891.000 12.6 827.01 ll4.439 ll4.439 2892.000 12.6 827.22 ll4.439 ll4.439 2893.000 12.6 827.44 ll4.439 ll4.439 2894.000 12.6 827.65 ll4.439 ll4.439 2895.000 12.6 827.86 ll4.439 114.439 2896.000 12.6 828.07 ll4.439 114.439 2897.000 12.6 828.28 ll4.439 114.439 2898.000 12.6 828.49 ll4.439 ll4.439 2899.000 12.6 828.70 114.439 114.439 2900.000 12.6 828.91 ll4.438 114.438 2901.000 12.6 829.12 114.438 ll4.438 2902.000 12.6 829.33 ll4.438 ll4.438 2903.000 12.6 829.54 ll4.438 114.438 2904.000 12.6 829.75 ll4.438 114.438 2905.000 12.6 829.96 ll4.438 ll4.438 2906.000 12.6 830.17 ll4.438 ll4.438 2907.000 12.6 830.38 ll4.438 ll4.438 2908.000 12.6 830.59 ll4.438 114.438 2909.000 12.6 830.80 ll4.438 ll4.438 2910.000 12.6 831.01 ll4.438 114.438 2911.000 12.6 831.22 ll4.438 ll4.438 2912.000 12.6 831.43 ll4.438 114.438 2913.000 12.6 831.64 ll4.438 ll4.438 2914.000 12.6 831.85 ll4.438 114.438 2915.000 12.6 832.06 114.438 ll4.438 2916.000 12.6 832.27 ll4.438 ll4.438 2917.000 12.6 832.48 ll4.438 ll4.438 2918.00b 12.6 832.69 ll4.438 ll4.438 2919.000 12.6 832.90 114.438 ll4.438 2920.000 12.6

  • 833.ll 114.438 ll4.438 2921.000 12.6 833.32 114.437 114.437 2922.000 12.6 833.53 ll4.437 ll4.437 2923.000 12.6 833.74 ll4.437 ll4.437 2924.000 12.6 833.95 ll4.437 ll4.437 2925.000 12.6 834.16 ll4.437 ** ll4.437 2926.000 12.6 834.37 . ll4.437 ll4.437 2927.000 12.6 834.58 114.437 ll4.437 2928.000 12.6 834.79 114.437 ll4.437 2929.000 12.6 835.01 114.437 114.437 2930.000 12.6 835.22 ll4.437 ll4.437 2931.000 12.6 835.43 114.437 ll4.437 2932.000 12.6 835.64 ll4.437 ll4.437 2933.000 12,6 835.85 ll4.437 ll4.437 2934.000 12.6 836.06 114.437 114.437 2935.000 12.6 836.27 ll4.437 114.437 2936.000 12.6 836.48 ll4.437 114.437 2937.000 12.6 836.69 ll4.437 114.437 2938.000 12.6 836.90 114.437 114.437 2939.000 12.6 837.11 ll4.437 ll4.437 2940.000 12.6 837.32 ll4.437 ll4.437 2941.000 12.6 837.53 ll4.437 ll4.437 2942.000 12.6 837.74 ll4.436 ll4.436 2943.000 12.6 837.95 ll4.436 ll4.436 2944.000 12.6 838.16 114.436 114.436 2945.000 12.6 838.37 ll4.436 ll4.436 2946.000 12.6 838.58 ll4.436 ll4.436 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP .Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 42 11-17-2018 Attachment 1 Page 54 of 27 4 KCICONSULT Base Nonna) Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Houl')

v-V+ Time (Amp) (Amp-Houl')

V-V+ 2947.000 12.6 838.79 114.436 114.436 2948.000 12.6 839.00 114.436 114.436 2949.000 12.6 839.21 114.436 114.436 2950.000 12.6 839.42 114.436 114.436 2951.000 12.6 839.63 114.436 114.436 2952.000 12.6 839.84 114.436 114.436 2953.000 12.6 840.05 114.436 114.436 2954.000 12.6 840.26 114.436 114.436 2955.000 12.6 840.47 114.436 114.436 2956.000 12.6 840.68 114.436 114.436 2957.000 12.6 840.89 114.436 114.436 2958.000 12.6 841.10 114.436 114.436 2959.000 12.6 841.31 114.436 114.436 2960.000 12.6 841.52 114.436 114.436 2961.000 12.6 841.73 114.436 114.436 2962.000 12.6 841.94 114.436 114.436 2963.000 12.6 842.15 114.435 114.435 2964.000 12.6 842.37 114.435 114.435 2965.000 12.6 842.58 114.435 114.435 2966.000 12.6 842.79 114.435 114.435 2967.000 12.6 843.00 .. 114.435 . '114.435 2968.000 12.6 843.21 114.435 114.435 2969.000 12.6 843.42 114.435 114.435 2970.000 12.6 843.63 114.435 114.435 2971.000 12.6 843.84 114.435 114.435 2972.000 12.6 844.05 114.435 114.435 2973.000 12.6 844.26 114.435 114.435 2974.000 12.6 844.47 114.435 114.435 2975.000 12.6 844.68 114.435 114.435 2976.000 12.6 844.89 114.435 114.435 2977.000 12.6 845.10 114.435 114.435 2978.000 12.6 845.31 114.435 114.435 2979.000 12.6 845.52 114.435 114.435 2980.000 12.6 845.73 114.435 114.435 2981.000 12.6 845.94 114.435 114.435 . 2982.000 12.6 846.15 114.435 114.435 2983.000 12.6 846.36 114.435 114.435 2984.000 12.6 846.57 114.434 114.434 2985.000 12.6 846.78 114.434 114.434 2986.000 12.6 846.99 114.434 114.434 2987.000 12.6 847.20 114.434 114.434 2988.000 12.6 847.41 114.434 114.434 2989.000 12.6 847.62 114.434 114.434 2990.000 12.6 847.83 114.434 114.434 2991.000 12.6 848.04 114.434 114.434 2992.000 12.6 848.25 114.434 114.434 2993.000 12.6 848.46 114.434 114.434 2994.000 12.6 848.67 114.434 114.434 2995.000 12.6 848.88 114.434 114.434 2996.000 12.6 849.09 114.434 114.434 2997.000 12.6 849.30 114.434 114.434 2998.000 12.6 849.51 114.434 114.434 2999.000 12.6 849.73 114.434 114.434 3000.000 12.6 849.94 . ' 114.434 114.434 3001.000 12.6 850.15 114.434 114.434 3002.000 12.6 850.36 114.434 114.434 3003.000 12.6 850.57 114.434 114.434 3004.000 12.6 850.78 114.433 114.433 3005.000 12.6 850.99 114.433 114.433 3006.000 12.6 851.20 114.433 114.433 3007.000 12.6 851.41 114.433 114.433 3008.000 12.6 851.62 114.433 114.433 3009.000 12.6 851.83 114.433 114.433 3010.000 12.6 852.04 114.433 114.433 3011.000 12.6 852.25 114.433 114.433 3012.000 12.6 852.46 114.433 114.433 3013.000 12.6 852.67 114.433 114.433 3014.000 12.6 852.88 114.433 114.433 3015.000 12.6 853.09 114.433 114.433 3016.000 12.6 853.30 114.433 114.433 3017.000 12.6 853.51 114.433 114.433 3018:000 12.6 853.72 114.433 114.433 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 43 11-17-2018 Attachment 1 Page 55 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3019.000 12.6 853.93 114.433 114.433 3020.000 12.6 854.14 114.433 114.433 3021.000 12.6 854.35 114.433 114.433 3022.000 12.6 854.56 114.432 114.432 3023.000 12.6 854.77 114.431 114.431 3024.000 12.6 854.98 114.431 114.431 3025.000 12.6 855.19 114.430 114.430 3026.000 12.6 855.40 114.429 114.429 3027.000 12.6 855.61 114.429 114.429 3028.000 12.6 855.82 114.428 114.428 3029.000 12.6 856.03 114.427 114.427 3030.000 12.6 856.24 114.426 114.426 3031.000 12.6 856.45 114.426 114.426 3032.000 12.6 856.66 114.425 114.425 3033.000 12.6 856.87 114.424 114.424 3034.000 12.6 857.09 114.424 114.424 3035.000 12.6 857.30 114.423 114.423 3036.000 12.6 857.51 114.422 114.422 3037.000 12.6 857.72 114.422 114.422 3038.000 12.6 857.93 114.421 1,14.421 3039.000 12.6 858.14 114.420 114.420 3040.000 12.6 858.35 114:419 114.419 3041.000 12.6 858.56 114.419 114.419 3042.000 12.6 858.77 .. 114.418 114.418 3043.000 12.6 858.98 114.417 114.417 3044.000 12.6 859.19 114.417 114.417 3045.000 12.6 859.40 114.416 114.416 3046.000 12.6 859.61 114.415 114.415 3047.000 12.6 859.82 114.414 114.414 3048.000 12.6 860.03 114.414 114.414 3049.000 12.6 860.24 114.413 114.413 3050.000 12.6 860.45 114.412 114.412 3051.000 12.6 860.66 114.412 114.412 3052.000 12.6 860.87 114.411 114.411 3053.000 12.6 861.08 114.410 114.410 3054.000 12.6 861.29 114.410 114.410 3055.000 12.6 861.50 114.409 114.409 3056.000 12.6 861.71 114.408 114.408 3057.000 12.6 861.92 114.407 114.407 3058.000 12.6 862.13 114.407 114.407 3059.000 12.6 862.34 114.406 114.406 3060.000 12.6. 862.55 114.405 114.405 3061.000 12.6 862.76 114.405 114.405 3062.000 . 12.6 862.97 114.404 114.404 3063.000 12.6 863.18 114.403 114.403 3064.000 12.6 863.39 114.402 114.402 3065.000 12.6 863.60 114.402 114.402 3066.000 12.6 863.81 114.401 114.401 3067.000 12.6 864.02 114.400 114.400 3068.000 12.6 864.23 114.400 114.400 3069.000 12.6 864.44 114.399 114.399 3070.000 12.6 864.66 114.398 114.398 3071.000 12.6 864.87 114.397 114.397 3072.000 12.6 865.08 114.397 114.397 3073.000 12.6 865.29 114.396 114.396 3074.000 12.6 865.50 114.395 114.395 3075.000 12.6 ,865.71 114.395 114.395 3076.000 12.6 865.92 114.394 114.394 3077.000 12.6 866.13 114.393 114.393 3078.000 12.6 866.34 114.392 114.392 3079.000 12.6 866.55 114.392 114.392 3080.000 12.6 866.76 114.391 114.391 3081.000 12.6 866.97 114.390 114.390 3082.000 12.6 867.18 114.390 114.390 3083.000 12.6 867.39 114.389 114.389 3084.000 12.6 867.60 114.388 114.388 3085.000 12.6 867.81 114.388 114.388 3086.000 12.6 868.02 114.387 114.387 3087.000 12.6 868.23 114.386 114.386 3088.000 12.6* 868.44 114.385 J14.385 3089.000 12.6 868.65 J14.385 114.385 3090.000 12.6 868.86 )14.384 JJ4.384 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV I Batte!)' IA48-Hour Coping Study Discharge Discharge 44 11-17-2018 Attachment 1 Page 56 of 27 4 KCICONSULT Base Normal Current Capacity Voltai(e(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)*

V-V+ 3091.000 12.6 869.07 1!4.383 114.383 3092.000 12.6 869.28 114.383 114.383 3093.000 12.6 869.49 114.382 114.382 3094.000 12.6 869.70 114.381 114.381 3095.000 12.6 869.91 114.380 114.380 3096.000 12.6 870.12 114.380 1!4.380 3097.000 12.6 870.33 1!4.379 114.379 3098.000 12.6 870.54 1!4.378 114.378 3099.000 12.6 870.75 1!4.378 114.378 3100.000 12.6 870.96 1!4.377 114.377 3101.000 12.6 871.17 114.376 114.376 3102.000 12.6 871.38 1!4.375 114.375 3103.000 12.6 871.59 1!4.375 114.375 3104.000 12.6 871.80 114.374 114.374 3105.000 12.6 872.02 114.373 114.373 3106.000 12.6 872.23 .. 114.373 114.373 3107.000 12.6 872.44 1!4.372 114.372 3108.000 12.6 872.65 114.371 114.371 3109.000 12.6 872.86 114.370 114.370 3110.000 12.6 873.07 114.370 114.370 31!1.000 12.6 873.28 1!4.369 114.369 3112.000 12.6 873.49 114.368 114.368 31!3.000 12.6 873.70 1!4.368 114.368 3114.000 12.6 873.91 114.367 1!4.367 3115.000 12.6 874.12 114.366 114.366 3116.000 12.6 874.33 114.365

  • 114.365 31!7.000 12.6 874.54 114.365 114.365 3118.000 12.6 874.75 1!4.364 114.364 31!9.000 12.6 874.96 1!4.363 114.363 3120.000 12.6 875.17 114.363 1!4.363 3121.000 12.6 875.38 1!4.362 114.362 3122.000 12.6 875.59 1!4.361 114.361 3123.000 12.6 875.80 1!4.360 1!4.360 3124.000 12.6 876.01 1!4.360 114.360 3125.000 12.6 876.22 114.359 114.359 3126.000 12.6 876.43 114.358 114.358 3127.000 12.6 876.64 114.358 114.358 3128.000 12.6 876.85 114.357 114.357 3129.000 12.6 877.06 1!4.356 114.356 3130.000 12.6 877.27 114.355 114.355 3131.000 12.6 877.48 114.355 114.355 3132.000 12.6 877.69 114.354 114.354 3133.000 12.6 877.90 114.353 114.353 3134.000 12.6 878.11 114.353 114.353 3135.000 12.6 878.32 114.352 114.352 3136.000 12.6 878.53 '* 114.351 114.351 3137.000 12.6 878.74 114.350 114.350 3138.000 12.6 878.95 114.350 114.350 3139.000 12.6 879.16 114.349 114.349 3140.000 12.6 879.38 114.348 114.348 3141.000 12.6 879.59 114.348 1!4.348 3142.000 12.6 879.80 114.347 1!4.347 3143.000 12.6 880.01 114.346 1!4.346 3144.000 12.6 880.22 114.345 114.345 3145.000 12.6 880.43 1!4.345 1!4.345 3146.000 12.6 880.64 1!4.344 1!4.344 3147.000 12.6 880.85 114.343 1!4.343 3148.000 12.6 881.06 1!4.343 1!4.343 3149.000 12.6 881.27 1!4.342 1!4.342 3150.000 12.6 881.48 1!4.341 1!4.341 3151.000 12.6 881.69 1!4.340 1!4.340 3152.000 12.6
  • 881.90 1!4.340 1!4.340 3153.000 12.6 882.ll 1!4.339 1!4.339 3154.000 12.6 882.32 114.338 114.338 3155.000 12.6 882.53 1!4.338 1!4.338 3156.000 12.6 882.74 114.337 114.337 3157.000 12.6 882.95 114.336 114.336 3158.000 12.6 883.16 114.335 114.335 3159.000 12.6 883.37 114.335 114.335 3160.000 12.6 883.58 114.334 1!4.334 3161.000 12.6 883.79 114.333 1!4.333 3162.000 12.6 884.00 1!4.333 1!4.333 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.l.ON KC! Date: SN: Badar Hussain Study Case: BS!A-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharl(e Discharl(e 45 11-17-2018 Attachment 1 Page 57 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltal!e (V) Current Capacity Voltal(e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3163.000 12.6 884.21 114.332 114.332 3164.000 12.6 884.42 114.331 114.331 3165.000 12.6 884.63 114.330 114.330 3166.000 12.6 884.84 114.330 114.330 3167.000 12.6 885.05 114.329 114.329 3168.000 12.6 885.26 114.328 114.328 3169.000 12.6 885.47 114.328 114.328 3170.000 12.6 885.68 114.327 114.327 3171.000 12.6 885.89 114.326 114.326 3172.000 12.6 886.10 114.325 114.325 3173.000 12.6 886.31 114.325 114.325 3174.000 12.6 886.52 114.324 114.324 3175.000 12.6 886.73 114.323 114.323 3176.000 12.6 886.95 114.323 114.323 3177.000 12.6 887.16 114.322 114.322 3178.000 12.6 . 887.37 114.321 114.321 3179.000 12.6 887.58 114.320 114.320 3180.000 12.6 887.79 114.320 114.320 3181.000 12.6 888.00 114.319 114.319 3182.000 12.6 888.21 114.318 114.318 3183.000 12.6 888.42 114.318 114.318 3184.000 12.6 888.63 114.317 114.317 3185.000 12.6 888.84 114.316 114.316 3186.000 12.6 889.05 114.315 114.315 3187.000 12.6 889.26 114.315 114.315 3188.000 12.6 889.47 114.314 114.314 3189.000 12.6 889.68 114.313 114.313 3190.000 12.6 889.89

  • 114.313 114.313 3191.000 12.6 890.10 114.312 114.312 3192.000 12.6 890.31 114.311 114.311 3193.000 12.6 890.52 114.310 114.310 3194.000 12.6 890.73 114.310 114.310 3195.000 12.6 890.94 114.309 114.309 3196.000 12.6 891.15 114.308 114.308 3197.000 12.6 891.36 114.307 114.307 3198.000 12.6 891.57 114.307 114.307 3199.000 12.6 891.78 114.306 114.306 3200.000 12.6 891.99 114.305 114.305 3201.000 12.6 892.20 114.305 114.305 3202.000 12.6 892.41 114.304 114.304 3203.000 12.6 892.62 114.303 .* 114.303 3204.000 12.6 892.83 114.302 114.302 3205.000 12.6 893.04 114.302 114.302 3206.000 12.6 893.25 114.301 114.301 3207.000 12.6 893.46 114.300 114.300 3208.000 12.6 893.67 114.300 114.300 3209.000 12.6 893.88 114.299 114.299 3210.000 12.6 894.09 114.298 114.298 3211.000 12.6 894.31 114.297 114.297 3212.000 12.6 894.52 114.297 114.297 3213.000 12.6 894.73 114.296 114.296 3214.000 12.6 894.94 114.295 114.295 3215.000 12.6 895.15 114.295 114.295 3216.000 12.6 895.36 114.294 114.294 3217.000 12.6 895.57 114.293 114.293 3218.000 12.6 895.78 114.292 114.292 3219.000 12.6 895.99 114.292 114.292 3220.000 12.6 896.20 114.291 114.291 3221.000 12.6 896.41 114.292 114.292 3222.000 12.6 896.62 114.292 114.292 3223.000 12.6 896.83 114.292 114.292 3224.000 12.6 897.04 114.292 114.292 3225.000 12.6 897.25 114.292 114.292 3226.000 12.6 897.46 114.292 114.292 3227.000 12.6 897.67 114.292 114.292 3228.000 12.6 897.88 114.292 114.292 3229.000 12.6 898.09 114.292 114.292 3230.000 12.6 898.30 114.292 114.292 3231.000 12.6 898.51 114.292 114.292 3232.000 12.6 898.72 114.292 114.292 3233.000 12.6 898.93 114.292 114.292 3234.000 12.6 899.14 114.292 114.292 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Pa_ge: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batte!)' IA 48-Hour Coping Study Discharge Discharge 46 11-17-2018 Attachment 1 Page 58 of 27 4 KC!CONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3235.000 12.6 899.35

  • 114.292 114.292 3236.000 12.6 899.56 114.292 114.292 3237.000 12.6 899.77 .. 114.292 114.292 3238.000 12.6 899.98 114.292 114.292 3239.000 . 12.6 900.19 114.292 114.292 3240.000 12.6 900.40 114.292 114.292 3241.000 12.6 900.61 114.292 114.292 3242.000 12.6 900.82 114.292 114.292 3243.000 12.6 901.03 114.292 114.292 3244.000 12.6 901.24 114.292 114.292 3245.000 12.6 901.45 114.292 114.292 3246.000 12.6 901.67 114.292 114.292 3247.000 12.6 901.88 114.292 114.292 3248.000 12.6 902.09 114.292 114.292 3249.000 12.6 902.30 114.292 114.292 3250.000 12.6 902.51 114.292 114.292 3251.000 12.6 902.72 114.292 114.292 3252.000 12.6 902.93 114.292 114.292 3253.000 12.6 903.14 114.292 114.292 3254.000 12.6 903.35 114.292 114.292 3255.000 12.6 903.56 il4.292 114.292 3256.000 12.6 903.7?...-

114.292 114.292 3257.000 12.6 903.98 114.292 114.292 3258.000 12.6 904.19 114.292 114.292 3259.000 12.6 904.40 114.292 114.292 3260.000 12.6 904.61 114.292 114.292 3261.000 12.6 904.82 114.292 114.292 3262.000 12.6 905.03 114.292 114.292 3263.000 12.6 905.24 114.293 114.293 3264.000 12.6 905.45 114.293. 114.293 3265.000 12.6 905.66 114.293 114.293 3266.000 12.6 905.87 114.293 114.293 3267.000 12.6 906.08 114.293 114.293 3268.000 12.6 906.29 114.293 114.293 3269.000 12.6 906.50 114.293 114.293 3270.000 12.6 906.71 114.293 114.293 3271.000 12.6 906.92 114.293 114.293 3272.000 12.6 907.13 114.293 114.293 3273.000 12.6 907.34 114.293 114.293 3274.000 12.6 907.55 114.293 114.293 3275.000 12.6 907.76 114.293 114.293 3276.000 12.6 907.97 114.293 114.293 3277.000 12.6 908.18 114.293 114.293 3278.000 12.6 908.39 114.293 114.293 3279.000 12.6 908.60 114.293 114.293 3280.000 12.6 908.81 114.293 114.293 3281.000 12.6 909.03 114.293 114.293 3282.000 12.6 909.24 114.293 114.293 3283.000 12.6 909.45 114.293 114.293 3284.000 12.6 909.66 114.293 114.293 3285.000 12.6 909.87 114.293 114.293 3286.000 12.6 910.08 114.293 114.293 3287.000 12.6 910.29 114.293 114.293 3288.000 12.6 910.50 114.293 114.293 3289.000 12.6 910.71 114.293 114.293 3290.000 12.6 910.92 114.293 114.293 3291.000 12.6 911.13 114.293 114.293 3292.000 12.6 911.34 114.293 114.293 3293.000 12.6 911.55 114.293 114.293 3294.000 12.6 911.76 114.293 114.293 3295.000 12.6 911.97 114.293 114.293 3296.000 12.6 912.18 114.293 114.293 3297.000 12.6 912.39 114.293 114.293 3298.000 12.6 912.60 114.293 114.293 3299.000 12.6 912.81 114.293 114.293 3300.000 12.6 913.02 114.293 114.293 3301.000 12.6 913.23 114.293 114.293 3302.000 12.6 913.44 114.294 114.294 3303.000 12.6 913.65 114.294 114.294 3304.000 12.6 913.86 114.294 114.294 3305.000 12.6 914.07 114.294 114.294 3306.000 12.6 914.28 114.294 114.294 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 59 of274 -for greater than 24 Hrs Project: Clinton Flex Study ETAP Page: 47 14.l.ON Location:

KCI Date: 11-17-2018 Contract:.

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSIA-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal DIV I Battery IA 48-Hour Coping Study Dischar2e Dischar2e Current Capacity Volta2e(V)

Current Capacity Volta2e (V) ' Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hou,*)

V-V+ 3307.000 12.6 914.49 114.294 114.294 3308.000 12.6 914.70 114.294 114.294 3309.000 12.6 914.91 114.294 114.294 3310.000 12.6 915.12 114.294 114.294 3311.000 12.6 915.33 114.294 114.294 3312.000 12.6 915.54 114.294 114.294 3313.000 12.6 915.75 114.294 114.294 3314.000 12.6 915.96 114.294 114.294 3315.000 12.6 916.17 114.294 114.294 3316.000 12.6 916.38 114.294 114.294 3317.000 12.6 916.60 114.294 114.294 3318.000 12.6 916.81 114.294 114.294 3319.000 12.6 917.02 114.294 114.294 3320.000 12.6 917.23 114.294 114.294 3321.000 12.6 917.44 114.294 114.294 3322.000 12.6 917.65 114.294 114.294 3323.000 12.6 917.86 114.294 114.294 3324.000 12.6 918.07 114.294 114.294 3325.000 12.6 918.28 114.294 114.294 3326.000 12.6 918.49 114.294 114.294 3327.000 12.6 918.70 114.294 114.294 3328.000 12.6 918.91 114.294 114.294 3329.000 12.6 919.12 114.294 114.294 3330.000 12.6 919.33 114.294 114.294 3331.000 12.6 919.54 114.294 114.294 3332.000 12.6 919.75 114.294 114.294 3333.000 12.6 919.96 114.294 114.294 3334.000 12.6 920.17 114.294 114.294 3335.000 12.6 920.38 114.294 114.294 3336.000 12.6 920.59 114.294 114.294 3337.000 12.6 920.80 114.294 114.294 3338.000 12.6 921.01 114.294 114.294 3339.000 12.6 921.22 114.295 114.295 3340.000 12.6 921.43 114.295 114.295 3341.000 12.6 921.64 114.295 114.295 3342.000 12.6 921.85 114.295 114.295 3343.000 12.6 922.06 114.295 114.295 3344.000 12.6 922.27 114.295 114.295 3345.000 12.6 922.48 114.295 114.295 3346.000 12.6 922.69 114.295 114.295 3347.000 12.6 922.90 114.295 114.295 3348.000 12.6 923.11 114.295 114.295 3349.000 12.6 923.32 114.295 114,295 3350.000 12.6 923.53 .. 114.295 114.295 3351.000 12.6 923.74 114.295 114.295 3352.000 12.6 923.96 114.295 114.295 3353.000 12.6 924.17 114.295 114.295 3354.000 12.6 924.38 114.295 114.295 3355.000 12.6 924.59 114.295 114.295 3356.000 12.6 924.80 114.295 114.295 3357.000 12.6 925.01 114.295 114.295 3358.000 12.6 925.22 114.295 114.295 3359.000 12.6 925.43 114.295 114.295 3360.000 12.6 925.64 114.295 114.295 336i.ooo 12.6 925.85 114.295 114.295 3362.000 12.6 926.06 114.295 114.295 3363.000 12.6 926.27 114.295 114.295 3364.000 12.6 926.48 114.295 114.295 3365.000 12.6 926.69 114.295 114.295 3366.000 12.6 926.90 114.295 114.295 3367.000 12.6 927.11 114.295 114.295 3368.000 12.6 927.32 114.295 114.295 3369.000 12.6 927.53 114.295 114.295 3370.000 12.6 927.74 114.295 114.295 3371.000 12.6 927.95 114.295 114.295 3372.000 12.6 928.16 114.295 114.295 3373.000 12.6 928.37 114.295 114.295 3374.000 12.6 928.58 114.296 114.296 3375.000 12.6 928.79 114.296 114.296 3376.000 12.6 929.00 114.296 114.296 3377.000 12.6 929.21 114.296 114.296 3378.000 12.6 929.42 114.296 114.296 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 48 11-17-2018 Attachment 1 Page 60 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3379.000 12.6 929.63 114.296 114.296 3380.000 12.6 929.84 114.296 114.296 3381.000 12.6 930.05 114.296 114.296 3382.000 12.6 930.26 114.296 114.296 3383.000 12.6 930.47 114.296 114.296 3384.000 12.6 930.68 114.296 114.296 3385.000 12.6 930.89 114.296 114.296 3386.000 12.6 931.10 114.296 114.296 3387.000 12.6 931.32 114.296 114.296 3388.000 12.6 931.53 114.296 114.296 3389.000 12.6 931.74 114.296 114.296 3390.000 12.6 931.95 114.296 114.296 3391.000 12.6 932.16 114.296 114.296 3392.000 12.6 932.37 114.296 114.296 3393.000 12.6 932.58 114.296 114.296 3394.000 12.6 932.79 114.296 114.296 3395.000 12.6 933.00 114.296 114.296 3396.000 12.6 933.21 114.296 114.296 3397.000 12.6 933,42 114.296 114.296 3398.000 12.6 933.63 114.296 114.296 3399.000 12.6 933.84 114.296 114.296 3400.000 12.6 934.05 114.296 114.296 3401.000 12.6 934.26 114.296 114.296 3402.000 12.6 934.47 114.296 114.296 3403.000 12.6 934.68 114.296 114.296 3404.000 12.6 934.89 114.296 114.296 3405.000 12.6 935.10 114.296 114.296 3406.000 12.6 935.31 114.296 114.296 3407.000 12.6 935.52 114.297 114.297 3408.000 12.6 935.73 114.297 114.297 3409.000 12.6 935.94 114.297 114.297 3410.000 12.6 936.15 114.297 114.297 3411.000 12.6 936.36 114.297 114.297 3412.000 12.6 936.57 114.297 114.297 3413.000 12.6 936.78 114.297 114.297 3414.000 12.6 936.99 114.297 114.297 3415.000 12.6 937.20 114.297 114.297 3416.000 12.6 937.41 114.297 114.297 3417.000 12.6 937.62 114.297 114.297 3418.000 12.6 937.83 114.297 114.297 3419.000 12.6 938.04 114.297 114.297 3420.000 12.6 938.25 114.297 114.297 3421.000 12.6 938.46 114.297 114.297 3422.000 12.6 938.67 114.297 114.297 3423.000 12.6 938.89 114.297 114.297 3424.000 12.6 939.10 114.297 114.297 3425.000 12.6 939.31 114.297 114.297 3426.000 12.6 939.52 114.297 114.297 3427.000 12.6 939.73 114.297 114.297 3428.000 12.6 939.94 114.297 114.297 3429.000 12.6 940.15 114.297 114.297 3430.000 12.6 940.36 114.297 114.2?7 3431.000 12.6 940.57 114.297 114.297 3432.000 ) 12.6 940.78 114.297 114.297 3433.000 12.6 940.99 114.297 114.297 3434.000 12.6 941.20 114.297 114.297 3435.000 12.6 941.41 114.297 114.297 3436.000 12.6 941.62 114.297 114.297 3437.000 12.6 941.83 114.297 114.297 3438.000 12.6 942.04 114.297 114.297 3439.000 12.6 942.25 114.298 114.298 3440.000 12.6 942.46 114.298 114.298 3441.000 12.6 942.67 114.298 114.298 3442.000 12.6 942.88 114.298 114.298 3443.000 12.6 943.09 114.298 114.298 3444.000 12.6 943.30 114.298 114.298 3445.000 12.6 943.51 114.298 114.298 3446.000 12.6 943.72 114.298 114.298 3447.000 12.6 943.93 114.298 114.298 3448.000 12.6 944.14 114.298 114.298 3449.000 12.6 944.35 114.298 114.298 3450.000 12.6 944.56 114.298 114.298 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain _Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharee Discharee 49 11-17-2018 Attachment 1 Page 61 of274 KCICONSULT Base Nonna! Current Capacity Voltaee (V) Current Capacity Voltaee (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)
y. V+ 3451.000 12.6 944.77 114.298 114.298 3452.000 12.6 944.98 114.298 114.298 3453.000 12.6 945.19 114.298 114.298 3454.000 12.6 945.40 114.298 114.298 3455.000 12.6 945.61 114.298 114.298 3456.000 12.6 945.82 114.298 114.298 3457.000 12.6 946.03 114.298 114.298 3458.000 12.6 946.25 114.298 114.298 3459.000 12.6 946.46 114.298 114.298 3460.000 12.6 946.67 114.298 114.298 3461.000 12.6 946.88 114.298 114.298 3462.000 12.6 947.09 114.298 114.298 3463.000 12.6 947.30 114.298 114.298 3464.000 12.6 947.51 114.298 114.298 3465.000 12.6 947.72 114.298 114.298 3466.000 12.6 947.93 114.298 114.298 3467.000 12.6 948.14 114.298 114.298 3468.000 12.6 948.35 114.298 114.298 3469.000 12.6 948.56 114.299 114.299 3470.000 12.6 948.77 114.299 114.299 3471.000 12.6 948.98 114.299 114.299 3472.000 12.6 949.19 114.299 114.299 3473.000 12.6 949.40 114.299 114.299 3474.000 12.6 949.61 114.299 114.299 ( 3475.000 12.6 949.82 114.299 114.299 3476.000 12.6 950.03 114.299 114.299 3477.000 12.6 950.24 114.299 114.299 3478.000 12.6 950.45 114.299 114.299 3479.000 12.6 950.66 114.299 114.299 3480.000 12.6 950.87 114.299 114.299 3481.000 12.6. 951.08 114.299 114.299 3482.000 12.6 951.29 114.299 114.299 3483.000 12.6 951.50 114.299 114.299 3484.000 12.6 951.71 114.299 114.299 3485.000 12.6 951.92 114.299 114.299 3486.000 12.6 952.13 114.299 114.299 3487.000 12.6 952.34 114.299 114.299 3488.000 12.6 952.55 114.299 114.299 3489.000 12.6 952.76 114.299 114.299 3490.000 12.6 952.97 114.299 114.299 3491.000 12.6 953.18 114.299 114.299 3492.000 12.6 953.39 114.299 114.299 3493.000 12.6 953.61 114.299 114.299 3494.000 12.6 953.82 114.299 114.299 3495.000 12.6 954.03 114.299 114.299 3496.000 12.6 954.24 114.299 114.299 3497.000 12.6 954.45 114.299 114.299 3498.000 12.6 954.66 114.300 114.300 3499.000 12.6 954.87 114.300 114.300 3500.000 12.6 955.08 114.300 114.300 3501.000 12.6 955.29 114.300 114.300 3502.000 12.6 955.50 114.300 114.300 3503.000 12.6 955.71 114.300 114.300 3504.000 12.6 955.92 . 114.300 114.300 3505.000 12.6 956.13 114.300 114.300 3506.000 12.6 956.34 114.300 114.300 3507.000 12.6 956.55 114.300 114.300 3508.000 12.6 956.76 114.300 114.300 3509.000 12.6 956.97 114.300 114.300 3510.000 12.6 957.18 114.300 114.300 3511.000 12.6 957.39 114.300 1.14.300 3512.000 12.6 957.60 114.300 114.300 3513.000 12.6 957.81 114.300 114.300 3514.000 12.6 958.02 114.301 114.301 3515.000 12.6 958.23 114.301 114.301 3516.000 12.6 958.44 114.301 114.301 3517.000 12.6 958.65 111-301. 114.301 3518.000 12.6 958.86 114.301 114.301 3519.000 12.6 959.07 114.302 114.302 3520.000 12.6 959.28 114.302 114.302 3521.000 12.6 959.49 114.302 114.302 3522.000 12.6 959.70 114.302 114.302 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 50 11-17-2018 Attachment 1 Page 62 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ ----3523.000 12.6 959.91 114.303 114.303 3524.000 12.6 960.12 114.302 114.302 3525.000 12.6 960.33 114.301 114.301 3526.000 12.6 960.54 114.301 114.301 3527.000 12.6 960.75 114.300 114.300 3528.000 12.6 960.97 114.299 114.299 3529.000 12.6 961.18 114.298 114.298 3530.000 12.6 961.39 114.297 114.297 3531.000 12.6 961.60 114.297 114.297 3532.000 12.6 961.81 114.296 114.296 3533.000 12.6 962.02 114.295 114.295 3534.000 12.6 962.23 114.294 114.294 3535.000 12.6 962.44 114.293 114.293 3536.000 12.6 962.65 114.293 114.293 3537.000 12.6 962.86 114.292 114.292 3538.000 12.6 963.07 114.291 114.291 3539.000 12.6 963.28 114.290 114.290 3540.000 12.6 963.49 114.290 114.290 3541.000 12.6 963.70 114.289 114.289 3542.000 12.6 963.91 114.288 114.288 3543.000 12.6 964.12 114.287 114.287 3544.000 12.6 964.33 114.286 114.286 3545.000 12.6 964.54 114.286 114.286 3546.000 12.6 964.75 114.285 114.285 3547.000 12.6 964.96 114.284, . 114.284 3548.000 12.6 965.17 114.283 114.283 3549.000 12.6 965.38 114.282 114.282 3550.000 12.6 965.59 114.281 114.281 3551.000 12.6 965.80 114.281 114.281 3552.000 12.6* 966.01 . 114.280 114.280 3553.000 12.6 966.22 114.279 114.279 3554.000 12.6 966.43 114.278 114.278 3555.000 12.6 966.64 114.278 114.278 3556.000 12.6 . 966.85 114.277 114.277 3557.000 12.6 967.06 114.276 114.276 3558.000 12.6 967.27 114.275 114.275 3559.000 12.6 967.48 114.274 114.274 3560.000 12.6 967.69 114.273 114.273 3561.000 12.6 967.90 114.273 114.273 3562.000 12.6 968.11 114.272 114.272 3563.000 12.6 968.32 114.271 114.271 3564.000 12.6 968.54 \. 114.270 114.270 3565.000 12.6 968.75 114.269 114.269 3566.000 12.6 968.96 114.269 114.269 . 3567.000 12.6 969.17 114.268 114.268 3568.000 12.6 969.38 114.267 114.267 3569.000 *12.6 969.59 114.266 114.266 3570.000 12.6 969.80 114.265 114.265 3571.000 12.6 970.01 114.265 114.265 3572.000 12.6 970.22 114.264 114.264 3573.000 12.6 970.43 114.263 114.263 3574.000 12.6 970.64 114.262 114.262 3575.000 12.6 970.85 114.261 114.261 3576.000 12.6 971.06 114.261 114.261 3577.000 12.6 971.27 114.260 114.260 3578.000 12.6 971.48 114.259 114.259 3579.000 12.6 971.69 114.258 114.258 3580.000 12.6 971.90 114.257 .. 114.257 3581.000 12.6 972.11 114.257 114.257 3582.000 12.6 972.32 114.256 114.256 3583.000 12.6 972.53 114.255 114.255 3584.000 12.6 972.74 114.254 114.254 3585.000 12.6 972.95 114.253 114.253 3586.000 12.6 973.16 114.253 114.253 3587.000 12.6 973.37 114.252 114.252 3588.000 12.6 973.58 114.251 .. 114.251 3589.000 12.6 973.79 114.250 114.250 3590.000 12.6 974.00 114.249 114.249 3591.000 12.6 974.21 114.249 114.249 3592.000 12.6 974.42 114.248 114.248 3593.000 12.6 974.63 114.247 114.247 3594.000 12.6 974.84 114.246 114.246 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCJ Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 51 11-17-2018 Attachment 1 Page 63 of 27 4 KCJCONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3595.000 12.6 975.05 114.245 114.245 3596.000 12.6 975.26 114.245 114.245 3597.000 12.6 975.47 114.244 114.244 3598.000 12.6 975.68 114.243 114.243 3599.000 12.6 975.90 114.242 114.242 3600.000 12.6 976.11 114.241 114.241 3601.000 12.6 976.32 114.241 114.241 3602.000 12.6 976.53 114.240 114.240 3603.000 12.6 976.74 114.239 114.239 3604.000 12.6 976.95 114.238 114.238 3605.000 12.6 977.16 114.237 114.237 3606.000 12.6 977.37 114.237 114.237 3607.000 12.6 977.58 114.236 114.236 3608.000 12.6 977.79 114.235 114.235 3609.000 12.6 978.00 114.234 114.234 3610.000 12.6 978.21 114.233 114.233 3611.000 12.6 978.42 114.233 114.233 3612.000 12.6 978.63 114.232 114.232 3613.000 12.6 978.84 114.231 114.231 3614.000 12.6 979.05 114.230 114.230 3615.000 12.6 979.26 114.229 114.229 3616.000 12.6 979.47 114.229 114.229 3617.000 12.6 979.68 114.228 114.228 3618.000 12.6 979.89 114.227 114.227 3619.000 12.6 980.10 114.226 114.226 3620.000 12.6 980.31 114.225 114.225 3621.000 12.6 980.52 114.225 114.225 3622.000 12.6 980.73 114.224 114.224 3623.000 12.6 980.94 114.223 114.223 3624.000 12.6 981.15 114.222 114.222 3625.000 12.6 981.36 114.221 114.221 3626.000 12.6 981.57 114.220 114.220 3627.000 12.6 981.78 114.220 114.220 3628.000 12.6 981.99 114.219 114.219 3629.000 12.6 982.20 114.218 114.218 3630.000 12.6 982.41 114.217 114.217 3631.000 12.6 982.62 114.216 114.216 3632.000 12.6 982.83 114.216 114.216 3633.000 12.6 983.04 114.215 114.215 3634.000 12.6 983.26 114.214 114.214 3635.000 12.6 983.47 114.213 114.213 3636.000 12.6 983.68 114.212 114.212 3637.000 12.6 983.89 114.212 114.212 3638.000 12.6 984.10 114.211 114.211 3639.000 12.6 984.31 114.210 114.210 3640.000 12.6 984.52 114.209 114.209 3641.000 12.6 984.73 114.208 114.208 "3642.000 12.6 984.94 114.208 114.208 3643.000 12.6 985.15 114.207 114.207 3644.000 12.6 985.36 114.206 114.206 3645.000 12.6 985.57 114.205 114.205 3646.000 12.6 985.78 114.204 114.204 3647.000 12.6 985.99 114.204 114.204 3648.000 12.6 986.20 114.203 114.203 3649.000 12.6 986.41 114.202 114.202 3650.000 12.6 986.62 114.201 114.201 3651.000 12.6 986.83 114.200 114.200 3652.000 12.6 987.04 114.200 114.200 3653.000 12.6 987.25 114.199 114.199 3654.000 12.6 987.46 114.198

  • 114.198 3655.000, 12.6 987.67 114.197 114.197 3656.000 12.6 987.88 114.196 114.196 3657.000 12.6 988.09 114.195 114.195 3658.000 12.6 988.30 114.195 114.195 3659.000 12.6 988.51 . .114.194 114.194 3660.000 12.6 988.72 114.193 114.193 -3661.000 12.6 988.93 114.192 114.192 3662.000 12.6 989.14 114.191 114.191 3663.000 12.6 989.35 114.191 114.191 3664.000 12.6 989.56 114.190 114.190 3665.000 12.6 989.77 114.189 114.189 3666.000 12.6 989.98 114.188 114.188 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 52 11-17-2018 Attachment 1 Page 64 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 3667.000 12.6 990.19 114.187 114.187 3668.000 12.6 990.40 114.187 114.187 3669.000 12.6 990.61 114.186 114.186 3670.000 12.6 990.83 .114.185 114.185 3671.000 12.6 991.04 114.184 114.184 3672.000 12.6 991.25 114.183 114.183 3673.000 12.6 991.46 114.183 114.183 3674.000 12.6 991.67 114.182 114.182 3675.000 12.6 991.88 114.181 114.181 3676.000 12.6 992.09 114.180 114.180 3677.000 12.6 992.30 114.179 114.179 3678.000 12.6 992.51 114.178 114.178 3679.000 12.6 992.72 114.178 114.178 3680.000 12.6 992.93 114.177 114.177 3681.000 12.6 993.14 114.176 114.176 3682.000 12.6 993.35 114.175 .. 114.175 3683.000 12.6 993.56 114.174 114.174 3684.000 12.6 993.77 114.174 114.174 3685.000 12.6 993.98 114.173 114.173 3686.000 12.6 994.19 114.172 114.172 3687.000 12.6 994.40 114.171 114.171 3688.000 12.6 994.61 114.170 114.170 3689.000 12.6 994.82 114.170 114.170 3690.000 12.6 995.03 114.169 114.169 3691.000 12.6 995.24 114.168 114.168 3692.000 12.6 995.45 114.167 114.167 3693.000 12.6 995.66 114.166 114.166 3694.000 12.6 995.87 114.166 114.166 3695.000 12.6 996.08 114.165 114.165 3696.000 12.6 996.29 114.164 114.164 3697.000 12.6 996.50 114.163 114.163 3698.000 12.6 996.71 114.162 114.162 3699.000 ' 12.6 996.92 114.161 114.161 3700.000 12.6 997.13 114.161 114.161 3701.000 12.6 997.34 114.160 114.160 3702.000 12.6 997.55 114.159 114.159 3703.000 12.6 997.76 114.158 114.158 3704.000 12.6 997.97 114.157 114.157 3705.000 12.6 998.19 114.157 114.157 3706.000 12.6 998.40 114.156 114.156 3707.000 12.6 998.61 114.155 114.155 3708.000 12.6 998.82 . 114.154 114.154 3709.000 12.6 999.03 114.153 .. 114.153 3710.000 12.6 999.24 114.153 114.153 3711.000 12.6 999.45 114.152 114.152 3712.000 12.6 999.66 114.151 114.151 3713.000 12.6 999.87 114.150 114.150 3714.000 12.6 1000.08 114.149 114.149 3715 .. 000 12.6 1000.29 114.149 114.149 3716.000 12.6 1000.50 114.148 114.148 3717.000 12.6 1000.71 114.147 114.147 3718.000 12.6 1000.92 114.146 114.146 3719.000 12.6 1001.13 114.145 114.145 3720.000 12.6 1001.34 114.144 114.144 3721.000 12.6 1001.55 114.144 114.144 3722.000 12.6 1001.76 114;143 114.143 3723.000 12.6 1001.97 114.142 114.142 3724.000 12.6 1002.18 114.141 114.141 3725.000 12.6 1002.39 114.140 114.140 3726.000 12.6 1002.60 114.140 114.140 3727.000 12.6 1002.81 114.139 114.139 3728.000 12.6 1003.02 114.138 114.138 3729.000 12.6 1003.23 114.137 114.137 3730.000 12.6 1003.44 114.136 114.136 3731.000 12.6 1003.65 114.136 114.136 3732.000 12.6 1003.86 114.135 114.135 3733.000 12.6 1004.07 114.134 114.134 3734.000 12.6 1004.28 114.133 114.133 3735.000 12.6 1004.49 114.132 114.132 3736.000 12.6 1004.70 114.131 114.131 3737.000 12.6 1004.91 114.131 114.131 3738.000 12.6 1005.12 114.130 114.130 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 53 11-17-2018 Attachment 1 Page 65 of 27 4 KCICONSULT Base / Nonna! Current Capacity Voltage(V)

Current Capacity Voltage(V)

Time~,. (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3739.000 12.6 1005.34 114.129 114.129 3740.000 12.6 1005.55 114.128 114.128 3741.000 12.6 1005.76 114.127 114.127 3742.000 12.6 1005.97 114.127 114.127 3743.000 !'2.6 1006.18 114.126 114.126 3744.000 12.6 1006.39 114.125 114.125 3745.000 12.6 1006.60 114.124 114.124 3746.000-*

12.6 1006.81 114.123 114.123 3747.000 12.6 1007.02 114.122 114.122 3748.000 12.6 1007.23 114.122 114.122 3749.000 12.6 1007.44 114.121 114.121 3750.000 12.6 1007.65 114.120 114.120 3751.000 12.6 1007.86 114.119 . '114.119 3752.000 12.6 1008.07 114.118 114.118 3753.000 12.6 1008.28 114.118 114.118 3754.000 12.6 1008.49 114.117 114.117 3755.000 12.6 1008.70 114.116 114.116 3756.000 12.6 1008.91 114.115 114.115 3757.000 12.6 1009.12 114.114 114.114 3758.000 12.6 1009.33 114.114 114.114 3759.000 12.6 1009.54 114.113 114.113 3760.000 12.6 1009.75 114.112 114.112 3761.000 12.6 1009.96 114.111 114.111 3762.000 12.6 1010.17 114.110 114.110 3763.000 12.6 1010.38 114.109 114.109 3764.000 12.6 1010.59 114.109 114.109 3765.000 12.6 .JOJO.SO 114.108 114.108 3766.000 12.6 IOll.01 114.107 114.107 3767.000 12.6 1011.22 114.106 114.106 3768.000 12.6 1011.43 114.105 114.105 3769.000 12.6 1011.64 114.105 114.105 3770.000 12.6 1011.85 114.104 114.104 3771.000 12.6 1012.06 114.103 114.103 3772.000 12.6 1012.27 114.102 114.102 p 3773.000 12.6 1012.48 114.101 114.101 3774.000 12.6 1012.70 114.100 114.100 3775.000 12.6 1012.91 114.100 114.100 3776.000 12.6 1013.12 114.099 114.099 3777.000 12.6 1013.33 114.098 114.098 3778.000 12.6 1013.54 114.097 114.097 3779.000 12.6 1013.75 114.096 114.096 3780.000 12.6 1013.96 114.096 114.096 3781.000 12.6 1014.17 114.095 114.095 3782.000 12.6 1014.38 114.094 114.094 3783.000 12.6 1014.59 114.093 114.093 3784.000 12.6 1014.80 114.092 114.092 3785.000 12.6 1015.01 114.092 114.092 3786.000 12.6 1015.22 114.091 114.091 3787.000 12.6 1015.43 114.090 114.090 3788.000 12.6 1015.64 114.089 114.089 3789.000 12.6 1015.85 114.088 114.088 3790.000 12.6 1016.06 114.087 114.087 3791.000 12.6 1016.27 114.087 114.087 3792.000 12.6 1016.48 114.086 114.086 3793.000 12.6 1016.69 114.085 114.085 3794.000 12.6 1016.90 114.084 114.084 3795.000 12.6 1017.11 114.083 114.083 3796.000 12.6 1017.32 114.083 114.083 3797.000 12.6 1017.53 114.082 114.082 3798.000 12.6 1017.74 114.081 114.081 3799.000 12.6 1017.95 114.080 114.080 3800.000 12.6 1018.16 114.079 114.079 3801.000 12.6 1018.37 114.078 114.078 3802.000 12.6 1018.58 114.078 114.078 3803.000 12.6 1018.79 114.077 114.077 3804.000 12.6 1019.00 114.076 114.076 3805.000 12.6 1019.21 114.075 114.075 3806.000 12.6 1019.42 114.074 114.074 3807.000 12.6 1019.63 114.074 114.074 3808.000 12.6 1019.84 114.073 114.073 3809.000 12.6 1020.06 114.072 114.072 3810.000 12.6 1020.27 114.071 114.071 EC 626319 Project: Location:

Contract:'

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharj!e Discharl!e 54 11-17-2018 Attachment 1 Page 66 of 27 4 KCICONSULT Base Normal Current Capacity Voltal!e(V)

Current Capacity Voltal!e (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 3811.000 12.6 1020.48 114.070 114.070 3812.000 12.6 1020.69 114.069 114.069 3813.000 12.6 1020.90 114.069 114.069 3814.000 12.6 1021.11 114.068 114.068 3815.000 12.6 1021.32 114.067 114.067 3816.000 12.6 1021.53 114.066 114.066 3817.000 12.6 1021.74 114.065 114.065 3818.000 12.6 1021.95 114.065 114.065 3819.000 12.6 1022.16 114.064 114.064 3820.000 12.6 1022.37 114.063 114.063 3821.000 12.6 1022.58 114.062 114.062 3822.000 12.6 1022.79 114.061 ll4.061 3823.000 12.6 1023.00 114.060 114.060 3824.000 12.6 1023.21 ll4.060 114.060 3825.000 12.6 1023.42 ll4.059 114.059 3826.000 12.6 1023.63 114.058 ll4.058 3827.000 12.6 1023.84 ll4.057 ll4.057 3828.000 12.6 1024.05 114.056 114.056 3829.000 12.6 1024.26 114.056 ll4.056 3830.000 12.6 1024.47 114.055 114.055 3831.000 12.6 1024.68 114.054 *114.054 3832.000 12.6 1024.89 114.053 114.053 3833,000 12.6 1025.10 114.052 114.052 3834.000 12.6 1025.31 114.051 114.051 3835.000 12.6 1025.52 114.051 114.051 3836.000 12.6 1025.73 ll4.050 114.050 3837.000 12.6 1025.94 ll4.049 114.049 3838.000 12.6 1026.15 114.048 114.048 3839.000 12.6 1026.36 114.047 114.047 3840.000 12.6 1026.57 114,046 114.046 3841.000 12.6 1026.78 114.046 114.046 3842.000 12.6 1026.99 114.045 114.045 3843.000 12.6 1027.20 ll4.044 114.044 3844.000 12.6 1027.41 114.044 114.044 3845.000 12.6 1027.63 114.043 114.043 3846.000 12.6 1027.84 114.043 114.043 3847.000 12.6 1028.05 114.043 114.043 3848.000 12.6 1028.26 114.043 114.043 3849.000 12.6 1028.47 ll4.042 114.042 3850.000 12.6 1028.68 114.042 114.042 3851.000 12.6 1028.89 ll4.042 114.042 3852.000 12.6 1029.10 ,. 114.042 114.042 3853.000 12.6 1029.31 114.041 114.041 3854.000 12.6 1029.52 114.041 114.041 ' 3855.000 12.6 1029.73 ll4.041 114.041 3856.000 12.6 1029.94 114.040 114.040 3857.000 12.6 1030.15 114.040 114.040 3858.000 12.6 1030.36 114.040 114.040 3859.000 12.6 1030.57 114.040 114.040 3860.000 12.6 1030,78 114.039 114,039 3861.000 12.6 1030.99 114.039 114.039 3862.000 12.6 1031.20 114.039 114.039 3863.000 12.6 1031.41 114.038 114.038 3864.000 12.6 1031.62 114.038 114.038 3865.000 12.6 1031.83 114.038 ll4.038 3866.000 12.6 1032.04 114.038 114.038 3867.000 12.6 1032.25 114.037 114,037 3868.000 12.6 1032.46 114.037 . 114.037 3869.000 12.6 1032.67 ll4.037 114.037 3870,000 12.6 1032.88 114.037 114.037 3871.000 12.6 1033.09 114.036 114.036 3872.000 12.6 1033.30 114.036 114.036 3873.000 12.6 1033.51 114.036 114.036 3874.000 12.6 1033.72 114.035 114.035 3875.000 12.6 1033.93 114.035 114.035 3876.000 12.6 1034.14 114.035 114.035 3877.000 12.6 1034.35 ll4.035 ll4.035 3878.000 12.6 1034.56 114.034 ll4.034 3879.000 12.6 1034.77 ll4.034 ll4.034 3880.000 12.6 1034.99 ll4.034 .. 114.034 " 3881.000 12.6 1035.20 114.033 114.033 3882.000 12.6 1035.41 114.033 ll4.033 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battecy I A 48-Hour Coping Study Discharge Discharge 55 11-17-2018 Attachment 1 Page 67 of274 KCJCONSULT Base Normal Current

  • Capacity Voltage (V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time/ (Amp) (Amp-Hour)

V-V+ 3883,000 12.6 1035.62 114.033 114.033 3884.000 12.6 1035.83 114.033 114.033 3885.000 12.6 1036.04 114.032 114.032 3886.000 12.6 1036.25 114.032 114.032 3887.000 12.6 1036.46 114.032 114.032 3888.000 12.6 1036.67 114.032 114.032 3889.000 12.6 1036.88 114.031 114.031 3890.000 12.6 1037.09 114.031 114.031 3891:000 12.6 1037.30 114.031 114.031 3892.000 12.6 10'37.51 114.030 114.030 3893.000 12.6 1037.72 114.030 114.030 3894.000 12.6 1037.93 114.030 114.030 3895.000 12.6 1038.14 114.030 114.030 3896.000 12.6 1038.35 114.029 114.029 3897.000 °12.6 1038.56 114.029 114.029 3898.000 12.6 1038.77 114.029 114.029 3899.000 12.6 1038.98 114.028 114.028 3900.000 12.6 1039.19 114.028 114.028 3901.000 12.6 1039.40 114.028 114.028 3902.000 12.6 1039.61 114.028 114.028 3903.000 12.6 1039.82 114.027 114.027 3904.000 12.6 1040.03 114.027 114.027 3905.000 12.6 1040.24 114.027 114.027 3906.000 12.6 1040.45 114.026 114.026 3907.000 12.6 1040.66 114.026 114.026 3908.000 12.6 1040.87 114.026 114.026 3909.000 12.6 1041.08 114.026 114.026 3910.000 li.6 1041.29 114.025 114.025 3911.000 12.6 1041.50 114.025 114.025 3912.000 12.6 1041.71 114.025 114.025 3913.000 12.6 1041.92 114.024 114.024 3914.000 12.6 1042.13 114.024 114.024 3915.000 12.6 1042.35 114.024 114.024 3916.000 12.6 ,1042.56 114.024 114.024 3917.000 12.6 1042.77 114.023 114.023 391~.000 12.6 1042.98 114.023 114.023 3919.000 12.6 1043.19 114.023 114.023 3920.000 12.6 1043.40 114.023 114.023 3921.000 12.6 1043.61 114.022 114.022 3922.000 12.6 1043.82 114.022 114.022 3923.000 12.6 1044.03 114.022 114.022 3924.000 12.6 1044.24 114.021 114.021 3925.000 12.6 1044.45 114.021 114.021 3926.000 12.6 1044.66 114.021 114.021 3927.000 12.6 1044.87 114.021 114.021 3928.000 12.6 1045.08 114.020 114.020 3929.000 12.6 1045.29 114.020 114.020 3930.000 12.6 1045.SO 114.020 114.020 3931.000 12.6 1045.71 114.019 114.019 3932.000 12.6 1045.92 114.019 114.019 3933.000 12.6 1046.13 114.019 114.019 3934.000 12.6 1046.34 114.019 114.019 3935.000 12.6 1046.55 114.018 114.018 3936.000 12.6 1046.76 114.018 114.018 3937.000 12.6 1046.97 114.018 114.018 3938.000 12.6 1047.18 114.017 114.017 3939.000 12.6 1047.39 114.017 114.017 3940.000 12.6 1047.60 114.017 114.017 3941.000 12.6 1047.81 114.017 114.017 3942.000 12.6 1048.02 114.016 114.016 3943.000 12.6 1048.23 114.016 114.016 3944.000 12.6 1048.44 114.016 114.016 3945.000 12.6 1048.65 114.015 114.015 3946.000 12.6 1048.86 114.015 114.015 3947.000 12.6 1049.07 114.015 114.015 3948.000 12.6 1049.28 114.015 114.015 3949.000 12.6 1049.49 114.014 114.014 3950.000 12.6 1049.70 114.014 114.014 3951.000 12.6 1049.92 114.014 114.014 3952.000 12.6 . 1050.13 .

  • 114.013 114.013 3953.000 12.6 1050.34 114.013 114.013 3954.000 12.6 1050.55 114.013 114.013 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batte!)' IA48-HourCoping Study Discharge Discharge 56 11-17-2018 Attachment 1 Page 68 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) ' Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 3955.000 12.6 1050.76 114.013 114.013 3956.000 12.6 1050.97 114.012 114.012 3957.000 12.6 1051.18 114.012 114.012 3958.000 12.6 1051.39 114.012 114.012 3959.000 12.6 1051.60 114.011 114.011 3960.000 12.6 1051.81 114.011 114.011 3961.000 12.6 1052.02 114.011 114.011 3962.000 12.6 1052.23 114.010 114.010 3963.000 12.6 1052.44 114.010 114.010 3964.000 12.6 1052.65 114.010 114.010 3965.000 12.6 1052.86 114.010 114.010 3966.000 12.6 1053.07 114.009 114.009 3967.000 12.6 1053.28 114.009 114.009 3968.000 12.6 1053.49 114.009 114.009 3969.000 12.6 1053.70 114.008 114.008 3970.000 12.6 1053.91 114.008 114.008 3971.000 12.6 1054.12 114.008 114.008 3972.000 12.6 1054.33 114.008 114.008 3973.000 12.6 1054.54 114.007 114.007 3974.000 12.6 1054.75 114.007 114.007 3975.000 12.6 1054.96 114.007 114.007 3976.000 12.6 1055.17 114.006 114.006 3977.000 12.6 1055.38 114.006 114.006 3978.000 12.6 1055.59 114.006 114.006 3979.000 12.6 1055.80 114.006 114.006 3980.000 12.6 1656.01 114.005 114.005 3981.000 12.6 1056.22 114.005 114.005 3982.000 12.6 1056.43 114.005 114.005 3983.000 12.6 1056.64 114.004 114.004 3984.000 12.6 1056.85 114.004 114.004 3985.000 12.6 1057.06 114.004 114.004 3986.000 12.6 1057.28 114.004 114.004 3987.000 12.6 1057.49 r. 114.003 114.003 3988.000 12.6 1057.70 114.003 114.003 3989.000 12.6 1057.91 114.003 114.003 3990.000 12.6 1058.12 114.002 114.002 3991.000 12.6 1058.33 114.002 114.002 3992.000 12.6 1058.54 114.002 114.002 3993.000 12.6 1058.75 114.002 114.002 3994.000 12.6 1058.96 114.001 114.001 3995.000 12.6 1059.17 . , 114.001 114.001 3996.000 12.6 1059.38 114.001 114.001 3997.000 12.6 1059.59 114.000 114.000 3998.000 12.6 1059.80 114.000 114.000 3999.000 12.6 1060.01 114.000 114.000 4000.000 12.6 1060.22 113.999 113.999 4001.000 12.6 1060.43 113.999 113.999 4002.000 12.6 1060.64 113.999 113.999 4003.000 12.6 1060.85 113.999 113.999 4004.000 12.6 1061.06 113.998 113.998 4005.000 12.6 1061.27 113.998 113.998 4006.000 12.6 1061.48 113.998 113.998 4007.000 12.6 1061.69 113.997 113.997 4008.000 12.6 1061.90 113.997 113.997 4009.000 12.6 1062.11 113.997 113.997 4010.000 12.6 1062.32 113.997 113.997 4011.000 12.6 1062.53 113.996 113.996 4012.000 12.6 1062.74 113.996 113.996 4013.000 12.6 1062.95 113,996 113.996 4014.000 12.6 1063.16 113.995 113.995 4015.000 12.6 1063.37 113.995 113.995 4016.000 12.6 1063.58 113.995 113.995 4017.000 12.6 1063.79 113.994 113.994 4018.000 12.6 1064.00 113.994 113.994 4019.000 12.6 1064.21 113.994 113.994 4020.000 12.6 1064.42 113.994 113.994 4021.000 12.6 1064.64 113.993 113.993 4022.000 12.6 1064.85 113.993 113.993 4023.000 12.6 1065.06 113.993 113.993 4024.000 12.6 1065.27 113.992 113.992 4025.000 12.6 1065.48 113.992 113.992 4026.000 12.6 1065.69 113.992 113.992 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Discharge Discharge 57 11-17-2018 Attachment 1 Page 69 of 27 4 , KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity . Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4027.000 12.6 1065.90 113.991 113.991 4028.000 12.6 1066.11 113.991 113.991 4029.000 12.6 1066.32 113.991 113.991 4030.000 12.6 1066.53 113.990 113.990 4031.000 12.6 1066.74 113.990 113.990 4032.000 12.6 1066.95 113.990 113.990 4033.000 12.6 1067.16 113.989 113.989 4034.000 12.6 1067.37 113.989 113.989 4035.000 12.6 1067.58 113.989 113.989 4036.000 12.6 1067.79 113.988 113.988 4037.000 12.6 1068.00 113.988 113.988 4038.000 12.6 1068.21 113.988 113.988 4039.000 12.6 1068.42 113.987 113.987 4040.000 12.6 1068.63 113.987 113.987 4041.000 12.6 1068.84 113.987 113.987 4042.000 12.6 1069.05 113.986 113.986 4043.000 12.6 1069.26 113.986 113.986 4044.000 12.6 1069.47 113.986 113.986 4045.000 12.6 1069.68 113.985 113.985 4046.000 12.6 1069.89 113.985 113.985 4047.000 12.6 1070.10 113.985 113.985 4048.000 12.6 1070.31 113.984 113.984 4049.000 12.6 1070.52 113.984 113.984 4050.000 12.6 1070.73 113.984 113.984 4051.000 12.6 1070.94 113.983, . 113.983 4052.000 12.6 1071.15 113.983 113.983 4053.000 12.6 1071.36 113.983 113.983 4054.000 12.6 1071.57 113.982 113.982 4055.000 12.6 1071.78 113.982 113.982 4056.000 12.6 1072.00 113.982 113.982 4057.000 12.6 1072.21 113.981 113.981 4058.000 12.6 1072.42 113.981 113.981 4059.000 12.6. 1072.63 113.981 113.981 4060.000 12.6 1072.84 113.980 113.980 4061.000 12.6 1073.05 113.980 113.980 4062.000 12.6 1073.26 113.980 113.980 4063.000 12.6 1073.47 113.979 113.979 4064.000 12.6 1073.68 113.979 113.979 4065.000 12.6 1073.89 113.979 113.979 4066.000 12.6 1074.10 113.978 113.978 4067.000 12.6 1074.31 113.978 113.978 4068.000 12.6 1074.52 113.978 113.978 4069.000 12.6 1074.73 113.977 113.977 4070.000 12.6 1074.94 113.977 113.977 4071.000 12.6 1075.15 113.977 113.977 4072.000 12.6 1075.36 113.976 113.976 4073.000 12.6 1075.57 113.976 113.976 4074.000 12.6 1075.78 113.976 113.976 4075.000 12.6 1075.99 113.975 113.975 4076.000 12.6 1076.20 113.975 113.975 4077.000 12.6 1076.41 113.975 113.975 4078.000 12.6 1076.62 113.974 113.974 4079.000 12.6 1076.83 113.974 113.974 4080.000 12.6 1077.04 113.974 113.974 4081.000 12.6 1077.25 113:913 113.973 4082.000 12.6 1077.46 113.973 113.973 4083.000 12.6 1077.67 113.973 113.973 4084.000 12.6 1077.88 113.972 113.972 4085.000 12.6 1078.09 113.972 113.972 4086.000 12.6 1078.30 113.972 113.972 4087.000 12.6 1078.51 113.971 113.971 4088.000 12.6 1078.72 113.971 113.971 4089.000 12.6 1078.93 113.971 113.971 4090.000 12.6 1079.14 113.970 113.970 4091.000 12.6 1079.35 113.970 113.970 4092.000 12.6 1079.57 113.970 113.970 4093.000 12.6 1079.78 113.969 113.969 4094.000 12.6 1079.99 113.969 113.969 4095.000 12.6 1080.20 113.969 113.969 4096.000 12.6 1080.41 113.968 113.968 4097.000 12.6 1080.62 113.968 113.968 4098.000 12.6 1080.83 113.967 113.967 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 58 11-17-2018 Attachment 1 Page 70 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4099.000 12.6 1081.04 113.967 113.967 4100.000 12.6 1081.25 113.967 113.967 4101.000 12.6 1081.46 113.966 .. 113.966 4102.000 12.6 1081.67 113.966 113.966 4103.000 12.6 1081.88 113.966 113.966 4104.000 12.6 1082.09 113.965 113.965 4105.000 12.6 1082.30 113.965 113.965 4106.000 12.6 1082.51 113.965 113.965 4107.000 12.6 1082.72 113.964 113.964 4108.000 12.6 1082.93 113.964 113.964 4109.000 12.6 1083.14 113.964 113.964 4110.000 12.6 1083.35 113.963 113.963 4111.000 12.6 1083.56 113.963 113.963 4112.000 12.6 1083.77 113.963 113.963 4113.000 12.6 1083.98 113.962 113.962

  • 4114.000 12.6 1084.19 113.962 113.962 4115.000 12.6 1084.40 113.962 113.962 4116.000 12.6 1084.61 113.961 113.961 4117.000 12.6 1084.82 113.961 113.961 4118.000 12.6 1085.03 113.961 113.961 4119.000 12.6 1085.24 113.960 113.960 4120.000 12.6 1085.45 113.960 113.960 4121.000 12.6 1085.66 113.960 113.960 4122.000 12.6 1085.87 113.959 113.959 4123.000 12.6 1086.08 113.959 113.959 4124.000 12.6 1086.29 113.959 113.959 4125.000 12.6 1086.50 113.958 113.958 4126.000 12.6 1086.71 113.958 113.958 4127.000 12.6 1086.93 113.958 113.958 4128.000 12.6 1087.14
  • 113.957 113.957 4129.000 12.6 1087.35 113.957 113.957 4130.000 12.6 1087.56 113.957 113.957 . 4131.000 12.6 1087.77 113.956 113.956 4132.000 12.6 1087.98 113.956 113.956 4133.000 12.6 1088.19 113.956 113.956 4134.000 12.6 1088.40 113.955 113.955 4135.000 12.6 1088.61 113.955 113.955 4136.000 12.6 1088.82 113.954 113.954 4137.000 12.6 1089.03 113.954 113.954 4138.000 12.6 1089.24 113.954 113.954 4139.000 12.6 1089.45 113.953 113.953 4140.000 12.6 1089.66 113.953 113.953 4141.000 12.6 1089.87 113.953 113.953 4142.000 12.6 1090.08 113.952 113.952 4143.000 12.6 1090.29 113.952 113.952 4144.000 12.6 1090.50 113.952 113.952 4145.000 12.6 1090.71 113.951 113.951 4146.000 12.6 1090.92 113.951 113.951 4147.000 12.6 1091.13 113.951 113.951 4148.000 12.6 1091.34 113.950 113.950 4149.000 12.6 1091.55 113.950 113.950 4150.000 12.6 1091.76 113.950 113.950 4151.000 12.6 1091.97 113.949 113.949 4152.000 12.6 1092.18 113.949 113.949 4153.000 12.6 1092.39 113.949 113.949 4154.000 12.6 1092.60 113.948 113.948 4155.000 12.6 1092.81 113.948 113.948 4156.000 12.6 109~.02 113.948 113.948 4157.000 12.6 1093.23 113.947 113.947 4158.000 12.6 1093.44 113.947 113.947 4159.000 12.6 1093.65 113.947 113.947 4160.000 12.6 1093.86 113.946 113.946 4161.000 12.6 1094.07 113.946 113.946 4162.000 12.6 1094.29 113.946 113.946 4163.000 12.6 1094.50 113.945 113.945 4164.000 12.6 1094.71 113.945 113.945 4165.000 12.6 1094.92 113.944 113.944 4166.000 12.6 1095.13 113.944 113.944 4167.000 12.6 1095.34 113.944 113.944 4168.000 12.6 1095.55 113.943 113.943 4169.000 12.6 1095.76 113.943 113.943 4170.000 12.6 1095.97 113.943 113.943 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 59 11-17-2018 Attachment 1 Page 71 of 274 KCICONSULT Base Normal Cnrrent Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)

V-V+ 4171.000 12.6 1096.18 113.942 113.942 4172.000 12.6 1096.39 113.942 113.942 4173.000 12.6 1096.60 113.942 113.942 4174.000 12.6 1096.81 113.941 113.941 4175.000 12.6 1097.02 113.941 113.941 4176.000 12.6 1097.23 113.941 113.941 4177.000 12.6 1097.44 113.940 113.940 4178.000 12.6 1097.65 113.940 113.940 4179.000 12.6 1097.86 113.940 113.940 4180.000 12.6 1098.07 113.939 113.939 4181.000 12.6 1098.28 113.939 113.939 4182.000 12.6 1098.49 113.939 113.939 4183.000 12.6 1098.70 113.938 113.938 4184.000 12.6 1098.91 113.938 113.938 4185.000 12.6 1099.12 113.938 113.938 4186.000 12.6 1099.33 113.937 113.937 4187.000 12.6 1099.54 113.937 113.937 4188.000 12.6 1099.75 113.936 113.936 4189.000 12.6 1099.96 113.936 113.936 4190.000 12.6 1100.17 113.936 113.936 4191.000 12.6 1100.38 113.935 113.935 4192.000 12.6 1100.59 113.935 113.935 4193.000 12.6 1100.80 113.935 113.935 4194.000 12.6 1101.01 113.934 113.934 4195.000 12.6 1101.22 113.934 113.934 .. 4196.000 12.6 1101.43 -* 113.934 113.934 4197.000 12.6 1101.65 113.933 113.933 4198.000 12.6 1101.86 113.933 113.933 4199.000 12.6 1102.07 113.933 113.933 4200.000 12.6 1102.28* 113.932 113.932 4201.000 12.6 1102.49 113.932 113.932 4202.000 12.6 1102.70 113.932 113.932 4203.000 12.6 1102.91 113.931 113.931 4204.000 12.6 1103.12 113.931 113.931 4205.000 12.6 1103.33 113.931 113.931 4206.000 12.6 1103.54 113.930 113.930 4207.000 12.6 1103.75 113.930 113.930 4208.000 12.6 1103.96 113.929 113.929 4209.000 12.6 1104.17 113.929 113.929 4210.000 12.6 1104.38 113.929 113.929 4211.000 12.6 1104.59 113.929 113.929 4212.000 12.6 1104.80 113.929 113.929 4213.000 12.6 1105.01 113.929 113.929 4214.000 12.6 1105.22 113.929 113.929 4215.000 12.6 1105.43 113.928 113.928 4216.000 12.6 1105.64 113.928 113.928 4217.000 12.6 1105.85 113.928 113.928 4218.000 12.6 1106.06 113.928 113.928 " 4219.000 12.6 1106.27 113.928 113.928 4220.000 12.6 1106.48 113.928 113.928 4221.000 12.6 1106.69 113.928 113.928 4222.000 12.6 1106.90 113.927 113.927 4223.000 12.6* 1107.11 113.927 113.927 4224.000 12.6 1107.32 113.927 113.927 J 4225.000 12.6 1107.53 113.927 113.927 4226.000 12.6 1107.74 113.927 113.927 4227.000 12.6 1107.95 113.927 113.927 4228.000 12.6 1108.16 113.926 113.926 > 4229.000 12.6 1108.37 113.926 113.926 4230.000 12.6 1108.58 113.926 113.926 4231.000 12.6 1108.79 113.926 113.926 4232.000 12.6 1109.00 113.926 113.926 4233.000 12.6 1109.22 113.926 113.926 4234.000 12.6 1109.43 113.926 113.926 4235.000 12.6 1109.64 113.925 113.925 4236.000 12.6 1109.85 113.925 113.925 4237.000 12.6 1110.06 113.925 113.925 4238.000 12.6 1110.27 113.925 113.925 4239.000 12.6 1110.48 113.925 113.925 4240.000 12.6 1110.69 113.925 113.925 4241.000 12.6 1110.90 113.925 113.925 4242.000 12.6 1111.11 113.924 113.924 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharee Discharee 60 11-17-2018 Attachment 1 Page 72 of 27 4 KCJCONSULT

Base Normal Current* Capacity Voltaec(V)

Current Capacity Voltaee (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4243.000 12.6 1111.32 113.924 113.924 4244.000 12.6 lll 1.53 113.924 113.924 4245.000 12.6 lll 1.74 113.924 113.924 4246.000 12.6 lll 1.95 113.924 113.924 4247.000 12.6 1112.16 113.924 113.924 4248.000 12.6 lll2.37 113.924 113.924 4249.000 12.6 1112.58 113.923 113.923 4250.000 12.6 1112.79 113.923 113.923 4251.000 12.6 1113.00 113.923 113.923 4252.000 12.6 lll3.21 113.923 113.923 4253.000 12.6 1113.42 113.923 113.923 4254.000 12.6 lll3.63 113.923 113.923 4255.000 12.6 1113.84 113.922 113.922 4256.000 12.6 1114.05 113.922 113.922 4257.000 12.6 lll4.26 113.922 113.922 4258.000 12.6 lll4.47 113.922 113.922 4259.000 12.6 1114.68 113.922 113.922 4260.000 12.6 1114.89 113.922 113.922 4261.000 12.6 lll5.10 113.922 113.922 4262.000 12.6 lll5.31 113.921 113.921 4263.000 12.6 1115.52 113.921 113.921 4264.000 12.6 lll5.73 113.921 113.921 4265.000 12.6 1115.94 113.921 113.921 4266.000 12.6 lll6.15 113.921 113.921 4267.000 12.6 lll6.36 113.921 113.921 4268.000 12.6 lll6.58 113.921 113.921 4269.000 12.6 1116.79 113.920 113.920 4270.000 12.6 lll 7.00 113.920 113.920 4271.000.

12.6 1117.21 113.920 113.920 4272.000 12.6 1117.42 113.920 113.920 4273.000 12.6 lll7.63 113.920 113.920 4274.000 12.6 lll 7.84 113.920 113.920 4275.000 12.6 lll8.05 113.919 113.919 4276.000 12.6 lll8.26 113.919 113.919 4277.000 12.6 lll8.47 113.919 113.919 4278.000 12.6 lll8.68 113.919 113.919 4279.000 12.6 1118.89 113.919 113.919 4280.000 12.6 lll9.10 113.919 113.919 4281.000 12.6 1119.31 113.919 113.919 4282.000 12.6 lll9.52 113.918 113.918 4283.000 12.6 1119.73 113.918 113.918 4284.000 12.6 lll9.94 113.918 113.918 4285.000 12.6 1120.15 113.918 113.918 4286.000 12.6 1120.36 113.918 113.918 ,4287.000 12.6 1120.57 113.918 . .113.918 4288.000 12.6 1120.78 113.918 113.918 4289.000 12.6 1120.99 113.917 113.917 4290.000 12.6 1121.20 113.917 113.917 4291.000 12.6 1121.41 113.917 113.917 4292.000 12.6 1121.62 113.917 113.917 4293.000 12.6 1121.83 113.917 113.917 4294.000 12.6 1122.04 113.917 113.917 4295.000 12.6 1122.25 113.916 113.916 4296.000 12.6 1122.46 113.916 113.916 4297.000 12.6 1122.67 113.916 113.916 4298.000 12.6 1122.88 113.916 113.916 4299.000 12.6 1123.09 113.916 113.916 4300.000 12.6 1123.30 113.916 113.916 4301.000 12.6 1123.51 113.916 113.916 4302.000 12.6 1123.72 113.915 113.915 4303.000 12.6. 1123.94 113.915 113.915 4304.000 12.6 1124.15 113.915 113.915 4305.000 12.6 1124.36 113.915 113.915 4306.000 12.6 1124.57 113.915 113.915 4307.000 12.6 1124.78 113.915 113.915 4308.000 12.6 1124.99 113.915 113.915 4309.000 12.6 1125.20 113.914 113.914 4310.000 12.6 1125.41 113.914 113.914 4311.000 12.6 1125.62 113.914 113.914 4312.000 12.6 1125.83 113.914 113.914 4313.000 12.6 1126.04 113.914 113.914 4314.000 12.6 1126.25 113.914 113.914 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 61 11-17-2018 Attachment 1 Page 73 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Houri v-V+ Time (Amp) (Amp-Hour)

V-V+ 4315.000 12.6 1126.46 113.913 113.913 4316.000 12.6 1126.67 113.913 113.913 4317.000 12.6 1126.88 113.913 113.913 4318.000 12.6 1127.09 113.913 113.913 4319.000 12.6 1127.30 113.913 113.913 4320.000 12.6 1127.51 113.913 113.913 4321.000 12.6 1127.72 113.913 113.913 4322.000 12.6 1127.93 113.912 113.912 4323.000 12.6 1128.14 113.912 113.912 4324.000 12.6 1128.35 113.912 113.912 11325.000 12.6 1128.56 113.912 113.912 4326.000 12.6 1128.77 113.912 113.912 4327.000 12.6 1128.98 113.912 113.912 4328.000 12.6 1129.19 113.911 113.911 4329.000 12.6 1129.40 113.911 113.911 4330.000 12.6 1129.61 113.911 113.911 4331.000 12.6 1129.82 113.911 113.911 4332.000 12.6 1130.03 113.911 113.911 4333.000 12.6 1130.24 113.911 113.911 4334.000 12.6 1130.45 113.911 113.911 4335.000 12.6 1130.66 113.910 113.910 4336.000 12.6 1130.87 113.910 113.910 4337.000 12.6 1131.08 113.910 113.910 4338.000 12.6 1131.29 113.910 113.910 4339.000 12.6 1131.51 113.910 113.910 4340.000 12.6 1131.72 113.910 113.910 4341.000 12.6 1131.93 113.909 113.909 4342.000 12.6 1132.14 113.909 113.909 4343.000 12.6 1132.35 . 113.909 113.909 4344.000 12.6 1132.56 113.909 113.909 4345.000 12.6 1132.77 113.909 113.909 4346.000 12.6 1132.98 113.909 113.909 4347.000 12.6 1133.19 113.909 113.909 4348.000 12.6

  • 1133.40 113.908 113.908 4349.000 12.6 1133.61 113.908 113.908 4350.000 12.6 1133.82 113.908 113.908 4351.000 12.6 1134.03 113.908 113.908 4352.000 12.6 1134.24 113.908 113.908 4353.000 12.6 1134.45 113,908 113.908 4354.000 12.6 1134.66 113.907 113.907 4355.000 12.6 1134.87 113.907 113:907 4356.000 12.6 1135.08 113.907 113.907 4357.000 12.6 1135.29 113.907 113.907 4358.000 12.6 1135.50 113.907 113.907 4359.000 12.6 1135.71 113.907 113.907 4360.000 12.6 1135.92 113.907 113.907 4361.000 12.6 1136.13 113.906 113.906 4362.000 12.6 1136.34 113.906 113.906 4363.000 12.6 1136.55 113.906 . 113.906 4364.000 12.6 1136.76 113.906 113.906 4365.000 12.6 1136.97 113.906 113.906 4366.000 12.6 1137.18 113.906 113.906 4367.000 12.6 1137.39 113.905 113.905 4368.000 12.6 1137.60 113.905 113.905 4369.000 . 12.6 1137.81 113.905 113.905 4370.000 12.6 1138.02 113.905 113.905 4371.000 12.6 1138.23 113.905 113.905 4372.000 12.6 1138.44 113.905 113.905 4373.000 12.6 1138.65 113.904 113.904 4374.000 12.6 1138.87 113.904 113.904 4375.000 12.6 1139.08 113.904 113.904 4376.000 12.6 1139.29 113.904 113.904 4377.000 12.6 1139.50 113.904 113.904 4378.000 12.6 1139.71 113.904 113.904 4379.000 12.6 1139.92 113.904 113.904 4380.000 12.6 1140.13 113.903 113.903 4381.000 12.6 1140.34 113.903 113.903 4382.000 12.6 1140.55 113.903 113.903 4383.000 12.6 1140.76 113.903 113.903 4384.000 12.6 1140.97 113.903 113.903 4385.000 12.6 1141.18 113.903 113.903 4386.000 12.6 1141.39 113.902 113.902 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Sn1dy ETAP P_age: 14.1.0N KC! Date: SN: Badar Hussain sn,dy Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 62 11-17-2018 Attachmer;it 1 Page 74 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 4387.000 12.6 1141.60 113.902 113.902 4388.000 12.6 1141.81 113.902 113.902 4389.000 12.6 1142.02 113.902 113.902 4390.000 12.6 1142.23 113.902 113.902 4391.000 12.6 1142.44 113.902 113.902 4392.000 12.6 1142.65 113.901 113.901 4393.000 12.6 1142.86 113.901 113.901 4394.000 12.6 1143.07 113.901 113.901 4395.000 12.6 1143.28 113.901 113.901 4396.000 12.6 1143.49 113.901 113.901 4397.000 12.6 1143.70 113.901 113.901 4398.000 12.6 1143.91 113.901 113.901 4399.000 12.6 1144.12 113.900 113.900 4400.000 12.6 1144.33 113.900 113.900 4401.000 12.6 1144.54 113.900 . 113.900 4402.000 12.6 1144.75 113.900 113.900 4403.000 12.6 1144.96 113.900 113.900 4404.000 12.6 1145.17 113.900 113.900 4405.000 12.6 1145.38 .. 113.899 113.899 4406.000 12.6 1145.59 113.899 113.899 4407.000 12.6 1145.80 113.899 113.~99 4408.000 12.6 1146.01 113.899 113.899 4409.000 12.6 1146.23 113.899 113.899 4410.000 12.6 1146.44 113.899 113.899 4411.000 12.6 1146.65 113.898 113.898 4412.000 12.6 1146.86 113.898 113.898 4413.000 12.6 1147.07 113.898 113.898 4414.000 12.6 1147.28 113.898 113.898 4415.000 12.6 1147.49 113.898 113.898 4416.000 12.6 1147.70 113.898 113.898

  • 4417.000 12.6 1147.91 113.898 113.898 4418.000 12.6 ,1148.12 113.897 113.897 4419.000 12.6 1148.33 113.897 113.897 4420.000 12.6 1148.54 113.897 113.897 4421.000 12.6 1148.75 113.897 113.897 4422.000 12.6 1148.96 113.897 113.897 4423.000 12.6 1149.17 113.897 113.897 4424.000 12.6 1149.38 113.896 113.896 4425.000 12.6 1149.59 113.896 113.896 4426.000 12.6 1149.80 113.896 113.896 4427.000 12.6 1150.01 *113.896 113.896 4428.000 12.6 1150.22 113.896 113.896 4429.000 12.6 1150.43 113.896 113.896 4430.000 12.6 1150.64 113.895 113.895 4431.000 12.6 1150.85 113.895 113.895 4432.000 12.6 1151.06 113.895 113.895 4433.000 12.6 1151.27 113.895 113.895 4434.000 12.6 1151.48 113.895 . 113.895 4435.000 12.6 1151.69 113.895 113.895 4436.000 12.6 1151.90 113.894 113.894 4437.000 12.6 1152.11 113.894 113.894 4438.000 12.6 1152.32 113.894 113.894 4439.000 12.6 1152.53 113.894 113.894 4440.000 12.6 1152.74 113.894 113.894 4441.000 12.6 1152.95 113.894 113.894 4442.000 12.6 1153.16 113.894 113.894 4443.000 12.6 1153.37 113.893 113.893 4444.000 12.6 1153.58 113.893 113.893 4445.000 12.6 1153.80 113.893 113.893 4446.000 12.6 1154.01 113.893 113.893 4447.000 12.6 1154.22 113.893 113.893 4448.000 12.6 1154.43 113.893 113.893 4449.000 12.6 1154.64 113.892 113.892 4450.000 12.6 1154.85 113.892 113.892 4451.000 12.6 1155.06 113.892 113.892 4452.000 12.6 1155.27 113.892 113.892 4453.000 12.6 1155.48 113.892 113.892 4454.000 12.6 1155.69 113.892 113.892 4455.000 ,12.6 1155.90 113.891 113.891 4456.000 12.6 1156.11 113.891 113.891 4457.000 12.6 .1156.32 113.891 113.891 4458.000 12.6 1156.53 113.891 113.891 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 63 11-17-2018 Attachment 1 Page 75 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4459.000 12.6 1156.74 113.891 113.891 4460.000 12.6 1156.95 113.891 113.891 4461.000 12.6 1157.16 113.890 113.890 4462.000 12.6 1157.37 113.890 113.890 4463.000 12.6 1157.58 113.890 113.890 4464.000 12.6 1157.79 113.890 113.890 4465.000 12.6 1158.00 113:890 113.890 4466.000 12.6 1158.21 113.890 113.890 4467.000 12.6 1158.42 113.889 113.889 4468.000 (/ 12.6 1158.63 113.889 113.889 4469.000 12.6 1158.84 113.889 113.889 4470.000 12.6 1159.05 113.889 113.889 4471.000 12.6 1159.26 113.889 113.889 4472.000 12.6 1159.47 113.889 113.889 4473.000 12.6 1159.68 113.888 113.888 4474.000 12.6 1159.89 113.888 113.888 4475.000 12.6 1160.10 113.888 113.888 4476.000 . 12.6 1160.31 113.888 113.888 4477.000 12.6 1160.52 113.888 113.888 4478.000 12.6 1160.73 113.888 113.888 4479.000 12.6 1160.94 113.887 H3.887 4480.000 12.6 1161.16 113.887 113.887 4481.000 12.6 1161.37 113.887 113.887 4482.000 12.6 1161.58* 113.887 113.887 4483.000 12.6 1161.79 113.887 113.887 4484.000 12.6 1162.00 113.887 113.887 4485.000 12.6 1162.21 113.886 113.886 4486.000 12.6 1162.42 113.886 113.886 4487.000 12.6 1162.63 113.886 113.886 4488.000 12.6 1162.84 113.886 113.886 4489.000 12.6 1163.05 113.886 113.886 4490.000 12.6 1163.26 113.886 113.886 4491.000 12.6 1163.47 113.886 113.886 4492.000 12.6 1163.68 113.885 113.885 4493.000 12.6 1163.89 113.885 113.885 4494.000 12.6 1164.10 113.885 113.885 4495.000 12.6 1164.31 113.885 113.885 4496.000 12.6 1164.52 113.885 113.885 4497.000 12.6 1164.73 113.885 113.885 4498.000 12.6 1164.94 113.884 113.884 4499.000 12.6 1165.15 113.884 113.884 4500.000 12.6 1165.36 113.884 113.884 4501.000 12.6 1165.57 113.884 113.884 4502.000 12.6 1165.78 113.884 113.884 4503.000 12.6 1165.99 113.884 113.884 4504.000 12.6 1166.20 113.883 113.883 4505.000 12.6 1166.41 113.883 113.883 4506.000 12.6 1166.62 113.883 113.883 4507.000 12.6 1166.83 113.883 113.883 4508.000 12.6 1167.04 113.883 113.883 4509.000 12.6 1167.25 113.883 113.883 4510.000 12.6 1167.46 113.882 113.882 4511.000 12.6 1167.67 113.882 113.882 4512.000 12.6 1167.88 113.882 113.882 4513.000 12.6 1168.09 113.882 113.882 4514.000 12.6 1168.30 113.882 113.882 4515.000 12.6 1168.52 113.882 113.882 4516.000 12.6 1168.73 113.881 113.881 4517.000 12.6 1168.94 113.881 113.881 4518.000 12.6 1169.15 113.881 113.881 4519.000 12.6 1169.36 113.881 113.881 4520.000 12.6 1169.57 113.881 113.881 4521.000 12.6 1169.78 113.881 113.881 4522.000 12.6 1169.99 113.880 113.880 4523.000 12.6 1170.20 113.880 113.880 4524.000 12.6 1170.41 113.880 113.880 4525.000 12.6 1170.62 113.880 113.880 4526.000 12.6 1170.83 113.880 113.880 4527.000 12.6 1171.04 113.880 . '113.880 4528.000 12.6 1171.25 113.879 113.879 4529.000 12.6 1171.46 113.879 113.879 4530.000 12.6 1171.67 113.879 113.879 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Contig.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 64 11-17-2018 Attachment 1 Page 76 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4531.000 12.6 1171.88 113.879 113.879 4532.000 12.6 1172.09 113.879 113.879 4533.000 12.6 1172.30 113.879 113.879 4534.000 12.6 1172.51 113.878 113.878 4535.000 12.6 1172.72 113.878 113.878 4536.000 12.6 1172.93 113.878 113.878 4537.000 12.6 1173.14 113.878 113.878 4538.000 12.6 1173.35 113.878 113.878 4539.000 12.6 1173.56 113.878 113.878 4540.000 12.6 1173.77 113.877 113.877 4541.000 12.6 1173.98 113.877 113.877 4542.000 12.6 1174.19 113.877 113.877 4543.000 12.6 1174.40 113.877 113.877 4544.000 12.6 1174.61 113.877 113.877 4545.000 12.6 1174.82 113.876 113.876 4546.000 12.6 1175.03 113.876 113.876 4547.000 12.6 1175.24 113.876 113.876 4548.000 12.6 1175.45 113.876 113.876 4549.000 12.6 1175.66 113.876 113.876 4550.000 12.6 1175.88 113.876 113.876 4551.000 12.6 1176.09 113.875 113.875 4552.000 12.6 1176.30 113.875 113.875 4553.000 12.6 1176.51 113.875 113.875 4554.000 12.6 1176.72 113.875 113.875 4555.000 12.6 1176.93 113.875 113.875 4556.000 12.6 1177.14 113.875 113.875 4557.000 12.6 1177.35 113.874 113.874 4558.000 12.6 1177.56 113.874 113.874 4559.000 12.6 1177.77 113.874 113.874 4560.000 12.6 1177.98 113.874 113.874 4561.000 12.6 1178.19 -113.874 113.874 4562.000 12.6 1178.40 113.874 113.874 4563.000 12.6 1178.61 113.873 113.873 4564.000 12.6 1178.82 113.873 113.873 4565.000 12.6 1179.03 113.873 113.873 4566.000 12.6 1179.24 113.873 113.873 4567.000 12.6 1179.45 113.873 113.873 4568.000 12.6 1179.66 113.873 113.873 4569.000 12.6 1179.87 113.872 113.872 4570.000 12.6 1180.08 113.872 113.872

-4571.000 12.6 1180.29 113.872 113.872 4572.000 12.6 1180.50 113.872 113.872 4573.000 12.6 1180.71 113.872 113.872 4574.000 12.6 1180.92 113.871 113.871 4575.000 12.6 1181.13 113.871 113.871 4576.000 12.6 1181.34 113.871 113.871 4577.000 12.6 1181.55 113.870 113.870 4578.000 12.6 1181.76 113.870 113.870 4579.000 12.6 1181.97 113.870 113.870 4580.000 12.6 1182.18 113.869 113.869 4581.000 12.6 1182.39 113.869 113.869 4582.000 12.6 1182.60 113.869 113.869 4583.000 12.6 1182.81 113.868* 113.868 4584.000 12.6 1183.02 113.868 113.868 4585.000 12.6 1183.23 113.868 113.868 4586.000 12.6 1183.45 113.867 113.867 4587.000 12.6 1183.66 113.867 113.867 4588.000 12.6 1183.87 113.866 113.866 4589.000 12.6 1184.08 113.866 113.866 4590.000 12.6 1184.29 113.866 113.866 4591.000 12.6 1184.50 113.865 113.865 4592.000 12.6 1184.71 113.865 113.865 4593.000 12.6 1184.92 113.865 113.865 4594.000 12.6 1185.13 113.864 113.864 4595.000 12.6 1185.34 113.864 113.864 4596.000 12.6 1185.55 113.864 113.864 4597.000 12.6 1185.76 113.863 113.863 4598.000 12.6 1185.97 113.863 113.863 4599.000 12.6 1186.18 113.862 113.862 4600.000 12.6 1186.39 113.862 113.862 4601.000 12.6 1186.60 113.862 113.862 4602.000 12.6 1186.81 113.861 113.861 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study Discharge Discharge 65 11-17-2018 Attachment 1 Page 77 of 27 4 KCICONSULT

Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4603.000 12.6 1187.02 113.861 113.861 4604.000 12.6 1187.23 113.861 113.861 4605.000 12.6 1187.44 113.860 113.860 4606.000 12.6 1187.65 113.860 113.860 4607.000 12.6 1187.86 113.860 113.860 4608.000 12.6 1188.07 113.859 113.859 4609.000 12.6 1188.28 113.859 113.859 4610.000 12.6 1188.49 113.859 113.859 4611.000 12.6 1188.70 113.858 113.858 4612.000 12.6 1188.91 113.858 113.858 4613.000 12.6 1189.12 113.857 113.857 4614.000 12.6 1189.33 113.857 113.857 4615.000 12.6 1189.54 113.857 113.857 4616.000 12.6 1189.75 113.856 113.856 4617.000 12.6 1189.96 113.856 113.856 4618.000 12.6 1190.17 113.856 113.856 4619.000 12.6 1190.38 113.855 113.855 4620.000 12.6 1190.59 113.855 113.855 4621.000 12.6 1190.81 113.855 113.855, 4622.000 12.6 1191.02 113.854 113.854 4623.000 12.6 1191.23 113.854 113.854 4624.000 12.6 1191.44 113.853 113.853 4625.000 12.6 1191.65 113.853 113.853 4626.000 12.6 1191.86 113.853 113.853 4627.000 12.6 1192.07 113.852 113.852 4628.000 12.6 1192.28 113.852 113.852 4629.000 12.6 1192.49 113.852 113.852 4630.000 12.6 1192.70 113.851 113.851 4631.000 12.6 1192.91 113.851 113.851 4632.000 12.6 1193.12 113.851 113.851 4633.000 12.6 1193.33 113.850 113.850 4634.000 12.6 1193.54 113.850 113.850 4635.000 12.6 1193.75 113.849 113.849 4636.000 12.6 1193.96 113.849 113.849 4637.000 12.6 1194J7 113.849 113.849 4638.000 12.6 1194.38 113.848 113.848. 4639.000 12.6 1194.59 113.848 113.848 4640.000 12.6 1194.80 113.848 113.848 4641.000 12.6 1195.01 113.847 ** 113.847 4642.000 12.6 1195.22 113.847 113.847 4643.000 12.6 1195.43 113.847 113.847 4644.000 12.6 1195.64 113.846 113.846 4645.000 12.6 1195.85 113.846 113.846 4646.000 12.6 1196.06 113.845 113.845 4647.000 12.6 1196.27 113.845 113.845 4648.000 12.6 1196.48 113.845 113.845 4649.000 12.6 1196.69 113.844 113.844 4650.000 12.6 1196.90 113.844 113.844 4651.000 12.6 1197.11 113-.844 113.844 4652.000 12.6 1197.32 113.843 113.843 4653.000 12.6 1197.53 113.843 113.843 4654.000 12.6 1197.74 113.843 113.843 4655.000 12.6 1197.95 113.842 113.842 4656.000 12.6 1198.17 *, 113.842 113.842 4657.000 12,6 1198.38 113.841 113.841 4658.000 12.6 1198.59 113.841 113.841 4659.000 12.6 1198.80 113.841 113.841 4660.000 12.6 1199.01 113.840 113.840 . 4661.000 12.6 1199.22 113.840 113.840 4662.000 12.6 1199.43 113.840 113.840 4663.000 12.6 1199.64 113.839 113.839 4664.000 12.6 1199.85 113.839 113.839 4665.000 12.6 1200.06 113.838 113.838 4666.000 12.6 1200.27 113.838 113.838 4667.000 12.6 1200.48 113.838 113.838 4668.000 12.6 1200.69 113.837 113.837 4669.000 12.6 1200.90 113.837 113.837 4670.000 12.6 1201.11 113.837 113.837 4671.000 12.6 1201.32 113.836 113.836 4672.000 12.6 1201.53 113.836 113.836 4673.000 12.6 1201.74 113.836 113.836 4674.000 12.6 1201.95 113.835 113.835 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharj!c Discharl!c 66 11-17-2018 Attachment 1 Page 78 of 27 4 KCICONSULT Base Normal Current Capacity Voltal!c(V)

Current Capacity Voltal!e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 4675.000 12.6 1202.16 113.835 113.835 4676.000 12.6 1202.37 113.834 113.834 4677.000 12.6 1202.58 113.834 113.834 4678.000 12.6 1202.79 113.834 113.834 4679.000 12.6 1203.00 113.833 113.833 4680.000 12.6 1203.21 113.833 113.833 4681.000 12.6 1203.42 113.833 113.833 4682.000 12.6 1203.63 113.832 113.832 4683.000 12.6 1203.84 113.832 113.832 4684.000 12.6 1204.05 113.831 113.831 4685.000 12.6 1204.26 113.831 113.831 4686.000 12.6 1204.47 113.831 113.831 4687.000 12.6 1204.68 113.830 113.830 4688.000 12.6 1204.89 113.830 113.830 4689.000 12.6 1205.10 113.830 113.830 4690.000 12.6 1205.31 113.829 113.829 4691.000 12.6 1205.52 113.829 113.829 4692.000 12.6 1205.74 113.829 113.829 4693.000 12.6 1205.95 113.828 113.828 4694.000 12.6 1206.16 113.828 113.828 4695.000 12.6 1206.37 113.827 113.827 4696.000 12.6 1206.58 113.827 113.827 4697.000 12.6 1206.79 113.827 113.827 4698.000 12.6 1207.00 113.826 113.826 4699.000 12.6 1207.21 113.826 113.826
  • 4700.000 12.6 1207.42 113.826 113.826 4701.000 12.6 1207.63 113.825 113:825 4702.000 12.6 1207.84 113.825 113.825 4703.000 12.6 1208.05 113,824 113.824 4704.000 12.6 1208.26 113.824 113.824 4705.000 12.6 1208.47 113.824 113.824 4706.000 12.6 1208.68 113.823
  • 113.823 4707.000 12.6 1208.89 113.823 113.823 4708.000 12.6 1209.10 113.823 113.823 4709.000 12.6 1209.31 113.822 113.822 4710.000 12.6 1209.52 113.822 113.822 4711.000 12.6 1209.73 113.821 113.821 4712.000 12.6 1209.94 113.821 113.821 4713.000 12.6 1210.15 113.821 113.821 4714.000 12.6 1210.36 113.820 113.8io 4715.000 12.6 1210.57 113.820 113.820 4716.000 12.6 1210.78 113.820 113.820 4717.000 12.6 1210.99 113.819 113.819 4718.000 12.6 1211.20 113.819 113.819 4719.000 12.6 1211.41 113.818 113.818 4720.000 12.6 1211.62 113.818 113.818 4721.000 12.6 1211.83 113.818 113.818 4722.000 12.6 1212.04 113.817 113.817 4723.000 12.6 1212.25 113.817 113.817 4724.000 12.6 1212.46 113.817 113.817 4725.000 12.6 1212.67 113.816 113.816 4726.000 12.6 1212.88 113.816 113.816 4727.000 12.6 1213.10 113.815 113.815 4728.000
  • 12.6 1213.31 113.815 113.815 4729.000 12.6 1213.52 113.815 113.815 4730.000 12.6 1213.73 113.814 113.814 4731.000 12.6 1213.94 113.814 113.814 4732.000 12.6 1214.15 113.814 113.814 4733.000 12.6 1214.36 113.813 113.813 4734.000 12.6 1214.57 113.813 113.813 4735.000 12.6 1214.78 113.812 113.812 4736.000 12.6 1214.99 113.812 113.812 4737.000 12.6 1215.20 113.812 113.812 4738.000 12.6 1215.41 113.811 113.811 4739.000 12.6 1215.62 113.811 113.811 4740.000 12.6 1215.83 113.811 113.811 4741.000 12.6 1216,04 113.810 113.810 4742.000 12.6 1216.25 113.810 113.810 4743.000 12.6 1216.46 113.809 113.809 4744.000 12.6 1216.67 113.809

-113.809 4745.000 12.6 1216.88 113.809 113.809 4746.000 12.6 1217.09 113.808 113.808 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Dischar2e Dischar2e 67 11-17-2018 Attachment 1 Page 79 of 27 4 KCICONSULT Base Normal Current Capacity V0Ita2e (V) Current Capacity V0Ita2e (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hom*)

V-V+ 4747.000 12.6 1217.30 113.808 113.808 4748.000 12.6 1217.51 113.807 113.807 4749.000 12.6 1217.72 113.807 I 13.807 4750.000 12.6 1217.93 113.807 113.807 4751.000 12.6 1218.14 113.806 113.806 4752.000 12.6 1218.35 113.806 113.806 4753.000 12.6 1218.56 113.806 113.806 4754.000 12.6 1218.77 113.805 113.805 4755.000 12.6 1218.98 113.805 113.805 4756.000 12.6 1219.19 113.804 113.804 4757.000 12.6 1219.40 113.804 113.804 4758.000 12.6 1219.61 113.804 113.804 4759.000 12.6 1219.82 113.803 113.803 4760.000 12.6 1220.03 113.803 113.803 4761.000 12.6 1220.24 113.803 113.803 4762.000 12.6 1220.46 113.802 113.802 4763.000 12.6 1220.67 113.802 113.802 4764.000 12.6 1220.88 113.801 113.801 4765.000 12.6 1221.09 113,801 113.801 4766.000 12.6 1221.30 113.801 113.801 4767.000 12.6 1221.51 113.800 113.800 4768.000 12.6 1221.72 113.800 113.800 4769.000 12.6 1221.93 113.799 113.799 4770.000 12.6 1222.14 113.799 113.799 4771.000 12.6 1222.35 113.799 113.799 4772.000 12.6 1222.56 113.798 113.798 4773.000 12.6 1222.77 113.798 113.798 4774.000 12.6 1222.98 113.798 113.798 4775.000 12.6 1223.19 113.797 113.797 4776.000 12.6 1223.40 113.797 113.797 4777.000 12.6 -1223.61 113.796 113.796 4778.000 12.6 1223.82 113.796 113.796 4779.000 12.6 1224.03 113.796 113.796 4780.000 12.6 1224.24 113.795 113.795 4781.000 12.6 1224.45 113.795 113.795 4782.000 12.6 1224.66 113.794 113.794 4783.000 12.6 1224.87 113.794 113.794 4784.000 12.6 1225.08 113.794 113.794 4785.000 12.6 1225.29 113.793 113.793 4786.000 12.6 1225.50 113.793 113.793 4787.000 12.6 1225.71 113.793 113.793 4788.000 12.6 1225.92 113.792 113.792 4789.000 12.6 1226.13 113.792 113.792 4790.000 12.6 1226.34 113.791 113.791 4791.000 12.6 1226.55 113.791 113.791 4792.000 12.6 1226.76 113.791 113.791 4793.000 12.6 1226.97 113.790 113.790 4794.000 12.6 1227.18 113.790 113.790 4795.000 12.6 1227.39 113.789 113.789 4796.000 12.6 1227.60 113.789 113.789 4797.000 12.6 1227.81 113.789 113.789 4798.000 12.6 1228.03 113.788 113.788 4799.000 12.6 1228.24 113.788 113.788 4800.000 12.6 1228.45 113.788 113.788 4801.000 12.6 1228.66 113.787 113.787 4802.000 12.6 1228.87 113.787 113.787 4803.000 12.6 1229.08 .. 113.786 113.786 4804.000 12.6 1229.29 113.786 113.786 4805.000 12.6 1229.50 113.786 113.786 4806.000 12.6 1229.71 113.785 113.785 4807.000 12.6 1229.92 113-785 113.785 4808.000 12.6 1230.13 113.784 113.784 4809.000 12.6 1230.34 113.784 . *lJ3.784 4810.000 12.6 1230.55 113.784 113.784 4811.000 12.6 1230.76 113.783 113.783 4812.000 12.6 1230.97 113.783 113.783 4813.000 12.6 1231.18 113.783 113.783 4814.000 12.6 1231.39 113.782 113.782 4815.000 12.6 1231.60 113.782 113.782 4816.000 12.6 1231.81 113.781 113.781 4817.000 12.6 1232.02 113.781 113.781 4818.000 12.6 1232.23 113.781 113.781 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 68 11-17-2018 Attachment 1 Page 80 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4819.000 12.6 1232.44 113.780 113.780 4820.000 12.6 1232.65 113.780 113.780 4821.000 12.6 1232.86 113.779 113.779 4822.000 12.6 1233.07 113.779 113.779 4823.000 12.6 1233.28 113.779 113.779 4824.000 12.6 1233.49 113.778 113.778 4825.000 12.6 1233.70 113.778 113.778 4826.000 12.6 1233.91 113.777 113.777 4827.000 12.6 1234.12 113.777 113.777 4828.000 12.6 1234.33 113.777

.113.777 4829.000 12.6 1234.54 113.776 113.776 4830.000 12.6 1234.75 113.776 113.776 4831.000 12.6 1234.96 113.776 113.776 4832.000 12.6 1235.17 113.775 113.775 4833.000 12.6 1235.39 113.775 113.775 4834.000 12.6 1235.60 113.774 113.774 4835.000 12.6 1235.81 113.774 113.774 4836.000 12.6 1236.02 *

  • 113.774 113.774 4837.000 12.6 1236.23 113.773 113.773 4838.000 12.6 1236.44 113.773 113.773 4839.000 12.6 1236.65 113.772 113.772 4840.000 12.6 1236.86 113.772 113.772 4841.000 12.6 1237.07 113.772 113.772 4842.000 12.6 1237.28 113.771 .. 113.771 4843.000 12.6 1237.49 113.771 113.771 4844.000 12.6 1237.70 113.770 113.770 4845.000 12.6 1237.91 113.770 113.770 4846.000 12.6 1238.12 113.770 113.770 4847.000 12.6 1238.33 113.769 113.769 4848.000 12.6 1238.54 113.769 113.769 4849.000 12.6 1238.75 113.768 113.768 4850.000 12.6 1238.96 113.768 113.768 4851.000 12.6 1239.17 113.768 113.768 4852.000 12.6 1239.38 113.767 113.767 4853.000 12.6 1239.59 113.767 113.767 4854.000 12.6 1239.80 113.766 113.766 4855.000 12.6 1240.01 113.766 113.766 4856.000 12.6 1240.22 113:166 113.766 4857.000 12.6 1240.43 113.765 113.765 4858.000 12.6 1240.64 113.765 113.765 4859.000 12.6 1240.85 113.764 113.764 4860.000 "\ 12.6 1241.06 113.764 113.764 4861.000 12.6 1241.27 113.764 113.764 4862.000 12.6 1241.48 113.763 113.763 4863.000 12.6 1241.69 113.763 113.763 4864.000 12.6 1241.90 113.763 113.763 4865.000 12.6 1242.11 113.762 113.762 4866.000 12.6 1242.32 113.762 113.762 4867.000 12.6 1242.53 113.761 113.761 4868.000 12.6 1242.75 113.761 113.761 4869.000 12.6 i242.96 113.761 113.761 4870.000 12.6 1243.17 113.760 113.760 4871.000 12.6 1243.38 113.760 113.760 4872.000 12.6 1243.59 113.759 113.759 I 4873.000 12.6 1243.80 113.759 113.759 4874.000 12.6 1244.01 113.759 113.759 4875.000 12.6 1244.22 113.758 113.758 4876.000 12.6 1244.43 113.758 113.758 4877.000 12.6 1244.64. 113.757 113.757 4878.000 12.6 1244.85 113.757 113.757 4879.000 12.6 1245.06 113.757 113.757 4880.000 12.6 1245.27 113.756 113.756 4881.000 12.6 1245.48 113.756 113.756 4882.000 12.6 1245.69 113.755 113.755 4883.000 12.6 1245.90 113.755 113.755 4884.000 12.6 1246.11 113.755 113.755 4885.000 12.6 1246.32 113.754 113.754 4886.000 12.6 1246.53 113.754 113.754 4887.000 12.6 1246.74 113.753 113.753 4888.000 12.6 1246.95 113.753 113.753 4889.000 12.6 1247.16 113.753 113.753 4890.000 12.6 1247.37 113.752 113.752 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 for greater than 24 Hrs Page 81 of274 / Project: Clinton Flex Study ETAP Page: 69 Location:

KC! 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSlA-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal / DIV 1 Battery IA 48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4891.000 12.6 1247.58 113.752 113.752 4892.000 12.6 1247.79 113.751 113.751 4893.000 12.6 1248.00 113.751 113.751 4894.000 12.6 1248.21 113.751 113.751 4895.000 12.6 1248.42 113.750 113.750 4896.000 12.6 1248.63 113.750 113.750 4897.000 12.6 1248.84 113.749 113.749 4898.000 12.6 1249.05 113.749 113.749 4899.000 12.6 1249.26 113.749 113.749 4900.000 12.6 1249.47 113.748 113.748 4901.000 12.6 1249.68 113.748 113.748 4902.000 12.6 1249.89 113.747 113.747 4903.000 12.6 1250.10 113.747 113.747 4904.000 12.6 1250.32 113.747 113.747 4905.000 12.6 1250.53 113.746 113.746 4906.000 12.6 1250.74 113.746 113.746 4907.000 12.6 1250.95 113.745 113.745 4908.000 12.6 1251.16 113.745 113.745 4909.000 12.6 1251.37 113.745 113.745 4910.000 12.6 1251.58 113.744 113.744 4911.000 12.6 1251.79 113.744 113.744 4912.000 12.6 1252.00 113.743 113.743 4913.000 12.6 1252.21 113.743 113.743 4914.000 12.6 1252.42 1b.743 113.743 I 4915.000 12.6 1252.63 113.742 113.742 4916.000 12.6 1252.84 113.742 113.742 4917.000 12.6 1253.05 113.741 113.741 4918.000 12.6 1253.26 113.741 113.741 4919.000 12.6 1253.47 113.741 113.741 4920.000 12.6 1253.68 113.740 113.740 4921.000 12.6 1253.89 113.740 113.740 4922.000 12.6 1254.10 113.739 113.739 4923.000 12.6 1254.31 113.739 113.739 4924.000 12.6 1254.52 113.738 113.738 4925.000 12.6 1254.73 113.738 113.738 4926.000 12.6 1254.94 113.738 113.738 4927.000 12.6 1255.15 113.737 113.737 4928.000 12.6 1255.36 113.737 113.737 4929.000 12.6 1255.57 113.736 113,736 4930.000 12.6 1255.78 113.736 113.736 4931.000 12.6 1255.99 113.736 113.736 4932.000 12.6 1256.20 113.735 113.735 4933.000 12.6 1256.41 113.735 113.735 4934.000 12.6 1256.62 113.734 113.734 4935.000 12.6 1256.83 113.734 113.734 4936.000 12.6 1257.04 113.734 . 113.734 4937.000 12.6 1257.25 113.733 113.733 4938.000

  • 12.6 1257.46 113.733 113.733 4939.000 12.6 1257.68 113.732 113.732 4940.000 12.6 1257.89 113.732 113.732 4941.000 12.6 1258.10 113.732 113.732 4942.000 12.6 1258.31 113.731 113.731 4943.000 12.6 1258.52 113.731 113.731 4944.000 12.6 1258.73 113.730 113.730 4945.000 12.6 1258.94 113.730 113.730 4946.000 12.6 1259.15 113.730 113.730 4947.000 12.6 1259.36 113.729 113.729 4948.000 12.6 1259.57 113.729 113.729 4949.000 12.6 1259.78' 113.728 113.728 4950.000 12.6 1259.99 113.728 113.728 4951.000 12.6 1260.20 113.728 113.728 4952.000 12.6 1260.41 113.727 113.727 4953.000 12.6 1260.62 113.727 113.727 4954.000 12.6 1260.83 113.726 113.726 4955.000 12.6 1261.04 113.726 113.726 4956.000 12.6 1261.25 113.725 113.725 4957.000 12.6 1261.46 113.725 113.725 4958.000 12.6 1261.67 113.725 113.725 4959.000 12.6 1261.88 113.724 113.724 4960.000 12.6 1262.09 113.724 113.724 4961.000 12.6 1262.30 113.723 113.723 4962.000 12.6 1262.51 113.723 113.723 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study .. ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 70 11-17-2018 Attachment 1 Page 82 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp~Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 4963.000 12.6 1262.72 113.723 113.723 4964.000 12.6 1262.93 113.722 113.722 4965.000 12.6 1263.14 113.722 113.722 4966.000 12.6 1263.35 113.721 113.721 4967.000 12.6 1263.56 113.721 113.721 4968.000 12.6 1263.77 113.721 113.721 4969.000 12.6 1263.98 113.720 113.720 4970.000 12.6 1264.19 113.720 113.720 4971.000 12.6 1264.40 113.719 113.719 4972.000 12.6 1264.61 113.719 113.719 4973.000 12.6 1264.82 113.718 113.718 4974.000 12.6 1265.04 113.718 113.718 4975.000 12.6 1265.25 113.718 113.718 4976.000 12.6 1265.46 113.717 113.717 .4977.000 12.6 1265.67 113.717 113.717 4978.000 12.6 1265.88 113.716 113.716 4979.000 12.6 1266.09 113.716 113.716 4980.000 12.6 1266.30 113.716 113.716 4981.000 12.6 1266.51 113.715 113.715 4982.000 12.6 1266.72 113.715 113.715 4983.000 12.6 1266.93 113.714 113.714 4984.000 12.6 1267.14 113.714 113.714 4985.000 12.6 1267.35 113.714 113.714 4986.000 12.6 1267.56 113.713 113.713 4987.000 12.6 1267.77 113.713 113.713

  • 4988.000 12.6 1267.98 113.713 113.713 4989.000 12.6 1268.19 113.713 113.713 4990.000 12.6 1268.40 113.713 113.713 4991.000 12.6 1268.61 113.712 113.712 4992.000 12.6 1268.82 113.712 113.712 4993.000 12.6 1269.03 113.712 113.712 4994.000 12.6 1269.24 113.712 113.712 4995.000 12.6 1269.45 113.711 113.711 4996.000 12.6 1269.66 113.711 113.711 4997.000 12.6 1269.87 113.711 113.711 4998.000 12.6 1270.08 113.711 113.711 4999.000 12.6 1270.29 113.711 113.711 5000.000 12.6 1270.50 113.710 113.710 5001.000 12.6 1270.71 113.710 113.7!0 5002.000 12.6 1270.92 113.710 113.710 5003.000 12.6 1271.13 113.710 113.710 5004.000 12.6 1271.34 113.709 113.709 5005.000 12.6 1271.55 113.709 113.709 5006.000 12.6 1271.76 113.709 113.709 5007.000 12.6 1271.97 113.709 113.709

.. 5008.000 12.6 1272.18 113.708 113.708 5009.000 12.6 1272.40 113.708 113.708 5010.000 12.6 1272.61 113.708 113.708 5011.000 12.6 1272.82 113.708 113.708 5012.000 12.6 1273.03 113.708 113.708 5013.000 12.6 1273.24 113.707 113.707 5014.000 12.6 1273.45 113.707 113.707 5015.000 12.6 1273.66 113.707 113.707 5016.000 12.6 1273.87 113.707 113.707 5017.000 12.6 1274.08 113.706 113.706 5018.000 12.6 1274.29 113.706 113.706 5019.000 12.6 1274.50 113.706 113.706 5020.000 12.6 1274.71 113.706 113.706 5021.000 12.6 1274.92 113.706 113.706 5022.000 12.6 1275.13 113.705 113.705 5023.000 12.6 1275.34 113.705 113.705 5024.000 12.6 1275.55 113.705 113.705 5025.000 12.6 1275.76 113.705 113.705 5026.000 12.6 1275.97 113.704 113.704 5027.000 12.6 1276.18 113.704 113.704 5028.000 12.6 1276.39 113.704 113.704 5029.000 12.6 1276.60 113.704 113.704 5030.000 12.6 1276.81 113.703 113.703 5031.000 12.6 1277.02 113.703 113.703 5032.000 12.6 1277.23 113.703 113.703 5033.000 12.6 1277.44 113.703 113.703 5034.000 12.6 1277.65 113.703 113.703 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously

' for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: 1;>IV I Battery 1A48-Hour Coping Study Discharge Discharge 71 11-17-2018 Attachment 1 Page 83 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp). (Amp-Hour)

V-V+ 5035.000 12.6 1277.86 113.702 113.702 5036.000 12.6 1278.07 113.702 113.702 5037.000 12.6 1278.28 113.702 113.702 5038.000 12.6 1278.49 113.702 113.702 5039.000 12.6 1278.70 113.701 113.701 5040.000 12.6' 1278.91 113.701 113.701 5041.000 12.6 1279.12 113.701 113.701 5042.000 12.6 1279.33 113.701 113.701 5043.000 12.6 1279.54 113.701 113.701 5044.000 12.6 1279.76 .. 113.700 113.700 5045.000 12.6 1279.97 113.700 113.700 5046.000 12.6 1280.18 113.700 113.700 5047.000 12.6 1280.39 113.700 113.700 5048.000 12.6 1280.60 113.699 113.699 5049.000 12.6 1280.81 113.699 113.699 5050.000 12.6 1281.02 113.699 113.699 5051.000 12.6 1281.23 113.699 113.699 5052.000 12.6 1281.44 113.698 113.698 5053.000 12.6 1281.65 113.698 113.698 5054.000 12.6 1281.86 113.698 113.698 5055.000 12.6 1282.07 113.698 113.698 5056.000 12.6 1282.28 113.698 113.698 5057.000 12.6 1282.49 113.697 113.697 5058.000 12.6 1282.70 113.697 113.697 5059.000 12.6 1282.91 113.697 113.697 5060.000 12.6 1283.12 113.697 113.697 5061.000 12.6 1283.33 113.696 113.696 5062.000 12.6 1283.54 113.696 113.696 5063.000 12.6 1283.75 113.696 113.696 5064.000 12.6 1283.96 113.696 113.696 5065.000 12.6 1284.17 113.695 113.695 5066.000 12.6 1284.38 113.695 113.695 5067.000 12.6 1284.59 113.695 113.695 5068.000 12.6 1284.80 113.695 113.695 5069.000 12.6 1285.01 113.694 113.694 5070.000 12.6 1285.22 113.694 113.694 5071.000 12.6 1285.43 113.694 113.694 5072.000 12.6 1285.64 113.694 113.694 5073.000 12.6 1285.85 113.694 113.694 5074.000 12.6 1286.06 113.693 113.693 5075.000 12.6 1286.27 113.693 113.693 5076.000 12.6 1286.48 113.693 113.693 5077.000 12.6 1286.69 113.693 113.693 5078.000 12.6 1286.90 113.692 113.692 5079.000 12.6 1287.11 113.692 113.692 5080.000 12.6 1287.33 113.692 113.692 5081.000 12.6 1287.54 113.692 .. 113.692 5082.000 12.6 1287.75 113.691 113.691 5083.000 12.6 1287.96 113.691 113.691 5084.000 12.6 1288.17 113.691 113.691 5085.000 12.6 1288.38 113.691 113.691 5086.000 12.6 1288.59 113.691 113.691 5087.000 12.6 1288.80 113.690 113.690 5088.000 12.6 1289.01 113.690 113.690 5089.000 12.6 1289.22 113.690 113.690 5090.000 12.6 1289.43 113.690 113.690 5091.000 12.6 1289.64 113.689 113.689 5092.000 12.6 1289.85 113.689 113.689 5093.000 12.6 1290.06 113.689 113.689 5094.000 12.6 1290.27 113.689 113.689 5095.000 12.6

  • 1290.48 113.688 113.688 5096.000 12.6 1290.69 113.688 113.688 5097.000 12.6 1290.90 113.688 113.688 5098.000 12.6 1291.11 113.688 113.688 5099.000 12.6 1291.32 113.687 113.687 5100.000 12.6 1291.53 113.687 113.687 5101.000 12.6 1291.74 113.687 113.687 5102.000 12.6 1291.95 113.687 113.687 5103.000 12.6 1292.16 113.687 113.687 5104.000 12.6 1292.37 113.686 113.686 5105.000 12.6 1292.58 113.686 113.686 5106.000 12.6 1292.79 113.686 113.686 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 72 II-17-2018 Attachment 1 Page 84 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5107.000 12.6 1293.00 113.686 113.686 5108.000 12.6 1293.21 113.686 113.686 5109.000 12.6 1293.42 113.685 113.685 5110.000 12.6 1293.63 113.685 113.685 5111.000 12.6 1293.84 113.685 113.685 5112.000 12.6 1294.05 113.685 113.685 5113.000 12.6 1294.26 113.685 113.685 5114.000 12.6 *1294.47 113.684 113.684 5115.000 12.6 1294.69 113.684 113.684 5116.000 12.6 1294.90 113.684 113.684 5117.000 12.6 1295.11 113.684 113.684 5118.000 12.6 1295.32 113.684 113.684 5119.000 12.6 1295.53 113.684 113.684 5120.000 12.6 1295.74 113.683 113.683 5121.000 12.6 1295.95 113.683 113.683 5122.000 12.6 1296.16 113.683 113.683 5123.000 12.6 1296.37 113.683 113.683 5124.000 12.6 1296.58 113.683 113.683 5125.000 12.6 1296.79 113.682 113.682 5126.000 12.6 1297.00 113.682 113.682 5127.000 12.6 1297.21 113.682 113.682 5128.000 12.6 1297.42 113.682 113.682 5129.000 12.6 1297.63 113.682 113.682 5130.000 12.6 1297.84 113.682 113.682 5131.000 12.6 1298.05 113.681 113.681 5132.000 12.6 1298.26 113.681 113.681 5133.000 12.6 1298.47 113.681 113.681 5134.000 12.6 1298.68 113.681 113.681 5135.000 12.6 1298.89 113.681 113.681 5136.000 12.6 1299.10 113.680 113.680 5137.000 12.6 1299.31 113.680 113.680 5138.000 12.6 1299.52 113.680 113.680 5139.000 12.6 1299.73 113.680 113.680 5140.000 12.6 1299.94 113.680 113.680 5141.000 12.6 1300.15 113.679 113.679 5142.000 12.6 1300.36 . . 113.679 113.679 5143 .. 000 12.6 1300.57 113.679 113.679 5144.000 12.6 1300.78 113.679 113.679 5145.000 12.6 1300.99 113.679 113.679 5146.000 12.6 1301.20 113.679 113.679 5147.000 12.6 1301.41 113.678 113.678 5148.000 12.6 1301.62 113.678 113.678 5149.000 12.6 1301.83 . 113.678 113.678 5150.000 12.6 1302.05 113.678 .. 113.678 5151.000 12.6 1302.26 113.678 113.678 5152.000 12.6 1302.47 113.677 113.677 5153.000 12.6 1302.68 113.677 113.677 5154.000 12.6 1302.89 113.677 113.677 5155.000 12.6 1303.10 113.677 113.677 5156.000 12.6 1303.31 113.677 113.677 5157.000 12.6 1303.52 113.676 113.676 5158.000 12.6 1303.73 113.676 113.676 5159.000 12.6 1303.94 113.676 113.676 5160.000 12.6 1304.15 113.676 113.676 5161.000 12.6 1304.36 113.676 113.676 5162.000 12.6 1304.57 113.676 113.676 5163.000 12.6 1304.78 113.675 113.675 5164.000 12.6 1304.99 113.675 113.675 5165.000 12.6 1305.20 113.675 113.675 5166.000 12.6 1305.41 113.675 113.675 5167.000 12.6 1305.62 113.675 113.675 5168.000 12.6 1305.83 113.674 113.674 5169.000 12.6 1306.04 113.674 113.674 5170.000 12.6 1306.25 113.674 113.674 5171.000 12.6 1306.46 113.674 113.674 5172.000 12.6 1306.67 113.674 113.674 5173.000 12.6 1306.88 113.673 113.673 5174.000 12.6 1307.09 113.673 113.673 5175.000 12.6 1307.30 113.673 113.673 5176.000 12.6 1307.51 113.673 113.673 5177.000 12.6 1307.72 113.673 113.673 5178.000 12.6 1307.93 113.672 113.672 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study Discharge Discharge 73 11-17-2018 Attachment 1 Page 85 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)

V-V+ 5179.000 12.6 1308.14 113.672 113.672 5180.000 12.6 1308.35 113.672 113.672 5181.000 12.6 1308.56 113.672 113.672 5182.000 12.6 1308.77 113.672 113.672 5183.000 12.6 1308.98 113.671 113.671 5184.000 12.6 1309.19 113.671 113.671 5185.000 12.6 1309.40 113.671 113.671 5186.000 12.6 1309.62 113.671 113.671 5187.000 12.6 1309.83 113.671 113.671 5188.000 12.6 1310.04 113.671 113.671 5189.000 12.6 1310.25 113.670 113.670 5190.000 12.6 1310.46 113.670 113.670 5191.000 12.6 1310.67 113.670 113.670 5192.000 12.6 1310.88 113.670 113.670 5193.000 12.6 1311.09 113.670 113.670 5194.000 12.6 1311.30 113.669 113.669 5195.000 12.6 1311.51 113.669 113.669 5196.000 12.6 1311.72 113.669 113.669 5197.000 12.6 1311.93 113.669 113.669 5198.000 12.6 1312.14 113.669 113.669 5199.000 12.6 1312.35 113.668 113,668. 5200.000 12.6 1312.56 113.668 113.668 5201.000 12.6 1312.77 113.668 113.668 5202.000 12.6 1312.98 113.668 113.668 5203.000 12.6 1313.19 113.668 113.668 5204.000 12.6 1313.40 113.667 113.667 5205.000 12.6 1313.61 113.667 113.667 5206.000 12.6 1313.82 113.667 113.667 5207.000 12.6 1314.03 . 113.667 113.667 5208.000 12.6 1314.24 113.667 113.667 5209.000 12.6 1314.45 113.666 113.666 5210.000 12.6 1314.66 113.666 113.666 5211.000 12.6 1314.87 113.666 113.666 5212.000 12.6 1315.08 113.666 113.666 5213.000 12.6 1315.29 113.666 113.666 5214.000 12.6 1315.50 113.665 113.665 5215.000 12.6 1315.71 113.665 113.665 5216.000 12.6 1315.92 113.665 113.665 5217.000 12.6 1316.13 113.665 113.665 5218.000 12.6 1316.34 113.665 113.665 5219.000 12.6 1316.55 113.664 113.664 5220.000 12.6 1316.76 113.664 113.664 5221.000 12.6 1316.98 113.664 113.664 5222.000 12.6 1317.19 113.664 113.664 5223.000 12.6 1317.40 113.664 113.664 5224.000 12.6 1317.61 113.663 .. 113.663 522_5.000 12.6 1317.82 113.663 113.663 5226.000 12.6 1318.03 113.663 113.663 5227.000 12.6 1318.24 113.663 113.663 5228.000 12.6 1318.45 113.663 113.663 5229.000 12.6 1318.66 113.662 113.662 5230.000 12.6 1318.87 113.662 113.662 5231.000 12.6 1319.08, 113.662 113.662 5232.000 12.6 1319.29 113.662 113.662 5233.000 12.6 1319.50 113.662 113.662 5234.000 12.6 1319.71 113.661 113.661 5235.000 12.6 1319.92 113.661 113.661 5236.000 12.6 1320.13 113.661 113.661 5237.000 12.6 1320.34 113.661 113.661 5238.000 12.6 1320.55 113.661 113.661 5239.000 12.6 1320.76 113.660 113.660 5240.000 12.6 1320.97 113.660 113.660 5241.000 12.6 1321.18 113.660 113.660 5242.000 12.6 1321.39 113.660 113.660 5243.000 12.6 1321.60 113.660 113.660 5244.000 12.6 1321.81 113.659 113.659 5245.000 12.6 1322.02 113.659 113.659 5246.000 12.6 1322.23 113.659 113.659 5247.000 12.6 1322.44 113.659 113.659 5248.000 12.6 1322.65 . 113.659 113.659 5249.000 12.6 1322.86 113.658 113.658 5250.000 12.6 1323.07 113.658 113.658 EC 626319 .10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 86 of 27 4

  • for greater than 24 Hrs Project:*

Clinton Flex Study ETAP Page: 74 14.1.0N Location:

KC! Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSlA-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal DIV I Battery IA 48-Hour Coping Study Discharl!C Discharl!c Current Capacity Voltal!e (V) Current Capacity Voltal!e (V) Time (Amp) (Amp-Hool')

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5251.000 12.6 1323.28 113.658 113.658 5252.000 12.6 1323.49 113.658 113.658 5253.000 12.6 1323.70 113.658 113.658 5254.000 12.6 1323.91 113.657 113.657 5255.000 12.6 1324.12 113.657 113.657 5256.000 12.6 1324.34 113.657 113.657 5257.000 12.6 1324.55 113.657 113.657 5258.000 12.6 1324.76 113.657 113.657 5259.000 12.6 1324.97 113.656 113.656 5260.000 12.6 1325.18 113.656 113.656 5261.000 12.6 1325.39 113.656 113.656 5262.000 12.6 1325.60 113.656 113.656 5263.000 12.6 1325.81 113.656 113.656 5264.000 12.6 1326.02 113.655 113.655 5265.000 12.6 1326.23 113.655 113.655 5266.000 12.6 1326.44 , 113.655 113.655 5267.000 12.6 1326.65 113.655 113.655 5268.000 12.6 1326.86 113.655 113.655 5269.000 12.6 1327.07 113.654 113.654 5270.000 12.6 1327.28 113.654 113.654 5271.000 12.6 1327.49 113.654 113.654 5272.000 12.6 1327.70 113.654 113.654 5273.000 12.6 1327.91 113.654 113.654 5274.000 12.6 1328.12 113.653 113.653 5275.000 12.6

  • 1328.33 113.653 113.653 5276.000 12.6 1328.54 113.653 113.653 5277.000 *12.6 1328.75 113.653 113.653 5278.000 12.6 1328.96 113.652 113.652 5279.000 12.6 1329.17 113.652 113.652 5280.000 12.6 1329.38 113.652 113.652 5281.000 12.6 1329.59 113.652 113.652 5282.000 12.6 1329.80 113.652 113.652 5283.000 12.6 1330.01 113.651 113.651 5284.000 12.6 1330.22 113.651 113.651 5285.000 12.6 1330.43 113.651 113.651 5286.000 12.6 1330.64 113.651 113.651 5287.000 12.6 1330.85 113.651 113.651 5288.000 12.6 1331.06 113.650 113.650 5289.000 12.6 1331.27 113.650 113.650 5290.000 12.6 1331.48 113.650 113.650 5291.000 12.6 1331.69 113.650 113.650 5292.000 12.6 1331.91 113.650 113.650 5293.000 12.6 1332.12 113.649 113.649 5294.000 12.6 1332.33 113.649 113.649 5295.000 12.6 1332.54 113.649 113.649 5296.000 12.6 1332.75 113.649 113.649 5297.000 12.6 1332.96 113.649 113.649 5298.000 12.6 1333.17 113.648 113.648 5299.000 12.6 1333.38 113.648 113.648 5300.000 12.6 1333.59 113.648 113.648 5301.000 12.6 1333.80 113.648 113.648 5302.000 12.6 1334.01 113.647 113.647 5303.000 12.6 1334.22 113.647 113.647 5304.000 12.6 1334.43 113.647 113.647 5305.000 12.6 1334.64 113.647 113.647 5306.000 12.6 1334.85 113.647 113.647 5307.000 12.6 1335.06 113.646 113.646 5308.000 12.6 1335.27 113.646 113.646 5309.000 12.6 1335.48 113.646 113.646 5310.000 12.6 1335.69 113.646 113.646 5311.000 12.6 1335.90 113.646 113.646 5312.000 12.6 1336.11 113.645 113.645 5313.000 12.6 1336.32 113.645 113.645 5314.000 12.6 1336.53 113.645 113.645 5315.000 12.6 1336.74 113.645 113.645 5316.000 12.6 1336.95 113.644 113.644 5317.000 12.6 1337.16 113.644 113.644 5318.000 12.6 1337.37 113.644 113.644 5319.000 12.6 1337.58 113.644 113.644 5320.000 12.6 1337.79 113.644 113.644 5321.000 12.6 1338.00 113.643 113.643 5322.000 12.6 1338.21 113.643 113.643 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Dischare:e Dischare:e 75 11-17-2018 Attachment 1 Page 87 of 274 KCICONSULT Base Nonna! Current Capacity Voltae:e (V) Current Capacity Voltae:e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5323.000 12.6 1338.42 113.643 113.643 5324.000 12.6 1338.63 113.643 113.643 5325.000 12.6 1338.84 113.643 113.643 5326.000 12.6 1339.05 113.642 113.642 5327.000 12.6 1339.27 113.642 113.642 5328.000 12.6 1339.48 113.642 113.642 5329.000 12.6 1339.69 113.642 113.642 5330.000 12.6 1339.90 113.641 113.641 5331.000 12.6 1340.11 113.641 113.641 5332.000 12.6 1340.32 113.641 113.641 5333.000 12.6 1340.53 113.641 113.641 5334.000 12.6 1340.74 113.641 113.641 5335.000 12.6 1340.95 113.640 113.640 5336.000 12.6 1341.16 113.640 113.640 5337.000 12.6 1341.37 113.640 113.640 5338.000 12.6 1341.58 113.640 113.640 5339.000 . 12.6 1341.79 113.640 113.640 5340.000 12.6 1342.00 113.63~ 113.639 5341.000 12.6 1342.21 113.639 113.639 5342.000 12.6 1342.42 113.639 113.639 5343.000 12.6 1342.63 113.639 113.639 5344.000 12.6 1342.84 113.638 113.638 5345.000 12.6 1343.05 113.638 113.638 5346.000 12.6 1343.26 113.638 113.638 5347.000 12.6 1343.47 113.638 113.638 5348.000 12.6 1343.68 113.638 113.638 5349.000 12.6 1343.89 113.637 113.637 5350.000 12.6 1344.10 113.637 113.637 5351.000 12.6 1344.31 113.637 113.637 5352.000 12.6 1344.52 113.637 113.637 5353.000 12.6 1344.73 113.637 113.637 5354.000 12.6 1344.94 113.637 113.637 5355.000 12.6 1345.15 113.637 113.637 5356.000 12.6 1345.36 113.637 113.637 5357.000 12.6 1345.57 113.636 113.636 5358.000 12.6 1345.78 113.636 113.636 5359.000 12.6

  • 1345.99 113.636 113.636 5360.000 12.6 1346.20 113.636 113.636 5361.000 12.6 1346.41 113.636 113.636 5362.000 12.6 1346.63 113.636 113.636 5363.000 12.6 1346.84 113.636 113.636 5364.000 12.6 1347.05 113.636 113.636 5365.000 12.6 1347.26 113.635 113.635 5366.000 12.6 1347.47 113.635 113.635 5367.000 12.6 1347.68 113.635 113.635 5368.000 12.6 1347.89 113.635 113.635 5369.000 12.6 1348.10 113.635 113.635 5370.000 12.6 1348.31 113.635 113.635 5371.000 12.6 1348.52 113.635 113.635 5372.000 12.6 1348.73 113.635 113.635 5373.000 12.6 1348.94 113.634 113.634 5374.000 12.6 1349.15 113.634 113.634 5375.000 12.6 1349.36 113.634 113.634 5376.000 12.6 1349.57 113.634 113.634 5377.000 12.6 1349.78 113.634 113.634 5378.000 12.6 1349.99 113.634 113.634 5379.000 12.6 1350.20 113.634 113.634 5380.000 12.6 1350.41 113.634 113.634 5381.000 12.6 1350.62 113.633 113.633 5382.000 12.6 1350.83 113.633 113.633 5383.000 12.6 1351.04. 113.633 113.633 5384.000 12.6 1351.25 113.633 113.633 5385.000 12.6 1351.46 113.633 113.633 5386.000 12.6 1351.67 113.633 113.633 5387.000 12.6 1351.88 113.633 113.633 5388.000 12.6 1352.09 113.633 113.633 5389.000 12.6 1352.30 113.633 113.633 5390.000 12.6 1352.51 113.632 113.632 5391.000 12.6 1352.72 113.632 113.632 5392.000 12.6 1352.93 113.632 113.632 5393.000 12.6 1353.14 113.632 113.632 5394.000 12.6 1353.35 113.632 113.632 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battety IA48-Hour Coping Study Discharge Discharge 76 11-17-2018 Attachment 1 Page 88 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5395.000 12.6 1353.56 113.632 113.632 5396.000 12.6 1353.77 113.632 113.632 5397.000 12.6 1353.98 113.632 113.632 5398.000 12.6 1354.20 113.631 113.631 5399.000 12.6 1354.41 113.631 113.631 5400.000 12.6 1354.62 113.631 113.631 5401.000 12.6 1354.83 113.631 113.631 5402.000 12.6 1355.04 113.631 113.631 5403.000 12.6 1355.25 113.631 113.631 5404.000 12.6 1355.46 113.631 113.631 5405.000 12.6 1355.67 113.631 113.631 5406.000 12.6 1355.88 113.630 113.630 5407.000

  • 12.6 1356.09 113.630 113.630 5408.000 12.6 1356.30 113.630 113.630 5409.000 12.6 1356.51 113.630 113.630 5410.000 12.6 1356.72 113.630 113.630 5411.000 12.6 1356.93 113.630 113.630 5412.000 12.6 1357.14 113.630 113.630 5413.000 12.6 1357.35 113.630 113.630 5414.000 12.6 1357.56 113.629 113.629 5415.000 12.6 1357.77 113.629 113.629 5416.000 12.6 1357.98 113.629 .. 113.629 5417.000 12.6 1358.19 113.629 113.629 5418.000 12.6 1358.40 113.629 113.629 5419.000 12.6 1358.61 113.629 113.629 5420.000 12.6 1358.82 113.629 113.629 5421.000 12.6 1359.03 113.629 113.629 5422.000 12.6 1359.24 113.628 113.628 5423.000 12.6 1359.45 113.628 113.628 5424.000 12.6 1359.66 113.628 113.628 5425.000 12.6 1359.87 113.628 113.628 5426.000 12.6 1360.08 113.628 113.628 5427.000 12.6 1360.29 113.628 113.628 5428.000 12.6 1360.50 113.628 113.628 5429.000 12.6 1360.71 113.628 113.628 5430.000 12.6 1360.92 113.627 113.627 5431.000 12.6 1361.13 113.627 113.627 5432.000 12.6 1361.34 113.627 113.627 5433.000 12.6 1361.56 113.627 113.627 5434.000 12.6 1361.77 113.627 113.627 5435.000 12.6 1361.98 113.627 113.627 5436.000 12.6 1362.19 113.627 113.627 5437.000 12.6 1362.40 113.627 113.627 5438.000 12.6 1362.61 113.626 113.626 5439.000 12.6 1362.82 113.626 113.626 5440.000 12.6 1363.03 113.626 113.626 5441.000 12.6 1363.24 113.626 113.626 5442.000 12.6 1363.45 113.626 113.626 5443.000 12.6 1363.66 113.626 113.626 5444.000 12.6 1363.87 113.626 113.626 5445.000 12.6 1364.08 113.625 113.625 5446.000 12.6 1364.29 113.625 113.625 5447.000 12.6 1364.50 113.625 113.625 5448.000 12.6 1364.71 113.625 113.625 5449.000 12.6 1364.92 113.625 113.625 5450.000 12.6 1365.13 113.625 113.625 5451.000 12.6 1365.34 113.625 113.625 5452.000 12.6 1365.55 113.625 113.625 5453.000 12.6 1365.76 113.624 113.624 5454.000 12.6 1365.97 113.624 113.624 5455.000 12.6 1366.18 113.624 113.624 5456.000 12.6 1366.39 113.624 113.624 5457.000 12.6 1366.60 113.624 113.624 5458.000 12.6 1366.81 113.624 113.624 5459.000 12.6 1367.02 113.624 113.624 5460.000 12.6 1367.23 113.624 113.624 5461.000 12.6 1367.44 113.623 113.623 5462.000 12.6 1367.65 113.623 113.623 5463.000 12.6 1367.86 113.623 113.623 5464.000 12.6 1368.07 113.623 113.623 5465.000 12.6 1368.28 113.623 113.623 5466.000 12.6 1368.49 113.623 113.623 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Stndy ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

<?PS SBO Stndy Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 77 ll-17-2018 Attachment 1 Page 89 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5467.000 12.6 1368.70 113.623 113.623 5468.000 12.6 1368.92 113.623 113.623 5469.000 12.6 1369.13 113.622 113.622 5470.000 12.6 1369.34 113.622 113.622 5471.000 12.6 1369.55 113.622 113.622 5472.000 12.6 1369.76 113.622 113.622 5473.000 12.6 1369.97 113.622 113.622 5474.000 12.6 1370.18 113.622 113.622 5475.000 12.6 1370.39 113.622 113.622 5476.000 12.6 1370.60 113.621 113.621 5477.000 12.6 1370.81 113.621 113.621 5478.000 12.6 1371.02 113.621 113.621 5479.000 12.6 1371.23 113.621 113.621 5480.000

  • 12.6 1371.44 113.621 113.621 5481.000 12.6 1371.65 113.621 113.621 5482.000 12.6 1371.86 113.621 113.621 5483.000 12.6 1372.07. 113.621 113.621 5484.000 12.6 1372.28 113.620 113.620 5485.000 12.6 1372.49 113.620 113.620 5486.000 12.6 1372.70 113.620 113.620 5487.000 126 137291 113.620 113.620 5488.000 12.6 1373.12 113.620 113.620 5489.000 12.6 1373.33 113.620 113.620 5490.000 12.6 1373.54 113.620 113.620 5491.000 12.6 1373.75 113.619 113.619 5492.000 12.6 1373.96 113.619 113.619 5493.000 12.6 1374.17 113.619 113.619 5494.000 12.6 1374.38 113.619 113.619 5495.000 12.6 1374.59 113.619 113.619 5496.000 12.6 1374.80 113.619 113.619 5497.000 12.6 1375.01 113.619 113.619 5498.000 12.6 1375.22 113.619 113.619 5499.000 12.6 1375.43 113.618 113.618 5500.000 12.6 1375.64 113.618 113.618 5501.000 12:6 1375.85 113.618 113.618 5502.000 12.6 1376.06 113.618 113.618 5503.000 12:6 1376.28 113.618 113.618 5504.000 12.6 1376.49 113.618 113.618 5505.000 12.6 1376.70 113.618 113.618 5506.000 12.6 1376.91 113.617 113.617 5507.000 12.6 1377.12 113.617 113.617 5508.000 12.6 1377.33 113.617 113.617 5509.000 12.6 1377.54 113.617 113.617 5510.000 12.6 1377.75 113.617 113.617 5511.000 12.6 1377.96 113.617 113.617 5512.000 12.6 1378.17 113.617 113.617 5513.000 12.6 1378.38 113.617 113.617 5514.000 12.6 1378.59 113.616 113.616 5515.000 12.6 1378.80 113.616 113.616 5516.000 12.6 1379.01 113.616 113.616 5517.000 12.6 1379.22 113.616 113.616 5518.000 12.6 1379.43 113.616 113.616 5519.000 12.6 1379.64 113.616 113.616 ) 5520.000 12.6 1379.85 113.616 113.616 5521.000 12.6 1380.06 113.615 113.615 5522.000 12.6 1380.27 113.615 113.615 5523.000 12.6 1380.48 113.615 113.615 5524.000 12.6 1380.69 113.615 113.615 5525.000 12.6 1380.90 113.615 113.615 5526.000 12.6 1381.11' 113.615 113.615 5527.000 12.6 1381.32 113.615 113.615 5528.000 12.6 1381.53 113.614 113.614 5529.000 12.6 1381.74 113.614 113.614 5530.000 12.6 1381.95 113.614 113.614 5531.000 12.6 1382.16 113.614 113.614 5532.000 12.6 1382.37 113.614 113.614 5533.000 12.6 1382.58 113.614 113.614 5534.000 12.6 1382.79 113.614 113.614 5535.000 12.6 1383.00 113.613 113.613 5536.000 12.6 1383.21 113.613 113.613 5537.000 12.6 1383.42 113.613 113.613 5538.000 12.6 1383.63 113.613 113.613 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 78 11-17-2018 Attachment 1 Page 90 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage(V)

TimC (Amp) (Amp-Hour)

Y-Y+ Time (Amp) (Amp-Hour)

Y-Y+ 5539.000 12.6 1383.85 113.613 113.613 5540.000 12.6 1384.06 113.613 113.613 5541.000 12.6 1384.27 113.613 113.613 5542.000 12.6 1384.48 113.613 113.613 5543.000 12.6 1384.69 113.612 113.612 5544.000 12.6 1384.90 113.612 113.612 5545.000 12.6 1385.11 113.612 113.612 5546.000 12.6 1385.32 113.612 113.612 5547.000 12.6 1385.53 113.612 113.612 5548.000 12.6 1385.74 113.612 113.612 5549.000 12.6 1385.95 113.612 113.612 5550.000 12.6 1386.16 113.611 113.611 5551.000 12.6 1386.37 113.611 113.611 5552.000 12.6 1386.58 113.611 113.611 5553.000 12.6 1386.79 113.611 113.611 5554.000 12.6 1387.00 113.611 113.611 5555.000 12.6 1387.21 113.611 113.611 5556.000 12.6 1387.42 113.611 113.611 5557.000 12.6 1387.63 113.610 113.610 5558.000 12.6 1387.84 113.610 113.610 5559.000 12.6 1388.05 113.610 113.610 5560.000 12.6 1388.26 113.610 113.610 5561.000 12.6 1388.47 113.610 113.610 5562.000 12.6 1388.68 113.610 113.610 5563.000 12.6 1388.89 113.610 113.610 5564.000 12.6 1389.10 113.609 113.609 5565.000 12.6 1389.31 113.609 113.609 5566.000 12.6 1389.52 113.609 113.609 5567.000 12.6 1389.73 113.609 113.609 5568.000 12.6 1389.94 113.609 113.609 5569.000 12.6 1390.15 113.609 113.609 5570.000 12.6 1390.36 113.609 113.609 5571.000 12.6 1390.57 113.608 113.608 5572.000 12.6 1390.78 113.608 113.608 5573.000 12.6 1390.99 113.608 113.608 5574.000 12.6 1391.21 113.608 113.608 5575.000 12.6 1391.42 113.608 113.608 5576.000 12.6 1391.63 113.608 113.608 5577.000 12.6 1391.84 113.608 113.608 5578.000 12.6 1392.05 113.607 113.607 5579.000 12.6 1392.26 113.607 113.607 5580.000 12.6 1392.47 113.607 113.607 5581.000 12.6 1392.68 113.607 113.607 5582.000 12.6 1392.89 113.607 113.607 5583.000 12.6 1393.10 113.607 113.607 5584.000 12.6 1393.31 113.607 113.607 5585.000 12.6 1393.52 113.606 113.606 5586.000 12.6 1393.73 113.606 113.606 5587.000 12.6 1393.94 113.606 113.606 5588.000 12.6 1394.15 113.606 113.606 5589.000 12.6 1394.36 113.606 113.606 5590.000 12.6 1394.57 113.606 113.606 5591.000 12.6 1394.78 113.606 113.606 5592.000 12.6 1394.99 113.605 113.605 5593.000 12.6 1395.20 113.605 113.605 5594.000 12.6 1395.41 113.605 113.605 5595.000 12.6 1395.62 113.605 113.605 5596.000 12.6 1395.83 113.605 113.605 5597.000 12.6 1396.04 113.605 113.605 5598.000 12.6 1396.25 113.604 . 113.604 5599.000 12.6 1396.46 113.604 113.604 5600.000 12.6 1396.67 113.604 113.604 5601.000 12.6 1396.88 113.604 113.604 5602.000 12.6 1397.09 113.604 113.604 5603.000 12.6 1397.30 113.604 113.604 5604.000 12.6 1397.51 113.604 113.604 5605.000 12.6 1397.72

  • 113.603 113.603 5606.000 12.6 1397.93 113.603 113.603 5607.000 12.6 1398.14 113.603 113.603 5608.000 12.6 1398.35 113.603 113.603 5609.000 12.6 1398.57 113.603 113.603 5610.000 12.6 1398.78 113.603 113.603 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Discharge Discharge 79 11-17-2018 Attachment 1 Page 91 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5611.000 12.6 1398.99 113.603 113.603 5612.000 12.6 1399.20 113.602 113.602 5613.000 12.6 1399.41 113.602 113.602 5614.000 12.6 1399.62 113.602 113.602 5615.000 12.6 1399.83 113.602 113.602 5616.000 12.6 1400.04 113.602 113.602 5617.000 \2.6 1400.25 113.602 113.602 5618.000 12.6 1400.46 113.602 113.602 5619.000 12.6 1400.67 113.601 113.601 5620.000 12.6 1400.88 113.601 113.601 5621.000 12.6 1401.09 113.601 113.601 5622.000 12.6 1401.30 113.601 113.601 5623.000 12.6 1401.51 113.601 113.601 5624.000 12.6 1401.72 113.601 113.601 5625.000 12.6 1401.93 113.600 113.600 5626.000 12.6 1402.14 113.600 113.600 5627.000 12.6 1402.35 113.600 113.600 5628.000 12.6 1402.56 113.600 113.600 5629.000 12.6 1402.77 113.600 113.600 5630.000 12.6 1402.98 113.600 113.600 5631.000 12.6 1403.19 113.600 113.600 5632.000 12.6 1403.40 113.599 113.599 5633.000 12.6 1403.61 113.599 113.599 5634.000 12.6 1403.82 113.599 113.599 5635.000 12.6 1404.03 113.599 113.599 5636.000 12.6 1404.24 113.599 113.599 5637.000 12.6 1404.45 113.599 113.599 5638.000 12.6 1404.66 113.599 113.599 5639.000 12.6 1404.87 113.598 113.598 5640.000 12.6 1405.08 113.598 113.598 5641.000 12.6 1405.29 113.598 113.598 5642.000 12.6 1405.50 113.598 113.598 5643.000 12.6 1405.71 113.598 113.598 5644.000 12.6 1405.92 113.598 113.598 5645.000 12.6 1406.14 113.597 113.597 5646.000 12.6 1406.35 113.597 113.597 5647.000 12.6 1406.56 113.597 113.597 5648.000 12.6 1406.77 113.597 113.597 5649.000 12.6 1406.98 113.597 113.597 5650.000 12.6 1407.19 113.597 113.597 5651.000 12.6 1407.40 113.597 113.597 5652.000 12.6 1407.61 113.596 113.596 5653.000 12.6 1407.82 113.596 113.596 5654.000 12.6 1408.03 113.596 113.596 5655.000 12.6 1408.24 113.596 113.596 5656.000 12.6 1408.45 113.596 113.596 5657.000 12.6 1408.66 113.596 113.596 5658.000 12.6 1408.87 113.595 113.595 5659.000 12.6 1409.08 113.595 113.595 5660.000 12.6 1409.29 113.595 113.595 5661.000 12.6 1409.50 113.595 113.595 5662.000 12.6 1409.71 113.595 113.595 5663.000 12.6 1409.92 113.595 113.595 5664.000 12.6 1410.13 113.595 113.595 5665.000 12.6 1410.34 113.594 113.594 5666.000 12.6 1410.55 113.594 113.594 5667.000 12.6 1410.76 113.594 113.594 5668.000 12.6 1410.97 113.594 113.594 5669.000 12.6 1411.18 113.594 113.594 5670.000 12.6 1411.39 113.594 113.594 5671.000 12.6 1411.60 113.593 113.593 5672.000 12.6 1411.81 113.593 113.593 5673.000 12.6 1412.02 113.593 113.593 5674.000 12.6 1412.23 113.593 113.593 5675.000 12.6 1412.44 113.593 113.593 5676.000 12.6 1412.65 113.593 113.593 5677.000 12.6 1412.86 113.592 113.592 5678.000 12.6 1413.07 113.592 113.592 5679.000 12.6 1413.28 113.592 113.592 5680.000 12.6 1413.50 113.592 113.592 5681.000" 12.6 1413.71 113.592 113.592 5682.000 12.6 1413.92 113.592 113.592 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discliarge 80 11-17-2018 Attachment 1 Page 92 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5683.000 12.6 1414.13 113.592 113.592 5684.000 12.6 1414.34 113.591 113.591 5685.000 12.6 1414.55 113.591 113.591 5686.000 12.6 1414.76 113.591 113.591 5687.000 12.6 1414.97 113.591 113.591 5688.000 12.6 1415.18 113.591 113.591 5689.000 12.6 1415.39 113.591 113.591 5690.000 12.6 1415.60 113.590 113.590 5691.000 12.6 1415.81 113.590 113.590 5692.000 12.6 1416.02 113.590 113.590 5693.000 12.6 1416.23 113.590 113.590 5694.000 12.6 1416.44 113.590 113.590 5695.000 12.6 1416.65 113.590 113.590 5696.000 12.6 1416.86. 113.589 113.589 5697.000 12.6 1417.07 113.589 113.589 5698.000 12.6 1417.28 113.589 113.589 5699.000 12.6 1417.49 113.589 113.589 5700.000 12.6 1417.70 113.589 113.589 ( 5701.000 12.6 1417.91 113.589 113.589 5702.000 12.6 1418.12 113.588

  • " 113.588 5703.000 12.6 1418.33 113.588 113.588 5704.000 12.6 1418.54 113.588 113.588 5705.000 12.6 1418.75 113.588 113.588 5706.000 12.6 1418.96 113.588 113.588 5707.000 12.6 1419.17 113.588 113.588 5708.000 12.6 1419.38 113.588 113.588 5709.000 12.6 1419.59 113.587 113.587 5710.000 12.6 1419.80 113.587 113.587 5711.000 12.6 1420.01 113.587 113.587 5712.000 12.6 1420.22 113.587 113.587 5713.000 12.6 1420.43 113.587 113.587 5714.000 12.6 1420.64 113.587 113.587 5715.000 12.6 1420.86 113.586 113.586 5716.000 12.6 1421.07 113.586 113.586 5717.000 12.6 1421.28 113.586 113.586 5718.000 12.6 1421.49 113.586 113.586 5719.000 12.6 1421.70 113.586 113.586 5720.000 12.6 1421.91 113.586 113.586 5721.000 12.6 1422.12 113.585 113.585 5722.000 12.6 1422.33 113.585 113.585 5723.000 12.6 1422.54 113.585 113.585 5724.000 12.6 1422.75 113.585 113.585 5725.000 12.6 1422.96 113.585 113.585 5726.000 12.6 1423.17 113.585 113.585 5727.000 12.6 1423.38 113.584 113.584 5728.000 12.6 1423.59 113.584 113.584 5729.000 12.6 1423.80 113.584 113.584 5730.000 '12.6 1424.01 113.584 113.584 5731.000 12.6 1424.22 113.584 113.584 5732.000 12.6 1424.43 113.584 113.584 5733.000 12.6 1424.64 113.583 113.583 5734.000 12.6 1424.85 113.583 113.583 5735.000 12.6 1425.06 113.583 113.583 5736.000 12.6 1425.27 113.583 113.583 5737.000 12.6 1425.48 113.583 113.583 5738.000 12.6 1425.69 113.583 113.583 5739.000 12.6 1425.90 113.582 113.582 5740.000 12.6 1426.11 113.582 113.582 5741.000 12.6 1426.32 113.582 113.582 5742.000 12.6 1426.53 113.582 113.582 5743.000 12.6 1426.74 113.582 113.582 5744.000 12.6 1426.95 113.582 113.582 5745.000 12.6 1427.16 113.581 113.581 5746.000 12.6 1427.37 113.581 113.581 5747.000 12.6 1427.58 113.581 113.581 5748.000 12.6 1427.79 113.581 113.581 5749.000 12.6 1428.00 113.581 113.581 5750.000 12.6 1428.21 113.581 113.581 5751.000 12.6 1428.43 113.580 113.580 5752.000 12.6 1428.64 113.580 113.580 5753.000 12.6 1428.85 113.580 113.580 5754.000 12.6 1429.06 113.580 113.580 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Discharge Discharge 81 11-17-2018 Attachment 1 Page 93 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltagc(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5755.000 12.6 1429.27 113.580 113.580 5756.000 12.6 1429.48 113.580 113.580 5757.000 12.6 1429.69 113.579 113.579 5758.000 12.6 1429.90 113.579 113.579 5759.000 12.6 1430.11 113.579 113.579 5760.000 12.6 1430.32 113.579 113.579 5761.000 12.6 1430.53 113.579 113.579 5762.000

  • 12.6 1430.74 113.579 113.579 5763.000 12.6 1430.95 113.578 113.578 5764.000 12.6 1431.16 113.578 113.578 5765.000 12.6 1431.37 113.578 113.578 5766.000 12.6 1431.58 113.578 113.578 5767.000 12.6 1431.79 113.578 ' . 113.578 5768.000 12.6 1432.00 113.577 113.577 5769.000 12.6 1432.21 113.577 113.577 5770.000 12.6 1432.42 113.577 113.577 5771.000 12.6 1432.63 113.577 113.577 5772.000 12.6 1432.84 113.577 113.577 5773.000 12.6 1433.05 113.577 113.577 5774.000 12.6 1433.26 113.576 113.576 5775.000 12.6 1433.47 113.576 113.576 5776.000 12.6 1433.68 113.576 113.576 5777.000 12.6 1433.89 113.576 113.576 5778.000 12.6 1434.10 113.576 113.576 5779.000 12.6 1434.31 113.576 113.576 5780.000 12.6 1434.52 113.575 113.575 5781.000 12.6 1434.73 113.575 113.575 5782.000 12.6 1434.94 113.575 113.575 5783.000 12.6 1435.15 113.575 113.575 5784.000 12.6 1435.36 113.575 113.575 ' 5785.000 12.6 1435.57 113.575 113.575 5786.000 12.6 1435.79 113.574 113.574 5787.000 12.6 1436.00 113.574 113.574 5788.000 12.6 1436.21 113.574 113.574 5789.000 12.6 1436.42 113.574 113.574 5790.000 12.6 1436.63 113.574 113.574 5791.000 12.6 1436.84 113.573 113.573 5792.000 12.6 1437.05 113.573 113.573 5793.000 12.6 1437.26 113.573 113.573 5794.000 12.6 1437.47 113.573 113.573 5795.000 12.6 1437.68 113.573 113.573 5796.000 12.6 1437.89 113.573 113.573 5797.000 12.6 1438.10 113.572 113.572 5798.000 12.6 1438.31 113.572 113.572 5799.000 12.6 1438.52 113.572 113.572 5800.000 12.6 1438.73 113.572 113.572 5801.000 12.6 1438.94
  • 113.572 113.572 5802.000 12.6 1439.15 113.572 113.572 5803.000 12.6 1439.36 113.571 113.571 5804.000 12.6 1439.57 113.571 113.571 5805.000 12.6 1439.78 113.571 113.571 5806.000 12.6 1439.99 113.571 113.571 5807.000 12.6 1440.20 113.571 113.571 5808.000 12.6 1440.41 113.571 113.571 5809.000 12.6 1440.62 113.571 113.571 5810.000 12.6 1440.83 113.571 113.571 5811.000 12.6 1441.04 113.570 113.570 5812.000 , 12.6 1441.25 113.570 113.570 5813.000 12.6 1441.46 113.570 113.570 5814.000 12.6 1441.67 113.570 113.570 5815.000 12.6 i441.88 113.570 113.570 5816.000 12.6 1442,09 113.570 113.570 5817.000 12.6 1442.30 113.570 113.570 5818.000 12.6 1442.51 113.570 113.570 5819.000 -12.6 1442.72 113.570 113.570 5820.000 12.6 1442.93 113.570 113.570 5821.000 12.6 1443.15 113.570 113.570 5822.000 12.6 1443.36 113.570 113.570 5823.000 12.6 1443.57 113.570 113.570 5824.000 12.6 1443.78 113.570 113.570 5825.000 12.6 1443.99 113.570 113.570 5826.000 12.6 1444.20 113.569 113.569 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Discharge Discharge 82 11-17-2018 Attachment 1 Page 94 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5827.000 12.6 1444.41 113.569 113.569 5828.000 12.6

  • 1444.62 113.569 113.569 5829.000 12.6 1444.83 113.569 113.569 5830.000 12.6 1445.04 113.569 113.569 5831.000 12.6 1445.25 113.569 113.569 5832.000 12.6 1445.46 113.569 113.569 5833.000 12.6 1445.67 113.569 113.569 5834.000 12.6 1445.88 113.569 113.569 5835.000 12.6 1446.09 113.569 113.569 5836.000 12.6 1446.30 113.569 113.569 5837.000 12.6 1446.51 113.569 113.569 5838.000 12.6 1446.72 113.569 113.569 5839.000 12.6 1446.93 113.569 113.569 5840.000 12.6 1447.14 113.568 113.568 5841.000 12.6 1447.35 113.568 113.568 5842.000 12.6 1447.56 113.568 113.568 5843.000 12.6 1447.77 113.568 113.568 5844.000 12.6 1447.98 113.568 113.568 5845.000 12.6 1448.19 113.568 113.568 5846.000 12.6 1448.40 113.568 113.568 5847.000 12.6 1448.61 113.568 113.568 5848.000 12.6 1448.82 113.568 113.568 5849.000 12.6 1449.03 113.568 113.568 5850.000 12.6 1449.24 113.568 113.568 5851.000 12.6 1449.45 113.568 113.568 5852.000 12.6 1449.66 113.568 113.568 5853.000 12.6 1449.87 113.568 113.568 5854.000 12.6 1450.08 113.567 113.567 5855.000 12.6 1450.29 113.567 113.567 5856.000 12.6 1450.51 113.567 113.567 5857.000 12.6 1450.72 113.567 113.567 5858.000 12.6 1450.93 113.567 113.567 5859.000 12.6 1451.14 113.567 113.567 5860.000 12.6 1451.35 113.567 113.567 5861.000 12.6 1451.56 113.567 113.567 5862.000 12.6 1451.77 113.567 113.567 5863.000 12.6 1451.98 113.567 113.567 5864.000 12.6 1452.19 113.567 113.567 5865.000 12.6 1452.40 113.567 113.567 5866.000 12.6 1452.61 113.567 113.567 5867.000 12.6 1452.82 113.566 113.566 5868.000 12.6 1453.03 113.566 113.566 5869.000 12.6 1453.24 113.566 113.566 5870.000 12.6 1453.45 113.566 113.566 5871.000 12.6 1453.66 113.566 113.566 5872.000 12.6 1453.87 113.566 113.566 5873.000 12.6 1454.08 113.566 113.566 5874.000 12.6 1454.29 113.566 113.566 5875.000 12.6 1454.50 113.566 113.566 5876.000 12.6 1454.71 113.566 113.566 5877.000 12.6 1454.92 113.566 113.566 5878.000 12.6 1455.13 113.566 113.566 5879.000 12.6 1455.34 113.566 113.566 5880.000 12.6 1455.55 113.566 113.566 5881.000 12.6 1455.76 113.565 113.565 5882.000 12.6 1455.97 113.565 113.565 5883.000 12.6 1456.18 113.565 113.565 5884.000 12.6 1456.39 113.565 113.565 5885.000 12.6 1456.60 113.565 113.565 5886.000 12.6 1456.81 113.565 113.565 5887.000 12.6 1457.02 113.565 113.565 5888.000 12.6
  • 1457.23 113.565 113.565 5889.000 12.6 1457.44 113.565 113.565 5890.000 12.6 1457.65 113.565 113.565 5891.000 12.6 1457.87 113.565 113.565 5892.000 12.6 1458.08 113.565 113.565 5893.000 12.6 1458.29 113.565 113.565 5894.000 12.6 1458.50 113.564 113.564 5895.000 12.6 1458.71 113.564 113.564 5896.000 12.6 1458.92 113.564 113.564 5897.000 12.6 1459.13 113.564 113.564 5898.000 12.6 1459.34 .. 113.564 113.564 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 83 11-17-2018 Attachment 1 Page 95 of 274 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5899.000 12.6 1459.55 113.564 113.564 5900.000 12.6 1459.76 113.564 113.564 5901.000 12.6 1459.97 113.564 113.564 5902.000 12.6 1460.18 113.564 113.564 5903.000 12.6 1460.39 113.564 113.564 5904.000 12.6 1460.60 113.564 113.564 5905.000 12.6 1460.81 113.564 113.564 5906.000 12.6 1461.02 113.563 113.563 5907.000 12.6 1461.23 113.563 113.563 5908.000' 12.6 1461.44 113.563 113.563 5909.000 12.6 1461.65 113.563 113.563 5910.000 12.6 1461.86 113.563 113.563 5911.000 12.6 1462.07 113.563 113.563 5912.000 12.6 1462.28 113.563 113.563 5913.000 12.6 1462.49 113.563 113.563 5914.000 12.6 1462.70 113.563 113.563 5915.000 12.6 1462.91 113.563 113.563 5916.000 12.6 1463.12 113.563 113.563

  • 5917.000 12.6 1463.33 113.563 113.563 5918.000 12.6 1463.54 113.563 113.563 5919.000 126 1463.75 113.562 113.562 5920.000 126 1463.96 113.-562 P3.562 5921.000 12.6 1464.17 113.562 113.562 5922.000 12.6 1464.38 113.562 113.562 5923.000 12.6 1464.59 113.562 113.562 5924.000 12.6 1464.80 113.562 113.562 5925.000 12.6 1465.01 113.562 113.562 5926.000 12.6 1465.22 113.562 113.562 5927.000 12.6 1465.44 113.562 113.562 5928.000 12.6 1465.65 113.562 113.562 5929.000 12.6 1465.86 113.562 113.562 5930.000 12.6 1466.07 113.562 113.562 5931.000 12.6 1466.28 113.561 113.561 5932.000 12.6 1466.49 113.561 113.561 5933.000 12.6 1466.70 113.561 113.561 5934.000 12.6 1466.91 113.561 113.561 5935.000 12.6 1467.12 113.561 113.561 5936.000 12.6 1467.33 113.561 113.561 5937.000 12.6 1467.54 113.561 113.561 5938.000 12.6 1467.75 113.561 113.561 5939.000 12.6 1467.96 113.561 113.561 5940.000 12.6 1468.17 113.561 113.561 5941.000 12.6 1468.38 113.561 113.561 5942.000 12.6 1468.59 113.561 113.561 5943.000 12.6 1468.80 113.560 113.560 5944.000 12.6 1469.01 . 113.560 113.560 5945.000 12.6 1469.22 113.560 113.560 5946.000 12.6 1469.43 . 113.560 113.560 5947.000 12.6 1469.64 113.560 113.560 5948.000 12.6 1469.85 113.560 113.560 5949.000 12.6 1470.06 113.560 113.560 5950.000 12.6 1470.27 113.560 113.560 5951.000 12.6 1470.48 113.560 113.560 5952.000 12.6 1470.69 113.560 . 113.560 5953.000 12.6 1470.90 113.560 113.560 5954.000 12.6 1471.11 113.560 113.560 5955.000 12.6 1471.32 113.559 113.559 5956.000 12.6 1471.53 113.559 113.559 5957.000 12.6 1471.74 113.559 113.559 5958.000 12.6 1471.95 113.559 .113.559 5959.000 12.6 1472.16 113.559 113.559 5960.000 12.6 1472.37 113.559 113.559 5961.000 12.6 1472.58 113.559 113.559 5962.000 12.6 1472.80 113.559 113.559 5963.000 12.6 1473.01 113.559 113.559 5964.000 12.6 1473.22 113.559 113.559 5965.000 12.6 1473.43 113.559 113.559 5966.000 12.6 1473.64 113.558 113.558 5967.000 12.6 1473.85 113.558 113.558 5968.000 12.6 1474.06 113.558 113.558 5969.000 12.6 1474.27 113.558 113.558 5970.000 12.6 1474.48 113.558 113.558 EC,626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA48-Hour Coping Study Discharge Discharge 84 11-17-2018 Attachment 1 Page 96 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 5971.000 12.6 1474.69 113.558 113.558 5972.000 12.6 1474.90 113.558 113.558 5973.000 12.6 1475.11 113.558 113.558 5974.000 12.6 1475.32 113.558 113.558 5975.000 12.6 1475.53 113.558 113.558 5976.000 12.6 1475.74 113.558 113.558 5977.000 12.6 1415.95 113.558 113.558 5978.000 12.6 1476.16 113.557 113.557 5979.000 12.6 1476.37 113.557 113.557 5980.000 12.6 1476.58 113.557 113.557 5981.000 12.6 1476.79 113.557 113.557 5982.000 12.6 1477.00 113.557 113.557 5983.000 12.6 1477.21 113.557 113.557 5984.000 12.6 1477.42 113.557 113.557 5985.000 12.6 1477.63 113.557 113.557 5986.000 12.6 1477.84 113.557 113.557 5987.000 12.6 1478.05 113.557 113.557 5988.000 12.6 1478.26 113.557 113.557 5989.000 12.6 1478.47 113.556 113.556 5990.000 12.6 1478.68 113.556 113.556 5991.000 12.6 1478.89 113.556 113.556 5992.000 12.6 1479.10 113.556 113.556 5993.000 12.6 1479.31 113.556 113.556 5994.000 12.6 1479.52 113.556 113.556 5995.000 12.6 1479.73 113.556 113.556 5996.000 12.6 1479.94 113.556 113.556 5997.000 12.6 1480.16 113.556 113.556 5998.000 12.6 1480.37 113.556 113.556 5999.000 12.6 1480.58 113.556 113.556 6000.000 12.6 1480.79 113.555 113.555 6001.000 12.6 1481.00 113.555 113.555 6002.000 12.6 1481.21 113.555 113.555 6003.000 12.6 1481.42 113.555 113.555 6004.000 12.6 1481.63 113.555 113.555 6005.000 12.6 1481.84 113.555 113.555 6006.000 12.6 1482.05 113.555 113.555 6007.000 12.6 1482.26 113.555 113.555 6008.000 12.6 1482.47 113.555 113.555 6009.000 12.6 1482.68 113.555 113.555 6010.000 12.6 1482.89 113.555 113.555 6011.000 12.6 1483.10 113.554 113.554 6012.000 12.6 1483.31 113.554 113.554 6013.000 12.6 1483.52 113.554 113.554 6014.000 12.6 1483.73 113.554 113.554 6015.000 12.6 1483.94 113.554 113.554 6016.000 12.6 1484.15 113.554 113.554 6017.000 12.6 1484.36 113.554 113.554 6018.000 12.6 1484.57 113.554 113.554 6019.000 12.6 1484.78 113.554 113.554 6020.000 12.6 1484.99 113.554 113.554 6021.000 12.6 1485.20 113.553 113.553 6022.000 12.6 1485.41 113.553 113.553 6023.000 12.6 1485.62 113.553 113.553 6024.000 12.6 1485.83 113.553 113.553 6025.000 12.6 1486.04 113.553 113.553 6026.000 12.6 1486.25 113.553 113.553 6027.000 12.6 1486.46 113.553 113.553 6028.000 12.6 148~.67 113.553 113.553 6029.000 12.6 1486.88 113.553 113.553 6030.000 12.6 1487.09 113.553 113.553 6031.000 12.6 1487.30 113.552 113.552 6032.000 12.6 1487.51 113.552 113.552 6033.000 12.6 1487.73 113.552 113.552 6034.000 12.6 1487.94 113.552 113.552 6035.000 12.6 1488.15 113.552 113.552 6036.000 12.6 1488.36 113.552 113.552 '--6037.000 12.6 1488.57 113.552 113.552 6038.000 12.6 1488.78 113.552

'113.552 6039.000 12.6 1488.99 113.552 113.552 6040.000 12.6 1489.20 113.552 113.552 6041.000 12.6 1489.41 113.552 113.552 6042.000 12.6 1489.62 113.551 113.551 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Stndy ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Sindy Config.: DIV I Batte()' IA48-HourCoping Stndy Discharge Discharge 85 11-17-2018 Attachment 1 Page 97 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 6043.000 12.6 1489.83 113.551 113.551 6044.000 12.6 1490.04 113.551 113.551 6045.000 12.6 1490.25 113.551 113.551

  • 6046.000 12.6 1490.46 113.551 113.551 6047.000 12.6 1490.67 113.551 113.551 6048.000 12.6 1490.88 113.551 113.551 6049.000 12.6 1491.09 113.551 113.551 6050.000 12.6 1491.30 113.551 113.551 6051.000 12.6 1491.51 113.551 113.551 6052.000 12.6 1491.72 113.550 113.550 6053.000 12.6 1491.93 113.550 113.550 6054.000 12.6 1492.14 113.550 113.550 6055.000 12.6 1492.35 113.550 113.550 6056.000 12.6 1492.56 113.550 113.550 6057.000 12.6 1492.77 113.550

!13.550 6058.000 12.6 1492.98 113.550 113.550 6059.000 12.6 1493.19 113.550 113.550 6060.000 12.6 1493.40 113.550 113.550 6061.000 12.6 1493.61 113.549 113.549 6062.000 12.6 1493.82 113.549 113.549 6063.000 12.6 1494.03 113.549 113.549 6064.000 12.6 1494.24 113.549 113.549 6065.000 12.6 1494.45 113.549 113.549 6066.000 12.6 1494.66 113.549 113.549 6067.000 12.6 1494.87 113.549 !13.549 6068.000 12.6 1495.09 113.549 113.549 6069.000 12.6 1495.30 113.549 !13.549 6070.000 12.6 1495.51 113.549 113.549 6071.000 12.6 1495.72 113.548 113.548 6072.000 12.6 1495.93 113.548 113.548 6073.000 12.6 1496.14 113.548 113.548 6074.000 12.6 1496.35 113.548 113.548 6075.000 12.6 1496.56 113.548 113.548 6076.000 12.6 1496.77 113.548 113.548 6077.000 12.6 1496.98 113.548 113.548 6078.000 12.6 1497.19 113.548 113.548 6079.000 12.6 1497.40 113.548 113.548 6080.000 12.6 1497.61 113.547 113.547 6081.000 12.6 1497.82 113.547

!13.547 6082.000 12.6 1498.03 113.547 113.547 6083.000 12.6 1498.24 113.547 113.547 6084.000 12.6 1498.45 113.547 113.547 6085.000 12.6 1498.66 113.547 113.547 6086.000 12.6 1498.87 113.547 113.547 6087.000 12.6 1499.08 113.547 113.547 6088.000 12.6 1499.29 113.547 113.547 6089.000 12.6 1499.50 113.547 113.547 6090.000 12.6 1499.71 113.546 113.546 6091.000 12.6 1499.92 113.546 113.546 6092.000 12.6 1500.13 113.546 113.546 6093.000 12.6 1500.34 113.546 113.546 6094.000 12.6

  • 1500.55 113.546 113.546 6095.000 12.6 1500.76 113.546 113.546 6096.000 12.6 1500.97 113.546 113.546 6097.000 12.6 1501.18 113.546 113.546 6098.000 12.6 1501.39 113.546 113.546 6099.000 12.6 1501.60 113.545 113.545 6100.000 12.6 1501.81 113.545 113.545 6101.000 12.6 1502.02 113.545 113.545 6102.000 12.6 1502.23 !13.545 113.545 6103.000 12.6 1502.45 113.545 113.545 6104.000 12.6 1502.66 113.545 113.545 6105.000 12.6 1502.87 113.545 113.545 6106.000 12.6 1503.08 113.545 113.545 6107.000 12.6 1503.29 113.545 113.545 6108.000 12.6 1503.50 113.544 113.544 6109.000 12.6 1503.71 113.544 113.544 6110.000 12.6 1503.92 113.544 113.544 6111.000 12.6 1504.13 113.544 113.544 6112.000 12.6 1504.34 113.544 113.544 6113.000 12.6 1504.55 113.544 113.544 6114.000 12.6 1504.76 113.544 113.544 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14. l.ON KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharee Discharge 86 11-17-2018 Attachment 1 Page 98 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 6115.000 12.6 1504.97 113.544 113.544 6116.000 12.6 1505.18 113.544 113.544 6117.000 12.6 1505.39 113.543 113.543 6118.000 12.6 1505.60 113.543 113.543 6119.000 12.6 1505.81 113.543 113.543 6120.000 12.6 1506.02 113.543 113.543 6121.000 12.6 1506.23 113.543 113.543 6122.000 12.6 1506.44 113.543 113.543 6123.000 12.6 1506.65 113.543 113.543 6124.000 12.6 1506.86 113.543 113.543 6125.000 12.6 1507.07 113.542 113.542 6126.000 12.6 1507.28 113.542 113.542 6127.000 12.6 1507.49 113.542 113.542 6128.000 12.6 1507.70 113.542 113.542 6129.000 12.6 1507.91 113.541 113.541 6130.000 12.6 1508.12 113.541 113.541 6131.000 12.6 1508.33 113.540 113.540 6132.000 12.6 1508.54 113.540 113.540 6133.000 12.6 1508.75 113.540 113.540 6134.000 12.6 1508.96 113.539 113.539 6135.000 12:6 1509.17 113.539 113.539 6\36.000 12.6 1509.38 113.539 113.539 .6137.000 12.6 1509.59 113.538 113.538 6138.000 12.6 1509.80 113.538 113.538 6139.000 12.6 1510.02 113.538 113.538 6140.000 12.6 1510.23 113.537 113.537 6141.000 12.6 1510.44 113.537 113.537 6142.000 12.6 1510.65 113.536 113.536 6143.000 12.6 1510.86 113.536 113.536 6144.000 12.6 1511.07 113.536 113.536 6145.000 12.6 1511.28 113.535 113.535 6146.000 12.6 1511.49 113.535 113.535 6147.000 12.6 1511.70 113.535 113.535 6148.000 12.6 1511.91 113.534 113.534 6149.000 12.6 1512.12 113.534 113.534 6150.000 12.6 1512.33 113.533 113.533 6151.000 12.6 1512.54 113.533 113.533 6152.000 12.6 1512.75 113.533 113.533 6153.000 12.6 1512.96 113.532 113.5.32 6154.000 12.6 1513.17 113.532 113.532 6155.000 12.6 1513.38 113.532 113.532 6156.000 12.6 1513.59 113.531 113.531 6157.000 12.6 ~513.80 113.531 113.531 6158.000 12.6 1514.01 113.530 113.530 6159.000 12.6 1514.22 113.530 113.530 6160.000 12.6 1514.43 113.530 113.530 6161.000 12.6 1514.64 113.529 113.529 6162.000 12.6. 1514.85 113.529 113.529 6163.000 12.6 1515.06 113.529 113.529 6164.000 12.6 1515.27 113.528 113.528 6165.000 12.6 1515.48 113.528 113.528 6166.000 12.6 1515.69 113.527 113.527 6167.000 12.6 1515.90 113.527 113.527 6168.000 12.6 1516.11 113.527 113.527 6169.000 12.6 1516.32 113.526 113.526 6170.000 12.6 1516.53 113.526 113.526 6171.000 12.6 1516.74 113.526 113.526 6172.000 12.6 1516.95 113.525 113.525 6173.000 12.6 1517.16 113.525 113.525 6174.000 12.6 1517.38 113.524 113.524 6175.000 12.6 1517.59 113.524 113.524 6176.000 12.6 1517.80 113.524 113.524 6177.000 12.6 1518.01 113.523 113.523 6178.000 12.6
  • 1518.22 113.523 113.523 6179.000 12.6 1518.43 113.523 113.523 6180.000 12.6 1518.64 113.522 113.522 6181.000 12.6 1518.85 113.522 113.522 6182.000 12.6 1519.06 113.521 113.521 6183.000 12.6 1519.27 113.521 113.521 6184.000 12.6 _.1519.48 113.521 113.521 6185.000 12.6 1519.69 113.520 113.520 6186.000 12.6 1519.90 113.520 113.520 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Dischare:e Dischare:e 87 11-17-2018 Attachment 1 Page 99 of274 KCICONSULT Base Normal Current Capacity Voltae:e (V) Current Capacity Voltae:e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6187.000 12.6 1520.11 .. 113.520 113.520 6188.000 12.6 1520.32 113.519 113.519 6189.000 12.6 1520.53 113.519 113.519 6190.000 12.6 1520.74 113.518 113.518 6191.000 12.6 1520.95 113.518 113.518 6192.000 12.6 1521.16 113.518 113.518 6193.000 12.6 1521.37 113.517 113.517 6194.000 12.6 1521.58 113.517 113.517 6195.000 12.6 1521.79 113.516 113.516 6196.000 12.6 1522.00 113.516 113.516 6197.000 12.6 1522.21 113.516 113.516 6198.000 12.6 1522.42 113.515 113.515 6199.000 12.6 1522.63 113.515 113.515 6200.000 12.6 1522.84 113.515 113.515 6201.000 12.6 1523.05 113.514 113.514 6202.000 12.6 1523.26 113.514 113.514 6203.000 12.6 1523.47 113.513 113.513 6204.000 12.6 1523.68 113.513 113.513 6205.000 12.6 1523.89 113.513 113.513 6206.000 12.6 1524.10 113.512 113.512 6207.000 12.6 1524.31 113.512 113.512 6208.000 12.6 1524.52 113.511 113.511 6209.000 12.6 1524.73 113.511 113.511 6210.000 12.6 1524.95 113.511 113.511 6211.000 12.6 1525.16 113.510 113.510 6212.000 12.6 1525.37 113.510 113.510 6213.000 12.6 1525.58 113.509 113.509 6214.000 12.6 1525.79 113.509 113.509 6215.000 12.6 1526.00 113.509 113.509 6216.000 12.6 1526.21 113.508 113.508 6217.000 12.6 1526.42 113.508 113.508 6218.000 12.6 1526.63 113.508 113.508 6219.000 12.6 1526.84 113.507 113.507 6220.000 12.6 1527.05 113.507 113.507 6221.000 12.6 1527.26 113:506 113.506 6222.000 12.6 1527.47 113.506 113.506 6223.000 12.6 1527.68 113.506 113.506 6224.000 12.6 1527.89 113.505 113.505 6225.000 12.6 1528.10 113.505 113.505 6226.000 12.6 1528.31 113.504 113.504 6227.000 12.6 1528.52 113.504 113.504 6228.000 12.6 1528.73 113.504 113.504 6229.000 12.6 1528.94 113.503 113.503 6230.000 12.6 1529.15 113.503 113.503 6231.000 12.6 1529.36 113.502 113.502 6232.000 12.6 1529.57 113.502 113.502 6233.000 12.6 1529.78 113.502 113.502 6234.000 12.6 1529.99 113.501 113.501 6235.000 12.6 1530.20 113.501 113.501 6236.000 12.6 1530.41 113.500 113.500 6237.000 12.6 1530.62 113.500 113.500 6238.000 12.6 1530.83 113.500 113.500 6239.000 12.6 1531.04 113.499 113.499 6240.000 12.6 1531.25 113.499 113.499 6241.000 12.6 1531.46 113.498 113.498 6242.000 12.6 1531.67 113.498 113.498 6243.000 12.6 1531.88 113.498 113.498 6244.000 12.6 1532.09 113.497 113.497 6245.000 12.6 1532.31 113.497 113.497 6246.000 12.6 1532.52 113.496 113.496 6247.000 12.6 1532.73 113.196 113.496 6248.000 12.6 1532.94 113.496 113.496 6249.000 12.6 1533.15 113.495 113.495 6250.000 12.6 1533.36 113.495 113.495 6251.000 12.6 1533.57 113.494 113.494 6252.000 12.6 1533.78 113.494 113.494 6253.000 12.6 1533.99 113.494 113.494 6254.000 12.6 1534.20 113.493 113.493 6255.000 12.6 1534.41 ') 13.493 113.493 6256.000 12.6 1534.62 113.492 113.492 6257.000 12.6 1534.83 113.492 113.492 6258.000 12.6 IS35.Q4 113.492 113.492 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP _Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 88 11-17-2018 Attachment 1 Page 100 of 274 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage(V)

Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ "6259.000 12.6 1535.25 113.491 113.491 6260.000 12.6 1535.46 113.491 113.491 6261.000 12.6 1535.67 113.490 113.490 6262.000 12.6 1535.88 113.490 113.490 6263.000 12.6 1536.09 113.490 113.490 6264.000 12.6 1536.30 113.489 113.489 6265.000 12.6 1536.51 113.489 113.489 6266.000 12.6 1536.72 113.488 113.488 6267.000 12.6 1536.93 . . 113.488 113.488 6268.000 12.6 1537.14 113.488 113.488 6269.000 12.6 1537.35 113.487 113.487 6270.000 12.6 1537.56 113.487 113.487 6271.000 12.6 1537.77 113.486 113.486 6272.000 12.6 1537.98 113.486 113.486 6273.000 12.6 1538.19 113.485 113.485 6274.000 12.6 1538.40 113.485 113.485 6275.000 12.6 1538.61 113.485 113.485 6276.000 12.6 1538.82 113.484 113.484 6277.000 12.6 1539.03 113.484 113.484 6278.000 12.6 1539.24 113.483 113.483 6279.000 12.6 1539.45 113.483 113.483 6280.000 12.6 1539.67 113.483 113.483 6281.000 12.6 1539.88 113.482 113.482 6282.000 12.6 1540.09 113.482 113.482 6283.000 12.6 1540.30 113.481 113.481 6284.000 12.6 1540.51 113.481 113.481 6285.000 12.6 1540.72 113.481 113.481 6286.000 12.6 1540.93 113.480 113.480 6287.000 12.6 1541.14 113.480 113.480 6288.000 12.6 1541.35 113.479 113.479 6289.000 12.6 1541.56 113.479 113.479 6290.000 12.6 1541.77 113.478 113.478 6291.000 12.6 1541.98 113.478 113.478 6292.000 12.6 1542.19 113.478 113.478 6293.000 12.6 1542.40 113.477 113.477 6294.000 12.6 1542.61 113.477 113.477 6295.000 12.6 1542.82 113.476 113.476 6296.000 12.6 1543.03 113.476 113.476 6297.000 12.6 1543.24 113.476 113.476 6298.000 12.6 1543.45 113.475 113.475 6299.000 12.6 1543.66 113.475 113.475 6300.000 12.6 1543.87 113.474 113.474 6301.000 12.6 1544.08 113.474 113.474 6302.000 12.6 1544.29 113.473 113.473 6303.000 12.6 1544.50 113.473 113.473 6304.000 12.6 1544.71 113.473 113.473 6305.000 12.6 1544.92 113.472 113.472 6306.000 12.6 1545.13 113.472 113.472 6307.000 12.6 1545.34 113.471 113.471 6308.000 12.6 1545.55 113.471 113.471 6309.000 12.6 1545.76 113.471 113.471 6310.000 12.6 1545.97 113.470 113.470 6311.000 12.6 1546.18 113.470 113.470 6312.000 12.6 1546.39 113.469 113.469 6313.000 12.6 1546.60 113.469 113.469 6314.000 12.6 1546.81 113.468 113.468 6315.000 12.6 1547.03 113.468 113.468 6316.000 12.6 1547.24 113.468 113.468 6317.000 12.6 1547.45 113.467 113.467 6318.000 12.6 1547.66 113.467 113.467 6319.000 12.6 1547.87 113.466 113.466 6320.000 12.6 1548.08 113.466 113.466 6321.000 12.6 1548.29 113.465 113.465 6322.000 12.6 1548.50 113.465 113.465 6323.000 12.6 1548.71 113.465 113.465 6324.000 12.6 1548.92 113.464 113.464 6325.000 12.6 1549.13 113.464 113.464 6326.000 12.6 1549.34 113.463 113.463 6327.000 12.6 1549.55 113.463 113.463 6328.000 12.6 1549.76 113.462 113.462 6329.000 12.6 1549.97 113.462 113.462 6330.000 12.6 1550.18 113.462 113.462 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs

  • Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 89 ll-17-2018 Attachment 1 Page 101 of 274 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6331.000 12.6 1550.39 113.461 113.461 6332.000 12.6 1550.60 113.461 113.461 6333.000 12.6 1550.81 113.460 113.460 6334.000 12.6 1551.02 113.460 113.460 6335.000 12.6 1551.23 113.459 113.459 6336.000 12.6 1551.44 113.459 113.459 6337.000 12.6 1551.65 113.459 113.459 6338.000 12.6 1551.86 113.458 113.458 6339.000 12.6 1552.07 .. 113.458 113.458 6340.000 12.6 1552.28 113.457 113.457 6341.000 12.6 1552.49 113.457 113.457 6342.000 12.6 1552.70 113.456 113.456 6343.000 12.6 1552.91 113.456 113.456 6344.000 12.6 1553.12 113.455 113.455 6345.000 12.6 1553.33 113.455 113.455 6346.000 12.6 1553.54 113.455 113.455 6347.000 12.6 1553.75 113.454 113.454 6348.000 12.6 1553.96 113.454 113.454 6349.000 12.6 1554.17 113.453 113.453 6350.000 12.6 1554.39 113.453 113.453 6351.000 12.6 1554.60 113.452 113.452 6352.000 12.6 1554.81 113.452 113.452 6353.000 12.6 1555.02 113.452 113.452 6354.000 12.6 1555.23 113.451 113.451 6355.000 12.~ 1555.44 113.451 113.451 6356.000 12.6 1555.65 113.450 113.450 6357.000 12.6 1555.86 113.450 113.450 6358.000 12.6 1556.07 113.449 113.449 6359.000 12.6 1556.28 113.449 113.449 6360.000 12.6 1556.49 113.448 113.448 6361.000 12.6 1556.70 113.448 113.448 6362.000 12.6 1556.91 113.448 113.448 6363.000 12.6 1557.12 113.447 113.447 6364.000 12.6 1557.33 113.447 113.447 6365.000 12.6 1557.54 113.446 113.446 6366.000 12.6 1557.75 113.446 113.446 6367.000 *12.6 1557.96 113.445 113.445 6368.000 12.6 1558.17 113.445 113.445 , 6369.000 12.6 1558.38 113.444 113.444 6370.000 12.6 1558.59 . 113.444 113.444 6371.000 12.6 1558.80 113.444 113.444 6372.000 12.6 1559.01 .. 113.443 113.443 6373.000 12.6 1559.22 113.443 113.443 6374.000 12.6 1559.43 113.442 113.442 6375.000 12.6 1559.64 113.442 113.442 6376.000 12.6 1559.85 113.441 113.441 6377.000 12.6 1560.06 113.441 113.441 6378.000 12.6 1560.27 113.440 111440 6379.000 12,6 1560.48 113.440 113.440 6380.000 12.6 1560.69 113.440 113.440 6381.000 12.6 1560.90 113.439 113.439 6382.000 12.6 1561.11 113.439 113.439 6383.000 12.6 1561.32 113.438 113.438 6384.000 12.6 1561.53 i 13.438 113.438 6385.000 12.6 1561.74 113.437 113.437 6386.000 12.6 1561.96 113.437 113.437 6387.000 12.6 1562.17 113.436 113.436 6388.000 12.6 1562.38 113.436 113.436 6389.000*

12.6 1562.59 113.435 113.435 6390.000 12.6 1562.80 113.435 113.435 6391.000 12.6 1563.01 113.435 113.435 6392.000 12.6 1563.22 113.434 113.434 6393.000 12.6 1563.43 113.434 113.434 6394.000 12.6 1563.64 113.433 113.433 6395.000 12.6 1563.85 113.433 113.433 6396.000 12.6 1564.06 113.432 113.432 6397.000 12.6 1564.27 113.432 113.432 6398.000 12.6 1564.48 113.431 113.431 6399.000 12.6 1564.69 113.431 113.431 6400.000 12.6 1564.90 113.430 113.430 6401.000 12.6 1565.11 113.430 113.430 6402.000 12.6 1565.32 113.430 113.430 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study Dischare;e Dischare;e 90 11-17-2018 Attachment 1 Page 102 of 274 KCICONSULT Base Normal Current Capacity Voltae;e (V) Current Capacity Voltae;e (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hom*)

V-V+ 6403.000 12.6 1565.53 113.429 113.429 6404.000 12.6 1565.74 113.429 113.429 6405.000 12.6 1565.95 113.428 113.428 6406.000 12.6 1566.16 113.428 113.428 6407.000 12.6 1566.37 113.427 113.427 6408.000 12.6 I°566.58 113.427 113.427 6409.000 12.6 1566.79 113.426 113.426 6410.000 12.6 1567.00 113.426 113.426 6411.000 12.6 1567.21 113.425 113.425 6412.000 12.6 1567.42 113.425 113.425 6413.000 12.6 1567.63 113.424 113.424 6414.000 12.6 1567.84 113.424 113.424 6415.000 12.6 1568.05 113.424 113.424 6416.000 12.6 1568.26 113.423 113.423 6417.000 12.6 1568.47 113.423 113.423 6418.000 12.6 1568.68 113.422 113.422 6419.000 12.6 1568.89 113.422 113.422 6420.000 12.6 1569.10 113.421 113.421 6421.000, 12.6 !'569.32 113.421 113.421 6422.000 12.6 1569.53 113.420 113.420 6423.000 12.6 1569.74 113.420 113.420 6424.000 12.6 1569.95 113.419 113.419 6425.000 12.6 1570.16 113.419 113.419 6426.000 12.6 1570.37 113.418 113.418 6427.000 12.6 1570.58 113.418 113.418 6428.000 12.6 1570.79 113.418 113.418. 6429.000 12.6 1571.00 113.417 113.417 *6430.000 12.6 1571.21 . 113.417 113.417 6431.000 12.6 1571.42 113.416 113.416 6432.000 12.6 1571.63 113.416 113.416 6433.000 12.6 1571.84 113.415 113.415 6434.000 12.6 1572.05 113.415 113.415 6435.000 12.6 1572.26 113.414 113.414 6436.000 12.6 1572.47 113.414 l 13.4I4 6437.000 12.6 1572.68 113.413 113.413 6438.000 12.6 1572.89 113.413 113.413 6439.000 12.6 1573.10 113.412 113.412 6440.000 12.6 1573.31 113.412 113.412 6441.000 12.6 1573.52 113.411 113.411 6442.000 12.6 1573.73 113.411 113.411 6443.000 12.6 1573.94 113.410 113.410 6444.000 12.6 1574.15 113.410 113.410 6445.000 12.6 1574.36 113.409 113.409 6446.000 12.6 1574.57 113.409 113.409 6447.000 12.6 1574.78 i 13.409 113.409 6448.000 12.6 1574.99 113.408 113.408 6449.000 12.6 1575.20 113.408 113.408 6450.000 12.6 1575.41 113.407 113.407 6451.000 12.6 1575.62 113.407 113.407 6452.000 12.6 1575.83 113.406 113.406 6453.000 12.6 1576.04 . 113.406 113.406 6454.000 12.6 1576.25 113.405 113.405 6455.000 12.6 1576.46 113.405 113.405 6456.000 12.6 1576.68 113.404 113.404 6457.000 12.6 1576.89 113.404 113.404 6458.000 12.6 1577.10 113.403 113.403 6459.000 12.6 1577.31 113.403 113.403 6460.000 12.6 1577.52 113.402 113.402 6461.000 12.6 1577.73 113.402 113.402 6462.000 12.6. 1577.94 113.401 113.401 6463.000 12.6 1578.15 113.401 113.401 6464.000 12.6 1578.36 113.400 113.400 6465.000 12.6 1578.57 113.400 113.400 6466.000 12.6 1578.78 113.399 113.399 6467.000 12.6 1578.99 113.399 113.399 6468.000 12.6 1579.20 113.398 113.398 6469.000 12.6 1579.41 113.398

  • 113.398 6470.000 12.6 1579.62 113.397 113.397 6471.000 12.6 1579.83 113.397 113.397 6472.000 12.6 1580.04 113.396 113.396 6473.000 12.6 1580.25 113.396 113.396 6474.000 12.6 1580.46 113.395 113.395 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 .Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA48-Hour Coping Study Discharge Discharge 91 11-17-2018 Attachment 1 Page 103 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6475.000 12.6 1580.67 113.395 113.395 6476.000 12.6 1580.88 113.394 113.394 6477.000 12.6 1581.09 113.394 113.394 6478.000 12.6 1581.30 113.394 113.394 6479.000 12.6 1581.51 113.393 113.393 6480.000 12.6 1581.72 113.393 113.393 6481.000 12.6 1581.93

  • 113.392 113.392 6482.000 12.6 1582.14 113.392 113.392 6483.000 12.6 1582.35 113.391 113.391 6484.000 12.6 1582.56 113.391 113.391 6485.000 12.6 15~2.77 113.390 113.390 6486.000 12.6 1582.98 113.390 113.390 6487.000 12.6 1583.19 113.389 113.389 6488.000 12.6 1583.40 113.389 113.389 6489.000 12.6 1583.61 113.388 113.388 6490.000 12.6 1583.82 113.388 113.388 6491.000 12.6. 1584.03 113.387 113.387 6492.000 12.6 1584.25 113.387 . 113.387 6493.000 12.6 1584.46 113.386
  • 113;386 6494.000 12.6 1584.67 113.386 113.386 6495.000 12.6 1584.88 113.385 113.385 6496.000 12.6 1585.09 113.385 113.385 6497.000 12.6 1585.30 113.385 113.385 6498.000 12.6 1585.51 113.384 113.384 6499.000 12.6 1585.72 113.384 113.384 6500.000 12.6 1585.93 113.383 113.383 6501.000 12.6 1586.14 113.383 113.383 6502.000 12.6 1586.35 113.382 113.382 6503.000 12.6 1586.56 113.382 113.382 6504.000 12.6 1586.77 113.381 113.381 6505.000 12.6 1586.98 113.381 113.381 6506.000 12.6 1587.19 113.381 113.381 6507.000 12.6 1587.40 113.380 113.380 6508.000 12.6 1587.61 113.380 113.380 6509.000 12.6 1587.82 113.379 113.379 6510.000 12.6 1588.03 113.379 113.379 6511.000 12.6 1588.24 113.378 113.378 6512.000 12.6 1588.45 113.378 113.378 6513.000 12.6 1588.66 113.378 113.378 6514.000 12.6 1588.87 113.377 113.377 6515.000 12.6 1589.08 113.377 113.377 6516.000 12.6 1589.29 113.376 113.376 6517.000 12.6 1589.50 113.376 113.376 6518.000 12.6 1589.71 113.375 113.375 6519.000 12.6 1589.92 113.375 113.375 6520.000 12.6 1590.13 113.374 113.374 6521.000 12.6 1590.34 113.374 113.374 6522.000 12.6 1590.55 113.374 113.374 6523.000 12.6 1590.76 113.373 113.373 6524.000 12.6 1590.97 113.373 I 13.373 6525.000 12.6 1591.18 113.372 113.372 6526.000 12.6 1591.39 113.372 I 13.372 6527.000 12.6 1591.61 113.371 113.371 6528.000 12.6 1591.82 113.371 113.371 6529.000 12.6 1592.03 113.370 113.370 6530.000 12.6 1592.24 113.370 113.370 6531.000 12.6 1592.45 113.369 I 13.369 6532.000 12.6 1592.66 113.369 113.369 6533.000 12.6 1592.87 113.369 113.369 6534.000 12.6 1593.08 113.368 113.368 6535.000 12.6 1593.29 113.368 I 13.368 6536.000 12.6. 1593.50 113.367 113.367 6537.000 12.6 1593.71 113.367 113.367 6538.000 12.6 1593.92 113.366 113.366 6539.000 12.6 1594.13 113.366 .
  • 113.366 6540.000 12.6 1594.34 113.365 113.365 6541.000 12.6 1594.55 113.365 113.365 6542.000 12.6 1594.76 113.364 113.364 6543.000 12.6 1594.97 113.364 113.364 6544.000 12.6 1595.18 113.364 113.364 6545.000 12.6 1595.39 113.363 113.363 6546.000 12.6 1595.60 113.363 113.363 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Dischar2e Dischar2e 92 11-17-2018 Attachment 1 Page 104 of 274 KCICONSULT Base Normal Current Capacity Volta2e(V)

Current Capacity Volta2e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 6547.000 12.6 1595.81 113.362 113.362 6548.000 12.6 1596.02 113.362 113.362 6549.000 12.6 1596.23 113.361 113.361 6550.000 12.6 1596.44 113.361 113.361 6551.000 12.6 1596.65 113.360 113.360 6552.000 12.6 1596.86 113.360 113.360 6553.000 12.6 1597.07 113.359 113.359 6554.000 12.6 1597.28 113.359 113.359 6555.000 12.6 1597.49 113.358 113.358 6556.000 12.6 1597.70 113.358 113.358 6557.000 12.6 1597.91 113.357 113.357 6558.000 12.6 1598.12 113.357 113.357 6559.000 12.6 1598.33 113.357 113.357 6560.000 12.6 1598.54 113.356 113.356 6561.000 12.6 1598.75 113.356 113.356 6562.000 12.6 1598.97 113.355 113.355 6563.000 12.6 1599.18 113.355 113.355 6564.000 12.6 1599.39 113.354 113.354
  • 6565.000 12.6 1599.60 113.354 113.354 6566.000 12.6 1599.81 .113.353 113.353 6567.000 12.6 1600.02 113.353 113.353 6568.000 .12.6 1600.23 113.352 113.352 6569.000 12.6 1600.44 113.352 113.352 6570.000 12.6 1600.65 .
  • 113.351 113.351 6571.000 12.6 1600.86 113.351 113.351 6572.000 12.6 1601.07 113.350 113.350 6573.000 12.6 1601.28 113.350 113.350 6574.000 12.6 1601.49 113.349 113.349 6575.000 12.6 1601.70 113.349 113.349 6576.000 12.6 1601.91 113.348 113.348 6577.000 12.6 1602.12 113.348 113.348 6578.000 12.6 1602.33 113.347 113.347 6579.000 12.6 1602.54 113.347 113.347 6580.000 12.6 1602.75 113.346 113.346 6581.000 12.6 1602.96 113.346 113.346 6582.000 12.6 1603.17 113.345 113.345 6583.000 12.6 1603.38 113.345 113.345 6584.000 12.6 1603.59 113.345 113.345 6585.000 12.6 1603.80 113.344 113.344 6586.000 12.6 1604.01 113.344 113.344 6587.000 12.6 1604.22 113.343 113.343 6588.000 12.6 1604.43 113.343 113.343 6589.000 12.6 1604.64 113.342 113.342 6590.000 12.6 1604.85 113.342 113.342 6591.000 12.6 1605.06 113.341 113.341 6592.000 12.6 1605.27 113.341 113.341 6593.000 12.6 1605.48 113.340 113.340 6594.000 12.6 1605.69 113.340 113.340 6595.000 12.6 1605.90 113.339 113.339 6596.000 12.6 1606.11 113.339 113.339 6597.000 12.6 1606.32 113.338 113.338 6598.000 12.6 1606.54 113.338 113.338 6599.000 12.6 1606.75 113.337 113.337 6600.000 12.6 1606.96 113.337 113.337 6601.000 12.6 1607.17 .. 113.336 113.336 6602.000 12.6 1607.38 113.336 113.336 6603.000 12.6 1607.59 113.335 113.335 6604.000 12.6 1607.80 113.335 113.335 6605.000 12.6 1608.01 113.334 113.334 6606.000 12.6 1608.22 113.334 113.334 6607.000 12.6 1608.43 113.333 113.333 6608.000 12.6 1608.64 113.333 113.333 6609.000 12.6 1608.85 113.332 113.332 6610.000 12.6 1609.06 113.332 113.332 6611.000 12.6 1609.27 113.331 113.331 6612.000 12.6 1609.48 113.330 113.330 6613.000 12.6 1609.69 113.330 113.330 6614.000 12.6 1609.90 113.329 113.329 6615.000 12.6 1610.11 113.329 113.329 6616.000 12.6 1610.32 113.328 113.328 6617.000 / 12.6 1610.53 113.328 113.328 6618.000 12.6 1610.74 113.327 . 113.327 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Cop_ing Study Discharge Discharge 93 11-17-2018 Attachment 1 Page 105 of274 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6619.000 12.6 1610.95 113.327 113.327 6620.000 12.6 1611.16 113.326 113.326 6621.000 12.6 1611.37 113.326 113.326 6622.000 12.6 1611.58 113.325 113.325 6623.000 12.6 1611.79 113.325 113.325 6624.000 12.6 1612.00 113.324 113.324 6625.000 12.6 1612.21 113.324 113.324 6626.000 12.6 1612.42 113.323 113.323 6627.000 12.6 1612.63 113.323 113.323 6628.000 12.6 1612.84 113.322 113.322 6629.000 12.6 1613.05 113.322 113.322 6630.000 12.6 1613.26 113.321 113.321 6631.000 12.6 1613.47 113.321 113.321 6632.000 12.6 1613.68 113.320 113.320 6633.000 12.6 1613.90 113.320 113.320 6634.000 12.6 1614.11 113.319 113.319 6635.000 12.6 1614.32 113.319. 113.319 6636.000 12.6 1614.53 113.318 113:318 6637.000 12.6 1614.74 113.317 113.317 6638.000 12.6 1614.95 113.317 113.317 6639,000 12.6 1615.16 113.316 113.316 6640.000 12.6 1615.37 113.316 113.316 6641.000 12.6 1615.58 113.315 113.315 6642.000 12.6 1615.79 113.315 113.315 6643.000 12.6 1616.00 113.314 113.314 6644.000 12.6 1616.21 113.314 113.314 6645.000 12.6 1616.42 113.313 113.313 6646.000 12.6 1616.63 113.313 113.313 6647.000 12.6 1616.84 113.312 113.312 6648.000 12.6 1617.05 113.312 113.312 6649.000 12.6 1617.26 113.311 113.311 6650.000 12.6 1617.47 113.310 113.310 6651.000 12.6 1617.68 113.310 113.319 6652.000 12.6 1617.89 113.309 113.309 6653.000 12.6 1618.10 113.309 113.309 6654.000 12.6 1618.31 113.308 113.308 6655.000 12.6 1618.52 113.308 113.308 6656.000 12.6 1618.73 113.307 113.307 6657.000 12.6 1618.94 113.307 113.307 6658.000 12.6 1619.15 113.306 113.306 6659.000.

12.6 1619.36 113.306 113.306 6660.000 12.6 1619.57 113.305 113.305 6661.000 12.6 1619.78 113.304 113.304 6662.000 12.6 1619.99 113.304 113.304 6663.000 12.6 1620.20 113.303 113.303 6664.000 12.6 1620.41 113.303 113.303 6665.000 12.6 1620.62 113.302 113.302 6666.000 12.6 1620.83 113.302 113.302 6667.000 12.6 1621.04 113.301 113.301 6668.000 12.6 1621.26 113.301 113.301 6669.000 12.6 1621.47 113.300 113.300 6670.000 12.6 1621.68 113.299

.* 113.299 6671.000 12.6 1621.89 113.299 113.299 6672.000 12.6 1622.10 113.298 113.298 6673.000 12.6 1622.31 113.298 113.298 6674.000 12.6 1622.52 113.297 113.297 6675.000 12.6 1622.73 113.297 113.297 6676.000 12.6 1622.94 113.296 113.296 6677.000 12.6 1623.15 113.296 113.296 6678.000 12.6 1623.36 113.295 113.295 6679.000 12.6 1623.57 113.294 113.294 6680.000 12.6 1623.78 113.294 113.294 6681.000 12.6 1623.99 113.293 113.293 6682.000 12.6 1624.20 113.293 113.293 6683.000 12.6 1624.41 113.292 113.292 6684.000 12.6 1624.62 113.292 113.292 6685.000 12.6 1624.83 113.291 113.291 6686.000 12.6 1625.04 113.290 113.290 6687.000 12.6 1625.25 113.290 113.290 6688.000 12.6 . 1625.46 113.289 113.289 6689.000 12.6 1625.67 113.289 113.289 6690.000 12.6 *1625.88 113.288 113.288 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.l.ON KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 94 ll-17-2018 Attachment 1 Page 106 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6691.000 12.6 1626.09 113.288 113.288 6692.000 12.6 1626.30 113.287 113.287 6693.000 12.6 1626.51 .. 113.286 113.286 6694.000 12.6 1626.72 113.286 113.286 6695.000 12.6 1626.93 113.285 113.285 6696.000 12.6

  • 1627.14 113.285 113.285 6697.000 12.6 1627.35 113.284 113.284 6698.000 12.6 1627.56 113.283 113.283 6699.000 12.6 1627.77 113.283 113.283 6700.000 12.6 1627.98 113.282 113.282 6701.000 12.6 1628.19 113.281 113.281 6702.000 12.6 1628.40 113.280 113.280 6703.000 12.6 1628.62 113.280 113.280 6704.000 12.6 1628.83 113.279 113.279 6705.000 12.6 1629.04 113.278 113.278 6706.000 12.6 1629.25 113.278 113.278 6707.000 12.6 1629.46 113.277 113.277 6708.000 12.6 1629.67 113.276 113.276 6709.000 12.6 1629.88 113.275 113.275 6710.000 12.6 1630.09 113.275 113.275 6711.000 12.6 1630.30 113.274 113.274 6712.000 12.6 1630.51 113.273 113.273 6713.000 12.6 1630.72 113.273 113.273 6714.000 12.6 1630.93 113.272 113.272 6715.000 12.6 1631.14 113.271 113.271 6716.000 12.6 1631.35 113.271 113.271 6717.000 12.6 1631.56 113.270 113.270 6718.000 12.6 1631.77 113.269 113.269 6719.000 12.6 1631.98 113.268 113.268 6720.000 12.6 1632.19 113.268 113.268 6721.000 12.6 1632.40 113.267 113.267 6722.000 12.6 1632.61 113.266 113.266 6723.000 12.6 1632.82 113.266 113.266 6724.000 12.6 1633.03 113.265 113.265 6725.000 12.6 1633.24 113.264 113.264 6726.000 12.6 1633.45 113.263 113.263 6727.000 12.6 1633.66 113.263 113.263 6728.000 12.6 1633.87 113.262 113.262 6729.000 12.6 1634.08 113.261 113.261 6730.000 12.6 1634.29 113.261 113.261 6731.000 12.6 1634.50 113.260 113.260 6732.000 12.6 1634.71 113.259 113.259 6733.000 12.6 1634.92 113.258 113.258 6734.000 12.6 1635.13 113.258 113.258 6735.000 12.6 1635.34 113.257 113.257 6736.000 12.6 1635.55 113.256 113.256 6737.000 12.6 1635.76 113.256 113.256 6738.000 12.6 1635.97 113.255 113.255 6739.000 12.6 1636.19 113.254 113.254 6740.000 12.6 1636.40 113.254 113.254 6741.000 12.6 1636.61 113.253 113.253 6742.000 12.6 1636.82 113.252 113.252 6743.000 12.6 1637.03 113.251 113.251 6744.000 12.6 1637.24 113.251 113.251 6745.000 12.6 1637.45 113.250 113.250 6746.000 12.6 1637.66 113.249 113.249 6747.000 12.6 1637.87 113.249 113.249 6748.000 12.6 1638.08 113.248 113.248 6749.000 12.6 1638.29 113.247 113.247 6750.000 12.6 1638.50 113.246 113.246 6751.000 12.6 1638.71 113.246 113.246 6752.000 12.6 1638.92 113.245 113.245 6753.000 12.6 1639.13 113.244 113.244 6754.000 12.6 1639.34 113.243 113.243 6755.000 12.6 1639.55 113.243
  • 113.243 6756.000 12.6 1639.76 113.242 113.242 6757.000 12.6 1639.97 113.241 113.241 6758.000 12.6 1640.18 113.241 113.241 6759.000 12.6 1640.39 113.240 113.240 6760.000 12.6 1640.60 113.239 113.239 6761.000 12.6 1640.81 113.238 113.238 6762.000 12.6 1641.02 113.238 113.238 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA48-Hour Coping Study Dischare;e Dischare;c 95 11-17-2018 Attachment 1 Page 107 of274 KCICONSULT Base Normal Current Capacity Voltae;e (V) Current Capacity Voltae;e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6763.000 12.6 1641.23 113.237 113.237 6764.000 12.6 1641.44 113.236 113.236 6765.000 12.6 1641.65 113.236 113.236 6766.000 12.6 1641.86 113.235 113.235 6767.000 12.6 1642.07 113.234 113.234 6768.000 12.6 1642.28 113.233 113.233 6769.000 12.6 1642.49 113.233 113.233 6770.000 12.6 1642.70 113.232 113.232 6771.000 12.6 1642.91 113.231 113.231 6772.000 12.6 1643.12 113.231 113.231 6773.000 12.6 1643.33 113.230 113.230 6774.000 12.6 1643.55 113.229 113.229 6775.000 12.6 1643.76 113.228 113.228 6776.000 12.6 1643.97 113.228 113.228 6777.000 12.6 1644.18 113.227 113.227 6778.000 12.6 1644.39 113.226 113.226 6779.000 12.6 1644.60 113.226 113.226 6780.000 12.6 1644.81 113.225 113.225 6781.000 12.6 1645.02 113.224 113.224 6782.000 12.6 1645.23 113.223 113.223 6783.000 12.6 1645.44 113.223 113.223 6784.000 12.6 1645.65 113.222 . \ 113.222 6785.000 12.6 1645.86 113.221 113.221 6786.000 12.6 1646.07 113.220 113.220 6787.000 12.6 1646.28 113.220 113.220 6788.000 12.6 1646.49 113.219 113.219 6789.000 12.6 1646.70 113.218 113.218 6790.000 12.6 1646.91 113.218 113.218 6791.000 12.6 1647.12 113.217 113.217 6792.000 12.6 1647.33 113.216 113.216 6793.000 12.6 1647.54 113.215 113.215 6794.000 12.6 1647.75 113.215 113.215 6795.000 12.6 1647.96 113.214 113.214 6796.000 12.6 1648.17 113.213 113.213 6797.000 12.6 1648.38 113.212 113.212 6798.000 12.6 1648.59 113.212 113.212 6799.000 12.6 1648.80 113.211 113.211 6800.000 12.6 1649.01 113.210 113.210 6801.000 12.6 1649.22 113.210 113.210 6802.000 12.6 '1649.43 113.209 113.209 6803.000 12.6 1649.64 113.208 113.208 6804.000 12.6 1649.85 113.207 113.207 6805.000 12.6 1650.06 113.207 113.207 6806.000 12.6 1650.27 113.206 113.206 6807.000 12.6 1650.48 113.205 113.205 6808.000 12.6 1650.69 113.204 113.204 6809.000 12.6 1650.91 *

  • 113.204 113.204 6810.000 12.6 1651.12 113.203 113.203 6811.000 12.6 1651.33 113.202 113.202 6812.000 12.6 1651.54 113.202 113.202 6813.000 12.6 1651.75 113.201 113.201 6814.000 12.6 1651.96 113.200 113.200 6815.000 12.6 1652.17 113.199 113.199 6816.000 12.6 1652.38 113.199 113.199 6817.000 12.6 1652.59 113.198 113.198 6818.000 12.6 1652.80 113.197 113.197 6819.000 12.6 1653.01 113.196 113.196 6820.000 12.6 1653.22 113.196, 113.196 6821.000 12.6 1653.43 113.195 113.195 6822.000 12.6 1653.64 113.194 113.194 6823.000 12.6 1653.85 113.193 113.193 6824.000 12.6 1654.06 113.193 113.193 6825.000 12.6 '1654.27 113.192 113.192 6826.000 12.6 1654.48 113.191 113.191 6827.000 12.6 1654.69 113.191 113.191 6828.000 12.6 1654.90 113.190 1)3.190 6829.000 12.6 1655.11 113.189 113.189 6830.000 12.6 1655.32 113.188 113.188 6831.000 12.6 1655.53 113.188 113.188 6832.000 12.6 1655.74 113.187 113.187 6833.000 12.6 1655.95 113.186 113.186 6834.000 12.6 1656.16 113.185 113.185 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battecy IA48-Hour Coping Study Discharge Discharge 96 11-17-2018 Attachment 1 Page 108 .of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour) v-V+ Time (Amp) (Amp-Hour)

V-V+ 6835.000 12.6 1656.37 113.185 113.185 6836.000 12.6 1656.58 113.184 113.184 6837.000 12.6 1656.79 113.183 113.183 6838.000 12.6 1657.00 113.182 113.182 6839.000 12.6 1657.21 113.182 113.182 6840.000 12.6 1657.42 113.181 113.181 6841.000 12.6 1657.63 113.180 113.180 6842.000 12.6 1657.84 113.179 113.179 6843.000 12.6 1658.05 113.179 113.179 6844.000 12.6 1658.27 113.178 113.178 6845.000 12.6 1658.48 113.177 113.177 6846.000 12.6 1658.69 113.176 113.176 6847.000 12.6 1658.90 113.176 113.176 6848.000 12.6 1659.11 113.175 113.175 6849.000 12.6 1659.32 113.174 113.174 6850.000 12.6 1659.53 113.174 113.174 6851.000 12.6 1659.74 113.173 113.173 6852.000 12.6 1659.95 113.172 113.172 6853.000 12.6 1660.16 113.171 113.171 6854.000 12.6 1660.37 113.171 113.171 6855.000 12.6 1660.58 113.170 113.170 6856.000 12.6 1660.79 113.169 113.169 6857.000 12.6 1661.00 113.168 113.168 6858.000 12.6 1661.21 113.168 113.168 6859.000 12.6 1661.42 113.167 113.167 6860.000 12.6 1661.63 113.166 113.166 6861.000 12.6 1661.84 113.165 113.165 6862.000 12.6 1662.05 113.165 113.165 6863.000 12.6 1662.26 113.164 113.164 6864.000 12.6 1662.47 113.163 113.163 6865.000 12.6 1662.68 113.162 113.162 6866.000 12.6 1662.89 113.162 113.162 6867.000 12.6 1663.10 113.161 113.161 6868.000 12.6 1663.31 113.160 113.160 6869.000 12.6 1663.52 113.159 113.159 6870.000 12.6 1663.73 113.159 113.159 6871.000 12.6 1663.94 113.158 113.158 6872.000 12.6 1664.15 113.157 113.157 6873.000 12.6 1664.36 113.156 113.156 6874.000 12.6 1664.57 113.156 113.156 6875.000 12.6 1664.78 113.155 113.155 6876.000 12.6 1664.99 113.154 113.154 6877.000 12.6 1665.20 113.153 113.153 6878.000 12.6 1665.41 113.153 113.153 6879.000 12.6 1665.62 113.152 113.152 6880.000 12.6 1665.84 113.151 113.151 6881.000 12.6 1666.05 113.150 113.150 6882.000 12.6 1666.26 113.150 113.150 6883.000 12.6 1666.47 113.149 113.149 6884.000 12.6 1666.68 113.148 113.148 6885.000 12.6 1666.89 113.147 113.147 6886.000 12.6 1667.10 113.147 113.147 6887.000 12.6 1667.31 113.146 113.146 6888.000 12.6 1667.52 113.145 113.145 6889.000 12.6 1667.73 113.144 113.144 6890.000 12.6 1667.94 113.144 113.144 6891.000 12.6 1668.15 113.143 113.143 6892.000 12.6 1668.36 113.142 113.142 6893.000 12.6 1668.57 113.141 113.141 6894.000 12.6 1668.78 113.)41 113.141 6895.000 12.6 1668.99 113.140 113.140 6896.000 12.6 1669.20 113.139 113.139 6897.000 12.6 1669.41 113.138 113.138 6898.000 12.6 1669.62 113.138 113.138 6899.000 12.6 1669.83 113.137 113.137 6900.000 12.6 1670.04 113.136 113.136 6901.000 12.6 1670.25 113.135 113.135 6902.000 12.6 1670.46 113.135 113.135 6903.000 12.6 1670.67 113.134 113.134 6904.000 12.6 1670.88 113.133 113.133 6905.000 12.6 1671.09 113.132 113.132 6906.000 12.6 1671.30 113.132 113.132 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battety IA48-Hour Coping Study Dischare:e Dischare:e 97 11-17-2018 Attachment 1 Page 109 of 274 KCICONSULT Base Nonna! Current Capacity Voltae:e (V) Current Capacity Voltae:e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 6907.000 12.6 1671.51 113.131 113.131 6908.000 12.6 1671.72 ll3.130 ll3.130 6909.000 12.6 1671.93 113.129 113.129 6910.000 12.6 1672.14 ll3.129 ll3.129 6911.000 12.6 1672.35 ll3.128 ll3.128 6912.000 12.6 1672.56 ll3.127 ll3.127 6913.000 12.6 1672.77 113.126 ll3.126 6914.000 12.6 1672.98 ll3.126 ll3.i26 6915.000 12.6 1673.20 113.125 ll3.125 6916.000 12.6 1673.41 ll3.124 ll3.124 6917.000 12.6 1673.62 113.123 ll3.123 6918.000 12.6 1673.83 ll3.122 ll3.122 6919.000 12.6 1674.04 113.122 ll3.122 6920.000 12.6 1674.25 ll3.121 113.121 6921.000 12.6 1674.46 ll3.120 113,120 6922.000 12.6 1674.67 ll3.119 ll3.ll9 6923.000 12.6 1674.88 ll3.ll9 ll3.ll9 6924.000 12.6 1675.09 ll3.ll8 113.ll8 6925.000 12.6 1675.30 ll3.117 113.ll7 6926.000 12.6 1675.51 ll3.116 l 13.ll6 6927.000 12.6 1675.72 ll3.ll6 113. ll6 6928.000 12.6 1675.93 113.115 113.ll5 6929.000 12.6 1676.14 113.114 113. ll4 6930.000 12.6 1676.35 113.113 113.113 6931.000 12.6 1676.56 ll3.113 ll3.ll3 6932.000 12.6 1676.77 113. ll2 ll3.ll2 6933.000 12.6 1676.98 ll3.lll ll3.lll 6934.000 12.6 1677.19 ll3.ll0 ll3.ll0 6935.000 12.6 1677.40 ll3.ll0 ll3.ll0 6936.000 12.6 1677.61 ll3.109 ll3.109 6937.000 12.6 1677.82 ll3.l08 ll3.108 6938.000 12.6 1678.03 ll3.107 ll3.107 6939.000 12.6 1678.24 ll3.l06 113.106 6940.000 12.6 1678.45 ll3.106 113.106 6941.000 12.6 1678.66 ll3.105 ll3.105 6942.000 12.6 1678.87 ll3.104 ll3.104 6943.000 12.6 1679.08 113.100 113.100 6944.000 12.6 1679.29 ll3.100 ll3.100 6945.000 12.6 1679.50 113.100 113.100 6946.000 12.6 1679.71 ll3.100 113.100 6947.000 12.6 1679.92 ll3.100 113.100 6948.000 12.6 1680.13 ll3.100 ll3.100 6949.000 12.6 1680.34 ll3.100 ll3.100 6950.000 12.6 1680.55 ll3.100 ll3.100 6951.000 12.6 1680.77 113.100 113.100 6952.000 12.6 1680.98 ll3.096 ll3.096 6953.000 12.6 168!.19 ll3.096 ll3.096 6954.000 12.6 1681.40 113.095 ll3.095 6955.000 12.6 1681.61 ll3.094 ll3.094 6956.000 12.6 1681.82 113.093 113.093 6957.000 12.6 1682.03 ll3.093 ll3.093 6958.000 12.6 1682.24 ll3.092 113.092 6959.000 12.6 1682.45 ll3.091 113.091 6960.000 12.6 1682.66 113.090 ll3.090 6961.000 12.6 1682.87 ll3.090 ll3.090 6962.000 12.6 1683.08 ll3.089 ll3.089 6963.000 12.6 1683.29 ll3.088 ll3.088 6964.000 12.6 1683.50 ll3.087 113.087 6965.000 12.6 1683.71 ll3.086 ll3.086 6966.000 12.6 1683.92 113.086 ll3.086 6967.000 12.6 1684.13 ll3.085 ll3.085 6968.000 12.6 1684.34 ll3.084 ll3.084 6969.000 12.6 1684.55 ll3.083 ll3.083 6970.000 12.6 1684.76 ll3.083 ll3.083 6971.000 12.6 1684.97 ll3.082 ll3.082 6972.000 12.6 1685.18 ll3.081 ll3.081 6973.000 12.6 1685.39 ll3.080 ll3.080 6974.000 12.6 1685.60 ll3.079 ll3.079 6975.000 12.6 1685.81 ll3.079 ll3.079 6976.000 12.6 1686.02 113.078 ll3.078 6977.000 12.6 1686.23 113.077 ll3.077 6978.000 12.6 1686.44 113.076 ll3.076 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 98 11-17-2018 Attachment 1 Page 110 of 27 4 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity

  • Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ ----6979.000 12.6 1686.65 ll3.076 ll3.076 6980.000 12.6 1686.86 ll3.075 ll3.075 6981.000 12.6 1687.07 ll3.074 ll3.074 6982.000 12.6 1687.28 113.073 113.073 6983.000 12.6 1687.49 ll3.072 113.072 6984.000 12.6 1687.70 113.072 113.072 6985.000 12.6 1687.91 113.071 ll3.071 6986.000 12.6 1688.13 113.070 113.070 6987.000 12.6 1688.34 ll3.069 ll3.069 6988.000 12.6 1688.55 113.069 113.069 6989.000 12.6 1688.76 ll3.068 113.068 6990.000 12.6 1688.97 113.067 113.067 6991.000 12.6 1689.18 ll3.066 113.066 6992.000 12.6 1689.39 113.065 113.065 6993.000 12.6 1689.60 ll3.065 113.065 6994.000 12.6 1689.81 113.064 113.064 6995.000 12.6 1690.02 ll3.063 113.063 6996.000 12.6 1690.23 113.062 113.062 6997.000 12.6 1690.44 ll3.062 ll3.062 6998.000 12.6 1690.65 113.061 113.061 6999.000 12.6 1690.86 113.060 ll3.060 7000.000 12.6 1691.07 113.059 113.059 7001.000 12.6 1691.28 ll3.058 ll3.058 7002.000 12.6 1691.49 113.058 113.058 7003.000 12.6 1691.70 113.057 ll3.057 7004.000 12.6 1691.91 113.056 113.056 7005.000 12.6 1692.12 ll3.055 ll3.055 7006.000 12.6 1692.33 113.055 113.055 7007.000 12.6 1692.54 113.054 113.054 7008.000 12.6 1692.75 113.053 113.053 7009.000 12.6 1692.96 113.052 ll3.052 7010.000 12.6 1693.17 113.051 113.051 7011.000 12.6 1693.38 113.051 113.051 7012.000 12.6 1693.59 113.050 113.050 7013.000 12.6 1693.80 113.049 113.049 7014.000 12.6 1694.01 113.048 113.048 7015.000 12.6 1694.22 113.047 ll3.047 7016.000 12.6 1694.43 113.047 113.047 7017.000 12.6 1694.64 113.046 113.046 7018.000 12.6 1694.85 ll3.045 113.045 7019.000 12.6 1695.06 113.044 113.044 7020.000 12.6 1695.27 113.044 113.044 7021.000 12.6 1695.~9 113.043 113.043 7022.000 12.6 1695.70 113.042 113.042 7023.000 12.6 1695.91 113.041 113.041 7024.000 12.6 1696.12 113.040 113.040 7025.000 12.6 1696.33 113.040 113.040 7026.000 12.6 1696.54 113.039 113.039 7027.000 12.6 1696.75 ll3.038 ll3.038 7028.000 12.6 1696.96 113.037 113.037 7029.000 12.6 1697.17 ll3.036 113.036 7030.000 12.6 1697.38 113.036 113.036 7031.000 12.6 1697.59 113.035 113.035 7032.000 12.6 1697.80 113.034 113.034 7033.000 12.6 1698.01 113.033 113.033 7034.000 12.6 1698.22 113.032 113.032 7035.000 12.6 1698.43 113.032 113.032 7036.000 12.6 1698.64 ll3.031 113.031 7037.000 12.6 1698.85 113.030 113.030 7038.000 12.6 1699.06 113.029 ll3.029 7039.000 12.6 1699.27 ll3.028 113.028 7040.000 12.6 1699.48 ll3.028 113.028 7041.000 12.6 1699.69 ll3.027 113.027 7042.000 12.6 1699.90 113.026 113.026 7043.000 12.6 1700.11 113.025 113.025 7044.000 12.6 1700.32 113.024 113.024 7045.000 12.6 1700.53 113.024 ll3.024 7046.000 12.6 1700.74 113.023 ll3.023 7047.000 12.6 1700.95 113.022 ll3.022 7048.000 12.6 1701.16 ll3.021 ll3.021 7049.000 12.6 1701.37 ll3.021 ll3.021 7050.000 12.6 1701.58 ll3.020 ll3.020 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 99 11-17-2018 Attachment 1 Page 111 of 27 4 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7051.000 12.6 1701.79 ll3.019 ll3.019 7052.000 12.6 1702.00 113.018 ll3.018 7053.000 12.6 1702.21 113.017 113.017 7054.000 12.6 1702.42 113.017 ll3.017 7055.000 12.6 1702.63 ll3.016 113.016 7056.000 12.6 1702.84 ll3.015 ll3.015 7057.000 12.6 1703.06 ll3.014 113.014 7058.000 12.6 1703.27 113.013 ll3.013 7059.000 12.6 1703.48 ll3,013 J 13.013 7060.000 12.6 1703.69 ll3.012 ll3.012 7061.000 12.6 1703.90 ll3.011 113.011 7062.000 12.6 1704.ll ll3.010 ll3.010 7063.000 12.6 1704.32 ll3.009 ll3.009 7064.000 12.6 1704.53 113.009 ll3.009 7065.000 12.6 1704.74 ll3.008 ll3.008 7066.000 12.6 1704.95 ** ll3.007 113.007 7067.000 12.6 1705.16 ll3.006 113.006 7068.000 12.6 1705.37 ll3.005 ll3.005 7069.000 12.6 1705.58 ll3.005 ll3.005 7070.000 12.6 1705.79 ll3.004 .. ll3.004 ' 7071.000 12.6 1706.00 ll3.003 113.003 7072.000 12.6 1706.21 ll3.002 ll3.002 7073.000 12.6 1706.42 ll3.001 113.001 7074.000 12.6 1706.63 113.000 ll3.000 7075.000 12.6 1706.84 ll3.000 ll3.000 7076.000 12.6 1707.05 ll2.999 ll2.999 7077.000 12.6 1707.26 ll2.998 ll2.998 7078.000 12.6 1707.47 ll2.997 ll2.997 7079.000 12.6 1707.68 ll2.996 ll2.996 7080.000 12.6 1707.89 ll2.996 ll2.996 7081.000 12.6 1708.10 ll2.995 ll2.995 7082.000 12.6 1708.31 ll2.994 ll2.994 7083.000 12.6 1708.52 ll2.993 ll2.993 7084.000 12.6 1708.73 ll2.992 ll2.992 7085.000 12.6 1708.94 ll2.992 ll2.992 7086.000 12.6 1709.15 ll2.991 ll2.991 7087.000 12.6 1709.36 ll2.990 112.990 7088.000 12.6 1709.57 ll2.989 ll2.989 7089.000 12.6 1709.78 ll2.988 ll2.988 7090.000 12.6 1709.99 ll2.988 ll2.988 7091.000 12.6 1710.20 ll2.987 ll2.987 7092.000 12.6 1710.42 ll2.986 ll2.986 7093.000 12.6 1710.63 ll2.985 ll2.985 7094.000 12.6 1710.84 ll2.984 ll2.984 7095.000 12.6 1711.05 ll2.984 112.984 7096.000 12.6 1711.26 ll2.983 ll2.983 7097.000 12.6 1711.47 ll2.982 ll2.982 7098.000 12.6 1711.68 ll2.981 ll2.981 7099.000 12.6 1711.89 ll2.980 ll2.980 7100.000 12.6 1712.10 ll2.979 ll2.979 7101.000 12.6 1712.31 ll2.979 ll2.979 7102.000 12.6 1712.52 ll2.978 ll2.978 7103.000 12.6 1712.73 ll2.977 ll2.977 7104.000 12.6 1712.94 ll2.976 112.976 7105.000 12.6 1713.15 112.975 .. ll2.975 7106.000 12.6 1713.36 112.975 ll2.975 7107.000 12.6 1713.57 112.974 .. ll2.974 7108.000 12.6 1713.78 112.973 112.973 7109.000 12.6 1713.99 112.972 112.972 7110.000 12.6 1714.20 112.971 112.971 7111.000 12.6 1714.41 112.970 112.970 7M2.000 12.6 1714.62 112.970 ll2.970 7113.000 12.6 1714.83 112.969 112.969 7114.000 12.6 1715.04 ll2.968 ll2.968 7115.000 12.6 1715.25 112.967 112.967 7116.000 12.6 1715.46 112.966 ll2.966 7117.000 12.6 1715.67 112.966 112.966 7118.000 12.6 1715.88 112.965 112.965 7119.000 12.6 1716.09 112.964 112.964 7120.000 12.6 1716.30 112.963 112.963 7121.000 12.6 1716.51 112.962 ll2.962 7122.000 12.6 1716.72 112.961 112.961 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSJA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 100 11-17-2018 Attachment 1 Page 112 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7123.000 12.6 1716.93 112.961 112.961 7124.000 12.6 1717.14 112.960 112.960 7125.000 12.6 1717.35 112.959 112.959 7126.000 12.6 1717.56 112.958 112.958 7127.000 12.6 1717.78 112.957 112.957 7128.000 12.6 1717.99 112.957 112.957 7129.000 12.6 1718.20 112.956 .. 112.956 7130.000 12.6 1718.41 112.955 112.955 7131.000 12.6 1718.62 112.954 112.954 7132.000 12.6 1718.83

  • 112.953 112.953 7133.000 12.6 1719.04 112.952 112.952 7134.000 12.6 1719.25 112.952 112.952 7135.000 12.6 1719.46 112.951 112.951 7136.000 12.6 1719.67 112.950 112.950 7137.000 12.6 1719.88 112.949 112.949 7138.000 12.6 1720.09 112.948 112.948 7139.000 12.6 1720.30 112.948 * . 112.948 7140.000 12.6 1720.51 112.947 112.947 7141.000 12.6 1720.72 112.946 112.946 7142.000 12.6 1720.93 .. 112.945 112.945 7143.000 12.6 1721.14 112.944 112.944 7144.000 12.6 1721.35 112.943 112.943 7145.000 12.6 1721.56 112.943 112.943 7146.000 12.6 1721.77 112.942 112.942 7147.000 12.6 1721.98 .. 112.941 112.941 7148.000 12.6 1722.19 112.940 112.940 7149.000 12.6 1722.40 112.939 112.939 7150.000 12.6 1722.61 112.938 112.938 7151.000 12.6 1722.82 112.938 112.938 7152.000 12.6 1723.03 112.937 112.937 7153.000 12.6 1723.24 112.936 112.936 7154.000 12.6 1723.>15 112.935 112.935 7155.000 12.6 1723.66 112.934 112.934 7156.000 12.6 1723.87 112.933 112.933 7157.000 12.6 1724.08 112.933 112.933 7158.000 12.6 1724.29 112.932 112.932 7159.000 12.6 1724.50 112.931 112.931 7160.000 12.6 1724.71 112.930 112.930 7161.000 12.6 1724.92 112.929 112.929 7162.000 12.6 1725.14 112.928 112.928 7163.000 12.6 1725.35 112.928 112.928 7164.000 12.6 1725.56 112.927 112.927 7165.000 12.6 1725.77 112.926 112.926 7166.000 12.6 1725.98 112.925 112.925 7167.000 12.6 1726.19 112.924 112.924 7168.000 12.6 1726.40 112.923 112.923 7169.000 12.6 1726.61 112.923 112.923 7170.000 12.6 1726.82 112.922 .. 112.922 7171.000 12.6 1727.03 112.921 112.921 7172.000 12.6 1727.24 112.920 112.920 7173.000 12.6 1727.45 112.919 112.919 7174.000 12.6 1727.66 112.918 112.918 7175.000 12.6 1727.87 112.918 112.918 7176.000 12.6 1728.08 112.917 112.917 7177.000 12.6 1728.29 112.916 112.916 7178.000 12.6 1728.50 112.915 112.915 7179.000 12.6 1728.71 112.914 112.914 7180.000 12.6 1728.92 112.913 112.913 7181.000 12.6 1729.13 112.913 112.913 7182.000 12.6 1729.34 112.912 112.912 7183.000 12.6 1729.55 112.911 112.911 7184.000 12.6 1729.76 112.910 112.910 7185.000 12.6 1729.97 112.909 112.909 7186.000 12.6 1730.18 112.908 112.908 7187.000 12.6 1730.39 112.908 112.908 7188.000 12.6 1730.60 112.907 112.907 7189.000 12.6 1730.81 112.906 112.906 7190.000 12.6 1731.02 112.905 112.905 7191.000 12.6 1731.23 112.904 112.904 7192.000 12.6 1731.44 112.903 112.903 7193.000 12.6 1731.65 112.903 112.903 7194.000 12.6 1731.86 112.902 112.902 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: .BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 101 11-17-2018 Attachment 1 Page 113 of 274 KCICONSULT Base Nonna! Current Capacity Volta2e (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour) v-V+ 7195.000 12.6 1732.07 112.901 112.901 7196.000 12.6 1732.28 112.900 112.900 7197.000 12.6 1732.50 112.899 112.899 7198.000 12.6 1732.71 112.898 112.898 7199.000 12.6 1732.92 112.897 112.897 7200.000 12.6 1733.13. 112.897 112.897 7201.000 12.6 1733.34 112.896 112.896 7202.000 12.6 1733.55 112.895 112.895 7203.000 12.6 1733.76 112.894 112.894 7204.000 12.6 1733.97 112.893 112.893 7205.000 12.6 1734.18 112.892 112.892 7206.000 12.6 1734.39 112.892 112.892 7207.000 12.6 1734.60 112.891 112.891 7208.000 12.6 1734.81 112.890 112.890 7209.000 12.6 1735.02 112.889 112.889 7210.000 12.6 1735.23 112.888 112.888 7211.000 12.6 1735.44 112.887 112.887 7212.000 12.6 1735.65 112.886 112.886 7213.000 12.6 1735.86 112.886 112.886 7214.000 12.6 1736.07 112.885 112.885 7215.000 12.6 1736.28 112.884 112.884 7216.000 12.6 1736.49 112.883 112.883 7217.000 12.6 1736.70 112.882 112.882 7218.000 12.6 1736.91 112.881 112.881 7219.000 12.6 1737.12 112.881 112.881 7220.000 12.6 1737.33 112.880 112.880 7221.000 12.6 1737.54 112.879 112.879 7222.000 12.6 1737.75 112.878 112.878 7223.000 12.6 1737.96 112.877 112.877 7224.000 12.6 1738.17 112.876 112.876 7225.000 12.6 1738.38 . .112.875 112.875 7226.000 12.6 1738.59 112.875 112.875 7227.000 12.6 1738.80 112.874 112.874 7228.000 12.6 1739.01 112.873 112.873 7229.000 12.6 1739.22 112.872 112.872 7230.000 '12.6 1739.43 112.871 112.871 7231.000 12.6 1739.64 112.870 112.870 7232.000 12.6 1739.85 112.869 112.869 7233.000 12.6 1740.07 112.869 112.869 7234.000 12.6 1740.28 112.868 112.868 7235.000 12.6 1740.49 112.867 112.867 7236.000 12.6 1740.70 112.866 112.866 7237.000 12.6 1740.91 112.865 112.865 7238.000 12.6 1741.12 112.864 112.864 7239.000 12.6 1741.33 112.863 112.863 7240.000 12.6 1741.54 112.863 112.863 7241.000 12.6 1741.75 112.862 112.862 7242.000 12.6 1741.96 112.861 112.861 7243.000 12.6 1742.17 112.860 112.860 7244.000 12.6 1742.38 112.859 112.859 7245.000 12.6 1742.59 112.858 112.858 7246.000 12.6 1742.80 112.857 112.857 7247.000 12.6 1743.01 112.857 112.857 7248.000 12.6 1743.22 112.856 112.856 7249.000 12.6 1743.43 112.855 112.855 7250.000 12.6 1743.64 112.854 112.854 7251.000 12.6 1743.85 112.853 112.853 7252.000 12.6 1744.06 112.852 112.852 7253.000 12.6 1744.27 112.851 112.851. 7254.000 12.6 1744.48 112.851 112.851 7255.000 12.6 1744.69 112.850 112.850 7256.000 12.6 1744.90 112.849 112.849 7257.000 12.6 1745.11 112.848 112.848 7258.000 12.6 1745.32 112.847 112.847 7259.000 12.6 1745.53 112.846 112.846 7260.000 12.6 1745.74 112.845 112.845 7261.000 12.6 1745.95 112.845 112.845 7262.000 12.6 1746.16 112.844 112.844 7263.000 12.6 1746.37 112.843 112.843 7264.000 12.6 1746.58 112.842 112.842 7265.000 12.6 1746.79 112.841 112.841 7266.000

  • 12.6 1747.00 112.840 112.840 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 114 of 274 for greater than 24 Hrs
  • Project: Clinton Flex Study ETAP Page: 102 14.1.0N I.;ocation:

KCI Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSIA-48 Revision:

Base Filename:

CPS SBO Study Config.: Nonna! DIV I Battery IA48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7267.000 12.6 1747.21 112.839 112.839 7268.000 12.6 1747.43 112.838 112.838 7269.000 12.6 1747.64 112.838 112.838 7270.000 12.6 1747.85 112.837 112.837 7271.000 12.6 1748.06 112.836 112.836 7272.000 12.6 1748.27 112.835 112.835 7273.000 12.6 1748.48 112.834 112.834 7274.000 12.6 1748.69 112.833 112.833 7275.000 12.6 1748.90 112.832 112.832 7276.000 12.6 1749.11 112.832 112.832 7277.000 12.6 1749.32 112.831 112.831 7278.000 12.6 1749.53 112.830 112.830 7279.000 12.6 1749.74 112.829 112.829 7280.000 12.6 1749.95 112.828 112.828 7281.000 12.6 1750.16 112.827 112.827 7282.000 12.6 1750.37 112.826 112.826 7283.000 12.6 1750.58 112.825 112.825 7284.000 12.6 1750.79 112.825 112.825 7285.000 12.6 1751.00 112.824 112.824 7286.000 12.6 1751.21 112.823 112.823 7287.000 12.6 1751.42 112.822 112.822 7288.000 12.6 1751.63 112.821 112.821 7289.000 12.6 1751.84 112.820 112.820 7290.000 12.6 1752.05 112.819 112.819 7291.000 12.6 1752.26 112.818 112.818 7292.000 12.6 1752.47 112.817 112.817 7293.000 12.6 1752.68 112.816 112.816 7294.000 12.6 1752.89 112.816 112.816 7295.000 12.6 1753.10 112.815 112.815 7296.000 12.6 1753.31 112.814 112.814 7297.000 12.6 1753.52 112.813 112.813 7298.000 12.6 1753.73 112.812 112.812 7299.000 12.6 1753.94 112.811 112.811 7300.000 12.6 1754.15 112.810 112.810 7301.000 12.6 1754.36 112.809 112.809 7302.000 12.6 1754.57' 112.808 112.808 7303.000 12.6 1754.79 112.807 112.807 7304.000 12.6 1755.00 112.807 112.807 7305.000 12.6 1755.21 112.806 112.806 7306.000 12.6 1755.42 112.805 112.805 7307.000 12.6 ' 1755.63 112.804 112.804 7308.000 12.6 1755.84 112.803 112.803 7309.000 12.6 1756.05 112.802 112.802 7310.000 12.6 1756.26 112.801 112.801 7311.000 12.6 1756.47 112.800 1q.800 7312.000 12.6 1756.68 112.799 112.799 7313.000 12.6 1756.89 112.798 112.798 7314.000 12.6 1757.10 112.797 112.797 7315.000 12.6 1757.31 112.797 112.797 7316.000 12.6 1757.52 112.796 112.796 7317.000 12.6 1757.73 112.795 112.795 7318.000 12.6 1757.94 112.794 112.794 7319.000 12.6' 1758.15 .. 112.793 112.793 7320.000 12.6 1758.36 112.792 112.792 7321.000 12.6 1758.57 112.791 112.791 7322.000 12.6 1758.78, 112.790 112.790 7323.000 12.6 1758.99 112.789 112.789 7324.000 12.6 1759.20 112.788 112.788 7325.000 12.6 1759.41 112.787 112.787 7326.000 12.6 1759.62 112.786 112.786 7327.000 12.6 1759.83 112.786 112.786 7328.000 12.6 1760.04 112.785 112.785 7329.000 12.6 1760.25 112.784 112.784 7330.000 12.6 1760.46 112.783 112.783 7331.000 12.6 1760.67 112.782 112.782 7332.000 12.6 1760.88 112.781 112.781 7333.000 12.6 1761.09 112.780 112.780 7334.000 12.6 1761.30 112.779 112.779 7335.000 12.6 1761.51 112.778 112.778 7336.000 12.6 1761.72 112.777 112.777 7337.000 12.6 1761.93 112.776 112.776 7338.000 12.6 1762.14 112.775 112.775 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 103 11-17-2018 Attachment 1 Page 115 of 274 KCICONSULT

Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)
y. V+ 7339.000 12.6 1762.36 1!2.775 1!2.775 7340.000 12.6 1762.571 1!2.774 1!2.774 7341.000 12.6 1762.78 1!2.773 112.773 7342.000 12.6 1762.99 1!2.772 1!2.772 7343.000 12.6 1763.20 1!2.771 112.771 7344.000 12.6 1763.41 112.770 112.770 7345.000 12.6 1763.62 1!2.769 112.769 7346.000 12.6 1763.83 112.768 1!2.768 7347.000 12.6 1764.04 1!2.767 112.767 7348.000 12.6 1764.25 112.766 112.766 7349.000 12.6 1764.46 1!2.765 112.765 7350.000 12.6 1764.67 1!2.764 1!2.764 7351.000 12.6 1764.88 1!2.763 112.763 7352.000 12.6 1765.09 1!2.762 1!2.762 7353.000 12.6 1765.30 112.762 112.762 7354.000 12.6 1765.51 112.761 112.761 7355.000 12.6 1765.72 1!2.760 112.760 7356.000 12.6 1765.93 1!2.759 1!2.759 7357.000 12.6 1766.14 1!2.758 112.758 7358.000 12.6 1766.35 1!2.757 112.757 7359.000 12.6 1766.56 1!2.756 112.756 7360.000 12.6 1766.77 112.755 1!2.755 7361.000 12.6 1766.98 1!2.754 112.754 7362.000 12.6 1767.19 112.753 1!2.753 7363.000 12.6 1767.40 1!2.752 1!2.752 7364.000 12.6 1767.61 1!2.751 1!2.751 7365.000 12.6 1767.82 1!2.750 112.750 7366.000 12.6 1768.03 112.749 1!2.749 7367.000 12.6 1768.24 1!2.748 112.748 7368.000 12.6 1768.45 1!2.747 1!2.747 7369.000 12.6 1768.66 1!2.747 112.747 7370.000 12.6 1768.87 1!2.746 112.746 7371.000 12.6 1769.08 1!2.745 112.745 7372.000 12.6 1769.29 1!2.744 112.744 7373.000 12.6 1769.50 112.743 112.743 7374.000 12.6 1769.72 1!2.742 112.742 7375.000 12.6 1769.93 1!2.741 112.741 7376.000 12.6 1770.14 1!2.740 112.740 7377.000 12.6 1770.35 1!2.739 112.739 7378.000 12.6 1770.56 1!2.738 112.738 7379.000 12.6 1770.77 1!2.737 1!2.737 7380.000 12.6 1770.98 1!2.736 1!2.736 7381.000 12.6 1771.19 1!2.735 1!2.735 7382.000 12.6 1771.40 1!2.734 1!2.734 7383.000 12.6 1771.61 1!2.733 1!2.733 7384.000 12.6 1771.82 1!2.732 1!2.732 7385.000 12.6 1772.03 112.731 1!2.731 7386.000 12.6 1772.24 1!2.730 1!2.730 7387.000 12:6 1772.45 1!2.730 1!2.730 7388.000 12.6 1772.66 1!2.729 112.729 7389.000 12.6 1772.87 1!2.728 1!2.728 7390.000 12.6 1773.08 1!2.727 1!2.727 / 7391.000 12.6 1773.29 112.726 1!2.726 7392.000 12.6 1773.50 1!2.725 1!2.725 7393.000 12.6 1773.71 1!2.724 1!2.724 7394.000 12.6 1773.92 1!2.723 1!2.723 7395.000 12.6 1774.13 1!2.722 1!2.722 7396.000 12.6 1774.34 1!2.721 1!2.721 7397.000 12.6 1774.55 1!2.720 112.720 7398.000 12.6 1774.76 112.719 1!2.719 7399.000 12.6 i774.97 1!2.718 112.718 7400.000 12.6 1775.18 112.717 112.717 7401.000 12.6 1775.39 1!2.716 112.716 7402.000 12.6 1775.60 112.715 112.715 7403.000 12.6 1775.81 1!2.714 1!2.,14 7404.000 12.6 1776.02 1!2.713 1!2.713 7405.000 12.6 1776.23 1!2.712 1!2.712 7406.000 12.6 1776.44 112.71! 1!2.711 7407.000 12.6 1776.65 1!2.710 1!2.710 7408.000 12.6 1776.86 1!2.709 1!2.709 7409.000 12.6 1777.08 1!2.708 1!2.708 7410.000 12.6 1777.29 "1!2.708 1!2. 708 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 104 11-17-2018 Attachment 1 Page 116 of 274 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7411.000 12.6 1777.50 112.707 112.707 7412.000 12.6 1777.71 112.706 112.706 7413.000 12.6 1777.92 112.705 112.705 7414.000 12.6 1778.13 112.704 112.704 7415.000 12.6 1778.34 112.703 112.703 7416.000 12.6 1778.55 112.702 112.702 7417.000 12.6 1778.76 112.701 112.701 7418.000 12.6 1778.97 112.700 112.700 7419.000 12.6 1779.18 112.699 112.699 7420.000 12.6 1779.39 112.698 112.698 7421.000 12.6 1779.60 112.697 112.697 7422.000 12.6 1779.81 112.696 112.696 7423.000 12.6 1780.02 112.695 112.695 7424.000 12.6 1780.23 112.694 112.694 7425.000 12.6 1780.44 112.693 112.693 7426.000 12.6 1780.65 112.692 112.692 7427.000 12.6 1780.86 112.691 112.691 7428.000 12.6 1781.07 112.690 112.690 7429.000 12.6 1781.28 112.689 112.689 7430.000 12.6 1781.49 112.688 112.688 7431.000 12.6 1781.70 112.687 112.687 7432.000 12.6 1781.91 112.686 112.686 7433.000 12.6 1782.12 112.685 112.685 7434.000 12.6 1782.33 112.684 112.684 7435.000 12.6 1782.54 112.683 112.683 7436.000 12.6 1782.75 112.682 112.682 7437.000 12.6 1782.96 112.681 112.681 7438.000 12.6 1783.17 112.680 112.680 7439.000 12.6 1783.38 112.679 112.679 7440.000 12.6 1783.59 112.678 112.678 7441.000 12.6 1783.80 112.677 112.677 7442.000 12.6 1784.01 112.676 112.676 7443.000 12.6 1784.22 112.675 112.675 7444.000 12.6 1784.43 112.674 112.674 7445.000 12.6 1784.65 112.673 112.673 7446.000 1'2.6 1784.86 112.672 112.672 7447.000 12.6 1785.07 112.671 112.671 7448.000 12.6 1785.28 112.670 112.670 7449.000 12.6 1785.49 112.670 112.670 7450.000 12.6 1785.70 112.669 112.669 7451.000 12.6 1785.91 112.668 112.668 7452.000 12.6 1786.12 112.667 112.667 7453.000 12.6 1786.33 112.666 112.666 7454.000 12.6 1786.54 112.665 112.665 7455.000 12.6 1786.75 112.664 112.664 7456.000 12.6 1786.96 112.663 112.663 7457.000 12.6 1787.17 112.662 112.662 7458.000 12.6 1787.38 112.661 112.661 7459.000 12.6 1787.59 112.660 112.660 7460.000 12.6 1787.80 112.659 112.659 7461.000 12.6 1788.01 112.658 112.658 7462.000 12.6 1788.22 112.657 *. 112.657 7463.000 12.6 1788.43 112.656 112.656 7464.000 12.6 1788.64 112.655 112.655 7465.000 12.6 1788.85 112.654 112.654 7466.000 12.6 1789.06 112.653 112.653 7467.000 12.6 1789.27 112.652 112.6S2 7468.000 12.6 1789.48 112.651 112.651 7469.000 12.6 1789.69 112.650 112.650 7470.000 12.6 1789.90 112.649 112.649 7471.000 12.6 1790.11 112.648 112.648 7472.000 12.6 1790.32 112.647 112.647 7473.000 12.6 1790.53 112.646 112.646 7474.000 12.6 1790.74 112.645 112.645 7475.000 12.6 1790.95 112.644 112.644 7476.000 12.6 1791.16 112.643 112.643 7477.000 12.6 1791.37 112.642 112.642 7478.000 12.6 1791.58 112.641 112.641 7479.000 12.6 1791.79 112.640 112.640 7480.000 12.6 1792.01 112.639 112.639 7481.000 12.6 1792.22 112.638 112.638 7482.000 12.6 1792.43 112.637 112.637 I._

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Con.fig.:

DIV I Battery IA 48-Hour Coping Study Discharge Discharge 105 11-17-2018 Attachment 1 Page 117 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Houi*)

V-V+ 7483.000 12.6 1792.64 112.636 112.636 7484.000 12.6 1792.85 112.635 112.635 7485.000 12.6 1793.06 112.634 112.634 7486.000 12.6 1793.27 112.633 112.633 7487.000 12.6 1793.48 112.632 112.632 7488.000 12.6 1793.69 112.631 112.631 7489.000 12.6 1793.90 112.630 112.630 7490.000 12.6 1794.11 112.629 112.629 7491.000 12.6 1794.32 112.628 112.628 7492.000 12.6 1794.53 112.627 112.627 7493.000 12.6 1794.74 112.626 112.626 7494.000 12.6 1794.95 112.625 112.625 7495.000 12.6 1795.16 112.624 112.624 7496.000 12.6 1795.37 112.623 112.623 7497.000 12.6 1795.58 112.622 112.622 7498.000 12.6 1795.79 112.620 112.620 7499.000 12.6 1796.00 112.619 112.619 7500.000 12.6 1796.21 112.618 112.618 7501.000 12.6 1796.42 112.617 112.617 7502.000 12.6 1796.63 112.616 112.616 7503.000 12.6 1796.84 112.615 112.615 7504.000 12.6 1797.05 112.614 112.614 7505.000 12.6 1797.26 112.613 112.613 7506.000 12.6 1797.47 112.612 112.612 7507.000 12.6 1797.68 112.611 112.611 7508.000 12.6 1797.89 112.610 112.610 7509.000 12.6 1798.10 112.609 112.609 7510.000 12.6 1798.31 112.608 112.608 7511.000 12.6 1798.52 112.607 112.607 7512.000 12.6 1798.73 112.606 112.606 7513.000 12.6 1798.94 112.605 112.605 7514.000 12.6 1799.15 112.604 112.604 7515.000 12.6 1799.37 112.603 112.603 7516.000 12.6 1799.58 112.602 112.602 7517.000 12.6 1799.79 112.601 112.601 7518.000 12.6 1800.00 112.600 112.600 7519.000 12.6 1800.21 112.599 112.599 7520.000 12.6 1800.42 112.598 112.598 7521.000 12.6 1800.63 112.597 112.597 7522.000 12.6 . 1800.84 112.596 112.596 7523.000 12.6 1801.05 112.595 112.595 7524.000 12.6 1801.26 112.594 112.594 7525.000 12.6 1801.47 112.593 112.593 7526.000 12.6 1801.68 .. 112.592 112.592 7527.000 12.6 1801.89 112.591 112.591 7528.000 12.6 1802.10 112.590 112.590 7529.000 , 12.6 1802.31 112.589 112.589 7530.000 12.6 1802.52 112.588 112.588 7531.000 12.6 1802.73 112.587 112.587 7532.000 12.6 1802.94 112.586 112.586 7533.000 12.6 1803.15 112.585 112.585 7534.000 12.6 1803.36 112.584 112.584 7535.000 12.6 1803.57 112.583 112.583 7536.000 12.6 1803.78 112.581 112.581 7537.000 12.6 1803.99 112.580 112.580 7538.000 12.6 1804.20 112.579 112.579 7539.000 12.6 1804.41 112.578 112.578 7540.000 12.6 1804.62 I 112.577 112.577 7541.000 12.6 1804.83 112.576 112.576 7542.000 12.6 1805.04 112.575 112.575 7543.000 12.6 1805.25 112.574 112.574 7544.000 12.6 1805.46 112.573 112.573 7545.000 12.6 1805.67 112.572 112.572 7546.000 12.6 1805.88 112.571 112.571 7547.000 12.6 1806.09 112.570 112.570 7548.000 12.6 1806.30 112.569 112.569 7549.000 12.6 1806.51 112.568 112.568 7550.000 12.6 1806.72 112.567 112.567 7551.000 12.6 1806.94 112.566 112.566 7552.000 12.6 1807.15 112.565 112.565 7553.000 12.6 1807.36 112.564 112.564 7554.000 12.6 1807.57 112.563 112.563 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 106 11-17-2018 Attachment 1 Page 118 of 27 4 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7555.000 12.6 1807.78 112.562 112.562 7556.000 12.6 1807.99 112.561 112.561 7557.000 12.6 1808.20 112.560 112.560 7558.000 12.6 1808.41 112.558 112.558 7559.000 12.6 1808.62 112.557 112.557 7560.000 12.6 1808.83 112.556 112.556 7561.000 12.6 1809.04 112.555 112.555 7562.000 12.6 1809.25 112.554 112.554 7563.000 12.6 1809.46 112.553 112.553 7564.000 12.6 1809.67 112.552 112.552 7565.000 12.6 1809.88 112.551 112.551 7566.000 12.6 1810.09 112.550 112.550 7567.000 12.6 1810.30 112.549 112.549 7568.000 12.6 1810.51 112.548 112.548 7569.000 12.6 1810.72 112.547 112.547 7570.000 12.6 1810.93 112.546 112.546 7571.000 12.6 1811.14 112.545 112.545 7572.000 12.6 1811.35 112.544 112.544 7573.000 12.6 1811.56 112.543 112.543 7574.000 12.6 1811.77 112.542 112.542 7575.000 12.6 1811.98 112.540 112.540 7576.000 12.6 1812.19 112.539 112.539 7577.000 12.6 1812.40 112.538 112.538 7578.000 12.6 1812.61 112.537 112.537 7579.000 12.6 1812.82 .. 112.536 112.536 7580.000 12.6 1813.03 112.535 112.535 7581.000 12.6 1813.24 112.534 112.534 7582.000 12.6 1813.45 112.533 112.533 7583.000 12.6 1813.66 112.532 112.532 7584.000 12.6 1813.87 112.531 112.531 7585.000 12.6 1814.08 112.530 112.530 7586.000 12.6 1814.30

  • 112.529 112.529 7587.000 12.6 1814.51 112.528 112.528 7588.000 12.6 1814.72 112.527 112.527 7589.000 12.6 1814.93 112.526 112.526 7590.000 12.6 1815.14 112.524 112.524 7591.000 12.6 1815.35 112.523 112.523 7592.000 12.6 1815.56 112.522 112.522 7593.000 12.6 1815.77 112.521 112.521 7594.000 12.6 1815.98 112.520 112.520 7595.000 12.6 1816.19 112.519 112.519 7596.000 12.6 1816.40 112.518 112.518 7597.000 12.6 1816.61 112.517 112.517 7598.000 12.6 1816.82 112.516 112.516 7599.000 12.6 1817.03 112.515 . 112.515 7600.000 12.6 1817.24 112.514 112.514 7601.000 12.6 1817.45 112.513 112.513 7602.000 12.6 1817.66 112.512 112.512 7603.000 12.6 1817.87 112.510 112.510 7604.000 12.6 1818.08 112.509 112.509 7605.000 12.6 1818.29 112.508 112.508 7606.000 12.6 1818.50 112.507 112.507 7607.000 12.6 1818.71
  • 112.506 112.506 7608.000 12.6 1818.92 112.505 112.505 7609.000 12.6 1819.13 112.504 112.504 7610.000 12.6 1819.34 112.503 112.503 7611.000 12.6 1819.55 112.502 112.502 7612.000 12.6 1819.76 112.501 112.501 7613.000 12.6 1819.97 112.500 112.500 7614.000 12.6 1820.18 112.499 112.499 7615.000 12.6 1820.39 112.497 112.497 7616.000 12.6 1820.60 112.496 112.496 7617.000 12.6 1820.81 112.495 112.495 7618.000 12.6 1821.02 112.494 112.494 7619.000 12.6 1821.23 112.493 112.493 7620.000 12.6 1821.44 112.492 112.492 7621.000 12.6 1821.66 112.491 112.491 7622.000 12.6 1821.87 112.490 112.490 7623.000 12.6 1822.08 112.489 112.489 7624.000 12.6 1822.29 112.488 112.488 7625.000 12.6 1822.50 112.486 112.486 7626.000 12.6 1822.71 112.485 112.485 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Discharge Discharge

,101 11-17-2018 Attachment 1 Page 119 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7627.000 12.6 1822.92 112.484 112.484 7628.000 12.6 1823.13 112.483 112.483 7629.000 12.6 1823.34 112.482 112.482 7630.000 12.6 1823.55 112.481 112.481 7631.000 12.6 1823.76 112.480 112.480 7632.000 12.6 1823.97 112.479 112.479 7633.000 12.6 1824.18 112.478 112.478 7634.000 12.6 1824.39 112.477 112.477 7635.000 12.6 1824.60 112.475 112.475 7636.000 12.6 1824.81 112.474 112.474 7637.000 12.6 1825.02 112.473 112.473 7638.000 12.6 1825.23 112.472 112.472 7639.000 12.6 1825.44 112.471 112.471 7640.000 12.6 1825.65 112.470 112.470 7641.000 12.6 1825.86 112.468 112.468 7642.000 12.6 1826.07 112.467 112.467 7643.000 12.6 1826.28 112.466 112.466 7644.000 12.6 1826.49 112.465 112.465 7645.000 12.6 1826.70 112.464 112.464 7646.000 12.6 1826.91 112.463 112.463 7647.000 12.6 1827.12 112.462 112.462 7648.000 12.6 1827.33 112.460 112.460 7649.000 12.6 1827.54 112.459 112.459 7650.000 12.6 1827.75 112.458 112.458 7651.000 12.6 1827.96 112.457 112.457 7652.000 12.6 1828.17 112.456 112.456 7653.000 12.6 1828.38 112.455 112.455 7654._000 12.6 1828.59 112.453 112.453 7655.000 12.6 1828.80 112.452 112.452 7656.000 12.6 1829.02 112.451 112.451 7657.000 12.6 1829.23 112.450 112.450 7658.000 12.6 1829.44 112.449 112.449 7659.000 12.6 1829.65 112.448 112.448 7660.000 12.6 1829.86 112.447 112.447 7661.000 12.6 1830.07 112.445 112.445 7662.000 12.6 1830.28 112.444 112.444 7663.000 12.6 1830.49 112.443 112.443 7664.000 12.6 1830.70 112.442* 112.442 7665.000 12.6 1830.91 112.441 112.441 7666.000 12.6 1831.12 .. 112.440 112.440 7667.000 12.6 1831.33 112.438 112.438 7668.000 12.6 1831.54 112.437 , . 112:437 7669.000 12.6 1831.75 112.436 112.436 7670.000 12.6 1831.96 112.435 112.435 7671.000 12.6 1832.17 112.434 112.434 7672.000 12.6 1832.38 112.432 112.432 7673.000 12.6 1832.59 112.431 112.431 7674.000 12.6 1832.80 112.430 112.430 7675.000 12.6 1833.01 112.429 112.429 7676.000 12.6 1833.22 112.428 112.428 7677.000 12.6 1833.43 . 112.427 112.427 7678.000 12.6 1833.64 112.425 112.425 7679.000 12.6 1833.85 112.424 112.424 7680.000 12.6 1834.06 112.423 112.423 7681.000 12.6 1834.27 112.422 112.422 7682.000 12.6 1834.48 112.421 112.421 7683.000 12.6 1834.69 112.419 112.419 7684.000 12.6 1834.90 112.418 112.418 7685.000 12.6 1835.11 112.417 112.417 7686.000 12.6 1835.32 112.416 112.416 7687.000 12.6 1835.53 112.415 112.415 7688.000 12.6 1835.74 112.414

  • 112.414 7689.000 12.6 1835.95 112.412 112.412 7690.000 12.6 1836.16 112.411 112.411 7691.000 12.6 1836.37 112.410 112.4!0 7692.000 12.6 1836.59 112.409 112.409 7693.000 12.6 1836.80 112.408 112.408 7694.000 12.6 1837.01 112.406 112.406 7695.000 12.6 1837.22 112.405 112.405 7696.000 12.6 1837.43 112.404 112.404 7697.000 12.6 1837.64 112.403 112.403 7698.000 12.6 1837.85 112.402 112.402 EC 626319 Project: Location:

Contract:

Engineer:, Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Dischar2e Dischar2e 108 11-17-2018 Attachment 1 Page 120 of 274 KCICONSULT

Base Normal Current Capacity Volta2e(V)

Current Capacity Volta2e (V) Time (Amp) (Amp-Hom*)

V-V+ Time (Amp) *(Amp-Hour)

V-V+ 7699.000 12.6 1838.06 112.400 112.400 7700.000 12.6 1838.27 112.399 112.399 7701.000 12.6 1838.48 112.398 . . 112.398 7702.000 12.6 1838.69 112.397 .. 112.397 7703.000 12.6 1838.90 112.396 112.396 7704.000 12.6 1839.11 112.394 112.394 7705.000 12.6 1839.32 112.393 llZ:393 7706.000 12.6 1839.53 112.392 112.392 7707.000 12.6 1839.74 112.391 112.391 7708.000 12.6 1839.95 112.390 112.390 7709.000 12.6

  • 1840.16 112.388 112.388 7710.000 12.6 1840.37 112.387 112.387 7711.000 12.6 1840.58 112.386 112.386 7712.000 12.6 1840.79 112.385 112.385 7713.000 12.6 1841.00 112.384 112.384 7714.000 12.6 1841.21 112.382 112.382 7715.000 12.6 1841.42 112.381 112.381 7716.000 12.6 1841.63 112.380 112.380 7717.000 12.6 1841.84 112.379 112.379 7718.000 12.6 1842.05 112.377 112.377 7719.000 12.6 1842.26 112.376 112.376 7720.000 12.6 1842.47 112.375 112.375 7721.000 12.6 1842.68 112.374 112.374 7722.000 12.6 1842.89 112.373 112.373 7723.000 12.6 1843.10 112.371 112.371 77i4.000 12.6 1843.31 112.370 112.370 7725.000 12.6 1843.52 112.369 112.369 7726.000 12.6 1843.73 112.368 112.368 7727.000 12.6 1843.95 112.366 112.366 *7728.000 12.6 1844.16 112.365 112.365 7729.000 12.6 1844.37 112.364 . 112.364 7730.000 12.6 1844.58 112.363 112.363 7731.000 12.6 1844.79 112.362 112.362 7732.000 12.6 1845.00 112.360 112.360 7733.000 12.6 1845.21 112.359 112.359 7734.000 12.6 1845.42 112.358 112.358 7735.000 12.6 1845.63 112.357 112.357 7736.000 12.6 1845.84 112.355 112.355 7737.000 12.6 1846.05 112.354 112.354 7738.000 12.6 1846.26 112.353 112.353 7739.000 12.6 1846.47 112.352 112.352 7740.000 12.6 1846.68 112.350 112.350 7741.000 12.6 1846.89 112.349 112.349 7742.000 12.6 1847.10 112.348 112.348 7743.000 12.6 1847.31 112.347 112.347 7744.000 12.6 1847.52 112.345 112.345 7745.000 12.6 1847.73 112.344 112.344 7746.000 12.6 1847.94 112.343 112.343 7747.000 12.6 1848.15 112.342 112.342 7748.000 12.6 1848.36 112.340 112.340 7749.000 12.6 1848.57 112.339 112.339 7750.000 12.6 1848.78 112.338 112.338 7751.000 12.6 1848.99 112.337 112.337 7752.000 12.6 1849.20 112.335 112.335 7753.000 12.6 1849.41 112.334 112.334 7754.000 12.6 1849.62 112.333 112.333 7755.000 12.6 1849.83 112.332 112.332 7756.000 12.6 1850.04 112.330 112.330 7757.000 12.6 1850.25 112.329 112.329 7758.000 12.6 1850.46 112.328 112.328 7759.000 12.6 1850.67 112.327 112.327 7760.000 12.6 1850.88 112.325 112.325 7761.000 12.6 1851.09 112.324 112.324 7762.000 12.6 1851.31 112.323 112.323 7763.000 12.6 1851.52 112.322 112.322 7764.000 12.6 1851.73 112.320 112.320 7765.000 12.6 1851.94 112.319 112.319 7766.000 12.6 1852.15 112.318 112.318 7767.000 12.6 1852.36 112.317 112.317 7768.000 12.6 1852.57 112.315 112.315 7769.000 12.6 1852.78 112.314 112.314 7770.000 12.6 1852.99 112.313 112.313 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharj!e Discharl!e 109 11-17-2018 Attachment 1 Pa'ge 121 of 274 KCICONSULT Base Normal Current Capacity Voltaj!e (V) Current Capacity Vollal!e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7771.000 12.6 1853.20 112.312 112.312 7772.000 12.6 1853.41 112.310 112:310 7773.000 12.6 1853.62 112.309 112.309 7774.000 12.6 1853.83 112.308 112.308 7775.000 12.6 1854.04 112.306 112.306 7776.000 12.6 1854.25 112.305 112.305 7777.000 12.6 1854.46 112.304 112.304 7778.000 12.6 1854.67 112.303 112.303 7779.000 12.6 1854.88 112.301 112.301 7780.000 12.6 1855.09 112.300 112.300 7781.000 12.6 1855.30 112.299 112.299 7782.000 12.6 1855.51 112.297 112.297 7783.000 12.6 1855.72 112.296 112.296 7784.000 12.6 1855,93 112.295 112.295 7785.000 12.6 1856.14 112.294 112.294 7786.000 12.6 1856.35 112.292 112.292 7787.000 12.6 1856.56 112.291 112.291 7788.000 12.6 1856.77 112.290 112.290 7789.000 12.6 1856.98 112.288 112.288 7790.000 12.6 1857.19. 112.287 112.287 7791.000 12.6 1857.40 112.286 112.286 7792.000 12.6 1857.61 112.285 112.285 7793.000 12.6 1857.82 112.283 112.283 7794.000 12.6 1858.03 112.282 112.282 7795.000 12.6 1858.24 112.281 112.281 7796.000 12.6 1858.45 112.279 112.279 7797.000 12.6 1858.66 112.278 112.278 7798.000 12.6 1858.88 112.277 112.277 7799.000 12.6 1859.09 112.276 112.276 7800.000 12.6 1859.30 112.274 112.274 7801.000 12.6 1859.51 112.273 112.273 7802.000 12.6 1859.72 112.272 112.272 7803.000 12.6 1859.93 112.270 112.270 7804.000 12.6 1860.14 112.269 112.269 7805.000 12.6 1860.35 112.268 112.268 7806.000 12.6 1860.56 112.266 112.266 7807.000 12.6 1860.77 112.265 112.265 7808.000 12.6 1860.98 112.264 112.264 7809.000 12.6 1861.19 112.263 112.263 7810.000 12.6 1861.40 112.261 112.261 7811.000 12.6 1861.61 112.260 112.260 7812.000 12.6 1861.82 112.259 112.259 7813.000 12.6 1862.03 112.257 112.257 7814.000 12.6 1862.24 112,256 112.256 7815.000 12.6 1862.45 112.255 112.255 7816.000 12.6 1862.66 112.253 112.253 7817.000 12.6 1862.87 112.252 112.252 7818.000 12.6 1863.08 112.251 112.251 7819.000 12.6 1863.29 112.249 112.249 7820.qoo 12.6 1863.50 112.248 112.248 7821.000 12.6 1863.71 112.247 112.247 7822.000 12.6 1863.92 112.245 112.245 7823.000 12.6 1864.13 112.244 112.244 7824.000 12.6 1864.34 112.243 112.243 7825.000 12.6 1864.55 112.241 112.241 7826.000 12.6 1864.76 112.240 112.240 7827.000 12.6 1864.97 112.239 112.239 7828.000 12.6 1865.18 112.237 112.237 7829.000 12.6 1865.39 112.236 112.236 7830.000 12.6 1865.60 112.235 112.235 7831.000 12.6 1865.81 112.233 112.233 7832.000 12.6 1866.02 112.232 112.232 7833.000 12.6 1866.24 112.231 112.231 7834.000 12.6 1866.45 112.229 112.229 7835.000 12.6 1866.66 112.228 112.228 7836.000 12.6 1866.87 112.227 112.227 7837.000 12.6 1867.08 112.225 112.225 7838.000 12.6 1867.29 112.224 112.224 7839.000 12.6 1867.50 112.223 112.223 7840.000 12.6 1867.71 112.221 112.221 7841.000 12.6 1867.92 112.220 112.220 7842.000 12.6 1868.13 112.219 112.219 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 110 11-17-2018 Attachment 1 Page 122 of 274 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Houl')

y. Y+ Time (Amp) (Amp-Hou I') V-V+ 7843.000 12.6 1868.34 112.217 112.217 7844.000 12.6 1868.55 112.216 112.216 7845.000 12.6 1868.76 112.215 112.215 7846.000 12.6 1868.97 112.213 112.213 7847.000 12.6 1869.18 112.212 112.212 7848.000 12.6 1869.39 112.211 112.211 7849.000 12.6 1869.60 112.209 112.209 7850.000 12.6 1869.81 112.208 112.208 7851.000 12.6 1870.02 112.207 112.207 7852.000 12.6 1870.23 112.205 112.205 7853.000 12.6 1870.44 112.204 112.204 7854.000 12.6 1870.65 112.203 112.203 7855.000 12.6 1870.86 112.201 112.201 7856.000 12.6 1871.07 112.200 112.200 7857.000 12.6 1871.28 112.198 112.198 7858.000 12.6 1871.49 112.197 112.197 7859.000 12.6 1871.70 112.196 112.196 7860.000 12.6 1871.91 112.194 112.194 7861.000 12.6 1872.12 112.193 112.193 7862.000 12.6 1872.33 112.192 112.192 7863.000 12.6 1872.54 112.190 112.190 7864.000 12.6 1872.75 112.189 112.189 7865.000 12.6 1872.96 112.188 112.188 7866.000 12.6 1873.17 112.186 112.186 7867.000 12.6 1873.38 112.185 112.185 7868.000 12.6 1873.60 112.183 112.183 7869.000 12.6 1873.81 112.182 112.182 7870.000 12.6 1874.02 112.181 112.181 7871.000 12.6 1874.23 112.179 112.179 7872.000 12.6 1874.44 112.178 112.178 7873.000 12.6 1874.65 112.177 112.177 7874.000 12.6 1874.86 112.175 112.175 7875.000 12.6 1875.07 112.174 112.174

.7876.000 12.6 1875.28 112.172 112.172 7877.000 12.6 1875.49 112.171 112.171 7878.000 12.6 1875.70 112.170 112.170 7879.000 12.6 1875.91 112.168 112.168 7880.000 12.6 1876.12 112.167 112.167 7881.000 12.6 1876.33 112.165 112.165 7882.000 12.6 1876.54 112.164 112.164 7883.000 12.6 1876.75 112.1~3 112.163 7884.000 12.6 1876.96 112.161 112.161 7885.000 12.6 1877.17 112.160 112.160 7886.000 12.6 1877.38 112.159 112.159 7887.000 12.6 1877.59 112.157 112.157" 7888.000 12.6 1877.80 112.156 112.156 7889.000 12.6 1878.01 112.154 112.154 7890.000 12.6 1878.22 112.153 112.153 7891.000 12.6 1878.43 112.152 112.152 7892.000 12.6 1878.64 112.150 112.150 7893.000 12.6 1878.85 112.149 112.149 7894.000 12.6 1879.06 112.147 112.147 7895.000 12.6 1879.27 112.146 -112.146 7896.000 12.6 1879.48 112.145 112.145 7897.000 12.6 1879.69 112.143 112.143 7898.000 12.6 1879.90 112.142 112.142 7899.000 12.6 1880.11 112.140 112.140 7900.000 12.6 1880.32 112.139 112.139 7901.000 12.6 1880.53 112.137 112.137 7902.000 12.6 1880.74 112.136 112.136 7903.000 12.6 1880.95 112.135 112.135 7904.000 12.6 1881.17 112.133 112.133 7905.000 12.6 1881.38 112.132 112.132 7906.000 12.6 1881.59 112.130 112.130 7907.000 12.6 1881.80 112.129 112.129 7908.000 12.6 1882.01 112.128 112.128 7909.000 12.6 1882.22 112.126 112.126 7910.000 12.6 1882.43 112.125 112.125 7911.000 12.6 1882.64 112.123 112.123 7912.000 12.6 1882.85 112.122 112.122 7913.000 12.6 1883.06 112.120 112.120 7914.000 12.6 1883.27 112.119 112.119 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously

  • for greater than 24 Hrs
  • Attachment 1 Page 123 of 274 Project: Clinton Flex Study ETAP Page: ll1 14.1.0N Location:

KC! Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSlA-48 Revision:

Base Filename:

CPS SBO Study Config.: Nonnal DIV I Battery I A 48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7915.000 12.6 1883.48 112.118 112.118 7916.000 12.6 1883.69 112. 116 112.116 7917.000 12.6 1883.90 112.115 112.115 7918.000 12.6 1884.11 112. 113. 112.113 7919.000 12.6 1884.32 112.112 112.i12 7920.000 12.6 1884.53 112. 110 112.110 7921.000 12.6 1884.74 112. 109 112. 109 7922.000 12.6 1884.95 112.108 112.108 7923.000 12.6 1885.16 112.106 112.106 7924.000 12.6 1885.37 11i.J05 112.105 7925.000 12.6 1885.58 112.103 112.103 7926.000 12.6 1885.79 112.102 112.102 7927.000 12.6 1886.00 112.100 112.100 7928.000 12.6 1886.21 112.099 112.099 7929.000 12.6 1886.42 112.097 112.097 7930.000 12.6 1886.63 112.096 112.096 7931.000 12.6 1886.84 112.095 112.095 7932.000 12.6 1887.05 112,093 112.093 7933.000 12.6 1887.26 112.092 112.092 7934.000 12.6 1887.47 112.090 112.090 7935.000 12.6 1887.68 112.089 112.089 7936.000 12.6 1887.89 112.087 112.087 7937.000 12.6 1888.10 112.086 112.086 7938.000 12.6 1888.31 112.084 112.084 7939.000 12.6 1888.53 112.083 112.083 7940.000 12.6 1888.74 112.082 112.082 7941.000 12.6 1888.95 112.080 112.080 7942.000 12.6 1889.16 112.079 112.079 7943.000 12.6 1889.37 112.077 112.077 7944.000 12.6 1889.58 112.076 112.076 7945.000 12.6 1889.79 112.074 112.074 7946.000 12.6 1890.00 112.073 112.073 7947.000 12.6 1890.21 112.071 112.071 7948.000 12.6 1890.42 112.070 112.070 7949.000 12.6 1890.63 112.068 112.068 7950.000 12.6 1890.84 112.067 112.067 7951.000 12.6 1891.05 -* 112.065 112.065 7952.000 12.6 1891.26 112.064 11~.064 7953.000 12.6 1891.47 112.062 112.062 7954.000 12.6 1891.68 112.061 112.061 7955.000 12.6 1891.89 112.059 112.059 7956.000 12.6 1892.10 112.058 112.058 7957.000 12.6 1892.31 112.057 112.057 7958.000 12.6 1892.52 112.055 112.055 7959.000 12.6 1892.73 112.054 112.054 7960.000 12.6 1892.94 112.052 112.052 7961.000 12.6 1893.15 112.051 112.051 7962.000 12.6 1893.36 112.049 112.049 7963.000 12.6 1893.57 112.048 112.048 7964.000 12.6 1893.78 112.046 112.046 7965.000 12.6 1893.99 112.045 112.045 7966.000 12.6 1894.20 112.043 112.043 7967.000 12.6 1894.41 112.042 112.042 7968.000 12.6 1894.62 112.040 112.040 7969.000 12.6 1894.83 112.039 112.039 7970.000 12.6 1895.04 112.037 112.037 7971.000 12.6 1895.25 112.036 112.036 7972.000 12.6 . 1895.46 112.034 112.034 7973.000 12.6 i895.67 112.033 112.033 7974.000 12.6 1895.89 112.031 112.031 7975.000 12.6 1896.10 112.030 112.030 7976.000 12.6 1896.31 112.028 112.028 7977.000 12.6 i896.52 112.027 112.027 7978.000 12.6 1896.73 112.025 112.025 7979.000 12.6 1896.94 112.024 112.024 7980.000 12.6 1897.15 112.022 112.022 7981.000 12.6 1897.36 112.021 112.021 7982.000 i2.6 1897.57 112.019 112.019 7983.000 12.6 1897.78 112.018 112.018 7984.000 12.6 1897.99 112.016 112.016 7985.000 12.6 1898.20 112.015 112.015 7986.000 12.6 1898.41 112.013 112.013 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO.Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 112 11-17-2018 Attachment 1 Page 124 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 7987.000 12.6 1898.62 112.012 112.012 7988.000 12.6 1898.83 112.010 112.010' 7989.000 12.6 1899.04 112.009 112.009 7990.000 12.6 1899.25 112.007 112.007 7991.000 12.6 1899.46 112.005 112.005 79920~~ 12.6 1899.67 112.004 112.004 7993.000 12.6 1899.88 112.002 112.002 79911.000 12.6 1900.09 112.001 112.001 7995.000 12.6 1900.30 111.999 111.999 7996.000 12.6 1900.51 111.998 111.998 7997.000 12.6 1900.72 111.996 111.996 7998.000 12.6 1900.93 111.995 111.995 7999.000 12.6 1901.14 111.993 111.993 8000.000 12.6 1901.35 111.992 111.992 8001.000 12.6 1901.56 111.990 111.990 8002.000 12.6 1901.77 111.989 111.989 8003.000 12.6 1901.98 111.987 111.987 8004.000 12.6 1902.19 lll.986 111.986 8005.000 12.6 1902.40 111.984 111.984 8006.000 12.6 1902.61 111.982 Jll.982 8007.000 12.6 1902.82 111.981 111.981 8008.000 12.6 1903.03 111.979 111.979 8009.000 12.6 1903.25 111.978 111.978 8010.000 12.6 1903.46 111.976 111.976 8011.000 12.6 1903.67 111.975 111.975 8012.000 12.6 1903.88 111.973 111.973 8013.000 12.6 1904.09 lll.972 111.972 8014.000 12.6 1904.30 111.970 111.970 8015.000 12.6 1904.51 111.969 111.969 8016.000 12.6 .1904.72 111.967 111.967 8017.000 12.6 1904.93 111.965 111.%5 8018.000 12.6 1905.14 111.964 111.964 8019.000 12.6 1905.35 111.962 111.962 8020.000 12.6 1905.56 111.961 111.961 8021.000 12.6 1905.77 111.959 m'.959 8022.000 12.6 1905.98 111.958 111.958 8023.000 12.6 1906.19 111.956 111.956 8024.000 12.6 1906.40 111.954 111.954 8025.000 12.6 1906.61 11 !.953 111.953 8026.000 12.6 1906.82 111.951 111.951 8027.000 12.6 1907.03 111.950 lll.950 8028.000 12.6 1907.24 111.948 111.948 8029.000 12.6 1907.45 111.947 111.947 8030.000 12.6 1907.66 111.945 111.945 8031.000 12.6 1907.87 111.943 111.943 8032.000 12.6 1908.08 111.942 111.942 8033.000 12.6 1908.29 111.940 111.940 8034.000 12.6 1908.50 111.939 111.939 8035.000 12.6 1908.71 111.937 111.937 8036.000 12.6 1908.92 111.936 111.936 8037.000 12.6 1909.13 111.934 111.934 8038.000 12.6 1909.34 111.932 111.932 8039.000 12.6 1909.55 111.931 111.931 8040.000 12.6 1909.76 111.929 111.929 8041.000 12.6 1909.97 111.928 111.928 8042.000 12.6 1910.18 .111.926 111.926 8043.000 12.6 1910.39 111.924 111.924 8044.000 12.6 1910.60 111.923 111.923 8045.000 12.6 1910.82 111.921 111.921 8046.000 12.6 1911.03 111.920 111.920 8047.000 12.6 1911.24 111.918 111.918 8048.000 12.6 1911.45 111.916 111.916 8049.000 12.6 1911.66 111.915 111.915 8050.000 12.6 1911.87 111.913 111.913 8051.000 12.6 1912.08 111.912 111.912 8052.000 12.6 1912.29 111.910 111.910 8053.000 12.6 1912.50 111.908 111.908 8054.000 12.6 1912.71 111.907 .-111.907 8055.000 12.6 1912.92 ill.905 111.905 8056.000 12.6 1913.13 111.904 111.904 8057.000 12.6 1913.34 111.902 111.902 8058.000 12.6 1913.55 111.900 111.900 EC 626319 Project: Location:

Contra~!:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 113 11-17-2018 Attachment 1 Page 125 of 274 KCICONSULT Base Nonna! Current

  • Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hou.-)

V-V+ 8059.000 12.6 1913.76 111.899 111.899 8060.0QO 12.6 1913.97 111.897 111.897 8061.000 12.6 1914.18 111.895 111.895 8062.000 12.6 1914.39 111.894 111.894 8063.000 12.6 1914.60 111.892 111.892 8064.000 12.6 1914.81 111.891 111.891 8065.000 12.6 1915.02 111.889 111.889 8066.000 12.6 1915.23 111.887 111.887 8067.000 12.6 1915.44 111.886 111.886 8068.000 12.6 1915.65 111.884 111.884 8069.000 12.6 1915.86 111.882 111.882 8070.000 12.6 1916.07 111.881 111.881 8071.000 12.6 1916.28 111.879 111.879 8072.000 12.6 1916.49 111.878. 111.878 8073.000 12.6 1916.70 111.876 111.876 8074.000 12.6 1916.91 111.874 111.874 8075.000 12.6 1917.12 111.873 111.873 8076.000 12.6 1917.33 111.871 .111.871 8077.000 12.6 1917,54 111.869 111.869 8078.000 12.6 1917.75 111.868 111.868 8079.000 12.6 1917.96 111.866 111.866 8080.000 12.6 1918.18 111.864 111.864 8081.000 12.6 1918.39 111.863 111.863 8082.000 12.6 1918.60 111.861 111.861 8083.000 12.6 1918.81 111.859 111.859 8084.000 12.6 1919.02 111.858 111.858 8085.000 12.6 1919.23 111.856 111.856 8086.000 12.6 1919.44 111.855 111.855 8087.000 12.6 1919.65 111.853 111.853 8088.000 12.6 1919.86 111.851 111.851 8089.000 12.6 1920.07 111.850 111.850 8090.000 12.6 1920.28 111.848 111.848 8091.000 12.6 1920.49 111.846 111.846 8092.000 12.6 1920.70 111.845 111.845 8093.000 12.6 1920.91 111.843 111.843 8094.000 12.6 1921.12 111.841 111.841 8095.000 12.6 1921.33 111.840 111.840 8096.000 12.6 1921.54 111.838 111.838 8097.000 12.6 1921.75 111.836 111.836 8098.000 12.6 1921.96 111.834 111.834 8099.000 12.6 1922.17 111.833 111.833 8100.000 12.6 1922.38 111.831 111.831 8101.000 12.6 1922.59 111.829 111.829 8102.000 12.6 1922.80 111.828 111.828 8103.000 12.6 1923.01 111.826 111.826 8104.000 12.6 1923.22 111.824 111.824 8105.000 12.6 1923.43 111.823 111.823 8106.000 12.6 1923.64 111.821 111.821 8107.000 12.6 1923.85 111.819 111.819 8108.000 12.6 1924.06 111.818 111.818 8109.000 12.6 1924.27 111.816 111.816 8110.000 12.6 1924.48 111.814 111.814 8111.000 12.6 1924.69 111.813 111.813 8112.000 12.6

  • 1924.90 111.811 111.811 8113.000 12.6 1925.11 lll.809 111.809 8114.000 12.6 1925.32 111.807 111.807 8115.000 12.6 1925.54 111.806 111.806 8116.000 12.6 1925.75 111.804 111.804 8117.000 12.6 . 1925.96 111.802 111.802 8118.000 12.6 1926.17 lll.801 111.801 8119.000 12.6 1926.38 111.799 111.799 8120.000 12.6 1926.59 111.797 111.797 8121.000 12.6 1926.80 111.796 111.796 8122.000 12.6 1927.01 111.794 111.794 8123.000 12.6 1927.22 111.792 111.792 8124.000 12.6 1927.43 111.790 111.790 8125.000 12.6 1927.64 111.789 111.789 8126.000 12.6 1927.85 111.787 111.787 8127.000 12.6 1928.06 111.785 111.785 8128.000 12.6 1928.27 111.784 111.784 8129.000 12.6 1928.48 111.782 111.782 8130.000 12.6 1928.69 111.780 111.780 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: . DIV I Battery IA 48-Hour Coping Study Discharge Discharge 114 11-17-2018 Attachment 1 Page 126 of 274 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V)

Time (Amp) (Amp-Hour)

V-V+ -Time (Amp) (Amp-Hou,*)

V-V+ 8131.000 12.6 1928.90 111.778 111.778 8132.000 12.6 1929.11 111.777 111.777 8133,000 12.6 _ 1929.32 111.775 111.775 8134.000 12.6 1929.53 111.773 111.773 8135.000 12.6 1929.74 111.771 111.771 8136.000 12.6 1929.95 111.770 111.770 8137.000 12.6 1930.16 111.768 111.768 8138.000 12.6 1930.37 111.766 111.766 8139.000 12.6 1930.58 111.764 111.764 8140.000 12.6 1930.79 111.763 111.763 8141.000 12.6 1931.00 111.761

  • 111.761 ,8142.000 12.6 1931.21 111.759 111.759 8143.000 12.6 1931.42 111.758 111.758 8144.000 12.6 1931.63 111.756 111.756 8145.000 12.6 1931.84 111.754 111.754 8146.000 12.6 1932.05 111.752 111.752 8147.000 12.6 1932.26 111.751 111.751 8148.000 12.6 1932.47 111.749 111.749 8149.000 12.6 1932.68 111.747 111.747 8150.000 12.6 1932.90 111.745 111.745 8151.000 12.6 1933.11 111.743 111. 743 8152.000 12.6 1933.32 111.742 111. 742 8153.000 12.6 1933.53 111.740 111.740 8154.000 12.6 1933.74 111.738 111.738 8155.000 12.6 1933.95 111.736 111.736 8156.000 12.6 1934.16 111.735 111.735 8157.000 12.6 1934.37 111.733 111.733 8158.000 12.6 1934.58 111.731 111.731 8159.000 12.6 1934.79 111.729 111.729 8160.000 12.6 1935.00 111.728 111.728 8161.000 12.6 1935.21 111.726 111.726 8162.000 12.6 1935.42 111.724 111.724 8163.000 12.6 1935.63 111.722 111.722 8164.000 12.6 1935.84 111.720 111.720 8165.000 12.6 1936.05 111.719 111.719 8166.000 12.6 1936.26 111.717 111.717 8167.000 12.6 1936.47 111.715 111.715 8168.000 12.6 1936.68 111.713 111.713 8169.000 12.6 1936.89 111.712 111.712 8170.000 12.6 1937.10 111.710 111.710 8171.000 12.6 1937.31 111.708 111.708 8172.000 12.6 1937.52 111.706 111.706 8173.000 12.6 1937.73 111.704 111.704 8174.000 12.6 1937.94 111.703 111.703 8175.000 12.6 1938.15 111.701 111.701 8176.000 12.6 1938.36 111.699 111.699 8177.000 12.6 1938.57 111.697 111.697 8178.000 12.6 1938.78 111.695 111.695 8179.000 12.6 1938.99 111.694 111.694 8180.000 12.6 1939.20 111.692 111.692 8181.000 12.6 1939.41 111.690 111.690 8182.000 12.6 1939.62 111.688 111.688 8183,000 12.6 1939.83 111.686 111.686 8184.000 12.6 1940.04 111.685 111.685 8185.000 12.6 1940.25 111.683 111.683 8186.000 12.6 1940.47 111.681 111.681 8187.000 12.6 1940.68 111.679 111.679 8188.000 12.6 1940.89 111.677 111.677 8189,000 12.6 1941.10 111.675 111.675 8190.000 12.6 1941.31 111.674 111.674 8191.000 12.6 1941.52 111.672 111.672 8192.000 12.6 1941.73 111.670 111.670 8193.000 12.6 1941.94 111.668 111.668 8194.000 12.6 1942.15 111.666 111.666 8195.000 12.6 1942.36 "* 111.664 111.664 8196.000 12.6 . 1942.57 111.663 111.663 8197.000 12.6 1942.78 111.661 111.661 8198.000 12.6 1942.99 111.659 111.659 8199.000 12.6 1943.20 111.657 111.657 8200.000 12.6 1943.41 111.655 111.655 8201.000 12.6 1943.62 111.653 111.653 8202.000 12.6 1943.83 111.652 111.652 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 115 11-17-2018 Attachment 1 Page 127 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8203.000 12.6 1944.04 111.650 111.650 8204.000 12.6 1944.25 111.648 111.648 8205.000 12.6 1944.46 111.646 111.646 8206.000 12.6 1944.67 111.644 111.644 8207.000 12.6 1944.88 111.642 111.642 8208.000 12.6 1945.09 111.640 111.640 8209.000 12.6 1945.30 111.639 111.639 8210.000 12.6 1945.51 111.637 111.637 8211.000 12.6 1945.72 111.635 111.635 8212.000 12.6 1945.93 111.633 111.633 8213.000 'i2.6 1946.14 111.631 111.631 8214.000 12.6 1946.35 111.629 111.629 8215.000 12.6 1946.56 111.627 111.627 8216.000 12.6 1946.77 111.626 111.626 8217.000 12.6 1946.98 111.624 111.624 8218.000 12.6 1947.19 111.622 111.622 8219.000 12.6 1947.40 111.620 111.620 8220.000 12.6 1947.61 111.618 111.618 8221.000 12.6 1947.83 111.616 111.616 8222.000 12.6 1948.04 111.614 111.614 8223.000 12.6 1948.25 lll.612 111.612 8224.000 12.6 1948.46 111.611 111.611 8225.000 12.6 1948.67 111.609 111.609 8226.000 12.6 1948.88 111.607 111.607 8227.000 12.6 1949.09 111.605 111.605 8228.000 12.6 1949.30 111.603 111.603 8229.000 12.6 1949.51 111.601 111.601 8230.000 12.6 1949.72 111.599 111.599 8231.000 12.6 1949.93 lll.597 111.597 8232.000 12.6 1950.14 . . lll.595 111.595 8233.000 12.6 1950.35 111.593 111.593 8234.000 12.6 1950.56 111.592 111.592 8235.000 12.6 1950.77 111.590 111.590 8236.000 12.6 1950.98 111.588 111.588 8237.000 12.6 1951.19 111.586 111.586 8238.000 12.6 1951.40 111.584 111.584 8239.000 12.6 1951.61 111.582 111.582 8240.000 12.6 1951.82 111.580 111.580 8241.000 12.6 1952.03 111.578 111.578 8242.000 12.6 1952.24 111.576 111.576 8243.000 12.6 1952.45 111.574 111.574 8244.000 12.6 1952.66 111.572 111.572 8245.000 12.6 1952.87 111.570 111.570 8246.000 12.6 1953.08 111.569 111.569 8247.000 12.6 1953.29 111.567 111.567 8248.000 12.6 1953.50 111.565 111.565 8249.000 12.6 1953.71 111.563 111.563 8250.000 12.6 1953.92 111.561 111.561 8251.000 12.6 1954.13 lll.559 111.559 8252.000 12.6 1954.34 111.557 111.557 8253.000 12.6 1954.55

  • lll.555 111.555 8254.000 12.6 1954.76 111.553 111.553 8255.000 12.6 1954.97 111.551 111.551 8256.000 12.6 1955.19 111.549 111.549 8257.000 12.6 1955.40 111.547 111.547 8258.000 12.6 1955.61 111.545 111.545 8259.000 12.6 1955.82 111.543 111.543 8260.000 12.6 1956.03 111.541 111.541 8261.000 12.6 1956.24 111.539 111.539 8262.000 12.6 1956.45 111.537 111.537 8263.000 12.6 1956.66 111.536 111.536 8264.000 12.6 1956.87 111.534 111.534 8265.000 12.6 1957.08 111.532 111.532 8266.000 12.6 1957.29 111.530 111.530 8267.000 12.6 1957.50 111.528 111.528 8268.000 12.6 1957.71 111.526 111.526 8269.000 12.6 1957.92 111.524 111.524 8270.000 12.6 1958.13 111.522 111.522 8271.000 12.6 1958.34 111.520 111.520 8272.000 12.6 1958.55 111.518 111.518 8273.000 12.6 1958.76 111.516 111.516 8274.000 12.6 1958.97 111.514 111.514 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCl Date: SN: Badar Hussain Study Case: BS!A-48 Revision:

CPS SBO Study Contig.: DIV I Battery IA48-Hour Coping Study Discharj?e DischarJ?e 116 11-17-2018 Attachment 1 Page 128 of 274 KCICONSULT Base Normal Current Capacity VoltaJ?e(V)

Current Capacity VoltaJ?e(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hou,*)

V-V+ 8275.000 12.6 1959.18 111.512 111.512 8276.000 12.6 1959.39 111.510 111.510 8277.000 12.6 1959.60 111.508 111.508 8278.000 12.6 1959.81 111.506 111.506 8279.000 12.6 1960.02 111.504 111.504 8280.000 12.6 1960.23 111.502 111.502 8281.000 12.6 1960.44 111.500 111.500 8282.000 12.6 1960.65 . 111.498 111.498 8283.000 12.6 1960.86 111.496 111.496 8284.000 12.6 1961.07 111.494 111.494 8285.000 12.6 1961.28 .. 111.492 111.492 8286.000 12.6 1961.49 111.490 111.490 8287.000 12.6 1961.70 111.488 111.488 8288.000 12.6 1961.91 111.486 111.486 8289.000 12.6 1962.12 111.484 111.484 8290.000 12.6 1962.33 111.482 111.482 8291.000 12.6 1962.54 111.480 111.480 8292.000 12.6 1962.76 111.478 111.478 8293.000 12.6 1962.97 111.476 111.476 8294.000 12.6 1963.18 111.474 111.474. 8295.000 12.6 1963.39 111.472 111.472 8296.000 12.6 1963.60 . 111.470 111.470 8297.000 12.6 1963.81 111.468 111.468 8298.000 12.6 1964.02 111.466 111.466 8299.000 12.6 1964.23 111.464 111.464 8300.000 12.6 1964.44 111.462 111.462 8301.000 12.6 1964.65 111.460 111.460 8302.000 12.6 1964.86 111.458 111.458 8303.000 12.6 1965.07 111.456 111.456 8304.000 12.6 1965.28 111.454 111.454 8305.000 12.6 1965.49 111.452 111.452 8306.000 12.6 1965.70 lll.449 111.449 8307.000 12.6 1965.91 111.447 111.447 8308.000 12.6 1966.12 111.445 111.445 8309.000 12.6 1966.33 111.443 111.443 8310.000 12.6 1966.54 111.441 111.441 8311.000 12.6 1966.75 111.439 111.439 8312.000 12.6 1966.96 111.437 111.437 8313.000 12.6 1967.17 111.435 111.435 8314.000 12.6 1967.38 111.433 111.433 8315.000 12.6 1967.59 lll.431 111.431 8316.000 12.6 1967.80 111.429 111.429 8317.000 12.6 1968.01 111.427 111.427 8318.000 12.6 1968.22 111.425 111.425 8319.000 12.6 1968.43 111.423 111.423 8320.000 12.6 1968.64 111.421 111.421 8321.000 12.6 1968.85 . 111.419 111.419 8322.000 12.6 1969.06 111.416 111.416 8323.000 12.6 1969.27 111.414 111.414 8324.000 12.6 1969.48 111.412 111.412 8325.000 12.6 1969.69 111.410 111.410 8326.000 12.6 1969.90 111.408 111.408 8327.000 12.6 1970.12 111.406 111.406 8328.000 12.6 1970.33 111.404 111.404 8329.000 12.6 1970.54 111.402 111.402 8330.000 12.6 1970.75 111.400 111.400 8331.000 12.6 1970.96 111.398 111.398 8332.000 12.6 1971.17 111.396 111.396 8333.000 12.6 1971.38 111.394 111.394 8334.000 12.6 1971.59 111.391 111.391 8335.000 12.6 1971.80 111.389 111.389 8336.000 12.6 1972.01 111.387 111.387 8337.000 12.6 1972.22 111.385 111.385 8338.000 12.6 1972.43 111.383 111.383 8339.000 12.6 1972.64 111.381 111.381 8340.000 12.6 1972.85 111.379 111.379 8341.000 12.6 1973.06 111.377 111.377 8342.000 12.6 1973.27 111.375 111.375 8343.000 12.6 1973.48 111.372 111.372 8344.000 12.6 1973.69 111.370 111.370 8345.000 12.6 1973.90 111.368 111.368 8346.000 12.6 1974.11 111.366 111.366 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hnssain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Dischare:e Dischare:e 117 11-17-2018 Attachment 1 Page 129 of 274 KCICONSULT Base Normal Current Capacity Voltae:e (V) Current Capacity Voltae:e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hom*)

V-V+ 8347.000 12.6 1974.32 111.364 111.364 8348.000 12.6 1974.53 111.362 1,11.362 8349.000 12.6 1974.74 111.360 111.360 8350.000 12.6 1974.95 . 111.357 111.357 8351.000 12.6 1975.16 111.355 111.355 8352.000 12.6 1975.37 111.353 111.353 8353.000 12.6 1975.58 111.351 111.351 8354.000 12.6 1975.79 111.349 111.349 8355.000 12.6 1976.00 111.347 111.347 8356.000 12.6 1976.21 111.345 111.345 8357.000 12.6 1976.42 111.342 111.342 8358.000 12.6 1976.63 111.340 111.340 8359.000 12.6 1976.84 111.338 111.338 8360.000 12.6 1977.05 111.336 111.336 8361.000 12.6 1977.26 111.334. 111.334 8362.000 12.6 1977.48 111.332 111.332 8363.000 12.6 1977.69 111.329 111.329 8364.000 12.6 1977.90 111.327 111.327 8365.000 12.6 1978.11 111.325 111.325 8366.000 12.6 1978.32 111.323 111.323 8367.000 12.6 1978.53 111.321 111.321 8368.000 12.6 1978.74 111.319 111.319 8369.000 12.6 1978.95 111.316 111.316 8370.000 12.6 1979.16 111.314 111.314 8371.000 12.6 1979.37 111.312 111.312 8372.000 12.6 1979.58 111.310 111.310 8373.000 12.6 1979.79 111.308 111.308 8374.000 12.6 1980.00 111.306 111.306 8375.000 12.6 1980.21 111.303 111.303 8376.000 12.6 1980.42 111.301 111.301 8377.000 12.6 1980.63 111.299 111.299 , 8378.000 12.6 1980.84 111.297 111.297 8379.000 12.6 1981.05 111.295 111.295 8380.000 12.6 1981.26 111.292 111.292 8381.000 12.6 1981.47 111.290 111.290 8382.000 12.6 1981.68 111.288 111.288 . 8383.000 12.6 1981.89 111.286 111.286 8384.000 12.6 1982.10 111.283 111.283 8385.000 12.6 1982.31 111.281 111.281 8386.000 12.6 1982.52 111.279 111.279 8387.000 12.6 1982.73 111.277 111.277 8388.000 12.6 1982.94 111.275 111.275 8389.000 12.6 1983.15 111.272 111.272 8390.000 12.6 1983.36 111.270 111.270 8391.000 12.6 1983.57 111.268 111.268 8392.000 12.6 1983.78 111.266 111.266 8393.000 12.6 1983.99 111.263 111.263 8394.000 12.6 1984.20 111.261 111.261 8395.000 12.6 1984.41 111.259 111.259 8396.000 12.6 1984.62 111.257 111.257 8397.000 12.6 1984.83 111.254 111.254 8398.000 12.6 1985.05 111.252 111.252 8399.000 12.6 1985.26 111.250 111.250 8400.000 12.6 1985.47 111.248 111.248 8401.000 12.6 1985.68 111.245 111.245 8402:000 12.6 1985.89 111.243 111.243 8403.000 12.6 1986.10 lll.241 111.241 8404.000 12.6 1986.31 111.239 111.239 8405.000 12.6 1986.52 111.236 111.236 8406.000 12.6 1986.73 111.234 111.234 8407.000 12.6 1986.94 111.232 111.232 8408.000 12.6 1987.15 111.230 111.230 8409.000 12.6 1987.36 111.227 111.227 8410.000 12.6 1987.57 111.225 111.225 8411.000 12.6 1987.78 111.223 111.223 8412.000 12.6 1987.99 111.221 111.221 8413.000 12.6 1988.20 111.218 111.218 8414.000 12.6 1988.41 111.216 111.216 8415.000 12.6 1988.62 111.214 111.214 8416.000 12.6 1988.83 111.211 111.211 8417.000 12.6 1989.04 111.209 111.209 8418.000 12.6 1989.25 111.207 111.207 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 118 11-17-2018 Attachment 1 Page 130 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8419.000 12.6 1989.46 111.205 111.205 8420.000 12.6 1989.67 111.202 111.202 8421.000 12.6 1989.88 111.200 111.200 8422.000 12.6 1990.09 111.198 111.198 8423.000 12.6 1990.30 111.195 111.195 8424.000 12.6 1990.51 111.193 111.193 8425.000 12.6 1990.72 111.191 111.191 8426.000 12.6 1990.93 111.188 111.188 8427.000 12.6 1991.14 111.186 111.186 8428.000 12.6 1991.35 111.184 111.184 8429.000 12.6 1991.56 111.181 111.181 8430.000 12.6 1991.77 111.179 111.179 8431.000 12.6 1991.98 111.177 111.177 8432.000 12.6 1992.19 111.174 111.174 8433.000 12.6 1992.41 111.172 111.172 8434.000 12.6 1992.62 111.170 111.170 8435.000 12.6 1992.83 111.167 111.167 8436.000 12.6 1993.04 111.165 111.165 8437.000 12.6 1993.25 111.163 111.163 8438.000 12.6 1993.46 111.160 111.160 8439.000 12.6 1993.67 111.158 111.158 8440.000 12.6 1993.88 111.156 111.156 8441.000 12.6 1994.09 111.153 111.153 8442.000 12.6 1994.3P 111.151 111.151 8443.000 12.6 1994.51 111.149 111.149 8444.000 12.6 1994.72 111.146 111.146 8445.000 12.6 1994.93 111.144 111.144 8446.000 12.6 1995.14 111.142 111.142 8447.000 12.6 1995.35 111.139 111.139 8448.000

  • 12.6 1995.56 111.137 111.137 8449.000 12.6 1995.77 111.134 111.134 8450.000 12.6 1995.98 111.132 111.132 8451.000 12.6 1996.19 111.130 111.130 8452.000 12.6 1996.40 111.127 111.127 8453.000 12.6 1996.61 111.125 111.125 8454.000 12.6
  • 1996.82 111.123 111.123 8455.000 12.6 1997.03 111.120 111.120 8456.000 12.6 1997.24 111.118 111.118 8457.000 12.6 1997.45 111.115 111.115 8458.000 12.6 1997.66 111.113 111.113 8459.000 12.6 1997.87 111.111 111.111 8460.000 12.6 1998.08 111.108 111.108 8461.000 12.6 1998.29 111.106 111.106 8462.000 12.6 1998.50 111.103 111.103 8463.000 12.6 1998.71 Ill.IOI 111.101 8464.000 12.6 1998.92 111.099 111.099 8465.000 12.6 1999.13 111.096 111.096 8466.000 12.6 1999.34 111.094 111.094 8467.000 12.6 1999.55 111.091 111.091 8468.000 12.6 1999.77 111.089 111.089 8469.000 12.6 1999.98 111.086 111.086 8470.000 12.6 2000.19 111.084 111.084 8471.000 12.6 2000.40 111.082 111.082 8472.000 12.6 2000.61 111.079 111.079 8473.000 12.6 2000.82 111.077 111.077 8474.000 12.6 2001.03 111.074 111.074 8475.000 12.6 2001.24 111.072 111.072 8476.000 12.6 2001.45 111.069 111.069 8477.000 12.6 2001.66 111.067 111.067 8478.000 12.6 2001.87 111.065 111.065 8479.000 12.6 2002.08 111.062 111.062 8480.000 12.6 2002.29 111.060 111.060 8481.000 12.6 2002.50 111.057 111.057 8482.000 12.6 2002.71 111.055 111.055 8483.000 12.6 2002.92 111.052 111.052 8484.000 12.6 2003.13 111.050 111.050 8485.000 12.6 2003.34 111.047 111.047
  • 8486.000 12.6 2003.55 111.045 111.045 8487.000 12.6 2003.76 111.042 111.042 8488.000 12.6 2003.97 111.040 111.040 8489.000 12.6 2004.18 111.037 111.037 8490.000 12.6 2004.39 111.035 111.035 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSlA-48 Revision:

CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study Discharge Discharge 119 11-17-2018 Attachment 1 Page 131 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hom*)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8491.000 12.6 2004.60 111.032 111.032 8492.000 12.6 2004.81 111.030 111.030 8493.000 12.6 2005.02 111.027 111.027 8494.000 12.6 2005.23 111.025 111.025 8495.000 12.6 2005.44 111.022 111.022 8496.000 12.6 2005.65 111.020 111.020 8497.000 12.6 2005.86 111.017 111.017 8498.000 12.6 2006.0? 111.015 111.015 8499.000 12.6 2006.28 111.012 111.012 8500.000 12.6 2006.49 111.010 111.010 8501.000 12.6 2006.70 111.007 111.007 8502.000 12.6 2006.91 111.005 111 .. 005 8503.000 12.6 2007.13 111.002 111.002 8504.000 12.6 2007.34 111.000 111.000 8505.000 12.6 2007.55 110.997 110.997 8506.000 12.6 '2007.76 110.995 110.995 8507.000 12.6 2007.97 110.992 110.992 8508.000 12.6 2008.18 110.990 110.990 8509.000 12.6 2008.39 110.987 110.987 8510.000 12.6 2008.60 110.985 110.985 8511.000 12.6 2008.81 110.982 110.982 8512.000 12.6 2009.02 110.980 110.980 8513.000 12.6 2009.23 110.977 110.977 8514.000 12.6 2009.44 110.975 110.975 8515.000 12.6 2009.65 110.972 110.972 8516.000 12.6 2009.86 110.969 110.969 8517.000 12.6 2010.07 110.967 110.967 8518.000 12.6 2010.28 110.964 110.964 8519.000 12.6 2010.49 110.962 110.962 8520.000 12.6 2010.70 110.959 110.959 8521.000 12.6 2010.91 110.957 110.957 8522.000 12.6 2011.12 110.954 110.954 8523.000 12.6 2011.33 110.951 110.951 8524.000 12.6 2011.54 110.949 110.949 8525.000 12.6 2011.75 110.946 110.946 8526.000 12.6 2011.96 110.944 110.944 8527.000 12.6 2012.17 110.941 110.941 8528.000 12.6 2012.38 110.939 110.939 8529.000 12.6 2012.59 110.936 110.936 8530.000 12.6 2012.80 110.933 110.933 8531.000 12.6 2013.01 110.931 110.931 8532.000 12.6 2013.22 110.928 110.928 8533.000 12.6 2013.43 110.926 110.926 8534.000 12.6 2013.64 l l0.923 110.923 8535.000 12.6 2013.85 110.920 110.920 8536.000 12.6 2014.06 110.918 110.918 8537.000 12.6 2014.27 110.915 110.915 8538.000 12.6 2014.48 110.912 110.912 8539.000 12.6 2014.70 110.910 110.910 8540.000 12.6 2014.91 110.907 110.907 8541.000 12.6 2015.12 110.905 110.905 8542.000 12.6 2015.33 110.902 110.902 8543.000 12.6 2015.54 ,* 110.899 110.899 8544.000 12.6 2015.75 110.897 110.897 8545.000 12.6 2015.96 110.894

  • 110.894 8546.000 12.6 2016.17 110.891 110.891 8547.000 12.6 2016.38 110.889 110.889 8548.000 12.6 2016.59 110.886 110.886 8549.000 12.6 2016.80 110.883 110.883 8550.000 12.6 2017.01 110.881 110.881 8551.000 12.6 2017.22 110.878 110.878 8552.000 12.6 2017.43 110.876 110.876 8553.000 12.6 2017.64 110.873 110.873 8554.000 12.6 2017.85 110.870 110.870 8555.000 12.6 2018.06 110.868 110.868 8556.000 12.6 2018.27 ll0.865 110.865 8557.000 12.6 2018.48 110.862 110.862 8558.000 12.6 2018.69 110.859 110.859 8559.000 12.6 2018.90 110.857 110.857 8560.000 12.6 2019.11 110.854 110.854 8561.000 12.6 2019.32 110.851 110.851 8562.000 12.6 2019.53 110.849 110.849 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Dischar2e Dischar2e 120 11-17-2018 Attachment 1 Page 132 of 274 KCICONSULT Base Normal Current Capacity Volta2e(V)

Current Capacity Volta2e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8563.000 12.6 2019.74 110.846 110.846 8564.000 12.6 2019.95 110.843 110.843 8565.000 12.6 2020.16 110.841 110.841 8566.000 12.6 2020.37 110.838 110.838 8567.000 12.6 2020.58 110.835 110.835 8568.000 12.6 2020.79 110.833 110.833 8569.000 12.6 2021.00 .. 110.830 110.830 8570.000 12.6 2021.21 110.827 110.827 8571.000 12.6 2021.42 110.824 110.824 8572.000 12.6 2021.63 110.822 110.822 8573.000 12.6 2021.84 110.819 110.819 8574.000 12.6 2022.06 110.816 110.816 8575.000 12.6 2022.27. 110.813 110.813 8576.000 12.6 2022.48 110.811 110.811 8577.000 12.6 2022.69 110.808 110.808 8578.000 12.6 2022.90 110.805 110.805 8579.000 12.6 2023.11 110.803 110.803 8580.000 12.6 2023.32 110.800 110.800 8581.000 12.6 2023.53 110.797 110.797 8582.000 12.6 2023.74 110.794 110.794 8583.000 12.6 2023.95 110.791 110.791 8584.000 12.6 2024.16 110.789 110.789 8585.000 12.6 2024.37 110.786 110.786 8586.00_0 12.6 2024.58 110.783 110.783 8587.000 12.6 2024.79 110.780 110.780 8588.000 12.6 2025.00 110.778 110.778 8589.000 12.6 2025.21 110.775 110.775 8590.000 12.6 2025.42 110.772 110.772 8591.000 12.6 2025.63 110.769 110.769 8592.000 12.6 2025.84 110.767 110.767 8593.000 12.6 2026.05 110.764 110.764 8594.000 12.6 2026.26 110.761 110.761 8595.000 12:6 2026.47 110.758 110.758 8596.000 12.6 2026.68 110.755 110.755 8597.000 12.6 2026.89 110.753 110.753 8598.000 12.6 2027.10 110.750 110.750 8599.000 12.6 2027.31 110.747 110.747 8600.000 12.6 2027.52 110.744 110.744 8601.000 12.6 2027.73 110.741 110.741 8602.000 12.6 2027.94 110.738 110.738 8603.000 12.6 2028.15 110.736 110.736 8604.000 12.6 2028.36 110.733 110.733 8605.000 12.6 2028.57 110.730 110.730

  • 8606.000 12.6 2028.78 110.727 110.727 8607.000 12.6 2028.99 110.724 110.724 8608.000 12.6 2029.20 110.721 110.721 8609.000 12.6 2029.42 110.719 110.719 8610.000 12.6 2029.63 110.716 110.716 8611.000 12.6 2029.84 110.713 110.713 8612.000 12.6 2030.05 110.710 110.710 8613.000 12.6 2030.26 110.707 110.707 8614.000 12.6 2030.47 110.704 110.704 8615.000 12.6 2030.68 110.701 110.701 8616.000 12.6 2030.89 110.699 110.699 8617.000 12.6 2031.10 110.696 110.696 8618.000 12.6 2031.31 110.693 110.693 8619.000 12.6 2031.52 110.690 110.690 8620.000 12.6 2031.73 110.687 110.687 8621.000 12.6 2031.94 110.684 110.684 8622.000 12.6 2032.15 110.681 110.681 8623.000 12.6 2032.36 110.678 110.678 8624.000 12.6 2032.57 110.676 110.676 8625.000 12.6 2032.78 110.673 110.673 8626.000 12.6 2032.99 110.670 110.670 8627.000 12.6 2033.20 110.667 110.667 8628.000 12.6 2033.41 110.664 110.664 8629.000 12.6 2033.62 110.661 110.661 8630.000 12.6 2033.83 110.658 110.658 8631.000 12.6 2034.04 110.655 110.655 8632.000 12.6 2034.25 110.652 110.652 8633.000 12.6 2034.46 110.649 110.649 8634.000 12.6 2034.67 110.646 110.646 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 121 11-17-2018 Attachment 1 Page 133 of 274 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hool')

V-V+ Time (Amp) (Amp-Hool')

V-V+ 8635.000 12.6 2034.88 110.643 110.643 8636.000 12.6 2035.09 110.641 110.641 8637.000 12.6 2035.30 110.638 110.638 8638.000 12.6 2035.51 110.635 110.635 8639.000 12.6 2035.72 110.632 110.632 8640.000 12.6 2035.93 110.629 110.629 8641.000 12.6 2036.14 110.626 110.626 8642.000 12.6 2036.35 110.623 110.623 8643.000 12.6 2036.56 110.620 110.620 8644.000 1-2.6 2036.77 110.617 110.617 8645.000 12.6 2036.99 110.614 110.614 8646.000 12.6 2037.20 110.611 110.611 8647.000 12.6 2037.41 110.608 110.608 8648.000 12.6 2037.62 110.605 110.605 8649.000 12.6 2037.83 110.602 110.602 8650.000 12.6 2038.04 110.599 110.599 8651.000 12.6 2038.25 110.596 110.596 8652.000 12.6 2038.46 110.593 110.593 8653.000 12.6 2038.67 110$0 110.590 8654.000 12.6 2038.88 110.587 110.587 8655.000 12.6 2039.09 110.584 110.584 8656.000 12.6 2039.30 110.581 110.581 8657.000 12.6 2039.51 110.578 110.578 8658.000 12.6 2039.72 110.575 110.575 8659.000 12.6 2039.93 110.572 110.572 8660.000 12.6 2040.14 110.569 110.569 8661.000 12.6 2040.35 110.566 110.566 8662.000 12.6 2040.56 110.563 110.563 8663.000 12.6 2040.77 110.560 110:560 8664.000 12.6 2040.98 110.557 110.557 8665.000 12.6 2041.19 110.554 110.554 8666.000 12.6 2041.40 110.551 110.551 8667.000 12.6 2041.61 110.548 110.548 8668.000 12.6 2041.82 110.545 110.545 8669.000 12.6 2042.03 110.542 110.542 8670.000 12.6 2042.24 110.539 110.539 8671.000 12.6 2042.45 110.535 110.535 8672.000 12.6 2042.66 110.532 110.532 8673.000 12.6 2042.87 110.529 110.529 8674.000 12.6 2043.08 110.526 110.526 8675.000 12.6 2043.29 110.523 110.523 8676.000 12.6 2043.50 110.520 110.520 8677.000 12.6 2043.71 110.517 110.517 8678.000 12.6 2043.92 110.514 110.514 8679.000 12.6 2044.13 110.511 110.511 8680.000 12.6 2044.35 110.508 110.508 8681.000 12.6 2044.56 110.505 110.505 8682.000 12.6 2044.77 110.502 110.502 8683.000 12.6 2044.98 110.498 110.498 8684.000 12.6 2045.19 110.495 110.495 8685.000 12.6. 2045.40 110.492 110.492 8686.000 12.6 2045.61 110.489 110.489 8687.000 12.6 2045.82

  • 110.486 110.486 8688.000 12.6 2046.03 110.483 110.483 8689.000 12.6 2046.24 110.480 110.480 8690.000 12.6 2046.45 110.477 110.477 8691.000 12.6 2046.66 110.473 110.473 8692.000 *12.6 2046.87 110.470 110.470 8693.000 12.6 2047.08 110.467 110.467 8694.000 12.6 2047.29 110.464 110.464 8695.000 12.6 2047.50 110.461 110.461 8696.000 12.6 2047.71 110.458 110.458 8697.000 12.6 2047.92 110.454 110.454 8698.000 12.6 2048.13 110.451 110.451 8699.000 12.6 2048.34 110.448 110.448 8700.000 12.6 2048.55 110.445 110.445 8701.000 12.6 2048.76 110.442 110.442 8702.000 12.6 2048.97 110.439 110.439 8703.000 12.6 2049.18 110.435 110.435 8704.000 12.6 2049.39 110.432 110.432 8705.000 12.6 204_9.60 110.429 110.429 8706.000 12.6 2049.81 110.426 110.426 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA48-Hour Coping Study Discharge Discharge 122 11-17-2018 Attachment 1 Page 134 of 274 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8707.000 12.6 2050.02 110.423 110.423 8708.000 12.6 2050.23 110.419 110.419 8709.000 12.6 2050.44 110.416 110.416 8710.000 12.6 2050.65 110.413 110.413 8711.000 12.6 2050.86 110.410 110.410 8712.000 12.6 2051.07 110.406 110.406 8713.000 12.6 2051.28 110.403 110.403 8714.000 12.6 2051.49 110.400 110.400 8715.000 12.6 2051.71 110.397 110.397 8716.000 12.6 2051.92 110.394 110.394 8717.000 12.6 2052.13 110.390 110.390 8718.000 12.6 2052.34 110.387 110.387 8719.000 12.6 2052.55 110.384 110.384 8720.000 12.6 2052.76 110.381 110.381 8721.000 12.6 2052.97 110.377 110.377 8722.000 12.6 2053.18 110.374 110.374 8723.000 12.6 2053.39 110.371 110.371 8724.000 12.6 2053.60 110.367 110.367 8725.000 12.6 2053.81 110.364 110.364 8726.000 12.6 2054.02 110.361 110.361 8727.000 12.6 2054.23 110.358 110.358 8728.000 12.6 2054.44 110.354 110.354 8729.000 12.6 2054.65 110.351 110.351 8730.000 12.6 2054.86 110.348 110.348 8731.000 12.6 2055.07 110.344 110.344 8732.000 12.6 2055.28 110.341 110.341 8733.000 12.6 2055.49 110.338 110.338 8734.000 12.6 2055.70 110.334 110.334 8735.000 12.6 2055.91 110.331 110.331 8736.000 12.6 2056.12 110.328 110.328 8737.000 ' 12.6 2056.33 110.324 110.324 8738.000 12.6 2056.54 110.321 110.321 8739.000 12.6 2056.75 110.318 110.318 8740.000 12.6 2056.96 110.314 110.314 8741.000 12.6 2057.17 110.311 110.311 8742.000 12.6 2057.38 110.308 110.308 8743.000 12.6 2057.59 110.304 110.304 8744.000 12.6 2057.80 110.301 110.301 8745.000 12.6 2058.01 110.298 110.298 8746.000 12.6 2058.22 110.294 110.294 8747.000 12.6 2058.43 110.291 110.291 8748.000 12.6 2058.64 110.288 110.288 8749.000 12.6 2058.85 110.284 110.284 8750.000 12.6 2059.06 110.281 110.281 8751.000 12.6 2059.28 110.277 110.277 8752.000 12.6 2059.49 110.274 110.274 8753.000 12.6 2059.70 110.271 110.271 8754.000 12.6 2059.91 110.267 110.267 8755.000 12.6 2060.12 110.264 110.264 8756.000 12.6 2060.33 110.260 110.260 8757.000 12.6 2060.54 110.257 110.257 8758.000 12.6 2060.75 110.254 110.254 8759.000 12:6 2060.96 110.250 110.250 8760.000 12.6 2061.17 110.247 110.247 8761.000 12.6 2061.38 110.243 110.243 8762.000 12.6 2061.59 110.240 110.240 8763.000 12.6 2061.80 110.236 110.236 8764.000 12.6 2062.01 110.233 110.233 8765.000 12.6 2062.22 110.229 110.229 8766.000 12.6 2062.43 110.226 110.226 8767.000 12.6 2062.64 110.223 110.223 8768.000 12.6 2062.85 110.219 110.219 8769.000 12.6 2063.06 110.216 110.216 8770.000 12.6 2063.27 110.212 110.212 8771.000 12.6 2063.48 110.209 110.209 8772.000 12.6 2063.69 110.200 110.200 8773.000 12.6 2063.90 110.200 110.200 8774.000 12.6 2064.11 110.200 110.200 8775.000 12.6 2064.32 110.200 110.200 8776.000 12.6 2064.53 110.195 110.195 8777.000 12.6 2064.74 110.193 110.193 8778.000 12.6 2064.95 110.191 110.191 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 123 11-17-2018 Attachment 1 Page 135 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 8779.000 12.6 2065.16 110.190 110.190 8780.000 12.6 2065.37 110.188 110.188 8781.000 12.6 . 2065.58 110.186 110.186 8782.000 12.6 2065.79 110.184 110.184 8783.000 12.6 2066.00 110.182 110.182 8784.000 12.6 2066.21 110.180 110.180 8785,000 12.6 2066.42 110.178 110.178 8786.000 12.6 2066.64 110.176 110.176 8787.000 12.6 2066 .. 85 110.175 110.175 8788.000 12.6 2067.06 110.173 110.173 8789.000 12.6 2067.27 110.171 110.171 8790.000 12.6 2067.48 110.169 110.169 8791.000 12.6 2067.69 110.167 110.167 8792.000 12.6 2067.90 110.165 110.165 8793.000 12.6 2068.11 110.163 110.163 8794.000 12.6 2068.32 110.161 110.161 8795.000 12.6 2068.53 110.159 110.159 8796.000 12.6 2068.74 110.158 110.158 8797.000 12.6 2068.95 110.156 110.156 8798.000 12.6 2069.16 110.154 110.154 8799.000 12.6 2069.37 110.152 110.152 8800.000 12.6 2069.58 110.150 110.150 8801.000 12.6 2069.79 110.148 110.148 8802.000 12.6 2070.00 110.146 110.146 8803.000 12.6 2070.21 110.144 110.144 8804.000 12.6 2070.42 110.143 110.143 8805.000 12.6 2070.63 110.141 110.141 8806.000 12.6 2070.84 110.139 110.139 8807.000 12.6 2071.05 110.137 110.137 8808.000 12.6 2071.26 110.135 110.135 8809.000 12.6 2071.47 110.133 110.133 8810.000 12.6 2071.68 110.131 110.131 8811.000 12.6 2071.89 110.129 110.129 8812.000 12.6 2072.10 110.128 110.128 8813.000 12.6 2072.31 110.126 110.126 8814.000 12.6 2072.52 110.124 110.124 8815.000 12.6 2072.73 110.122 110.122 8816.000 12.6 2072.94 110.120 110.120 8817.000 12.6 2073.15. 110.118 110.118 8818.000 12.6 2073.36 110.116 110.116 8819.000 12.6 2073.57 110.114 110.114 8820.000 12.6 2073.78 110.113 110.113 8821.000 12.6 2074.00 110.lll . . 110.111 8822.000 12.6 2074.21 110.109 110.109 8823.000 12.6 2074.42 110.107 110.107 8824.000 12.6 2074.63 110.105 110.105 8825.000 12.6 2074.84 110.103 110.103 8826.000 12.6 2075.05 110.101 110.101 8827.000 12.6 2075.26 110.099 110.099 8828.000 12.6 2075.47 110.098 110.098 8829.000 12.6 2075.68 110.096 110.096 8830.000 12.6 2075.89 110.094 110.094 8831.000 12.6 2076.10 110.092 110.092 8832.000 12.6 2076.31 110.090 110.090 8833,000 12.6 2076.52 110.088 110.088 8834.000 12.6 2076.73 110.086 )10.086 8835.000 12.6 2076.94 110.085 110.085 8836.000 12.6 2077.15 110.083 110.083 8837.000 12.6 2077.36 110.081 110.081 8838.000 12.6 2077.57 110.079 110.079 8839.000 12.6 2077.78 110.077 110.077 8840.000 12.6 2077.99 110.075 110.075 8841.000 12.6 2078.20 110.073 110.073 8842.000 12.6 2078.41 110.071 110.071 8843.000 12.? 2078.62 110.070 110.070 8844.000 12.6 2078.83 110.068 110.068 8845.000 12.6 2079.04 110.066 110.066 8846.000 12.6 2079.25 110.064 110.064 8847.000 12.6 2079.46 110.062 110.062 8848.000 12.6 2079.67 110.060 110.060 8849.000 12.6 2079.88 110.058 110.058 8850.000 12.6 2080.09 110.057 110.057 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Discharge Discharge 124 11-17-2018 Attachment 1 Page 136 of 274 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8851.000 12.6 2080.30 110.055 110.055 8852.000 12.6 2080.51 110.053 110.053 8853.000 12.6 2080.72 110.051 110.051 8854.000 12.6 2080.93 JJ0.049 110.049 8855.000 12.6 2081.14 110.047 110.047 8856.000 12.6 2081.35 IJ0.045 IJ0.045 8857.000 12.6 2081.57 110.044 . IJ0.044 8858.000 12.6 2081.78 110.042 110.042 8859.000 12.6 2081.99 110.040 110.040 8860.000 12.6 2082.20 110.038 .. IJ0.038 8861.000 12.6 2082.41 110.036 IJ0.036 8862.000 12.6 2082.62 IJ0.034 110.034 8863.000 12.6 2082.83 110.032 110.032 8864.000 12.6 2083.04 IJ0.031 110.031 8865.000 12.6 2083.25 JJ0.029 110.029 8866.000 12.6 . 2083.46 110.027 110.027 8867.000 12.6 2083.67 110.025 IJ0.025 8868.000 12.6 2083.88 JJ0.023 110.023 8869.000 12.6 2084.09 110.021 JJ0.021 8870.000 12.6 2084.30 110.019 110.019 8871.000 12.6 2084.51 110.018 IJ0.018 8872.000 12.6 2084.72 JJ0.016 IJ0.016 8873.000 12.6 2084.93 IJ0.014 110.014 8874.000 12.6 2085.14 JJ0.012 110.012 8875.000 12.6 2085.35 110.010 IJ0.010 8876.000 12.6 2085.56 IJ0.008 110.008 8877.000 12.6 2085.77 110.007 JJ0.007 8878.000 12.6 2085.98 IJ0.005 110.005 8879.000 12.6 2086.19 IJ0.003 IJ0.003 8880.000 12.6 2086.40 110.001 110.001 8881.000 12.6 2086.61 109.999 109.999 8882.000 12.6 2086.82 109.997 109.997

  • 8883.000 12.6 2087.03 109.995 109.995 8884.000 12.6 2087.24 109.994 109.994 8885.000 12.6 2087.45 109.992 109.992 8886.000 12.6 2087.66 109.990 109.990 8887.000 12.6 2087.87 109.988 109.988 8888.000 12.6 2088.08 109.986 109.986 8889.000 12.6 2088.29 109.984 109.984 8890.000 12.6 2088.50 109.983 109.983 8891.000 12.6 2088.71 109.981 109.981 8892.000 12.6 2088.93 109.979 109.979 8893.000 12.6 2089.14 109.977 109.977 8894.000 12.6 2089.35 109.975 109.975 8895.000 12.6 2089.56 109.973 109.973 8896.000 12.6 2089.77. 109.971 109.971 8897.000 12.6 2089.98 109.970 109.970 8898.000 12.6 2090.19 109.968 109.968 8899.000 12.6 2090.40 109.966 109.966 8900.000 12.6 2090.61 109.964 109.964 8901.000 12.6 2090.82 109.962 . 109.962 8902.000 12.6 2091.03 109.960 109.960 8903.000 12.6 2091.24 109.959 109.959 8904.000 12.6 2091.45 109.957 109.957 8905.000 12.6 2091.66 109.955 109.955 8906.000 12.6 2091.87 109.953 109.953 8907.000 12.6 2092.08 109.951 109.951 8908.000 12.6 2092.29 109.949 109.949 8909.000 12.6 2092.50 109.948 109.948 8910.000 12.6 2092.71 109.946 109.946 8911.000 12.6 2092.92 109.944 109.944 8912.000 12.6 2093.13 109.942 109.942 8913.000 12.6 2093.34 109.940 109.940 8914.000 12.6 2093.55 109.938 .. 109.938 8915.000 12.6 2093.76 109.937 109.937 8916.000 12.6 2093.97 109.935 109.935 8917.000 12.6 2094.18 109.933 109.933 8918.000 12.6 2094.39 109.931 109.931 8919.000 12.6 2094.60 109.929 109.929 8920.000 12.6 2094.81 109.927 109.927 8921.000 12.6 2095.02 109.926 109.926 8922.000 12.6 2095.23 109.924 109.924 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Dischar2e Dischar2e 125 11-17-2018 Attachment 1 Page 137 of 274 KCICONSULT Base Nonna( Current Capacity Volta2e(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hou.-)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8923.000 12.6 2095.44 109.922 109.922 8924.000 12.6 2095.65 109.920 109.920 8925.000 12.6 2095.86 109.918 109.918 8926.000 12.6 2096.07 109.916 109.916 8927.000 12.6 2096.29 109.915 109.915 8928.000 12.6 2096.50 109.913 109.913 8929.000 12.6 2096.71 109.911 109.911 8930.000 12.6 2096.92 109.909 109.909 8931.000 12.6 2097.13 109.907 109.907 8932.000 12.6 2097.34 109.905 109.905 8933.000 12.6 2097.55 109.904 109.904 8934.000 12.6 2097.76 109.902 109.902 8935.000 12.6 2097.97 109.900 109.900 8936.000 12.6 2098.18 109.898 109.898 8937.000 . 12.6 2098.39 109.896 109.896 8938.000 12.6 2098.60 109.895 109.895 8939.000 12.6 2098.81 109.893 109.893 8940.000 12.6 2099.02 109:891 109.891 8941.000 12.6 2099.23 109.889 109.889 8942.000 12.6 2099.44 109.887 109.887 8943.000 12.6 2099.65 109.885 109.885 8944.000 12.6 2099.86 109.884 109.884 8945.000 12.6 2100.07 109.882 109.882 8946.000 12.6 2100.28 109.880 109.880 8947.000 12.6 2100.49 109.878 109.878 8948.000 12.6 2100.70 109.876 109.876 8949.000 12.6 2100.91 109.874 109.874 8950.000 12.6 2101.12 109.873 109.873 8951.000 12.6 2101.33 109.871 109.871 8952.000 12.6 2101.54 109.869 109.869 8953.000 12.6 2101.75 109.867 109.867 8954.000 12.6 2101.96 109.865 109.865 8955.000 12.6 2102.17 109.864 109.864 8956.000 12.6 2102.38 109.862 109.862 8957.000 12.6 2102.59 109.860 109.860 8958.000 12.6 2102.80 109.858 109.858 8959.000 12.6 2103.01 109.855 109.855 8960.000 12.6 2103.22 109.853 109.853 8961.000 12.6 2103.43 109.851 109.851 8962.000 12.6 2103.65 109.849 109.849 8963.000 12.6 2103.86 109.847 109.847 8964.000 12.6 2104.07 109.845 109.845 8965.000 12.6 2104.28 109.843 109.843 8966.000 12.6 2104.49 109.841 109.841 8967.000 12.6 2104.70 109.839 109.839 8968.000 12.6 2104.91 109.837 109.837 8969.000 12.6 2105.12 109.834 109.834 8970.000 12.6 2105.33 109.832 109.832 8971.000 12.6 2105.54 109.830 109.830 8972.000 12.6 2105.75 109.828 109.828 8973.000 12.6 2105.96 109.826 109.826 8974.000 12.6 2106.17 .. 109.824 109.824 8975.000 12.6 2106.38 109.822 109.822 8976.000 12.6 2106.59 109.820 109.820 ' 8977.000 12.6 2106.80 109.817 109.817 8978.000 12.6 2107.01 109.815 109.815 8979.000 12.6 2107.22 109.813 109.813 8980.000 12.6 2107.43 .. 109.811 109.811 8981.000 12.6 2107.64 109.809 109.809 8982.000 12.6 2107.85 109.807 109.807 8983.000 12.6 2108.06 109.804 109.804 , 8984.000 12.6 2108.27 109.802 109.802 8985.000 12.6 2108.48 109.800 109.800 8986.000 12.6 2108.69 109.798 109.798 8987.000 12.6 2108.90 109.796 109.796 8988.000 12.6 2109.11 109.794 109.794 8989.000 12.6 2109.32 109.791 109.791 8990.000 12.6 2109.53 109.789 109.789 8991.000 12.6 2109.74 109.787 109.787 8992.000 12.6 2109.95 109.785 109.785 8993.000 12.6 2110.16 109.783 109.783 8994.000 1*2.6 2110.37 109.781 109.781 EC 626319 Project: Location:

Contract:

Enginber:

Filename:

10.4 ET AP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.l.ON KCI Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery 1 A 48-Hour Coping Study Discharj?e Dischar1?e 126 11-17-2018 Attachment 1 Page 138 of 274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 8995.000 12.6 2110.58 109.778 109.778 8996.000 12.6 2110.79 109.776 109.776 8997.000 12.6 2111.00 109.774 109.774 8998.000 12.6 2111.22 109.772 109.772 8999.000 12.6 2111.43 109.770 109.770 9000.000 12.6 2111.64 109.767 109.767 9001.000 12.6 2111.85 109.765 109.765 9002.000 12.6 2112.06 109.763 109.763 9003.000 12.6 2112.27 109.761 109.761 9004.000 12.6 2112.48 109.758 109.758 9005.000 12.6 2112.69 109.756 109.756 9006.000 12.6 2112.90 109.754 109.754 9007.000 12.6 2113.11 . 109.752 109.752 9008.000 12.6 2113.32 109.750 109.750 9009.000 12.6 2113.53 109.747 109.747 9010.000 12.6 2113.74 109.745 109.745 9011.000 12.6 2113.95 109.743 109.743 9012.000 12.6 2114.16 109.741 109.741 9013.000 12.6 2114.37. 109.738 109.738 9014.000 12.6 2114.58 109.736 109.736 9015.000 12.6 2114.79 109.734 109.734 9016.000 12.6 2115.00 109.732 109.732 9017.000 12.6 2115.21 109.729 109.729 9018,000 12.6 2115.42 109.727 109.727 9019.000 12.6 2115.63 109.725 109.725 9020.000 12.6 2115.84 109.722 109.722 9021.000 12.6 2116.05 109.720 109.720 9022.000 12.6 2116.26 109.718 109.718 9023.000 12.6 2116.47 109.716 109.716 9024.000 12.6 2116.68 109.713 109.713 9025.000 12.6 2116.89 109.711 109.711 9026.000 12.6 2117.10 109.709 109.709 9027.000 12.6 2117.31 109.706 109.706 9028.000 12.6 2117.52 109.704 109.704 9029.000 12.6 2117:73 109.702 109.702 9030.000 12.6 2117.94 109.700 109.700 9031.000 12.6 2118.15 109.697 109.697 9032.000 12.6 2118.37 109.695 109.695 9033.000 12.6 2118.58 109.693 109.693 9034.000 12.6 2118.79 109.690 109.690 9035.000 12.6 2119.00 109.688 109.688 9036.000 12.6 2119.21 109.686 109.686 9037.000 12.6 2119.42 109.683 109.683 9038.000 12.6 2119.63 109.681 109.681 9039.000 12.6 2119.84 109.6?9 109.679 9040.000 12.6 2120.05 109.676 109.676 9041.000 12.6 2120.26 109.674 109.674 9042.000 12.6 2120.47 109.672 109.672 9043.000 12.6 2120.68 109.669 109.669 9044.000 12.6 2120.89 109.667 109.667 9045.000 12.6 2121.10 109.665 109.665 9046.000 12.6 2121.31 109.662 109.662 9047.000 12.6 2121.52 109.660 109.660 9048.000 12.6 2121.73 109.657 109.657 9049.000 12.6 2121.94 109.655 109.655 9050.000 12.6 2122.15 109.653 109.653 9051.000 12.6 2122.36 109.650 109.650 9052.000 12.6 2122.57 109.648 109.648 9053.000 12.6 2122.78 109.646 109.646 9054.000 12.6 2122.99 109.643 109.643 9055.000 12.6 2123.20 109.641 109.641 9056.000 12.6 2123.41 109.638 109.638 9057.000 12.6 2123.62 109.636 109.636 9058.000 12.6 2123.83 109.634 109.634 9059.000 12.6 2124.04 109.631 109.631 9060.000 12.6 2124.25 109.629 109.629 9061.000 12.6 2124.46 109.626 109.626 9062.000 12.6 2124.67 109.624 109.624 9063.000 12.6 2124.88 109.621 109.621 9064.000 12.6 2125.09 109.619 109.619 9065.000 12.6 2125.30 109.617 109.617 9066.000 12.6 2125.51 109.614 109.614 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.l.ON KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Discharge Discharge 127 11-17-2018 Attachment 1 Page 139 of274 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 9067.000 12.6 2125.72 109.612 109.612 9068.000 12.6 2125.94 109.609 109.609 ~069.000 12.6 2126.15 109.607 109.607 9070.000 12.6 2126.36 109.604 109.604 9071.000 12.6 2126.57 109.602 109.602 9072.000 " 12.6 2126.78

.. 109.600 109.600 9073.000 12.6 2126.99 109.597 109.597 9074.000 12.6 2127.20 109.595 109.595 9075.000 12.6 2127.41 109.592 109.592 9076.000 12.6 2127.62 109.590 109.590 9077.000 12.6 2127.83 109.587 109.587 9078."000 12.6 2128.04 109.585 109.585 9079.000 12.6 2128.25 109.582 109.582 9080.000 12.6 2128.46 109.580 109.580 9081.000 12.6 2128.67 109.577 109.577 9082.000 12.6 2128.88 109.575 109.575 9083.000 12.6 2129.09 109.572 109.572 9084.000 12.6 2129.30 109.570 109.570 9085.000

  • 12.6 2129.51 109.~67 109.567 9086.000 12.6 2129.72 109.565 109.565 9087.000 12.6 2129.93 109.562 109.562 9088.000 12.6 2130.14 109.560 109.560 9089.000 12.6 2130.35 109.557 109.557 9090.000 12.6 2130.56 109.555 109.555 9091.000 12.6 2130.77 109.552 109.552 9092.000 12.6 2130.98 109.550 109.550 9093.000 12.6 2131.19 109.547 109.547 9094.000 12.6 2131.40 109.545 109.545 9095.000 12.6 2131.61 109.542 109.542 9096.000 12.6 2131.82 109.540 109.540 9097.000 12.6 2132.03 109.537 109.537 9098.000 12.6 2132.24 109.535 .. 109.535 9099.000 12.6 2132.45 109.532 109.532 9100.000 12.6 2132.66 109.529 109.529 9101.000 12.6 2132.87 109.527 109.527 9i02.000 12.6 2133.08 109.524 109.524 9103.000 12.6 2133.29 109.522 109.522 9104.000 12.6 2133.51 109.519 109.519 9105.000 12.6 2133.72 109.517 109.517 9106.000 12.6 2133.93 109.514 109.514 9107.000 12.6 2134.14 109."511 109.511 9108.000 12.6 2134.35 109.509 109.509 9109.000 12.6 2134.56 109.506 109.506 9110.000 12.6 2134.77 109.504 109.504 9111.000 12.6 2134.98 109.501 109.501 9112.000 12.6 2135.19 109.498 109.498 9113.000 12.6 2135.40 109.496 109.496 9114.000 12.6 2135.61 109.493 109.493 9115.000 12.6 2135.82 109.491 109.491 9116.000 12.6 2136.03 109.488 109.488 9117.000 12.6 2136.24 109.485 109.485 9118.000 12.6 2136.45 109.483 109.483 9119.000 12.6 2136.66 109.480 109.480 9120.000 12.6 2136.87 109.477 109.477 9121.000 12.6 2137.08 109.475 109.475 9122.000 12.6 2137.29 109.472 109.472 9123.000 12.6 2137.50 109.470 109.470 9124.000 12.6 2137.71 109.467 109.467 9125.000 12.6 2137.92 109.464 109.464 9126.000 12.6 2138.13 109.462 109.462 9127.000 12.6 2138.34 109.459 109.459 9128.000 12.6 2138.55 109.456 109.456 9129.000 12.6 2138.76 109.454 109.454 9130.000 12.6 2138.97 109.451 109.451 9131.000 12.6 2139.18 109.448 109.448 9132.000 12.6 2139.39 109.446 109.446 9133.000
  • 12.6 2139.60 109.443 109.443 9134.000 12.6 2139.81 109.440 109.440 9135.000 12.6 2140.02 109.437 109.437 9136.000 12.6 2140.23 109.435 109.435 9137.000 12.6 2140.44 109.432 109.432 9138.000 12.6 2140.66 109.429 109.429 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP I Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: . DIV I Battecy I A 48-Hour Coping Study Discharge Discharge 128 11-17-2018 Attachment 1 Page 140 of 274 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hom*)

V-V+ Time (Amp) (Amp-Hour)

V-V+ . 9139.000 12.6 2140.87 109.427 109.427 9140.000 12.6 2141.08 109.424 109.424 9141.000 12.6 2141.29 109.421 109.421 9142.000 12.6 2141.50 109.418 109.418 9143.000 12.6 2141.71 109.416 109.416 9144.000 12.6 2141.92 109.413 109 .. 413 9145.000 12.6 2142.13 109.410 109.410 9146.000 12.6 2142.34 109.408 109.408 9147.000 12.6 2142.55 109.405 109.405 9148.000 12.6 2142.76 109.402 109.402 9149.000 12.6 2142.97 109.399 109.399 9150.000 12.6 2143.18 109.397 109.397 9151.000 12.6 2143.39 109.394 109.394 9152.000 12.6 2143.60 109.391 109.391 9153.000 12.6 2143.81 109.388 109.388 9154.000 12.6 2144.02 109.385 109.385 9155.000 12.6 2144.23 109.383 109.383 9156.000 12.6 2144.44 109.380 109.380 9157.000 12.6 2144.65 109.377 109.377 9158.000 12.6 2144.86 109.374 109.374 9159.000 12.6 2145.07 109.372 109.372 9160.000 12.6 2145.28 109.369 109.369 9161.000 12.6 2145.49 109.366 109.366 9162.000 12.6 2145.70 109.363 109.363 9163.000 12.6 2145.91 109.360 109.360 9164.000 12.6 2146.12 109.357 109.357 9165.000 12.6 2146.33 109.355 109.355 9166.000 12.6 2146.54 109.352 109.352 -9167.000 12.6 2146.75 -109.349 109.349 9168.000 12.6 2146.96 109.346 109.346 9169.000 12.6 2147.17 109.343 109.343 9170.000 12.6 .2147.38 109.340 109.340 9171.000 12.6 2147.59 109.338 109.338 9172.000 12.6 2147.80 . 109.335 109.335 9173.000 12.6 2148.01 109.332 109.332 9174.000 12.6 2148.23 109.329 109.329 9175.000 12.6 2148.44 109.326 109.326 9176.000 12.6 2148.65 109.323 109:323 9177.000 12.6 2148.86 109.320 109.320 9178.000 12.6 2149.07 109.318 109.318 9179.000 12.6 2149.28 109.315 109.315 9180.000 12.6 2149.49 109.312 109.312 9181.000 12.6 2149.70 109.309 109.309 9182.000 12.6 2149.91 109.306 109.306 9183.000 12.6 2150.12 109.303 109.303 9184.000 12.6 2150.33 109.300 109.300 9185.000 12.6 2150.54 109.297 109.297 9186.000 12.6 2150.75 109.294 109.294 9187.000 12.6 2150.96 109.291 109.291 9188.000 12.6 2151.17 109.288 109.288 9189.000 12.6 2151.38 109.285 109.285 9190.000 12.6 2151.59 109.283 109.283 9191.000 12.6 2151.80 109.280 109.280 9192.000 12.6 2152.01 109.277 109.277 9193.000 12.6 2152.22 109.274 109.274 9194.000 12.6 2152.43 109.271 109.271 9195.000 12.6 2152.64 109.268 109.268 9196.000 12.6 2152.85 109.265 109.265 9197.000 12.6 2153.06 109.262 109.262 9198.000 12.6 2153.27 109.259 109.259 9199.000 12.6 2153.48 109.256 109.256 9200.000 12.6 2153.69 109.253 109.253 9201.000 '12.6 2153.90 109.250 109.250 9202.000 12.6 2154.11 109.247 109.247 9203.000 12.6 2154.32 109.244 109.244 9204.000 12.6 2154.53 109.241 109.241 9205.000 12.6 2154.74 109.238 109.238 9206.000 12.6 2154.95 109.235 109.235 9207.000 12.6 2155.16 109.232 109.232 9208.000 12.6 2155.37 109.229 109.229 9209.000 12.6 2155.58 109.226 109.226 9210.000 12.6 2155.80 109.223 109.223 j EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 141 of274 for greater than 24 Hrs

  • Project: Clinton Flex Study ETAP Page: 129 Location:

KC! 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSIA-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal DIV I Battery IA 48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hou.-)

V-V+ Time (Amp) (Amp-Hou.-)

V-V+ 9211.000 12.6 2156.01 109.220 109.220 9212.000 12.6 2156.22 109.217 109.217 9213.000 12.6 2156.43 109.214 109.214 9214:000 12.6 2156.64 109.211 109.211 9215.000 12.6 2156.85 109.207 109.207 9216.000 12.6 2157.06 109.204 109.204 9217.000 12.6 2157.27 109.201 109.201 9218.000 12.6 2157.48 109.198 109.198 9219.000 12.6 2157.69 109.195 109.195 9220.000 12.6 2157.90 109.192 109.192 9221.000 12.6 2158.11 109.189 109.189 9222.000 12.6 2158.32 109.186 109.186 9223.000 12.6 2158.53 109.183 109.183 9224.000 12.6 2158.74 109.180 109.180 9225.000 12.6 2158.95 109.177 109.177 9226.000 12.6 2159.16 109.173 109.173 9227.000 12.6 2159.37 109.170 109.170 9228.000 12.6 2159.58 109.167 109.167 9229.000 12.6 2159.79 109.164 109,164 9230.000 12.6 2160.00 109.161 109.161 9231.000 12.6 2160.21 109.158 109.158 9232000 12.6 2160.42 109.155 109.155 9233.000 12.6 2160.63 109.152 109.152 9234.000 12.6 2160.84 109.148 109.148 9235.000 12.6 2161.05 109.145 109.145 9236.000 12.6 2161.26 109.142 109.142 9237.000 12.6 2161.47 109.139 109.139 9238.000 12.6 2161.681 109.136 109.136 9239,000 12.6 2161.89 . , 109.132 109.132 9240.000 12.6 2162.10 109.129 109.129 9241.000 12.6 2162.31 109.126 109.126 9242.000 12.6 2162.52 109.123 109.123 9243.000 12.6 2162.73 109.120 109.120 9244.000 12.6 2162.95 109.116 109.116 9245.000 12.6 2163.16 109.113 109.113 9246.000 12:6 2163.37 109.110 109.110 9247.000 12.6 2163.58 109,107 109.107 9248.000 12.6 2163.79 109.104 109.104 9249.000 12.6 2164.00 109.100 109.100 9250.000 12.6 2164.21 109.097 109.097 9251.000 12.6 2164.42 109,094 109.094 9252.000 12.6 2164.63 109.091 109.091 9253.000 12.6 2164.84 109.087 109.087 9254.000 12.6 2165.05 109.084 109.084 9255.000 12.6 2165.26 109.081 109.081 9256.000 12.6 2165.47 109.077 109.077 9257.000 12.6 2165.68 109,074 109.074 9258.000 12.6 2165.89 109.071 109.071 9259,000 12.6 2166.10 109.068_ 109.068 9260.000 12.6 2166.31 109.064 109.064 9261.000 12.6 2166.52 109.061 109.061 9262.000 12.6 2166.73 109.058 109.058 9263.000 12.6 2166.94 109.054 109.054 9264.000 12.6 2167.15 109.051 109.051 9265.000 12.6 2167.36 109.048 109.048 9266.000 12.6 2167.57 109.044 109.044 9267.000 12.6 2167.78 109.041 109.041 9268.000 12.6 2167.99 109.038 109.038 9269.000 12.6 2168.20 109.034 109.034 9270.000 12.6 2168.41 109.031 109.031 9271.000 12.6 2168.62 109.028 109.028 9272.000 12.6 2168.83 109.024 109.024 9273.000 12.6 2169.04 109.021 109.021 9274.000 12.6 2169.25 109.017 109.017 9275.000 12.6 2169.46 109.014 109.014 9276.000 12.6 2169.67 109.011 109.011 9277.000 12.6 2169.88 109.007 109.007 9278.000 12.6 2170.09 109.004 109.004 9279.000 12.6 2170.30 109.001 109.001 9280.000 12.6 2170.52 108.997 108.997 9281.000 12.6 2170.73 108.994 108.994 9282.000 12.6 2170.94 108.990 108.990 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Dischar2e Dischar2e 130 11-17-2018 Attachment 1 Page 142 of274 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Volta2e (V) Time (Amp)* (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 9283.000 12.6 2171.15 108.987 108.987 9284.000 12.6 2171.36 .. !08.983 !08.983 9285.000 12.6 2171.57 !08.980 108.980 9286.000 12.6 2171.78 108.976 108.976 9287.000 12.6 2171.99 108.973 108.973 9288.000 12.6 2172.20 108.970 108.970 9289.000 12.6 2172.41 108.966 108.966 9290.000 12.6 2172.62 !08.963 .. 108.963 9291.000 12.6 2172.83 108.959 108.959 9292.000 12.6 2173.04 108.956 108.956 9293.000 12.6 2173.25 108.952 108.952 9294.000 12.6 2173.46 !08.949 108.949 9295.000 12.6 2173.67 !08.945 108.945 9296.000 12.6 2173.88 !08.942 108,942 9297.000 12.6 2174.09 108.938 108.938 9298.000 12.6 2174.30 108.935 108.935 9299.000 12.6 2174.51 108.931 108.931 9300.000 12.6 2174.72 108.927 108.927 9301.000 12.6 2174.93 108.924 108.924 9302.000 12.6 2175.14 108.920 108.920 9303.000 12.6 2175.35 !08.917 108.917 9304.000 12.6 2175.56 108.913 108.913 9305.000 12.6 2175.77 !08.910 108.910 9306.000 12.6 2175.98 108.906 108.906 9307.000 12.6 2176.19 108.903 108.903 9308.000 12.6 2176.40 108.899 108.899 9309.000 12.6 2176.61 !08.895 108.895 9310.000 12.6 2176.82 !08.892 108.892 9311.000 12.6 2177.03 !08.888 108.888 9312.000 12.6 2177.24 108.885 108.885 9313.000 12.6 2177.45 !08.881 108.881 9314.000 12.6 2177.66 108.877 108.877 9315.000 12.6 2177.88 108.874 108.874 9316.000 12.6 2178.09 108.870 108.870 9317.000 12.6 2178.30 108.866 108.866 9318.000 12.6 2178.51 108.863 108.863 9319.000 12.6 2178.72 108.859 108.859 9320.000 12.6 2178.93 108.855 108.855 9321.000 12.6 2179.14 108.852 108.852 9322.000 12.6 2179.35 108.848 108.848 9323.000 12.6 2179.56 !08.844 108.844 9324.000 12.6 2179.77 108.841 108.841 9325.000 12.6 2179.98 108.837 108.837 9326.000 12.6 2180.19 !08.833 108.833 9327.000 12.6 2180.40 !08.830 108.830 9328.000 12.6 2180.61 108.826 108.826 9329.000 12.6 2180.82 108.822. . 108.822 9330.000 12.6 2181.03 !08.818 108.818 9331.000 12.6 2181.24 .. !08.815 108.815 9332.000 12.6 2181.45 !08.811 108.811 9333.000 12.6 2181.66 !08.807 108.807 9334.000 12.6 2181.87 108.803 108.803 9335.000 12.6 2182.08 108.800 108.800 9336.000 12.6 2182.29 108.796 108.796 9337.000 12.6 2182.50 108.792 108.792 9338.000 12.6 2182.71 !08.788 108.788 9339.000 12.6 2182.92 !08.784 108.784 9340.000 12.6 2183.13 108.781 108.781 9341.000 12.6 2183.34 108.777 108.777 9342.000 12.6 2183.55 !08.773 108.773 9343.000 12.6 2183.76 108.769 !08.769 9344.000 12.6 2183.97 108.765 108.76~ 9345.000 12.6 2184.18 108.761 108.761 9346.000 12.6 2184.39 108.758 108.758 9347.000 12.6 2184.60 !08.754 108.754 9348.000 12.6 2184.81 108.750 108.750. 9349.000 12.6 2185.02 108.746 108.746 9350.000 12.6 2185.23 108.742 108.742 9351.000 12.6 2185.45 108.738 108.738 9352.000 12.6 2185.66 108.734 108.734 9353.000 12.6 2185.87 108.731 108.731 9354.000 12.6 2186.08 108.727 108.727 EC 626319 Project: Location:

Contract:

Eni,<ineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIA-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 131 11-17-2018 Attachment 1 Page 143 of274 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 9355.000 12.6 2186.29 108.723 108.723 9356.000 12.6 2186.50 108.719 108.719 9357.000 12.6 2186.71 108.715 108.715 9358.000 12.6 2186.92 108.711 108.711 9359.000 12.6 2187.13 108.707 108.707 9360.000 12.6 2187.34 108.703 108.703 9361.000 12.6 2187.55 108.699 108.699 9362.000 12.6 2187.76 108.695 108.695 9363.000 12.6 2187.97 108.691 108.691 9363.333 0.0 2188.04 108.690 119.654

  • This voltage result was obtained using extrapolated batterv data.

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Bus Voltage Tabulation During Battery Discharge BATT IA BUS ll-17-2018 Attachment 1 Page 144 of274 KCICONSULT Base Nonna! Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 0.000 119.654 112.674 0.017 112.674 114.136 1.000 114.139 114.228 2.000 114.231 114.231 3.000 114.234 114.234 4.000 114.237 114.237 5.000 114.239 114.239 6.000 114.243 114.243 7.000 114.248 114.248 8.000 114.252 114.252 9.000 114.257 114.257 10.000 114.261 114.261 11.000 114.266 114.266 12.000 114.271 114.271 13.000 114.275 114.275 14.000 114.280 114.280 15.000 114.285 114.285 16.000 114.290 114.290 17.000 114.294 114.294 18.000 114.299 114.299 19.000 114.304 114.304 20.000 114.309 114.309 21.000 114.314 114.314 22.000 114.319 114.319 23.000 114.324 114.324 24.000 114.329 114.329 25.000 114.334 114.334 26.000 114.339 114.339 27.000 114.344 114.344 28.000 114.349 114.349 29.000 114.355 114.355 30.000 114.360 114.360 31.000 114.365 114.365 32.000 114.370 114.370 33.000 114.376 114.376 34.000 114.381 114.381 35.000 114.387 114.387 36.000 114.392 114.392 37.000 114.398 114.398 38.000 114.403 114.403 39.000 114.409 114.409 40.000 114.414 114.414 41.000 114.420 114.420 42.000 114.426 114.426 43.000 114.431 114.431 44.000 114.437 114.437 45.000 114.443 114.443 46.000 114.449 114.449 47.000 114.455 114.455 48.000 114.461 114.461 49.000 114.467 114.467 50.000 114.473 114.473 51.000 114.479 114.479 52.000 114.485 114.485 53.000 114.491 114.491 54.000 114.497 114.497 55.000 114.503 114.503 56.000 114.510 114.510 57.000 114.516 114.516 58.000 114.522 114.522 59.000 114.529 114.529 60.000 114.535 115.431 61.000 115.433 115.433 62.000 115.434 115.434 63.000 115.435 115.435 64.000 115.436 115.436 65.000 115.438 115.438 66.000 115.439 115.439 67.000 115.440 115.440 68.000 115.441 115.441 69.000 115.443 115.443 70.000 115.444 115.444 71.000 115.445 115.445 72.000 115.447 115.447 73.000 115.448 115.448 74.000 115.449 115.449 75.000 115.450 115.450 76.000 115.452 115.452 77.000 115.453 115.453 78.000 115.454 115.454 79.000 115.456 115.456 80.000 115.457 115.457 81.000 115.458 115.458 82.000 115.459 115.459 83.000 115.461 115.461 84.000 115.462 115.462 85.000 115.463 115.463 86.000 115.464 115.464 87.000 115.465 115.465 88.000 115.466 115.466 89.000 115.466 115.466 90.000 115.467 115.467 91.000 115.467 115.467 92.000 115.468 115.468 93.000 115.469 115.469 94.000 115.469 115.469 95.000 115.470 115.470 96.000 115.470 115.470 97.000 115.471 115.471 98.000 115.472 115.472 99.000 115.472 115.472 100.000 115.473 115.473 IOl.000 115.473 115.473 102.000 115.474 115.474 103.000 115.475 115.475 104.000 115 .. 475 115.475 105.000 115.476 115.476 106.000 115.476 115.476 107.000 115.477 115.477 108.000 115.478 115.478 109.000 115.478 115.478 110.000 115.479 115.479 111.000 115.479 115.479 112.000 115.480 115.480 113.000 115.481 115.481 114.000 115.481 115.481 115.000 115.482 115.482 116.000 115.483 115.483 117.000 115.483 115.483 118.000 115.484 115.484 119.000 115.484 115.484 120.000 115.485

  • 115.485 121.000 115.486 115.486 122.000 115.486 115.486 123.000 115.487 115.487 124.000 115.487 115.487 125.000 115.488 115.488 126.000 115.489 115.489 127.000 115.489 115.489 128.000 115.490 115.490 129.000 115.491 115.491 130.000 115.491 115.491 131.000 115.492 115.492 132.000 115.492 115.492 133.000 115.493 115.493 134.000 115.494 115.494 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study

  • ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Batte,:y IA 48-Hour Coping Study BATT IA BUS 2 11-17-2018 Attachment 1 Page 145 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 135.000 115.494 115.494 136.000 1!5.495 1!5.495 137.000 1!5.495 115.495 138.000 1!5.496 1!5.496 139.000 1!5.497 1!5.497 140.000 115.497 1!5.497 141.000 1!5.498 1!5.498 142.000 115.499 1!5.499 143.000 115.499 1!5.499 144.000 1!5.500 1!5.500 145.000 1!5.500 1!5.500 146.000 1!5.501 1!5.501 147.000 1!5.502 1!5.502 148.000 1!5.502 115.502 149.000 115.503 115.503 150.000 115.504 115.504 151.000 115.504 115.504 152.000 115.505 115.505 153.000 1!5.505 115.505 154.000 1!5.506 1!5.506 155.000 1!5.507 115.507 156.000 1!5.507 115.507 157.000 115.508 1!5.508 158.000 115.508 115.508 159.000 115.508 115.508 160.000 1!5.508 115.508 161.000 1!5.507 115.507 162.000 1!5.507 115.507 163.000 115.507 115.507 164.000 1!5.507 115.507 165.000 115.507 1!5.507 166.000 1!5.507 115.507 167.000 115.507 115.507 168.000 115.507 115.507 169.000 1!5.507 115.507 170.000 115.507 115.507 171.000 115.507 115.507 172.000 115.507 115.507 173.000 1!5.507 115.507 174.000 115.507 1!5.507 175.000 115.507 115.507 176.000 115.507 115.507 177.000 115.507 115.507 178.000 115.507 115.507 179.000 115.507 1!5.507 180.000 115.507 115.507 181.000 115.507 115.507 182.000 115.507 115.507 183.000 115.507 115.507 184.000 115.506 115.506 185.000 115.506 115.506 186.000 115.506 115.506 187.000 115.506 115.506 188.000 115.506 115.506 189.000 115.506 1!5.506 190.000 115.506 115.506 191.000 115.506 115.506 192.000 115.506 115.506 193.000 115.506 1!5.506 194.000 1!5.506 115.506 195.000 115.506 115.506 196.000 1!5.506 1!5.506 197.000 115.506 1!5.506 198.000 1!5.506 115.506 199.000 115.506 115.506 200.000 115.506 115.506 201.000 115.506 1!5.506 202.000 1!5.506 115.506 203.000 1!5.506 115.506 204.000 1!5.506 115.506 205.000 115.506 115.506 206.000 115.506 115.506 207.000 115.505 115.505 208.000 115.505 115.505 209.000 115.505 1!5.505 210.000 1!5.505 1!5.505 211.000 1!5.505 115.505 212.000 115.505 1!5.505 213.000 115.505 1!5.505 214.000 1!5.505 1!5.505 215.000 1!5.505 1!5.505 216.000 1!5.505 1!5.505 217.000 1!5.505 115.505 218.000 1!5.505 115.505 219.000 1!5.505 115.505 220.000 1!5.505 1!5.505 221.000 1!5.505 115.505 222.000 115.505 1!5.505 223.000 115.505 115.505 224.000 1!5.505 115.505 225.000 115.505 115.505 226.000 115.505 1!5.505 227.000 1!5.505 115.505 228.000 115.505 115.505 229.000 1!5.505 115.505 230.000 115.504 115.504 231.000 115.504 115.504 232.000 1!5.504 115.504 233.000 1!5.504 115.504 ' 234.000 1!5.504 1!5.504 235.000 1!5.504 1!5.504 236.000 1!5.504 115.504 237.000 1!5.504 1!5.504 238.000 1!5.504 1!5.504 239.000 1!5.504 1!5.504 240.000 1!5.504 1!5.504 241.000 1!5.504 1!5.504 242.000 1!5.504 1!5.504 243.000 1!5.504 115.504 244.000 115.504 115.504 245.000 1!5.504 115.504 246.000 1!5.504 1!5.504 247.000 115.504 115.504 248.000 115.504 115.504 249.000 1!5.504 1!5.504 250.000 1!5.504 1!5.504 251.000 115.504 115.504 252.000 1!5.504 115.504 253.000 115.503 115.503 254.000 115.503 1!5.503 255.000 1!5.503 115.503 256.000 115.503 115.503 257.000 1!5.503 1!5.503 258.000 1!5.503 1!5.503 259.000 1!5.503 115.503 260.000 1!5.503 115.503 261.000 115.503 1!5.503 262.000 115.503 115.503 263.000 115.503 115.503 264.000 115.503 115.503 265.000 115.503 115.503 266.000 115.503 1!5.503 267.000 115.503 115.503 268.000 115.503 115.503 269.000 *115.503 1!5-.503 270.000 115.503 115.503 271.000 115.503 115.503 272.000 1!5.503 115.503 273.000 115.503 115.503 274.000 115.503 115.503 / 275.000 115.503 115.503 276.000 115.502 115.502 277.000 115.502 1!5.502 278.000 115.502 115.502 279.000 115.502 115.502 280.000 115.502 115.502 281.000 115.502 115.502 282.000 115.502 115.502 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATTlABUS 3 11-17-2018 Attachment 1 Page 146 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 283.000 115.502 115.502 284.000 115.502 115.502 285.000 115.502 115.502 286.000 115.502 115.502 287.000 115.502 115.502 288.000 115.502 115.502 289.000 115.502 115.502 290.000 115.502 115.502 291.000 115.502 115.502 292.000 115.502 115.502 293.000 115.502 115.502 294.000 115.502 115.502 295.000 115.502 115.502 296.000 115.502 115.502 297.000 115.502 115.502 298.000 115.501 115.501 299.000 115.501 115.501 300.000 115.501 115.501 301.000 115.501 115.501 302.000 115.501 115.501 "303.000 115.501 115.501 304.000 115.501 115.501 305.000 115.501 115.501 306.000 115.501 115.501 307.000 115.501 115.501 308.000 115.501 115.501 309.000 115.501 115.501 310.000 115.501 115.501 311.000 115.501 115.501 312.000 115.501 115.501 313.000 115.501 115.501 314.000 115.501 115.501 315.000 115.501 115.501 316.000 115.501 115.501 317.000 115.501 115.501 318.000 115.501 !IS.SOI 319.000 115.501 115.501 320.000 115.501 115.501 321.000 115.500 115.500 322.000 115.500 115.500 323.000 115.500 115.500 324.000 115.500 115.500 325.000 115.500 115.500 326.000 115.500 115.500 327.000 115.500 115.500 328.000 115.500 115.500 329.000 115.500 115.500 330.000 115.500 115.500 331.000 115.500 115.500 332.000 115.500 115.500 333.000 115.500 115.500 334.000 115.500 115.500 335.000 115.500 115.500 336.000 115.500 115.500 337.000 115.500 115.500 338.000 115.500 115.500 339.000 115.500 115.500 340.000 115.500 115.500

341.000 115.500 115.500 342.000 115.500 115.500 343.000 115.499 115.499 344.000 115.499 115.499 345.000 115.499 115.499 346.000 115.499 115.499 347.000 115.499 115.499 348.000 115.499 115.499 349.000 115.499 115.499 350.000 115.499 115.499 351.000 115.499 115.499 352.000 115.499 115.499 353.000 115.499 115.499 354.000 115.499 115.499 355.000 115.499 115.499 356.000 115.499 115.499 357.000 115.499 115.499 358.000 115.499 115.499 359.000 115.499 115.499 360.000 115.499 115.499 361.000 115.499 115.499 362.000 115.499 115.499 363.000 115.499 115.499 364.000 115.499 115.499 365.000 115.499 115.499 366.000 115.498 115.498 *367.000 115.498 115.498 368.000 115.498 115.498 369.000 115.498 115.498 370.000 115.498 115.498 371.000 115.498 115.498 372.000 115.498 115.498 373.000 115.498 115.498 374.000 115.498 115.498 375.000 115.498 115.498 376.000 115.498 115.498 377.000 115.498 115.498 378.000 115.498 flS.498 379.000 115.498 115.498 380.000 115.498 115.498 381.000 115.498 115.498 382.000 115.498 115.498 383.000 115.498 115.498 384.000 115.498 115.498 385.000 115.498 115.498 386.000 115.498 115.498 387.000 115.498 115.498 388.000 115.497 115.497 389.000 115.497 115.497 390.000 115.497 115.497 391.000 115.497 115.497 392.000 115.497 115.497 393.000 115.497 115.497 394.000 115.497 115.497 395.000 115.497 115.497 396.000 115.497 115.497 397.000 115.497 115.497 398.000 115.497 115.497 399.000 115.497 115.497 400.000 115.497 115.497 401.000 115.497 115.497 402.000 115.497 115.497 403.000 115.497 115.497 404.000 115.497 115.497 405.000 115.497 115.497 406.000 115.497 115.497 407.000 115.497 115.497 408.000 115.497 115.497 409.000 115.497 115.497 410.000 115.496 115.496 411.000 115.496 115.496 412.000 115.496 115.496 413.000 115.496 115.496 414.000 115.496 115.496 415.000 115.496 115.496 416.000 115.496 115.496 417.000 115.496 115.496 418.000 115.496 115.496 419.000 115.496 115.496 420.000 115.496 115.496 421.000 115.496 115.496 422.000 115.496 115.496 423.000 115.496 115.496 424.000 115.496 115.496 425.000 115.496 115.496 426.000 115.496 115.496 427.000 115.496 115.496 428.000 115.496 115.496 429.000 115.496 115.496 430.000 115.496 115.496 EC 626319 Project
Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 4 11-17-2018 Attachment 1 Page 147 of 274 KCICONSULT Base , Nonna! Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ TilJ!e V-V+ Time V-V+ 431.00.0 115.496 115.496 432.000 115.495 115.495 433.000 115.495 115.495 434.000 115.495 115.495 435.000 115.495 115.495 436.000 115.495 115.495 437.000 115.495 115.495 438.000 115.495 115.495 439.000 115.495 115.495 440.000 115.495 115.495 441.000 115.495 115.495 442.000 115.495 115.495 443.000 115.495 115.495 444.000 115.495 115.495 445.000 115.495 115.495 446.000 115.495 115.495 447.000 115.495 115.495 448.000 115.495 115.495 449.000 115.495 115.495 450.000 115.4~5 115.495 451.000 115.495 115.495 452.000 115.495 115.495 453.000 115.495 115.495 454.000 115.494 115.494 455.000 115.494 115.494 456.000 115.494 115.494 457.000 115.494 115.494 458.000 115.494 115.494 459.000 115.494 115.494 460.000 115.494 115.494 461.000 115.494 115.494 462.000 115.494 115.494 463.000 115.494 115.494 464.000 115.494 115.494 465.000 115.494 115.494 466.000 115.494 115.494 467.000 115.494 115.494 468.000 115.494 115.494 469.000 115.494 115.494 470.000 115.494 115.494 471.000 115.494 115.494 472.000 115.494 115.494 473.000 115.494 115.494 474.000 115.494 115A94 475.000 115.494 115.494 476.000 115.493 115.493 477.000 115.493 115.493 478.000 115.493 115.493 479.000 115.493 115.493 480.000 115.493 115.493 481.000 115.493 115.493 ' 482.000 115.493 115.493 483.000 115.493 115.493' 484.000 115.493 115.493 485.000 115.493 115.493 486.000 115.493 115.493 487.000 115.493 115.493 488.000 115.493 115.493 489.000 115.493 115.493 490.000 115.493 115.493 491.000 115.493 115.493 492.000 115.493 115.493 493.000 115.493 115.493 494.000 115.493 115.493 " 495.000 115.493 115.493 496.000 115.493 115.493 497.000 115.493 115.493 498.000 115.492 115.492 499.000 115.492 115.492 500.000 115.492 115.492 501.000 115.492 115.492 502.000 115.492 115.492 503.000 115.492 115.492 504.000 115.492 115.492 505.000 115.492 115.492 506.000 115.492 115.492 507.000 115.492 115.492 508.000 i 15.492 115.492 509.000 115.492 115.492 510.000 115.492 115.492 511.000 115.492 115.492 512.000 115.492 115.492 513.000 115.492 115.492 514.000 115.492 115.492 515.000 115.492 115.492 516.000 115.492 115.492 511:000 115.492 115.492 518.000 115.492 115.492 519.000 115.492 115.492 520.000 115.491 115.491 521.000 115.491 115.491 522.000 115.491 115.491 523.000 115.491 115.491 524.000 115.491 115.491 525.000 115.491 115.491 526.000 115.491 115.491

./ 527.000 115.491 . 115.491 528.000 115.491 115.491 529.000 115.491 115.491 530.000 115.491 115.491 531.000 115.491 115.491 532.000 115.491 115.491 533.000 115.491 115.491 534.000 115.491 115.491 535.000 115.491 115.491 536.000 115.491 115.491 537.000 115.491 115.491 538.000 115.491 115.491 539.000 115.491 115.491 540.000 115.491 115.491 541.000 115.490 115.490 542.000 115.490 115.490 543.000 115.490 115.490 544.000 115.490 115.490 545.000 115.490 115.490 546.000 115.490 115.490 547.000 115.490 115.490 548.000 115.490 115.490 549.000 115.490 115.490 550.000 115.490 115.490 551.000 115.490 115.490 552.000 115.490 115.490 553.000 115.490 115.490 554.000 115.490 115.490 555.000 115.490 115.490 556.000 115.490 115.490 557.000 115.490 115.490 558.000 115.490 115.490 559.000 115.490 115.490 560.000 115.490 115.490 561.000 , 115.490 115.490 562.000 115.490 115.490 563.000 115.489 115.489 564.000 115.489 115.489 565.000 115.489 115.489 566.000 1 115.489 115.489 567.000 115.489 115.489 568.000 115.489 115.489 569.000 115.489 115.489 570.000 115.489 115.489 571.000 115:489 115.489 572.000 115.489 115.489 573.000 115.489 115.489 574.000 115.489 115.489 575.000 115.489 115.489 576.000 115.489 115.489 577.000 115.489 115.489 578.000 115.489 115.489 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division*

1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 5 11-17-2018 Attachment 1 Page 148 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 579.000 115.489 115.489 580.000 115.489 115.489 581.000 115.489 115.489 582.000 115.489 115.489 583.000 115.489 115.489 584.000 115.489 115.489 585.000 115.488 115.488 586.000 115.488 115.488 587.000 115.488 115.488 588.000 115.488 115.488 589.000 115.488 115.488 590.000 115.488 115.488 591.000 115.488 115.488 592.000 115.488 115.488 593.000 115.488 115.488 594.000 115.488 115.488 595.000 115.488 115.488 596.000 115.488 115.488 597.000 115.488 115.488 598.000 115.488 115.488 599.000 115.488 115.488

  • 600.000 115.488 115.488 601.000 115.488 115.488 602.000 115.488 115.488 603.000 115.488 115.488 604.000 115.488 115.488 605.000 115.488 115.488 606.000 115.487 115.487 607.000 115.487 115.487 608.000 115.487 115.487 609.000 115.487 115.487 610.000 115.487 115.487 611.000 I !'5.487 115.487 612.000 115.487 115.487 613.000 115.487 115.487 614.000 115.487 115.487 615.000 115.487 115.487 616.000 115.487 115.487 617.000 115.487 115.487 618.000 115.487 115.487 619.000 115.487 115.487 620.000 115.487 115.487 621.000 115.487 115.487 622.000 115.487 115.487 623.000 115.487 115.487 624.000 115.487 115.487 625.000 115.487 115.487 626.000 115.487 115.487 627.000 115.487 115.487 628.000 115.486 115.486 629.000 115.486 115.486 630.000 115.486 115.486 631.000 115.486 115.486 632.000 115.486 115.486 633.000 115.486 115.486 634.000 115.486 115.486 635.000 115.486 115.486 636.000 115.486 115.486 637.000 115.486 115.486 638.000 115.486 115.486 639.000 115.486 115.486 640.000 115.486 115.486 641.000 115.486 115.486 642.000 115.486 115.486 643.000 115.486 115.486 644.000 115.486 115.486 645.000 115.486 115.486 646.000 115.486 115.486 647.000 115.486 115.486 648.000 115.486 115.486 649.000 115.485 115.485 650.000 115.485 115.485 651.000 115.485 115.485 652.000 115.485 115.485 653.000 115.485 115.485 654.000 115.485 115.485 655.000 115.485 115.485 656.000 115.485 115.485 657.000 115.485 115.485 658.000 115.485 115.485 659.000 115.485 115.485 660.000 115.485 115.485 661.000 115.485 115.485 662.000 115.485 115.485 663.000 115.485 115.485 664.000 115.485 115.485 665.000 115.485 115.485 666.000 115.485 115.485 667.000 115.485 115.485 668.000 115.485 115.485 669.000 115.485 115.485 670.000 115.484 115.484 671.000 115.484 115.484 672.000 115.484 115.484 673.000
  • 115.484 115.484 674.000 115.484 115.484 675.000 115.484 115.484 676.000 115.484 115.484 677.000 115.484 115.484 678.000 115.484 115.484 679.000 115.484 115.484 680.000 115.484 115.484 681.000 115.484 115.484 682.000 115.484 115.484 683.000 115.484 115.484 684.000 115.484 115.484 685.000 115.484 115.484 686.000 115.484 115.484 687.000 115.484 115.484 688.000 115.484 115.484 689.000 115.484 115.484 690.000 115.484 115.484 691.000 115.483 115.483 692.000 115.483 115.483 693.000 115.483 115.483 694.000 115.483 115.483 695.000 115.483 115.483 696.000 115.483 115.483 697.000 115.483 115.483 698.000 115.483 115.483 699.000 115.483 115.483 700.000 115.483 115.483 701.000 115.483 115.483 702.000 115.483 115.483 703.000 115.483 115.483 704.000 115.483 115.483 705.000 115.483 115.483 706.000 115.483 115.483 707.000 115.483 115.483 708.000 115.483 115.483 709.000 115.483 115.483 710.000 115.483 115.483 711.000 115.483 115.483 712.000 115.482 115.482 713.000 115.482 115.482 714.000 115.482 115.482 715.000 115.482 115.482 716.000 115.482 115.482 717.000 115.482 115.482 718.000 115.482 115.482 719.000 115.482 115.482 720.000 115.482 115.482 721.000 115.482 115.482 722.000 115.482 115.482 723.000 115.482 115.482 724.000 115.482 115.482 725.000 115.482 115.482 726.000 115.482 115.482 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV 1 Batteiy IA 48-Hour Coping Study BATT IA BUS 6 11-17-2018 Attachment 1 Page 149 of274 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage(V)

Voltage.(V)

Time y. V+ Time y. V+ Time V-V+ Time y. V+ 727.000 115.482 115.482 728.000 115.482 115.482 729.000 115.482 115.482 730.000 115.482 115.482 731.000 115.482 115.482 732.000 115.482 115.482 733.000 115.481 115.481 734.000 115.481 115.481 735.000 115.481 115.481 736.000 115.481 115.481 737.000 115.481 115.481 738.000 115.481 115.481 739.000 115.481 115.481 740.000 115.481 115.481 741.000 115.481 115.481 742.000 115.481 115.481 743.000 115.481 115.481 744.000 115.481 115.481 745.000 115.481 115.481 746.000 115.481 115.481 747.000 115.481 115.481 748.000 115.481 115.481 749.000 115.481 115.481 750.000 115.481 115.481 751.000 115.481 115.481 752.000 115.481 115.481 753.000 115.481 115.481 754.000 115.480 115.480 755.000 115.480 115.480 756.000 115.480 115.480 757.000 115.480 115.480 758.000 115.480 115.480 759.000 115.480 115.480 760.000 115.480 115.480 761.000 115.480 115.480 762.000 115.480 115.480 763.000 115.480 115.480 764.000 115.480 115.480 765.000 115.480 115.480 766.000 115.480 115.480 767.000 115.480 115.480 768.000 115.480 115.480 769.000 115.480 115.480 770.000 115.480 115.480 771.000 115.480 115.480 772.000 115.480 115.480 773.000 115.480 '115.480 774.000 115.480 115.480 775.000 115.479 115.479 776.000 115.479 115.479 777.000 115.479 115.479 778.000 115.479 115.479 779.000 115.479 115.479 780.000 115.479 115.479 781.000 115.479 115.479 782.000 115.479 115.479 783.000 115.479 115.479 784.000 115.479 115.479 785.000 115.479 115.479 786.000 115.479 115.479 787.000 115.479 115.479 788.000 115.479 115.479 789.000 115.479 115.479 790.000 115.479 115.479 791.000 115.479 115.479 792.000 115.479 115.479 793.000 115.479 115.479 794.000 115.479 115.479 795.000 115.479 115.479 796.000 115.478 115.478 797.000 115.478 115.478 798.000 115.478 115.478 799:000 115.478 115.478 800.000 115.478 115.478 801.000 115.478 115.478 802.000 115.478 115.478 803.000 115.478 115.478 804.000 115.478 115.478 805.000 115.478 115.478 806.000 115.478 115.478 807.000 115.478 115.478 808.000 115.478 115.478 809.000 115.478 115.478 810.000 115.478 115.478 811.000 115.478 115.478 812.000 115.478 115.478 813.000 115.478 115.478 814.000 115.478 115.478 815.000 115.478 115.478 816.000 115.477 115.477 817.000 115.477 115.477 818.000 115.477 115.477 819.000 115.477 115.477 820.000 115.477 115.477 821.000 115.477 115.477 822.000 115.477 115.477 823.000 115.477 115.477 824.000 115.477 115.477 825.000 115.477 115.477 826.000 115.477 115.477 827.000 115.477 115.477 8i8.ooo 115.477 115.477 829.000 115.477 115.477 830.000 115.477 115.477 831.000 115.477 115.477 832.000 115.477 115.477 833.000 115.477 115.477 834.000 115.477 115.477 835.000 115.477 115.477 836.000 115.477 115.477 837.000 115.476 115.476 838.000 115.476 115.476 839.000 115.476 115.476 840.000 115.476 115.476 841.000 115.476 115.476 842.000 115.476 115.476 843.000 115.476 115.476 844.000 115.476 115.476 845.000 115.476 115.476 846.000 115.476 115.476 847.000 115.476 115.476 848.000 115.476 115.476 849.000 115.476 115.476 850.000 115.476 115.476 851.000 115.476 115.476 852.000 115.476 115.476 853.000 115.476 115.476 854.000 115.476 115.476 855.000 115.476 115.476 856.000 115.476 115.476 857.000 115.475 115.475 858.000 115.475 115.475 859.000 115.475 115.475 860.000 115.475 115.475 861.000 115.475 115.475 862.000 115.475 115.475 863.000 115.475 115.475 864.000 115.475 115.475 865.000 115.475 115.475 866.000 115.475 115.475 867.000 115.475 115.475 868.000 115.475 115.475 869.000 115.475 115.475 870.000 115.475 115.475 871.000 115.475 115.475 872.000 115.475 115.475 873.000 115.475 115.475 874.000 115.475 115.475 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IABUS 7 11-17-2018 Attachment 1 Page 150 of274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (VJ Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 875.000 115.475 115.475 876.000 115.475 115.475 877.000 115.475 115.475 878.000 115.474 115.474 879.000 115.474 115.474 880.000 115.474 115.474 881.000 115.474 llS.474 882.000 115.474 115.474 883.000 115.474 115.474 884.000 115.474 115.474 885.000 115.474 115.474 886.000 115.474 115.474 887.000 115.474 115.474 888.000 115.474 115.474 889.000 115.474 115.474 890.000 115.474 115.474 891.000 115.474 115.474 892.000 115.474 115.474 893.000 115.474 115.474 894.000 115.474 115.474 895.000 115.474 115.474 896.000 115.474 115.474 897.000 115.474 115.474 898.000 115.473 115.473 899.000 115.473 115.473 900.000 115.473 115.473 901.000 115.473 115.473 902.000 115.473 115.473 903.000 115.473 115.473 904.000 115.473 115.473 905.000 115.473 115.473 906.000 115.473 115.473 907.000 115.473 115.473 908.000 I 15.473 115.473 909.000 115.473 115.473 910.000 115.473 115.473 911.000 115.473 115.473 912.000 115.473 115.473 913.000 115.473 115.473 914.000 115.473 115.473 915.000 115.473 115.473 916.000 115.473 115.473 917.000 115.473 115.473 918.000 115.473 115.473 919.000 115.472 115.472 920.000 115.472 115.472 921.000 115.472 115.472 922.000 115.472 115.472 923.000 115.472 115.472 924.000 115.472 115.472 925.000 115.472 115.472 926.000 115.472 115.472 927.000 I 15.472 115.472 928.000 115.472 115.472 929.000 115.472 115.472 930.000 115.472 115.472 931.000 115.472 115.472 932.000 115.472 115.472 933.000

  • 115.472 115.472 934.000 115.472 115.472 935.000 115.472 115.472 936.000 115.472 115.472 937.000 115.472 115.472
  • 938.000 115.472 115.472 939.000 115.471 115.471 940.000 115.471 115.471 941.000 115.471 115.471 942.000 115.471 115.471 943.000 115.471 115.471 944.000 115.471 115.471 945.000 115.471 115.471 946.000 115.471 115.471 947.000 115.471 115.471 948.000 115.471 115.471 949.000 115.471 115.471 950.000 115.471 115.471 951.000 115.471 115.471 952.000 115.471 115.471 953.000 115.471 115.471 954.000 115.471 115.471 955.000 115.471 115..471 956.000 115.471 115.471 957.000 115.471 115.471 958.000 115.471 115.471 959.000 115.470 115.470 960.000 115.470 115.470 961.000 115.470 115.470 962.000 115.470 115.470 963.000 115.470 115.470 964.000 115.470 115.470 965.000 115.470 115.470 966.000 115.470 115.470 967.000 115.470 115.470 968.000 115.470 115.470 969.000 115.470 115.470 970.000 115.470 115.470 971.000 115.470 115.470 972.000 115.470 115.470 973.000 115.470 115.470 974.000 115.470 115.470 975.000 115.470 115.470 976.000 115.470 115.470 977.000 115.470 115.470 978.000 115.470 115.470 979.000 115.469 115.469 980.000 115.469 115.469 981.000 115.469 I 15.469 982.000 115.469 115.469 983.000 115.469 115.469 984.000 115.469 115.469 985.000 115.469 115.469 986.000 115.469 115.469 987.000 115.469 115.469 988.000 115.469 115.469 989.000 115.469 115.469 990.000 115.469 115.469 991.000 115.469 115.469 992.000 115.469 115.469 993.000 115.469 115.469 994.000 115.469 115.469 . 995.000 115.469 115.469 996.000 115.469 115.469 997.000 115.469 115.469 998.000 115.469 115.469 999.000 115.468 115.468 1000.000 115.468 115.468 1001.000 115.468 115.468 1002.o'i'lo 115.468 115.468 1003.000 115.468 115.468 1004.000 115.468 115.468 1005.000 115.468 115.468 1006.000 115.468 115.468 1007.000 115.468 115.468 1008.000 115.468 115.468 1009.000 115.468 115.468 1010.000 115.468 I 15.468 1011.000 115.468 115.468 1012.000 115.468 115.468 1013.000 115.467 115.467 1014.000 115.466 115.466 1015.000 115.464 115.464 1016.000 115.463 115.463 1017.000 115.462 115.462 1018.000 115.460 115.460 1019.000 115.459 115.459 1020.000 115.457 115.457 1021.000 115.456 115.456 1022.000 115.455 115.455 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 8 11-17-2018 Attachment 1 Page 151 of274 KCICONSULT Base Normal Voltage (V) Voltage '(V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1023.000 115.453 115.453 1024.000 115.452 115.452 1025.000 115.451 115.451 1026.000 115.449 115.449 1027.000 115.448 115.448 1028.000 115.446 115.446 1029.000 115.445 115.445 1030.000 115.444 115.444 1031.000 115.442 115.442 1032.000 115.441 115.441 1033.000 115.440 115.440 1034.000 115.438 115.438 1035.000 115.437 115.437 1036.000 115.436 115.436 1037.000 115.434 115.434 1038.000 115.433 115.433 1039.000 115.431 115.431 1040.000 115.430 115.430 1041.000 115.429 115.429 1042.000 115.427 115.427 1043.000 115.426 115.426 1044.000 115.425 115.425 1045.000 115.423 115.423 1046.000 115.422 115.422 1047.000 115.420 115.420 1048.000 115.419 115.419 1049.000 115.418 115.418 1050.000 115.416 115.416 1051.000 115.415 115.415 1052.000 115.414 115.414 1053.000 115.412 115.412 1054.000 115.411 115.411 1055.000 115.410 115.410 1056:ooo 115.408 115.408 1057.000 115.407 115.407 1058.000 115.405 115.405 1059.000 115.404 115.404 1060.000 115.403 115.403 1061.000 115.401 115.401 1062.000 115.400 115.400 1063.000 115.399 115.~99 1064.000 115.397 115.397 1065.000 115.396 115.396 1066.000 115.395 115.395 1067.000 115.393 115.393 1068.000 115.392 115.392 1069:ooo 115.391 115.391 1070.000 115.389 115.389 1071.000 115.388 115.388 1072.000 115.386 115.386 '1073.000 115.385 115.385 1074.000 115.384 115.384 1075.000 115.382 115.382 1076.000 115.381 115.381 1077.000 115.380 115.380 1078.000 115.378 115.378 1079.000 115.377 115.377 1080.000 115.376 115.376 1081.000 115.374 115.374 1082.000 115.373 115.373 1083.000 115.372 115.372 1084.000 115.370 115.370 1085.000 115.369 115.369 1086.000 115.368 115.368 1087.000 115.366 115.366 1088.000 115.365 115.365. 1089.000 115.364 115.364 1090.000 115.362 115.362 1091.000 115.361 115.361 1092.000 115.360 115.360 1093.000 115.358 115.358 1094.000 115.357 115.357 1095.000 115.355 115.355 1096.000 115.354 115.354 1097.000 115.353 115.353 1098.000 115.351 115.351 1099.000 115.350 115.350 1100.000 115.349 115.349 1101.000 115.347 115.347 1102.000 115.346 115.346 1103.000 115.345 115.345 1104.000 115.343 115.343 1105.000 115.342 115.342 1106.000 115.341 115.341 1107.000 115.339 115.339 1108.000 115.338 115.338 1109.000 115.337 115.337 1110.000 115.335 115.335 1111.000 115.334 115.334 1112.000 115.333 115.333 1113.000 115.331 115.331 1114.000 115.330 115.330 1115.000 115.329 115.329 1116.000 115.327 115.327 1117.000 115.326 115.326 1118.000 115.325 115.325 1119.000 115.323 115.323 1120.000 115.322 115.322 1121.000 115.321 115.321 1122.000 115.319 115.319 1123.000 115.318 115.318 1124.000 115.317 115.317 1125.000 115.315 115.315 1126.000 115.314 115.314 1127.000 115.313 115.313 1128.000 115.311 115.311 1129.000 115.310 115.310 1130.000 115.309 115.309 1131.000 115.307 115.307 1132.000 115.306 115.306 1133.000 115.305 115.305 1134.000 115.303 115.303 1135.000 115.302 115.302 1136.000 115.301 115.301 1137.000 115.299 115.299 1138.000 115.298 115.298 1139.000 115.297 115.297 1140.000 115.295 115.295 1141.000 115.294 115.294 1142.000 115.293 115.293 1143.000 115.292 115.292 1144.000 115.291 115.291 1145.000 115.290 115.290 1146.000 115.289 115.289 1147.000 115.288 115.288 1148.000 115.287 115.287 1149.000 115.286 115.286 1150.000 115.285 115.285 1151.000 1,15,284 115.284 1152.000 115.283 115.283 1153.000 115.282 115.282 1154.000 115.281 115.281 1155.000 115.280 115.280 1156.000 115.279 115.279 1157.000 115.278 115.278 1158.000 115.277 115.277 1159.000 115.276 115.276 1160.000 115.275 115.275 1161.000 115.274 115.274 1162.000 115.273 115.273 1163.000 115.272 115.272 1164.000 115.271 115.271 1165.000 115.270 115.270 1166.000 115.269 115.269 1167.000 115.268 115.268 1168.000 115.267 115.267 1169.000 115.266 115.266 1170.000 115.265 115.265 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division' 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 9 11-17-2018 Attachment 1 Page 152 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time V-V+ Time V-V+ 1171.000 115.264 115.264 1172.000 115.263 115.263 1173.000 115.262 115.262 1174.000 115.261 115.261 1175.000 115.260 115.260 1176.000 115.259 115.259 1177.000 115.258 115.258 1178.000 115.257 115.257 1179.000 115.256 115.256 1180.000 115.256 115.256 1181.000 115.255 115.255 1182.000 115.254 115.254 1183.000 115.253 115.253 1184.000 115.252 115.252 1185.000 115.251 115.251 1186.000 115.250 115.250 1187.000 115.249 115.249 1188.000 115.248 115.248 1189.000 115.247 115.247 1190.000 115.246 115.246 1191.000 115.245 115.245 1192.000 115.244 115.244 1193.000 115.243 115.243 1194.000 115.242 115.242 1195.000 115.241 115.241 1196.000 115.240 115.240 1197.000 115.239 115.239 1198.000 115.238 115.238 1199.000 115.237 115.237 1200.000 115.236 115.236 1201.000 115.235 115.235 1202.000 115.234 115.234 1203.000 115.233 115.233 1204.000 115.232 115.232 1205.000 115.231 115.231 1206.000 115.230 115.230 1207.000 115.229 115.229 1208.000 115.228 115.228 1209.000 115.227 115.227 1210.000 115.226 115.226 1211.000 115.225 115.225 1212.000 115.224 115.224 1213.000 115.223 115.223 1214.000 115.222 115.222 1215.000 115.221 115.221 1216.000 115.220 115.220 1217.000 115.219 115.219 1218.000 115.218 115.218 1219.000 115.217 115.217 1220.000 115.216 115.216 1221.000 115.215 115.215 1222.000 115.214 115.214 1223.000 115.213 115.213 1224.000 115.21-2 115.212 1225.000 115.211 115.211 1226.000 115.210 115.210 1227.000 115.209 115.209 1228.000 115.208 115.208 1229.000 115.208 115.208 1230.000 115.207 115.207 1231.000 115.206 115.206 1232.000 115.205 115.205 1233.000 115.204 115.204 1234.000 115.203 115.203 1235.000 115.202 115.202 1236.000 115.201 115.201 1237.000 115.200 115.200 1238.000 115.199 115.199 1239.000 115.198 115.198 1240.000 115.197 115.197 1241.000 115.196 115.196 1242.000 115.195 115.195 1243.000 115.194 115.194 1244.000 115.193 115.193 1245.000 115.192 115.192 1246.000 115.191 115.191 1247.000 115.190 115.190 1248.000 115.189 115.189 1249.000 115.188 115.188 1250.000 115.187 115.187 1251.000 115.186 115.186 1252.000 115.185 115.185 1253.000 115.184 115.184 1254.000 115.183 115.183 1255.000 115.182 115.182 1256.000 115.181 115.181 1257.000 115.180 115.180 1258.000 115.179 115.179 1259.000 115.178 115.178 1260.000 115.177 115.177 1261.000 115.176 115.176 1262.000 115.175 115.175 1263.000 115.174 115.174 1264.000 115.173 115.173 1265.000 115.172 115.172 1266.000 115.171 115.171 1267.000 115.170 115.170 1268.000 115.169 115.169 1269.000 115.168 115.168 1270.000 115.167 115.167 1271.000 115.166 115.166 1272.000 115.165 115.165 1273.000 115.164 115.164 1274.000 115.163 115.163 1275.000 115.162 115.162 1276.000 115.161 115.161 1277.000 115.160 115.160 1278.000 115.159 115.159 1279.000 115.159 115.159 1280.000 115.158 115.158 1281.000 115.157 115.157 1282.000 115.156 115.156 1283.000 115.155 115.155 1284.000 115.154 115.154 1285.000 115.153 115.153 1286.000 115.152 115.152 1287.000 115.151 115.151 1288.000 115.150 115.150 1289.000 115.149 115.149 1290.000 115.148 115.148 1291.000 115.147 115.147 1292.000 115.146 115.146 1293.000 115.145 115.145 1294.000 115.144 115.144 1295.000 115.143 115.143 1296.000 115.142 115.142 1297.000 115.141 115.141 1298.000 115.140 115.140 1299.000 115.139 115.139 1300.000 115.138 115.138 1301.000 115.137 115.137 1302.000 115.136 115.136 1303.000 115.135 115.135 1304.000 115.134 115.134 1305.000 115.133 115.133 1306.000 115.132 115.132 1307.000 115.131 115.131 1308.000 115.130 115.130 1309.000 115.129 115.129 1310.000 115.128 115.128 1311.000 115.127 115.127 1312.000 115.126 115.126 1313.000 115.125 115.125 1314.000 115.124 115.124 1315.000 115.123 115.123 1316.000 115.122 115.122 1317.000 115.121 115.121 1318.000 115.120 115.120 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery lA48-HourCopingStudy BATT lABUS 10 11-17-2018 Attachment 1 Page 153 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1319.000 115.119 115.119 1320.000 115.118 115.118 1321.000 115.117 115.117 1322.000 115.116 115.116 1323.000 115.115 115.115 1324.000 115.114 115.114 1325.000 115.113 115.113 1326.000 115.112 115.112 1327.000 115.111 115.111 1328.000 115.111 115.1,11 1329.000 115.110 115.110 1330.000 115.109 115.109 1331.000 115.108 115.108 1332.000 115:101 115.107 1333.000 115.106 115.106 1334.000 115.105 115.105 1335.000 115.104 115.104 1336.000 115.103 115.103 1337.000 115.102 115.102 1338.000 115.101 115.101 1339.000 115.100 115.100 1340.000 115.099 115.099 1341.000 115.098 115.098 1342.000 115.097 115.097 1343.000 115.096 115.096 1344.000 115.095 115.095 1345.000 115.094 115.094 1346.000 115.093 115.093 1347.000 115.092 115.092 1348.000 115.091 115.091 1349.000 115.090' 115.090 1350.000 115.089 115.089 1351.000 115.088 115.088 1352.000 115.087 115.087 1353.000 115.086 115.086 1354.000 11.5.085 115.085 1355.000 115.084 115.084 1356.000 115.083 115.083 1357.000 115.082 115.082 1358.000 115.081 115.081 1359.000 115.080 115.080 1360.000 115.079 115.079 1361.000 115.078 115.078 1362.000 115.077 115.077 1363.000 115.076 115.076 1364.000 115.075 115.075 1365.000 115.074 115.074 1366.000 115.073 115.073 1367.000 115.072 115.072 1368.000 115.071 115.071 1369.000 115.070 115.070 1370.000 115.069 115.069 1371.000 115.068 115.068 1372.000 115.067 115.067 1373.000 115.066 115.066 1374.000 115.065 115.065 1375.000 115.064 115.064 1376.000 115.063 ,115.063 1377.000 115.063 115.063 1378.000 115.062 115.062 1379.000 115.061 115.061 1380.000 115.060 115.060 1381.000 115.059 115.059 1382.000 115.058 115.058 1383.000 115.057 115.057 1384.000 115.056 115.056 1385.000 115.055 115.055 1386.000 115.054 115.054 1387.000 115.053 115.053 1388.000 115.052 115.052 1389.000 115.051 115.051 1390.000 115.050 115.050 1391.000 115.049 115.049 1392.000 115.048 115.048 1393.000 115.047 115.047 1394.000 115.046 115.046 1395.000 115.045 115.045 1396.000 115.044 115.044 1397.000 115.043 115.043 1398.000 115.042 115.042 1399.000 115.041 115.041 1400.000 115.040 115.040 1401.000 115.039 115.039 1402.000 115.038 115.038 1403.000 115.037 115.037 1404.000 115.036 115.036 1405.000 115.035 115.035 1406.000 115.034 115.034 1407.000 115.033 115.033 1408.000 115.032 115.032 1409.000 115.031 115.031 1410.000 115.030 115.030 1411.000 115.029 115.029 1412.000 115.028 115.028 1413.000 115.027 115.027 1414.000 115.026 115.026 1415.000 115.025 115.025 1416.000 115.024 115.024 1417.000 115.023 115.023 1418.000 115.022 115.022 1419.000 115.021 115.021 1420.000 115.020 115.020 1421.000 115.019 115.019 1422.000 115.018 115.018 1423.000 115.017 115.017 1424.000 115.016 115.016 1425.000 115.015 115.015 1426.000 115.015 115.015 1427.000 115.014 115.014 1428.000 115.013 115.013 1429.000 115.012 115.012 1430.000 115.011 115.011 1431.000 115.010 115.010 1432.000 115.009 115.009 1433.000 115.008 115.008 1434.000 115.007 115.007 1435.000 115.006 115.006 1436.000 115.005 115.005 1437.000 115.004 115.004 1438.000 115.003 115.003 1439.000 115.002 115.002 1440.000 115.001 115.001 1441.000 115.000 115.000 1442.000 114.999 114.999 1443.000 114.998 114.998 1444.000 114.997 114.997 1445.000 114.996 114.996 1446.000 114.995 ]14.995 1447.000 114.994 114.994 1448.000 114.993 114.993 1449.000 114.992 114.992 1450.000 114.991 114.991 1451.000 114.990 114.990 1452.000 114.989 114.989 1453.000 114.988 114.988 1454.000 114.987 114.987 1455.000 114.986 114.986 1456.000 114.985 114.985 1457.000 114.984 114.984 1458.000 114.983 114.983 1459.000 114.982 114.982 1460.000 114.981 114.981 1461.000 114.980 114.980 1462.000 114.979 114.979 1463.000 114.978 114.978 1464.000 114.977 114.977 1465.000 114.976 114.976 1466.000 114.975 114.975

.,

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATT IA BUS 11 11-17-2018 Attachment 1 Page 154 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time v-V+ 1467.000 114.974 114.974 1468.000 114.973 114.973 1469.000 114.972 114.972 1470.000 114.971 114.971 1471.000 114.970 114.970 1472.000 114.969 114.969 1473.000 114.968 114.968 1474.000 114.968 114.968 1475.000 114.966 114.966 1476.000 114.964 114.964 1477.000 114.962 114.962 1478.000 114.960 114.960 1479.000 114.958 114.958 1480.000 114.956 114.956 1481.000 114.954 114.954 1482.000 114.952 114.952 1483.000 114.949 114.949 1484.000 114.947 114.947 1485.000 114.945 114.945 1486.000 114.943 114.943 1487.000 114.941 114.941 1488.000 114.939 114.939 1489.000 114.937 114.937 1490.000 114.935 114.935 1491.000 114.933 114.933 1492.000 114.931 114.931 1493.000 114.929 114.929 1494.000 114.927 114.927 1495.000 114.924 114.924 1496.000 114.922 114.922 1497.000 114.920 114.920 1498.000 114.918 114.918 1499.000 114.916 114.916 1500.000 114.914 114.914 1501.000 114.912 114.912 1502.000 114.910 114.910 1503.000 114.908 114.908 1504.000 114.906 114.906 1505.000 114.904 114.904 1506.000 114.902 114.902 1507.000 114.900 114.900 1508.000 114.897 114.897 1509.000 114.895 114.895 1510.000 114.893 114.893 1511.000 114.891 114.891 1512.000 114.889 114.889 1513.000 114.887 114.887 1514.000 114.885 114.885 1515.000 114.883 114.883 1516.000 114.881 114.881 1517.000 114.879 114.879 1518.000 114.877 114.877 1519.000 114.875 114.875 i520.000 114.873 114.873 1521.000 114.871 114.871 1522.000 114.869 114.869 1523.000 114.867 114.867 1524.000 114.864 114.864 1525.000 114.862 114.862 1526.000 114.860 114.860 1527.000 114.858 114.858 1528.000 114.856 114.856 1529.000 114.854 114.854 1530.000 114.852 114.852 1531.000 114.850 114.850 1532.000 114.848 114.848 1533.000 114.846 -114.846 1534.000 114.844 114.844 1535.000 114.842 114.842 1536.000 114.840 114.840 1537.000 114.838 114.838 1538.000 114.836 114.836 1539.000 114.834 114.834 1540.000 114.832 , 114.832 1541.000 114.830 114.830 1542.000 114.828 114.828 1543.000 114.826 114.826 1544.000 114.824 114.824 1545.000 114.822 114.822 1546.000 114.820 114.820 1547.000 114.818 114.818 1548.000 114.815 114.815 1549.000 114.813 114.813 1550.000 114.811 114.811 1551.000 114.809 114.809 1552.000 114.807 114.807 1553.000 114.805 114.805 1554.000 114.803 114.803 1555.000 114.801 114.801 1556.000 114.799 114.799 1557.000 114.797 114.797 1558.000 114.795 114.795 1559.000 114.793 114.793 1560.000 114.791 114.791 1561.000 114.789 114.789 1562.000 114.787 114.787 1563.000 114.785 114.785 1564.000 114.783 114.783 1565.000 114.781 114.781 1566.000 114.779 114.779 1567.000 114.777 114.777 1568.000 114.775 114.775 1569.000 114.773 114.773 1570.000 114.771 114.771 1571.000 114.769 114.769 1572.000 114.767 114.767 1573.000 114.765 114.765 1574.000 114.763 114.763 1575.000 114.761 114.761 1576.000 114.759 114.759 1577.000 114.757 114.757 1578.000 114.755 114.755 1579.000 114.753 114.753 1580.000 114.751 114.751 1581.000 114.749 114.749 1582.000 114.747 114.747 1583.000 114.745 114.745 1584.000 114.743 114.743 1585.000 114.741 114.741 1586.000 114.739 114.739 1587.000 114.737 114.737 1588.000 114.735 114.735 1589.000 114.733 114.733 1590.000 114.731 114.731 1591.000 114.729 114.729 1592.000 114.727 114.727 1593.000 114.725 114.725 1594.000 114.723 114.723 1595.000 114.721 114.721 1596.000 114.719 114.719 1597.000 114.717 114.717 1598.000 114.715 114.715 1599.000 114.713 114.713 1600.000 114.711 114.711 1601.000 114.709 114.709 1602.000 114:707 114.707 1603.000 114.705 114.705 1604.000 114.703 114.703 1605.000 114.701 114.701 1606.000 . 114.699 114.699 1607.000 114.697 114.697 1608.000 114.695 114.695 1609.000 114.693 114.693 1610.000 114.691 114.691 1611.000 114.689 114.689 1612.000 114.687 114.687 1613.000 114.685 114.685 1614.000 114.684 114.684 EC 626319

  • Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 12 11-17-2018 Attachment 1 Page 155 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1615.000 114.682 114.682 1616.000 114.680 114.680 1617.000 114.678 114.678 1618.000 114.676 114.676 1619.000 114.674 114.674 1620.000 114.672 114.672 1621.000 114.670 114.670 1622.000 114.668 114.668 1623.000 114.666 114.666 1624.000 114.664 114.664 1625.000 114.662 114.662 1626.000 114.660 114.660 1627.000 114.658 114.658 1628.000 114.656 114.656 1629.000 114.654 114.654 1630.000 114.652 114.652 1631.000 114.650 114.650 1632.000 114.648 114.648 1633.000 114.646 114.646 1634.000 114.644 114.644 1635.000 114.642 114.642 1636.000 114.640 114.640 1637.000 114.638 114.638 1638.000 114.637 114.637 1639.000 114.635 114.635 1640.000 114.633 114.633 1641.000 114.631 114.631 1642.000 114.629 114.629 1643.000 114.627 114.627 1644.000 114.625 114.625 1645.000 114.623 114.623 1646.000 114.621 114.621 1647.000 114.619 114.619 1648.000 114.617 114.617 1649.000 114.615 114.615 1650.000 114.613 114.613 1651.000 114.611 114.611 1652.000 114.609 114.609 1653.000 114.607 114.607 1654.000 114.605 114.605 1655.000 114.604 114.604 1656.000 114.602 114.602 1657.000 114.600 114.600 1658.000 114.598 114.598 1659.000 114.596 114.596 1660.000 114.594 114.594 1661.000 114.592 114.592 1662.000 114.590 114.590 1663.000 114.588 114.588 1664.000 114.586 114.586 1665.000 114.584 114.584 1666.000 114.582 114.582 1667.000 114.580 114.580 1668.000 114.578 114.578 1669.000 114.577 114.577 1670.000 114.575 114.575 1671.000 114.573 114.573 1672.000 114.571 114.571 1673.000 114.569 114.569 1674.000 114.567 114.567 1675.000 114.565 114.565 1676.000 114.563 114.563 1677.000 114.561 114.561 1678.000 114.559 114.559 1679.000 114.557 114.557 1680.000 114.555 114.555 1681.000 114.554 114.554 1682.000 114.552 114.552 1683.000 114.550 114.550 1684.000 114.548 114.548 1685.000 114.546 114.546 1686.000 114.544 114.544 1687.000 114.542 114.542 1688.000 114.540 114.540 1689.000 114.538 114.538 1690.000 114.536 114.536 1691.000 114.535 114.535 1692.000 114.533 114.533 1693.000 114.531 114.531 1694.000 114.529 114.529 1695.000 114.527 114.527 1696.000 114.525 114.525 1697.000 114.523 114.523 1698.000 114.522 114.522 1699.000 114.522 114.522 1700.000 114.522 114.522 1701.000 114.522 114.522 1702.000 114.521 114.521 1703.000 114.521 114.521 1704.000 114.521 114.521 1705.000 114.521 114.521 1706.000 114.521 114.521 1707.000 114.520 114.520 1708.000 114.520 114.520 1709.000 114.520 114,520 1710.000 114.520 114.520 1711.000 114.519 114.519 1712.000 114.519 114.519 1713.000 114.519 114.519 1714.000 114.519 114.519 1715.000 114.519 114.519 1716.000 114.518 114.518 1717.000 114.518 114.518 1718.000 114.518 114.518 1719.000 114.518 114.518 1720.000 114.517 114.517 1721.000 114.517 114.517 1722.000

  • 114.517 114.517 1723.000 114.517 114.517 1724.000 114.516 114.516 1725.000 114.516 114.516 1726.000 114.516 114.516 1727.000 114.516 114.516 1728.000 114.516 114.516 1729.000 114.515 114.515 1730.000 114.515 114.515 1731.000 114.515 114.515 1732.000 114.515 114.515 1733.000 114.514 114.514 1734.000 114.514 114.514 1735.000 114.514 114.514 1736.000 114.514 114.514 1737.000 114.514 114.514 1738.000 114.513 114.513 1739.000 114.513 114.513 1740.000 114.513 114.513 1741.000 114.513 114.513 1742.000 114.512 114.512 1743.000 114.512 114.512 1744.000 114.512 114.512 1745.000 114.512 114.512 1746.000 114.511 114.511 1747.000 114.511 114.511 1748.000 114.511 114.511 1749.000 114.511 114.511 1750.000 114.511 114.511 1751.000 114.510 114.510 1752.000 114.510 114.510 1753.000 114.510 114.510 1754.000 114.510 114.510 1755.000 114.509 114.509 1756.000 114.509 114.509 1757.000 114.509 114.509 1758.000 114.509 114.509 1759.000 114.508 114.508 1760.000 114.508 114.508 1761.000 114.508 114.508 1762.000 114.508 114.508 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 13 11-17-2018 Attachment 1 Page 156 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time V-V+ Time y. V+ Time V-V+ 1763.000 114.508 114.508 1764.000 114.507 114.507 1765.000 114.507 114.507 1766.000 114.507 114.507 1767.000 114.507 114.507 1768.000 114.506 114.506 1769.000 114.506 114.506 1770.000 114.506 114.506 1771.000 114.506 114.506 1772.000 114.505 114.505 1773.000 114.505 114.505 1774.000 114.505 114.505 1775.000 114.505 114.505 1776.000 114.505 114.505 1777.000 114.504 114.504 1778.000 114.504 114.504 1779.000 114.504 114.504 1780.000 114.504 114.504 1781.000 114.503 114.503 1782.000 114.503 114.503 1783.000 114.503 114.503 1784.000 114.503 114.503 1785.000 114.502 114.502 1786.000 114.502 114.502 1787.000 114.502' 114.502 1788.000 114.502 114.502 1789.000 114.502 114.502 1790.000 114.501 114.501 1791.000 114.501 114.501 1792.000 114.501 114.501 1793.000 114.501 114.501 1794.000 114.500 114.500 1795.000 114.500 114.500 1796.000 114.500 114.500 1797.000 114.500 114.500 1798.000 114.499 114.499 1799.000 114.499 114.499 1800.000 114.499 114.499 1801.000 114.499 114.499 1802.000 114.498 114.498 1803.000 114.498 114.498 1804.000 I 14.498 114.498 1805.000 114.498 114.498 1806.000 114.498 114.498 1807.000 114.497 114.497 1808.000 114.497 114.497 1809.000 114.497 114.497 1810.000 114.497 114.497 1811.000.

114.496 114.496 1812.000 114.496 114.496 1813.000 114.496 114.496 1814.000 114.496 114.496 1815.000 114.495 114.495 1816.000 114.495 114.495 1817.000 114.495 114.495 1818.000 114.495 114.495 1819.000 114.495 114.495 1820.000 114.494 114.494 1821.000 114.494 114.494 1822.000 114.494 114.494 1823.000 114.494 114.494 1824.000 114.493 114.493 1825.000 114.493 114.493 1826.000 114.493 114.493 1827.000 114.493 114.493 1828.000 114.492 114.492 1829.000 114.492 114.492 1830.000 114.492 114.492 1831.000 114.492 114.492 1832.000 114.491 114.491 1833.000 114.491 114.491 1834.000 114.491 114.491 1835.000 114.491 114.491 1836.000 114.491 114.491 1837.000 114.490 114.490 1838.000 114.490 114.490 1839.000 114.490 114.490 1840.000 114.490 114.490 1841.000 114.489 114.489 1842.000 114.489 114.489 1843.000 114.489 114.489 1844.000 114.489 114.489 1845.000 114.488 114.488 1846.000 114.488 114.488 1847.000 114.488 114.488 1848.000 114.488 114.488 1849.000 114.487 114.487 1850.000 I 14.487 114.487 1851.000 114.487 114.487 1852.000 114.487 114.487 1853.000 114.486 114.486 1854.000 114.486 114.486 1855.000 114.486 114.486 1856.000 114.486 114.486 1857.000 114.486 114.486 1858.000 114.485 114.485 1859.000 114.485 114.485 1860.000 114.485 114.485 1861.000 114.485 114.485 1862.000 114.484 114.484 1863.000 114.484 114.484 1864.000 114.484 114.484 1865.000 114.484 114.484 1866.000 114.483 114.483 1867.000 114.483 114.483 1868.000 114.483 114.483 1869.000 114.483 114.483 1870.000 114.482 114.482 1871.000 114.482 114.482 1872.000 114.482 114.482 1873.000 114.482 114.482 1874.000 114.481 114.481 1875.000 114.481 114.481 1876.000 114.481 114.481 1877.000 114.481 114.481 1878.000 114.481 114.481 1879.000 114.480 114.480 1880.000 114.480 114.480 1881.000 114.480 114.480 1882.000 114.480 114.480 1883.000 114.479 114.479 1884.000 114.479 114.479 1885.000 114.479 I 14.479 1886.000 114.479 114.479 1887.000 114.478 114.478 1888.000 114.478 114.478 1889.000 114.478 114.478 1890.000 114.478 114.478 1891.000 114.477 114.477 1892.000 114.477 114.477 1893.000 114.477 114.477 1894.000 114.477 114.477 1895.000 114.476 114.476 1896.000 114.476 114.476 1897.000 114.476 114.476 1898.000 114.476 114.476 1899.000 114.475 114.475 1900.000 114.475 114.475 1901.000 114.475 114.475 1902.000 114.475 114.475 1903.000 114.475 114.475 1904.000 114.474 114.474 1905.000 114.474 114.474 1906.000 114.474 114.474 1907.000 114.474 114.474 1908.000 114.473 114.473 1909.000 114.473 114.473 1910.000 114.473 114.473 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 14 11-17-2018 Attachment 1 Page 157 of 274 KCICONSULT

Base Normal Voltage(V)

Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1911.000 114.473 114.473 1912.000 114.472 114.472 1913.000 114.472 114.472 1914.000 114.472 114.472 1915.000 114.472 114.472 1916.000 114.471 114.471 1917.000 114.471 114.471 1918.000 114.471 114.471 1919.000 114.471 114.471 1920.000 114.470 114.470 1921.000 114.470 114.470 1922.000 114.470 114.470 1923.000 114.470 114.470 1924.000 114.469 114.469 1925.000 114.469 114.469 1926.000 114.469 114.469 1927.000 114.469 114.469 1928.000 114.468 114.468 1929.000 114.468 114.468 1930.000 114.468 114.468 1931.000 114.468 114.468 1932.000 114.467 114.467 1933.000 114.467 114.467 1934.000 114.467 114.467 1935.000 114.467 114.467 1936.000 114.466 114.466 1937.000 114.466 114.466 1938.000 114.466 114.466 1939.000 114.466 114.466 1940.000 114.466 114.466 1941.000 114.465 114.465 1942.000 114.465 114.465 1943.000 114.465 114.465 1944.000 114.465 114.465 1945.000 114 .. j,64 114.464 1946.000 114.464 114.464 1947.000 114.464 114.464 1948.000 114.464 114.464 1949.000 114.463 114.463 1950.000 114.463 114.463 1951.0QO 114.463 114.463 1952.000 114.463 114.463 1953.000 114.462 114.462 1954.000 114.462 114.462 1955.000 114.462 114.462 1956.000 114.462 114.462 1957.000 114.461 114.461 1958.000 114.461 114.461 1959.000 114.461 114.461 1960.000 114.461 114.461 1961.000 114.460 114.460 1962.000 114.460 114.460 1963.000 114.460 114.460 1964.000 114.460 114.460 1965.000 114.459 i 14.459 1966.000 114.459 /114.459 1967.000 114.459 114.459 1968.000 114.459 114.459 1969.000 114.458 114.458 1970.000 114.458 114.458 1971.000 114.458 114.458 1972.000 114.458 114.458 1973.000 114.457 114.457 1974.000 114.457 114.457 1975.000 114.457 114.457 1976.000 114.457 114.457 1977.000 114.456 114.456 1978.000 114.456 114.456 1979.000 114.456 114.456 1980.000 114.456 114.456 1981.000 114.455 114.455 1982.000 114.455 114.455 1983.000 114.455 114.455 1984.000 114.455 114.455 1985.000 114.454 114.454" 1986.000 114.454 114.454 1987.000 114.454 114.454 1988.000 114.454 114.454 1989.000 114.453 114.453 1990.000 114.453 114.453 1991.000 114.453 114.453 1992.000 114.453 114.453 1993.000 114.452 114.452 1994.000 114.452* 114.452 1995.000 114.452 114.452 1996.000 114.452 114.452 1997.000 114.451 114.451 1998.000 114.451 114.451 1999.000 114.451 114.451 2000.000 114.451 114.451 2001.000 114.450 114.450 2002.000 114.450 114.450 2003.000 114.450 114.450 2004.000 114.450 114.450 2005.000 114.449 114.449 2006.000 114.449 114.449 2007.000 114.449 114.449 2008.000 114.449 114.449 2009.000 114.448 114.448 2010.000 114.448 114.448 2011.000 114.448 114.448 2012.000 114.448 114.448 2013.000 114.447 114.447 2014.000 114.447 114.447 r 2015.000 114.447 114.447 2016.000 114.447 114.447 2017.000 114.446 114.446 2018.000 114.446 114.446 2019.000 114.446 114.446 2020.000 114.446 114.446 2021.000 114.445 114.445 2022.000 114.445 114.445 2023.000 114.445 114.445 2024.000 114.445 114.445 2025.000 114.444 114.444 2026.000 114.444 114.444 2027.000 114.444 114.444 2028.000 114.444

  • 114.444 2029.000 114.443 114.443 2030.000 114.443 114.443 2031.000 114.443 114.443 2032.000 114.443 114.443 2033.000 114.442 114.442 2034.000 114.442 114.442 2035.000 114.442 114.442 2036.000 114.442 114.442 2037.000 114.441 114.441 2038.000 114.441 114.441 2039.000 114.441 114.441 . 2040.000 114.441 114.441 2041.000 114.441 114.441 2042.000 114.441 114.441 2043.000 114.441 114.441 2044.000 114.441 114.441 2045.000 114.441 114.441 2046.000 114.441 114.441 I 2047.000 114.441 114.441 2048.000 114.441 114.441 2049.000 114.441 114.441 2050.000 114.441 114.441 2051.000 114.441 114.441 2052.000 114.441 114.441 2053.000 114.442
  • 114.442 2054.000 114.442 114.442 2055.000 114.442 114.442 2056.000 114.442 114.442 2057.000 114.442 114.442 2058.000 114.442 114.442 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 15 II-17-2018 Attachment 1 Page 158 of274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time v-V+ 2059.000 114.442 114.442 2060.000 114.442 114.442 2061.000 114.442 114.442 2062.000 114.442 114.442 2063.000 114.442 114.442 2064.000 114.442 114.442 2065.000 114.442 114.442 2066.000 114.442 114.442 2067.000 114.442 114.442 2068.000 114.443 114.443 2069.000 114.443 114.443 2070.000 114.443 114.443 2071.000 114.443 114.443 2072.000 114.443 114.443 2073.000 114.443 114.443 2074.000 114.443 114.443 2075.000 114.443 114.443 2076.000 114.443 114.443 2077.000 114.443 114.443 2078.000 114.443 114.443 2079.000 114.443 114.443 2080.000 114.443 114.443 2081.000 114.443 114.443 2082.000 114.443 114.443 2083.000 114.443 114.443 2084.000 114.444 114.444 2085.000 114.444 114.444 2086.000 114.444 114.444 2087.000 114.444 114.444 2088.000 114.444 114.444 2089.000 114.444 114.444 2090.000 114.444 114.444 2091.000 114.444 114.444 2092.000 114.444 114.444 2093.000 114.444 114.444 2094.000 114.444 114.444 2095.000 114.444 114.444 2096.000 114.444 114.444 2097.000 114.444 114.444 2098.000 114.444 114.444 2099.000 114.444 114.444 2100.000 114.445 114.445 2l0I:OOO 114.445 114.445 2102.000 114.445 114.445 2103.000 114.445' 114.445 2104.000 114.445 114.445 2105.000 114.445 114.445 2106.000 114.445 114.445 2107.000 114.445 114.445 2108.000 114.445 114.445 2109.000 114.445 114.445 2110.000 114.445 114.445 2111.000 114.445 114.445 2112.000 114.445 114.445 2113.000 114.445 114.445 2114.000 114.445 114.445 2115.000 114.446 114.446 2116.000 114.446 114.446 2117.000 114.446 114.446 2118.000 114.446 114.446 2119.000 114.446 114.446 2120.000 114.446 114.446 2121.000 114.446 114.446 2122.000 114.446 114.446 2123.000 114.446 114.446 2124.000 114.446 114.446 2125.000 114.446 114.446 2126.000 114.446 114.446 2127.000 114.446 114.446 2128.000 114.446 114.446 2129.000 114.446 114.446 2130.000 114.446 114.446 2131.000 114.447 114.447 2132.000 114.447 114.447 2133.000 114.447 114.447 2134.000 114.447 114.447 2135.000 114.447 114.447 2136.000 114.447 114.447 2137.000 114.447 114.447 2138.000 114.447 114.447 2139.000 114.447 114.447 2140.000 114.447 114.447 2141.000 114.447 114.447 2142.000 114.447 114.447 2143.000 114.447 114.447 2144.000 114.447 114.447 2145.000 114.447 114.447 2146.000 114.448 114.448 2147.000 114.448 114.448 2148.000 114.448 114.448 2149.000 114.448 114.448 2150.000 114.448 114.448 2151.000 114.448 114.448 2152.000 114.448 114.448 2153.000 114.448 114.448 2154.000 114.448 114.448 2155.000 114.448 114.448 2156.000 114.448 114.448 2157.000 114.448 114.448 2158.000 114.448 114.448 2159.000 114.448 114.448 2160.000 114.448 114.448 2161.000 114.449 114.449 2162.000 114.449 114.449 2163.000 114.449 114.449 2164.000 114.449 114.449 2165.000 114.449 114.449 2166.000 114.449 114.449 2167.000 114.449 114.449 2168.000 114.449 114.449 2169.000 114.449 114.449 2170.000 114.449 114.449 2171.000 114.449 114.449 2172.000 114.449 114.449 2173.000 114.449 114.449 2174.000 114.449 114.449 2175.000 114.449 114.449 2176.000 114.450 114.450 2177.000 114.450 114.450 2178.000 114.450 114.450 2179.000 114.450 114.450 2180.000 114.450 114.450 2181.000 114.450 114.450 2182.000 114.450 114.450 2183.000 114.450 114.450 2184.000 114.450 114.450 2185.000 114.450 114.450 2186.000 114.450 114.450 2187.000 114.450 114.450 2188.000 114.450 114.450 2189.000

  • 114.450 114.450 2190.000 114.450 114.450 2191.000 114.451 114.451 2192.000 114.451 114.451 2193.000 114.451 114.451 2194.000 114.451 114.451 2195.000 114.451 114.451 2196.000 114.451 114.451 2197.000 114.451 114.451 2198.000 114.451 114.451 2199.000 114.451 114.451 2200.000 114.451 114.451 2201.000 114.451 114.451 2202.000 114.451 114.451 2203.000 114.451 114.451 2204.000 114.451 114.451 2205.000 114.452 114.452 2206.000 114 452 114.452 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 16 11-17-2018 Attachment 1 Page 159 of 274 KCICONSULT Base Normal Volt~ge (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2207.000 1!4.452 1!4.452 2208.000 1!4.452 114.452 2209.000 114.452 1!4.452 2210.000 1!4.452 1!4.452 2211.000 1!4.452 1!4.452 2212.000 1!4.452 114.452 2213.000 114.452 114.452 2214.000 1!4.452 114.452 2215.000 114.452 1!4.452 2216.000 114.452 114.452 2217.000 114.452 114.452 2218.000 1!4.452 114.452 2219.000 114.452 ll4.452 2220.000 114.453 ll4.453 2221.000 1!4.453 ll4.453 2222.000 ll4.453 ll4.453 2223.000 ll4.453 114.453 2224.000 1!4.453 ll4.453 2225.000 1!4.453 ll4.453 2226.000 1!4.453 114.453 2227.000 ll4.453 1!4.453 2228.000 114.453 ll4.453 2229.000 1!4.453 1!4.453 2230.000 1!4.453 1!4.453 2231.000 1!4.453 1!4.453 2232.000 114.453 ll4.453 . 2233.000 1!4.453 1!4.453 2234.000 1!4.453 114.453 2235.000 114.454 114.454 2236.000 114.454 114.454 2237.000 114.454 1!4.454 2238.000 114.454 114.454 2239.000 114.454 114.454 2240.000 114.454 114.454 2241.000 1!4.454 114.454 2242.000 114.454 114.454 2243.000 114.454 114.454 2244.000 114.454 114.454 2245.000 1!4.454 114.454 2246.000 114.454 114.454 2247.000 114.454 114.454 2248.000 114.454 114.454 2249.000 114.455 114.455 2250.000 114.455 114.455 2251.000 1!4.455 114.455 2252.000 114.455 114.455 2253.000 114.455 114.455 2254.000 114.455 114.455 2255.000 114.455 114.455 2256.000 114.455 114.455 2257.000 114.455 114.455 2258.000 114.455 114.455 2259.000 114.455 114.455 2260.000 114.455 114.455 2261.000 114.455 114.455 2262.000 1!4.455 1!4.455 2263.000 114.456 114.456 2264.000 114.456 114.456 2265.000 114.456 114.456 2266.000 114.456 1!4.456 2267.000 1!4.456 114.456 2268.000 114.456 114.456. 2269.000 114.456 1!4.456 2270.000 114.456 114.456 2271.000 1!4.456 114.456 2272.000 114.456 114.456 2273.000 114.456 114.456 2274.000 114.456 114.456 2275.000 114.456 114.456 2276.000 114.456 1!4.456 2277.000 114.456 114.456 2278.000 114.457 114.457 2279.000 1!4.>157 1!4.457 2280.000 114.457 114.457 2281.000 114.457 114.457 2282.000 1!4.457 1!4.457 2283.000 114.457 1!4.457 2284.000 114.457 1!4.457 2285.000 114.457 114.457 2286.000 114.457 114.457 2287.000 1!4.457 1!4.457 2288.000 114.457 1!4.457 2289.000 1!4.457 1!4.457 2290.000 1!4.457 114.457 2291.000 114.457 ll4.457 2292.000 114.458 114.458 2293.000 1!4.458 1!4.458 2294.000 114.458 114.458 2295.000 1!4.458 1!4.458 2296.000 114.458 114.458 2297.000 114.458 1!4.458 2298.000 114.458 114.458 2299.000 1!4.458 1!4.458 2300.000 1!4.458 1!4.458 2301.000 1!4.458 114.458 2302.000 1!4.458 114.458 2303.000 114.458 1!4.458 2304.000 1!4.458 1!4.458 2305.000 1!4.458 1!4.458 2306.000 114.459 1!4.459 2307.000 114.459 ll4.459 2308.000 114.459 1!4.459 2309.000 1!4.459 1!4.459 2310.000 1!4.459 114.459 2311.000 1!4.459 1!4.459 2312.000 114.459 1!4.459 2313.000 1!4.459 114.459 2314.000 1!4.459 114.459 2315.000 1!4.459 1!4.459 2316.000 114.459 1!4.459 2317.000 1!4.459 114.459 2318.000 1!4.459 114.459 2319.000 1!4.459 1!4.459 2320.000 1!4.460 114.460 2321.000 114.460 1!4.460 2322.000 1!4.460 114.460 2323.000 114.460 1!4.460 2324.000 1!4.460 114.460 2325.000 114.460 114.460 2326.000 1!4.460 114.460 2327.000 1!4.460 1!4.460 2328.000 1!4.460 114.460 2329.000 114.460 114.460 2330.000 114.460 114.460 2331.000 114.460 114.460 2332.000 114.460 114.460 2333.000 114.460 114.460 2334.000 114.461 114.461 2335.000 114.461 114.461 2336.000 114.461 114.461 2337.000 1!4.461 114.461 2338.000 114.461 114.461 2339.000 114.461 1!4.461 2340.000 114.461 114.461 2341.000 114.461 114.461 2342.000 114.461 114.461 2343.000 114.461 114.461 2344.000 114.461 114.461 2345.000 114.461 114.461 2346.000 114.461 114.461 2347.000 114.462 114.462 2348.000 114.462 114.462 2349.000 114.462 114.462 2350.000 114.461 114.461 2351.000 114.461 114.461 2352.000 114.461 114.461 2353.000 1!4.461 114.461 2354.000 114.461 114.461 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 17 11-17-2018 Attachment 1 Page 160 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time v-V+ Time V-V+ Time V-V+ Time V-V+ 2355.000 114.461 114.461 2356.000 114.461 114.461 2357.000 114.461 114.461 2358.000 114.461 114.461 2359.000 114.461 114.461 2360.000 114.461 114.461 2361.000 114.461 114.461 2362.000 114.461 114.461 2363.000 114.461 114.461 2364.000 114.461 114.461 2365.000 114.461 114.461 2366.000 114.461 114.461 2367.000 114.461 114.461 2368.000 114.461 114.461 2369.000 114.461 114.461 2370.000 114.461 114.461 2371.000 114.461 114.461 2372.000 114.461 114.461 2373.000 114.461 114.461 2374.000 114.461 114.461 2375.000 114.461 114.461 2376.000 114.461 114.461 2377.000 114.460 114.460 2378.000 114.460 114.460 2379.000 114.460 114.460 2380.000 114.460 114.460 2381.000 114.460 114.460 2382.000 114.460 114.460 2383.000 114.460 114.460 2384.000 114.460 114.460 2385.000 114.460 114.460 2386.000 114.460 114.460 2387.000 114.460 114.460 2388.000 114.460 114.460 2389.000 114.460 114.460 2390.000 114.460 114.460 2391.000 114.460 114.460 2392.000 114.460 114.460 2393.000 114.460 114.460 2394.000 114.460 114.460 2395.000 114.460 114.460 2396.000 114.460 114.460 2397.000 114.460 114.460 2398.000 114.460 114.460 2399.000 114.460 114.460 2400.000 114.460 114.460 2401.000 114.460 114.460 2402.000 114.460 114.460 2403.000 114.459 114.459 2404.000 114.459 114.459 2405.000 114.459 114.459 2406.000 114.459 114.459 2407.000 114.459 114.459 2408.000 114.459 114.459 2409.000 114.459 114.459 2410.000 114.459 114.459 2411.000 114.459 114.459 2412.000 114.459 114.459 2413.000 114.459 114.459 2414.000 114.459 114.459 2415.000 114.459 114.459 2416.000 114.459 114.459 2417.000 114.459 114.459 2418.000 114.459 114.459 2419.000 114.459 114.459 2420.000 114.459 114.459 2421.000 114.459 114.459 2422.000 114.459 114.459 2423.000 114.459 114.459 2424.000 114.459 114.459 2425.000 114.459 114.459 2426.000 114.459 114.459 2427.000 114.459 114.459 2428.000 114.459 114.459 2429.000 114.458 114.458 2430.000 114.458 114.458 2431.000 114.458 114.458 2432.000 114.45~ 114.458 2433.000 114.458 114.458 2434.000 114.458 114.458 2435.000 114.458 114.458 2436.000 114.458 114.458 2437.000 114.458 114.458 2438.000 114.458 114.458 2439.000 114.458 114.458 2440.000 114.458 114.458 2441.000 114.458 114.458 2442.000 114.458 114.458 2443.000 114.458 114.458 2444.000 114.458 114.458 2445.000 114.458 114.458 2446.000 114.458 114.458 2447.000 114.458 114.458 2448.000 114.458 114.458 2449.000 114.458 114.458 2450.000 114.458 114.458 2451.000 114.458 114.458 2452.000 114.458 114.458 2453.000 114.458 114.458 2454.000 114.458 114.458 2455.000 114.457 114.457 2456.000 114.457 114.457 2457.000 114.457 114.457 2458.000 114.457 114.457 2459.000 114.457 114.457 2460.000 114.457 114.457 2461.000 114.457 114.457 2462.000 114.457 114.457 2463.000 114.457 114.457 2464.000 114.457 114.457 2465.000 114.457 114.457 2466.000 114.457 114.457 2467.000 114.457 114.457 2468.000 114.457 114.457 2469.000 114.457 114.457 2470.000 114.457 114.457 2471.000 114.457 114.457 2472.000 114.457 114.457 2473.000 114.457 114.457 2474.000 114.457 114.457 2475.000 114.457 114.457 2476.000 114.457 114.457 2477.000 114.457 114.457 2478.000 114.457 114.457 2479.000 114.457 114.457 2480.000 114.456 114.456 2481.000 114.456 114.456 2482.000 114.456 114.456 2483.000 114.456 114.456 2484.000 114.456 114.456 2485.000 114.456 114.456 2486.000 114.456 114.456 2487.000 114.456 114.456 2488.000 114.456 114.456 2489.000 114.456 114.456 2490.000 114.456 114.456 2491.000 114.456 114.456 2492.000 114.456 114.456 2493.000 114.456 114.456 2494.000 114.456 114.456 2495.000 114.456 114.456 2496.000 114.456 114.456 2497.000 114.456 114.456 2498.000 114.456 114.456 2499.000 114.456 114.456 2500.000 114.456 114.456 2501.000 114.456 114.456 2502.000 114.456 114.456 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 18 11-17-2018 Attachment 1 Page 161 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2503.000 114.456 114.456 2504.000 114.456 114.456 2505.000 114.455 114.455 2506.000 -114.455 114.455 2507.000 114.455 114.455 2508.000 114.455 114.455 2509.000 114.455 114.455 2510.000 114.455 114.455 2511.000 114.455 114.455 2512.000 114.455 114.455 2513.000 114.455 114.455 2514.000 114.455 114.455 2515.000 114.455 114.455 2516.000 114.455 114.455 2517.000 114.455 114.455 2518.000 114.455 114.455 2519.000 114.455 114.455 2520.000 114.455 114.455 2521.000 114.455 114.455 2522.000 114.455 114.455 2523.000 114.455 114.455 2524.000 114.455 114.455 2525.000 114.455 114.455 2526.000 114.455 114.455 2527.000 114.455 114.455 2528.000 114.455 114.455 2529.000 114.455 114.455 2530.000 114.454 114.454 2531.000 114.454 114.454 2532.000 114.454 114.454 2533.000 114.454 114.454 2534.000 114.454 114.454 2535.000 114.454 114.454 2536.000 114.454 114.454 2537.000 114.454 114.454 2538.000 114.454 114.454 2539.000 114.454 114.454 2540.000 114.454 114.454 2541.000 114.454 114.454 2542.000 114.454 114.454 2543.000 114.454 114.454 2544.000 114.454 114.454 2545.000 114.454 114.454 2546.000 114.454 114.454 2547.000 114.454 114.454 2548.000 114.454 114.454 2549.000 114.454 114.454 2550.000 114.454 114.454 2551.000 114.454 114.454 2552.000 114.454 114.454 2553.000 1)4.454 114.454 2554.000 114.454 114.454 2555.000 114.453 114.453 2556.000 114.453 114.453 2557.000 114.453 114.453 2558.000 114.453 114.453 2559.000 114.453 114.453 2560.000 114.453 114.453 2561.000 114.453 114.453 2562.000 114.453 114.453 2563.000 114.453 114.453 2564.000 114.453 114.453 2565.000 114.453 114.453 2566.000 114.453 114.453 2567.000 114.453 114.453 2568.000 114.453 114.453 2569.000 114.453 114.453 2570.000 114.453 114.453 2571.000 114.453 114.453 2572.000 114.453 114.453 2573.000 114.453 114.453 2574.000 114.453 114.453 2575.000 114.453 114.453 2576.000 114.453 114.453 2577.000 114.453 114.453 2578.000 114.453 114.453 2579.000 114.452 114.452 2580.000 114.452 114.452 2581.000 114.452 114.452 2582.000 114.452 114.452 2583.000 114.452 114.452 2584.000 114.452 114.452 2585.000 114.452 114.452 2586.000 114.452 114.452 2587.000 114.452 114.452 2588.000 114.452 114.452 2589.000 114.452 114.452 2590.000 114.452 114.452 2591.000 114.452 114.452 2592.000 114.452 114.452 2593.000 114.452 114.452 2594.000 i 14.452 114.452 2595.000 114.452 114.452 2596.000 114.452 114.452 2597.000 114.452 114.452 2598.000 114.452 114.452 2599.000 114.452 114.452 2600.000 114.452 114.452 2601.000 114.452 114.452 2602.000 114.452 114.452 2603.000 114.452 114.452 2604.000 114.451 114.451 2605.000 114.451 114.451 2606.000 114.451 114.451 2607.000 114.451 114.451 2608.000 114.451 114.451 2609.000 114.451 114.451 2610.000 114.451 114.451 2611.000 114.451 114.451 2612.000 114.451 114.451 2613.000 114.451 114.451 2614.000 114.451 114.451 2615.000 114.451 114.451 2616.000 114.451 114.451 2617.000 114.451 114.451 2618.000 114.451 114.451 2619.000 114.451 114.451 2620.000 114.451 114.451 2621.000 114.451 114.451 2622.000 114.451 114.451 2623.000 114.451 114.451 2624.000 114.451 114.451 2625.000 114.451 114.451 2626.000 114.451 114.451 2627.000 114.451 114.451 2628.000 114.450 114.450 2629.000 114.450 114.450 2630.000 114.450 114.450 2631.000 114.450 114.450 2632.000 114.450 114.450 2633.000 114.450 114.450 2634.000 114.450 114.450 2635.000 114.450 114.450 2636.000 114.450 114.450 2637.000 114.450 114.450 2638.000 114.450 114.450 2639.000 114.450 114.450 2640.000 114.450 114.450 2641.000 114.450 114.450 2642.000 114.450 114.450 2643.000 114.450 114.450 2644.000 114.450 114.450 2645.000 114.450 114.450 2646.000 114.450 114.450 2647.000 114.450 114.450 2648.000 114.450 114.450 2649.000 114.450 114.450 2650.000 114.450 114.450 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT1ABUS 19 11-17-2018 Attachment 1 Page 162 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-' V+ Time V-V+ Time V-V+ 2651.000 114.449 114.449 2652.000 114.449 114.449 2653.000 114.449 114.449 2654.000 114.449 114.449 2655.000 114.449 114.449 2656.000 114.449 114.449 2657.000 114.449 114.449 2658.000 114.449 114.449 2659.000 114.449 . 114.449 2660.000 114.449 114.449 2661.000 114.449 114.449" 2662.000 114.449 114.449 2663.000 114.449 114.449 2664.000 114.449 114.449 2665.000 114.449 114.449 2666.000 114.449 114.449 2667.000 114.449 114.449 2668.000 114.449 114.449 2669.000 114.449 114.449 2670.000 114.449 114.449 2671.000 114.449 114.449 2672.000 114.449 114.449 2673.000 114.449 114.449 2674.000 114.449 114.449 2675.000 114.448 114.448 2676.000 114.448 114.448 2677.000 114.448 114.448 2678.000 114.448 114.448 2679.000 114.448 114.448 2680.000 114.448 114.448 2681.000 114.448 114.448 2682.000 114.448 114.448 2683.000 114.448 114.448 2684.000 114.448 114.448 2685.000 114.448 114.448 2686.000 114.448 114.448 2687.000 114.448 114.448 2688.000 114.448 114.448 2689.000 114.448 114.448 2690.000 114.448 114.448 2691.000 114.448 114.448 2692.000 114.448 114.448 2693.000 114.448 114.448 2694.000 114.448 114.448 2695.000 114.448 114.448 2696.000 114.448 114.448 2697.000 114.448 114.448 2698.000 114.447 114.447 2699.000 114.447 114.447 2700.000 114.447 114.447 2701.000 114.447 114.447 2702.000 114.447 114.447 2703.000 114.447 114.447 2704.000 114.447 114.447 2705.000 114.447 114.447 2706.000 114.447 114.447 2707.000 114.447 114.447 2708.000 114.447 114.447 2709.000 114.447 114.447

  • 2710.000 114.447 114.447 2711.000 114.447 114.447 2712.000 114.447 114.447 2713.000 114.447 114.447 2714.000 114.447 114.447 2715.000 114.447 114.447 2716.000 114.447 114.447 2717.000 114,447 114.447 2718.000 114.447 114.447 2719.000 114.447 114.447 2720.000 114.447 114.447 2721.000 114.447 114.447 2722.000 114.446 114.446 2723.000 114.446 114.446 2724.000 114.446 114.446 2725.000 114.446 114.446 2726.000 114.446 114.446 2727.000 114.446 114.446 2728.000 114.44~ 114.446 2729.000 114.446 114.446 2730.000 114.446 114.446 2731.000 114.446 114.446 2732.000 114.446 114.446 2733.000 114.446 114.446 2734.000 114.446 114.446 2735.000 114.446 114.446 2736.000 114.446 114.446 2737.000 114.446 114.446 2738.000 114.446 114.446 2739.000 114.446 114.446 2740.000 114.446 114.446 2741.000 114.446 114.446 2742.000 114.446 114.446 2743.000 114.446 114.446 2744.000 114.445 114.445 2745.000 114.445 114.445 2746.000 114.445 114.445 2747.000 114.445 114.445 2748.000 114.445 114.445 2749.000 114.445 114.445 2750.000 114.445 114.445 2751.000 114.445 114.445 2752.000 114.445 114.445 2753.000 114.445 114.445 2754.000 114.445 114.445 2755.000 114.445 114.445 2756.000 114.445 114.445 2757.000 114.445 114.445 2758.000 114.445 114.445 2759.000 114.445 114.445 2760.000 114.445 114.4:!5 2761.000 114.445 114.445 2762.000 114.445 114.445 2763.000 114.445 114.445 2764.000 114.445 114.445 2765.000 114.445 114.445 2766.000 114.445 114.445 2767.000 114.444 114.444 2768.000 114.444 114.444 2769.000 114.444 114.444 2770.000 114.444 114.444 2771.000 114.444 114.444 2772.000 114.444 114.444 2773.000 114.444 114.444 2774.000 114.444 114.444 2775.000 114.444 114.444 2776.000 114.444 114.444 2777.000 114.444 114.444 2778.000 114.444 114.444 2779.000 114.444 114.444 2780.000 114.444 114.444 2781.000 114.444 114.444 2782.000 114.444 114.444 2783.000 114.444 114.444 2784.000 114.444 114.444 2785.000 114.444 114.444 2786.000 114.444 114.444 2787.000 114.444 114.444 2788.000 114.444 114.444 2789.000 114.444 114.444 2790.000 114.443 114.443 2791.000 114.443 114.443 2792.000 114.443 114.443 2793.000 114.443 114.443 2794.000 114.443 114.443 2795.000 114.443 114.443 2796.000 114.443 114.443 2797.000 114.443 114.443 2798.000 114.443 114.443 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study BATTlABUS 20 11-17-2018 Attachment 1 Page 163 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2799.000 114.443 114.443 2800.000 114.443 114.443 2801.000 114.443 114.443 2802.000 114.443 114.443 2803.000 114.443 114.443 2804.000 114.443 114.443 2805.000 114.443 114.443 2806.000 114.443 114.443 2807.000 114.443 114.443 2808.000 114.443 114.443 2809.000 114.443 114.443 2810.000 114.443 114.443 2811.000 114.443 114.443 2812.000 114.442 114.442 2813.000 114.442 114.442 2814.000 114.442 114.442 2815.000 114.442 114.442 2816.000 114.442 114.442 2817.000 114.442 114.442 2818.000 114.442 114.442 2819.000 114.442 114.442 2820.000 114.442 114.442 2821.000 114.442 114.442 2822.000 114.442 114.442 2823.000 114.442 114.442 2824.000 114.442 114.442 2825.000 114.442 114.442 2826.000 114.442 114.442 2827.000 114.442 114.442 2828.000 114.442 114.442 2829.000 114.442 114.442 2830.000 114.442 114.442 2831.000 114.442 114.442 2832.000 114.442 114.442 2833.000 114.442 114.442

  • 2834.000 114.441 114.441 2835.000 114.441 114.441 2836.000 114.441 114.441 2837.000 114.441 114.441 2838.000 114.441 114.441
  • 2839.000 114.441 114.441 2840.000 114.441 114.441 2841.000 114.441 114.441 2842.000 114.441 114.441 2843.000 114.441 114.441 2844.000 114.441 114.441 2845.000 114.441 114.441 2846.000 114.441 114.441 2847.000 114.441 114.441 2848.000 114.441 114.441 2849.000 114.441 114.441 2850.000 114.441 114.441 2851.000 114.441 114.441 2852.000 114.441 114.441 2853.000 114.441 114.441 2854.000 114.441 114.441 2855.000 114.441 114.441 2856.000 114.440 114.440 2857.000 114.440 114.440 2858.000 114.440 114.440 2859.000 114.440 114.440 2860.000 114.440 114.440 2861.000 114.440 114.440 2862.000 114.440 114.440 2863.000 114.440 114.440 2864.000 114.440 114.440 2865.000 114.440 114.440 2866.000 114.440 114.440 2867.000 114.440 114.440 2868.000 114.440 114.440 2869.000 114.440 114.440 2870.000 114.440 114.440 2871.000 114.440 114.440 2872.000 114.440 114.440 2873.000 114.440 114.440 2874.000 114.440 114.440 2875.000 114.440 114.440 2876.000 114.440 114.440 2877.000 114.440 114.440 2878.000 114.439 , 114.439 2879.000 114.439 114.439 2880.000 114.439 114.439 2881.000 114.439 114.439 2882.000 114.439 114.439 2883.000 114.439 114.439 2884.000 114.439 114.439 2885.000 114.439 114.439 2886.000 114.439 114.439 2887.000 114.439 114.439 2888.000 114.439 114.439 2889.000 114.439 114.439 2890.000 114.439 114.439 2891.000 114.439 114.439 2892.000 114.439 114.439 2893.000 114.439 114.439 2894.000 114.439 114.439 2895.000 114.439 114.439 2896.000 114.439 114.439 2897.000 114.439 114.439 2898.000 114.439 114.439 2899.000 114.439 114.439 2900.000 114.438 114.438 2901.000 114.438 114.438 2902.000 114.438 114.438 2903.000 114.438 114.438 2904.000 114.438 114.438 2905.000 114.438 114.438 2906.000 114.438 114.438 2907.000 114.438 114.438 2908.000 114.438 114.438 2909.000 114.438 114.438 2910.000 114.438 114.438 2911.000 114.438 114.438 2912.000 114.438 114.438 2913.000 114.438 114.438 2914.000 114.438 114.438 2915.000 114.438 114.438 2916.000 114.438 114.438 2917.000 114.438 114.438 2918.000 114.438 114.438 2919.000 114.438 114.438 2920.000 114.438 114.438 2921.000 114.437 114.437 2922.000 114.437 114.437 2923.000 114.437 114.437 2924.000 114.437 114.437 2925.000 114.437 114.437 2926.000 114.437 114.437 '2927.000 114.437 114.437 2928.000 114.437 114.437 2929.000 114.437 114.437 2930.000 114.437 114.437 2931.000 114.437 114.437 2932.000 114.437 114.437 2933.000 114.437 114.437 2934.000 114.437 114.437 2935.000 114.437 114.437 2936.000 114.437 114.437 2937.000 114.437 114.437 2938.000 114.437 114.437 2939.000 114.437 114.437 2940.000 114.437 114.437 2941.000*

114.437 114.437 2942.000 114.436 114.436 2943.000 114.436 114.436 2944.000 114:436 114.436 2945.000 114.436 114.436 2946.000 114.436 114.436 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATT IA BUS 21 11-17-2018 Attachment 1 Page 164 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2947.000 114.436 114.436 2948.000 114.436 114.436 2949.000 114.436 114.436 2950.000 114.436 114.436 2951.000 114.436 114.436 2952.000 114.436 114.436 2953.000 114.436 114.436 2954.000 114.436 114.436 2955.000 114.436 114.436 2956.000 1 i4.436 114.436 2957.000 114.436 114.436 2958.000 114.436 114.436 2959.000 114.436 114.436 2960.000 114.436 114.436 2961.000 114.436 114.436 2962.000 114.436 114.436 2963.000 114.435 114.435 2964.000 114.435 114.435 2965.000 114.435 114.435. 2966.000 114.435 114.435 2967.000 114.435 114.435 2968.000 114.435 114.435 2969.000 114.435 114.435 2970.000 114.435 114.435 2971.000 114.435 114.435 2972.000 114.435 114.435 2973.000 114.435 114.435 2974.000 114.435 114.435 2975:ooo 114.435 114.435 2976.000 114.435 114.435 2977.000 114.435 114.435 2978.000 114.435 114.435 2979.000 114.435 114.435 2980.000 114.435 114.435 2981.000 114.435 114.435 2982.000 114.435 114.435 2983.000 114.435 114.435 2984.000 114.434 114.434 2985.000 114.434 114.434 2986.000 114.434 114.434 2987.000 114.434 114.434 2988.000 114.434 114.434 2989.000 114.434 114.434 2990.000 114.434 114.434 2991.000 114.434 114.434 2992.000 114.434 114.434 2993.000 114.434 114.434 2994.000 114.434 114.434 2995.000 114.434 114.434 2996.000 114.434 114.434 2997.000 114.434 114.434 2998.000 114.434 114.434 2999.000 114.434 114.434 3000.000 114.434 114.434 3001.000 114.434 114.434 3002.000 114.434 114.434 3003.000 114.434 114.434 3004.000 114.433 114.433 3005.000 114.433 114.433 3006.000 114.433 114.433 3007.000 114.433 114.433 3008.000 114.433 114.433 3009.000 114.433 114.433 3010.000 114.433 114.433 3011.000 114.433 114.433 3012.000 114.433 114.433 3013.000 114.433 114.433 3014.000 114.433 114.433 3015.000 114.433 114.433 3016.000 114.433 114.433 3017.000 114.433 114.433 3018.000 114.433 114.433 3019.000 114.433 114.433 3020.000 114.433 114.433 3021.000 114.433 114.433 3022.000 114.432 114.432 3023.000 114.431 114.431 3024.000 114.431 114.431 3025.000 114.430 114.430 3026.000 114.429 114.429 3027.000 114.429 114.429 3028.000 114.428 114.428 3029.000 114.427 114.427 3030.000 114.426 114.426 3031.000 114.426 114.426 3032.000 114.425 114.425 3033.000 114.424 114.424 3034.000 114.424 114.424 3035.000 114.423 114.423 3036.000 114.422 114.422 3037.000 114.422 114.422 3038.000 114.421 114.421 3039.000 114.420 114.420 3040.000 114.419

  • 114.419 3041.000 114.419 114.419 3042.000 114.418 114.418 3043.000 114.417 114.417 3044.000 114.417 114.417 3045.000 114.416 114.416 3046.000 114.415 114.415 3047.000 114.414 114.414 304.8.000 114.414 114.414 3049.000 114.413 114.413 3050.000 114.412 114.412 3051.000 114.412 114.412 3052.000 114.411 114.411 3053.000 114.410 114.410 3054.000 114.410 114.410 3055.000 114.409 114.409 3056.000 114.408 114.408 3057.000 114.407 114.407 3058.000 114.407 114.407

-./ 3059.000 114.406 114.406 3060.000 114.405 114.405 3061.000 114.405 114.405 3062.000 114.404 114.404 3063.000 114.403 114.403 3064.000 114.402 114.402 3065.000 114.402 114.402 3066.000 114.401 114.401 3067.000 114.400 114.400 3068.000 114.400 114.400 3069.000 114.399 114.399 3070.000 114.398 114.398 3071.000 114.397 114.397 3072.000 114.397 114.397 3073.000 114.396 114.396 3074.000 114.395 114.395 3075.000 114.395 114.395 3076.000 114.394 114.394 3077.000 114.393 114.393 3078.000 114.392 114.392 3079.000 114.392 114.392 3080.000 114.391 114.391 3081.000 114.390 114.390 3082.000 114.390 114.390 3083.000 114.389 114.389 3084.000 114.388 114.388 3085.000 114.388 114.388 3086.000 114.387 114.387 3087.000 114.386 114.386 3088.000 114.385 114.385 3089.000 114.385 114.385 3090.000 114.384 114.384 3091.000 114.383 114.383 3092.000 114.383 114.383 3093.000 114.382 114.382 3094.000 114.381 114.381 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 22 11-17-2018 Attachment 1 Page 165 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3095.000 114.380 114.380 3096.000 114.380 114.380 3097.000 114.379 114.379 3098.000 114.378 114.378 3099.000 114.378 114.378 3100.000 114.377 114.377 3101.000 114.376 114.376 3102.000 114.375 114.375 3I03.000 114.375 114.375 3104.000 114.374 114.374 3105.000 114.373 114.373 3106.000 114.373 114.373 3107.000 114.372 114.372 3108.000 114.371 114.371 3I09.000 114.370 114.370 3110.000 114.370 114.370 3111.000 114.369 114.369 3112.000 114.368 114.368 3113.000 114.368 114.368 3114.000 114.367 114.367 3115.000 114.366 114.366 3116.000 114.365 114.365 3117.000 114.365 114.365 3118.000 114.364 114.364 3119.000 114.363 114.363 3120.000 114.363 114.363 3121.000 114.362 114.362 3122.000 114.361 114.361 3123.000 114.360 114.360 3124.000 114.360 114.360 3125.000 114.359 114.359 3126.000 114.358 114.358 3127.000 114.358 114.358 3128.000 114.357 114.357 3129.000 114.356 114.356 3130.000 114.355 114.355 3131.000 114.355 114.355 3132.000 114.354 114.354 3133.000 114.353 114.353 3134.000 114.353 114.353 3135.000 114.352 114.352 3136.000 114.351 114.351 3137.000 114.350 114.350 3138.000 114.350 114.350 3139.000 114.349 114.349 3140.000 114.348 114.348 3141.000 114.348 114.348 3142.000 114.347 114.347 3143.000 114.346 114.346 3144.000 114.345 114.345 3145.000 114.345 114.345 3146.000 114.344 114.344 3147.000 114.343 114.343 3148.000 114.343 114.343 3149.000 114.342 114.342 3150.000 114.341 114.341 3151.000 114.340 114.340 3152.000 114.340 114.340 3153.000 114.339 114.339 3154.000 114.338 114.338 3155.000 114.338 114.338 3156.000 114.337 114.337 3157.000 114.336 114.336 3158.000 114.335 114.335 3159.000 114.335 114.335 3160.000 114.334 114.334 3161.000 114.333 114.333 3162.000 114.333 114.333 3163.000 114.332 114.332 3164.000 114.331 114.331 3165.000 114.330 114.330 3166.000 114.330 114.330 3167.000 114.329 114.329 3168.000 114.328 114.328 3169.000 114.328 114.328 3170.000 114.327 114.327 3171.000 114.326 114.326 3172.000 114.325 114.325 3173.000 114.325 114.325 3174.000 114.324 114.324 3175.000 114.323 114.323 3176.000 114.323 114.323 3177.000 114.322 114.322 3178.000 114.321 114.321 3179.000 114.320 114.320 3180.000 114.320 114.320 3181.000 114.319 114.319 3182.000 114.318 114.318 3183.000 114.318 114.318 3184.000 114.317 114.317 3185.000 114.316 114.316, 3186.000 114.315 114.315 3187.000 114.315 114.315 3188.000 114.314 114.314 3189.000 114.313 114.313 3190.000 114.313 114.313 3191.000 114.312 114.312 3192.000 114.311 114.311 3193.000 114.310 114.310 3194.000 114.310 114.310 3195.000 114.309 114.309 3196.000 114.308 114.308 3197.000 114.307 114.307 3198.000 114.307 114.307 3199.000 114.306 114.306 3200.000 114.305 114.305 3201.000 114.305 114.305 3202.000 114.304 114.304 3203.000 114.303 114.303 3204.000 114.302 114.302 3205.000 114.302 114.302 3206.000 114.301 114.301 3207.000 114.300 114.300 3208.000 114.300 114.300 3209.000 114.299 114.299 32IO.OOO 114.298 114.298 3211.000 114.297 114.297 3212.000 114.297 114.297 3213.000 114.296 114.296 . 3214.000 114.295 114.295 3215.000 114.295 114.295 3216.000 114.294 114.294 3217.000 114.293 114.293 3218.000 114.292 114.292 3219.000 114.292 114.292 3220.000 114.291 114.291 3221.000 114.292 114.292 3222.000 114.292 114.292 3223.000 114.292 114.292 3224.000 114.292 114.292 3225.000 114.292 114.292 3226.000 114.292 114.292 3227.000 114.292 114.292 3228.000 114.292 114.292 3229.000 114.292 114.292 3230.000 114.292 114.292 3231.000 114.292 114.292 3232.000 114.292 114.292 3233.000 114.292 114.292 3234.000 114.292 114.292 3235.000 114.292 114.292 3236.000 114.292 114.292 3237.000 114.292 114.292 3238.000 114.292 114.292 3239.000 114.292 114.292 3240.000 114.292 114.292 3241.000 114.292 114.292 3242.000 114.292 114.292 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 23 11-17-2018 Attachment 1 Page 166 of 274 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3243.000 114.292 114.292 3244.000 114.292 114.292 3245.000 114.292 114.292 3246.000 114.292 114.292 3247.000 114.292 114.292 3248.000 114.292 114.292 3249.000 '114.292 114.292 3250.000 114.292 114.292 3251.000 114.292 114.292 3252.000 114.292 114.292 3253.000 114.292 114.292 3254.000 114.292 114.292 3255.000 114.292 114.292 3256.000 114.292 114.292 3257.000 114.292 114.292 3258.000 114.292 114.292 3259.000 114.292 114.292 3260.000 114.292 114.292 3261.000 114.292 114.292 3262.000 114.292 114.292 3263.000 114.293 114.293 3264.000 114.293 114.293 3265.000 114.293 114.293 3266.000 114.293 114.293 3267.000 114.293 114.293 3268.000 114.293 114.293 3269.000 114.293 114.293 3270.000 114.293 114.293 3271.000 114.293 114.293 3272.000 114.293 114.293 3273.000 114.293 114.293 3274.000 114.293 114.293 3275.000 114.293 114.293 3276.000 114.293 114.293 3277.000 114.293 114.293 3278.000 114.293 114.293 3279.000 114.293 114.293 3280.000 114.293 114.293 3281.000 114.293 114.293 3282.000 114.293 114.293 3283.000 114.293 114.293 3284.000 114.293 114.293 3285.000 114.293 114.293 3286.000 114.293 114.293 3287.000 114.293 114.293 3288.000 114.293 114.293 3289.000 114.293 114.293 3290.000 114.293 114.293 3291.000 114.293 114.293 3292.000 114.293 114.293 3293.000 114.293 114.293 3294.000 114.293 114.293 3295.000 114.293 114.293 3296.000 114.293 114.293 3297.000 114.293 114.293 3298.000 114.293 114.293 3299.000 114.293 114.293 3300.000 114.293 114.293 3301.000 114.293 114.293 3302.000 114.294 114.294 3303.000 114.294 114.294 3~04.000 114.294 114.294 3305.000 114.294 114.294 3306.000 114.294 114.294 3307.000 114.294 114.294 3308.000 114.294 114.294 3309.000 114.294 114.294 3310.000 114.294 114.294 3311.000. 114.294 114.294 3312.000 114.294 114.294 3313.000 114.294 114.294 3314.000 114.294 114.294 3315.000 114.294 114.294

.3316.000 114.294 114.294 3317.000 114.294 114.294 3318.000 114.294 114.294 3319.000 114.294 114.294 3320.000 114.294 114.294 3321.000 114.294 114.294 3322.000 114.294 114.294 3323.000 114.294 114.294 3324.000 114.294 114.294 3325.000 114.294 114.294 3326.000 114.294 114.294 3327.000 114.294 114.294 3328.000 114.294 114.294 3329.000 114.294 114.294 3330.000 114.294 114.294 3331.000 114.294 114.294 3332.000 114.294 114.294 3333.000 114.294 114.294 3334.000 114.294 114.294 3335.000 114.294 114.294 3336.000 114.294 114.294 3337.000 114.294 114.294 3338.000 114.294 114.294 3339.000 114.295 114.295 3340.000 114.295 114.295 3341.000 114.295 114.295 3342.000 114.295 114.295 3343.000 114.295 114.295 3344.000 114.295 114.295 3345.000 114.295 114.295 3346.000 114.295 114.295 3347.000 114.295 114.295 3348.000 114.295 114.295 3349.000 114.295 114.295 3350.000 114.295 114.295 3351.000 114.295 114.295 3352.000 114.295 114.295 3353.000 114.295 114.295 3354.000 114.295 114.295 3355.000 114.295 114.295 3356.000 114.295 114.295 3357.000 114.295 114.295 3358.000 114.295 114.295 3359.000 114.295 114.295 3360.000 114.295 114.295 3361.000 114.295 114.295 3362.000 114.295 114.295 3363.000 114.295 114.295 3364.000 114.295 114.295 3365.000 114.295 114.295 3366.000 114.295 114.295 3367.000 114.295 114.295 336~.000 114.295 114.295 3369.000 114.295 114.295 3370.000 114.295 114.295 3371.000 114.295 114.295 3372.000 114.295 114.295 3373.000 114.295 114.295 3374.000 114.296 114.296 3375.000 114.296 114.296 3376.000 114.296 114.296 3377.000 114.296 114.296 3378.000 114.296 114.296 3379.000 114.296 114.296 3380.000 114.296 114.296 3381.000 114.296 114.296 3382.000 114.296 114.296 3383.000 114.296 114.296 3384.000 114.296 114.296 3385.000 114.296 114.296 3386.000 114.296 114.296 3387.000 114.296 114.296 3388.000 114.296 114.296 3389.000 114.296 114.296 3390.000 114.296 114.296 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTIABUS 24 11-17-2018 Attachment 1 Page 167 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time V-V+ Time y. V+ Time V-V+ 3391.000 114.296 114.296 3392.000 114.296 114.296 3393.000 114.296 114.296 3394.000 114.296 114.296 3395.000 114.296 114.296 3396.000 114.296 114.296 3397.000 114.296 114.296 3398.000 114.296 114.296 3399.000 114.296 114.296 3400.000 114.296 114.296 3401.000 114.-296 114.296 3402.000 114.296 114.296 3403.000 114.296 114.296 3404.000 114.296 114.296 3405.000 114.296 114.296 3406.000 114.296 114.296 3407.000 114.297 114.297 3408.000 114.297 114.297 3409.000 114.297 114.297 3410.000 114.297 114.297 3411.000 114.297 114.297 3412.000 114.297 114.297 3413.000 114.297 114.297 3414.000 114.297 114.297 3415.000 114.297 114.297 3416.000 114.297 114.297 3417.000 114.297 114.297 3418.000 114.297 114.297 3419.000 114.297 114.297 3420.000 114.297 114.297 3421.000 114.297 114.297 3422.000 114.297 114.297 3423.000 114.297 114.297 3424.000 114.297 114.297 3425.000 114.297 114.297 3426.000 114.297 114.297 3427.000 114.297 114.297 3428.000 114.297 114.297 3429.000 114.297 114.297 3430.000 114.297 114.297 3431.000 114.297 114.297 3432.000 114.297 114.297 3433.000 114.297 114.297 3434.000 114.297 114.297 3435.000 114.297 114.297 3436.000 114.297 114.297 3437.000 114.297 114.297 3438.000 114.297 114.297 3439.000 114.298 114.298 3440.000 114.298 114.298 3441.000 114.298 114.298 3442.000 114.298 114.298 3443.000 114.298 114.298 3444.000 114.298 114.298 3445.000 114.298 114.298 3446.000 114.298 114.298 3447.000 114.298 114.298 3448.000 114.i98 114.298 3449.000 114.298 114.298 3450.000 114.298 114.298 3451.000 114.298 114.298 3452.000 114.298 114.298 3453.000 114.298 114.298 3454.000 114.298 114.298 3455.000 114.298 114.298 3456.000 114.298 114.298 3457.000 114.298 114.298 3458.000 114.298 114.298 3459.000 114.298 114.298 3460.000 114.298 114.298 3461.000 114.298 114.298 3462.000 114.298 114.298 3463.000 114.298 114.298 3464.000 114.298 114.298 3465.000 114.298 114.298 3466.000 114.298 114.298 3467.000 114.298 114.298 3468.000 114.298 114.298 3469.000 114.299 114.299 3470.000 114.299 114.299 3471.000 114.299 114.299 3472.000 114.299 114.299 3473.000 114.299 114.299 3474.000 114.299 114.299 3475.000 114.299 114.299 3476.000 114.299 114.299 3477.000 114.299 114.299 3478.000 114.299 114.299 3479.000 114.299 114.299 3480.000 114.299 114.299 3481.000 114.299 114.299 3482.000 114.299 114.299 . 3483.000 114.299 114.299 3484.000 114.299 114.299 3485.000 114.299 114.299 3486.000 114.299 114.299 3487.000 114.299 114.299 3488.000 114.299 114.299 3489.000 114.299 114.299 3490.000 114.299 114.299 3491.000 114.299 114.299 3492.000 114.299 114.299 3493.000 114.299 114.299 3494.000 114.299 114.299 3495.000 114.299 114.299 3496.000 114.299 114.299 3497.000 114.299 114.299 3498.000 114.300 114.300 3499.000 114.300 114.300 3500.000 114.300 114.300 3501.000 114.300 114.300 3502.000 114.300 114.300 3503.000 114.300 114.300 3504.000 114.300 114.300 3505.000 114.300 114.300 3506.000 114.300 114.300 3507.000 114.300 114.300 3508.000 114.300 114.300 3509.000 114.300 114.300 3510.000 114.300 114.300 3511.000 114.300 114.300 3512.000 114.300 114.300 3513.000 114.300 114.300 3514.000 114.301 114.301 3515.000 114.301 114.301 3516.000 114.301 114.301 3517.000 114.301 114.301 3518.000 114.301 114.301 3519.000 114.302 114.302 3520.000 114.302 114.302 3521.000 114.302 114.302 3522.000 114.302 114.302 3523.000 114.303 114.303 3524.000 114.302 114.302 3525.000 114.301 114.301 3526.000 114.301 114.301 3527.000 114.300 114.300 3528.000 114.299 114.299 3529.000 114.298 114.298 3530.000 114.297 114.297 3531.000 114.297 114.297 3532.000 114.296 114.296 3533.000 114.295 114.295 3534.000 114.294 114.294 3535.000 114.293 114.293 3536.000 114.293 114.293 3537.000 114.292 114.292 3538.000 114.291 114.291 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously fpr greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battety IA 48-Hour Coping Stttdy BATTlABUS 25 11-17-2018 Attachment 1 Page 168 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time v-V+ Time V-V+ Time V-V+ Time V-V+ 3539.000 114.290 114.290 3540.000 114.290 114.290 3541.000 114.289 114.289 3542.000 114.288 114.288 3543.000 114.287 114.287 3544.000 114.286 114.286 3545.000 114.286 114.286 3546.000 114.285 114.285 3547.000 114.284 114.284 3548.000 114.283 114.283 3549.000 114.282 114.282 3550.000 114.281 114.281 3551.000 114.281 114.281 3552.000 114.280 114.280 3553.000 114.279 . 114.279 3554.000 114.278 114.278 3555.000 114.278 114.278 3556.000 114.277 114.277 3557.000 114.276 114.276 3558.000 114.275 114.275 3559.000 114.274 114.274 3560.000 114.273 114.273 3561.000 114.273 114.273 3562.000 114.272 114.272 3563.000 114.271 114.271 3564.000 114.270 114.270 3565.000 114.269 114.269 3566.000 114.269 114.269 3567.000 114.268 114.268 3568.000 114.267 114.267 3569.000 114.266 114.266 3570.000 114.265 114.265 3571.000 114.265 114.265 3572.000 114.264 114.264 3573.000 114.263 114.263 3574.000 114.262 114.262 3575.000 114.261 114.261 3576.000 114.261 114.261 r-3577.000 114.260 114.260 3578.000 114.259 114.259 3579.000 114.258 114.258 3580.000 114.257 114.257 3581.000 114.257 114.257 3582.000 114.256 114.256 3583.000 114.255 114.255 3584.000 114.254 114.254 3585.000 114.253 114.253 3586.000 114.253 114.253 3587.000 114.252 114.252 3588.000 114.251 114.251 3589.000 114.250 114.250 3590.000 114.249 114.249 3591.000 114.249 114.249 3592.000 114.248 114.248 3593.000 114.247 114.247 3594.000 114.246 114.246 3595.000 114.245 114.245 3596.000 114.245 114.245 3597.000 114.244 114.244 3598.000 114.243 114.243 3599.000 114.242 114.242 3600.000 114.241 114.241 3601.000 114.241 114.241 3602.000 114.240 114.240 3603.000 114.239 114.239 3604.000 114.238 114.238 3605.000 114.237 114.237 36b6.000 114.237 114.237 3607.000 114.236 114.236 3608.000 114.235 114.235 3609.000 114.234 114.234 3610.000 114.233 114.233 3611.000 114.233 114.233 3612.000 114.232 114.232 3613.000 114.231 114.231 3614.000 114.230 114.230 3615.000 114.229* 114.229 3616.000 114.229 114.229 3617.000 114.228 114.228 3618.000 114.227 114.227 3619.000 114.226 114.226 3620.000 114.225 114.225 3621.000 114.225 114.225 3622.000 114.224 114.224 3623.000 114.223 114.223 3624.000 114.222 114.222 3625.000 114.221 114.221 3626.000 114.220 114.220 3627.000 114.220 114.220 3628.000 114.219 114.219 3629.000 114.218 114.218 3630.000 114.217 114.217 3631.000 114.216 114.216 3632.000 114.216 114.216 3633.000 114.215 114.215 3634.000 114.214 114.214 3635.000 114.213 114.213 3636.000 114.212 114.212 3637.000 114.212 114.212 3638.000 114.211 114.211 I 3639.000 114.210 114.210 3640.000 114.209 114.209 3641.000 114.208 114.208 3642.000 114.208 114.208 3643.000 114.207 114.207 3644.000 114.206 114.206 3645.000 114.205 114.205 3646.000 114.204 114.204 3647.000 114.204 114.204 3648.000 114.203 114.203 3649.000 114.202 114.202 3650.000 114.201 114.201 3651.000 114.200 114.200 3652.000 114.200 114.200 3653.000 114.199 114.199 3654.000 114.198 114.198 3655.000 114.197 114.197 3656.000 114:196 114.196 3657.000 114.195 114.195 3658.000 114.195 114.195 3659.000 114.194 114.194 3660.000 114.193 114.193 3661.000 114.192 114.192 3662.000 114.191 114.191 3663.000 114.191 114.191 3664.000 114.190 114.190 3665.000

  • 114.189 114.189 3666.000 114.188 114.188 3667.000 114.187 114.187 3668.000 114.187 114.187 3669.000 114.186 114.186 3670.000 114.185 114.185 3671.000 114.184 114.184 3672.000 114.183 114.183 3673.000 114.183 114.183 3674.000 114.182 114.182 3675.000 114.181 114.181 3676.000 114.180 114.180 3677.000 114.179 114.179 3678.000 114.178 114.178 3679.000 114.178 114.178 3680.000 114.177 114.177 3681.000 114.176 114.176 3682.000 114.175 114.175 3683.000 114.174 114.174 3684.000 114.174 114.174 3685.000 114.173 114.173 3686.000 114.172 114.172 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study BATT lABUS 26 11-17-2018 Attachment 1 Page 169 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3687.000 114.171 114.171 3688.000 114.170 114.170 3689.000 114.170 114.170 3690.000 114.169 114.169 3691.000 114.168 114.168 3692.000 114.167 114.167 3693.000 114.166 114.166 3694.000 114.166 114.166 3695.000 114.165 114.165 3696.000 114.164 114.164 3697.000 114.163 114.163 3698.000 11.4.162 114.162 3699.000 114.161 114.161 3700.000 114.161 114.161 3701.000 114.160 114.160 3702.000 114.159 114.159 ** 3703.000

  • 114.158 114.158 3704.000 114.157 114.157 3705.000 114.157 114.157 3706.000 114.156 114.156 3707.000 114.155 114.155 3708.000 114.154 114.154 3709.000 114.153 114.153 3710.000 114.153 114.153 3711.000 114.152 114.152 3712.000 114.151 114.151 3713.000 114.150 114.150 3714.000 114.149 114.149 3715.000 114.149 114.149 3716.000 114.148 114.148 3717.000 114.147 114.147 3718.000 114.146 114.146 3719.000 114.145 114.145 3720.000 114.144
  • 114.144 3721.000 114._144 114.144 3722.000 114.143 114.143 3723.000 114.142 114.142 3724.000 114.141 114.141 3725.000 114.140 114.140 3726.000 114.140 114.140 3727.000 114.139 114.139 3728.000 114.138 114.138 3729.000 114.137 114.137 3730.000 114.136 114.136 3731.000 114.136 114.136 3732.000 114.135 114.135 3733.000 114.134 114.134 3734.000 114.133 114.133 3735.000 114.132 114.132 3736.,000 114.131 114.131 3737.000 114.131 114.131 3738.000 114.130 114.130 3739.000 114.129 114.129 3740.000 114.128 114.128 3741.000 114.127 114.127 3742.000.

114.127 114.127 3743.000 114.126 114.126 3744.000 114.125 114.125 3745.000 114.124 114.124 3746.000 114.123 114.123 3747.000 114.122 114.122 3748.000 114.122 114.122 3749.000 114.121 114.121 3750.000 114.120 114.120 3751.000 114.119 114.119 3752.000 114.118 114.118 3753.000 114.118 114.118 3754.000 114.117 114.117 3755.000 114.116 114.116 3756.000 114.115 114.115 3757.00Q 114.114 114.114 3758.000 114.114 114.114 3759.000 114.113 114.113 3760.000 114.112 114.112 3761.000 114.lll 114.lll 3762.000 114.110 114.110 3763.000 114.109 114.109 3764.000 114.109 114.109 3765.000 114.108 114.108 3766.000 . 114.107 114.107 3767.000 114.106 114.106 3768.000 114.105 114.105 3769.000 114.105 114.105 3770.000 114.104 114.104 3771.000 114.103 114.103 3772.000 114.102 114.102 3773.000 114.101 114.101 3774.000 114.100 114.100 I 3775.000 114.100 114.100 3776.000 114.099 114.099 3777.000 114.098 114.098 3778.000 114.097 114.097 3779.000 114.096 114.096 3780.000 114.096 114.096 3781.000 114.095 114.095 3782.000 114.094 114.094 3783.000 114.093 114.093 3784.000 114.092 114.092 3785.000 114.092 114.092 3786.000 114.091 114.091 3787.000 114.090 114.090 3788.000 114.089 114.089 3789.000 . 114.088 114.088 3790.000 114.087 114.087 3791.000 114.087 114.087 3792.000 114.086 114.086 3793.000 114.085 114.085 3794.000 114.084 114.084 3795.000 114.083 114.083 3796.000 114.083 114.083 3797.000 114.082 114.082 3798.000 114.081 114.081 3799.000 114.080 114.080 3800.000 114.079 114.079 3801.000 114.078 114.078 3802.000 114.078 114.078 3803.000 114.077 114.077 3804.000 114.076 114.076 3805.000 114.075 114.075 3806.000 114.074 114.074 3807.000 114.074 114.074 3808.000 114.073 114.073 3809.000 114.072 114.072 3810.000 114.071 114.071 3811.000 114.070 114.070 3812.000 114.069 114.069 3813.000 114.069 114.069 3814.000 114.068 114.068 3815.000 114.067 114.067 3816.000 114.066 114.066 3817.000 114.065 114.065 3818.000 114.065 114.065 3819.000 114.064 114.064 3820.000 114.063 114.063 3821.000 114.062 114.062 3822.000 114.061 114.061 3823.000 114.060 114.060 3824.000 114.060 114.060 3825.000 114.059 114.059 3826.000 114.058 114.058 3827.000 114.057 ll~.057 3828.000 114.056 114.056 3829.000 114.056 114.056 3830.000 114.055 114.055 3831.000 114.054 114.054 3832.000 114.053 114.053 3833.000 114.052 114.052 3834.000 114.051 114.051 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously , for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 27 11-17-2018 Attachment 1 Page 170 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage(V)

Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3835.000 ll4.051 ll4.051 3836.000 ll4.050 114.050 3837.000 ll4.049 ll4.049 3838.000 114.048 114.048 3839.000 ll4.047 ll4.047 3840.000 114.046 ll4.046 3841.000 ll4.046 114.046 3842.000 114.045 114.045 3843.000 ll4.044 ll4.044 3844.000 114.044 ll4.044 3845.000 ll4.043 114.043 3846.000 114.043 ll4.043 3847.000 ll4.043 ll4.043 3848.000 ll4.043 ll4.043 3849.000 114.042 114.042 3850.000 114.042 114.042 3851.000 114.042 ll4.042 3852.000 114.042 ll4.042 3853.000 114.041 ll4.041 3854.000 114.041 ll4.041 3855.000 ll4.041 114.041 3856.000 114.040 ll4.040 3857.000 114.040 ll4.040 3858.000 114.040 114.040 3859.000 114.040 ll4.040 3860.000 ll4.039 ll4.039 3861.000 ll4.039 114.039 3862.000 ll4.039 ll4.039 3863.000 ll4.038 ll4.038 3864.000 114.038 ll4.038 3865.000 ll4.038 114.038 3866.000 114.038 114.038 3867.000 ll4.037 ll4.037 3868.000 ll4.037 ll4.037 3869.000 114.037 114.037 3870.000 ll4.037 ll4.037 3871.000 114.036 114.036 3872.000 ll4.036 114.036 3873.000 114.036 114.036 3874.000 114.035 114.035 3875.000 ll4.035 ll4.035 3876.000 ll4.035 114.035 3877.000 114.035 ll4.035 3878.000 ll4.034 114.034 3879.000 114.034 ll4.034 3880.000 114.034 114.034 3~81.000 114.033 114.033 3882.000 114.033 ll4.033 3883.000 114.033 114.033 3884.000 ll4.033 114.033 3885.000 114.032 114.032 3886.000 114.032 114.032 3887.000 ll4.032 114.032 3888.000 ll4.032 ll4.032 3889.000 114.031 114.031 3890.000 114.031 114.031 3891.000 ll4.031 ll4.031 3892.000 ll4.030 114.030 3893.000 114.030 114.030 3894.000 114.030 ll4.030 3895.000 114.030 114.030 3896.000 114.029 114.029 3897.000 114.029 114.029 3898.000 114.029 114.029 3899.000 114.028 114.028 3900.000 114.028 114.028 3901.000 114.028 114.028 3902.000 114.028 114.028 3903.000 114.027 114.027 3904.000 ll4.027 ll4.027 3905.000 ll4.027 114.027 3906.000 114.026 114.026 3907.000 ll4.026 ll4.026 3908.000 114.026 ll4.026 3909.000 114.026 114.026 3910.000 114.025 ll4.025 3911.000 ll4.025 *ll4.025 3912.000 ll4.025 ll4.025 3913.000 ll4.024 114.024 3914.000 114.024 114.024 3915.000 114.024 114.024 3916.000 114.024 114.024 3917.000 114.023 114.023 3918.000 114.023 ll4.023 3919.000 ll4.023 ll4.023 3920.000 ll4.023 114.023 3921.000 114.022 114.022 3922.000 114.022 ll4.022 3923.000 ll4.022 114.022 3924.000 114.021 ll4.021 3925.000 114.021 114.021 3926.000 114.021 ll4.021 3927.000 114.021 ll4.021 3928.000 ll4.020 ll4.020 3929.000 114.020 114.020 3930.000 114.020 114.020 3931.000 114.019 ll4.019 3932.000 114.019 114.019 3933.000 114.019 114.019 3934.000 114.019 114.019 3935.000 114.018 ll4.018 3936.000 114.018 ll4.018 3937.000 114.018 114.018 3938.000 114.017 114.017 3939.000 114.017 114.017 3940.000 ll4.017 114.017 3941.000 114.017 114.017 3942.000 114.016 ll4.016 3943.000 114.016 ll4.016 3944.000 114.016 114.016 3945.000 114.015 114.015 3946.000 114.015 ll4.015 3947.000 114.015 114.015 3948.000 114.015 114.015 3949.000 114.014 114.014 3950.000 114.014 114.014 3951.000 ll4.014 ll4.014 3952.000 ll4.013 114.013 3953.000 114.013 114.013 3954.000 114.013 114.013 3955.000 ll4.013 114.013 3956.000 ll4.012 114.012 3957.000 114.012 114.012 3958.000 114.012 114.012 3959.000 ll4.0ll ll4.0ll 3960.000 ll4.0ll 114.0ll 3961.000 114.0ll 114.0ll 3962.000 ll4.010 ll4.010 3963.000 ll4.010 ll4.010 3964.000 114.010 ll4.010 3965.000 114.010 114.010 3966.000 114.009 114.009 3967.000 114.009 114.009 3968.000 114.009 114.009 3969.000 114.008 114.008 3970.000 114.008 114.008 3971.000 ll4.008 114.008 3972.000 114.008 114.008 3973.000 114.007 114.007 3974.000 114.007 114.007 3975.000 114.007 114.007 3976.000 114.006 114.006 3977.000 114.006 114.006 3978.000 114.006 114.006 3979.000 114.006 114.006 3980.000 114.005 114.005 3981.000 114.005 114.005 3982.000 114.005 114.005 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 28 11-17-2018 Attachment 1 Page 171 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time y. V+ Time V-V+ 3983.000 114.004 114.004 3984.000 114.004 114.004 3985.000 114.004 114.004 3986.000 114.004 114.004 3987.000 114.003 114.003 3988.000 114.003 114.003 3989.000 114.003 114.003 3990.000 114.002 114.002 3991.000 114.002 114.002 3992.000 114.002 114.002 3993.000 114.002 114.002 3994.000 114.001 114.001 3995.000 114.001 114.001 3996.000 114.001 114.001 3997.000 114.000 114.000 3998.000 114.000 114.000 3999.000 114.000 114.000 4000.000 113.999 113.999 4001.000 113.999 113.999 4002.000 113.999 113.999 4003.000 113.999 113.999 4004.000 113.998 113.998 4005.000 113.998 113.998 4006.000 113.998 113.998 4007.000 113.997 113.997 4008.000 113.997 113.997 4009.000 113.997 113.997 4010.000 113.997 113.997 4011.000 113.996 113.996 4012.000 113.996 113.996 4013.000 113.996 113.996 4014.000 113.995 113.995 4015.000 113.995 113.995 4016.000 113.995 113.995 4017.000 113.994 113.994 4018.000 113.994 113.994 4019.000 113.994 113.994 4020.000 113.994 113.994 4021.000 113.993 113.993 4022.000 113.993 113.993 4023.000 113.993 113.993 4024.000 113.992 113.992 4025.000 113.992 113.992 4026.000 113.992 113.992 4027.000 113.991 113.991 4028.000 113.991 113.991 4029.000 113.991 113.991 4030.000 113.990 113.990 4031.000 113.990 113.990 4032.000 113.990 113.990 4033.000 113.989 113.989 4034.000 113.989 113.989 4035.000 113.989 113.989 4036.000 113.988 113.988 4037.000 113.988 113.988 4038.000 113.988 113.988 4039.000 113.987 113.987 4040.000 113.987 113.987 4041.000 113.9°87 113.987 4042.000 113.986 113.986 4043.000 113.986 113.986 4044.000 113.986 113.986 4045.000 113.985 113.985 4046.000 113.985 113.985 4047.000 113.985 113.985 4048.000 113.984 113.984 4049.000 113.984 113.984 4050.000 113.984 113.984 4051.000 113.983 113.983 4052.000 113.983 113.983 4053.000 113.983 113.983 4054.000 113.982 113.982 4055.000 113.982 113.982 4056.000 113.982 113.982 4057.000 113.981 113.981 4058.000 113.981 113.981 4059.000 113.981 113.981 4060.000 113.980 113.980 4061.000 113.980 113.980 4062.000 113.980 113.980 4063.000 113.979 113.979 4064.000 113.979 113.979 4065.000 113.979 113.979 4066.000 113.978 113.978 4067.000 113.978 113.978 4068.000 113.978 113.978 4069.000 113.977 113.977 4Q70.000 113.977 113.977 4071.000 113.977 113.977 4072.000 113.976 113.976 4073.000 113.976 113.976 4074.000 113.976 113.976 4075.000 113.975 113.975 4076.000 113.975 113.975 4077.000 113.975 113.975 4078.000 113.974 113.974 4079.000 113.974 113.974 4080.000 113.974 113.974 4081.000 113.973 113.973 4082.000 113.973 113.973 4083.000 113.973 113.973 4084.000 113.972 113.972 4085.000 113.972 113.972 4086.000 113.972 113.972 4087.000 113.971 113.971 4088.000 113.971 113.971 4089.000 113.971 113.971 4090.000 113.970 113.970 4091.000 113.970 113.970 4092.000 113.970 113.970 4093.000 113.969 113.969 4094.000 113.969 113.969 4095.000 113.969 113.969 4096.000 113.968 113.968 4097.000 113.968 113.968 4098.000 113.967 113.967 4099.000 113.967 113.967 4100.000 113.967 113.967 4101.000 113.966 113.966 4102.000 113.966 113.966 4103.000 113.966 113.966 4104.000 113.965 113.965 4105.000 113.965 113.965 4106.000 113.965 113.965 4107.000 113.964 113.964 4108.000 113.964

  • 113.964 4109.000 113.964 113.964 4110.000 113.993 113.963 4111.000 113.963 113.963 4112.000 113.963 113.963 4113.000 113.962 113.962 4114.000 113.962 113.962 4115.000 113.962 113.962 4116.000 113.961 113.961 4117.000 113.961 113.961 4118.000 113.961 113.961 4119.000 113.960 113.960 4120.000 113.960 113.960 4121.000 113.960 113.960 4122.000 113.959 113.959 4123.000 113.959 113.959 4124.000 113.959 113.959 4125.000 113.958 113.958 4126.000 113.958 113.958 4127.000 113.958 113.958 4128.000 113.957 113.957 4129.000 113.957 113.957 4130.000 113.957 113.957 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study BATT IA BUS 29 11-17-2018 Attachment 1 Page 172 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4131.000 113.956 113.956 4132.000 113.956 113.956 4133.000 113.956 113.956 4134.000 113.955 113.955 4135.000 113.955 113.955 4136.000 113.954 113.954 4137.000 113.954 113.954 4138.000 113.954 113.954 4139.000 113.953 113.953 4140.000 113.953 113.953 4141.000 113.953 113.953 4142.000 113.952 113.952 4143.000 113.952 113.952 4144.000 113.952 113.952 4145.000 113.951 113.951 4146.000 113.951 113.951 4147.000 113.951 113.951 4148.000 113.950 113.950 4149.000 113.950 113.950 4150.000 113.950 113.950 4151.000 113.949 113.949 4152.000 113.949 113.949 4153.000 113.949 113.949 4154.000 113.948 113.948 4155.000 113.948 113.948 4156.000 113.948 113.948 4157.000 113.947 113.947 4158.000 113.947 113.947 4159.000 113.947 113.947 4160.000 113.946 113.946 4161.000 113.946 113.946 4162.000 113.946 113.946 4163.000 113.945 113.945 4164.000 113.945 113.945 4165.000 113.944 113.944 4166.000 113.944 113.944 4167.000 113.944 113.944 4168.000 113.943 113.943 4169.000 113.943 113.943 4170.000 113.943 113.943 4171.000 113.942 113.942 4172.000 113.942 113.942 4173.000 113.942 113.942 4174.000 113.941 113.941 4175.000 113.941 113.941 4176.000 113.941 113.941 4177.000 113.940 113.940 4178.000 113.940 113.940 4179.000 113.940 113.940 4180.000 113.939 113.939 4181.000 113.939 113.939 4182.000 113.939 113.939 4183.000 113.938 113.938 4184.000 113.938 113.938 4185.000 113.938 113.938 4186.000 113.937 113.937 4187.000 113.937 113.937 4188.000 113.936 113.936 4189.000 113.936 113.936 4190.000 113.936 113.936 I 4191.000 113.935 113.935 4192.000 113.935 113.935 4193.000 113.935 113.935 4194.000 113.934 113.934 4195.000 113.934 113.934 4196.000 113.934 113.934 4197.000 113.933 113.933 4198.000 113.933 113.933 4199.000 113.933 113.933 4200.000 113.932 113.932 4201.000 113.932 113.932 4202.000 113.932 113.932 4203.000 113.931 113.931 4204.000 113.931 113.931 4205.000 113.931 113.931 4206.000 113.930 113.930 4207.000 113.930 113.930 4208.000 113.929 113.929 4209.000 113.929 113.929 4210.000 113.929 113.929 4211.000 113.929 113.929 4212.000 113.929 113.929 4213.000 113.929 113.929 4214.000 113.929 113.929 4215.000 113.928 113.928 4216.000 113.928 113.928 4217.000 113.928 113.928 4218.000 113.928 113.928 4219.000 113.928 113.928 4220.000 113.928 113.928 4221.000 113.928 113.928 4222.000 113.927 113.927 4223.000 113.927 113.927 4224.000 113.927 113.927 4225.000

  • 113.927 113.927 4226.000 113.927 113.927 4227.000 113.927 113.927 4228.000 113.926 113.926 4229.000 113.926 113.926 4230.000 113.926 113,926 4231.000 113.926 113.926 4232.000 113.926 113.926 4233.000 113.926 113.926 4234.000 113.926 113.926 4235.000 113.925 113.925 4236.000 113.925 113.925 4237.000 113.925 113.925 4238.000 113.925 113.925 4239.000 113.925 113.925 4240.000 113.925 113.925 4241.000 113.925 113.925 4242.000 113.924 113.924 4243.000 113.924 113.924 4244.000 113.924 113.924 4245.000 113.924 113.924 4246.000 113.924 113.924 4247.000 113.924 113.924 4248.000 113.924 113.924 4249.000 113.923 113.923 4250.000 113.923 113.923 4251.000 113.923 113.923 4252.000 113.923 113.923 4253.000 113.923 113.923 4254.000 113.923 113.923 4255.000 113.922 113.922 4256.000 113.922 113.922 4257.000 113.922 113.922 4258.000 113.922 113.922 4259.000 113.922 113.922 4260.000 113.922 113.922 4261.000 113.922 113.922 4262.000 113.921 113.921 4263.000 113.921 113.921 4264.000 113.921 113.921 4265.000 113.921 113.921 4266.000 113.921 113.921 4267.000 113.921 113.921 4268.000 113.921 113.921 4269.000 113.920 113.920 4270.000 113.920 113.920 4271.000 113.920 113.920 4272.000 113.920 113.920 4273.000 113.920 113.920 4274.000 113.920 113.920 4275.000 113.919 113.919 4276.000 113.919 113.919 4277.000 113.919 113.919 4278.000 113.919 113.919 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 30 11-17-2018 Attachment 1 Page 173 of 274 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4279.000 113.919 113.919 4280.000 113.919 113.919 4281.000 113.919 113.919 4282.000 113.918 113.918 4283.000 113.918 113.918 4284.000 113.918 113.918 4285.000 113.918 113.918 4286.000 113.918 113.918 4287.000 113.918 113.918 4288.000 113.918 113.918 4289.000 113.917 113.917 4290.000 113.917 113.917 4291.000 113.917 113.917 4292.000 113.917 113.917 4293.000 113.917 113.917 4294.000 113.917 113.917 4295.000 113.916 113.916 4296.000 113.916 113.916 4297.000 113.916 113.916 4298.000 113.916 113.916 4299.000 113.916 113.916 4300.000 113.916 113.916 4301.000 113.916 113.916 4302.000 113.915 113.915 4303.000 113.915 113.915 4304.000 113.915 113.915 4305.000 113.915 113.915 4306.000 113.915 113.915 4307.000 113.915 113.915 4308.000 113.915 113.915 4309.000 113.914 113.914 4310.000 113.914 113.914 4311.000 113.914 113.914 4312.000 113.914 113.914 4313.000 113.914 113.914 4314.000 113.914 113.914 4315.000 113.913 113.913 4316.000 113.913 113.913 4317.000 113.913 113.913 4318.000 113.913 113.913 4319.000 113.913 113.913 4320.000 113.913 113.913 4321.000 113.913 113.913 4322.000 113.912 113.912 4323.000 113.912 113.912 4324.000 113.912 113.912 4325.000 113.912 113.912 4326.000 113.912 113.912 4327.000 113.912 113.912 4328.000 113.911 113.911 4329.000 113.911 113.911 4330.000 113.911 113.911 4331.000 113.911 113.911 4332.000 113.911 113.911 4333.000 113.911 113.911 4334.000 113.911 113.911 4335.000 113.,910 113.910 4336.000 113.910 113.910 4337.000 113.910 113.910 4338.000 113.910 113.910 4339.000 113.910 113.910 4340.000 113.910 11.3.910 4341.000 113.909 113.909 4342.000 113.909 113.909 4343.000 113.909 113.909 4344.000 113.909 113.909 4345.000 113.909 113.909 4346.000 113.909 113.909 4347.000 113.909 113.909 4348.000 113.908 113.908 4349.000 113.908 113.908 4350.000 113.908 113.908 4351.000 113.908 113.908 4352.000 113.908 113.908 4353.000 '113.908 113.908 4354.000 113.907 113.907 4355.000 113.907 113.907 4356.000 113.907 113.907 4357.000 113.907 113.907 4358.000 113.907 113.907 4359.000 113.907 113.907 4360.000 113.907 113.907 4361.000 113.906 113.906 4362.000 113.906 113.906 4363.000 113.906 113.906 4364.000 113.906 113.906 4365.000 113.906 113.906 4366.000 113.906 113.906 4367.000 113.905 113.905 4368.000 113.905 113.905 4369.000 113.905 113.905 4370.000 113.905 113.905 4371.000 113.905 113.905 4372.000 113.905 113.905 4373.000 113.904 113.904 4374.000 113.904 113.904 4375.000 113.904 113.904 4376.000 113.904 113.904 4377.000 113.904 113.904 4378.000 113.904 113.904 4379.000 113.904 113.904 4380.000 113.903 113.903 4381.000 113.903 113.903 4382.000 113.903 113.903 4383.000 113.903 113.903 4384.000 113.903 113.903 4385.000 113.903 113.903 4386.000 113.902 113.902 4387.000 113.902 113.902 4388.000 113.902 113.902 4389.000 113.902 113.902 4390.000 113.902 113.902 4391.000 113.902 113.902 4392.000 113.901 113.901 4393.000 113.901 113.901 4394.000 113.901 113.901 4395.000 113.901 113.901 . 4396.000 113.901 113.901 4397.000 113.901 113.901 4398.000 113.901 113.901 4399.000 113.900 113.900 4400.000 113.900 113.900 4401.000 113.900 113.900 4402.000 113.900 113.900 4403.000 113.900 113.900 4404.000 113.900 113.900 4405.000 113.899 113.899 4406.000 113.899 113.899 4407.000 113.899 113.899 4408.000 113.899 ' 113.899 4409.000 113.899 113.899 4410.000 113.899 113.899 4411.000 113.898 113.898 4412.000 113.898 113.898 4413.000 113.898 113.898 4414.000 113.898 113.898 4415.000 113.898 113.898 4416.000 113.898 113.898 4417.000 113.898 113.898 4418.000 113.897 113.897 4419.000 113.897 113.897 4420.000 113.897 113.897 4421.000 113.897 113.897 4422.000 113.897 113.897 4423.000 113.897 113.897 4424.000 113.896 113.896 4425.000 113.896 113.896 4426.000 113.896 113.896 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study . Config.: DIV I Battery IA48-Hour Coping Study BATT lABUS 31 11-17-2018 Attachment 1 Page 174 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4427.000 113.896 113.896 4428.000 113.896 113.896 4429.000 113.896 113.896 4430.000 113.895 113.895 4431.000 113.895 113.895 4432.000 113.895 113.895 4433.000 113.895 113.895 4434.000 113.895 113.895 4435.000 113.895 113.895 4436.000 113.894 113.894 4437.000 113.894 113.894 4438.000 113.894 113.894 4439.000 113.894 113.894 4440.000 113.894 113.894 4441.000 113.894 113.894 4442.000 ll3.894 113.894 4443.000 113.893 113.893 4444.000 113.893 ll3.893 4445.000 113.893 113.893 4446.000 ll3.893 ll3.893 4447.000 113.893 113.893 4448.000 113.893 113.893 4449.000 113.892 113.892 4450.000 113.892 113.892 4451.000 113.892 113.892 4452.000 ll3.892 113.892 4453.000 113.892 113.892 4454.000 113.892 113.892 4455.000 . 113.891 113.891 4456.000 113.891 113.891 4457.000 113.891 113.891 4458.000 113.891 113.891 4459.000 113.891 113.891 4460.000 113.891 113.891 4461.000 113.890 113.890 4462.000 113.890 113.890 4463.000 113.890 113.890 4464.000 113:890 113.890 4465.000 113.890 113.890 4466.000 113.890 113.890 4467.000 113.889 113.889 4468.000 113.889 113.889 4469.000 113.889 113.889 4470.000 113.889 113.889 4471.000 113.889 113.889 4472.000 113.889 113.889 4473.000 113.888 113.888 . 4474.000 113.888 113.888 4475.000 113.888 113.888 4476.000 113.888 113.888 4477.000 113.888 113.888 4478.000 113.888 113.888 4479.000 113.887 113.887 4480.000 113.887 113.887 4481.000 113.887 113.887 4482.000 113.887 113.887 4483.000 113.887 113.887 4484.000 113.887 113.887 4485.000 113.886 113.886 4486.000 113.886 113.886 4487.000 113.886 113.886 4488.000 113.886 113.886 4489.000 113.886 113.886 4490.000 113.886 113.886 4491.000 113.886 113.886 4492.000 113.885 113.885 4493.000 113.885 113.885 4494.000 113.885 113.885 4495.000 113.885 113.885 4496.000 113.885 113.885 4497.000

  • 113.885 113.885 4498.000 113.884 113.884 4499.000 113.884 113.884 4500.000 113.884 113.884 4501.000 113.884 113.884 4502.000 113.884 113.884 4503.000 113.884 113.884 4504.000 113.883 113.883 4505.000 113.883 113.883 4506.000 113.883 113.883 4507.000 113.883 113.883 4508.000 113.883 113.883 4509.000 113.883 113.883 4510.000 113.882 113.882 4511.000 113.882 113.882 4512.000 ll3.882 113.882 4513.000 113.882 113.882 4514.000 ll3.882 113.882 4515.000 113.882 113.882 4516.000 113.881 113.881 4517.000 113.881 113.881 4518.000 113.881 113.881 4519.000 113.881 113.881 4520.000 113.881 113.881 4521.000 113.881 113.881 4522.000 113.880 ll3.880 4523.000 113.880 113.880 4524.000 113.880 113.880 4525.000 113.880 113.880 4526.000 113.880 113.880 4527.000 113.880 113.880 4528.000 ll3.879 ll3.879 4529.000 113.879 113.879 4530.000 113.879 113.879 4531.000 113.879 113.879 4532.000 113.879 113.879 4533.000 113.879 113.879 4534.000 113.878 ll3.878 4535.000 113.878 113.878 4536.000 113.878 113.878 4537.000 113.878 113.878 4538.000 113.878 113.878 4539.000 113.878 113.878 4540.000 113.877 113.877 4541.000 113.877 113.877 4542.000 113.877 113.877 4543.000 113.877 113.877 4544.000 113.877 113.877 4545.000 113.876 113.876 4546.000 113.876 113.876 4547.000 113.876 113.876 4548.000 113.876 113.876 4549.000 113.876 113.876 4550.000 113.876 113.876 4551.000 113.875 113.875 4552.000 113.875 113.875 4553.000 113.875 113.875 4554.000 113.875 113.875 4555.000 113.875 113.875 4556.000 113.875 . 113.875 4557.000 113.874 113.874 4558.000 113.874 113.874 4559.000 113.874 113.874 4560.000 113.874 113.874 4561.000' 113.874 113.874 4562.000 113.874 113.874 4563.000 113.873 113.873 4564.000 113.873 113.873 4565.000 113.873 113.873 4566.000 113.873 113.873 4567.000 113.873 113.873 4568.000 113.873 113.873 4569.000 113.872 113.872 4570.000 113.872 113.872 4571.000 113.872 113.872 4572.000 113.872 113.872 4573.000 113.872 113.872 4574.000 113.871 113.871 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 32 11-17-2018 Attachment 1 Page 175 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4575.000 113.871 113.871 4576.000 113.871 113.871 4577.000 113.870 113.870 4578.000 113.870 113.870 4579.000 113.870 113.870 4580.000 113.869 113.869 4581.000 113.869 113.869 4582.000 113.869 113.869 4583.000 113.868 113.868 4584.000 113.868 113.868 4585.000 113.868 113.868 4586.000 113.867 113.867 4587.000 113.867 113.867 4588.000 113.866 113.866 4589.000 113.866. 113.866 4590.000 113.866 113.866 4591.000 113.865 113.865 4592.000 113.865 113.865 4593.000 113.865 113.865 4594.000 113.864 113.864 4595.000 113.864 ll3.864 4596.000 113.864 ll3.864 4597.000 113.863 113.863 4598.000 113.863 113.863 4599.000 113.862 ll3.862 4600.000 113.862 113.862 4601.000 113.862 113.862 4602.000 113.861 113.861 4603.000 113.861 ll3.861 4604.000 113.861 113.861 4605.000 113.860 113.860 4606.000 113.860 113.860 4607.000 113.860 ll3.860 4608.000 113.859 113.859 4609.000 113.859 113.859 4610.000 113.859 113.859 4611.000 113.858 113.85.8 4612.000 113.858 113.858 4613.000 113.857 113.857 4614.000 113.857 113.857 4615.000 113.857 113.857 4616.000 113.856 113.856 4617.000 113.856 113.856 4618.000 113.856 113.856 4619.000 113.855 113.855 4620.000 113.855 113.855 4621.000 113.855 113.855 4622.000 113.854 113.854 4623.000 113.854 ll3.854 4624.000 113.853 113.853 4625.000 113.853 113.853 4626.000 113.853 113.853 4627.000 113.852 113.852 4628.000 113.852 113.852 4629.000 113.852 113.852 4630.000 113.851 113.851 4631.000, 113.851 113.851 4632.000 113.851 113.851 4633.000 113.850 113.850 4634.000 113.850 113.850 4635.000 113.849 ll3.849 4636.000 ll3.849 113.849 4637.000 113.849 113.849 4638.000 113.848 113.848 4639.000 ll3.848 113.848 4640.000 ll3.848 113.848 4641.000 113.847 113.847 4642.000 113.847 113.847 4643.000 113.847 ll3.847 4644.000 113.846 113.846 4645.000 113.846 113.846 4646.000 113.845 113.845 4647.000 113.845 113.845 4648.000 113.845 113.845 4649.000 113.844 113.844 4650.000 113.844 ll3.844 4651.000 113.844 113.844 4652.000 113.843 113.843 4653.000 113.843 113.843 4654.000 113.843 113.843 4655.000 113.842 113.842 4656.000 113.842 113.842 4657.000 113.841 113.841 4658.000 113.841 113.841 4659.000 113.841 113.841 4660.000 113.840 113.840 4661.000 113.840 113.840 4662.000 113.840 113.840 4663.000 113.839 113.839 4664.000 113.839 113.839 4665.000 113.838 113.838 4666.000 113.838 113.838 4667.000 113.838 113.838 4668.000 i13.837 113.837 4669.000 113.837 113.837 4670.000 113.837 113.837 4671.000 113.836 113.836 4672.000 113.836 113.836 4673.000 113.836 113.836 4674.000 113.835 113.835 4675.000 113.835 113.835 4676.000 113.834 113.834 4677.000 113.834 113.834 4678.000 113.834 113.834 4679.000 113.833 113.833 4680.000 113.833 113.833 468i.ooo 113.833 113.833 4682.000 113.832 113.832 4683.000 ll3.832 113.832 4684.000 113.831 113.831 4685.000 113.831 113.831 4686.000 113.831 113.831 4687.000 ll3.830 113.830 4688.000 ll3.830 113.830 4689.000 113.830 113.830 4690.000 113.829 113.829 4691.000 ll3.829 ll3.829 4692.000 113.829 113.829 4693.000 113.828 113.828 4694.000 113.828 113.828 4695.000 113.827 113.827 4696.000 113.827 ll3.827 4697.000 113.827 113.827 4698.000 113.826 113.826 4699.000 ll3.826 ll3.826 4700.000 113.826 113.826 4701.000 113.825 113.825 4702.000 113.825 113.825 4703.000 113.824 ll3.824 4704.000 113.824 113.824 4705.000 113.824 113.824 4706.000 113.823 113.823 4707.000 113.823 ll3.823 4708.000 113.823 113.823 4709.000 113.822 113.822 4710.000 ll3.822 113.822 4711.000 113.821 113.821 4712.000 113.821 113.821 4713.000 113.821 ll3.821 4714.000 ll3.820 113.820 4715.000 113.820 113.820 4716.000 113.820 113.820 4717.000 113.819 113.819 4718.000 113.819 113.819 4719.000 113.818 113.818 4720.000 113.818 113.818 4721.000 113.818 113.818 4722.000 113.817 113.817 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hnssain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 33 11-17-2018 Attachment 1 Page 176 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V)

  • Voltage (V) Time y. V+ Time V-Y+ Time V-V+ Time V-V+ 4723.000 113.817 113.817 4724.000 113.817 113.817 4725.000 113.816 113.816 4726.000 113.816 113.816 4727.000 113.815 113.815 4728.000 113.815 113.815 4729.000 113.815 113.815 4730.000 113.814 113.814 4731.000 113.814 113.814 4732.000 113.814 113.814 4733.000 113.813 113.813 4734.000 113.813 113.813 4735.000 113.812 113.812 4736.000 113.812 113.812 4737.000 113.812 113.812 4738.000 113.811 113.811 4739.000 113.811 113.811 4740.000 113.811 113.811 4741.000 113.810 113.810 4742.000 113.810 113.810 4743.000 113.809 113.809 4744.000 113.809 113.809 4745.000 113.809 113.809 4746.000 113.808 113.808 4747.000 113.808 113.808 4748.000 113.807 113.807 4749.000 113.807 113.807 4750.000 113.807 113.807 4751.000 113.806 113.806 4752.000 113.806 113.806 4753.000 113.806 113.806 4754.000 113.805 113.805 4755.000 113.805 113.805 4756.000 113.804 113.804 4757.000 113.804 113.804 4758.000 113.804 113.804 4759.000 113.803 113.803 4760.000 113.803 113.803 4761.000 113.803 113.803 4762.000 113.802 113.802 4763.000 113.802 113.802 4764.000 113.801 113.801 4765.000 113.801 113.801 4766.000 113.801 113.801 4767.000 113.800 113.800 4768.000 113.800 113.800 4769.000 113.799 113.799 4770.000 113.799 113.799 4771.000 113.799 113.799 4772.000 113.798 113.798 4773.000 113.798 113.798 4774.000 113.798 113.798 4775.000 113.797 113.797 4776.000 113.797 113.797 4777.000 113.796 113.796 4778.000 113.796 113.796 4779.000 113.796 113.796 4780.000 113.795 113.795 4781.000 113.795 113.795 4782.000 113.794 113.794 4783.000 113.794 113.794 4784.000 113.794 113.794 4785.000 113.793 113.793 4786.000 113.793 113.793 4787.000 113.793 113.793 4788.000 113.792 113.792 4789.000 113.792 113.792 4790.000 113.791 113.791 4791.000 113.791 113.791 4792.000 113.791 113.791 4793.000 113.790 113.790 4794.000 113.790 113.790 4795.000 113.789 113.789 4796.000 113.789 113.789 4797.000 113.789 113.789 4798.000 113.788 113.788 4799.000 113.788 113.788 4800.000 113.788 113.788 4801.000 113.787 113.787 4802.000 113.787 113.787 4803.000 113.786 113.786 4804.000 113.786 113.786 4805.000 113.786 113.786 4806.000 113.785 113.785 4807.000 113.785 U3.785 4808.000 113.784 113.784 4809.000 113.784 113.784 4810.000 113.784 113.784 V 4811.000 113.783 113.783 4812.000 113.783 113.783 4813.000 113.783 113.783 4814.000 113.782 113.782 4815.000 113.782 113.782 4816.000 113.781 113.781 4817.000 113.781 113.781 4818.000 113.781 113.781 4819.000 113.780 113.780 4820.000 113.780 113.780 4821.000 113.779 113.779 4822.000 113.779 113.779 4823.000 113.779 113.779 4824.000 113.778 113.778 4825.000 113.778 113.778 4826.000 113.777 113.777 4827.000 113.777 113.777 4828.000 113.777 113.777 4829.000 113.776 113.776 4830.000 113.776 113.776 4831.000 113.776 113.776 4832.000 113.775 113.775 4833.000 113.775 '113.775 4834.000 113.774 113.774 4835.000 113.774 113.774 4836.000 113.774 113.774 4837.000 113.773 113.773 4838.000 113.773 113.773 4839.000 113.772 113.772 4840.000 113.772 113.772 4841.000 113.772 113.772 4842.000 113.771 113.771 4843.000 113.771 113.771 4844.000 113.770 113.770 4845.000 113.770 113.770 4846.000 113.770 113.770 4847.000 113.769 113.769 4848.000 113.769 113.769 4849.000 113.768 113.768 4850.000 113.768 113.768 4851.000 113.768 113.768 4852.000 113.767 113.767 4853.000 113.767 113.767 4854.000 113.766 113.766 4855.000 113.766 113.766 4856.000 113.766 113.766 4857.000 113.765 113.765 4858.000 113.765 113.765 4859.000 113.764 113.764 4860.000 113.764 113.764 4861.000 113.764 113.764 4862.000 113.763 113.763 4863.000 113.763 113.763 4864.000 113.763 113.763 4865.000 113.762 113.762 4866.000 113.762 113.762 4867.000 113.761 113.761 4868.000 113.761 113.761 4869.000 113.761 113.761 4870.000 113.760 113.760 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATT lABUS 34 11-17-2018 Attachment 1 Page 177 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4871.000 113.760 113.760 4872.000 113.759 113.759 4873.000 113.759 113.759 4874.000 113.759 113.759 4875.000 113.758 113.758 4876.000 113.758 113.758 4877.000 113.757 113.757 4878.000 113.757 113.757 4879.000 113.757 113.757 4880.000 113.756 113.756 4881.000 113.756 113.756 4882.000 113.755 113.755 4883.000 113.755 113.755 4884.000 113.755 113.755 4885.000 113.754 113.754 4886.000 113.754 113.754 4887.000 113.753 113.753 4888.000 113.753 113.753 4889.000 113.753 113.753 4890.000 113.752 113.752 4891.000 113.752 113.752 4892.000 113.751 113.751 4893.000 113.751 113.751 4894.000 113.751 113.751 4895.000 113.750 113.750 4896.000 113.750 113.750 4897.000 113.749 113.749 4898.000 113.749 113.749 4899.000 113.749 113.749 4900.000 113.748 113.748 4901.000 113.748 113.748 4902.000 113.747 113.747 4903.000 113.747 113.747 4904.000 113.747 113.747 4905.000 liJ.746 113.746 4906.000 113.746 113.746 4907.000 113.745 113.745 4908.000 113.745 113.745 4909.000 113.745 113.745 4910.000 113.744 113.744 4911.000 113.744 113.744 4912.000 113.743 113.743 4913.000 113.743 113.743 4914.000 113.743

  • 113.743 4915.000 113.742 113.742 4916.000 113.742 113.742 4917.000 113.741 113.741 4918.000 113.741 113.741 4919.000 113.741 113.741 4920.000 113.740 113.740 4921.000 113.740 113.740 4922.000 113.739 113.739 4923.000 113.739 113.739 4924.000 113.738 113.738 4925.000 113.738 113.738 4926.000 113.738 113.738 4927.000 113.737 113.737 4928.000 113.737 113.737 4929.000 113.736 113.736 4930.000 113.736 113.736 4931.000 113.736 113.736 4932.000 113.735 113.735 4933.000 113.735 113.735 4934.000 113.734 113.734 4935.000 113.734 113.734 4936.000 113.734
  • 113.734 4937.000 113.733 113.733 4938.000 113.733 113.733 4939.000 113.732 113.732 4940.000 113.732 113.732 4941.000 113.732 113.732 4942.000 113.731 113.731 4943.000 113.731 113.731 4944.000 113.730 113.730 4945.000 113.730 113.730 4946.000 113.730 113.730 4947.000 113.729 113.729 4948.000 113.729 113.729 4949.000 113.728 113. 728 4950.000 113.728 113.728 4951.000 113.728 113.728 4952.000 113.727 113.727 4953.000 113.727 113.727 4954.000 113.726 113.726 4955.000 113.726 113.726 4956.000 113.725 113.725 4957.000 113.725 113.725 4958.000 113.725 113.725 4959.000 113.724 113.724 4960.000 113.724 113.724 4961.000 113.723 113.723 4962.000 113.723 113.72~ 4963.000 113.723 113.723 4964.000 113.722 113.722 4965.000 113.722 113.722 4966.000 113.721 113.721 4967.000 113.721 113.721 4968.000 113.721 113.721 4969.000 113.720
  • 113.720 4970.000 113.720 113.720 4971.000 113.719 113.719 4972.000 113.719 113.719 4973.000 113.718 113.718 4974.000 113.718 113.718 4975.000 113.718 113.718 4976.000 113.717 113.717 4977.000 113.717 113.717 4978.000 113.716 113.716 4979.000 113.716 113.716 4980.000 113.716 113.716 4981.000 113.715 113.715 4982.000 113.715 113.715 4983.000 113.714 113.714 4984.000 113.714 113.714 4985.000 113.714 113.714 4986.000 113.713 113.713 4987.000 113.713 113.713 4988.000 113.713 113.713 4989.000 113.713 113.713 4990.000 113.713 113.713 4991.000 113.712 113.712 4992.000 113.712 113.712 4993.000 113.712 113.712 4994.000 113.712 113.712 4995.000 113.711 113.711 4996.000 113.711 113.711 4997.000 113.711 113.711 4998.000 113.711 113.711 4999.000 113.711 113.711 5000.000 113.710 113.710 5001.000 113.710 113.710 5002.000 113.710 113.710 5003.000 113.710 113.710 5004.000 113.709 113.709 5005.000 113.709 113.709 5006.000 113.709 113.709 5007.000 113.709 113.709 5008.000 113.708 113.708 5009.000 113.708 113.708 5010.000 113.708 113.708 5011.000 113.708 113.708 5012.000 113.708 113.708 5013.000 113.707 113.707 5014.000 113.707 113.707 5015.000 113.707 113.707 5016.000 113.707 113.707 5017.000 113.706 113.706 5018.000 113.706 113.706 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-.48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 35 11-17-2018 Attachment 1 Page 178 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5019.000 113.706 113.706 5020.000 113.706 113.706 5021.000 113.706 113.706 5022.000 113.705 113.705 5023.000 113.705 113.705 5024.000 113.705 113.705 5025.000 113.705 113.705 5026.000 113.704 113.704 5027.000 113.704 113.704 5028.000 113.704 113.704 5029.000 113.704 113.704 5030.000 113.703 113.703 5031.000 113.703 113.703 5032.000 113.703 113.703 5033.000 113.703 113.703 5034.000 113.703 113.703 5035.000 113.702 113.702 5036.000 113.702 113.702 5037.000 113.702 113.702 5038.000 113.702 113.702 5039.000 113.701 113.701 5040.000 113.701 113.701 5041.000 113.701 113.701 5042.000 113.701 113.701 5043.000 113.701 113.701 5044.000 113.700 113.700 5045.000 113,700 113.700 5046.000 113.700 113.700 5047.000 113.700 113.700 5048.000 113.699 113.699 5049.000 113.699 113.699 5050.000 113.699 113.699 5051.000 113.699 113.699 5052.000 113.698 113.698 5053.000 113.698 113.698 5054.000 113.698 113.698 5055.000 113.698 113.698 5056.000 113.698 113.698 5057.000 113.697 113.697 5058.000 113.697 113.697 5059.000 113.697 113.697 5060.000 113.697 113.697 5061.000 113.696 113.696 5062.000 113.696 113.696 5063.000 113.696 113.696 5064.000 113.696 113.696 5065.000 113.695 113.695 5066.000 113.695 113.695 5067.000 113.695 113.695 5068.000 113.695_ 113.695 5069.000 113.694 113.694 5070.000 113.694 113.694 5071.000 113.694 113.694 5072.000 113.694 113.694 5073.000 113.694 113.694 5074.000 113.693 113.693 5075.000 113.693 113.693 5076.000 113.693 113.693 5077.000 113.693 113.693 5078.000 113.692 113.692 5079.000 113.692 113.692 5080.000 113.6Q2 113.692 5081.000 113.692 113.692 5082.000 113.691 113.691 5083.000 113.691 113.691 5084.000 113.691 113.691 5085.000 113.691 113.691 5086.000 113.691 113.691 5087.000 113.690 113.690 5088.000 113.690 113.690 5089.000 113.690 113.690 5090.000 113.690 113.690 5091.000 113.689 113.689 5092.000 113.689 113.689 5093.000 113.689 113.689 5094.000 113.689 113.689 5095.000 113.688 113.688 5096.000 113.688 113.688 5097.000 113.688 113.688 5098.000 113.688 113.688 5099.000 113.687 113.687 5100.000 113.687 113.687 5101.000 113.687 113.687 5102.000 113.687 113.687 5103.000 113.687 113.687 5104.000 113.686 113.686 5105.000 113.686 113.686 5106.000 113.686 113.686 5107.000 113.686 113.686 5108.000 113.686 113.686 5109.000 113.685 113.685 5110.000 113.685 113.685 5111.000 113.685 113.685 5112.000 113.685 113.685 5113.000 113.685 113.685 5114.000 113.684 113.684 5115.000 113.684 113.684 5116.000 113.684 113.684 5117.000 113.684 113.684 5118.000 113.684 113.684 5119.000 113.684 113.684 5120.000 113.683 113.683 5121.000 113.683 113.683 5122.000 113.683 113.683 5123.000 113.683 113.683 5124.000 113.683 113.683 5125.000 113.682 113.682 5126.000 113.682 113.682 5127.000 113.682 113.682 5128.000 113.682 113.682 5129.000 113.682 113.682 5130.000 113.682 113.682 5131.000 113.681 113.681 5132.000 113.681 113.681 5133.000 113.681 113.681 5134.000 113.681 113.681 5135.000 113.681 113.681 5136.000 113.680 113.680 5137.000 113.680 113.680 5138.000 113.680 113.680 5139.000 113.6_80 113.680 5140.000 113.680 113.680 5141.000 113.679 113.679 5142.000 113.679 113.679 5143.000 113.679 113.679 5144.000 113.679 113.679 5145.000 113.679 113.679 5146.000 113.679 113.679 5147.000 113.678 113.678 5148.000 113.678 113.678 5149.000 113.678 113.678 5150.000 113.678 113.678 5151.000 113.678 113.678 5152.000 113.677 113.677 5153.000 113.677 113.677 5154.000 113.677 113.677 5155.000 113.677 113.677 5156.000 113.677 113.677 5157.000 113.676 113.676 5158.000 113.676 113.676 5159.000 113.676 113.676 5160.000 113.676 113.676 5161.000 113.676 113.676 5162.000 113.676 113.676 5163.000 113.675 113.675 5164.000 113.675 113.675 5165.000 113.675 113.675 5166.000 113.675 113.675 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 36 11-17-2018 Attachment 1 Page 179 of274 KCICONSULT Base Nonna! \ Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5167.000 113.675 113.675 5168.000 113.674 113.674 5169.000 113.674 113.674 5170.000 113.674 113.674 5171.000 113.674 113.674 5172.000 113.674 113.674 5173.000 113.673 113.673 5174.000 113.673 113.673 5175.000 113.673 113.673 5176.000 113.673 113.673 5177.000 113.673 113.673 5178.000 113.672 113.672 5179.000 113.672 113.672 5180.000 113.672 113.672 5181.000 . 113.672 113.672 5182.000 113.672 113.672 5183.000 113.671 113.671 5184.000 113.671 113.671 5185.000 113.671 113.671 5186.000 113.671 113.671 5187.000 113.671 113.671 5188.000 113.671 113.671 5189.000 113.670 113.670 5190.000 113.670 113.670 5191.000 113.670 113.670 5192.000 113.670 113.670 5193.000 113.670 113.670 5194.000 113.669 113.669 5195.000 113.669 113.669 5196.000 113.669 113.669 5197.000 113.669 113.669 5198.000 113.669 113.669 5199.000 113.668 113.668 5200.000 113.668 113.668 5201.000 113.668 113.668 5202.000 113.668 113.668 5203.000 113.668 113.668 5204.000 113.667 113.667 5205.000 113.667 113.667 5206.000 113.667 113.667 5207.000 113.667 113.667 5208.000 113.667 113.667 5209.000 113.666 113.666 5210.000 113.666 113.666 5211.000 113.666 113.666 5212.000 113.666 113.666 5213.000 113.666 113.666 5214.000 113.665 113.665 5215.000 113.665 113.665 5216.000 113.665 113.665 5217.000 113.665 113.665 5218.000 113.665 113.665 5219.000 113.664 113.664 5220.000 113.664 113.664 5221.000 113.664 113.664 5222.000 113.664 , 113.664 5223.000 113.664 113.664 5224.000 113.663 113.663 5225.000 113.663 113.663 5226.000 113.663 113.663 5227.000 113.663 113.663 5228.000 113.663 113.663 5229.000 113.662 113.662 5230.000 113.662 113.662 5231.000 113.662 113.662 5232.000 113.662 113.662 5233.000 113.662 113.662 5234.000 113.661 113.661 5235.000 113.661 113.661 5236.000 113.661 113.661 5237.000 113.661 113.661 5238.000 113.661 113.661 5239.000 113.660 113.660 5240.000 113.660 113.660 5241.000 113.660 113.660 5242.000 113.660 113.660 5243.000 113.660 113.660 5244.000 113.659 113.659 5245.000 113.659 113.659 5246.000 113.659 113.659 5247.000 113.659 113.659 5248.000 113.659 113.659 5249.000 113.658 113.658 5250.000 113.658 113.658 5251.000 113.658 113.658 5252.000 113.658 113.658 5253.000 113.658 11~.658 5254.000 113.657 113.657 5255.000 113.657 113.657 5256.000 113.657 113.657 5257.000 113.657 113.657 5258.000 113.657 113.657 5259.000 113.656 113.656 5260.000 113.656 113.656 5261.000 113.656 113.656 5262.000 113.656 113.656 5263.000 113.656 113.656 5264.000 113.655 113.655 5265.000 113.655 113.655 5266.000 113.655 113.655 5267.000 113.655 113.655 5268.000 113.655 113.655 5269.000 113.654 113.654 5270.000 113.654 113.654 5271.000 113.654 113.654 5272.000 113.654 113.654 5273.000 113.654 113.654 5274.000 113.653 113.653 5275.000 113.653 113.653 5276.000 113.653 113.653 5277.000 113.653 113.653 5278.000 113.652 113.652 5279.000 113.652 113.652 5280.000 113.652 113.652 5281.000 113.652 113.652 5282.000 113.652 113.652 5283.000 113.651 113.651 5284.000 113.651 113.651 5285.000 113.651 113.651 5286.000 113.651 113.651 5287.000 113.651 113.651 5288.000 113.650 113.650 5289.000 113.650 113.650 5290.000 113.650 113.650 5291.000 113.650 113.650 5292.000 113.650 113.650 5293.000 113.649 113.649 5294.000 113.649 113.649 5295.000 113.649 113.649 5296.000 113.649 113.649 5297.000 113.649 113.649 5298.000 113.648 113.648 5299.000 113.648 113.648 5300.000 113.648 113.648 5301.000 113.648 113.648 5302.000 113.647 113.647 5303.000 113.647 113.647 5304.000 113.647 113.647 5305.000 113.647 113.647 5306.000 113.647 113.647 5307.000 113.646 113.646 5308.000 113.646 113.646 5309.000 113.646 113.646 5310.000 113.646 113.646 5311.000 113.646 113.646 5312.000 113.645 113.645 5313.000 113.645 113.645 5314.000 113.645 113.645 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 180 of274 for greater than 24 Hrs / Project: Clinton Flex Study ETAP Page: 37 Location:

KC! 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Revision:

Base Study Case: BSIA-48 Filename:

CPS SBO Study Config.: Normal DIV I Battery IA 48-Hour Coping Study BATT lABUS Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 5315.000 . 113.645 113.645 5316.000 113.644 113.644 5317.000 113.644 113.644 5318.000 113.644 113.644 5319.000 113.644 113.644 5320.000 113.644 113.644 5321.000 113.643 113.643 5322.000 113.643 113.643 5323.000 113.643 113.643 5324.000 113.643 113.643 5325.000 113.643 113.643 5326.000 113.642 113.642 5327.000 113.642 113.642 5328.000 113.642 113.642 5329.000 113.642 113.642 5330.000 113.641 113.641 5331.000 113.641 113.641 5332.000 113.641 113.641 5333.000 113.641 113.641 5334.000 113.641 113.641 5335.000 113.640 113.640 5336.000 113.640 113.640 5337.000 113.640 113.640 5338.000 113.640 113.640 5339.000 113.640 113.640 5340.000 113.639 113.639 5341.000 113.639 113.639 5342.000 113.639 113.639 5343.000 113.639 113.639 5344.000 113.638 113.638 5345.000 113.638 113.638 5346.000 113.638 113.638 5347.000 113.638 113.638 5348.000 113.638 113.638 5349.000 113.637 113.637 5350.000 113.637 113.637 5351.000 113.637 113.637 5352.000 113.637 113.637 5353.000 113.637 113.637 5354.000 113.637 113.637 5355.000 113.637 113.637 5356.000 113.637 113.637 5357.000 113.636 113.636 5358.000 113.636 113.636 5359.000 113.636 113.636 5360.000 113.636 113.636 5361.000 113.636 113.636 5362.000 113.636 113.636 5363.000 113.636 113.636 5364.000 113.636 113.636 5365.000 113.635 113.635 5366.000 113.635 113.635 5367.000 113."635 113.635 5368.000 113.635 113.635 5369.000 113.635 113.635 5370.000 113.635 113.635 5371.000 113.635 113.635 5372.000 113.635 113.635 5373.000 113.634 113.634 5374.000 113.634 113.634 5375.000 113.634 113.634 5376.000 113.634 113.634 5377.000 113.634 113.634 5378.000 113.634 113.634 5379.000 113.634 113.634 5380.000, 113.634 113.634 5381.000 113.633 113.633 5382.000 113.633 113.633 5383.000 113.633 113.633 5384.000 113.633 ll3.633 5385.000 113.633 113.633 5386.000 113.633 113.633 5387.000 113.633 113.633 5388.000 113.633 113.633 5389.000 113.633 113.633 5390.000 113.632 113.632 5391.000 113.632 113.632 5392.000 113.632 113.632 5393.000 113.632 113.632 5394.000 113.632 113.632 5395.000 ll3.632 113.632 5396.000 113.632 113.632 5397.000 113.632 113.632 5398.000 113.631 113.631 5399.000 ll3.631 113.631 5400.000 113.631 113.631 5401.000 113.631 113.631 5402.000 113.631 113.631 5403.000 113.631 113.631 5404.000 113.631 113.631 5405.000 113.631 113.631 5406.000 113.630 113.630 5407.000 113.630 113.630 5408.000 113.630 113.630 5409.000 113.630 113.630 5410.000 ll3.630 113.630 5411.000 113.630 113.630 5412.000 113.630 113.630 5413.000 113.630 113.630 5414.000 113.629 113.629 5415.000 113.629 113.629 5416.000 113.629 113.629 5417.000 113.629 113.629 5418.000 113.629 113.62.9 5419.000 113.629 113.629 5420.000 113.629 113.629 5421.000 113.629 lf3.629 5422.000 113.628 113.628 5423.000 113.628 113.628 5424.000 113.628 113.628 5425.000 113.628 113.628 5426.000 113.628 113.628 5427.000 113.628 113.628 5428.000 113.628 ll3.628 5429.000 113.628 113.628 5430.000 113.627 113.627 5431.000 113.627 113.627 5432.000 113.627 113.627 5433.000 113.627 113.627 5434.000 113.627 113.627 5435.000 113.627 113.627 5436.000 113.627 113.627 5437.000 113.627 113.627 5438.000 113.626 113.626 5439.000 113.626 113.626 5440.000 113.626 113.626 5441.000 113.626 113.626 5442.000 113.626 113:626 5443.000 113.626 113.626 5444.000 113.626 113.626 5445.000 113.625 113.625 5446.000 113.625 113.625 5447.000 113.625 113.625 5448.000 113.625 113.625 5449.000 113.625 113.625 5450.000 113.625 113.625 5451.000 113.625 113.625 5452.000 113.625 113.625 5453.000 113.624 113.624 5454.000 113.624 113.624 5455.000 113.624 113.624 5456.000 113.624 113.624 5457.000 113.624 113.624 5458.000 113.624 113.624 5459.000 113.624 113.624 5460.000 113.624 113.624 5461.000 113.623 113.623 5462.000 113.623 113.623 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 38 11-17-2018 Attachment 1 Page 181 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 5463.000 113.623 113.623 5464.000 113.623 113.623 5465.000 113.623 113.623 5466.000 113.623 113.623 5467.000 113.623 113.623 5468.000 113.623 113.623 5469.000 113.622 113.622 5470.000 113.622 113.622 5471.000 113.622 113.622 5472.000 113.622 113.622 5473.000 113.622 113.622 5474.000 113.622 113.622 5475.000 113.622 113.622 5476.000 113.621 113.621 5477.000 . 113.621 113.621 5478.000 113.621 113.621 5479.000 113.621 113.621 5480.000 113.621 113.621 5481.000 113.621 113.621 5482.000 113.621 113.621 5483.000 113.621 113.621 5484.000 113.620 113.620 5485.000 113.620 113.620 5486.000 113.620 113.620 5487.000 113.620 113.620 5488.000 113.620 113.620 5489.000 113.620 113.620 5490.000 113.620 113.620 5491.000 113.619 113.619 5492.000 113.619 113.619 5493.000 113.619 113.619 5494.000 113.619 113.619 5495.000 113.619 113.619 5496.000 113.619 113.619 5497.000 113.619 113.619 5498.000 113.619 113.619 5499.000 113.618 113.618 5500.000 113.618 113.618 5501.000 113.618 113.618 5502.000 113.618 113.618 5503.000 113.618 113.618 5504.000 113.618 113.618 5505.000 113.618 113.618 5506.000 113.617 113.617 5507.000 113.617 113.617 5508.000 113.617 113.617 5509.000 113.617 113.617 5510.000 113.617 113.617 5511.000 . 113.617 113.617 5512.000 113.617 113.617 5513.000 113.617 113.617 5514.000 113.616 113.616 5515.000 113.616 113.616 5516.000 113.616 113.616 5517.000 113.616 113.616 5518.000 113.616 113.616 5519.000 113.616 113.616 5520.000 113.616 113.616 5521.000

  • 113.615 113.615 5522.000 113.615 113.615 5523.000 113.615 113.615 5524.000 113.615 113.615 5525.000 113.615 113.615 5526.000 113.615 113.615 5527.000 113.615 113.615 5528.000 113.614 113.614 5529.000 113.614 113.614 5530.000 113.614 113.614 5531.000 113.614 113.614 5532.000 113.614 113.614 5533.000 113.614 113.614 5534.000 113.614 113.614 5535.000 113.613 113.613 5536.000 113.613 113.613 5537.000 113.613 113.613 5538.000 113.613 113.613 5539.000 113.613 113.613 5540.000 113.613 113.613 5541.000 113.613 113.613 5542.000 113.613 113.613 5543.000 113.612 113.612 5544.000 113.612 113.612 5545.000 113.612 113.612 5546.000 113.612 113.612 5547.000 113.612 113.612 5548.000 113.612 113.612 5549.000 113.612 113.612 5550.000 113.611 113.611 5551.000 113.611 113.611 5552.000 113.611 113.611 5553.000 113.611 113.611 5554.000 113.611 113.611 5555.000 113.611 113.611 5556.000 113.611 113.611 5557.000 113.610 113.610 5558.000 113.610 113.610 5559.000 113.610 113.610 5560.000 113.610 113.610 5561.000 113.610 113.610 5562.000 113.610 113.610 5563.000 I 13.610 113.610 5564.000 113.609 113.609 5565.000 113.609 113.609 5566.000 113.609 113.609 5567.000 113.609 113.609 5568.000 113.609 113.609 5569.000 113.609 113.609 5570.000 113.609 113.609 5571.000 113.608 113.608 5572.000 113.608 113.608 5573.000 113.608 113.608 5574.000 113.608 113.608 5575.000 113.608 113.608 5576.000 113.608 113.608 5577.000 113.608 113.608 5578.000 113.607 113.607 5579.000 113.607 113.607 5580.000 113.607 113.607 5581.000 113.607 113.607 5582.000 113.607 113.607
  • 5583.000 113.607 113.607 5584.000 113.607 113.607 5585.000 113.606 113.606 5586.000 113.606 113.606 5587.000 113.606 113.606 5588.000 113.606 113.606 5589.000 113.606 113.606 5590.000 113.606 113.606 5591.000 113.606 113.606 5592.000 113.605 113.605 5593.000 113.605 113.605 5594.000 113.605 113.605 5595.000 113.605 113.605 5596.000 113.605 113.605 5597.000 113.605 113.605 5598.000 113.604 113.604 5599.000 113.604 113.604 5600.000 113.604 113.604 5601.000 113.604 113.604 5602.000 113.604 113.604 5603.000 113.604 113.604 5604.000 113.604 113.604 5605.000 113.603 113.603 5606.000 113.603 113.603 5607.000 113.603 113.603 5608.000 113.603 113.603 5609.000 113.603 113.603 5610.000 113.603 113.603 EC 626319 ,/ Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads With 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 39 11-17-2018 Attachment 1 Page 182 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time v-V+ Time V-V+ Time V-V+ 5611.000 113.603 113.603 5612.000 113.602 113.602 5613.000 113.602 113.602 5614.000 113.602 113.602 5615.000 113.602 113.602 5616.000 113.602 113.602 5617.000 113.602 113.602 5618.000 113.602 113.602 5619.000 113.601 113.601 5620.000 113.601 113.601 5621.000 113.601 113.601 5622.000 113.601 113.601 5623.000 113.601 113.601 5624.000 113.601 113.601 5625.000 113.600 113.600 5626.000 113.600 113.600 5627.000 113.600 113.600 5628.000 113.600 113.600 5629.000 113.600 113.600 5630.000 113.600 113.600 5631.000 113.600 113.600 5632.000 113.599 113.599 5633.000 113.599 113.599 5634.000 113.599 113.599 5635.000 113.599 113.599 5636.000 113.599 113.599 5637.000 113.599 113.599 5638.000 113.599 113.599 5639.000 113.598 113.598 5640.000 113.598 113.598 5641.000 113.598 113.598 5642.000 113.598 113.598 5643.000 113.598 113.598 5644.000 113.598 113.598 5645.000 113.597 113.597 5646.000 113.597 113.597 5647.000 113.597 113.597 5648.000 113.597 113.597 5649.000 113.597 113.597 5650.000 113.597 113.597 5651.000 113.597 113.597 5652.000 113.596 113.596 5653.000 113.596 113.596 5654.000 113.596 113.596 5655.000 113.596 113.596 5656.000 113.596 113.596 5657.000 113.596 113.596 5658.000 113.595 113.595 5659.000 113.595 113.595 5660.000 113.595 113.595 5661.000 113.595 113.595 5662.000 113.595 113.595 5663.000 113.595 113.595 5664.000 113.595 113.595 5665.000 113.594 113.594 5666.000 113.594 113.594 5667.000 113.594 113.594 5668.000 113.594 113.594 5669.000 113.594 113.594 5670.000 113.594 113.594 5671.000 113.593 113.593 5672.000

  • 113.593 113.593 5673.000 113.593 113.593 5674.000 113.593 113.593 5675.000 113.593 113.593 5676.000 113.593 113.593 5677.000 113.592 113.592 5678.000 113.592 . 113.592 5679.000 113.592 113.592 5680.000 113.592 113.592 5681.000 113.592 113.592 5682.000 113.592 113.592 5683.000 113.592 113.592 5684.000 113.591 113.591 5685.000 113.591 113.591 5686.000 113.591 113.591 5687.000 113.591 113.591 5688.000 113.591 113.591 5689.000 113.591 113.591 5690.000 113.590 113.590 5691.000 113.590 113.590 5692.000 113.590 113.590 5693.000 113.590 113.590 5694.000 113.590 113.590 5695.000 113.590 113.590 5696.000 113.589 113.589 5697.000 113.589 113.589 5698.000 113.589 113.589 5699.000 113.589 113.589 5700.000 113:589 113.589 5701.000 113.589 113.589 5702.000 113.588 113.588 5703.000 113.588 113.588 5704.000 113.588 113.588 5705.000 113.588 113.588 5706.000 113.588 113.588 5707.000 113.588 113.588 5708.000 113.588 113.588 5709.000 113.587 113.587 5710.000 113.587 113.587 5711.000 113.587 113.587 5712.000 113.587 113.587 5713.000 113.587 113.587 5714.000 113.587 113.587 5715.000 113.586 113.586 5716.000 113.586 113.586 5717.000 113.586 113.586 5718.000 113.586 113.586 5719.000' 113.586 113.586 5720.000 113.586 113.586 5721.000 113.585 113.585 5722.000 113.585 113.585 5723.000 113.585 113.585 5724.000 113.585 113.585 5725.000 113.585 113.585 5726.000 113.585 113.585 5727.000 113.584 113.584 5728.000 113.584 113.584 5729.000 113.584 113.584 5730.000 113.584 113.584 5731.000 113.584 113.584 5732.000 113.584 113.584 5733.000 113.583 113.583 5734.000 113.583 113.583 5735.000 113.583 113.583 5736.000 113.583 113.583 5737.000 113.583 113.583 5738.000 113.583 113.583 5739.000 113.582 113.582 5740.000 113.582 113.582 5741.000 113.582 113.582 5742.000 113.582 113.582 5743.000 113.582 113.582 5744.000 113.582 113.582 5745.000 113.581 113.581 5746.000 113.581 113.581 5747:000 113.581 113.581 5748.000 113.581 113.581 5749.000 113.581 113.581 5750.000 113.581 113.581 5751.000 113.580 113.580 5752.000 113.580 113.580 5753.000 113.580 113.580 5754.000 113.580 113.580 5755.000 113.580 113.580 5756.000 113.580 113.580 5757.000 113.579 113.579 5758.000 113.579 113.579 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP ~eports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 40 11-17-2018 Attachment 1 Page 183 of274 KCICONSULT Base Nonnal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5759.000 113.579 113.579 5760.000 113.579 113.579 5761.000 113.579 113.579 5762.000 113.579 113.579 5763.000 113.578 113.578 5764.000 113.578 113.578 5765.000 113.578 113.578 5766.000 113.578 113.578 5767.000 113.578 113.578 5768.000 113.577 113.577 5769.000 113.577 113.577 5770.000 113.577 113.577 5771.000 113.577 113.577 5772.000 113.577 113.577 5773.000 113.577 113.577 5774.000 113.576 113.576 5775.000 113.576 113.576 5776.000 113.576 113.576 5777.000 113.576 113.576 5778.000 113.576 113.576 5779.000 113.576 113.576 5780.000 113.575 113.575 5781.000 113.575 113.575 5782.000 113.575 113.575 5783.000 113.575 113.575 5784.000 113.575 113.575 5785.000 113.575 113.575 5786.000 113.574 113.574 5787.000 113.574 113.574 5788.000 113.574 113.574 5789.000 113.574 113.574 5790.000 113.574 113.574 5791.000 113.573 113.573 5792.000 113.573 113.573 5793.000 113.573 113.573 5794.000 113.573 113.573 5795.000 113.573 113.573 5796.000 113.573 113.573 5797.000 113.572 113.572 5798.000 113.572 113.572 5799.000 113.572 113.572 5800.000 113.572 113.572 '5801.000 113.572 113.572 5802.000 113.572 113.572 5803.000 113.571 113.571 5804.000 113.571 113.571 5805.000 113.571 113.571 5806.000 113.571 113.571 5807.000 113.571 113.571 5808.000 113.571 113.571 5809.000 113.571 113.571 5810.000 113.571 113.571 5811.000 113.570 113.570 5812.000 113.570 113.570 5813.000 113.570 113.570 5814.000 113.570 113.570 5815.000 113.570 113.570 5816.000 113.570 113.570 5817.000 113.570 113.570 5818.000 113.570 113.570' 5819.000 113.570 113.570 5820.000 113.570 113.570 5821.000 113.570 113.570 5822.000 113.570 113.570 5823.000 113.570 113.570 5824.000 113.570 113.570 5825.000 113.570 113.570 5826.000 113.569 113.569 5827.000 113.569 113.569 5828.000 113.569 113.569 5829.000 113.569 113.569 5830.000 113.569 113.569 5831.000 113.569 113.569 5832.000 113.569 113.569 5833.000 113.569 113.569 5834.000 113.569 113.569 5835.000 113.569 113.569 5836.000 113.569 113.569 5837.000 113.569 113.569 5838.000 113.569 113.569 5839.000 113.569 113.569 5840.000 113.568 113.568 5841.000 113.568 113.568 5842.000 113.568 113.568 5843.000 113.568 113.568 5844.000 113.568 113.568 5845.000 113.568 113.568 5846.000 113.568 113.568 5847.000 113.568 113.568 5848.000 113.568 113.568 5849.000 113.568 113.568 5850.000 113.568 113.568 5851.000 113.568 113.568 5852.000 113.568 113.568 5853.000 113.568 113.568 5854.000 113.567 113.567 5855.000 113.567 113.567 5856.000 113.567 113.567 5857.,000 113.567 113.567 5858.000 113.567 113.567 5859.000 113.567 113.567 5860.000 113.567 113.567 5861.000 113.567 113.567 5862.000 113.567 113.567 5863.000 113.567 113.567 5864.000 113.567 113.567 5865.000 113.567 113.567 5866.000 113.567 113.567 5867.000 113.566 113.566 5868.000 113.566 113.566 5869.000 113.566 113.566 5870.000 113.566 113.566 5871.000 113.566 113.566 5872.000 113.566 113.566 5873.000 113.566 113.566 5874.000 113.566 113.566 5875.000 113.566 113.566 5876.000 113.566 113.566 5877.000 113.566 113.566 5878.000 113.566 113.566 5879.000 113.566 113.566 5880.000 113.566 113.566 5881.000 113.565 113.565 5882.000 113.565 113.565 5883.000 113.565 113.565 5884.000 113.565 113.565 5885.000 113.565 113.565 5886.000 113.565 113.565 5887.000 113.565 113.565 5888.000 113.565 113.565 5889.000 113.565 113.565 5890.000 113.565 113.565 5891.000 113.565 113.565 5892.000 113.565 113.565 5893.000 113.565 113.565 5894.000 113.564 113.564 5895.000 113.564 113.564 5896.000 113.564 113.564 5897.000 113.564 113.564 5898.000 113.564 113.564 5899.000 113.564 113.564 5900.000 113.564 113.564 5901.000 113.564 113.564 5902.000 113.564 113.564 5903.000 113.564 113.564 5904.000 113.564 113.564 5905.000 113.564 113.564 5906.000 113.563 113.563 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 41 11-17-2018 Attachment 1 Page 184 of 274 KCICONSUL'r Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5907.000 113.563 113.563 5908.000 113.563 113.563 5909.000 113.563 113.563 5910.000 113.563 113.563 5911.000 113.563 113.563 5912.000 113.563 113.563 5913.000 113.563 113.563 5914.000 113.563 113.563 5915.000 113.563 113.563 5916.000 113.563 113.563 5917.000 113.563 113.563 5918.000 113.563 113.563 5919.000 113.562 113.562 5920.000 113.562 113.562 5921.000 113.562 113.562 5922.000 113.562 113.562 5923.000 113.562 113.562 5924.000 113.562 113.562 5925.000 113.562 113.562 5926.000 113.562 113.562 5927.000 113.562 113.562 5928.000 113.562 113.562 5929.000 113.562 113.562 5930.000 113.562 113.562 5931.000 113.561 113.561 5932.000 113.561 113.561 5933.000 113.561 113.561 5934.000 113.561 11_3.561 5935.000 113.561 113.561 5936.000 113.561 113.561 5937.000 113.561 113.561 5938.000 113.561 113.561 5939.000 113.561 113.561 5940.000 113.561 113.561 5941.000 113.561 113.561 5942.000 113.561 113.561 5943.000 113.560 113.560 5944.000 113.560 113.560 5945.000 113.560 113.560 5946.000 113.560 113.560 5947.000 113.560 113.560 5948.000 113.560 113.560 5949.000 113.560 113.560 5950.000 113.560 113.560 5951.000 113.560 113.560 5952.000 113.560 113.560 5953.000 113.560 113.560 5954.000 113.560 113.560 5955.000 113.559 113.559 5956.000 113.559 113.559 5957.000 113.559 113.559 5958.000 113.559 113.559 5959.000 113.559 113.559 5960.000 113.559 113.559 5961.000 113.559 113.559 5962.000 113.559 113.559 5963.000 113.559 113.559 5964.000 113.559 113.559 5965.000 113.559 113.559 5966.000 113.558 113.558 5967.000 113.558 113.558 5968.000 113.558 113.558 5969.000 113.558 113.558 5970.000 113.558 113.558 5971.000 113.558 113.558 5972.000 113.558 113.558 5973.000 113.558 113.558 5974.000 113.558 113.558 5975.000 113.558 113.558 5976.000 113.558 113.558 5977.000 113.558 113.558 5978.000 113.557 113.557 5979.000 113.557 113.557 5980.000 113.557 113.557 5981.000 113.557 113.557 5982.000 113.557 113.557 5983.000 113.557 113.557 5984.000 113.557 113.557 5985.000 113.557 113.557 5986.000 113.557 113.557 5987.000 113.557 113.557 5988.000 113.557 113.557 5989.000 113.556 113.556 5990.000 113.556 113.556 5991.000 113.556 113.556 5992.000 113.556 113.556 5993.000 113.556 113.556 5994.000 113.556 113.556 5995.000 113.556 113.556 5996.000 113.556 113.556 5997.000 113.556 113.556 5998.000 113.556 113.556 5999.000 113.556 113.556 6000.000 113.555 113.555 6001.000 113.555 113.555 6002.000 113.555 113.555 6003.000 113.555 113.555 6004.000 113.555 113.555 6005.000 113.555 113.555 6006.000 113.555 113.555 6007.000 113.555 113.555 6008.000 113.555 113.555 6009.000 113.555 113.555 6010.000 113.555 113.555 6011.000 113.554 113.554 6012.000 113.554 113.554 6013.000 113.554 113.554 6014.000 113.554 113.554 6015.000 113.554 113.554 6016.000 113.554 113.554 6017.000 113.554 113.554 6018.000 113.554 113.554 6019.000 113.554 113.554 6020.000 113.554 113.554 6021.000 113.553 113.553 6022.000 113.553 113.553 6023.000 113.553 113.553 6024.000 113.553 113.553 6025.000 113.553 113.553 6026.000 113.553 113.553 6027.000 113.553 113.553 6028.000 113.553 113.553 6029.000 113.553 113.553 6030.000 113.553 113.553 6031.000 113.552 113.552 6032.000 113.552 113.552 6033.000 113.552 113.552 6034.000 113.552 113.552 6035.000 113.552 113.552 6036.000 113.552 113.552 6037.000 113.552 113.552 6038.000 113.552 113.552 6039.000 113.552 113.552 6040.000 113.552 113.552 6041.000 113.552 113.552 6042.000 113.551 113.551 6043.000 113.551 113.551 6044.000 113.551 113.551 6045.000 113.551 113.551 6046.000 113.551 113.551 6047.000 113.551 113.551 6048.000 113.551 113.551 6049.000 113.551 113.551 6050.000 113.551" 113.551 6051.000 113.551 \\ 113.551 6052.000 113.550 113.550 6053.000 113.550 113.550 6054.000 113.550 113.550 EC 626319 ' .. Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

S)Udy Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 42 11-17-2018 Attachment 1 Page 185 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6055.000 113.550 113.550 6056.000 113.550 113.550 6057.000 113.550 113.550 6058.000 113.550 113.550 6059.000 113.550 113.550 6060.000 113.550 113.550 6061.000 113.549 113.549 6062.000 113.549 113.549 6063.000 113.549 113.549 6064.000 113.549 113.549 6065.000 113.549 113.549 6066.000 113.549 113.549 6067.000 113.549 113.549 6068.000 113.549 113.549 6069.000 113.549 113.549 6070.000 113.549 113.549 6071.000 113.548 113.548 6072.000 113.548 113.548 6073.000 113.548 113.548 6074.000 113.548 113.548 6075.000 113.548 113.548 6076.000 113.548 113.548 6077.000 113.548 113.548 6078.000 113.548 113.548 6079.000 113.548 113.548 6080.000 113.547 113.547 6081.000 113.547 113.547 6082.000 113.547 113.547 6083.000 113.547 113.547 6084.000 113.547 113.547 6085.000 113.547 113.547 6086.000 113.547 113.547 6087.000 113.547 113.547 6088.000 113.547 113.547 6089.000 113.547 113.547 6090.000 113.546 113.546 6091.000 113.546 113.546 6092.000 113.546 113.546 6093.000 113.546 113.546 6094.000 113.546 . 113.546 6095.000 113.546 113.546 6096.000 113.546 113.546 6097.000 113.546 113.546 6098.000 113.546 113.546 6099.000 113.545 113.545 6100.000 113.545 113.545 6101.000 113.545 113.545 6102.000 113.545 113.545 6103.000 113.545 113.545 6104.000 113.545 113.545 6105.000 113.545 113.545 6106.000 113.545 113.545 6107.000 113.545 113.545 6108.000 113.544 113.544 6109.000 113.544 113.544 6110.000 113.544 113.544 6111.000 113.544 113.544 6112.000 113.544 113.544 6113.000 113.544 113.544 6114.000 113.544 113.544 6115.000 113.544 113.544 6116.000 113.544 113.544 6117.000 113.543 113.543 6118.000 113.543 113.543 6119.000 113.543 113.543 6120.000 113.543 113.543 6121.000 113.543 113.543 6122.000 113.543 113.543 6123.000 113.543 113.543 6124.000 113.543 113.543 6125.000 113.542 113.542 6126.000 113.542 113.542 6127.000 113.542 113.542 6128.000 113.542 113.542 6129.000 113.541 113.541 6130.000 113.541 113.541 6131.000 113.540 113.540 6132.000 113.540 113.540 6133.000 113.540 113.540 6134.000 113.539 113.539 6135.000 113.539 113.539 6136.000 113.539 113.539 6137.000 113.538 113.538 6138.000 113.538 113.538 6139.000 113.538 113.538 6140.ooo* 113.537 113.537 6141.000 113.537 113.537 6142.000 113.536 113.536 6143.000 113.536 113.536 6144.000 113.536 113.536 6145.000 113.535 113.535 6146.000 113.535 113.535 6147.000 113.535 113.535 6148.000 113.534 113.534 6149.000 113.534 113.534 6150.000 113.533 113.533 6151.000 113.533 113.533 6152.000 113.533 113.533 6153.000 113.532 113.532 6154.000 113.532 113.532 6155.000 113.532 113.532 6156.000 113.,531 113.531 6157.000 113.531 113.531 6158.000 113.530 113.530 6159.000 113.530 113.530 6160.000 113.53Q 113.530 . 6161.000 113.529 113.529 6162.000 113.529 113.529 6163.000 113.529 113.529 6164.000 113.528 113.528 6165.000 113.528 113.528 6166.000 113.527 113.527 6167.000 113.527 113.527 6168.000 113.527 113.527 6169.000 113.526 113.526 6170.000 113.526 113.526 6171.000 113.526 113.526 6172.000 113.525 113.525 6173.000 113.525 113.525 6174.000 113.524 113.524 6175.000 113.524 113.524 6176.000 113.524 113.524 6177.000 113.523 113.523 6178.000 113.523 113.523 6179.000 113.523 113.523 6180.000 113.522 113.522 6181.000 113.522 113.522 6182.000 113.521 113.521 6183.000 113.521 113.521 6184.000 113.521 113.521 6185.000 113.520 113.520 6186.000 113.520 113.520 6187.000 113.520 113.520 6188.000 113.519 113.519 6189.000 113.519 113.519 6190.000 113.518 113.518 6191.000 113.518 113.518 6192.000 113.518 113.518 6193.000 113.517 113.517 6194.000 113.517 113.517 6195.000 113.516 113.516 6196.000 113.516 113.516 6197.000 113.516 113.516 6198.000 113.515 113.515 6199.000 113.515 113.515 6200.000 113.515 113.515 6201.000 113.514 113.514 6202.000 113.514 113.514 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Sn1dy Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 43 11-17-2018 Attachment 1 Page 186 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6203.000 113.513 113.513 6204.000 113.513 113.513 6205.000 113.513 113.513 6206.000 113.512 113.512 6207.000 113.512 113.512 6208.000 113.511 113.511 6209.000 113.511 113.511 6210.000 113.511 113.511 6211.000 113.510 113.510 6212.000 113.510 113.510 6213.000 113.509 113.509 6214.000 113.509 113.509 6215.000 113.509 113.509 6216.000 113.508 113.508 6217.000 113.508 113.508 6218.000 113.508 113.508 6219.000 113.507 113.507 6220.000 113.507 113.507 6221.000 113.506 113.506 6222.000 113.506 113.506 6223.000 113.506 113.506 6224.000 113.505 113.505 6225.000 113:505 113.505 6226.000 113.504 113.504 6227.000 113.504 113.504 6228.000 113.504 113.504 6229.000

  • 113.503 113.503 6230.000 113.503 113.503 6231.000 113.502 113.502 6232.000 113.502 113.502 6233.000 113.502 113.502 6234.000 113.501 113.501 6235.000 113.501 113.501 6236.000 113.500 113.500 6237.000 113.500 113.500 6238.000 113.500 113.500 6239.000 113.499 113.499 6240.000 113.499 113.499 6241.000 113.498 113.498 6242.000 113.498 113.498 6243.000 113.498 113.498 6244.000 113.497 113.497 6245.000 113.497 113.497 6246.000 113.496 113.496 6247.000 113.496 113.496 6248.000 113.496 113.496 6249.000 113.495 113.495 6250.000 113.495 113.495 6251.000 113.494 113.494 6252.000 113.494 113.494 6253.000 113.494 113.494 6254.000 113.493 113.493 6255.000 113.493 113.493 6256.000 113.492 113.492 6257.000 113.492 113.492 6258.000 113.492 113.492 6259.000 113.491 113.491 6260.000 113.491 113.491 6261.000 113.490 113.490 6262.000 113.490 113.490 6263.000 113.490 113.490 6264.000 113.489 113.489 6265.000 113.489 113.489 6266.000 113.488 113.'488 6267.000 113.488 113.488 6268.000 113.488 113.488 6269.000 113.487 113.487 6270.000 113.487 113.487 6271.000 113.486 113.486 6272.000 113.486 113.486 6273.000 113.485 113.485 6274.000 113.485 113.485 6275.000 113.485 113.485 6276.000 113.484 113.484 6277.060 113.484 113.484 6278.000 113.483 113.483 6279.000 113.483 113.483 6280.000 113.483 113.483 6281.000 113.482 113.482 6282.000 113.482 113.482 6283.000 113.481 113.481 6284.000 113.481 113.481 6285.000 113.481 113.481 6286.000 113.480 113.480 6287.000 113.480 113.480 6288.000 113.479 113.479 6289.000 113.479 113.479 6290.000 113.478 113.478 6291.000 113.478 113.478 6292.000 113.478 113.478 6293.000 113.477 113.477 6294.000 113.477 113.477 6295.000 113.476 113.476 6296.000 113.476 113.476 6297.000 113.476 113.476 6298.000 113.475 113.475 6299.000 113.475 113.475 6300.000 113.474 113.474 6301.000 113.474 113.474 6302.000 113.473 113.473 6303.000 113.473 113.473 6304.000 113.473 113.473 6305.000 113.472 113.472 6306.000 113.472 113.472 6307.000 113.471 113.471 6308.000 113.471 113.471 6309.000 113.471 113.471 6310.000 113.470 113.470 6311.000 113.470 113.470 6312.000 113.469 113.469 6313.000 113.469 113.469 6314.000 113.468 113.468 6315.000 113.468 113.468 631~.ooo 113.468 113.468 6317.000 113.467 113.467 6318.000 113.467 113.467 6319.000 113.466 113.466 6320.000 113.466 113.466 6321.000 113.465 113.465 6322.000 113.465 113.465 6323.000 \ 13.465 113.465 6324.000 113.464 113.464 6325.000 113.464 113.464 6326.000 113.463 113.463 6327.000 113.463 113.463 6328.000 113.462 113.462 6329.000 113.462 113.462 6330.000 113.462 113.462 6331.000 113.461 113.461 6332.000 113.461 113.461 6333.000 113.460 113.460 6334.000 113.460 113.460 6335.000 113.459 113.459 6336.000 113.459 113.459 6337.000 113.459 113.459 6338.000 113.458 113.458 6339.000 113.458 113.458 6340.000 113,457 113.457 6341.000 113.457 113.457 6342.000 113.456 113.456 6343.000 113.456 113.456 6344.000 113.455 113.455 6345.000 113.455 113.455 6346.000 113.455 113.455 6347.000 113.454 113.454 6348.000 113.454 113.454 6349.000 113.453 113.453 6350.000 113.453 113.453 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 44 11-17-2018 Attachment 1 Page 187 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V)

Time Y-Y+ Time Y-Y+ Time v-Y+ Time y. Y+ 6351.000 113.452 113.452 6352.000 113.452 113.452 6353.000 113.452 113.452 6354.000 113.451 113.451 6355.000 113.451 113.451 6356.000 113.450 113.450 6357.000 113.450 113.450 6358.000 113.449 113.449 6359.000 113.449 113.449 6360.000 113.448 113.448 6361.000 113.448 113.448 6362.000 113.448 113.448 6363.000 113.447 113.447 6364.000 113.447 113.447 6365.000 113.446 113.446 6366.000 113.446 113.446 6367.000 113.445 113.445 6368.000 113.445 113.445 6369.000 113.444 113.444 6370.000 113.444 113.444 6371.000 113.444 113.444 6372.000 113.443 113.443 6373.000 113.443 113.443 6374.000 113.442 113.442 6375.000 113.442 113.442 6376.000 113.441 113.441 6377.000 113.441 113.441 6378.000 113.440

  • 113.440 6379.000 113.440 113.440 6380.000 113.440 113.440 6381.000 113.439 113.439 6382.000 113.439 113.439 6383.000 113.438 113.438 6384.000 113.438 113.438 6385.000 113.437 113.437 6386.000 113.437 113.437 6387.000 113.436 113.436 6388.000 113.436 113.436 6389.000 113.435 113.435 6390.000 113.435 113.435 6391.000 113.435 113.435 6392.000 113.434 113.434
  • 6393.000 113.434 113.434 6394.000 113.433 113.433 6395.000 113.433 U.3.433 6396.000 113.432 113.432 6397.000 113.432 113.432 6398.000 113.431 113.431 6399.000 113.431 113.431 6400.000 113.430 113.430 6401.000 113.430 113.430 6402.000 113.430 113.430 6403.000 113.429 113.429 6404.000 113.429 113.429 6405.000 113.428 113.428 6406.000 113.428 113.428 6407.000 113.427 113.427 6408.000 113.427 113.427 6409.000 113.426 113.426 6410.000 113.426 113.426 6411.000 113.425 113.425 6412.000 113.425 113.425 6413.000 113.424 113.424 6414.000 113.424 113.424 6415.000 113.424 113.424 6416.000 113.423 113.423 6417.000 1.13.423 113.423 6418.000 113.422 113.422 6419.000 113.422 113.422 6420.000 113.421 113.421 6421.000 113.421 113.421 6422.000 113.420 113.420 6423.000 113.420 113.420 6424.000 113.419 113.419 6425.000 113.419 113.419 6426.000 11f418 113.418 6427.000 113.418 113.418 6428.000 113.418 113.418 6429.000 113.417 113.417 6430.000 113.417 113.417 6431.000 113.416 113.416 6432.000 113.416 113.416 6433.000 113.415 113.415 6434.000 113.415 113.415 6435.000 113.414 113.414 6436.000 113.414 113.414 6437.000 113.413 113.413 6438.000 113.413 113.413 6439.000 113.412 113.412 6440.000 113.412 113.412 6441.000 113.411 113.411 6442.000 113.411 113.411 6443.000 113.410 113.410 6444.000 113.410 113.410 6445.000 113.409 113.409 6446.000 113.409 113.409 6447.000 113.409 113.409 6448.000 113.408 113.408 6449.000 113.408 113.408 6450.000 113.407 113.407 6451.000 113.407 113.407 6452.000 113.406 113.406 6453.000 113.406 113.406 6454.000 113.405 113.405 6455.000 113.405 113.405 6456.000 113.404 113.404 '6457.000 113.404 113.404 6458.000 113.403 113.403 6459.000 113.403 113.403 6460.000 113.402 113.402 6461.000 113.402 113.402 6462.000 113.401 113.401 6463.000 113.401 113.401 6464.000 113.400 113.400 6465.000 113.400 113.400 6466.000 113.399 113.399 6467.000 113.399 113.399 6468.000 113.398 113.398 6469.000 113.398 113.398 6470.000 113.397 113.397 6471.000 113.397 113.397 6472.000 113.396 113.396 6473.000 113.396 113.396 6474.000 113.395 113.395 6475.000 113.395 113.395 6476.000 113.394 113.394 6477.000 113.394 113.394 6478.000 113.394 113.394 6479.000 113.393 113.393 6480.000 113.393 113.393 6481.000 113.392 113.392 6482.000 113.392 113.392 6483.000 113.391 113.391 6484.000 113.391 113.391 6485.000 113.390 113.390 6486.000 113.390 113.390 6487.000 113.389 113.389 6488.000 113.389 113.389 6489.000 113.388 113.388 6490.000 113.388 113.388 6491.000 113.387 113.387 6492.000 113.387 113.387 6493.000 113.386 113.386 6494.000 113.386 113.386 6495.000 113.385 113.385 6496.000 113.385 113.385 6497.000 113.385 113.385 6498.000 113.384 113.384 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48:Hour Coping Study BATT IA BUS 45 11-17-2018 Attachment 1 Page 188 of 274 KC!CONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6499.000 113.384 113.384 6500.000 113.383 113.383 6501.000 113.383 113.383 6502.000 113.382 113.382 6503.000 113.382 113.382 6504.000 113.381 113.381 6505.000 113.381 113.381 6506.000 113.381 113.381 6507.000 113.380 113.380 6508.000 113.380 113.380 6509.000 113.379 113.379 6510.000 113.379 113.379 6511.000 113.378 113.378 6512.000 113.378 113.378 6513.000 113.378 113.378 6514.000 113.377 113.377 6515.000 113.377 113.377 6516.000 113.376 113.376 6517.000 113.376 113.376 6518.000 113.375 113.375 6519.000 113.375 113.375 6520.000 113.374 113.374 6521.000 113.374 113.374 6522.000 113.374 113.374 6523.000 113.373 113.373 6524.000 113.373 113.373 6525.000 113.372 113.372 6526.000 113.372 113.372 6527.000 113.371 113.371 6528.000 113.371 113.371 6529.000 113.370 113.370 6530.000 113.370 113.370 6531.000 113.369 113.369 6532.000 113.369 113.369 6533.000 113.369 113.369 6534.000 113.368 113.368 6535.000 113.368 113.368 6536.000 113.367 113.367 6537.000 113.367 113.367 6538.000 113.366 113.366 6539.000 113.366 113.366 6540.000 113.365 113.365 6541:000 113.365 113.365 6542.000 113.364 113.364 6543.000 113.364 113.364 6544.000 113)64 113.364 6545.000 113.363 113.363 6546.000 113.363 113.363 6547.000 113.362 113.362 6548.000 113.362 113.362 6549.000 113.361 113.361 6550.000 113.361 113.361 6551.000 113.360 113.360 6552.000 113.360 113.360 6553.000 113.359 113.359 6554.000 113.359 113.359 6555.000 113.358 113.358 6556.000 113.358 113.358 6557.000 113.357 113.357 6558.000 113.357 113.357 6559.000 113.357 113.357 6560.000 113.356 113.356 6561.000 113.356 113.356 6562.000 113.355 113.355 6563.000 113.355 113.355 6564.000 113.354 113.354 6565.000 113.354 113.354 6566.000 113.353 113.353 6567.000 113.353 113.353 6568.000 113.352 113.352 6569.000 113.352 113.352

  • 6570.000 113.351 113.351 6571.000 113.351 113.351 6572.000 113.350 113.350 6573.000 113.350 113.350 6574.000 113.349 113.349 6575.000 113.349 113.349 6576.000 113.348 113.348 6577.000 113.348 113.348 6578.000 113.347 113.347 6579.000 113.347 113.347 6580.000 113.346 113.346 6581.000 113.346 113.346 658i.ooo 113.345 113.345 6583.000 113.345 113.345 6584.000 113.345 113.345 6585.000 113.344 113.344 6586.000 113.344 113.344 6587.000 113.343 113.343 6588.000 113.343 113.343 6589.000 113.342 113.342 6590.000 113.342 113.342 6591.000 113.341 113.341 6592.000 113.341 113.341 6593.000 113.340 113.340 6594.000 113.340 113.340 6595.000 113.339 113.339 6596.000 113.339 113.339 6597.000 113.338 113.338 6598.000 113.338 113.338 6599.000 113.337 113.337 6600.000 113.337 113.337 6601.000 113.336 113.336 6602.000 113.336 113.336 6603.000 113.335 113.335 6604.000 113.335 113.335 6605.000 113.334 113.334 6606.000 113.334 113.334 6607.000 113.333 113.333 ,6608.000 113.333 113.333 6609.000 113.332 113.332 6610.000 113.332 113.332 \ 6611.000 113.331 113.331 6612.000 113.330 113.330 6613.000 113.330 113.330 6614.000 113.329 113.329 6615.000 113.329 113.329 6616.000 113.328 113.328 6617.000 113.328 113.328 6618.000 113.327 113.327 6619.000 113.327 113.327 6620.000 113.326 113.326 6621.000 113.326 113.326 6622.000 113.325 113.325 6623.000* 113.325 113.325 6624.000 113.324 113.324 6625.000 113.324 113.324 6626.000 113.323 113.323 6627.000 113.323 113.323 6628.000 113.322 113.322 6629.000 113.322 113.322 6630.000 113.321 113.321 6631.000 113.321 113.321 6632.000 113.320 113.320 6633.000 113.320 113.320 6634.000 113.319 113.319 6635.000 113.319 113.319 6636.000 113.318 113.318 6637.000 113.317 113.317 6638.000 113.317 113.317 6639.000 113.316 113.316 6640.000 113.316 113.316 6641.000 113.315 113.315 6642.000 113.315 113.315 6643.000 113.314 113.314 6644.000 113.314 113.314 6645.000 113.313 113.313 6646.000 113.313 113.313 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATT IA BUS 46 11-17-2018 Attachment 1 Page 189 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6647.000 113.312 113.312 6648.000 113.312 113.312 6649.000 113.311 113.311 6650.000 113.310 113.310 6651.000 113.310 113.310 6652.000 113.309 113.309 6653.000 113.309 113.309 6654.000 113.308 113.308 6655.000 113.308 113.308 6656.000 113.307 113.307 6657.000 113.307 113.307 6658.000 113.306 113.306 6659.000 113.306 113.306 6660.000 113.305 113.305 6661.000 113.304 113.304 6662.000 113.304 113.304 6663.000 113.303 113.303 6664.000 113.303 113.303 6665.000 113.302 113.302 6666.000 113.302 113.302 6667.000 113.301 113.301 6668.000 113.301 113.301 6669.000 113.300 113.300 6670.000 113.299 113.299 6671.000 113.299 113.299 6672.000 113.298 113.298 6673.000 113.298 113.298 6674.000 113.297 113.297 6675.000 113.297 113.297 6676.000 113.296 113.296 6677.000 113.296 113.296 6678.000 113.295 113.295 6679.000 113.294 113.294 6680.000 113.294 113.294 6681.000 113.293 113.293 6682.000 113.293 113.293 6683.000 113.292 113.292 6684.000 113.292 113.292 6685.000 113.291 113.291 6686.000 113.290 113.290 6687.000 113.290 113.290 6688.000 113.289 113.289 6689.000 113.289 113.289 6690.000 113.288 113.288 6691.000 113.288 113.288 6692.000 113.287 113.287 6693.000 113.286 113.286 6694.000 113.286 113.286 6695.000 113.285 113.285 6696.000 113.285 113.285 6697.000 113.284 113.284 6698.000 113.283 113.283 6699.000 113.283 113.283 6700.000 113.282 113.282 6701.000 113.281 113.281 6702.000 113.280 113.280 6703.000 113.280 113.280 6704.000 113.279 113.279 6705.000 113.278 113.278 6706.000 113.278 113.278 6707.000 113.277 113.277 6708.000 113.276 113.276 6709.000 113.275 113.275 6710.000 113.275 113.275 6711.000 113.274 113.274 6712.000 113.273 113.273 6713.000 113.273 113.273 6714.000 113.272 113.272 6715.000 113.271 113.271 6716.000 113.271 113.271 6717.000 113.270 113.270 6718.000 113.269 113.269 6719.000 113.268 113.268 6720.000 113.268 113.268 6721.000 113.267 113.267 6722.000 113.266 113.266 6723.000 113.266 113.266 6724.000 113.265 113.265 6725.000 113.264 113.264 6726.000 113.263 113.263 6727.000 113.263 113.263 6728.000 113.262 113.262 6729.000 113.261 113.261 6730.000 113.261 113.261 6731.000 113.260 113.260 6732.000 113.259 113.259 6733.000 113.258 113.258 6734.000 113.258 113.258 6735.000 113.257 113.257 6736.000 113.256 113.256 6737.000 113.256 113.256 6738.000 113.255 113.255 6739.000 113.254 113.254 6740.000 113.254 113.254 6741.000 113.253 113.253 6742.000 113.252 113.252 6743.000 113.251 113.251 6744.000 113.251 113.251 6745.000 113.250 113.250 6746.000 . 113.249 113.249 6747.000 113.249 113.249 6748.000 113.248 113.248 6749.000 113.247 113.247 6750.000 113.246 113.246 6751.000 113.246 113.246 6752.000 113.245 113.245 6753.000 113.244 113.244 6754.000 113.243 113.243 6755.000 113.243 113.243 6756.000 113.242 113.242 6757.000 113.241 113.241 6758.000 113.241 113.241 6759.000 113.240 113.240 6760.000 113.239 113.239 6761.000 113.238 113.238 67.62.000 113.238 113.238 6763.000 113.237 113.237 6764.000 113.236 113.236 6765.000 113.236 113.236 6766.000 113.235 113.235 6767.000 113.234 113.234 6768.000 113.233 113.233 6769.000 113.233 113.233 6770.000 113.232 113.232 6771.000 113.231 113.231 6772.000 113.231 113.231 6773.000 113.230 113.230 6774.000 113.229 113.229 6775.000 113.228 113.228 6776.000 113.228 113.228 6777.000 113.227 113.227 6778.000 113.226 113.226 6779.000 113.226 113.226 6780.000 113.225 113.225 6781.000 113.224 113.224 6782.000 113.223 113.223 6783.000 113.223 113.223 6784.000 113.222 113.222 6785.000 113.221 113.221 6786.000 113.220 113.220 6787.000 113.220 113.220 6788.000 113.219 113.219 6789.000 113.218 113.218 6790.000 113.218 113.218 6791.000 113.217 113.217 6792.000 113.216 113.216 6793.000 113.215 113.215 6794.000 113.215 113.215 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 190 of 274 ~-for greater than 24 Hrs Project: Clinton Flex Study ETAP Page: 47 Location:

KC! 14.1.0N Date: 11~17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Revision:

Base Study Case: BSIA-48 Filename:

CPS SBO Study Config.: Normal DIV I Battery IA48-HourCopingStudy BATT IA BUS Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time v-V+ Time V-V+ Time V-V+ 6795.000 113.214 113.214 6796.000 113.213 113.213 6797.000 113.212 113.212 6798.000 113.212 113.212 6799.000 113.211 113.211 6800.000 113.210 113.210 6801.000 113.210 113.210 6802.000 113.209 113.209 6803.000 113.208 113.208 6804.000 113.207 113.207 6805.000 113.207 113.207 6806.000 113.206 113.206 6807.000 113.205 113.205 6808.000 113.204 113.204 6809.000 113.204 113.204 6810.000 113.203 113.203 6811.000 113.202 113.202 6812.000 113.202 113.202 6813.000 113.201 113.201 6814.000 113.200 113.200 6815.000 113.199 113.199 6816.000 113.199 113.199 6817.000 113.198 113.198 6818.000 113.197 113.197 6819.000 113.196 113.196 6820.000 113.196 113.196

~821.000 113.195 113.195 6822.000 113.194 113.194 6823.000 113.193 113.193 6824.000 113.193 113.193 6825.000 113.192 113.192 6826.000 113.191 113.191 6827.000 113.191 113.191 6828.000 113.190 113.190 6829.000 113.189 113.189 6830.000 113.188 113.188 6831.000 113.188 113.188 6832.000 113.187 113.187 6833.000 113.186 113.186 6834.000 113.185 113.185 6835.000 113.185 113.185 6836.000 113.184 113.184

  • 6837.000 113.183 113.183 6838.000 113.182 113.182 6839.000 113.182 113.182 6840.000 113.181 113.181 6841.000 113.180 113.180 6842.000 113.179 113.179 6843.000 113.179 113.179 6844.000 113.178 113.178 6845.000 113.177 113.177 6846.000 113.176 113.176 6847.000 113.176 113.176 6848.000 113.175 113.175 6849.000 113.174 113.174 6850.000 113.174 113.174 6851.000 113.173 113.173 6852.000 113.172 113.172 6853.000 113.171 113.171 6854.000 113.171 113.171 6855.000 113.170 113.170 6856.000 113.169 113.169 6857.000 113.168 113.168 6858.000 113.168 113.168 6859.000 113.167 113.167 6860.000 113.166 113.166 6861.000 113.165 113.165 6862.000 113.165 113.165 6863.000 113.164 113.164 6864.000 113.163 113.163 6865.000 113.162 113.162 6866.000 113.162 113.162 6867.000 113.161 113.161 6868.000 113.160 113.160 6869.000 113.159 113.159 6870.00.0 113.159 113.159 6871.000 113.158 113.158 6872.000 113.157 113.157 6873.000 113.156 113.156 6874.000 113.156 113.156 6875.000 113.155 113.155 6876.000 113.154 113.154 6877.000 113.153 113.153 6878.000 113.153 113.153 6879.000 113.152 113.152 6880.000 113.151 113.151 6881.000 113.150 113.150 6882.000 113.150 113.150 6883.000 113.149 113.149 6884.000 113.148 113.148 6885.000 113.147 113.147 6886.000 113.147 113.147 6887.000 113.146 113.146 6888.000 113.145 113.145 6889.000 113.144 113.144 6890.000 113.144 113.144 6891.000 113.143 113.143 6892.000 113.142 113.142 6893.000 113.141 113.141 6894.000 113.141 113.141 6895.000 113.140 113.140 6896.000 113.139 113.139 6897.000 113.138 113.138 6898.000 113.138 113.138 6899.000 113.137 113.137 6900.000 113.136 113.136 6901.000 113.135 113.135 6902.000 113.135 113.135 6903.000 113.134 113.134 6904.000 113.133 113.133 6905.000 113.132 113.132 6906.000 113.132 113.132 6907.000 113.131 113.131 6908.000 113.130 113.130 6909.000 113.129 113.129 6910.000 113.129 113.129 6911.000 113.128 113.128 6912.000 113.127 113.127 6913.000 113.126 113.126 6914.000 . 113.126 113.126 6915.000 113.125 113.125 6916.000 113.124 113.124 6917.000 113.123 113.123 6918.000 113.122 11tl.122 6919.000 113.122 113.122 6920.000 113.121 113.121 6921.000 113.120 113.120 6922.000 113.119 113.119 6923.000 113.119 113.119 6924.000 113.118 113.118 6925.000 113.117 113.117 6926.000 113.116 113.116 6927.000 113.116 113.116 6928.000 113.115 113.115 6929.000 113.114 113.114 6930.000 113.113 113.113 6931.000 113.113 113.113 6932.000 113.112 113.112 6933.000 113.111 113.111 6934.000 113.110 113.110 6935.000 113.110 113.110 . 6936.000 113.109 113.109 6937.000 113.108 113.108 6938.000 113.107 113.107 6939.000 113.106 113.106 6940.000 113.106 113.106 6941.000 113.105 113.105 6942.000 113.104 113.104 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BS!A-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study BATT IA BUS 48 11-17-2018 Attachment 1 Page 191 of274 KCICONSULT Base Normal Voltage(V)

Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6943.000 113.100 113.100 6944.000 113.100 113.100 6945.000 113.100 113.100 6946.000 113.100 113.100 6947.000 113.100 113.100 6948.000 113.100 113.100 6949.000 113.100 113.100 6950.000 113.100 113.100 6951.000 113.100 113.100 6952.000 113.096 113.096 6953.000 113.096 113.096 6954.000 113.095 113.095 6955.000 113.094 113.094 6956.000 113.093 113.093 6957.000 113.093 113.093 6958.000 113.092 11~.092 6959.000 113.091 113.091 6960.000 113.090 113.090 6961.000 113.090 113.090 6962.000 113.089 113.089 6963.000 113.088 113.088 6964.000 113.087 113.087 6965.000 113.086 113.086 6966.000 113.086 113.086 6967.000 113.085 113.085 6968.000 113.084 113.084 6969.000 113.083 113.083 6970.000 113.083 113.083 6971.000 113.082 113.082 6972.000 113.081 113.081 6973.000 113.080 113.080 6974.000 113.079 113.079 6975.000 113.079 113.079 6976.000 113.078 113.078 6977.000 113.077 113.077 6978.000 113.076 113.076 6979.000 113.076 113.076 6980.000 113.075 113.075 6981.000 113.074 113.074 6982.000 113.073 113.073 6983.000 113.072 113.072 6984.000 113.072 113.072 6985.000 113.071 113.071 6986.000 113.070 113.070 6987.000 113.069 113.069 6988.000 113.069 113.069 6989.000 113.068 113.068 6990.000 113.067 113.067 6991.000 113.066 113.066 6992.000 113.065 113.065 6993.000 113.065 113.065 6994.000 113.064 113.064 6995.000 113.063 113.063 6996.000 113.062 113.062 6997.000 113.062 113.062 6998.000 113.061 113.061 6999.000 113.060 113.060 7000.000 113.059 113.059 7001.000 113.058 113.058 7002.000 113.058 113.058 7003.000 113.057 113.057 7004.000 113.056 113.056 7005.000 113.055 113.055 7006.000 113.055 113.055 7007.000 113.054

  • 113.054 7008.000 113.053 . 113.053 7009.000 113.052 113.052 7010.000 113.051 113.051 7011.000 113.051 113.051 7012.000 113.050 113.050 7013.000 113.049 113,049 7014.000 113.048 113.048 7015.000 113.047 113.047 7016.000 -113.047 113.047 7017.000 113.046 113,046 7018.000 113.045 113.045 7019.000 113.044 113.044 7020.000 113.044 113.044 7021.000 113.043 113,043 . 7022.000 113.042 113.042 7023.000 113.041 113.041 7024.000 113.040 113.040 7025.000 113.040 113.040 7026.000 113.039 113.039 7027.000 113.038 113.038 7028.000 113.037 113.037 7029.000 113.036 113.036 7030.000 113.036 113.036 7031.000 113.035 113.035 7032.000 113.034 113.034 7033.000 113.033 113.033 7034.000 113.032 113.032 7035.000 113.032 113.032 7036.000 113.031 113.031 7037.000 113.030 113.030 7038.000 113.029 113.029 7039.000 113.028 113.028 7040.000 113.028 113.028 7041.000 113.027 113.027 7042.000 113.026 113.026 7043.000 113.025 113.025 7044.000 113.024 113.024 7045.000 113.024 113.024 7046.000 113.023 113.023 7047.000 113.022 113.022 7048.000 113.021 113.021 7049.000 113.021 113.021 7050.000 113.020 113.020 7051.000 113.019 113.019 7052.000 113.018 113.018 7053.000 113.017 113.017 7054.000 113.017 113.017 7055.000 113.016 113.016 7056.000 113.015 113.015 7057.000 113.014 113.014 7058.000 113.013 113.013 7059.000 113.013
  • 113.013 7060.000 113.012 113.012 7061.000 113.011 113.011 7062.000 113.010 113.010 7063.000 113.009 113.009 7064.000 113.009 113.009 7065.000 113.008 113.008 7066.000 ,113.007 113.007 7067.000 113.006 113.006 7068.000 113.005 113.005 7069.000 113.005 113.005 7070.000 113.004 113.004 7071.000 113.003 113.003 7072.000 113.002 113.002 7073.000 113.001 113.001 7074.000 113.000 113.000 7075.000 113.000 113.000 7076.000 112.999 112.999 7077.000 112.998 112.998 7078.000 112.997 112.997 7079.000 112.996 112.996 7080.000 112.996 112.996 7081.000 112.995 112.995 7082.000 112.994 112.994 7083.000 112.993 112.993 7084.000 112.992 112.992 7085.000 112.992 112.992 7086.000 112.991 112.991 7087.000 112.990 112.990 7088.000 112.989 112.989 7089.000 112.988 112.988 7090.000 112.988 112.988 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 49 11-17-2018 Attachment 1 Page 192 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7091.000 112.987 112.987 7092.000 112.986 112.986 7093.000 112.985 112.985 7094.000 112.984 112.984 7095.000 112.984 112.984 7096.000 112.983 112.983 7097.000 112.982 112.982 7098.000 112.981 112.981 7099.000 112.980 112.980 7100.000 112.979 112.979 7101.000 112.979 112.979 7102.000 112.978 112.978 7103.000 112.977 112.977 7104.000 112.976 112.976 7105.000 112.975 112.975 7106.000 112.975 112.975 7107.000 112.974 112.974 7108.000 112.973 112.973 7109.000 112.972 112.972 7110.000 112.971 112.971 7111.000 112.970 112.970 7112.000 112.970 112.970 7113.000 112.969 112.969 7114.000 112.968 112.968 7115.000 112.967 112.967 7116.000 112.966 112.966 7117.000 112.966 112.966 7118.000 112.965 112.965 7119.000 112.964 112.964 7120.000 112.963 112.963 7121.000 112.962 112.962 7122.000 112.961 112.961 7123.000 112.961 112.961 7124.000 112.960 112.960 7125.000 112.959 112.959 7126.000 112.958 112.958 7127.000 112.957 112.957 7128.000 112.957 112.957 7129.000 112.956 112.956 7130.000 !12.955 112.955 7131.000 112.954 112.954 7132.000 112.953 112.953 7133.000 112.952 112.952 7134.000 112.952 112.952 7135.000 112.951 112.951 7136.000 112.950 112.950 7137.000 112.949 112.949 7138.000 112.948 112.948 7139.000, 112.948 112.948 7140.000 112.947 112.947 7141.000 112.946 112.946 7142.000 112.945 112.945 7143.000 112.944 112.944 7144.000 112.943 112.943 7145.000 112.943 112.943 7146.000 112.942 112.942 7147.000 112.941 112.941 7148.000 112.940 112.940 7149.000 112.939 112.939 7150.000 112.938 112.938 7151.000 112.938 112.938 7152.000 112.937 112.937 7153.000 112.936 112.936 7154.000 112.935 112.935 7155.000 112.934 112.934 7156.000 112.933 112.933 7157.000 112.933 112.933 7158.000 112.932 112.932 7159.000 112.931 112.931 7160.000 112.930 112.930 7161.000 112.929 112.929 7162.000 112.928 112.928 7163.000 112.928 112.928 7164.000 112.927 112.927 7165.000 112.926 112.926 7166.000 112.925 112.925 7167.000 112.924 112.924 7168.000 112.923 112.923 7169.000 112.923 112.923 7170.000 112.922 112.922 7171.000 112.921 112.921 7172.000 112.920 112.920 7173.000 112.919 112.919 7174.000 112.918 112.918 7175.000 112.918 112.918 7176.000 112.917 112.917 7177.000 112.916 112.916 7178.000 112.915 112.915 7179.000 112.914 112.914 7180.000 112.913 112.913 7181.000 112.913 112.913 7182.000 112.912 112.912 7183.000 112.911 112.911 7184.000 112.910 112.910 7185.000 112.909 112.909 7186.000 112.908 112;908 7187.000 112.908 112.908 7188.000 112.907 112.907 7189.000 112.906 112.906 7190.000 112.905 112.905 7191.000 112.904 112.904 7192.000 112.903 112.903 7193.000 112.903 112.903 1194.000 112.902 112.902 7195.000 112.901 112.901 7196.000 112.900 112.900 7197.000 112.899 112.899 7198.000 112.898 112.898 7199.000 112.897 112.897 7200.000 112.897 112.897 7201.000 112.896 112.896 7202.000 112.895 112.895 7203.000 112.894 112.894 7204.000 112.893 112.893 7205.000 112.892 112.892 7206.000 112.892 112.892 7207.000 112.891 112.891 7208.000 112.890 112.890 7209.000 112.889 112.889 7210.000 112.888 112.888 7211.000 112.887 112.887 7212.000 112.886 112.886 7213.000 112.886 112.886 7214.000 112.885 112.885 ' 7215.000 112.884 112.884 7216.000 112.883 112.883 7217.000 112.882 112.882 7218.000 112.881 112.881 7219.000 112.881 112.881 7220.000 112.880 112.880 7221.000 112.879 112.879 7222.000 112.878 112.878 7223.000 112.877 112.877 7224.000 112.876 112.876 7225.000 112.875 112.875 7226.000 112.875 112.875 7227.000 112.874 112.874 7228.000 112.873 112.873 7229.000 112.872 112.872 7230.000 112.871 112.871 7231.000 112.870 112.870 7232.000 112.869 112.869 7233.000 112.869 112.869 7234.000 112.868 112.868 7235.000 112.867 112.867 7236.000 112.866 112.866 7237.000 112.865 112.865 7238.000 112.864 112.864 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS so 11-17-2018 Attachment 1 Page 193 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7239.000 112.863 112.863 7240.000 112.863 112.863 7241.000 112.862 112.862 7242.000 112.861 112.861 7243.000 112.860 112.860 7244.000 112.859 112.859 7245.000 112.858 112.858 7246.000 112.857 112.857 7247.000 112.857 112.857 7248.000 112.856 112.856 7249.000 112.855 112.855 7250.000 112.854 112.854 7251.000 112.853 112.853 7252.000 112.852 112.852 7253.000 112.851 112.851 7254.000 112.851 112.851 7255.000 112.850 112.850 7256.000 112.849 112.849 7257.000 112.848 112.848 7258.000 112.847 112.847 7259.000 112.846 112.846 7260.000 112.845 112.845 7261.000 112.845 112.845 7262.000 112.844 112.844 7263.000 112.843 112.843 7264.000 112.842 112.842 7265.000 112.841 112.841 7266.000 112.840 112.840 7267.000 112.839 112.839 7268.000 112.838 112.838 7269.000 112.838 112.838 7270.000 112.837 112.837 7271.000 112.836 112.836 7272.000 112.835 112.835 7273.000 112.834 112.834 7274.000 112.833 112.833 7275.000 !12.832 112.832 7276.000 112.832 112.832 7277.000 112.831 112.831 7278.000 112.830 !12.830 7279.000 112.829 112.829 7280.000 112.828 112.828 7281.000 112.827 112.827 7282.000 112.826 112.826 7283.000 112.825 112.825 7284.000 112.825 112.825 7285.000 112.824 112.824 7286.000 112.823 112.823 7287.000 112.822 112.822 7288.000 112.821 112:821 7289.000 112.820 112.820 7290.000 112.819 112.819 7291.000 !12.818 !12.818 7292.000 !12.817 112.817 7293.000 112.816 112.816 7294.000 112.816 112.816 7295.000 !12.815 112.815 7296.000 112.814 112.814 7297.000 112.813 112.813 7298.000 112.812 112.812 7299.000 !12.811 !12.8!1 7300.000 112.810 112.810 7301.000 112.809 112.809 7302.000 112.808 . 112.808 7303.000 !12.807 112.807 7304.000 112.807 112.807 7305.000 112.806 112.806 7306.000 112.805 112.805 7307.000 !12.804 112.804 7308.000 112.803 112.803 7309.000 112.802 112.802 7310.000 112.801 112.801 7311.000 !12.800 !12.800 7312.000 112.799 112.799 7313.000 112.798 112.798 7314.000 112.797 !12.797 7315.000 !12.797 !12.797 7316.000 112.796 112.796 7317.000 112.795 112.795 7318.000 112.794 !12.794 7319.000 112.793 112.793 7320.000 112.792 !12.792 7321.000 112.791 112.791 7322.000 112.790 112.790 7323.000 !12.789 !12.789 7324.000 112.788 112.788 7325.000 112.787 !12.787 7326.000 !12.786 112.786 7327.000 112.786 !12.786 7328.000 !12.785 112.785 7329.000 112.784 112.784 7330.000 112.783 112.783 7331.000 112.782 !12.782 7332.000 112.781 112.781 7333.000 112.780 112.780 7334.000 !12.779 112.779 7335.000 112.778 112.778 7336.000 112.777 112.777 7337.000 112.776 112.776 7338.000 112.775 112.775 7339.000 112.775 112.775 7340.000 112.774 112.774 7341.000 112.773 112.773 7342.000 112.772 112.772 7343.000 112.771 112.771 7344.000 112.770 112.770 7345.000 112.769 112.769 7346.000 112.768 112.768 7347.000 112.767 112.767 7348.000 112.766 112.766 7349.000 112.765 112.765 7350.000 112.764 112.764 7351.000 112.763 112.763 7352.000 112.762 112.762 7353.000 112.762 112.762 7354.000 112.761 112.761 7355.000 112.760 112.760 7356.000 112.759 112.759 7357.000 112.758 112.758 7358.000 112.757 112.757 7359.000 112.756 112.756 7360.000 112.755 112.755 7361.000 112.754 112.754 7362.000 112.753 112.753 7363.000 112.752 112.752 7364.000 112.751 112.751 7365.000 112.750 112.75.0 7366.000 112.749 112.749 7367.000 112.748 112.748 7368.000 112.747 112.747 7369.000 112.747 112.747 7370.000 112.746 112.746 7371.000 112.745 112.745 7372.000 112.744 112.744 7373.000 112.743 112.743 7374.000 112.742 112.742 7375.000 112.741 112.741 7376.000 112.740 112.740 7377.000 112.739 112.739 7378.000 112.738 112.738 7379.000 112.737 112.737 7380.000 112.736 112.736 7381.000 112.735 112.735 7382.000 112.734 112.734 7383.000 112.733 112.733 7384.000 112.732 112.732 7385.000 112.731 112.731 7386.000 112.730 112.730 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 51 11-17-2018 Attachment 1 Page 194 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7387.000 112.730 112.730 7388.000 112.729 112.729 7389.000 112.728 112.728 7390.000 112.727 112.727 7391.000 112.726 112.726 7392.000 112.725 112.725 7393.000 112.724 112.724 7394.000 112.723 112.723 7395.000 112.722 112.722 7396.000 112.721 112.721 7397.000 112.720 112.720 7398.000 112.719 112.719 7399.000 112.718 112.718 7400.000 112.717 112.717 7401.000 112.716 112.716 7402.000 112.715 112.715 7403.000 112.714 112.714 7404.000 112.713 112.713 7405.000 112.712 112.712 7406.000 112.711 112.711 7407.000 112.710 112.710 7408.000 112.709 112.709 7409.000 112.708 112.708 7410.000 112.708 112.708 7411.000 112.707 112.707 7412.000 112.706 112.706 7413.000 112.705 112.705 7414.000 112.704 112.704 7415.000 112.703 112.703 7416.000 112.702 112.702 7417.000 112.701 112.701 7418.000 112.700 112.700 7419.000 112.699 112.699 7420.000 112.698 112.698 7421.000 112.697 112.697 7422.000 112.696 112.696 7423.000. 112.695 112.695 7424.000 112.694 112.694 7425.000 112.693 112.693 7426.000 112.692 112.692 7427.000 112.691 112.691 7428.000 112.690 112.690 7429.000 112.689 112.689 7430.000 112.688 112.688 7431.000 112.687 112.687 7432.000 112.686 112.686 7433.000 112.685 112.685 7434.000 112.684 112.684 7435.000 112.683 112.683 7436.000 112.682 112.682 7437.000 112.681 112.681 7438.000 112.680 112.680 7439.000 112.679 112.679 7440.000 112:678 112.678 7441.000 112.677 112.677 7442.000 112.676 112.676 7443.000 112.675 112.675 7444.000 112.674 112.674 7445.000 112.673 112.673 7446.000 112.672 112.672 7447.000 112.671 112.671 7448.000 112.670 112.670 7449.000 112.670 112.670 7450.000 112.669 112.669 7451.000 112.668 112.668 7452.000 112.667 112.667 7453.000 112.666 112.666 7454.000 112.665 112.665 7455.000 112.664 112.664 7456.000 112.663 112.663 7457.000 112.662 112.662 7458.000 112.661 112.661 7459.000 112.660 112.660 7460.000 112.659 112.659 7461.000 112.658 112.658 7462.000 112.657 112.657 7463.000 112.656 112.656 7464.000 112.655 112.655 7465.000 112.654 112.654 7466.000 112.653 112.653 7467.000 112.652 112.652 7468.000 112.651 112.651 7469.000 112.650 112.650 7470.000 112.649 112.649 7471.000 112.648 112:648 7472.000 112.647 112.647 7473.000 112.646 112.646 7474.000 112.645 112.645 7475.000 112.644 112.644 7476.000 112.643 112.643 7477.000 112.642 112.642 7478.000 112.641 112.641 7479.000 112.640 112.640 7480.000 112.639 112.639 7481.000 112.638 112.638 7482.000 112.637 112.637 7483.000 112.636 112.636 7484.000 112.635 112.635 7485.000 112.634 112.634 7486.000 112.633 112.633 7487.000 112.632 112.632 7488.000 112.631 112.631 7489.000 112.630 112.630 7490.000 112.629 112.629 7491.000 112.628 112.628 7492.000 112.627 112.627 7493.000 112.626 112.626 7494.000 112.625 112.625 7495.000 112.624 112.624 7496.000 112.623 112.623 7497.000 112.622 112.622 7498.000 112.620 112.620 7499.000 112.619 112.619 7500.000 112.618 112.618 7501.000 112.617 112.617 7502.000 112.616 112.616 7503.000 112.615 112.615 7504.000 112.614 112.614 7505.000 112.613 112.613 7506.000 112.612 112.612 7507.000 112.611 112.611 7508.000 112.610 112.610 7509.000 112.609 112.609 7510.000 112.608 112.608 7511.000 112.607 112.607 7512.000 112.606 112.606 7513.000 112.605 112.605 7514.000 112.604 112.604 7515.000 112.603 112.603 7516.000 112.602 112.602 7517.000 112.601 112.601 7518.000 112.600 112.600 7519.000 112.599 112.599 7520.000 112.598 112.598 7521.000 112.597 112.597 7522.000 112.596 112.596 7523.000 112.595 112.595 7524.000 112.594 112.594 7525.000 112.593 112.593 7526.000 112.592 112.592 7527.000 112.591 112.591 7528.000 112.590 112.590 7529.000 112.589 112.589 7530.000 112.588 112.588 7531.000 112.587 112.587 7532.000 112.586 112.586 7533.000 112.585 112.585 7534.000 112.584 112.584 '

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 52 11-17-2018 Attachment 1 Page 195 of 274 KCICONSULT

Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7535.000 112.583 112.583 7536.000 112.581 112.581 7537.000 112.580 112.580 7538.000 112.579 112.579 7539.000 112.578 112.578 7540.000 112.577 112.577 7541.000 112.576 112.576 7542.000 112.575 112.575 7543.000 112.574 112.574 7544.000 112.573 112.573 7545.000 112.572 112.572 7546.000 112.571 112.571 7547.000 112.570 112.570 7548.000 112.569 112.569 7549.000 112.568 112.568 7550.000 112.567 112.567 7551.000 112.566 112.566 7552.000 112.565 112.565 7553.000 112.564 112.564 7554.000 112.563 112.563 7555.000 112.562 112.562 7556.000 112.561 112.561 7557.000 112.560 112.560 7558.000 112.558 112.558 7559.000 112.557 112.557 7560.000 112.556 112.556 7561.000 112.555 112.555 7562.000 112.554 112.554 7563.000 112.553 112.553 7564.000 112.552 112.552 7565.000 112.551 112.551 7566.000 112.550 112.550 7567.000 112.549 112.549 7568.000 112.548 112.548 7569.000 112.547 112.547 7570.000 112.546 112.546 7571.000 112.545 112.545 7572.000 112.544 112.544 7573.000 112.543 112.543 7574.000 112.542 112.542 7575.000 112.540 112.540 7576.000 112.539 112.539 7577.000 112.538 112.538 7578.000 112.537 112.537 7579.000 112.536 112.536 7580.000 112.535 112.535 7581.000 112.534 112.534 7582.000 112.533 112.533 7583.000 112.532 112.532 7584.000 112.531 112.531 7585.000 112.530 112.530 7586.000 112.529 112.529 7587.000 112.528 112.528 7588.000 112.527 112.527 7589.000 112.526 112.526 7590.000 112.524 112.524 7591.000 112.523 112.523 7592.000 112.522 112.522 7593.000 112.521 112.521 7594.000 112.520 112.520 7595.000 112.519 112.519 7596.000 112.518 112.518 7597.000 112.517 112.517 7598.000 112.516 112.516 7599.000 112.515 112.515 7600.000 112.514 112.514 7601.000 112.513 112.513 7602.000 112.512 112.512 7603.000 112.510 112.510 7604.000 112.509 112.509 7605.000 112.508 112.508 7606.000 112.507 112.507 7607.000 112.506 112.506 7608.000 112.505 112.505 7609.000 112.504 112.504 7610.000 112.503 112.503 7611.000 112.502 112.502 7612.000 112.501 112.501 7613.000 112.500 112.500 7614.000 .112.499 112.499 7615.000 112.497 112.497 7616.000 112.496 112.496 7617.000 112.495 112.495 7618.000 112.494 112.494 7619.000 112.493 112.493 7620.000 112.492 112.492 7621.000 112.491 112.491 7622.000 112.490 112.490 7623.000 112.489 112.489 7624.000 112.488 112.488 7625.000 112.486 112.486 7626.000 112.485 112.485 7627.000 112.484 112.484 7628.000 112.483 112.483 7629.000 ' 112.482 112.482 7630.000 112.481 112.481 7631.000 112.480 112.480 7632.000 112.479 112.479 7633.000 112.478 112.478 7634.000 112.477 112.477 7635.000 112.475 112.475 7636.000 112.474 112.474 7637.000 112.473 112.473 7638.000 112.472 112.472 7639.000 112.471 112.471 7640.000 112.470 112.470 7641.000 112.468 112.468 7642.000 112.467 112.467 7643.000 112.466 112.466 7644.000 112.465 112.465 7645.000 112.464 112.464 7646.000 112.463 112.463 7647.000 112.462 112.462 7648.000 112.460 112.460 7649.000 112.459 112.459 7650.000 112.458 112.458 7651.000 112.457 112.457 7652.000 112.456 112.456 7653.000 112.455 112.455 7654.000 112.453 112.453 7655.000 112.452 112.452 7656.000 112.451 112.451 7657.000 112.450 112.450 7658.000 112.449 112.449 7659.000 112.448 112.448 .7660.000 112.447 112.447 7661.000 112.445 112.445 7662.000 112.444 112.444 7663.000 112.443 112.443 7664.000 112.442 112.442 7665.000 112.441 112.441 7666.000 112.440 112.440 7667.000 112.438 112.438 7668.000 112.437 112.437 7669.000 112.436 112.436 7670.000 112.435 112.435 7671.000 112.434 112.434 7672.000 112.432 112.432 7673.000 112.431 112.431 7674.000 112.430 112.430 7675.000 112.429 112.429 7676.000 112.428 112.428 7677.000 112.427 112.427 7678.000 112.425 112.425 7679.000 112.424 112.424 7680.000 112.423 112.423 , 7681.000 112.422 112.422 7682.000 112.421 112.421 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study BATT IA BUS 53 11-17-2018 Attachment 1 Page 196 of 274 KCICONSULT Base Nonna) Voltage(V)

Voltage(V)

Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7683.000 112.419 112.419 7684.000 112.418 112.418 7685.000 112.417 112.417 7686.000 112.416 112.416 7687.000 112.415 112.415 7688.000 112.414 112.414 7689.000 112.412 112.412 7690.000 112.411 112.411 7691.000 112.410 112.410 7692.000 112.409 112.409 7693.000 112.408 112.408 7694.000 112.406 112.406 7695.000 112.405 112.405 7696.000 112.404 112.404 7697.000 112.403 112.403 7698.000 112.402 112.402 7699.000 112.400 112.400 7700.000 112.399 112.399 7701.000 112.398 112.398 7702.000 112.397 112.397 7703.000 112.396 112.396 7704.000 112.394 112.394 7705.000 112.393 112.393 7706.000 112.392 112.392 7707.000 112.391 112.391 7708.000 112.390 112.390 7709.000 112.388 112.388 7710.000 112.387 112.387 7711.000 112.386 112.386 7712.000 112.385 112.385 7713.000 112.384 112.384 7714.000 112.382 112.382 7715.000 112.381 112.381 7716.000 112.380 112.380 7717.000 112.379 112.379 7718.000 112.377 112.377 7719.000 112.376 112.376 7720.000 112.375 112.375 7721.000 112.374 112.374 7722.000 112.373 112.373 7723.000 112.371 112.371 7724.000 112.370 112.370 7725.000 112.369 112.369 7726.000 112.368 112.368 7727.000 112.366 112.366 7728.000 112.365 112.365 7729.000 112.364 112.364 7730.000 112.363 112.363 7731.000 112.362 112.362 7732.000 112.360 112.360 7733.000 112.359 112.359 7734.000 112.358 112.358 7735.000 112.357 112.357 7736.000 112.355 112.355 7737.000 112.354 112.354 7738.000 112.353 112.353 7739.000 112.352 112.352 7740.000 112.350 112.350 7741.000 112.349 112.349 7742.000 112.348 112.348 7743.000 112.347 112.347 7744.000 112.345 112.345 7745.000 112.344 112.344 7746.000 112.343 112.3.43 7747.000 112.342 112.342 7748.000 112.340 112.340 7749.000 112.339 112.339 7750.000 112.338 112.338 7751.000 112.337 112.337 7752.000 112.335 112.335 7753.000 112.334 112.334 7754.000 112.333 112.333 7755.000 112.332 112.332 7756.000 112.330 112.330 7757.000 112.329 112.329 7758.000 112.328 112.328 7759.000 112.327 112.327 7760.000 112.325 112.325 7761.000 112.324 112.324 7762.000 112.323 112.323 7763.000 112.322 112.322 7764.000 112.320 112.320 7765.000 112.319 112.319 7766.000 112.318 112.318 7767.000 112.317 112.317 7768.000 112.315 112.315 7769.000 112.314 112.314 7770.000 112.313 112.313 7771.000 112.312 112.312 7772.000 112.310 112.310 7773.000 112.309 112.309 7774.000 112.308 112.308 7775.000 112.306 112.306 7776.000 112.305 112.305 7777.000 112.304 112.304 7778.000 112.303 112.303 7779.000 112.301 112.301 7780.000 112.300 112.300 7781.000 112.299 112.299 7782.000 112.297 112.297 7783.000 112.296 112.296 7784.000 112.295 112.295 7785.000 112.294 112.294 7786.000 112.292 112.292 7787.000 112.291 112.291 7788.000 112.290 112.290 7789.000 112.288 112.288 7790.000 112.287 112.287 7791.000 112.286 112.286 7792.000 112.285 112.285 7793.000 112.283 112.283 7794.000 112.282 112.282 7795.000 112.281 112.281 7796.000 112.279 112.279 7797.000 112.278 112.278 7798.000 112.277 112.277 7799.000 112.276 112.276 7800.000 112.274 112.274 7801.000 112.273 112.273 7802.000 112.272 112.272 7803.000 112.270 112.270 7804.000 112.269 112.269 7805.000 112.268 112.268 7806.000 112.266 112.266 7807.000 112.265 112.265 7808.000 112.264 112.264 7809.000 112.263 112.263 7810.000 112.261 112.261 7811.000 112.260 112.260 7812.000 112.259 112.259 7813.000 112.257 112.257 7814.000 112.256 112.256 7815.000 112.255 112.255 7816.000 112.253 112.253 7817.000 112.252 112.252 7818.000 112.251 112.251 7819.000 112.249 112.249 7820.000 112.248 112.248 7821.000 112.247 112.247 7822.000 112.245 112.245 7823.000 112.244 112.244 7824.000 112.243 112.243 7825.000 112.241 112.241 7826.000 112.240 112.240 7827.000 112.239 112.239 7828.000 112.237 112.237 7829.000 112.236 112.236 7830.000 112.235 112.235 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 54 11-17-2018 Attachment 1 Page 197 of 274 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7831.000 112.233 112.233 7832.000 112.232 112.232 7833.000 112.231 112.231 7834.000 112.229 112.229 7835.000 112.228 112.228 7836.000 112.227 112.2F 7837.000 112.225 112.225 7838.000 112.224 112.224 7839.000 112.223 112.223 7840.000 112.221 112.221 7841.000 112.220 112.220 7842.000 112.219 112.219 7843.000 112.217 112.217 7844.000 112.216 112.216 7845.000 112.215 112.215 7846.000 112.213 112.213 7847.000 112.212 112.212 7848.000 112.211 112.211 7849.000 112.209 112.209 7850.000 112.208 112.208 7851.000 112.207

  • 112.207 7852.000 112.205 112.205 7853.000 112.204 112.204 7854.000 112.203 112.203 7855.000 112.201 112.201 7856.000 112.200 112.200 7857.000 112.198 112.198 7858.000 112.197 112.197 7859.000 112.196 112.196 7860.000 112.194 112.194 7861.000 112.193 112.193 7862.000 112.192 112.192 7863.000 112.190 112.190 7864.000 112.189 112.189 7865.000 112.188 112.188 7866.000 112.186 112.186 7867.000 112.185 112.185 7868.000 112.183 112.183 7869.000 112.182 112.182 7870.000 112.181 112.181 7871.000 112.179 112.179 7872.000 112.178 112.178 7873.000 112.177 112.177 7874.000 112.175 112.175 7875.000 112.174 112.174 7876.000 112.172 112.172 7877.000 112.171 112.171 7878.000 112.)70 112.170 7879.000 112.168 112.168 7880.000 112.167 112.167 7881.000 112.165 112.165 7882.000 112.164 112.164 7883.000 112.163 112.163 7884.000 112.161 112.161 7885.000 112.160 112.160 7886.000 112.159 112.159 7887.000 112.157 112.157 7888.000 112.156 112.156 7889.000 112.154 112.154 7890.000 112.153 112.153 7891.000 112.152 112.152 7892.000 112.150 112.150 7893.000 112.149 112.149 7894.000 112.147 112.147 7895.000 112.146 112.146 7896.000 112.145 112.145 7897.000 112.143 112.143 7898.000 112.142 112.142 7899.000 112.140 112.140 7900.000 112.139 112.139 7901.000 112.137 112.137 7902.000 112.136 112.136 7903.000 112.135 112.135 7904.000 112.133 112.133 7905.000 112.132 112.132 7906.000 112.130 112.130 7907.000 112.129 112.129 7908.000 112.128 112.128 7909.000 112.126 112.126 7910.000 112.125 112.125 7911.000 112.123 112.123 7912.000 112.122 112.122 7913.000 112.120 112.120 7914.000 112.119 112.119 7915.000 112.118 112.118 7916.000 112.116 112.116 7917.000 112.115 112.115 7918.000 112.113 112.113 7919.000 112.112 112.112 7920.000 112.110 112.110 7921.000 112.109 112.109 7922.000 112.108 112.108 7923.000 112.106 112.106 7924.000 112.105 112.105 7925.000 112.103 112.103 7926.000 112.102 112.102 7927.000 112.100 112,100 7928.000 112.099 112.099 7929.000 112.097 112.097 7930.000 112.096 112.096 7931.000 112.095 112.095 7932.000 112.093 112.093 7933.000 112.092 112.092 7934.000 112.090 112.090 7935.000 112.089 112.089 7936.000 112.087 112.087 7937.000 112.086 112.086 7938.000 112.084 112.084 7939.000 112.083 112.083 7940.000 112.082 112.082 7941.000 112.080 112.080 7942.000 112.079 112.079 7943.000 112.077 112.077
  • 7944.000 112.076 112.076 7945.000 112.074 112.074 7946.000 112.073 112.073 7947.000 112.071 112.071 7948.000 112.070 112.070 7949.000 112.068 112.068 7950.000 112.067 112.067 7951.000 112.065 112.065 7952.000 112.064 112.064 7953.000 112.062 112.062 7954.000 112.061 112.061 7955.000 112.059 112.059 7956.000 112.058 112.058 7957.000 112.057 112.057 7958.000 112.055 112.055 7959.000 112.054 112.054 7960.000 112.052 112.052 7961.000 112.051 112.051 7962.000 112.049 112.049 7963.000 112.048 112.048 7964.000 112.046 112.046 7965.000 112.045 112.045 7966.000 112.043 112.043 7967.000 112.042 112.042 7968.000 112.040 112.040 7969.000 112.039 112.039 7970.000 112.037 112.037 7971.000 112.036 112.036 7972.000 112.034 112.034 7973.000 112.033 112.033 7974.000 112.031 112.031 7975.000 112.030 112.030 7976.000 112.028 112.028 7977.000 112.027 112.027 7978.000 112.025 112.025 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 55 11-17-2018 Attachment 1 Page 198 of 274 KCICONSUL!

Base .Normal Voltage (V) Voltage (V) Voltage (V)

Voltage (V). Time V-V+ Time V-V+ Time V-V+ Time y. V+ 7979.000 112.024 112.024 7980.000 112.022 112.022 7981.000 112.021 112.021 7982.000 112.019 112.019 7983.000 112.018 112.018 7984.000 112.016 112.016 7985.000 112.015 112.015 7986.000 112.013 112.013 7987.000 112.012 112.012 7988.000 112.010 112.010 7~89.000 112.009 112.009 7990.000 112.007 112.007 7991.000 112.005 112.005 7992.000 112.004 112.004 7993.000 112.002 112.002 7994.000 112.001 112.001 7995.000 111.999 111.999 7996.000 111.998 111.998 7997.000 111.996 111.996 7998.000 111.995 111.995 7999.000 111.993 111.993 8000.000 111.992 111.992 8001.000 111.990 111.990 8002.000 111.989 111.989 8003.000 111.987 111.987 8004.000 111.986 111.986 8005.000 111.984 111.984 8006.000 111.982 111.982 8007.000 111.981 111.981 8008.000 111.979 111.979 8009.000 111.978 111.978 8010.000 111.976 111.976 8011.000 111.975 111.975 8012.000 111.973 111.973 8013.000 111.972 111.972 8014.000 111.970 111.970 8015.000 111.969 111.969 8016.000 111.967 111.967 8017.000 111.965 111.965 8018.000 111.964 111.964 8019.000 111.962 lll.962 8020.000 111.961 111.961 8021.000 111.959 111.959 8022.000 111.958 111.958 8023.000 111.956 111.956 8024.000 111.954 111.954 8025.000 111.953 111.953 8026.000 111.951 111.951 8027.000 111.950 111.950 , 8028.000 111.948 111.948 8029.000 111.947 111.947 8030.000 111.945 111.945 8031.000 111.943 111.943 8032.000 111.942 111.942 8033.000 111.940 111.940 8034.000 111.939 111.939 8035.000 lll.937 111.937 8036.000 111.936 111.936 8037.000 111.934 111.934 8038.000 111.932 111.932 8039.000 111.931 lll.931 8040.000 111.929 111.929 8041.000 111.928 111.928 8042.000 111.926 111.926 8043.000 111.924 111.924 8044.000 lll.923 111.923 8045.000 111.921 111.921 8046.000 111.920 111.920 8047.000 111.918 111.918 8048.000 111.916 111.916 8049.000 111.915 111.915 8050.000 111.913 111.913 8051.000 111.912 111.912 8052.000 111.910 111.910 8053.000 111.908 111.908 8054.000 111.907 111.907 8055.000 111.905 111.905 8056.000 111.904 111.904 8057.000 111.902 111.902 8058.000 111.900 111.900 8059.000 111.899 111.899 8060.000 111.897 lll.897 8061.000 111.895 lll.895 8062.000 lll.894 111.894 8063.000 111.892 111.892 8064.000 111.891 111.891 8065.000 111.889 111.889 8066.000 111.887 111.887 8067.000 111.886 111.886 8068.000 111.884 111.884 8069.000 111.882 lll.882 8070.000 111.881 111.881 8071.000 111.879 111.879 8072.000 . 111.878 111.878 8073.000 111.876 lll.876 8074.000 111.874 111.874 8075.000 111.873 111.873 8076.000 111.871 111.871 8077.000 111.869 111.869 8078.000 111.868 111.868 8079.000 111.866 111.866 8080.000 111.864 111.864 8081.000 111.863 111.863 8082.000 111.861 111.861 8083.000 111.859 111.859 8084.000 111.858 111.858 8085.000 lll.856 111.856 8086.000 111.855 111.855 8087.000 111.853 111.853 8088.000 111.851 lll.851 8089.000 111.850 111.850 8090.000 lll.848 111.848 8091.000 111.846 111.846 8092.000 111.845 111.845 8093.000 111.843 lll.843 8094.000 111.841 111.841 8095.000 111.840 111.840 8096.000 111.838 111.838 8097.000 111.836 111.836 8098.000 111.834 111.834 8099.000 111.833 111.833 8100.000 111.831 111.831 8101.000 111.829 111.829 8102.000 111.828 111.828 8103.000 111.826 111.826 8104.000 111.824 111.824 8105.000 111.823 111.823 8106.000 111.821 111.821 8107.000 111.819 111.819 8108.000 111.818 111.818 8109.000 111.816 111.816 8110.000 111.814 111.814 8111.000 111.813 111.813 8112.000 111.811 Ill.Sil 8113.000 111.809 111.809 8114.000 111.807 111.807 8115.000 111.806 111.806 8116.000 111.804 111.804 8117.000 111.802 111.802 8118.000 111.801 111.801 8119.000 111.799 111.799 8120.000 111.797 111.797 8121.000 111.796 111.796 8122.000 111.794 111.794 8123.000 111.792 111.792 8124.000 111.790 111.790 8125.000 111.789 lll.789 8126.000 111.787 111.787 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 56 11-17-2018 Attachment 1 Page 199 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8127.000 lll.785 111.785 8128.000 111.784 111.784 8129.000 111.782 111.782 8130.000 111.780 111.780 8131.000 111.778 111.778 8132.000 111.777 111.777 8133.000 111.775 111.775 8134.000 111.773 111.773 8135.000 111.771 *111.111 8136.000 111.770 111.770 8137.000 111.768 111.768 8138.000 111.766 111.766 8139.000 111.764 111.764 8140.000 111.763 111.763 8141.000 111.761 111.761 8142.000 111.759 111.759 8143.000 111.758 111.758 8144.000 111.756 111.756 8145.000 111.754 111.754 8146.000 111.752 111.752 8147.000 111.751 111.751 8148.000 111.749 111.749 8149.000 111.747 111.747 8150.000 111.745 111.745 8151.000 11L743 111.743 8152.000 111.742 111.742 8153.000 111.740 111.740 8154.000 111.738 111.738 8155.000 111.736 111.736 8156.000 111.735 111.735 8157.000 111.733 111.733 8158.000 111.731 111.731 8159.000 111.729 111.729 8160.000 111.728 111.728 8161.000 111.726 111.726 8162.000 111.724 111.724 8163.000 111.722 111.722 8164.000 111.720 111.720 8165.000 111.719 111.719 8166.000 111.717 111.717 8167.000 111.715 111.715 8168.000 111.713 111.713 8169.000 111.712 111.712 8170.000 111.710 111.710 8171.000 111.708 111.708 8172.000 111.706 111.706 8173.000 111.704 111.704 8174.000 lll.703 111.703 8175.000 111.701 111.701 8176.000 111.699 111.699 8177.000 111.697 111.697 8178.000 111.695 111.695 8179.000 111.694 111.694 8180.000 111.692 111.692 8181.000 111.690 111.690 8182.000 111.688 111.688 8183.000 111.686 111.686 8184.000 111.685 111.685 8185.000 111.683 111.683 8186.000 111.681 111.681 8187.000 111.679 111.679 8188.000 111.677 lll.677 8189.000 111.675 111.675 8190.000 111.674 111.674 8191.000 111.672 111.672 8192.000 111.670 111.670 8193.000 111.668 111.668 8194.000 111.666 111.666

  • 8195.000 111.664 111.664 8196.000 111.663 lll.663 8197.000 111.661 111.661 8198.000 111.659 111.659 8199.000 111.657 111.657 8200.000 111.655 111.655 8201.000 111.653 111.653 8202.000 111.652 111.652 8203.000 111.650 111.650 8204.000 111.648 111.648 8205.000 111.646 111.646 8206.000 111.644, 111.644 8207.000 111.642 111.642 8208.000 111.640 111.640 8209.000 111.639 111.639 8210.000 111.637 111.637 8211.000 111.635 111.635 8212.000 111.633 111.633 8213.000 111.631 111.631 8214.000 111.629 111.629 8215.000 111.627 111.627 8216.000 111.626 111.626 8217.000 111.624 111.624 8218.000 111.622 111.622 8219.000 111.620 111.620 8220.000 111.618 111.618 8221.000 111.616 111.616 8222.000 111.614 111.614 8223.000 111.612 111.612 8224.000 '111.611 111.611 8225.000 111.609 111.609 8226.000 111.607 111.607 8227.000 111.605 111.605 8228.000 111.603 111.603 8229.000 111.601 111.601 8230.000 lll.599 111.599 8231.000 111.597 111.597 8232.000 111.595 lll.595 8233.000 111.593 111.593 8234.000 111.592 111.592 8235.000 111.590 111.590 8236.000 111.588 111.588 8237.000 111.586 111.586 8238.000 111.584 111.584 8239.000 111.582 111.582 8240.000 111.580 111.580 8241.000 111.578 111.578 8242.000 , 111.576 111.576 8243.000 111.574 111.574 8244.000 111.572 111.572 8245.000 111.570 111.570 8246.000 111.569 111.569 8247.000 111.567 111.567 8248.000 111.565 111.565 8249.000 111.563 111.563 8250.000 111.561 111.561 8251.000 111.559 111.559 8252.000 111.557 111.557 8253.000 111.555 111.555 8254.000 lll.553 111.553 8255.000 111.551 111.551 8256.000 111.549 111.549 8257.000 111.547 111.547 8258.000 111.545 111.545 8259.000 111.543 111.543 8260.000 111.541 111.541 8261.000 111.539 111.539 8262.000 111.537 111.537 8263.000 111.536 111.536 8264.000 111.534 111.534 8265.000 111.532 111.532 8266.000 111.530 111.530 8267.000 lll.528 111.528 8268.000 111.526 111.526 8269.000 111.524 111.524 8270.000 111.522 111.522 8271.000 111.520 111.520 8272.000 Tll.518 111.518 8273.000 111.516 111.516 8274.000 111.514 111.514 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: *SN: Badar Hussain BS1A~48 Revision:

Study Case: CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 57 11-17-2018 Attachment 1 Page 200 of 27 4 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8275.000 111.512 111.512 8276.000 111.510 111.510 8277.000 111.508 111.508 8278.000 111.506 111.506 8279.000 111.504 111.504 8280.000 111.502 111.502 8281.000 111.500 111.500 8282.000 111.498 111.498 8283.000 111.496 111.496 8284.000 111.494 111.494 8285.000 111.492 111.492 8286.000 111.490 111.490 8287.000 111.488 111.488 8288.000 111.486 111.486 8289.000 111.484 111.484 8290.000 111.482 111.482 8291.000 111.480 111.480 8292.000 111.478 111.478 8293.000 111.476 111.476 8294.000 111.474 111.474 8295.000 111.472 111.472 8296.000 111.470 111.470 8297.000 111.468 111.468 8298.000 111.466 111.466 8299.000 111.464 111.464 8300.000 111.462 111.462 8301.000 111.460 111.460 8302.000 111.458 111.458 8303.000 111.456 111.456 8304.000 111.454 111.454 8305.000 111.452 111.452 8306.000 111.449 111.449 8307.000 111.447 111.447 8308.000 111.445 111.445 8309.000 111.443 111.443 8310.000 111.441 111.441 8311.000 111.439 111.439 8312.000 111.437 111.437 8313.000 111.435 111.435 8314.000 111.433 111.433 8315.000 111.431 111.431 8316.000 111.429 111.429 8317.000 111.427 111.427 8318.000 111.425 111.425 8319.000 111.423 111.423 8320.000 111.421 111.421 8321.000 111.419 111.419 8322.000 111.416 111.416 8323.000 111.414 111.414 8324.000 111.412 111.412 8325.000 111.410 111.410 8326.000 111.408 111.408 8327.000 111.406 111.406 8328.000 111.404 111.404 8329.000 111.402 111.402 8330.000 111.400 111.400 8331.000 111.398 111.398 8332.000 111.396 111.396 8333.000 111.394 111.394 8334.000 111.391 111.391 8335.000 111.389 111.389 8336.000 111.387 111.387 8337.000 111.385 111.385 8338.000 111.383 111.383 8339.000 111.381 111.381 8340.000 111.379 111.379 8341.000 111.377 111.377 8342.000 111.375 111.375 8343.000 111.372 111.372 8344.000 111.370 lll.370 8345.000 111.368 111.368 8346.000 111.366 111.366 8347.000 111.364 111.364 8348.000 111.362 111.362 8349.000 111.360 111.360 8350.000 111.357 111.357 8351.000 111.355 111.355 8352.000 111.353 111.353 8353.000 111.351 111.351 8354.000 111.349 111.349 8355.000 111.347 111.347 8356.000 111.345 111.345 8357.000 111.342 111.342 8358.000 111.340 111.340 8359.000 111.338 111.338 8360.000 111.336 111.336 8361.000 111.334 111.334 8362.000 111.332 111.332 8363.000 111.329 111.329 8364.000 111.327 111.327 8365.000 111.325 111.325 8366.000 111.323 111.323 8367.000 lll.321 lll.321 8368.000 111.319 111.319 8369.000 111.316 111.316 8370.000 111.314 111.314 8371.000 111.312 111.312 8372.000 111.310 111.310 8373.000 111.308 111.308 8374.000 111.306 111.306 8375.000 111.303 111.303 8376.000 111.301 111.301 8377.000 111.299

  • 111.299 8378.000 lll.297 111.297 8379.000 111.295 111.295 8380.000 111.292 111.292 8381.000 111.290 111.290 8382.000 111.288 111.288 8383.000 111.286 111.286 8384.000 111.283 111.283 8385.000 111.281 111.281 8386.000 111.279 111.279 8387.000 111.277 111.277 8388.000 111.275 111.275 8389.000 111.272 111.272 8390.000 111.270 111.270 8391.000 111.268 111.268 8392.000 111.266 111.266 8393.000 111.263 111.263 8394.000 111.261 111.261 8395.000 111.259 111.259 8396.000 111.257 111.257 8397.000 111.254 111.254 8398.000 111.252 111.252 8399.000 111.250 111.250 8400.000 111.248 111.248 8401.000 111.245 111.245 8402.000 111.243 111.243 8403.000 111.241 111.241 8404.000 111.239 111.239 8405.000 111.236 111.236 8406.000 111.234 111.234 8407.000 111.232 111.232 8408.000 111.230 111.230 8409.000 111.227 111.227 8410.000 111.225 111.225 8411.000 111.223 111.223 8412.000 111.221 111.221 8413.000 111.218 111.218 8414.000 111.216 . 111.216 8415.000 111.214 111.214 8416.000 111.211 111.211 8417.000 111.209 111.209 8418.000 111.207 111.207 8419.000 111.205 111.205 8420.000 111.202 111.202 8421.000 111.200 111.200 8422.000 111.198 . 111.198 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater. than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 58 11-17-2018 Attachment 1 Page 201 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8423.000 111.195 111.195 8424.000 lll.193 111.193 8425.000 111.191 111.191 8426.000 111.188 111.188 8427.000 111.186 111.186 8428.000 111.184 111.184 8429.000 111.181 111.181 8430.000 111.179 111.179 8431.000 111.177 111.177 8432.000 111.174 111.174 8433.000 111.172 111.172 8434.000 111.170 111.170 8435.000 111.167 111.167 8436.000 111.165 111.165 8437.000 111.163 111.163 8438.000 111.160 111.160 8439.000 111.158 111.158 8440.000 111.156 111.156 8441.000 111.153 111.153 8442.000 111.151 111.151 8443.000 111.149

  • 111.149 8444.000 lll.146 111.146 8445.000 111.144 lll.144 8446.000 111.142 111.142 8447.000 111.139 111.139 8448.000 111.137 111.137 8449.000 111.134 111.134 8450.000 111.132 111.132 8451.000 111.130 111.130 8452.000 111.127 111.127 8453.000 111.125 lll.125 8454.000 111.123 111.123 8455.000 111.120 111.120 8456.000 111.118 111.118 8457.000 lll.115 111.115 8458.000 111.113 111.113 8459.000 111.111 111.111 8460.000 111.108 111.108 8461.000 111.106 111.106 8462.000 111.103 111.103 8463.000 111.101 111.101 8464.000 111.099 111.099 8465.000 111.096 1_11.096 8466.000 111.094 111.094 8467.000 111.091 111.091 8468.000 111.089 111.089 8469.000 111.086 111.086 8470.000 111.084 111.084 8471.000 111.082 111.082 8472.000 111.079 111.079 8473.000 111.077 111.077 8474.000 111.074 111.074 8475.000 ' 111.072 111.072 8476.000 111.069 111.069 8477.000 111.067 111.067 8478.000 111.065 111.065 8479.000 111.062 111.062 8480.000 111.060 111.060 8481.000 111.057 111.057 8482.000 111.055 111.055 8483.000 111.052 111.052 8484.000 111.050 111.050 8485.000 111.047 111.047 8486.000 111.045 111.045 8487.000 111.042 111.042 8488.000 111.040 111.040 8489.000 111.037 111.037 8490.000 111.035 111.035 8491.000 111.032 111.032 8492.000 111.030 111.030 8493.000 111.027 111.027 8494.000 111.025 111.025 8495.000 111.022 111.022 8496.000 111.020 111.020 8497.000 111.017 111.017 8498.000 111.015 111.015 8499.000 1110012 111.012 8500.000 111.010 111.010 8501.000 111.007 111.007 8502.000 111.005 111.005 8503.000 111.002 111.002 8504.000 111.000 111.000 8505.000 110.997 110.997 8506.000 110.995 110.995 8507.000 110.992 110.992 8508.000 110.990 110.990 8509.000 110.987 110.987 8510.000 110.985 110.985 8511.000 110.982 110.982 8512.000 110.980 110.980 8513.000 110.977 110.977 8514.000 110.975 110.975 8515.000 110.972 110.972 8516.000 110.969 110.969 8517.000 110.967 110.967 8518.000 110.964 110.964 8519.000 110.962 110.962 8520.000 110.959 110.959 8521.000 110.957 110.957 8522.000
  • 110.954 110.954 8523.000 110.951 110.951 8524.000 110.949 110.949 8525.000 110.946 110.946 8526.000 110.944 110.944 8527.000 110.941 110.941 8528.000 110.939 110.939 8529.000 110.936 110.936 8530.000 110.933 110.933 8531.000 110.931 110.931 8532.000 110.928 110.928 8533.000 110.926 110.926 8534.000 '110.923 110.923 8535.000 110.920 110.920 8536.000 110.918 110.918 8537.000 110.915 110.915 8538.000 110.912 110.912 8539.000 110.910 110.910 8540.000 110.907 110.907 8541.000 110.905 110.905 8542.000 110.9.02 110.902 8543.000 110.899 110.899 8544.000 110.897 110.897 8545.000 110.894 110.894 8546.000 110.891 110.891 8547.000 110.889 110.889 8548.000 110.886 110.886 8549.000 110.883 110.883 8550.000 110.881 110.881 8551.000 110.878 110.878 8552.000 110.876 110.876 8553.000 110.873 110.873 8554.000 110.870 110.870 8555.000 110.868 110.868 8556.000 110.865 110.865 8557.000 110.862 110.862 8558.000 110.859 110.859 8559.000 110.857 110.857 8560.000 110.854 110.854 8561.000 110.851 110.851 8562.000 110.849 110.849 8563.000 110.846 110.846 8564.000 110.843 110.843 8565.000 110.841 110.841 8566.000 110.838 110.838 8567.000 110.835 110.835 8568.000 110.833 110.833 8569.000 110.830 110.830 8570.000 110.827 110.827 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IA BUS 59 11-17-2018 Attachment 1 Page 202 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8571.000 110.824 110.824 8572.000 110.822 110.822 8573.000 110.819 110.819 8574.000 110.816 110.816 8575.000 110.813 110.813 8576.000 110.811 110.811 8577.000 110.808 . 110.808 8578.000

  • 110.805 110.805 8579.000 110.803 110.803 8580.000 110.800 110.800 8581.000 110.797 110.797 8582.000 110.794 110.794 8583.000 110.791 110.791 8584.000 110.789 110.789 8585.000 110.786 110.786 8586.000 110.783 110.783 8587.000 110.780 110.780 8588.000 110.778 110.778 8589.000 110.775 110.775 8590.000 110.772 110.772 8591.000 110.769 110.769 8592.000 110.767 110.767 8593.000 110.764 110.764 8594.000 110.761 110.761 8595.000 110.758 110.758 8596.000 110.755 110.755 8597.000 110.753 110.753 8598.000 110.750 110.750 8599.000 110.747 110.747. 8600.000 110.744 110.744 8601.000 110.741 110.741 8602.000 110.738 110.738 8603.000 110.736 110.736 8604.000 110.733 110.733 8605.000 110.730 110.730 8606.000 110.727 110.727 8607.000 110.724 110.724 8608.000 110.721 110.721 8609.000 110.719 110.719 8610.000 110.716 110.716 8611.000 110.713 110.713 8612.000 110.710 110.710 8613.000 110.707 110.707 8614.000 110.704 110.704 8615.000 110.701 110.701 8616.000 110.699 110.699 8617.000 110.696 110.696 8618.000 110.693 110.693 8619.000 110.690 110.690 8620.000 110.687 110.687 8621.000 110.684 110.684 8622.000 110.681 110.681 8623.000 110.678 110.678 8624.000 110.676 110.676 8625.000 110.673 110.673 8626.000 110.670 110.670 8627.000 110.667 110.667 8628.000 110.664 110.664 8629.000 110.661 110.661 8630.000 110.658 110.658 8631.000 110.655 110.655 8632.000 110.652 110.652 8633.000 110.649 110.649 8634.000 110.646 110.646 8635.000 110.643 110.643 8636.000 110.641 110.641 8637.000 110.638 110.638 8638.000 110.635 110.635 8639.000 110.632 110.632 8640.000 110.629 110.629 8641.000 110.626 110.626 8642.000 110.623 110.623 8643.000 110.620 110.620 8644.000 110.617 110.617 8645.000 110.614 110.614 8646.000 110.611 110.611 8647.000 110.608 110.608 8648.000 110.605 110.605 8649.000 110.602 110.602 8650.000 110.599 110.599 8651.000 110.596 110.596 8652.000 110.593 110.593 8653'.000 110.590 110.590 8654.000 110.587 110.587 8655.000 110.584 110.584 8656.000 110.581 110.581 8657.000 110.578 110.578 8658.000 110.575 110.575 8659.000 110.572 110.572 8660.000 110.569 110.569 8661.000 110.566 110.566 8662.000 110.563 110.563 8663.000 110.560 110.560 8664.000 110.557 110.557 8665.000 110.554 110.554 8666.000 110.551 110.551 8667.000 110.548 110.548 8668.000 110.545 110.545 8669.000 110.542 110.542 8670.000 110.539 110.539 8671.000 110.535 li0.535 8672.000 110.532 110.532 8673.000 110.529 110.529 8674.000 110.526 110.526 8675.000 110.523 110.523 8676.000 110.520 110.520 8677.000 110.517 110.517 8678.000 110.514 110.514 8679.000 110.511 110.511 8680.000 110.508 110.508 8681.000 110.505 110.505 8682.000 110.502 110.502 8683.000 110.498 110.498 8684.000 110.495 110.495 8685.000 110.492 110.492 8686.000 110.489 110.489 8687.000 110.486 110.486 8688.000 110.483 110.483 8689.000 110.480 110.480 8690.000 110.477 110.477 8691.000 110.473 110.473 8692.000 110.470 110.470 8693.000 110.467 110.467 8694.000 110.464 110.464 8695.000 110.461 110.461 8696.000 110.458 110.458 8697.000 110.454 110.454 8698.000 110.451 110.451 8699.000 110.448 110.448 8700.000 110.445 110.445 8701.000 110.442 110.442 8702.000 110.439 110.439 8703.000 110.435 110.435 8704.000 110.432 110.432 8705.000 110.429 110.429 8706.000 110.426 110.426 8707.000 110.423 110.423 8708.000 110.419 110.419 8709.000 110.416 110.416 8710.000 110.413 110.413 8711.000 110.410 110.410 8712.000 110.406 110.406 8713.000 110.403 110.403 8714.000 110.400 110.400 8715.000 110.397 110.397 8716.000 110.394 110.394 8717.000 110.390 110.390 8718.000 110.387 110.387 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATTlABUS 60 II-17-2018 Attachment 1 Page 203 of 27 4 KCICONSULT Base Normal .Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8719.000 110.384 110.384 8720.000 110.381 110.381 8721.000 110.377. 110.377 8722.000 110.374 110.374 8723.000 110.371 110.371. 8724.000 110.367 110.367, 8725.000 110.364 110.364 8726.000 110.361 110.361 8727.000 110.358 110.358 8728.000 110.354 110.354 8729.000 110.351 110.351 8730.000 110.348 110.348 8731.000 110.344 110.344 8732.000 110.341 110.341 8733.000 110.338 110.338 8734.000 110.334 110_.334 8735.000 110.331 110.331 8736.000 110.328 110.328 8737.000 110.324 110.324 8738.000 110.321 110.321 8739.000 110.318 110.318 8740.000 110.314 110.314 8741.000 110.311 110.311 8742.000 110.308 110.308 8743.000 110.304 110.304 8744.000 110.301 110.301 8745.000 110.298 110.298 8746.000 110.294 110.294 8747.000 110.291 110.291 8748.000 110.288 110.288 8749.000 110.284 110.284 8750.000 110.281 110.281 8751.000 110.277 110.277 8752.000 110.274 110.274 8753.000 110.271 110.271 8754.000 110.267 110.267 8755.000 110.264 110.264 8756.000 110.260 110.260 8757.000 110.257 110.257 8758.000 110.254 110.254 8759.000 110.250 110.250 8760.000 110.247 110.247 8761.000 110.243 110.243 8762.000 110.240 110.240 8763.000 110.236 110.236 8764.000 110.233 110.233 8765.000 110.229 110.229 8766:000 110.226 110.226 8767.000 110.223 110.223 8768.000 110.219 110.219 8769.000 110.216 110.216 8770.000 110.212 110.212 8771.000 110.209 110.209 8772.000 110.200 110.200 8773.000 110.200 110.200 8774.000 110.200 110.200 8775.000 110.200 110.200 8776.000 110.195 110.195 8777.000 110.1.93 110.193 8778.000 110.191 110.191 8779.000 110.190 110.190 8780.000 110.188 110.188 8781.000 110.186 110.186 8782.000 110.184 110.184_ 8783.000 110.182 110.182 8784.000 110.180* 110.180 8785.000 110.178 110.178 8786.000 110.176 110.176 8787.000 110.175 110.17~ 8788.000 110.173 110.173 8789.000 110.171 110.171 8790.000 110.169 110.169 8791.000 110.167 110.167 8792.000 110.165 110.165 8793.000 110.163 110.163 8794.000 110.161 110.161 8795.000 110.159 110.159 8796.000 110.158 110.158 8797.000 110.156 110.156 8798.000 110.154 110.154 8799.000 110.152 110.152 8800.000 110.150 110.150 8801.000 110.148 110.148 8802.000 110.146 110.146 8803.000 110.144 110.144 8804.000 110.143 110.143 8805.000 110.141 110.141 8806.000 110.139 110.139 8807.000 110.137 110.137 8808.000 110.135 110.135 8809.000 110.133 110.133 8810.000 110.131 110.131 8811.000 110.129 110.129 8812.000 110.128 110.128 8813.000 110.126 110.126 8814.000 110.124 110.124 8815.000 110.122 110.122 8816.000 110.120 110.120 8817.000 110.118 110.118 8818.000 110.116 110.116 8819.000 110.114 110.114 8820.000 110.113 110.113 8821.000 110.lll 110.lll 8822.000 110.109 110.109 8823.000 110.107 110.107 8824.000 110.105 110.105 8825.000 110.103 110.103 8826.000 110.101 110.101 8827.000 110.099 110.099 8828.000 110.098 110.098 8829.000 110.096 110.096 8830.000 110.094 110.094 8831.000 110.092 110.092 8832.000 110.090 110.090 8833.000 110.088 110.088 8834.000 110.086 110.086 8835.000 110.085 110.085 8836.000 110.083 110.083 8837.000 110.081 110.081 8838.000 110.079 110.079 8839.000 110.077 110.077 8840.000 110.075 110.075 8841.000 110.073 110.073 8842.000 110.071 110.071 8843.000 110.070 110.070 8844.000 110.068 110.068 8845.000 110.066 110.066 8846.000 110.064 110.064 8847.000 110.062 110.062 8848.000 110.060 110.060 8849.000 110.058 110.058 8850.000 110.057 110.057 8851.000 110.055 110.055 8852.000 110.053 110.053 8853.000 110.051 110.051 8854.000 110.049 110.049 8855.000 110.047 110.047 8856.000 110.045 110.045 8857.000 110.044 110.044 8858.000 110.Q42 110.042 8859.000 110.040 110.040 8860.000 110.038 110.038 8861.000 110.036 110.036 8862.000 110.034 110.034 8863.000 110.032 110.032 8864.000 110.031 110.031 8865.000 110.029 110.029 8866.000 110.027 110.027 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BS!A-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 61 11-17-2018 Attachment 1 Page 204 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8867.000 ll0.025 110.025 8868.000 ll0.023 110.023 8869.000 110.021 110.021 8870.000 110.019 110.019 8871.000 110.018 110.018 8872.000 110.016 ll0.016 8873.000 110.014 ll0.014 8874.000 110.012 110.012 8875.000 ll0.010 ll0.010 8876.000 ll0.008 ll0.008 8877.000 110.007 ll0.007 8878.000 110.005 ll0.005 8879.000 ll0.003 ll0.003 8880.000 ll0.001 ll0.001 8881.000 109.999 109.999 8882.000 109.997 109.997 8883.000 109.995 109:995 8884.000 109.994 109.994 8885.000 109.992 109.992 8886.000 109.990 109.990 8887.000 109.988 109.988 8888.000 109.986 109.986 8889.000 109.984 109.984 8890.000 109.983 109.983 8891.000 109.981 109.981 8892.000 109.979 109.979 8893.000 109.977 109.977 8894.000 109.975 109.975 8895.000 109.973 109.973 8896.000 109.971 109.971 8897.000 109.970 109.970 8898.000 109.968 109.968 8899.000 109.966 109.966 8900.000 109.964 109.964 8901.000 109.962 109.962 8902.000 109.960 109.960 8903.000 109.959 109.959 8904.000 109.957 109.957 8905.000 109.955 109.955 8906.000 109.953 109.953 8907.000 109.951 109.951 8908.000 109.949 109.949 8909.000 109.948 109.948 8910.000 109.946 109.946 8911.000 109.944 109.944 8912.000 109.942 109.942 8913.000 109.940 109.940 8914.000 109.938 109.938 8915.000 109.937 109.937 8916.000 109.935 109.935 8917.000 109.933 109.933 8918.000 109.931 109.931 8919.000 109.929 109.929 8920.000 109.927 109.927 8921.000 109.926 109.926 8922.000 109.924 109.924 8923.000 109.922 109.922 8924.000 109.920 109.920 8925.000 109.918 109.918 8926.000 109.916 109.916 8927.000 109.915 109.915 8928.000 109.913 109.913 8929.000 109.9ll 109.911 8930.000 109.909 109.909 8931.000 109.907 109.907 8932.000 109.905 109.905 8933.000 109.904 109.904 8934.000 109.902 109.902 8935.000 109.900 109.900 8936.000 109.898 109.898 8937.000 109.896 109.896 8938.000 109.895 109.895 8939.000 109.893 109.893 8940.000 109.891 109.891 8941.000 109.889 109.889 8942.000 109.887 109.887 8943.000 109.885 109.885 8944.000 109.884 109.884 8945.000 109.882 109.882 8946.000 109.880 109.880 8947.000 109.878 109.878

' 8948.000 109.876 109.876 8949.000 109.874 109.874 8950.000 109.873 109.873 I 8951.000 109.871 109.871 8952.000 109.869 109.869 8953.000 109.867 109.867 8954.000 109.865 109.865 8955.000 109.864 109.864 8956.000 109.862 109.862 8957.000 109.860 109.860 8958.000 . 109.858 109.858 8959.000 109.855 109.855 8960.000 109.853 109.853 8961.000 109.851 109.851 8962.000 109.849 109.849 8%3.000 109.847 109.847 8964.000 109.845 109.845 8965.000 109.843 109.843 8966.000 109.841 109.841 8967.000 109.839 109.839 8968.000 109.837 109.837 8969.000 109.834 109.834 8970.000 109.832 109.832 8971.000 109.830 109.830 8972.000 109.828 109.828 8973.000 109.826. 109.826 8974.000 109.824 109.824 8975.000 109.822 109.822 8976.000 109.820 109.820 8977.000 109.817 109.817 8978.000 109.815 109.815 8979.000 109.813 109.813 8980.000 !09.8ll 109.811 8981.000 109.809 109.809 8982.000 109.807 109.807 8983.000 109.804 109.804 8984.000 109.802 109.802 8985.000 109.800 109.800 8986.000 109.798 109.798 8987.000 109.796 109.796 8988.000 109.794 109.794 8989.000 109.791 109.791 8990.000 109.789 109.789 8991.000 109.787 109.787 8992.000 109.785 109.785 8993.000 109.783 109.783 8994.000 109.781 109.781 8995.000 109.778 109.778 8996.000 109.776 109.776 8997.000 109.774 109.774 8998.000 109.772 109.772 8999.000 109.770 109.770 9000.000 109.767 109.767 9001.000 109.765 109.765 9002.000 109.763 109.763 9003.000 109.761 109.761 9004.000 109.758 109.758 9005.000 109.756 109.756 9006.000 109.754 109.754 9007.000 109.752 109.752 9008.000 109.750 109.750 9009.000 109.747 109.747 9010.000 '!09.745 109.745 9011.000 109.743 109.743 9012.000 109.741 109.741 9013.000 109.738 109.738 9014.000 109.736 109.736 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 62 II-17-2018 Attachment 1 Page 205 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 901~.ooo 109.734 109.734 9016.000 109.732 109.732 9017.000 109.729 109.729 9018.000 109.727 109.727 9019.000 109.725 109.725 9020.000 109.722 109.722

  • 9021.000 109.720 109.720 9022.000 109.718 109.718 9023.000 109.716 109.716 9024.000 109.713 109.713 9025.000 109.711 109.711 9026.000 109.709 109.709 9027.000 109.706 109.706 9028.000 109.704 109.704 9029.000 109.702 109.702 9030.000 109.700 109.700 9031.000 109.697 109.697 9032.000 109.695 109.695 9033.000 109.693 109.693 9034.000 109.690 109.690 9035.000 109.688 109.688 9036.000 109.686 109.686 9037.000 109.683 109.683 9038.000 109.681 109.681 9039.000 109.679 109.679 9040.000 109.676 109.676 9041.000 109.674 109.674 9042.000 109.672 109.672 9043.000 109.669 109.669 9044.000 109.667 109.667 9045.000 109.665 ,109.665 9046.000 109.662 109.662 9047.000 109.660 109.660 9048.000 109.657 109.657 9049.000 109.655 109.655 9050.000 109.653 109.653 9051.000 109.650 109.650 9052.000 109.648 109.648 9053.000 109.646 109.646 9054.000 109.643 109.643 9055.000 109.641 109.641 9056.000 109.638 109.638 9057.000 109.636 109.636 9058.000 109.634 109.634 9059.000 109.631 109.631 9060.000 109.629 109.629 9061.000 109.626 109.626 9062.000 109.624 109.624 9063.000 109.621 109.621 9064.000 109.619 109.619 9065.000 109.617 109.617 9066.000 109.614 109.614 9067.000 109.612 109.612 9068.000 109.609 109.609 9069.000 109.607 109.607 9070.000 109.604 109.604 9071.000 109.602 109.602 9072.000 109.600 109.600 9073.000 109.597 109.597 9074.000 109.595 109.595 9075.000 109.592 109.592 9076.000 109.590 109.590 9077.000 '109.587 109.587 9078.000 109.585 109.585 9079.000 109.582 109.582 9080.000 109.580 109.580 9081.000 109.577 109.577 9082.000 109.575 109.575 9083.000 109.572 109.:S72 9084.000 109.570 109.570 9085.000 109.567 109.567 9086.000 109.565 109.565 9087.000 109.562 109.562 9088.000 109.560 109.560 9089.000 109.551 109.557 9090.000 109.555 109.555 9091.000.

109.552 109.552 9092.000 109.550 109.550 9093.000 109.547 109.547 9094.000 109.545 109.545 9095.000 109.542 109.542 9096.000 109.540 109.540 9097.000 109.537 109.537 9098.000 109.535 109.535 9099.000 109.532 109.532 9100.000 109.529 109.529 9101.000 109.527 109.527 9102.000 109.524 109.524 9103.000 109.522 109.522 9104.000 109.519 109.519 9105.000 109.517 109.517 9106.000 109.514 109.514 9107.000 109.511 109.511 9108.000 109.509 109.509 9109.000 109.506 109.506 9110.000 109.504 109.504 9111.000 109.501 109.501 9112.000 109.498 109.498 9113.000 109.496 109.496 9114.000 109.493 109.493 9115.000 109.491 109.491 9116.000 109.488 109.488 9117.000 109.485 109.485 9118.000 109.483 109.483 9119.000 109.480 109.480 9120.000 109.477 109.477 9121.000 109.475 109.475 9122.000 109.472 109.472 9123.000 109.470 109.470 9124.000 109.467 109.467 9125.000 109.464 109.464 9126.000 109.462 109.462 9127.000 109.459 109.459 9128.000 109.456 109.456 9129.000 109.454 109.454 9130.000 109.451 109.451 9131.000 109.448 109.448 9132.000 109.446 109.446 9133.000 109.443 109.443 9134.000 109.440 109.440 9135.POO 109.437 109.437 9136.000 109.435 109.435 9137.000 109.432 109.432 9138.000 109.429 109.429 9139.000 109.427 109.427 9140.000 109.424 109.424 9141.000 109.421 109.421 9142.000 109.418 109.418 9143.000 109.416 109.416 9144.000 109.413 109.413 9145.000 109.410 109.410 9146.000 109.408 109.408 9147.000 109.405 109.405 9148.000 109.402 109.402 9149.000 109.399 109.399 9150.000 109.397 109.397 9151.000 109.394 109.394 9152.000 109.391 109.391 9153.000 109.388 109.388 9154.000 109.385 109.385 9155.000 109.383 109.383 9156.000 109.380 109.380 9157.000 109.377 109.377 9158.000 109.374 109.374 9159.000 109.372 109.372 9160.000 109.369 109.369 9161.000 109.366 109.366 9162.000 109.363 109.363 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT lABUS 63 11-17-2018 Attachment 1 Page 206 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time V-V+ Time y. V+ 9163.000 109.360 109.360 9164.000 109.357 109.357 9165.000 109.355 109.355 9166.000 109.352 109.352 9167.000 109.349 109.349 9168.000 109.346 109.346 9169.000 109.343 109.343 9170.000 109.340 109.340 9171.000 109.338 109.338 9172.000 109.335 109.335 9173.000 109.332 109.332 9174.000 109.329 109.329 9175.000 109.326 109.326 9176.000 109.323 109.323 9177.000 109.320 109.320 9178.000 109.318 109.318 9179.000 109.315 109.315 9180.000 109.312 109.312 9181.000 109.309 109.309 9182.000 109.306 109.306 9183.000 109.303 109.303 9184.000 109.300 109.300 9185.000 109.297 109.297 9186.000 109.294 109.294 9187.000 109.291 109.291 9188.000 109.288 109.288 9189.000 109.285 109.285 9190.000 109.283 109.283 9191.000 109.280 109.280 9192.000 109.277 109.277 9193.000 109.274 109.274 9194.000 109.271 109.271 9195.000 109.268 109.268 9196.000 109.265 109.265 9197.000 109.262 109.262 9198.000 109.259 109.259 9199.000 109.256 109.256 9200.000 109.253 109.253 9201.000 109.250 109.250 9202.000 109.247 109.247 9203.000 109.244 109.244 9204.000 109.241 109.241 9205.000 109.238 109.238 9206.000 109.235 109.235 9207.000 109.232 109.232 9208.000 109.229 109.229 9209.000 109.226 109.226 9210.000 109.223 109.223 9211.000 109.220 109.220 9212.000 109.217 109.217 9213.000 109.214 109.214 9214.000 109.211 109.211 9215.000 109.207 109.207 9216.000 109.204 109.204 9217.000 109.201 109.201 9218.000 109.198 109.198 9219.000 109.195 109.195 9220.000 109.192 109.192 9221.000 109.189 109.189 9222.000 109.186 109.186 9223.600 109.183 109.183 9224.000 109.180 109.180 9225.000 109.177 109.177 9226.000 109.173 109.173 9227.000 109.170 109.170 9228.000 109.167 109.167 9229.000 109.164 109.164 9230.000 109.161 109.161 9231.000 109.158 109.158 9232.000 109.155 109.155 9233.000 109.152 109.152 9234.000 109.148 109.148 9235.000

  • 109.145 109.145 9236.000 109.142 109.142 9237.000 109.139 109.139 9238.000 109.136 109.136 9239.000 109.132 109.132 9240.000 109.129 109.129 9241.000 109.126 109.126 9242.000 109.123 109.123 9243.000 109.120 109.120 9244.000 109.116 109.116 9245.000 109.113 109.113 9246.000 109.110 109.110 9247.000 109.107 109.107 9248.000 109.104 109.104 9249.000 109.100 109.100 9250.000 109.097 109.097 9251.000 109.094 109.094 9252.000 109.091 109.091 9253.000 109.087 109.087 9254.000 109.084 109.084 9255.000 109.081 109.081 9256.000 109.077 109.077 9257.000 109.074 109.074 9258.000 109.071 109.q71 9259.000 109.068 109.068 9260.000 109.064 109.064 9261.000 109.061 109.061 9262.000 109.058 109.058 9263.000 109.054 109.054 9264.000 109.051 109.051 9265.000 109.048 109.048 9266.000 109.044 109.044 9267.000 109.041 109.041 9268.000 109.038 109.038 9269.000 109.034 109.034 9270.000 109.031 109.031 9271.000 109.028 109.028 9272.000 109.024 109.024 9273.000 109.021 109.021 9274.000 109.017 109.017 9275.000 109.014 109.014 9276.000 109.011 109.011 9277.000 109.007 109.007 9278.000 109.004 109.004 9279.000 109.001 109.001 9280.000 108.997 108.997 "9281.000 108.994 108.994 9282.000 108.990 108.990 9283.000 108.987 108.987 9284.000 108.983 108.983 9285.000 108.980 108.980 9286.000 108.976 108.976 9287.000 108.973 108.973 9288.000 108.970 108.970 9289.000 108.966 108.966 9290.000 108.963 108.963 9291.000 108.959 108.959 9292.000 108.956 108.956 9293.000 108.952 108.952 9294.000 108.949 108.949 9295.000 108.945 108.945 9296.000 108.942 108.942 9297.000 108.938 108.938 9298.000 108.935 108.935 9299.000 108.931 108.931 9300.000 108.927 108.927 9301.000 108.924 108.924 9302.000 108.920 108.920 9303.000 108.917 108.917 9304.000 108.913 108.913 9305.000 108.910 108.910 9306.000 108.906 108.906 9307.000 108.903 108.903 9308.000 108.899 108.899 9309.000 108.895 108.895 9310.000 108.892 108.892 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: 64 11-17-2018 Attachment 1 Page 207 of 27 4 KCICONSULT Base Normal DIV I Battery IA 48-Hour Coping Study BATT IA BUS Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 9311.000 108.888 108.888 9312.000 108.885 108.885 9313.000 108.881 108.881 9314.000 108.877 108.877 9315.000 108.874 108.874 9316.000 108.870 108.870 9317.000 108.866 108.866 9318.000 108.863 108.863 9319.000 108.859 108.859 9320.000 108.855 108.855 9321.000 108.852 108.852 9322.000 108.848 108.848 9323.000 108.844 108.844 9324.000 108.841 108.841 9325.000 108.837 108.837 9326.000 108.833 108.833 9327.000 108.830 108.830 9328.000 108.826 108.826 9329.000 108.822 108.822 9330.000 108.818 108.818 9331.000 108.815 108.815 9332.000 108.811 108.811 9333.000 108.807 108.807 9334.000 108.803 108.803 9335.000 108.800 108.800 9336.000 108.796 108.796 9337.000 108.792 108.792 9338.000 108.788 108.788 9339.000 108.784 108.784 9340.000 108.781 108.781 9341.000 108.777 108.777 9342.000 108.773 108.773 9343.000 108.769 108.769 9344.000 108.765 108.765 9345.000 108.761 108.761 9346.000 108.758 108.758 9347.000 108.754 108.754 . 9348.000 108.750 108.750 9349.000 108.746 108.746 9350.000 108.742 108.742 9351.000 108.738 108.738 9352.000 108.734 108.734 9353.000 108.731 108.731 9354.000 108.727 108.727 9355.000 108.723 108.723 9356.000 108.719 108.719 9357.000 108.715 108.715 9358.000 108.711 108.711 9359.000 108.707 108.707 9360.000 108.703 108.703 9361.000 108.699 108.699 9362.000 108.695 108.695 9363.000 108.691 108.691 9363.333 108.690 119.654 DCMCCIA Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time y. V+ Time V-V+ 0.000 119.654 111.654 0.017 111.654 113.738 1.000 113.741 113.868 2.000 113.871 113.871 3.000 113.874 113.874 4.000 113.877 113.877 5.000 113.880 113.880 6.000 113.883 113.883 7.000 113.888 113.888 8.000 113.892 113.892 ' 9.000 113.897 113.897 10.000 113.902 113.902 11.000 113.906 113.906 12.000 113.911 113.911 13.000 113.916 113.916 14.000 113.920 113.920 15.000 113.925 113.925 16.000 -113.930 113.930 17.000 113.935 113.935 18.000 113.939 113.939 19.000 113.944 113.944 20.000 113.949 113.949 21.000 113.954 113.954 22.000 113.959 113.959 23.000 113.964 li3.964 24.000 113.969 113.969 25.000 113.974 113.974 26.000 113.979 113.979 27.000 113.984 113.984 28.000 113.990 113.990 29.000 113.995 113.995 30.000 114.000 114.000 31.000 114.005 114.005 32.000 114.011 114.011 33.000 114.016 114.016 34.000 114.021 114.021 35.000 114.027 114.027 36.000 114.032 114.032 37.000 114.038 114.038 38.000 114.043 114.043 39.000 114.049 114.049 40.000 114.054 114.054 41.000 114.060 114.060 42.000 114.066 114.066 43.000 114.072 114.072 44.000 114.077 114.077 45.000 114.083 114.083 46.000 114.089 114.089 47.000 114.095 114.095 48.000 114.101 114.101 49.000 114.107 114.107 50.000 114.113 114.113 51.000 114.119 114.119 52.000 114.125 114.125 53.000 114.131 114.131 54.000 114.137 114.137 55.000 114.144 114.144 56.000 114.150 114.150 57.000 114.156 114.156 58.000 114:163 114.163 59.000 ' 114.169 114.169 60.000 114.176 115.385 61.000 115.387 115.387 62.000 115.388 115.388 63.000 115.389 115.389 64.000 115.390 115.390 65.000 115.392 115.392 66.000 115.393 115.393 67.000 115.394 115.394 68.000 115.396 115.396 69.000 115.397 115.397 70.000 115.398 115.398 71.000 115.399 115.399 72.000 115.401 115.401 73.000 115.402 115.402 74.000 115.403 115.403 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCClA 65 11-17-2018 Attachment 1 Page 208 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 75.000 115.404 115.404 76.000 115.406 115.406 77.000 115.407 115.407 78.000 115.408 115.408 79.000 115.410 115.410 80.000 115.411 115.411 81.000 115.412 115.412 82.000 115.413 115.413 83.000 115.415 115.415 84.000 115.416 115.416 85.000 115.417 115.417 86.000 115.418 115.418 87.000 115.419 115.419 88.000 115.420 115.420 89.000 115.420 115.420 90.000 115.421 115.421 91.000 115.421 115.421 92.000 115.422 115.422 93.000 115.423 115.423 94.000 115.423 115.423 95.000 115.424 115.424 96.000 115.424 115.424 97.000 115.425 115.425 98.000 115.426 115.426 99.000 115.426 115.426 100.000 115.427 115.427 101.000 115.427 115.427 102.000 115.428 115.428 103.000 115.429 115.429 104.000 115.429 115.429 105.000 115.430 115.430 106.000 115.431 115.431 107.000 115.431 115.431 108.000 115.432 115.432 109.000 115.432 115.432 110.000 115.433 115.433 111.000 115.434 115.434 112.000 115.434 115.434 113.000 115.435 115.435 114.000 115.435 115.435 115.000 115.436 115.436 116.000 115.437 115.437 117.000 115.437 115.437 118.000 115.438 115.438 119.000 115.438 115.438 120.000 115.439 115.439 121.000 115.440 115.440 122000 115.440 115.440 123.000 115.441 115.441 124.000 115.442 115.442 125.000 115.442 115.442 126.000 115.443 115.443 127.000 115.443 115.443 128.000 115.444 115.444 129.000 115.445 115.445 130.000 115.445 115.445 131.000 115.446 115.446 132.000 115.446 115.446 133.000 115.447 115.447 134.000 115.448 115.448 135.000 115.448 115.448 136.000 115.449 115.449 137.000 115.450 115.450 138.000 115.450 115.450 139.000 115.451 115.451 140.000 115.451 115.451 141.000 115.452 115.452 142.000 115.453 115.453 143.000 115.453 115.453 144.000 115.454 115.454 145.000 115.455 115.455 146.000 115.455 115.455 147.000 115.456 115.456 148.000 115.456 115.456 149.000 115.457 115.457 150.000 115.458 115.458 151.000 115.458 115.458 152.000 115.459 115.459 153.000 115.460 115.460 154.000 115.460 115.460 155.000 115.461 115.461 156.000 115.461 115.461 157.000 115.462 115.462 158.000 115.462 115.462 159.000 115.462 115.462 160.000 115.462 115.462 161.000 115.462 115.462 162.000 115.462 115.462 163.000 115.461 115.461 164.000 115.461 115.461 165.000 115.461 115.461 166.000 115.461 115.461 167.000 115.461 115.461 168.000 115.461 115.461 169.000 115.461 115.461 170.000 115.461 115.461 171.000 115.461 115.461 172.000 115.461 115.461 173.000 115.461 115.461 174.000 115.461 115.461 175.000 115.461 115.461 176.000 115.461 115.461 177.000 115.461 115.461 178.000 115.461 115.461 179.000 115.461 115.461 180.000 115.461 115.461 181.000 115.461 115.461 182.000 115.461 115.461 183.000 115.461 115.461 184.000 115.461 115.461 185.000 115.461 115.461 186.000 115.460 115.460 187.000 115.460 115.460 188.000 115.460 115.460 189.000 115.460 115.460 190.000 115.460 115.460 191.000 115.460 115.460 192.000 115.460 115.460 193.000 115.460 115.460 194.000 115.460 115.460 195.000 115.460 115.460 196.000 115.460 115.460 197.000 115.460 115.460 198.000 115.460 115.460 199.000 115.460 115.460 200.000 115.460 115.460 201.000 115.460 115.460 202.000 115.460 115.460 203.000 115.460 115.460 204.000 115.460 115.460 205.000 115.460 115.460 206.000 115.460 115.460 207.000 115.460 115.460 208.000 115.460 115.460 209.000 115.459 115.459 210.000 115.459 115.459 211.000 115.459 115.459 212.000 115.459 115.459 213.000 115.459 115.459 214.000 115.459 115.459 215.000 115.459 115.459 216.000 115.459 115.459 217.000 115.459 115.459 218.000 115.459 115.459 219.000 115.459 115.459 220.000 115.459 115.459 221.000 115.459 115.459 222.000 115.459 115.459 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery I.A 48-Hour Coping Study DCMCCIA 66 11-17-2018 Attachment 1 Page 209 of 27 4 KCICONSULT Base Normal Voltage (V)

Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 223.000 115.459 115.459 224.000 115.459 115.459 225.000 115.459 115.459 226.000 115.459 115.459 227.000 115.459 115.459 228.000 115.459 115.459 229.000 115.459 115.459 230.000 115.459 115.459 231.000 115.459 115.459 232.000 115.458 115.458 233.000 115.458 115.458 234.000 115.458 115.458 235.000 115.458 115.458 236.000 115.458 115.458 237.000 115.458 115.458 238.000 115.458 115.458 239.000 115.458 115.458 240.000 115.458 115.458 241.000 115.458 115.458 242.000 115.458. 115.458 243.000 115.458 115.458 244.000 115.458 115.458 245.000 115.458 115.458 246.000 115.458 115.458 247.000 115.458 115.458 248.000 115.458 115.458 249.000 115.458 115.458 250.000 115.458 115.458 251.000 115.458 115.458 252.000 115.458 115.458 253.000 115.458 115.458 254.000 115.457 115.457 255.000 115.457 115.457 256.000 115.457 115.457 257.000 115.457 115.457 258.000 115.457 115.457 259.000 115.457 115.457 260.000 115.457 115.457 261.000 115.457 115.457 262.000 115.457 115.457 263.000 115.457 115.457 264.000 115.457 115.457 265.000 115.457 115.457 266.000 115.457 115.457 267.000 115.457 115.457 268.000 115.457 115.457 269.000 115.457 115.457 270.000 115.457 115.457 271.000 115.457 115.457 272.000 115.457 115.457 273.000 115.457 115.457 274.000 115.457 115.457 275.000 115.457 115.457 276.000 115.457 115.457 277.000 115.456 115.456 278.000 115.456 115.456 279.000 115.456 115.456 280.000 115.456 115.456 281.000 115.456 115.456 282.000 115.456 115.456 283.000 115.456 115.456 284.000 115.456 115.456 285.000 115.456 115.456 286.000 115.456 115.456 287.000 115.456 115.456 288.000 115.456 115.456 289.000 115.456 115.456 290.000 115.456 115.456 291.000 115.456 115.456 292.000 115.456 115.456 293.000 115.456 115.456 294.000 115.456 115.456 295.000 115.456 115.456 296.000 115.456 115.456 297.000 115.456 115.456 298.000 115.456 115.456 299.000 115.456 115.456 300.000 115.455 115.455 301.000 115.455 115.455 302.000 115.455 115.455 303.000 115.455 115.455 304.000 115.455 115.455 305.000 115.455 115.455 306.000 115.455 115.455 307.000 115.455 115.455 308.000 115.455 115.455 309.000 115.455 115.455 310.000 115.455 115.455 311.000 115.455 115.455 312.000 115.455 115.455 313.000 115.455 115.455 314.000 115.455 115.455 315.000 115.455 115.455 316.000 115.455 115.455 317.000 115.455 115.455 318.000 115.455 115.455 319.000 115.455 115.455 320.000 115.455 115.455 321.000 115.455 115.455 322.000 115.454 115.454 323.000 115.454 115.454 324.000 115.454 115.454 325.000 115.454 115.454 326.000 115.454 115.454 327.000 115.454 115.454 328.000 115.454 115.454 329.000 115.454 115.454 330.000 115.454 115.454 331.000 115.454 115.454 332.000 115.454 115.454 333.000 115.454 115.454 334.000 115.454 115.454 335.000 115.454 115.454 336.000 115.454 115.454 337.000 115.454 115.454 338.000 115.454 115.454 339.000 115.454 115.454 340.000 115.454 115.454 341.000 115.454 115.454 342.000 115.454 115.454 343.000 115.454 115.454 344.000 115.454 115.454 345.000 115.453 115.453 346.000 115.453 115.453 347.000 115.453 115.453 348.000 '115.453 115.453 349.000 115.453 115.453 350.000 115.453 115.453 351.000 115.453 115.453 352.000 115.453 115.453 353.000 115.453 115.453 354.000 115.453 115.453 355.000 115.453 115.453 356.000 115.453 115.453 357.000 115.453 115.453 358.000 115.453 115.453 359.000 115.453 115.453 360.000 115.453 115.453 361.000 115.453 115.453 362.000 115.453 115.453 363.000 115.453 115.453 364.000 115.453 115.453 365.000 115.453 115.453 366.000 115.453 115.453 367.000 115.452 115.452 368.000 115.452 115.452 369.000 115.452 115.452 370.000 115.452 115.452 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA-48-Hour Coping Sn1dy DCMCCIA 67 11-17-2018 Attachment 1 Page 210 of 274 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 371.000 115.452 115.452 372.000 115.452 115.452 373.000 115.452 115.452 374.000 115.452 115.452 375.000 115.452 115.452 376.000 115.452 115.452 377.000

  • 115.452 115.452 378.000 115.452 115.452 379.000 115.452 115.452 380.000 115.452 115.452 381.000 115.452 115.452 382.000 t 15.452 115.452 383.000 115.452 115.452 384.000 115.452 115.452 385.000 115.452 115.452 386.000 115.452 115.452 387.000 115.452 115.452 388.000 115.452 115.452 389.000 115.451 115.451 390.000 115.451 115.451 391.000 115.451 115.451 392.000 115.451 115.451 393.000 115.451 115.451 394.000 115.451 115.451 395.000 115.451 115.451 396.000 115.451 115.451 397.000 115.451 115.451 398.000 115.451 115.451 399.000 115.451 115.451 400.000 115.451 115.451 401.000 115.451 115.451 402.000 115.451 115.451 403.000 115.451 115.451 404.000 115.451 115.451 405.000 115.451 115.451 406.000 115.451 115.451 407.000 115.451 115.451 408.000 115.451 115.451 409.000 115.451 115.451 410.000 115.451 115.451 411.000 115.450 115.450 412.000 115.450 115.450 413.000 115.450 115.450 414.000 115.450 115.450 415.000 115.450 115.450 416.000 115.450 115.450 417.000 115.450 115.450 418.000 115.450 115.450 419.000 115.450 115.450 420.000 115.450 115.450 421.000 115.450 115.450 422.000 115.450 115.450 423.000 115.450 115.450' 424.000 115.450 115.450 425.000 115.450 115.450 426.000 115.450 115.450 427.000 115.450 115.450 428.000 115.450 115.450 429.000 115.450 115.450 430.000 115.450 115.450 431.000 115.450 115.450 432.000 115.450 115.450 433.000 115.450 115.450 434.000 115.449 115.449 435.000 115.449 115.449 436.000 115.449 115.449 437.000 115.449 115.449 438.000 115.449 115.449 439.000 115.449 115.449 440.000 115.449 115.449 441.000 115.449 115.449 442.000 115.449 115.449 443.000 115.449 115.449 444.000 115.449 115.449 445.000 115.449 115.449 446.000 115.449 115.449 447.000 115.449 115.449 448.000 115.449 115.449 449.000 115.449 115.449 450.000 115.449 115.449 451.000 115.449 115.449 452.000 115.449 115.449 453.000 115.449 115.449 454.000 115.449 115.449 455.000 115.449 115.449 456.000 115.448 115.448 457.000 115.448 115.448 458.000 115.448 115.448 459.000 115.448 115.448 460.000 115.448 115.448 461.000 115.448 115.448 462.000 115.448 115.448 463.000 115.448 115.448 464.000 115.448 115.448 465.000 115.448 115.448 466.000 115.448 115.448 467.000 115.448 115.448 468.000 115.448 115.448 469.000 115.448 115.448 470.000 115.448 115.448 471.000 115.448 115.448 472.000 115.448 115.448 473.000 115.448 115.448 474.000 115.448 115.448 475.000 115.448 115.448 476.000 115.448 115.448 477.000 115.447 115.447 478.000 115.447 115.447 479.000 115.447 115.447 480.000 115.447 115.447 481.000 115.447 115.447 482.000 115.447 115.447 483.000 115.447 115.447 484.000 115.447 115.447 485.000 115.447 115.447 486.000 115.447 115.447 487.000 115.447 115.447 488.000 115.447 115.447 489.000 115.447 115.447 490.000 . 115.447 115.447 491.000 115.447 115.447 492.000 115.447 115.447 493.000 115.447 115.447 494.000 115.447 115.447 495.000 115.447 115.447 496.000 115.447 115.447 497.000 115.447 115.447 498.000 115.447 115.447 499.000 115.446 115.446 500.000 115.446 115.446 501.000 115.446 115.446 502.000 115.446 115.446 503.000 115.446 115.446 504.000 115.446 115.446 505.000 115.446 115.446 506.000 115.446 115.446 507.000 115.446 115.446 508.000 115.446 115.446 509.000 115.446 115.446 510.000 115.446 115.446 511.000 115.446 115.446 512.000 115.446 115.446 513.000 115.446 lls'.446 514.000 115.446 115.446 515.000 115.446 115.446 516.000 115.446 115.446 517.000 115.446 115.446 518.000 115.446 115.446 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study DCMCClA 68 11-17-2018 Attachment 1 Page 211 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time y. V+ Time y. V+ Time V-V+ Time V-V+ 519.000 115.446 115.446 520.000 115.446 115.446 521.000 115.445 115.445 522.000 115.445 115.445 523.000 115.445 115.445 524.000 115.445 115.445 525.000 115.445 115.445 526.000 115.445 115.445 527.000 115.445 115.445 528.000 115.445 115.445 529.000 115.445 115.445 530.000 115.445 115.445 531.000 115.445 115.445 532.000 115.445 115.445 533.000 115.445 115.445 534.000 115.445 115.445 535.000 115.445 115.445 536.000 115.445 115.445 537.000 115.445 115.445 538.000 115.445 115.445 539.000 115.445 115.445 540.000 115.445 115.445 541.000 115.445 115.445 542.000 115.445 115.445 543.000 115.444 115.444 544.000 115.444 115.444 545.000 115.444 115.444 546.000 115.444 115.444 547.000 115.444 11_5.444 548.000 115.444 115.444 549.000 115.444 115.444 550.000 115.444 115.444 551.000 115.444 115.444 552.000 115.444 115.444 553.000 115.444 115.444 554.000 115.444 115.444 555.000 115.444 115.444 556.000 115.444 115.444 557.000 115.444 115.444 558.000 115.444 115.444 559.000 115.444 115.444 560.000 115.444 115.444 561.000 115.444 115.444 562.000 115.444 115.444 563.000 115.444 115.444 564.000 115.444 115.444 565.000 115.443 115.443 566.000 115.443 115.443 567.000 115.443 115.443 568.000 115.443 115.443 569.000 115.443 115.443 570.000 115.443 115.443 571.000 115.443 115.443 572.000 115.443 115.443 573.000 115.443 115.443 574.000 115.443 115.443 575.000 115.443 115.443 576.000 115.443 115.443 577.000 115.443 115.443 578.000 115.443 115.443 579.000 115.443 115.443 580.000 115.443 115.443 581.000 115.443 115.443 582.000 115.443 115.443 583.000 115.443 115.443 584.000 115.443 115.443 585.000 115.443 115.443 586.000 115.442 115.442 587.000 115.442 115.442 588.000 115.442 115.442 589.000 115.442 115.442 590.000 115.442 115.442 591.000 115.442 115.442 592.000 115.442 115.442 593.000 115.442 115.442 594.000 115.442 115.442 595.000 115.442 115.442 596.000 115.442 115.442 597.000 115.442 115.442 598.000 115.442 115.442 599.000 115.442 115.442 600.000 115.442 115.442 601.000 115.442 115.442 602.000 115.442 115.442 603.000 115.442 115.442 604.000 115.442 115.442 605.000 115.442 115.442 606.000 115.442 115.442 607.000 115.441 115.441 608.000 115.441 115.441 609.000 115.441 115.441 610.000 115.441 115.441 611.000 115.441 115.441 , 612.000 115.441 115.441 613.000 115.441 115.441 614.000 115.441 115.441 615.000 115.441 115.441 616.000 115.441 115.441 617.000 115.441 115.441 618.000 115.441 115.441 619.000 115.441 115.441 620.000 115.441 115.441 621.000) 115.441 115.441 622.000 115.441 115.441 623.000 115.441 115.441 624.000 115.441 115.441 625.000 115.441 115.441 626.000 115.441 115.441 627.000 115.441 115.441 628.000 115.441 115.441 629.000 115.440 115.440 630.000 115.440 115.440 631.000 115.440 115.440 632.000 115.440 115.440 633.000 115.440 115.440 634.000 115.440 115.440 635.000 115.440 115.440 636.000 115.440 115.440 637.000 115.440 115.440 638.000 115.440 115.440 639.000 115.440 115.440 640.000 115.440 115.440 641.000 115.440 115.440 642.000 115.440 115.440 643.000 115.440 115.440 644.000 115.440 115.440 645.000 115.440 .115.440 646.000 115.440 115.440 647.000 115.440 115.440 648.000 115.440 115.440 649.000 115.440 115.440 650.000 115.439 115.439 651.000 115.439 115.439 652.000 115.439 115.439 653.000 115.439 115.439 654.000 115.439 115.439 655.000 115.439 115.439 656.000 115.439 115.439 657.000 115.439 115.439 658.000 115.439 115.439 659.000 115.439 115.439 660.000 115.439 115.439 661.000 115.439 115.439 662.000 115.439 115.439 663.000 115.439 115.439 664.000 115.439 115.439 665.000 115.439 115.439 666.000 115.439 115.439 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: ' DIV I Battery IA 48-Hour Coping Study DCMCClA 69 11-17-2018 Attachment 1 Page 212 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time v-V+ Time V-V+ Time V-V+ 667.000 115.439 115.439 668.000 115.439 115.439 669.000 115.439 115.439 670.000 115.439 115.439 671.000 115.438 115.438 672.000 115.438 115.438 673.000 115.438 115.438 674.000 115.438 115.438 675.000 115.438 115.438 676.000 115.438 115.438 677.000 115.438 115.438 678.000 115.438 115.438 679.000 115.438 115.438 680.000 115.438 115.438 681.000 115.438 115.438 682.000 115.438 115.438 683.000 115.438 ll5.438 684.000 115.438 115.438 685.000 115.438 115.438 686.000 115.438 115.438 687.000 115.438 115.438 688.000 115.438 115.438-689.000 115.438 115.438 690.000 115.438 115.438 691.000 115.438 115.438 692.000 115.437 115.437 693.000 115.437 115.437 694.000 115.437 115.437 695.000 115.437 ll5.437 696.000 115.437 115.437 697.000 115.437 115.437 698.000 115.437 115.437 699.000 115.437 115.437 700.000 115.437 115.437 701.000 115.437 115.437 702.000 115.437 115.437 703.000 115.437 115.437 704.000 115.437 115.437 705.000 115.437 115.437 706.000 115.437 115.437 707.000 115.437 115.437 708.000 115.437 115.437 709.000 115.437 115.437 710.000 115.437 115.437 711.000 115.437 115.437 712.000 115.437 115.437 713.000 115.436 115.436 714.000 115.436 115.436 715.000 115.436 115.436 716.000 115.436 115.436 717.000 115.436 115.436 718.000 115.436 115.436 719.000 115.436 115.436 720.000 115.436 115.436 721.000 115.436 115.436 722.000 115.436 115.436 723.000 115.436 115.436 724.000 115.436 115.436 725.000 115.436 115.436 726.000 115.436 115.436 727.000 115.436 115.436 728.000 115.436 ,115.436 729.000 115.436 115.436 730.000 115.436 115.436 731.000 115.436 115.436 732.000 115.436 115.436 733.000 115.436 115.436 734.000 115.435 115.435 735.000 115.435 115.435 736.000 115.435 ll5.435 737.000 115.435 115.435 738.000 115.435 115.435 739.000 115.435 115.435 740.000 115.435 ll5.435 741.000 115.435 115.435 742.000 115.435 115.435 743.000 115.435 115.435 744.000 115.435 115.435 745.000 115.435 115.435 746.000 115.435 115.435 747.000 115.435 115.435 748.000 115.435 115.435 749.000 115.435 115.435 750.000 115.435 115.435 \ 751.000 115.435 115.435 752.000 115.435 115.435 753.000 115.435 115.435 754.000 115.435 115.435 755.000 115.434 115.434 756.000 115.434 115.434 757.000 115.434 115.434 758.000 115.434 115.434 759.000 115.434 115.434 760.000 115.434 115.434 761.000 115.434 115.434 762.000 115.434 115.434 763.000 115.434 115.434 764.000 115.434 115.434 765.000 115.434 115.434 766.000 115.434 115.434 767.000 115.434 115.434 768.000 115.434 115.434 769.000 115.434 115.434 770.000 115.434 115.434 771.000 115.434 115.434 772.000 115.434 115.434 773.000 115.434 115.434 774.000 115.434 115.434 775.000 115.434 115.434 776.000 il5.433 115.433 777.000 115.433 115.433 778.000 115.433 115.433 779.000 115.433 115.433 780.000 115.433 115.433 781.000 115.433 115.433 782.000 115.433 115.433 783.000 115.433 115.433 784.000 115.433 115.433 785.000 115.433 115.433 786.000 115.433 115.433 787.000 115.433 115.433 788.000 115.433 115.433 789.000 115.433 115.433 790.000 115.433 115.433 791.000 115.433 115.433 792.000 115.433 115.433 793.000 115.433 115.433 794.000 115.433 115.433 795.000 115.433 115.433 796.000 115.433 115.433 797.000 115.432 115.432 798.000 115.432 115.432 799.000 115.432 115.432 800.000 115.432 115.432 801.000 115.432 115.432 802.000 115.432 115.432 803.000 115.432 115.432 804.000 115.432 115.432 805.000 115.432 115.432 806.000 115.432 115.432 807.000 115.432 115.432 808.000 115.432 115.432 809.000 115.432 115.432 810.000 115.432 115.432 811.000 115.432 115.432 812.000 115.432 115.432 813.000 115.432 115.432 814.000 115.432 115.432 EC. 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study DCMCCIA 70 11-17-2018 Attachment 1 Page 213 of 274 KCICONSULT

Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 815.000 115.432 115.432 816.000 115.432 115.432 817.000 115.431 115.431 818.000 115.431 115.431 819.000 115.431 115.431 820.000 115.431 115.431 821.000 115.431 115.431 822.000 115.431 115.431 823.000 115.431 115.431 824.000 115.431 115.431 825.000 115.431 115.431 826.000 115.431 115.431 827.000 115.431 115.431 828.000 115.431 115.431 829.000 115.431 115.431 830.000 115.431 115.431 831.000 115.431 115.431 832.000 115.431 115.431 833.000 115.431 115.431 834.000 115.431 115.431 835.000 115.431 115.431 836.000 115.431 115.431 837.000 115.431 115.431 838.000 115.430 115.430 839.000 115.430 115.430 840.000 115.430 115.430 841.000 115.430 115.430 842.000 115.430 115.430 843.000 115.430 115.430 844.000 115.430 115.430 845.000 115.430 115.430 846.000 115.430 115.430 847.000 115.430 115.430 848.000 115.430 115.430 849.000 115.430 115.430 850.000 115.430 115.430 851.000 115.430 115.430 852.000 115.430 115.430 853.000 115.430 115.430 854.000 115.430 "115.430 855.000 115.430 115.430 856.000 115.430 115.430 857.000 115.430 115.430 858.000 115.430 115.430 859.000 115.429 115.429 860.000 115.429 115.429 861.000 115.429 115.429 862.000 115.429 115.429 863.000 115.429 115.429 864.000 115.429 115.429 865.000 115.429 115.429 866.000 115.429 115.429 867.000 115.429 115.429 868.000 115.429 115.429 869.000 115.429 115.429 870.000 115.429 115.429 871.000 115.429 115.429 872.000 115.429 115.429 873.000 115.429 115.429 874.000 115.429 115.429 875.000 115.429 115.429 876.000 115.429 115.429 877.000 115.429 115.429 878.000 115.429 115.429 879.000 115.428 115.428 880.000 115.428 115.428 881.000 115.428 115.428 882.000 115.428 115.428 883.000 115.428 115.428 884.000 115.428 115.428 885.000 115.428 115.428 886.000 115.428 115.428 887.000 115.428 115.428 888.000 115.428 115.428 889.000 115.428 115.428 890.000 115.428 115.428 891.000 115.428 115.428 892.000 115.428 115.428 893.000 115.428 115.428 894.000 115.428 115.428 895.000 115.428 115.428 896.000 115.428 115.428 897.000 115.428 115.428 898.000 115.428 115.428 . 899.000 115.427 115.427 900.000 115.427 115.427 901.000 115.427 115.427 902.000 115.427 115.427 903.000 115.427 115.427 904.000 115.427 115.427 905.000 115.427 115.427 906.000 115.427 115.427 907.000 115.427 115.427 908.000 115.427 115.427 909.000 115.427 115.427 910.000 115.427 115.427 911.000 115.427 115.427 912.000 \15.427 115.427 913.000 115.427 115.427 914.000 115.427 115.427 915.000 115.427 115.427 916.000 115.427 115.427 917.000 115.427 115.427 918.000 115.427 115.427 919.000 115.427 115.427 920.000 115.426 115.426 921.000 115.426 115.426 922.000 115.426 115.426 923.000 115.426 115.426 924.000 115.426 115.426 925.000 115.426 115.426 926.000 115.426 115.426 927.000 115.426 115.426 928.000 115.426 115.426 929.000 115.426 115.426 930.000 115.426 115.426 931.000 115.426 115.426 932.000 115.426 115.426 933.000 115.426 115.426 934.000 115.426 115.426 935.000 115.426 115.426 936.000 115.426 115.426 937.000 115.426 115.426 938.000 115.426 115.426 939.000 115.426 115.426 940.000 115.425 115.425 941.000 115.425 115.425 942.000 115.425 115.425 943.000 115.425 115.425 944.000 115.425 115.425 945.000 115.425 115.425 946.000 115.425 115.425 947.000 115.425 115.425 948.000 115.425 115.425 949.000 115.425 115.425 950.000 115.425 115.425 951.000 115.425 115.425 952.000 115.425 115.425 953.000 115.425 115.425 954.000 115.425 115.425 955.000 115.425 115.425 956.000 115.425 115.425 957.000 115.425 115.425 958.000 115.425 115.425 959.000 115.425 115.425 960.000 115.424 115.424 961.000 115.424 115.424 962.000 115.424 115.424 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

.10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.LON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCClA 71 11-17-2018 Attachment 1 .Page 214 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time ,V-V+ Time V-V+ 963.000 115.424 115.424 964.000 115.424 115.424 965.000 115.424 115.424 966.000 115.424 115.424 967.000 115.424 115.424 968.000 115.424 115.424 969.000 115.424 115.424 970.000 115.424 115.424 -971.000 115.424 115.424 972.000 115.424 115.424 973.000 115.424 115.424 974.000 115.424 115.424 975.000 115.424 115.424 976.000 115.424 115.424 977.000 115.424 115.424 978.000 115.424 115.424 979.000 115.424 115.424 980.000 115.423 115.423 981.000 115.423 115.423 982.000 115.423 115.423 983.000 115.423 115.423 984.000 115.423 115.423 985.000 115.423 115.423 986.000 115.423 115.423 987.000 115.423 115.423 988.000 115.423 115.423 989.000 115.423 115.423 990.000 115.423 115.423 991.000 115.423 115.423 992.000 115.423 115.423 993.000 115.423 115.423 994.000 115.423 115.423 995.000 115.423 115.423 996.000 115.423 115.423 997.000 115.423 115.423 998.000 115.423 115.423 999.000 115.423 115.423 1000.000 115.422 115.422 1001.000 115.422 115.422 1002.000 115.422 115.422 1003.000 115.422 115.422 1004.000 115.422 115.422 1005.000 115.422 115.422 1006.000 115.422 115.422 1007.000 115.422 115.422 1008.000 115.422 115.422 1009.000 115.422 115.422 1010.000 115.422 115.422 1011.000 115.422 115.422 1012.000 115.422 115.422 1013.000 115.421 115.421 1014.000 115.420 115.420 1015.000 115.418 115.418 1016.000 115.417 115.417 1017.000 115.416 115.416 1018.000 115.414 115.414 1019.000 115.413 115.413 1020.000 115.412 115.412 1021.000 115.410 115.410 1022.000 115.409 115.409 1023.000 115.407 115.407 1024.000 115.406 115.406 1025.000 115.405 115.405 1026.000 115.403 115.403 1027.000 115.402 115.402 1028.000 115.401 115.401 1029.000 115.399 115.399 1030.000 115.398 115.398 1031.000 115.396 115.396 1032.000 115.395 115.395 1033.000 115.394 115.394 1034.000 115.392 115.392 1035.000 115.391 115.391 1036.000 115.390 115.390 1037.000 115.388 115.388 1038.000 115.387 115.387 1039.000 115.385 115.385 1040.000 115.384 115.384 1041.000 115.383 . 115.383 1042.000 115.381 115.381 1043.000 115.380 115.380 1044.000 115.379 115.379 1045.000 115.377 115.377 1046.000 115.376 115.376 1047.000 115.375 115.375 1048.000 115.373 115.373 1049.000 115.372 115.372 1050.000 115.370 115.370 1051.000 115.369 115.369 1052.000 115.368 115.368 1053.000 115.366 115.366 1054.000 115.365 115.365 1055.000 115.364 115.364 1056.000 115.362 115.362 1057.000 115.361 115.361 1058.000 115.360 115.360 1059.000 115.358 115.358 1060.000 115.357 115.357 1061.000 115.355 J.15.355 1062.000 115.354 115.354 1063.000 115.353 115.353 1064.000 115.351 115.351 1065.000 115.350 115.350 1066.000 115.349 115.349 1067.000 115.347 115.347 1068.000 115.346 115.346 1069.000 115.345 115.345 1070.000 115.343 115.343 1071.000 115.342 115.342 1072.000 115.341 115.341 1073.000 115.339 115.339 1074.000 115.338 115.338 1075.000 115.336 115.336 1076.000 115.335 115.335 1077.000 115.334 115.334 1078.000 115.332 115.332 1079.000 115.331 115.331 1080.000 115.330 115.330 1081.000 115.328 115.328 1082.000 115.327 115.327 1083.000 115.326 115.326 1084.000 115.324 115.324 1085.000 115.323 115.323 1086.000 115.322 115.322 1087.000 115.320 115.320 1088.000 115.319 115.319 1089.000 115.318 115.318 1090.000 115.316 115.316 1091.000 115.315 115.315 1092.000 115.314 115.314 1093.000 115.312 115.312 1094.000 115.311 115.311 1095.000 115.310 115.310 1096.000 115.308 115.308 1097.000 115.307 115.307 1098.000 115.306 115.306 1099.000 115.304 115.304 1100.000 115.303 115.303 1101.000 115.301 115.301 1102.000 115.300 115.300 1103.000 115.299 115.299 1104.000 115.297 115.297 1105.000 115.296 115.296 1106.000 115.295 115.295 1107.000 115.293 115.293 1108.000 115.292 115.292 1109.000 115.291 115.291 1110.000 115.289 115.289 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ET AP Reports for CASE 1.1 Division 1 DC Loads with _1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battecy IA 48-Hour Coping Study DC¥CC1A 72 11-17-2018 Attachment 1 Page 215 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-Y+ Time V-V+ Time V-V+ Time V-V+ llll.000 115.288 115.288 1112.000 115.287 115.287 1113.000 115.285 115.285 1114.000 115.284 115.284 l115.000 115.283 115.283 1116.000 115.281 115.281 1117.000 115.280 115.280 1118.000 115.279 115.279 1119.000 115.277 115.277 1120.000 115.276 115.276 1121.000 115.275 115.275 1122.000 115.273 115.273 1123.000 115.272 115.272 1124.000 115.271 115.271 1125.000 115.269 115.269 1126.000 115.268 115.268 1127.000 115.267 115.267 1128.000 115.265 115.265 1129.000 115.264 115.264 1130.000 115.263 115.263 1131.000 115.261 115.261 1132.000 115.260 115.260 1133.000 115.259 115.259 1134.000 115.257 115.257 1135.000 115.256 115.256 1136.000 115.255 115.255 1137.000 115.253 115.253 1138.000 115.252 115.252 1139.000 115.251 115.251 1140.000 115.249 115.249 1141.000 115.248 115.248 1142.000 115.247 115.247 1143.000 115.246 115.246 1144.000 115.245 115.245 1145.000 115.244 115.244 1146.000 115.243 115.243 1147.000 115.242 115.242 1148.000 115.241 115.241 1149.000 115.240 115.240 1150.000 115.239 115.239 1151.000. 115.238 115.238 1152.000 115.237 115.237 1153.000 115.236 115.236 1154.000 115.235 115.235 1155.000 115.234 115.234 1156.000 115.233 115.233 1157.000 115.232 115.232 1158.000 115.231 115.231 1159.000 115.230 115.230 1160.000 115.229 115.229 1161.000 115.228 115.228 1162.000 115.227 115.227 1163.000 115.226 115.226 1164.000 115.225 115.225 1165.000 115.224 115.224 1166.000 115.223 115.223 1167.000 115.222 115.222 1168.000 115.221 115.221 1169.000 115.220 115.220 1-170.000 115.219 115.219 1171.000 115.218 115.218 1172.000 115.217 115.217 1173.000 115.216 115.216 1174.000 115.215 115.215 1175.000 115.214 115.214 1176.000 115.213 115.213 1177.000 115.213 115.213 1178.000 115.212 115.212 1179.000 115.211 115.211 1180.000 115.210 115.210 1181.000 115.209 115.209 1182.000 115.208 115.208 1183.000 115.207 115.207 1184.000 115.206 115.206 1185.000 115.205 115.205 1186.000 115.204 115.204 1187.000 115.203 115.203 1188.000 115.202 115.202 1189.000 115.201 115.201 1190.000 115.200 115.200 1191.000 115.199 115.199 1192.000 115.198 115.198 1193.000 115.197 115.197 1194.000 115.196 115.196 1195.000 115.195 115.195 1196.000 115.194 115.194 1197.000 115.193 115.193 1198.000 115.192 115.192 1199.000 115.191 115.191 1200.000 115.190 115.190 1201.000 115.189. 115.189 1202.000 115.188 115.188 1203.000 115.187 115.187 1204.000

  • 115.186 115.186 1205.000 115.185 115.185 1206.000 115.184 115.184 1207.000 115.183 115.183 1208.000 115.182 115.182 1209.000 115.181 115.181 1210.000 115.180 115.180 1211.000 115.179 115.179 1212.000 115.178 115.178 1213.000 115.177 115.177 1214.000 115.176 115.176 1215.000 115.175 115.175 1216.000 115.174 115.174 1217.000 115.173 115.173 1218.000 115.172 115.172 1219.000 115.171 115.171 1220.000 115.170 115.170 1221.000 115.169 115.169 1222.000 115.168 115.168 1223.000 115.167 115.167 1224.000 115.166 115.166 1225.000 115.165 115.165 1226.000 115.165 115.165 1227.000 115.164 115.164 1228.000 115.163 115.163 1229.000 115.162 115.162 1230.000 115.161 115.161 1231.000 115.160 115.160 1232.000 115.159 115.159 1233.000 115.158 115.158 1234.000 115.157 115.157 1235.000 115.156 115.156 1236.000 115.155 115.155 1237.000 115.154 115.154 1238.000 115.153 115.153 1239.000 115.152 115.152 1240.000 115.151 115.151 1241.000 115.150 115.150 1242.000 115.149 115.149 1243.000 115.148 115.148 1244.000 115.147 115.147 1245.000 115.146 115.146 1246.000 115.145 115.145 1247.000 115.144 115.144 1248.000 115.143 115.143 1249.000 115.142 115.142 1250.000 115.141 115.141 1251.000 115.140 115.140 1252.000 115.139 115.139 1253.000 115.138 115.138 1254.000 115.137 115.137 1255.000 115.136 115.136 1256.000 115.135 115.135 1257.000 115.134 115.134 1258.000 115.133 115.133 EC 62~319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study_ D.CMCClA 73 11-17-2018 Attachment 1 Page 216 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V). Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1259.000 115.132 115. 132 1260.000 115.131 115.131 1261.000 115.130 115.130 1262.000 115.129 115.129 1263.000 115.128 115.128 1264.000 115.127 115.127 1265.000 115.126 115.126 1266.000 115.125 115.125 1267.000 115.124 115.124 1268.000 115.123 115.123 1269.000 115.122 115.122 1270.000 115.121 115.121 1271.000 115.120 115.120 1272.000 115.119 115.119 1273.000 115.118 115.118 1274.000 115.117 115.117 1i15.ooo 115.116 115.116 1276.000 115.116 115.116 1277.000 115.115 115.115 1278.000 115.114 115.114 1279.000 115.113 115.113 1280.000 115.112 115.112 1281.000 115.111 115.111 1282.000 115.110 115.110 1283.000. 115.109 115.109 1284.000 115.108 115.108 1285.000 115.107 115.107 1286.000 115.106 115.106 1287.000 115.105 115.105 1288.000 115.104 115.104 1289.000 115.103 115.103 1290.000 115.102 115.102 1291.000 115.101 115.101 1292.000 115.100 115.100 1293.000 115.099 115.099 1294.000 115.098 115.098 1295.000 115.097 115.097 1296.000 115.096 115.096 1297.000 115.095 115.095 1298.000 115.094 115.094 1299.000 115,093 115.093 1300.000 115.092 115,092 1301.000 115.091 115.o91 1302.000 115.090 115.090 1303.000 115.089 115.089 1304.000 115.088 115.088 1305.000 115.087 115.087 1306.000 115.086 115.086 1307.000 115.085 115.085 1308.000 115.084 115.084 1309.000 115.083 115.083 1310.000 115.082 115.082 1311.000 115.081 115.081

-1312.000 115.080 115.080 1313.000 115.079 115.079 1314.000 115.078 115.078 1315.000 115.077 115.077 1316.000 115.076 115.076 1317.000 115.075 115.075 1318.000 115.074 115.074 1319.000 115.073 115.073 1320.000 115.072 115.072 1321.000 115.071 115.071 1322.000 115,070 115.070 1323.000 115.069 115.069 1324.000 115.068 115.068 1325.000 115.068 115.068 1326.000 115.067 115.067 1327.000 115.066 115.066 1328.000 115.065 115.065 1329.000 115.064 115.064 1330.000 115.063 115.063 1331.000 115.062 115.062 1332.000 115.061 115.061 1333.000 115.060 115.060 1334.000 115.059 115.059 1335.000 115.058 115.058 1336.000 115.057 115.057 1337.000 115.056 115.056 1338.000 115.055 115.055 1339.000 115.054 ll5.054 1340.000 115.053 ll5.053 1341.000 115.052 115.052 1342.000 115.051 115.051 1343.000 115.050 115.050 1344.000 115.049 115.049 1345.000 115.048 115.048 1346.000 115.047 115.047 1347.000 115.046 ll5.046 1348.000 115.045 115.045 1349.000 115.044 115.044 1350.000 115.043 115.043 1351.000 115.042 ll5.042 1352.000 115.041 115.041 1353.000 115.040 .115.040 1354.000 115.039 115.039 1355.000 115.038. 115.038 1356.000 115.037 115.037 1357.000 115.036 115.036 1358.000 115.035 115.035 1359.000 ll5.034 115.034 1360.000 115.033 115.033 1361.000 115.032 115.032 1362.000 115.031 115.031 1363.000 115.030 115.030 1364.000 115.029 115.029 1365.000 115.028 115.028 1366.000 115.027 115.027 1367.000 115.026 115.026 1368.000 115.025 115.025 1369.000 115.024 115.024 1370.000 115.023 115.023 1371.000 115.022 115.022 1372.000 115.021 115.021 1373.000 115.020 115.020 1374.000 115.020 115.020 1375.000 115.019 115.019 1376.000 115.018 115.018 1377.000 115.017 115.017 1378.000 115.016 115.016 1379.000 115.015 115.015 1380.000 115.014 115.014 1381.000 115.013 115.013 1382.000 115.012 115.012 1383.000 115.011 115.011 1384.000 I 115.010 115.010 1385.000 115.009 115.009 1386.000 115.008 115.008 1387.000 115.007 115.007 1388.000 115.006 115.006 1389.000 115.005 115.005 1390.000 115.004 115.004 1391.000 115.003 115.003 1392.000 115.002 115.002 1393.000 115.001 115.001 1394.000 115.000 115.000 1395.000 114.999 114.999 1396.000 114.998 114.998 1397.000 114.997 114.997 1398.000 114.996 114.996 1399.000 114.995 114.995 1400.000 114.994 114.994 1401.000 114.993 114.993 1402.000.

114.992 114.992 1403.000 114.991 114.991 1404.000 114.990 114.990 1405.000 114.989 114.989 1406.000 114.988 114.988 EC 626319 Project: Location:

Contract:

Engineer:

J:ilename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for gre*ater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC IA 74 11-17-2018 Attachment 1 Page 217 of 274 KCJCONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1407.000 114.987 114.987 1408.000 114.986 114.986 1409.000 114.985 114.985 1410.000 114.984 114.984 1411.000 114.983 114.983 1412.000 114.982 114.982 1413.000 114.981 114.981 1414.000 . 114.980 114.980 1415.000 .114.979 114.979 1416.000 114.978 114.978 1417.000 114.977 114.977 1418.000 114.976 114.976 1419.000 114.975 114.975 1420.000 114.974 114.974 1421.000 114.973 114.973 1422.000 114.973 114.973 1423.000 114.972 114.972 1424.000 114.971 114.971 1425.000 114.970 114.970 1426.000 114.969 114.969 1427.000 114.968 114.968 1428.000 114.967 114.967 1429.000 114.966 114.966 1430.000 114.965 114.965 1431.000 114.964 114.964 1432.000 114.963 114.963 1433.000 114.962 114.962 1434.000 114.961 114.961 1435.000 114.960 114.960 1436.000 114.959 114.959 1437.000 114.958 114.958 1438.000 114.957 114.957 1439.000 114.956 114.956 1440.000 114.955 114.955 1441.000 114.954 114.954 1442.000 114.953 114.953 1443.000 114.952 114.952 1444.000 114.951 114.951 1445.000 114.950 114.950 1446.000 114.949 114.949 1447.000 114.948 114.948 1448.000 114.947 114.947 1449.000 114.946 114.946 1450.000 114.945 114.945 1451.000 114.944 114.944 1452.000 114.943 114.943 1453.000 114.942 114.942 1454.000 114.941 114.941 1455.000 114.940 114.940 1456.000 114.939 114.939 1457.000*

114.938 114.938 1458.000 114.937 114.937 ' 1459.000 114.936 114.936 1460.000 114.935 114.935 1461.000 114.934 114.934 1462.000 114.933 114.933 1463.000 114.932 114.932 1464.000 114.931 114.931 1465.000 114.930 114.930 1466.000 114.929 114.929 1467.000 114.928 114.928 1468.000 114.927 114.927 1469.000 114.926 114.926 1470.000 114.925 114.925 1471.000 114.925 114.925 1472.000 114.924 114.924 1473.000 114.923 114.923 1474.000 114.922 114.922 1475.000 114.920 114.920 1476.0IJ!) 114.918 114.918 1477.000 114.916 114.916 1478.000 114.914 114.914 1479.000 114.912 114.912 1480.000 114.910 114.910 1481.000 114.908 114.908 1482.000 114.906 114.906 1483.000 114.904 114.904 1484.000 114.901 114.901 1485.000 114.899 114.899 1486.000 114.897 114.897 1487.000 114.895 114.895 1488.000 114.893 114.893 1489.000 114.891 114.891 1490.000 114.889 114.889 1491.000 114.887 114.887 1492.000 114.885 114.885 1493.000 114.883 114.883 1494.000 114.881 114.881 1495.000 114:878 114.878 1496.000 114.876 114.876 1497.000 114.874 114.874 1498.000

  • 114.872 114.872 1499.000 114.870 114.870 1500.000 114.868 114.868 1501.000 114.866 114.866 1502.000 114.864 114.864 1503.000 114.862 114.862 1504.000 114.860 114.860 1505.000 114.858 114.858 1506.000 114.856 114.856 1507.000 114.854 114.854 1508.000 114.852 114.852 1509.000 114.849 114.849 1510.000 114.847 114.847 1511.000 114.845 114.845 1512.000 114.843 114.843 1513.000 114.841 114.841 1514.000 114.839 114.839 1515.000 114.837 114.837 1516.000 114.835 114.835 1517.000 114.833 114.833 1518.000 114.831 114.831 1519.000 114.829 114.829 1520.000 114.827 114.827 1521.000 114.825 114.825 1522.000 114.823 114.823 1523.000 114.821 114.821 1524.000 114.819 114.819 1525.000 114.816 114.816 1526.000 114.814 114.814 1527.000 114.812 114.812 1528.000 114.810 114.810 1529.000 114.808 114.808 1530.000 114.806 114.806 1531.000 114.804 114.804 1532.000 114.802 114.802 1533.000 114.800 114.800 1534.000 114.798 114.798 1535.000 114.796 114.796 1536.000 114.794 114.794 1537.000 114.792 114.792 1538.000 114.790 114.790 1539.000 114.788 114.788 1540.000 114.786 114.786 1541.000 114.784 114.784 1542.000 114.782 114.782 1543.000 114.780 114.780 1544.000 114.778 114.778 1545.000 114.776 114.776 1546.000 114.774 114.774 1547.000 114.772 114.772 1548.000 114.770 114.770 1549.000 114.768 114.768 1550.000 114.765 114.765 1551.000 114.763 114.763 1552.000 114.761 114.761 1553.000 114.759 114.759 1554.000 114.757 ' 114.757 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC IA 75 11-17-2018 Attachment 1 Page 218 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-Y+ Time V-Y+ 1555.000 114.755 114.755 1556.000 114.753 114.753 1557.000 114.751 114.751 1558.000 114.749 114.749 1559.000 114.747 114.747 1560.000 114.745 114.745 1561.000 114.743 114.743 *1562.000 114.741 114.741 1563.000 114.739 114.739 1564.000 114.737 114.737 1565.000 114.735 114.735 1566.000 114.733 114.733 1567.000 114.731 114.731 1568.000 114.729 114.729 1569.000 114.727 114.727 1570.000 114.725 114.725 1571.000 114.723 114.723 1572.000 114.721 114.721 1573.000 114.719 114.719 1574.000 114.717 114.717 1575.000 114.715 114.715 1576.000 114.713 114.713 1577.000 114.711 114.711 1578.000 114.709 114.709 1579.000 114.707 114.707 1580.000 114.705 114.705 1581.000 114.703 114.703 1582.000 114.701 114.701 1583.000 114.699 114.699 1584.000 114.697 114.697 1585.000 114.695 114.695 1586.000 114.693 114.693 1587.000 114.691 114.691 1588.000 114.689 114.689 1589.000 114.687 114.687 1590.000 114.685 114.685 1591.000 114.683 114.683 1592.000 114.681 114.681 1593.000 114.679 114.679 1594.000 114.677 114.677 1595.000 114.675 114.675 1596.000 114.673 114.673 1597.000 114.671 114.671 1598.000 114.669 114.669 1599.000 114.667 114.667 1600.000 114.665 114.665 1601.000 114.663 114.663 1602.000 114.661 114.661 1603.000 114.659 114.659 1604.000 114.657 114.657 1605.000 114.655 114.655 1606.000 114.653 114.653 1607.000 114.651 114.651 1608.000 114.649 114.649 1609.000 114.647 114.647 1610.000 114.645 114.645 1611.000 114.643 114.643 1612.000 114.642 114.642 1613.000 114.640 114.640 1614.000 114.638 114.638 1615.000 114.636 114.636 1616.000 114.634 114.634 1617.000 114.632 114.632 1618.000 114.630 114.630 1619.000 114.628 114.628 1620.000 114.626 114.626 1621.000 114.624 114.624 1622.000 114.622 114.622 1623.000 114.620 114.620 1624.000 114.618 114.618 1625.000 114.616 114.616 1626.000 114.614 114.614 1627.000 114.612 114.612 1628.000 114.610 114.610 1629.000 114.608 114.608 1630.000 114.606 114.606 1631.000 114.604 114.604 1632.000 114.602 114.602 1633.000 114.600 114.600 1634.000 114.598 114.598 1635.000 114.596 114.596 1636.000 114.594 114.594 1637.000 114.593 114.593 1638.000 114.591 114.591 1639.000 114.589 114.589 1640.000 .114.587 114.587 1641.000 114.585 114.585 1642.000 114.583 114.583 1643.000 114.581 114.581 1644.000 114.579 114.579 1645.000 114.577 114.577 1646.000 114.575 114.575 1647.000 114.573 114.573 1648.000 114.571 114.571 1649.000 114.569 114.569 1650.000 114.567 114.567 1651.000 114.565 114.565 1652.000 114.563 114.563 1653.000 114.561 114.561 1654.000 114.560 114.560 1655.000 114.558 114.558 1656.000 114.556 114.556 1657.000 114.554 114.554 1658.000 114.552 114.552 1659.000 114.550 114.550 1660.000 114.548 114.548 1661.000 114.546 114.546 1662.000 114.544 114.544 1663.000 114.542 114.542 1664.000 114.540 114.540 1665.000 114.538 114.538 1666.000 114.536 114.536 1667.000 114.534 114.534 1668.000 114.533 114.533 1669.000 114.531 114.531 1670.000 114.529 114.529 1671.000 114.527 114.527 1672.000 114.525 114.525 1673.000 114.523 114.523 1674.000 114.521 114.521 1675.000 114.519 114.519 1676.000 114.517 114.517 1677.000 114.515 114.515 1678.000 114.513 114.513 1679.000 114.511 114.511 1680.000 114.510 ll4.510 1681.000 114.508 114.508 1682.000 114.506 114.506 1683.000 114.504 114.504 1684.000 114.502 114.502 1685.000 114.500 114.500 1686.000 114.498 114.498 1687.000 114.496 114.496 1688.000 114.494 114.494 1689.000 114.492, 114.492 1690.000 114.490 114.490 1691.000 114.489 114.489 1692.000 114.487 114.487 1693.000 114.485 114.485 1694.000 114.483 114.483 1695.000, 114.481 114.481 1696.000 114.479 114.479 1697.000 114.477 114.477 1698.000 114.476 114.476 1699.000 114.476 114.476 1700.000 114.476 114.476 1701.000 114.476 114.476 1702.000 114.476 114.476 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery lA48-HourCopingStudy DCMCClA 76 11-17-2018 Attachment 1 Page 219 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1703.000 114.475 114.475 1704.000 114.475 114.475 1705.000 114.475 114.475 1706.000 114.475 114.475 1707.000 114.474 114.474 1708.000 114.474 114.474 1709.000 114.474 114.474 1710.000 114.474 114.474 1711.000 114.473 114.473 1712.000 114.473 114.473 1713.000 114.473 114.473 1714.000 114.473 114.473 1715.000 114.473 114.473 1716.000 114.472 114.472 1717.000 114.472 114.472 1718.000 114.472 114.472 1719.000 114.472 114.472 1720.000 114.471 114.471 1721.000 114.471 114.471 1722.000 114.471 114.471 1723.000 114.471 114.471 1724.000 114.471 114.471 1725.000 114.470 114.470 1726.000 114.470 114.470 . 1727.000 114.470 114.470 1728.000 114.470 114.470 1729.000 114.469 114.469 1730.000 114.469 114.469 . 1731.000 114.469 114.469 1732.000 114.469 114.469 1733.000 114.468 114.468 1734.000 114.468 114.468 1735.000 114.468 114.468 1736.000 114.468 114.468 1737.000 114.468 114.468 1738.000 114.467 114.467 1739.000 114.467 114.467 1740.000 114.467 114.467 1741.000 114.467 114.467 1742.000 114.466 114.466 1743.000 114.466 114.466 1744.000 114.466 114.466 1745.000 114.466 114.466 1746.000 114.466 114.466 1747.000 114.465 114.465 1748.000 114.465 114.465 1749.000 114.465 114.465 1750.000 114.465 114.465 1751.000 114.464 114.464 1752.000 114.464 114.464 1753.000 114.464 114.464 1754.000 114.464 114.464 1755.000 114.463 114.463 1756.000 114.463 114.463 1757.000 114.463 114.463 1758.000 114.463 114.463 1759.000 114.463 114.463 1760.000 114.462 114.462 1761.000 114.462 114.462 1762.000 114.462 114.462 1763.000 114.462 114.462 1764.000 114.461 114.461 1765.000 114.461 114.461 1766.000 114.461 114.461 1767.000 114.461 114.461 1768.000 114.460 114.460 1769.000 114.460 114.460 1770.000 114.460 114.460 1771.000 114.460 114.460 1772.000 114.460 114.460 1773.000 114.459 114.459 1774.000 114.459 114.459 1775.000 114.459 114.459 1776.000 114.459 114.459 1777.000 114.458 114.458 1778.000 114.458 114.458 1779.000 114.458 114.458 1780.000 114.458 114.458 1781.000 114.457 114.457 1782.000 114.457 114.457 1783.000 114.457 114.457 1784.000 114.457 114.457 1785.000 114.457 114.457 1786.009 114.456 114.456 1787.000 114.456 114.456 1788.000 114.456 114.456 1789.000 114.456 114.456 1790.000 114.455 114.455 1791.000 114.455 114.455 1792.000 114.455 114.455 1793.000 114.455 114.455 1794.000 114.454 114.454 1795.000 114.454 114.454 1796.000 114.454 114.454 1797.000 114.454 114.454 1798.000 114.453 114.453 1799.000 114.453 114.453 1800.000 114.453 114.453 1801.000 114.453 114.453 1802.000 114.453 114.453 1803.000 114.452 114.452 1804.000 114.452 114.452 1805.000 114.452 114.452 1806.000 114.452 114.452 1807.000 114.451 114.451 1808.000 114.451 114.451 1809.000 114.451 114.451 1810.000 114.451 114.451 1811.000 114.450 114.450 1812.000 114.450 114.450 1813.000 114.450 114.450 1814.000 114.450 114.450 1815.000 114.450 114.450 1816.000 114.449 114.449 1817.000 114.449 114.449 1818.000 114.449 114.449 1819.000 114.449 114.449 1820.000 114.448 114.448 1821.000 114.448 114.448 1822.000 114.448 114.448 1823.000 114.448 114.448 1824.000 114.447 114.447 1825.000 114.447 114.447 1826.000 114.447 114.447 1827.000 114.447 114.447 1828.000 114.446 114.446 1829.000 114.446 114.446 1830.000 114.446 114.446 1831.000 114.446 114.446 1832.000 114.446 114.446 1833.000 114.445 114.445 1834.000 114.445 114.445

  • 1835.000 114.445 114.445 1836.000 114.445 114.445 1837.000 114.444 114.444 1838.000 114.444 114.444 1839.000 114.444 114.444 1840.000 114.444 114.444 1841.000 114.443 114.443 1842.000 114.443 114.443 1843.000 114.443 114.443 1844.0_00 114.443 114.443 1845.000 114.442 114.442 1846.000 114.442 114.442 1847.000 114.442 114.442 1848.000
  • 114.442 114.442 1849.000 114.441 114.441 1850.000 114.441 114.441 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 77 11-17-2018 Attachment 1 Page 220 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1851.000 114.441 114.441 1852.000 114.441 114.441 1853.000 114.441 114.441 1854.000 114.440 114.440 1855.000 114.440 114.440 1856.000 114.440 114.440 1857.000 114.440 114.440 1858.000 114.439 114.439 1859.000 114.439 114.439 1860.000 114.439 114.439 1861.000 114.439 114.439 1862.000 114.438 114.438 1863.000 114.438 114.438 1864.000 114.438 114.438 1865.000 114.438 114.438 1866.000 114.437 114.437 1867.000 114.437 114.437 1868.000 114.437 114.437 1869.000 114.437 114.437 1870.000 114.436 114.436 1871.000 114.436 114.436 1872.000 114.436 114.436 1873.000 114.436 114.436 1874.000 114.436 114.436 1875.000 114.435 114.435 1876.000 114.435 114.435 1877.000 114.435 114.435 1878.000 114.435 114.435 1879.000 114.434 114.434 1880.000 114.434 114.434 1881.000 114.434 114.434 1882.000 114.434 114.434 1883.000 114.433 114.433 1884.000 114.433 114.433 1885.000 114.433 114.433 1886.000 114.433 114.433 1887.000 114.432 114.432 1888.000 114.432 114.432 1889.000 114.432 114.432 1890.000 114.432 114.432 1891.000 114.431 114.431 1892.000 114.431 114.431 1893.000 114.431 114.431 1894.000 114.431 114.431 1895.000 114.430 114.430 1896.000 114.430 114.430 1897.000 114.430 114.430 1898.000 114.430 114.430 1899.000 114.430 114.430 1900.000 114.429 114.429 1901.000 114.429 114.429 1902.000 114.429 114.429 1903.000 114.429 114.429 1904.000 114.428 114.428 1905.000 114.428 114.42.8 1906.000 114.428 114.428 1907.000 114.428 114.428 1908.000 114.427 114.427 1909.000 114.427 114.427 1910.000 114.427 114.427 1911.000 114.427 114.427 1912.000 114.426 114.426 1913.000 114.426 114.426 1914.000 114.426 114.426 1915.000 114.426 114.426 1916.000 114.425 114.425 1917.000 114.425 114.425 1918.000 114.425 114.425 1919.000 114.425 114.425 1920.000 114.424 114.424 1921.000 114.424 114.424 1922.000 114.424 114.424

!923.000 114.424 114.424 1924.000 114.423 114.423 1925.000 114.423 114.423 1926.000 114.423 114.423 1927.000 114.423 114.423 1928.000 114.423 114.423 1929.000 114.422 114.422 1930.000 114.422 114.422 1931.000 114.422 114.422 1932.000 114.422 114.422 1933.000 114.421 114.421 1934.000 114.421 114.421 1935.000 114.421 114.421 1936.000 114.421 114.421 1937.000 114.420 114.420 1938.000 114.420 114.420 1939.000 114.420 114.420 1940.000 114.420 114.420 1941.000 114.419 114.419 1942.000 114.419 114.419 1943.000 114.419 114.419 1944.000 114.419 114.419 1945.000 114.418 114.418 1946.000 114.418 114.418 1947.000 114.418 114.418 1948.000 114.418 114.418 1949.000 114.417 114.417 1950.000 114.417 114.417 1951.000 114.417 114.417 1952.000 114.417 114.417 1953.000 114.416 114.416 1954.000 114.416 114.416 1955.000 114.416 114.416 1956.000 114.416 114.416 1957.000 114.415 114.415 1958.000 114.415 114.415 1959.000 114.415 114.415 1960.000 114.415 114.415 1961.000 114.414 114.414 1962.000 114.414 114.414 1963.000 114.414 114.414 1964.000 114.414 114.414 1965.000 114.413 114.413 1966.000 114.413 114.413 1967.000 114.413 114.413 1968.000 114.413 114.413 1969.000 114.412 114.412 1970.000 114.412 114.412 1971.000 114.412 114.412 1972.000 114.412 114.412 1973.000 114.411 114.411 1974.000 114.411 114.411 1975.000 114.411 114.411 1976.000 114.411 114.411 1977.000 114.410 114.410 1978.000 114.410 114.410 1979.000 114.410 114.410 1980.000 114.410 114.410 1981.000 114.409 114.409 1982.000 114.409 114.409 1983.000 114.409 114.409 1984.000 114.409 114.409 1985.000 114.408 114.408 1986.000 114.408 114.408 1987.000 114.408 114.408 1988.000 114.408 114.408 1989.000 114.407 114.407 1990.000 114.407 114.407 1991.000 114.407 114.407 1992.000 114.407 114.407 1993.000 114.406 114.406 1994.000 114.406 114.406 1995.000 114.406 114.406 1996.000 114.406 114.406 1997.000 114.406 114.406 1998.000 114.405 114.405 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study DCMCC IA 78 11-17-2018 Attachment 1 Page 221 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1999.000 114.405 114.405 2000.000 114.405 114.405 2001.000 114.405 114.405 2002.000 114.404 114.404 2003.000 114.404 114.404 2004.000 114.404 114.404 2005.000 114.404 114.404 2006.000 114.403 114.403 2007.000 114.403 114.403 2008.000 114.403 114.403 2009.000 114.403 114.403 2010.000 114.402 114.402 2011.000 114.402 114.402 2012.000 114.402 114.402 2013.000 114.402 114.402 2014.000 114.401 114.401 2015.000 114.401 114.401 2016:000 114.401 114.401 2017.000 114.401 114.401 2018.000 114.400 114.400 2019.000 114.400 114.400 2020.000 114.400 114.400 2021.000 114.399 114.399 2022.000 114.399 114.399 2023.000 114.399 114.399 2024.000 IJ4.399 114.399 2025.000 114.398 114.398 2026.000 114.398 114.398 2027.000 114.398 114.398 2028.000 114.398 114.398 2029.000 114.397 114.397 2030.000 114.397 114.397 2031.000 114.397 114.397 2032.000 114.397 114.397 2033.000 114.396 114.396 2034.000 114.396 114.396 2035.000 114.396 114.396 2036.000 114.396 114.396 2037.000 114.395 114.395 2038.000 114.395 114.395 2039.000 114.395 114.395 2040.000 114.395 114.395 2041.000 114.395 114.395 2042.000 114.395 114.395 2043.000 114.395 114.395 2044.000 114.395 114.395 2045.000 114.395 114.395 2046.000 114.395 114.395 2047.000 114.395 114.395 2048.000 114.395 114.395 2049.000 114.395 114.395 2050.000 114.395 114.395 2051.000 114.395 114.395 2052.000 114.396 114.396 2053.000 114.396 114.396 2054.000 114.396 114.396 2055.000 114.396 114.396 2056.000 114.396 114.396 2057.000 114.396 114.396 2058.000 114.396 114.396 ) 2059.000 114.396 114.396 2060.000 114.396 114.396 2061.000 114.396 114.396 2062.000 114.396 114.396 2063.000 114.396 114.396 2064.000 114.396 114.396 2065.000 114.396 114.396 2066.000 114.396 114.396 2067.000 114.397 114.397 2068.000 114.397 114.397 2069.000 114.397 114.397 2070.000 114.397 114.397 2071.000 114.397 114.397 2072.000 114.397 114.397. 2073.000 114.397 114.397 2074.000 114.397 114.397 2075.000 114.397 114.397 2076.000 114.397 114.397 2077.000 114.397 114.397 2078.000 114.397 114.397 2079.000 114.397 114.397 2080.000 114.397 114.397 2081.000 114.397 114.397 2082.000 114.397 114.397 2083.000 114.398 114.398 2084.000 114.398 114.398 2085.000 114.398 114.398 2086.000 114.398 114.398 2087.000 114.398 114.398 2088.000 114.398 114.398 2089.000 114.398 114.398 2090.000 114.398 114.398 2091.000 114.398 114.398 2092.000 114.398 114.398 2093.000 114.398 114.398 2094.000 114.398 114.398 2095.000 114.398 114.398 2096.000 114.398 114.398 2097.000 114.398 114.398 2098.000 114.398 114.398 2099.000 114.399 114.399 2100.000 114.399 114.399 2101.000 114.399 114.399 2102.000 114.399 114.399 2103.000 114.399 114.399 2104.000 114.399 114.399 2105.000 114.399 114.399 2106.000 114.399 114.399 2107.000 114.399 114.399 2108.000 114.399 114.399 2109.000 114.399 114.399 2110.000 114.399 114.399 2111.000 114.399 114.399 2112.000 114.399 114.399 2113.000 114.399 114.399 2114.000 114.400 114.400 2115.000 114.400 114.400 2116.000 114.400 114.400 2117.000 114.400 114.400 2118.000 114.400 114.400 2119.000 114.400 114.400 2120.000 114.400 114.400 2121.000 114.400 114.400 2122.000 114.400 114.400 2123.000 114.400 114.400 2124.000 114.400 114.400 2125.000 114.400 114.400 2126.000 114.400 114.400 2127.000 114.400 114.400 2128.000 114.400 114.400 2129.000 114.400 114.400 2130.000 114.401 114.401 2131.000 114.401 114.401 2132.000 114.401 114.401 2133.000 114.401 114.401 2134.000 114.401 114.401 2135.000 114.401 114.401 2136.000 114.401 114.401 2137.000 114.401 114.401 2138.000 114.401 114.401 2139.000 114.401 114.401 2140.000 114.401 114.401 2141.000 114.401 114.401 2142.000 114.401 114.401

  • 2143.000 114.401 114.401 2144.000 114.401 114.401 2145.000 114.402 114.402 2146.000 114.402 114.402 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs* Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA48-HourCopingStudy DCMCC lA 79 11-17-2018 Attachment 1 Page 222 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2147.000 114.402 114.402 2148.000 114.402 114.402 2149.000 114.402 114.402 2150.000 114.402 114.402 2151.000 114.402 114.402 2152.000 114.402 114.402 2153.000 114.402 114.402 2154.000 114.402 114.402 2155.000 114.402 114.402 2156.000 114.402 114.402 2157.000 114.402 114.402 2158.000 '114.402 114.402 2159.000 114.402 114.402 2160.000 114.403 114.403 2161.000 114.403 114.403 2162.000 114.403 114.403 2163.000 114.403 114.403 2164.000 114.403 114.403 2165.000 114.403 114.403 2166.000 114.403 114.403 2167.000 114.403 114.403 2168.000 114.403 114.403 2169.000 114.403 114.403 2170.000 114.403 114.403 2171.000 114.403 114.403 2172.000 114.403 114.403 2173.000 114.403 114.403 2174.000 114.403 114.403 2175.000 114.404 114.404 2176.000 114.404 114.404 2177.000 114.404 114.404 2178.000 114.404 114.404 2179.000 114.404 114.404 2180.000 114.404 114.404 2181.000 114.404 114.404 2182.000 114.404 114.404 2183.000 114.404 114.404 2184.000 114.404 114.404 2185.000 114.404 114.404 2186.000 114.404 114.404 2187.000 114.404 114.404 2188.000 114.404 114.404 2189.000 114.404 114.404 2190.000 114.405 114.405 2191.000 114.405 114.405 2192.000 114.405 114.405 2193.000 114.405 114.405 2194.000 114.405 114.405 2195.000 114.405 114.405 2196.000 114.405 114.405 2197.000 114.405 114.405 2198.000 114.405 114.405 2199.000 114.405 114.405 2200.000 114.405 114.405 2201.000 114.405 114.405 2202.000 114.405 114.405 2203.000 114.405 114.405 2204.000 114.405 114.405 2205.000 114.406 114.406 2206.000 114.406 114.406 2207.000 114.406 114.406 2208.000 114.406 114.406 2209.000 114.406 114.406 2210.000 114.406 114.406 2211.000 114.406 114.406 2212.000 114.406 114.406 2213.000 114.406 114.406 2214.000 114.406 114.406 2215.000 114.406 114.406 2216.000 114.406 114.406 2217.000 114.406 114.406 2218.000 114.406 114.406 2219.000 114.407 114.407 2220.000 114.407 114.407 2221.000 114.407 114.407 2222.000 114.407 114.407 2223.000 114.407 114.407 2224.000 114.407 114.407 2225.000 114.407 114.407 2226.000 114.407 114.407 2227.000 114.407 114.407 2228.000 114.407 114.407 2229.000 114.407 114.407 2230.000 114.407 114.407 2231.000 114.407 114.407 2232.000 114.407 114.407 2233.000 114.407 114.407 2234.000 114.408 114.408 2235.000 114.408 114.408 2236.000 114.408 114.408 2237.000 114.408 114.408 2238.000 114.408 114.408 2239.000 114.408 114.408 2240.000 114.408 114.408 2241.000 114.408 114.408 2242.000 114.408 114.408 2243.000 114.408 114.408 2244.000 114.408 114.408 2245.000 114.408 114.408 2246.000 114.408 114.408 2247.000 114.408 114.408 2248.000 114.409 114.409 2249.000 114.409 114.409 2250.000 114.409 114.409 2251.000 114.409 114.409 2252.000 114.409 114.409 2253.000 114.409 114.409 2254.000 114.409 114.409 2255.000 114.409 114.409 2256.000 114.409 114.409 2257.000 114.409 114.409 2258.000 11ll.409 114.409 2259.000 114.409 114.409 2260.000 114.409 114.409 2261.000 114.409 114.409 2262.000 114.409 114.409 2263.000 114.410 114.410 2264.000 114.410 114.410 2265.000 114.410 114.410 2266.000 114.410 114.410 2267.000 114.410 114.410 2268.000 114.410 114.410 2269.000 114.410 114.410 2270.000 114.410 114.410 2271.000 114.410 114.410 2272.000 114.410 114.410 2273.000 114.410 114.410 2274.000 114.410 114.410 2275.000 114.410 114.410 2276.000 114.410 114.410 2277.000 114.411 114.411 2278.000 114.411 114.411 2279.000 114.411 114.411 2280.000 114.411 114.411 2281.000 114.411 114.411 2282.000 114.411 114.411 2283.000 114.411 114.411 2284.000 '114.411 114.411 2285.000 114.411 114.411 2286.000 114.411 114.411 2287.000 114.411 114.411 2288.000 114.411 114.411 2289.000 114.411 114.411 2290.000 114.411 114.411 2291.000 114.412 114.412 2292.000 114.412 114.412 2293.000 114.412 114.412 2294.000 114.412 114.412 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 80 11-17-2018 Attachment 1 Page 223 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2295.000 114.412 114.412 2296.000 114.412 114.412 2297.000 114.412 114.412 2298.000 114.412 114.412 2299.000 114.412 114.412 2300.000 114.412 114.412 2301.000 114.412 114.412 2302.000 114.412 114.412 2303.000 114.412 Ir4.412 2304.000 114.412 114.412 2305.000 114.413 114.413 2306.000 114.413 114.413 2307.000 114.413 114.413 2308.000 114.413 114.413 2309.000 114.413 114.413 2310.000 114.413 !14.413 2311.000" 114.413 114.413 2312.000 114.413 114.413 2313.000 114.413 114.413 2314.000 114.413 114.413 2315.000 114.413 !!4.413 2316.000 114.413 114.413 2317.000 !!4.413 114.413 2318.000 114.413 114.413 2319.000 114.414 !!4.414 2320.000 !14.414 114.414 2321.000 114.414 114.414 2322.000 114.414 114.414 2323.000 114.414 !!4.414 2324.000 !!4.414 !!4.414 2325.000 !!4.414 114.414 2326.000 1!4.414 114.414 2327.000 114.414 !!4.414 2328.000 114.414 114.414 2329.000 114.414. 114.414 2330.000 114.414 114.414 2331.000 114.414 !!4.414 2332.000 114.414 !!4.414 2333.000 !!4.415 114.415 2334.000 114.415 114.415 2335.000 114.415 !14.415 2336.000 114.415 114.415 2337.000 114.415

  • 114.415 2338.000 114.415 114.415 2339.000 114.415 !14.415 2340.000 114.415 114.415 2341.000 114.415 114.415 2342.000' 1!4.415 114.415 2343.000 114.415 !14.415 2344.000 !!4.415 !!4.415 2345.000 114.415 114.415 2346.000 114.416 114.416 2347.000 114.416 !14.416 2348.000 !14.416 !14.416 2349.000 114.416 114.416 2350.000 114.416 114.416 2351.000 114.416 114.410 2352.000 !14.415 !14.415 2353.000 114.415 114.415 2354.000 114.415 114.415 2355.000 114.415 !14.415 2356.000 !!4.415 114.415 2357.000 114.415 114.415 2358.000 114.415 114.415 2359.000 !14.415 114.415 2360.000 !14.415 !14.415 2361.000 !14.415 !14.415 2362.000 114.415 114.415 2363.000 114.415 !14.415 2364.000 114.415 !14.415 2365.000 114.415 114.415 2366.000 114.415 114.415 2367.000 !14.415 !14.415 2368.000 114.415 !14.415 2369.000 114.415 114.415 2370.000 114.415 114.415 2371.000 !14.415 114.415 2372.000 114.415 114.415 2373.000 114.415 114.415 2374.000 114.415 114.415
  • 2375.000 114.415 114.415 2376.000 114.415 114.415 2377.000 114.415 114.415 2378.000 114.415 !14.415 2379.000 114.414 114.414 2380.000 114.414 114.414 2381.000 114.414 114.414 2382.000 114.414 114.414 2383.000 114.414 114.414 2384.000 114.414 114.414 2385.000 114.414 114.414 2386.000 1!4.414 114.414 2387.000 114.414 114.414 2388.000 114.414 114.414 2389.000 114.414 114.414 2390.000 114.414 114.414 2391.000 114.414 114.414 2392.000 114.414 114.414 2393.000-114.414 114.414 2394.000 114.414 114.414 2395.000 114.414 114.414 2396.000 114.414 114.414 2397.000 114.414 114.414 2398.000 114.414 114.414 2399.000 114.414 !14.414 2400.000 114.414 !14.414 2401.000 !14.414 114.414 2402.000 114.414 114.414 2403.000 !14.414 114.414 2404.000 !14.414 114.414 2405.000 114.413 114.413 2406.000 !14.413 114.413 2407.000 !14.413 114.413 2408.000 114.413 114.413 2409.000 114.413 114.413 2410.000 114.413 114.413 2411.000 !14.413 114.413 2412.000 !14.413 114.413 2413.000 114.413 114.413 2414.000 1!4.413 114.413 2415.000 114.413 114.413 2416.000 114.413 114.413 2417.000 114.413 114.413 2418.000 114.413 114.413 2419.000 114.413 114.413 2420.000 !!4.413 114.413 2421.000 114.413 114.413 2422.000 114.413 114.413 2423.000 114.413 114.413 2424.000 114.413 !14.413 2425.000 114.413 114.413 2426.000 1!4.413 114.413 2427.000 114.413 114.413 2428.000 114.413 114.413 2429.000 114.413 114.413 2430.000 114.413 114.413 2431.000 114.412 !!4.412 2432.000 114.412 114.412 2433.000 114.412 114.412 2434.000 114.412 114.412 2435.000 !!4.412 114.412 2436.000 114.412 114.412 2437.000 114.412 114.412 2438.000 114.412 114.412 2439.000 !!4.412 114.412 2440.000 114.412 114.412 2441.000 114.412 114.412 2442.000 114.412 114.412 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 D_C Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 81 11-17-2018 Attachment 1 Page 224 of 27 4 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time y. V+ Time y. V+ Time V-V+ Time V-V+ 2443.000 114.412 114.412 2444.000 114.412 114.412 2445.000 114.412 114.412 2446.000 114.412 114.412 2447.000 114.412 114.412 2448.000 114.412 114.412 2449.000 114.412 114.412 2450.000 114.412 114.412 2451.000 114.412 114.412 2452.000 114.412 114.412 2453.000 114.412 114.412 2454.000 114.412 114.412 2455.000 114.412 114.412 2456.000 114.41! 114.41! 2457.000 114.411 114.41! 2458.000 114.411 114.411 2459.000 114.411 114.411 2460.000 114.411 114.411 2461.000 114.411 114.411 2462.000 114.411 114.411 2463.000 114.411 114.411 2464.000 114.411 114.411 2465.000 114.411 114.411 2466.000 114.411 114.411 2467.000 114.411 114.411 2468.000 114.411 114.411 2469.000 114.411 114.411 2470.000 114.411 114.411 2471.000 *114.411 114.411 2472.000 114.411 114.411 2473.000 114.411 114.411 2474.000 114.411 114.411 2475.000 114.411 114.411 2476.000 114.411 114.411 2477.000 114.411 114.411 2478.000 114.411 114.411 2479.000 114.411 114.411 24.80.000 114.411 114.411 2481.000 114.411 114.411 2482.000 114.410 114.410 2483.000 114.410 114.410 2484.000 114.410 114.410 2485.000 114.410 114.410 2486.000 114.410 114.410 2487.000 114.410 114.410 2488.000 114.410 114.410 2489.000 114.410 114.410 2490.000 114.410 114.410 2491.000 114.410 114.410 2492.000 114.410 114.410 2493.000 114.410 114.410 2494.000 114.410 114.410 2495.000 114.410 114.410 2496.000 114.410 114.410 2497.000 114.410 114.410 2498.000 114.410 114.410 2499.000 114.410 114.410 2500.000 114.410 114.410 2501.000 114.410 114.410 2502.000 114.410 114.410 2503.000 114.410 114.410 2504.000 114.410 114.410 2505.000 114.410 114.410 2506.000 114.410 114.410 2507.000 114.409 114.409 2508.000 114.409 114.409 2509.000 114.409 114.409 2510.000 114.409 114.409 2511.000 114.409 114.409 2512.000 114.409 114.409 2513.000 114.409 114.409 2514.000 114.409 114.409 2515.000 114.409 114.409 2516.000 114.409 114.409 2517.000 114.409 114.409 2518.000 114.409 114.409 2519.000 114.409 114.409 2520.000 114.409 114.409 2521.000 114.409 114.409 2522.000 114.409 114.409 2523.000 114.409 114.409 2524.000 114.409 114.409 2525.000 114.409 114.409 2526.000 114.409 114.409 2527.000 114.409 114.409 2528.000 114.409 114.409 2529.000 114.409 114.409 2530.000 114.409 114.409 2531.000 114.409 114.409 2532.000 114.408 114.408 2533.000 114.408 114.408 2534.000 114.408 114.408 2535.000 114.408 114.408 2536.000 114.408 114.408 2537.000 114.408 114.408 2538.000 . 114.408 114.408 2539.000 114.408 114.408 2540.000 114.408 114.408 2541.000 114.408 114.408 2542.000 114.408 114.408 -2543.000 114.408 1!4.408 2544.000 114.408 114.408 2545.000 114.408 114.408 2546.000 114.408 114.408 2547.000 114.408 114.408 2548.000 114.408 114.408 2549.000 114.408 114.408 2550.000 114.408 114.408 2551.000 114.408 114.408 2552.000 114.408 114.408 2553.000 114.408 114.408 2554.000 114.408 114.408 2555.000 114.408 114.408 2556.000 114.407 114.407 2557.000 114.407 114.407 2558.000 114.407 114.407 2559.000 114.407 114.407 2560.000 114.407 114.407 2561.000 114.407 114.407 2562.000 114.407 114.407 2563.000 114.407 114.407 2564.000 114.407 114.407 2565.000 114.407 114.407 2566.000 114.407 114.407 2567.000 114.407 114.407 2568.000 114.407 114.407 2569.000 114.407 114.407 2570.000 114.407 114.407 2571.000 114.407 114.407 2572.000 114.407 114.407 2573.000 114.407 114.407 2574.000 114.407 114.407 2575.000 114.407 114.407 2576.000 114.407 114.407 2577.000 114.407 114.407 2578.000 114.407 114.407 2579.000 114.407 114.407 2580.000 114.407 114.407 2581.000 114.406 114.406 2582.000 114.406 114.406 2583.000 114.406 114.406 ,2584.000 114.406 114.406 2585.000 114.406 114.406 2586.000 114.406 114.406 2587.000 114.406 114.406 2588.000 114.406 114.406 2589.000 114.406 114.406 2590.000 114.406 114.406 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ET AP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 82 11-17-2018 Attachment 1 Page 225 of 27 4 KCICONSULT Base Normal Voltage(V)

Voltage(V)

Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2591.000 114.406 114.406 2592.000 114.406 114.406 2593.000 114.406 114.406 2594.000 114.406 114.406 2595.000 114.406 114.406 2596.000 114.406 114.406 2597.000 114.406 114.406 2598.000 114.406 114.406 2599.000 114.406 114.406 2600.000 114.406 114.406 2601.000 114.406 114.406 2602.000 114.406 114.406 2603.000 114.406 114.406 2604.000 114.406 114.406 2605.000 114.405 114.405 2606.000 114.405 114.405 2607.000 114.405 114.405 2608.000 114.405 114.405 2609.000 114.405 114.405 2610.000 114.405 114.405 2611.000 114.405 114.405 2612.000 114.405 114.405 2613.000 114.405 114.405 2614.000 114.405 114.405 2615.000 114.405 114.405 2616.000 114.405 114:405 2617.000 114.405 114.405 2618.000 114.405 114.405 2619.000 114.405 114.405 2620.000 114.405 114.405 2621.000 114.405 114.405 2622.000 114.405 114.405 2623.000 114.405 114.405 2624.000 114.405 114.405 2625.000 114.405 114.405 2626.000 114.405 114.405 2627.000 114.405 114.405 2628.000 114.405 114.405 2629.000 114.404 114.404 2630.000 114.404 114.404 2631.000 114.404 114.404 2632.000 114.404 114.404 2633.000 114.404 114.404 2634.000 114.404 114.404 2635.000 114.404 114.404 2636.000 114.404 114.404 2637.000 114.404 114.404 2638.000 114.404 114.404 2639.000 114.404 114.404 2640.000 114.404 114.404 2641.000 114.404 114.404 2642.000 114.404 114.404 2643.000 114.404 114.404 2644.000 114.404 114.404 2645.000 114.404 114.404 2646.000 114.404 114.404 2647.000 114.404 114.404 2648.000 114.404 114.404 2649.000 114.404 114.404 2650.000 114.404 114.404 2651.000 114.404 114.404 2652.000 114.404 114.404 2653.000 114.403 114.403 2654.000 114.403 114.403 2655.000 114.403 114.403 2656.000 114.403 114.403 2657.000 114.403 114.403 2658.000 114.403 114.403 2659.000 . 114.403 114.403 2660.000 114.403 114.403 2661.000 114.403 114.403 2662.000 114.403 114.403 2663.000 114.403 114.403 2664.000 114.403 114.403 2665.000 114.403 114.403 2666.000 114.403 114.403 2667.000 114.403 114.403 2668.000 114.403 114.403 2669.000 114.403 114.403 2670.000 114.403 114.403 2671.000 114.403 '--114.403 2672.000 114.403 114.403 2673.000 114.403 114.403 2674.000 114.403 114.403 2675.000 114.403 114.403 2676.000 114.403 114.403 2677.000 114.402 114.402 2678.000 114.402 114.402 2679.000 114.402 114.402 2680.000 114.402 114.402 2681.000 114.402 114.402 2682.000 114.402 114.402 2683.000 114.402 114.402 2684.000 114.402 114.402 2685.000 114.402 114.402 2686.000 114.402 114.402 2687.000 114.402 114.402 2688.000 114.402 114.402 2689.000 114.402 114.402 2690.000 114.402 114.402 2691.000 114.402 114.402 2692.000 114.402 114.402 2693.000 114.402 114.402 2694.000 114.402 114.402 2695.000 114.402 114.402 2696.000 114.402 114.402 2697.000 114.402 114.402 2698.000 114.402 114.402 2699.000 114.402 114.402 2700.000 114.401 114.401 2701.000 114.401 114.401 2702.000 114.401 114.401 2703.000 114.401 114.401 2704.000 114.401 114.401 2705.000 114.401 114.401 2706.000 114.401 114.401 2707.000 114.401 114.401 2708.000 114.401 114.401 2709.000 114.401 114.401 2710.000 114.401 114.401 2711.000 114.401 114.401 2712.000 114.401 114.401 2713.000 114.401 114.401 2714.000 114.401 114.401 2715.000 114.401 114.401 2716.000 114.401 114.401 2717.000 114.401 114.401 2718.000 114.401 114.401 2719.000 114.401 114.401 2720.000 114.401 114.401 2721.000 114.401 114.401 2722.000 114.401 114.401 2723.000 114.400 114.400 2724.000 114.400 114.400 2725.000 114.400 114.400 2726.000 114.400 114.400 2727.000 114.400 114.400 2728.000 114.400 114.400 2729.000 114.400 114.400 2730.000 114.400 114.400 2731.000 114.400 114.400 2732.000 114.400 114.400 2733.000 114.400 114.400 2734.000 114.400 114.400 2735.000 114.400 114.400 2736.000 114.400 114.400 2737.000 114.400 114.400 2738.000 114.400 114.400 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 83 11-17-2018 Attachment 1 Page 226 of 27 4 KCICONSULT

Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2739.000 114.400 114.400 2740.000 114.400 114.400 2741.000 114.400 114.400 2742.000 114.400 114.400 2743.000 114.400 114.400 2744.000 114.400 114.400 2745.000 114.400 114.400 2746.000 114.399 114.399 2747.000 114.399 114.399 2748.000 114.399 114.399 2749.000 114.399 114.399 2750.000 114.399 114.399 2751.000 114.399 114.399 2152.qoo 114.399 114.399 2753.000 114.399 114.399 2754.000 114.399 114.399 2755.000 114.399 114.399 2756.000 114.399 114.399 2757.000 114.399 114.399 2758.000 114.399 114.399 2759.000 114.399 114.399 2760.000 114.399 114.399 2761.000 114.399 114.399 2762.000 114.399 114.399 2763.000 114.399 114.399 2764.000 114.399 114.399 2765.000 114.399 114.399 2766.000 114.399 114.399 2767.000 114.399 114.399 2768.000 114.399 114.399 2769.000 114.398 114.398 2770.000 114.398 114.398 2771.000 114.398 114.398 2772.000 114.398 114.398 2773.000 114.398 114.398 2774.000 114.398 114.398 2775.000 114.398 114.398 2776.000 114.398 114.398 2777.000 114.398 114.398 2778.000 114.398 114.398 2779.000 114.398 114.398 2780.000 114.398 114.398 2781.000 114.398 114.398 2782.000 114.398 114.398 2783.000 114.398 114.398 2784.000 114.398 114.398 2785.000 114.398 114.398 2786.000 114.398 114.398 2787.000 114.398 114.398 2788.000 114.398 114.398 2789.000 114.398 114.398 2790.000 114.398 114.398 2791.000 114.397 114.397 2792.000 114.397 114.397 2793.000 114.397 114.397 2794.000 114.397 114.397 2795.000 114.397 114.397 2796.000 114.397 114.397 2797.000 114.397 114.397 2798.000 114.397 114.397 2799.000 114.397 114.397 2800.000 114.397 114.397 2801.000 114.397 114.397 2802.000 114.397 114.397 2803.000 114.397 114.397 2804.000 114.397 114.397 2805.000 114.397 114.397 2806.000 114.397 114.397 2807.000 114.397 114.397 2808.000 114.397 114.397 2809.000 114.397 114.397 2810.000 114.397 114.397 2811.000 114.397 114.397 2812.000 114.397 114.397 2813.000 114.396 114.396 2814.000 114.396 114.396 2815.000 114.396 114.396 2816.000 114.396 114.396 2817.000 114.396 114.396 2818.000 114.396 114.396 2819.000 114.396 114.396 2820.000 114.396 114.396 2821.000 114.396 114.396 2822.000 114.396 114.396 2823.000 114.396 114.396 2824.000 114.396 114.396 2825.000 114.396 114.396 2826.000 114.396 114.396 2827.000 114.396 114.396 2828.000 114.396 114.396 2829.000 114.396 114.396 2830.000 114.396 114.396 2831.000 114.396 114.396 2832.000 114.396 114.396 2833.000 114.396 114.396 2834.000 114.396 114.396 2835.000 114.396 114.396 2836.000 114.395 114.395 2837.000 114.395 114.395 2838.000 114.395 114.395 2839.000 114.395 114.395 2840.000 114.395 114.395 2841.000 114.395 114.395 2842.000 114.395 114.395 2843.000 114.395 114.395 2844.000 114.395 114.395 2845.000 114.395 114.395 2846.000 114.395 114.395 2847.000 114.395 114.395 2848.000 114.395 114.395 2849.000 114.395 114.395 2850.000 114.395 114.395 2851.000 114.395 114.395 2852.000 114.395 114.395 2853.000 114.395 114.395 2854.000 114.395 114.395 2855.000 114.395 114.395 2856.000 114.395 114.395 2857.000 114.395 114.395 2858.000 114.394 114.394 2859.000 114.394 114.394 2860.000 114.394 114.394 2861.000 114.394 114.394 2862.000 114.394 114.394 2863.000 114.394 114.394 2864.000 114.394 114.394 2865.000 114.394 114.394 2866.000 114.394 114.394 2867.000 114.394 114.394 2868.000 114.394 114.394 2869.000 114.394 114.394 2870.000 114.394 114.394 2871.000 114.394 114.394 2872.000 114.394 114.394 2873.000 114.394 114.394 2874.000 114.394 114.394 2875.000 114.394 114.394 2876.000 114.394 114.394 2877.000 114.394 114.394 2878.000 114.394 114.394 2879.000 114.393 114.393 2880.000 114.393 114.393 2881.000 114.393 114.393 2882.000 114.393 114.393 2883.000 114.393 114.393 2884.000 114.393 114.393 2885.000 114.393 114.393 2886.000 114.393 114.393 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 84 11-17-2018 Attachment 1 Page 227 of 27 4 KCICONSULT Base Normal Voltage (V) . Voltage(V) Voltage (V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2887.000 114.393 114.393 2888.000 114.393 114.393 2889.000 114.393 114.393 2890.000 114.393 114.393 2891.000 114.393 114.393 2892.000 114.393 114.393 2893.000" 114.393 114.393 2894.000 114.393 114.393 2895.000 114.393 114.393 2896.000 114.393 114.393 2897.000 114.393 114.393 2898.000 114.393 114.393 2899.000 114.393 114.393 2900.000 114.393 114.393 2901.000 114.392 114.392 2902.000 114.392 114.392 2903.000 114.392 114.392 2904:000 114.392 114.392 2905.000 114.392 114.392 2906.000 114.392 114.392 2907.000 114.392 114.392 2908.000 114.392 114.392 2909.000 114.392 114.392 2910.000 114.392 114.392 2911.000 114.392 114.392 2912.000 114.392 114.392 2913.000 114.392 114.392 2914.000 114.392 114.392 2915.000 114.392 114.392 2916.000 114.392 114.392 2917.000 114.392 114.392 2918.000 114.392 114.392 2919.000 114.392 114.392 2920.000 114.392 114.392 2921.000 114.392 114.392 2922.000 114.391 114.391 2923.000 114.391 114.391 2924.000 114.391 114.391 2925.000 114.391 114.391 2926.000 114.391 114.391 2927.000 114.391 114.391 2928.000 114.391 114.391 2929.000 114.391 114.391 2930.000 114.391 114.391 2931.000 114.391 114.391 2932.000 114.391 114.391 2933.000 114.391 114.391 2934.000 114.391 114.391 2935.000 114.391 114.391 2936.000 114.391 114.391 2937.000 114.391 114.391 2938.000 114.391 114.391 2939.000 114.391 114.391 2940.000 114.391 114.391 2941.000 114.391 114.391 2942.000 114.391 114.391 2943.000 114.390 114.390 2944.000 114.390 114.390 2945.000 114.390 114.390 2946.000 114.390 114.390 2947.000 114.390 114.390 2948.000 114.390 114.390 2949.000 114.390 114.390 2950.000 114.390 114.390 2951.000 114.390 114.390 2952.000 114.390 114.390 2953.000 114.390 114.390 2954.000 114.390 114.390 2955.000 114.390 1i4.390 2956.000 114.390 114.390 2957.000 114.390 114.390 2958.000 114.390 114.390 2959.000 114.390 114.390 2960.000 114.390 114.390 2961.000 114.390 114.390 2962.000 114.390 114.390 2963.000 114.390 114.390 2964.000 114.389 114.389 2965.000 114.389 114.389 2966.000 114.389 114.389 2967.000 114.389 114.389 2968.000 114.389 114.389 2969.000 114.389 114.389 2970.000 114.389 114.389" 2971.000 114.389 114.389 2972.000 114.389 114.389 2973.000 114.389 114.389 2974.000 114.389 114.389 2975.000 114.389 114.389 2976.000 114.389 114.389 2977.000 114.389 114.389 2978.000 114.389 114.389 2979.000 114.389 114.389 2980.000 114.389 114.389 2981.000 114.389 114.389 2982.000 114.389 114.389 2983.000 114.389 114.389 2984.000 114.389 114.389 2985.000 114.388 114.388 2986.000 114.388 114.388 2987.000 114.388 114.388 2988.000 114.388 114.388 2989.000 114.388 114.388 2990.000 114.388 114.388 2991.000 114.388 114.388 2992.000 114.388 114.388 2993.000 114.388 114.388 2994.000 114.388 114.388 2995.000 114.388 114.388 2996.000 114.388 114.388 2997.000 '114.388 114.388 2998.000 114.388 114.388 2999.000 114.388 114.388 3000.000 114.388 114.388 3001.000 114.388 114.388 3002.000 114.388 114.388 3003.000 114.388 114.388 3004.000 114.388 114.388 3005.000 114.388 114.388 3006.000 114.387 114.387 3007.000 114.387 114.387 3008.000 114.387 114.387 3009.000 114.387 114.387 3010.000 114.387 114.387 3011.000 114.387 114.387 3012.000 114.387 114.387 3013.000 114.387 114.387 3014.000 114.387 114.387 3015.000 114.387 114.387 3016.000 114.387 114.387 3017.000 114.387 114.387 3018.000 114.387 114.387 3019.000 114.387 114.387 3020.000 114.387 114.387 3021.000 114.387 114.387 3022.000 114.386 114.386 3023.000 114.385 114.385 3024.000 114.385 114.385 3025.000 114.384 114.384 3026.000 114.383 114.383 3027.000 114.383 114.383 3028.000 114.382 114.382 3029.000 114.381 114.381 3030.000 114.381 114.381 3031.000 114.380 114.380 3032.000 114.379 114.379 3033.000 114.378 114.378 3034.000 114.378 114.378 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN*: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 85 11-17-2018 Attachment

.1 Page 228 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3035.000 114.377 114.377 3036.000 114.376 114.376 3037.000 114.376 114.376 3038.000 114.375 114.375 3039.000 114.374 114.374 3040.000 114.373 114.373 3041.000 114.373 114.373 3042.000 114.372 114.372 3043.000 114.371 114.371 3044.000 114.371 114.371 3045.000 114.370 114.370 3046.000 114.369 114.369 3047.000 114.369 114.369 3048.000 114.368 114.368 3049.000 114.367 114.367 3050.000 114.366 114.366 3051.000 114.366 114.366 3052.000 114.365 114.365 3053.000 114.364 114.364 3054.000 114.364 114.364 3055.000 114.363 114.363 3056.000 114.362 114.362 3057.000 114.361 114.361 3058.000 114.361 114.361 3059.000 114.360 114.360 3060.000 114.359 114.359 3061.000 114.359 114.359 3062.000 114.358 114.358 3063.000 114.357 114.357 3064.000 114.356 114.356 3065.000 114.356 114.356 3066.000 114.355 114.355 3067.000 114.354 114.354 3068.000 114.354 114.354 3069.000 114.353 114.353 3070.000 114.352 114.352 3071.000 114.352 114.352 3072.000 114.351 114.351 3073.000 114.350 114.350 3074.000 114.349 114.349 3075.000 114.349 114.349 3076.000 114.348 114.348 3077.000 114.347 114.347 3078.000 114.347 114.347 3079.000 114.346 114.346 3080.000 114.345 114.345 3081.000 114.344 114.344 3082.000 114.344 114.344 3083.000 114.343 114.343 3084.000 114.342 114.342 3085.000 114.342 114.342 3086.000 114.341 114.341 3087.000 114.340 114.340 3088.000 114.339 114.339 3089.000 114.339 114.339 3090.000 114.338 114.338 3091.000 114.337 114.337 3092.000 114.337 114.337 3093.000 114.336 114.336 3094.000 114.335 114.335 3095.000 114.334 114.334 3096.000 114.334 114.334 3097.000 114.333 114.333 3098.000 114.332 114.332 3099.000 114.332 114.332 3100.000 114.331 114.331 3101.000 114.330 114.330 3102.000 114.329 114.329 3103.000 114.329 114.329 3104.000 114.328 114.328 3105.000 114.327 114.327 3106.000 114.327 114.327 3107.000 114.326 114.326 3108.000 114.325 114.325 3109.000 114.325 114.325 3110.000 114.324 114.324 3111.000 114.323 114.323 3112.000 114.322 114.322 3113.000 114.322 114.322 3114.000 114.321 114.321 3115.000 114.320 114.320 3116.000 114.320 114.320 3117.000 114.319 114.319 3118.000 114.318 114.318 3119.000 114.317 114.317 3120.000 114.317 114.317 3121.000 114.316 114.316 3122.000 114.315 114.315 3123.000 114.315 114.315 3124.000 114.314 114.314 3125.000 114.313 114.313 3126.000 114.312 114.312 3127.000 114.312 114.312 3128.000 114.311 114.311 3129.000 114.310 114.310 3130.000 114.310 114.310 3131.000 114.309 114.309 3132.000 114.308 114.308 3133.000 114.307 114.307 3134.000 114.307 114.307 3135.000 114.306 114.306 3136.000 114.305 114.305 3137.000 114.305 114.305 3138.000 114.304 114.304 3139.000 114.303 114.303 3140.000 114.302 114.302 3141.000 114.302 114.302 3142.000 114.301 114.301 3143.000 114.300 114.300 3144.000 114.300 114.300 3145.000 114.299 114.299 3146.000 114.298 114.298 3147.000 114.297 114.297 3148.000 114.297 114.297 3149.000 114.296 114.296 3150.000 114.295 114.295 3151.000 114.295 114.295 3152.000 114.294 114.294 3153.000 114.293 114.293 3154.000 114.292 114.292 3155.000 114.292 114.292 3156.000 114.291 114.291 3157.000 114.290 114.290 3158.000 114.290 114.290 3159.000 114.289 114.289 3160.000 114.288 114.288 3161.000 114.287 114.287 3162.000 114.287 114.287 3163.000 114.286 114.286 3164.000 114.285 114.285 3165.000 114.285 114.285 3166.000 114.284 114.284 3167.000 114.283 114.283 3168.000 114.282 114.282 3169.000 114.282 114.282 3170.000 114.281 114.281 3171.000 114.280 114.280 3172.000 114.279 114.279 3173.000 114.279 114.279 3174.000 114.278 114.278 3175.000 114.277 114.277 3176.000 114.277 114.277 3177.000 114.276 114.276 3178.000 114.275 114.275 3179.000 114.274 114.274 3180.000 114.274 114.274 3181.000 114.273 114.273 3182.000 114.272 114.272 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 for greater than 24 Hrs Page 229 of 27 4 \ Project: Clinton Flex Study ETAP Page: 86 Location:

KCI 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Revision:

Base Study Case: BSIA-48 Filename:

CPS SBO Study Config.: Normal DIV I Battery IA 48-Hour Coping Study DCMCC IA Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3183.000 114.272 114.272 3184.000 114.271 114.271 3185.000 114.270 114.270 3186.000 114.269 114.269 3187.000 114.269 114.269 3188.000 114.268 114.268 3189.000 114.267 114.267 3190.000 114.267 114.267 3191.000 114.266 114.266 3192.000 114.265 114.265 3193.000 114.264 114.264 3194.000 114.264 ' 114.264 3195.000 114.263 114.263 3196.000 114.262 114.262 3197.000 114.262 114.262 3198.000 114.261 114.261 3199.000 114.260 114.260 3200.000 114.259 114.259 3201.000 114.259 114.259 3202.000 114.258 114.258 3203.000 114.257 114.257 3204.000 114.257 114.257 3205.000 114.256 114.256 3206.000 114.255 114.255 3207.000 114.254 114.254 3208.000 114.254 114.254 3209.000 114.253 114.253 3210.000 114.252 114.252 3211.000 114.251 114.251 3212.000 114.251 114.251 3213.000 114.250 114.250 3214.000 114.249 114.249 3215.000 114.249 114.249 3216.000 114.248 114.248 3217.000 114.247 114.247 3218.000 114.246 114.246 3219.000 114.246 114.246 3220.000 114.246 114.246 3221.000 114.246 114.246 3222.000 114.246 114.246 3223.000 114.246 114.246 3224.000 114.246 114.246 3225.000 114.246 114.246 3226.000 114.246 114.246 3227.000 114.246 114.246 3228.000 114.246 114.246 3229.000 114.246 114.246 3230.000 114.246 114.246 3231.000 114.246 114.246 3232.000 114.246 114.246 3233.000 114.246 114.246 3234.000 114.246 114.246 3235.000 114.246 114.246 3236.000 114.246 114.246 3237.000' 114.246 114.246 3238.000 114.246 114.246 3239.000 114.246 114.246 3240.000 114.246 114.246 3241.000 114.246 114.246 3242.000 114.246 114.246 3243.000 114.246 114.246 3244.000 114.246 114.246 3245.000 114.246 114.246 3246.000 114.246 114.246 3247.000 114.246 114.246 3248.000 114.246 114.246 3249.000 114.246 114.246 3250.000 114.246 114.246 3251.000 114.246 114.246 3252.000 114.246 114.246 3253.000 114.246 114.246 3254.000 114.246 114.246 3255.000 114.246 114.246 3256.000 114.246 114.246 3257.000 114.246 114.246 3258.000 114.246 114.246 3259.000 114.246 114.246 3260.000 114.247 114.247 3261.000 114.247 114.247 3262.000 114.247 114.247 3263.000 114.247 114.247 3264.000 114.247 114.247 3265.000 114.247 114.247 3266.000 114.247 114.247 3267.000 114.247 114.247 3268.000 114.247 114.247 3269.000 114.247 114.247 3270.000 114.247 114.247 3271.000 114.247 114.247 3272.000 114.247 114.247 3273.000 114.247 114.247 3274.000 114.247 114.247 3275.000 114.247 114.247 3276.000 114.247 114.247 3277.000 114.247 114.247 3278.000 114.247 114.247 3279.000 114.247 114.247 3280.000 114.247 114.247 3281.000 114.247 114.247 3282.000 114.247 114.247 3283.000 114.247 114.247 3284.000 114.247 114.247 3285.000 114.247 114.247 3286.000 114.247 114.247 3287.000 114.247 114.247 3288.000 114.247 114.247 3289.000 114.247 114.247 3290.000 114.247 114.247 3291.000 114.247 114.247 3292.000 114.247 114.247 3293.000 114.247 114.247 3294.000 114.247 114.247 3295.000 114.247 114.247 3296.000 114.247 114.247 3297.000 114.247 114.247 3298.000 114.247 114.247 3299.000 114.248 114.248 3300.000 114.248 114.248 3301.000 114.248 114.248 3302.000 114.248 114.248 3303.000 114.248 114.248 3304.000 114.248 114.248 3305.000 114.248 114.248 3306.000 114.248 114.248 3307.000 114.248 114.248 3308.000 114.248 114.248 3309.000 114.248 114.248 3310.000 114.248 114.248 3311.000 114.248 114.248 3312.000 114.248 114.248 3313.000 114.248 114.248 3314.000 114.248 114.248 3315.000 114.248 114.248 3316.000 114.248 114.248 3317.000 114.248 114.248 3318.000 114.248 114.248 3319.000 114.248 114.248 3320.000 114.248 114.248 3321.000 114.248 114.248 3322.000 114.248 114.248 3323.000 114.248 114.248 3324.000 114.248 114.248 3325.000 114.248 114.248 3326.000 114.248 114.248 3327.000 114.248 114.248 3328.000 114.248 114.248 3329.000 114.248 114.248 3330.000 114.248 114.248 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP R.eports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 87 11-17-2018 Attachment 1 Page 230 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3331.000 114.248 114.248 3332.000 114.248 114.248 3333.000 114.248 114.248 3334.000 114.248 114.248 3335.000 114.248 114.248 3336.000 114.248 114.248 3337.000 114.249 114.249 3338.000 114.249 114.249 3339.000 114.249 114.249 3340.000 114.249 114.249 3341.000 114,249 114.249 3342.000 114.249 114.249 3343.000 114.249 114.249 3344.000 114.249 114.249 3345.000 114.249 114.249 3346.000 114.249 114.249 3347.000 114.249 114.249 3348.000 114.249 114.249 3349.000 114.249 114.249 3350.000 114.249 114.249 3351.000 114.249 114.249 3352.000 114.249 114.249 3353.000 114.249 114.249 3354.000 114.249 114.249 3355.000 114.249 114.249 3356.000 114.249 114.249 3357.000 114.249 114.249 3358.000 114.249 114.249 3359.000 114.249 114.249 3360.000 114.249 114.249 3361.000 114.249 114.249 3362.000 114.249 114.249 3363.000 114.249 114.249 3364.000 114.249 114.249 3365.000* 114.249 114.249 3366.000 114.249 114.249 3367.000 114.249 114.249 3368.000 114.249 114.249 3369.000 114.249 114.249 3370.000 114.249 114.249 3371.000 114.249 114.249 3372.000 114.250 114.250 3373.000 114.250 114.250 3374.000 114.250 114.250 3375.000 114.250 114.250 3376.000 114.250 114.250 3377.000 114.250 114.250 3378.000 114.250 114.250 3379.000 114.250 114.250 3380.000 114.250 114.250 3381.000 114.250 114.250 3382.000 114.250 114,:250 3383.000 114.250 114.250 3384.000 114.250 114.250 3385.000 114.250 114.250 3386.000 114.250 114.250 3387.000 114.250 114.250 3388.000 114.250 114.250 3389.000 114.250 114.250 3390.000 114.250 114.250 3391.000 114.250 114.250 3392.000 114.250 114.250 3393.000 114.250 114.250 3394.000 114.250 114.250 3395.000 114.250 114.250 3396.000 114.250 114.250 3397.000 114.250 114.250 3398.000 114.250 114.250 3399.000 114.250 114.250 3400.000 114.250 114.250 3401.000 114.250 114.250 3402.000 114.250 114.250 3403.000 114.250 114.250 3404.000 114.250 114.250 3405.000 114.251 114.251 3406.000 114.251 114.251 3407.000 114.251 114.251 3408.000 114.251 114.251 3409.000 114.251 114.251 3410.000 114.251 ,114.251 3411.000 114.251 114.251 3412.000 114.251 114.251 3413.000 114.251 114.251 3414.000 114.251 114.251 3415.000 114.251 114.251 3416.000 114.251 114.251 3417.000 114.251 114.251 3418.000 114.251 114.251 3419.000 114.251 114.251 3420.000 114.251 114.251 3421.000 114.251 114.251 3422.000 114.251 114.251 3423.000 114.251 114.251 3424.000 114.251 114.251 3425.000 114.251 114.251 3426.000 114.251 114.251 3427.000 114.251 114.251 3428.000 114.251 114.251 3429.000 114.251 114.251 3430.000 114.251 114.251 3431.000 114.251 114.251 3432.000 114.251 114.251 3433.000 114.251 114.251 3434.000 114.251 114.251 3435.000 114.251 114.251 3436.000 114.251 114.251 3437.000 114.252 114.252 3438.000 114.252 114.252 3439.000 114.252 114.252 3440.000 114.252 114.252 3441.000 114.252 114.252 3442.000 114.252 114.252 3443.000 114.252 114.252 3444.000 114.252 114.252 3445.000 114.252 114.252 3446.000 114.252 114.252 I 3447.000 114.252 114.252 3448.000 114.252 114.252 3449.000 114.252 114.252 3450.000 114.252 114.252 3451.000 114.252 114.252 3452.000 114.252 114.252 3453.000 114.252 114.252 3454.000 114.252 114.252 3455.000 114.252 114.252 3456.000 114.252 114.252 3457.000 114.252 114.252 3458.000 114.252 114.252 3459.000 114.252 114.252 3460.000 114.252 114.252 3461.000 114.252 114.252 3462.000 114.252 114.252 3463.000 114.252 114.252 3464.000 114.252 114.252 3465.000 114.252 114.252 3466.000 114.252 114.252 3467.000 114.253 114.253 3468.000 114.253 114.253 3469.000 114.253 114.253 3470.000 114.253 114.253 3471.000 114.253 114.253 3472.000 114.253 114.253 3473.000 114.253 114.253 3474.000 114.253 114.253 3475.000 114.253 114.253 3476.000 114.253 114.253 3477.000 114.253 114.253 3478.000 114.253 114.253 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: -KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 88 11-17-2018 Attachment 1 Page 231 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3479.000 114.253 114.253 3480.000 114.253 114.253 3481.000 114.253 114.253 3482.000 114.253 114.253 3483.000 114.253 114.253 3484.000 114.253 114.253 3485.000 114.253 1!4.253 3486.000 114.253 114.253 3487.000 1!4.253 114.253 3488.000 1!4.253 1!4.253 3489.000 1!4.253 1!4.253 3490.000 114.253 114.253 3491.000 1!4.253 1!4.253 3492.000 114.253 114.253 3493.000 1!4.253 1!4.253 3494.000 1!4.253 1!4.253 3495.000 1!4.253 114.253 3496.000 114.254 1!4.254 3497.000 1!4.254 1!4.254 3498.000 114.254 114.254 3499.000 1!4.254 114.254 3500.000 1!4.254 1!4.254 3501.000 114.254 1!4.254 3502.000 114.254 114.254 3503.000 1!4.254 114.254 3504.000 114.254 114.254 3505.000 1!4.254 1!4.254 3506.000 114.254 1!4.254 3507.000 114.254 114.254 3508.000 1!4.254 1!4.254 3509.000 114.254 114.254 35!0.000 114.254 114.254 3511.000 114.254 114.254 3512.000 114.254 114.254 3513.000 1!4.254 114.254 3514.000 114.255 1!4.255 3515.000 1!4.255 114.255 3516.000 114.255 1!4.255 3517.000 1!4.255 1!4.255 3518.000 114.256 1!4.256 3519.000 1!4.256 1!4.256 3520.000 1!4.256 1!4.256 3521.000 1!4.256 114.256 3522.000 1!4.256 1!4.256 3523.000 1!4.257 1!4.257 3524.000 1!4.256 1!4.256 3525.000 1!4.256 1!4.256 3526.000 114.255 1!4.255 3527.000 1!4.254 114.254 3528.000 1!4.253 1!4.253 3529.000 1!4.252 1!4.252 3530.000 114.252 114.252 3531.000 1!4.251 114.251 3532.000 1!4.250 1!4.250 3533.000 1!4.249 114.249 3534.000 114.248 114.248 3535.000 1!4.248 114.248 3536.000 1!4.247 1!4.247 3537.000 1!4.246 1!4.246 3538.000 1!4.245 1!4.245 3539.000 1!4.244 114.244 3540.000 1!4.244 1!4.244 3541.000 1!4.243 114.243 3542.000 114.242 114.242 3543.000 1!4.241 114.241 3544.000 1!4.240 1!4.240 3545.000 1!4.240 114.240 3546.000 114.239 114.239 3547.000 114.238 114.238 3548.000 1!4.237 1!4.237 3549.000 114.236 114.236 3550.000 114.236 114.236 3551.000 114.235 114.235 3552.000 114.234 114.234 3553.000 114.233 114.233 3554.000 114.232 114.232 3555.000 114.232 114.232 3556.000 114.231 114.231 3557.000 114.230 114.230 3558.000 114.229 114.229 3559.000 114.228 114.228 3560.000 114.228 114.228 3561.000 114.227 114.227 3562.000 114.226 114.226 3563.000 114.225 114.225 3564.000 114.224 114.224 3565.000 114.224 114.224 3566.000 114.223 114.223 3567.000 114.222 1!4.222 3568.000 114.221 114.221 3569.000 114.220 114.220 3570.000 114.220 114.220 3571.000 114.219 1!4.219 3572.000 114.218 114.218 3573.000 114.217 1!4.217 3574.000 114.216 114.216 3575.000 114.216 114.216 3576.000 114.215 114.215 3577.000 114.214 114.214 3578.000 114.213 114.213 3579.000 114.212 114.212 3580.000 114.212 114.212 3581.000 114.211 114.211 3582.000 114.210 114.210 3583.000 114.209 1!4.209 3584.000 1!4.208 114.208 3585.000 114.208 114.208 3586.000 114.207 1!4.207 3587.000 114.206 114.206 3588.000 114:205 114.205 3589.000 1!4.204 1!4.204 3590.000 114.203 114.203 3591.000 114.203 1!4.203 3592.000 114.202 114.202 3593.000 114.201 1!4.201 3594.000 1!4.200 1!4.200 3595.000 1!4.199 114.199 3596.000 114.199 1!4.199 3597.000 114.198 114.198 3598.000 1!4.197 114.197 3599.000 114.196 1!4.196 3600.000 114.195 1!4.195 3601.000 114.195 114.195 3602.000 114.194 114.194 3603.000 114.193 1!4.193 3604.000 114.192 114.192 3605.000 1!4.191 1!4.191 3606.000 1!4.191 1!4.191 3607.000 114.190 1!4.190 3608.000 1!4.189 1!4.189 3609.000 1!4.188 114.188 3610.000 1!4.187 1!4.187 3611.000 1!4.187 1!4.187 3612.000 1!4.186 1!4.186 3613.000 1!4.185 114.185 3614.000 1!4.184 1!4.184 3615.000 114.183 1!4.183 3616.000 1!4.183 1!4.183 3617.000 114.182 114.182 3618.000 114.181 114.181 3619.000 114.180 114.180 3620.000 114.179 114.179 3621.000 114.179 114.179 3622.000 114.178 114.178 3623.000 114.177 114.177 3624.000 114.176 114.176 3625.000 114.175 114.175 3626.000 1!4.175 114.175 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study DCMCClA 89 11-17-2018 Attachment 1 Page 232 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time Y-Y+ Time Y-Y+ Time Y-Y+ Time Y-Y+ 3627.000 114.174 114.174 3628.000 114.173 114.173 3629.000 114.172 114.172 3630.000 114.171 114.171 3631.000 114.171 114.171 3632.000 114.170 114.170 3633.000 114.169 114.169 3634.000 114.168 114.168 3635.000 114.167 114.167 3636.000 114.166 114.166 3637.000 114.166 114.166 3638.000 114.165 114.165 3639.000 114.164 114.164 3640.000 114.163 114.163 3641.000 114.162 114.162 3642.000 114.162 114.162 3643.000 114.161 114.J61 3644.000 114.160 114.160 3645.000 114.159 114.159 3646.000 114.158 114.158 3647.000 114.158 114.158 3648.000 114.157 114.157 3649.000 114.156 114.156 3650.000 114.155 114.155 3651.000 114.154 114.154 3652.000 114.154 114.154 3653.000 114.153 114.153 3654.000 114.152 114.152 3655.000 114.151 114.151 3656.000 114.150 114.150 3657.000 114.150 114.150 3658.000 114.149 114.149 3659.000 114.148 114.148 3660.000 114.147 114.147 3661.000 114.146 114.146 3662.000 114.145 114.145 3663.000 114.145 114.145 3664.000 114.144 114.144 3665.000 114.143 114.143 3666.000 114.142 114.142 3667.000 114.141 114.141 3668.000 114.141 114.141 3669.000 114.140 114.140 3670.000 114.139 114.139 3671.000 114.138 114.138 3672.000 114.137 114.137 3673.000 114.137 114.137 3674.000 114.136 114.136 3675.000 114.135 114.135 3676.000 114.134 114.134 36n.ooo 114.133 114.133 3678.000 114.133 114.133 3679.000 114.132 114.132 3680.000 114.131 114.131 3681.000 114.130 114.130 3682.000 114.129 114.129 3683.000 114.129 114.129 3684.000 114.128 114.128 3685.000 114.127 114.127 3686.000 114.126 114.126 3687.000 114.125 114.125 3688.000 114.124 114.124 3689.000 114.124 114.124 3690.000 114.123 114.123 3691.000 114.122 114.122 3692.000 114.121 114.121 3693.000 114.120 114.120 3694.000 114.120 114.120 3695.000 114.119 114.119 3696.000 114.118 114.118 3697.000 114.117 114.117 3698.000 114.116 114.116 3699.000 114.116 114.116 3100.poo 114.115 114.115 3701.000 114.114 114.114 3702.000 114.113 114.113 3703.000 114.112 114.112 3704.000 114.111 114.111 3705.000 114.111 114.111 3706.000 114.110 114.110 3707.000 114.109 114.109 3708.000 114.108 114.108 3709.000 114.107 114.107 3710.000 114.107 114.107 3711.000 114.106 114.106 3712.000 114.105 114.105 3713.000 114.104 114.104 3714.000 114.103 114.103 3715.000 114.103 114.103 3716.000 114.102 114.102 3717.000 114.101 114.101 3718.000 114.100 114.100 3719.000 114.099 114.099 3720.000 114.099 114.099 3721.000 114.098 114.098 3722.000 114.097 114.097 3723.000 114.096 114.096 3724.000 114.095 114.095 3725.000 114.094 114.094 3726.000 114.094 114.094 3727.000 114.093 114.093 3728.000 114.092 114.092 3729.000 114.091 114.091 3730.000 114.090 114.090 3731.000 114.090 114.090 3732.000 114.089 114.089 3733.000 114.088 114.088 3734.000 114.087 114.087 3735.000 114.086 114.086 3736.000 114.086 114.086 3737.000 114.085 114.085 3738.000 114.084 114.084 3739.000 114.083 114.083 3740.000 114.082 114.082 3741.000 114.081 114.081 3742.000 114.081 114.081 3743.000 114.080 114.080 3744.000 114.079 114.079 3745.000 114.078 114.078 3746.000 114.077 114.077 3747.000 114.077 114.077 3748.000 114.076 114.076 3749.000 114.075 114.075 3750.000 114.074 114.074 3751.000 114.073 114.073 3752.000 114.072 114.072 3753.000 114.072 114.072 3754.000 114.071 114.071 3755.000

  • 114.070 114.070 3756.000 114.069 114.069 3757.000 114.068 114.068 3758.000 114.068 114.068 3759.000 114.067 114.067 3760.000 114.066 114.066 3761.000 114.065 114.065 3762.000 114.064 114.064 3763.000 114.064 114.064 3764.000 114.063 114.063 3765.000 114.062 114.062 3766.000 114.061 114.061 3767.000 114.060 114.060 3768.000 114.059 114.059 3769.000 114.059 114.059 3770.000 114.058 114.058 3771.000 114.057 114.057 3772.000 114.056 114.056 3773.000 114.055 114.055 3774.000 114.055 114.055 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 90 11-17-2018 Attachment 1 Page 233 of 27 4 KC!CONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 3775.000 114.054 ll4.054 3776.000 ll4.053 ll4.053 3777.000 ll4.052 ll4.052 3778.000 ll4.051 ll4.051 3779.000 ll4.050 114.050 3780.000 ll4.050 ll4.050 3781.000 ll4.049 ll4.Q49 3782.000 ll4.048 114.048 3783.000 114.047 114.047 3784.000 ll4.046 ll4.046 3785.000 ll4.046 ll4.046 3786.000 ll4.045 ll4.045 3787.000 ll4.044 114.044 3788.000 114.043 ll4.043 3789.000 ll4.042 114.042 3790.000 ll4.041 ll4.041 3791.000 ll4.041 114.041 3792.000 114.040 ll4.040 3793.000 ll4.039 114.039 3794.000 ll4.038 ll4.038 3795.000 ll4.037 ll4.037 3796.000 ll4.037 ll4.037 3797.000 ll4.036 ll4.036 3798.000 ll4.035 ll4.035 3799.000 114.034 ll4.034 3800.000 ll4.033 ll4.033 3801.000 ll4.032 114.032 3802.000 114.032 114.032 3803.000 114.031 114.031 3804.000 114.030 114.030 3805.000 114.029 114.029 3806.000 114.028 114.028 3807.000 114.028 ll4.028 3808.000 114.027 114.027 3809.000 114.026 114.026 3810.000 114.025 114.025 3811.000 114.024 114.024 3812.000 ll4.023 ll4.023 3813.000 ll4.023 ll4.023 3814.000 ll4.022 ll4.022 3815.000 ll4.021 114.021 3816.0,00 114.020 ll4.020 3817.000 ll4.0l9 ll4.0l9 3818.000 ll4.0l9 ll4.0l9 3819.000 114.018 114.018 3820.000 114.017 114.017 3821.000 114.016 ll4.0l6 3822.000 ll4.015 ll4.0l5 3823.000 114.014 ll4.014 3824.000 ll4.0l4 ll4.014 3825.000 ll4.013 ll4.013 3826.000 ll4.0l2 ll4.012 3827.000 114.011 114.0ll 3828.000 ll4.010 ll4.010 3829.000 ll4.010 114.010 3830.000 ll4.009 114.009 3831.000 114.008 ll4.008 3832.000 ll4.007 ll4.007 3833.000 114.006 ll4.006 3834.000 ll4.005 ll4.005 3835.000 ll4.005 ll4.005 3836.000 ll4.004 114.004 3837.000 ll4.003 ll4.003 3838.000 ll4.002 ll4.002 3839.000 ll4.00l ll4.00l 3840.000 ll4.00l ll4.00l 3841.000 ll4.000 ll4.000 3842.000 ll3.999 ll3.999 3843.000 ll3.998 ll3.998 3844.000 ll3.998 113.998 3845.000 ll3.998 ll3.998

  • 3846.000 ll3.997 ll3.997 3847.000 ll3.997 ll3.997 3848.000 ll3.997 ll3.997 3849.000 ll3.996 ll3.996 3850.000 ll3.996 ll3.996 3851.000 ll3.996 ll3.996 3852000 ll3.996 ll3.996 3853.000 113.995 ll3.995 3854.000 113.995 113.995 3855.000 ll3.995 113.995 3856.000 113.994 ll3.994 3857.000 113.994 113.994 3858.000 ll3.994 113.994 3859.000 ll3.994 113.994 3860.000 ll3.993 ll3.993 3861.000 113.993 113.993 . 3862.000 ll3.993 ll3.993 3863.000 ll3.993 ll3.993 3864.000 113.992 113.992 3865.000 ll3.992 ll3.992 3866.000 ll3.992 113.992 3867.000 113.991 113.991 3868.000 113.991 113.991 3869.000 ll3.99l ll3.99l 3870.000 ll3.99l 113.991 3871.000 ll3.990 113.990 3872.000 ll3.990 ll3.990 3873.000 113.990 ll3.990 3874.000 ll3.989 ll3.989 3875.000 ll3.989 ll3.989 3876.000 113.989 113.989 3877.000 113.989 ll3.989 3878.000 ll3.988 113.988 3879.000 113.988 ll3.988 3880.000 113.988 113.988 3881.000 ll3.988 ll3.988 3882.000 ll3.987 ll3.987 3883.000 ll3.987 113.987 3884.000 ll3.987 ll3.987 3885.000 ll3.986 ll3.986 3886.000 113.986 113.986 3887.000 ll3.986 ll3.986 3888.000 113.986 ll3.986 3889.000 113.985 ll3.985 3890.000 ll3.985 ll3.985 3891.000 ll3.985 ll3.985 3892.000 113.984 ll3.984 3893.000 ll3.984 ll3.984 3894.000 ll3.984 ll3.984 3895.000 ll3.984 ll3.984 3896.000 ll3.983 ll3.983 3897.000 ll3.983 ll3.983 3898.000 ll3.983 l 13.983 3899.000 ll3.982 ll3.982 3900.000 113.982 ll3.982 3901.000 ll3.982 ll3.982 3902.000 ll3.982 ll3.982 3903.000 ll3.981 ll3.98l 3904.000 113.981 ll3.981 3905.000 ll3.98l ll3.98l 3906.000 113.981 ll3.98l 3907.000 113.980 ll3.980 3908.000 ll3.980 ll3.980 3909.000 ll3.980 ll3.980 3910.000 ll3.979 ll3.979 3911.000 ll3.979 113.979 3912.000 ll3.979 ll3.979 3913.000 113.979 ll3.979 3914.000 ll3.978 ll3.978 3915.000 113.978 113.978 3916.000 ll3.978 ll3.978 3917.000 ll3.977 ll3.977 3918.000 ll3.977 ll3.977 3919.000 ll3.977 ll3.977 3920.000 ll3.977 ll3.977 3921.000 113.976 ll3.976 3922.000 ll3.976 ll3.976 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Sn1dy DCMCClA 91 11-17-2018 Attachment 1 Page 234 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V--V+ Time V-V+ Time V-V+ 3923.000 113.976 113.976 3924.000 113.975 113.975 3925.000 113.975 113.975 3926.000 113.975 113.975 3927.000 113.975 113.975 3928.000 113.974 113.974 3929.000 113.974 113.974 3930.000 113.974 113.974 3931.000 113.973 113.973 3932.000 113.973 113.973 3933.000 113.973 113.973 3934.000 113.973 113.973 3935.000 113.972 113.972 3936.000 113.972 113.972 3937.000 113.972 113.972 3938.000 113.971 113.971 3939.000 113.971 113.971 3940.000 113.971 113.971 3941.000 113.971 113.971 3942.000 113.970 113.970 3943.000 113.970 113.970 3944.000 113.970 113.970 3945.000 113.969 113.969 3946.000 113.969 113.969 3947.000 113.969 113.969 3948.000 113.969 113.969 3949.000 113:968 113.968 3950.000 113.968 113.968 3951.000 113.968 113.968 3952.000 113.967 113.967 3953.000 113.967 113.967 3954.000 113.967 113.967 3955.000 113.967 113.967 3956.000 113.966 113.966 3957.000 113.966 113.966 3958.000 113.966 113.966 3959.000 113.965 113.965 3960.000 113.965 113.965 3961.000 113.965 113.965 3962.000 113.965 113.965 3963.000 113.964 113.964 3964.000 113.964 113.964 3965.000 113.964 113.964 3966.000 113.963 113.963 3967.000 113.963 113.963 3968.000 113.963 113.963 3969.000 113.963 113.963 3970.000 113.962 113.962 3971.000 113.962 113.962 3972.000 113.962 113.962 3973.000 113.961 113.961 3974.000 113.961 113.961 3975.000 113.961 113.961 3976.000 113.961 113.961 3977.000 113.960 113.960 3978.000 113.960 113.960 3979.000 113.960 113.960 3980.000 113.959 113.959 3981.000 113.959 113.959 3982.000 113.959 113.959 3983.000 113.958 113.958 3984.000 113.958 113.958 3985.000 113.958 113.958 3986.000 113.958 113.958 3987.000 113.957 113.957 3988.000 113.957 113.957 3989.000 113.957 113.957 3990.000 113.956 113.956 3991.000 113.956 113.956 3992.000 113.956 113.956 3993.000 113.956 113.956 3994.000 113.955 113.955 3995.000 113.955 113.955 3996.000 113.955 113.955 3997.000 113.954 113.954 3998.000 113.954 113.954 3999.000 113.954 113.954 4000.000 113.954 113.954 4001.000 113.953 113.953 4002.000 113.953 113.953 4003.000 113.953 113.953 4004.000 113.952 113.952 4005.000 113.952 U3.952 4006.000 113.952 113.952 4007.000 113.951 113.951 4008.000 113.951 113.951 4009.000 113.951 113.951 4010.000 113.951 113.951 4011.000 113.950 113.950 4012.000 113.950 113.950 4013.000 113.950 113.950 4014.000 113.949 113.949 4015.000 113.949 113.949 4016.000 113.949 113.949 4017.000 113.949 113.949 4018.000 113.948 113.948 4019.000 113.948 113.948 4020.000 113.948 113.948 4021.000 113.947 113.947 4022.000 113.947 113.947 4023.000 113.947 113.947 4024.000 113.946 113.946 4025.000 113.946 113.946 4026.000 113.946 113.946 4027.000 113.945 113.945 4028.000 113.945 113.945 4029.000 113.945 113.945 4030.000 113.944 113.944 4031.000 113.944 113.944 4032.000 113.944 113.944 4033.000 113.943 113.943 4034.000 113.943 113.943 4035.000 113.943 113.943 4036.000 113.942 113.942 4037.000 113.942 113.942 4038.000 113.942 113.942 I / 4039.000 113.941 113.941 4040.000 113.941 113.941 4041.000 113.941 113.941 4042.000 113.940 113.940 4043.000 113.940 113.940 4044.000 113.940 113.940 4045.000 113.939 113.939 4046.000 113.939 113.939 4047.000 113.939 113.939 4048.000 113.938 113.938 4049.000 113.938 113.938 4050.000 113.938 113.938 4051.000 113.937 113.937 4052.000 113.937 113.937 4053.000 113.937 113.937 4054.000 113.936 113.936 4055.000 113.936 113.936

  • 4056.000 113.936 113.936 4057.000 113.935 113.935 4058.000 113.935 113.935 4059.000 . 113.935 113.935 4060.000 113.934 113.934 4061.000 113.934 113.934 4062.000 113.934 113.934 4063.000 113.933 113.933 4064.000 113.933 113.933 4065.000 113.933 113.933 4066.000 113.932 113.932 4067.000 113.932 113.932 4068.000 113.932 113.932 4069.000 113.931 113.931 4070.000 113.931 113.931 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously

  • for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! \ 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study DCMCCIA 92 11-17-2018 Attachment 1 Page 235 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time y. V+ Time V-V+ Time 'V-V+ 4071.000 113.931 113.931 4072.000 113.930 113.930 4073.000 113.930 113:930 4074.000 113.930 113.930 4075.000 113.929 113.929 4076.000 113.929 113.929 4077.000 113.929 113.929 4078.000 113.928 113.928 4079.000 113.928 113.928 4080.000 113.928 113.928 4081.000 113.927 113.927 4082.000 113.927 113.927 4083.000 113.927 113.927 4084.000 113.926 113.926 4085.000 113.926 113.926 4086.000 113.926 113.926 4087.000 113.925 113.925 4088.000 113.925 113.925 4089.000 113.925 113.925 4090.000 113.924 113.924 4091.000 113.924 113.924 4092.000 113.924 113.924 4093.000 113.923 113.923 4094.000 113.923 113.923 4095.000 113.923 113.923 4096.000 113.922 1*13.922 4097.000 113.922 113.922 4098.000 113.922 113.922 4099.000 113.921 113.921 4100.000 113.921 113.921 4101.000 113.921 113.921 4102.000 113.920 113.920 4103.000 113.920 113.920 4104.000 113.920 113.920 4105.000 113.919 113.919 4106.000 113.919 113.919 4107.000 113.918 113.918 4108.000 113.918 113.918 4109.000 113.918 113.918 4110.000 113.917 113.917 4111.000 113.917 113.917 4112.000 113.917 113.917 4113.000 113.916 113.916 4114.000 113.916 113.916 4115.000 113.916 113.916 4116.000 113.915 113.915 4117.000 113.915 113.915 4118.000 113.915 113.915 4119.000 113.914 113.914 4120.000 113.914 113.914 4121.000 113.914 113.914 4122.000 113.913 113.913 4123.000 113.913 113.913 4124.000 113.913 113.913 4125.000 113.912 113.912 4126.000 113.912 113.912 4127.000 .113.912 113.912 4128.000 113.911 113.911 4129.000 113.911 113.911 4130.000 113.911 113.911 4131.000 113.910 113.910 4132.000 113.910 113.910 4133.000 113.910 113.910 4134.000 113.909 113.909 4135.000 113.909 113.909 4136.000 113.909 113.909 4137.000 113.908 113.908 4138.000 113.908 113.908 4139.000 113.908 113.908 4140.000 113.907 113.907 4141.000 113.907 113.907 4142.000 113.906 113.906 4143.000 113.906 113.906 4144.000 113.906 113.906 4145.000 113.905 113.905 4146.000 113.905 113.905 4147.000 113.905 113.905 4148.000 113.904 113.904 4149.000 113.904 113.904 4150.000 113.904 113,904 4151.000 113.903 113.903 4152.000 113.903 113.903 4153.000 113.903 113.903 4154.000 113.902 113.902 4155.000 113.902 113.902 4156.000 113.902 113.902 4157.000 113.901 113.901 4158.000 113.901 113.901 4159.000 113.901 113.901 4160.000 113.900 113.900 4161.000 113.900 113.900 4162.000 113.900 113.900 4163.000 113.899 113.899 4164.000 113.899 113.899 4165.000 113.899 113.899 4166.000 113.898 113.898 4167.000 113.898 113.898 4168.000 113.898 113.898 4169.000 113.897 113.897 4170.000 113.897 113.897 4171.000 113.896 113.896 4172.000 113.896 113.896 4173.000 113.896 113.896 4174.000 113.895 113.895 4175.000 113.895 113.895 4176.000 113.895 113.895 4177.000 113.894 113.894 4178.00.0 113.894 113.894 4179.000 113.894 113.894 4180.000 113.893 113.893 4181.000 113.893 113.893 4182.000 113.893 113.893 4183.000 113.892 113.892 4184.000 113.892 113.892 4185.000 113.892 113.892 4186.000 113.891 113.891 4187.000 113.891 113.891 4188.000 113.891 113.891 4189.000 113.890 113.890 4190.000 113.890 113.890 4191.000 113.889 113.889 4192.000 113.889 113.889 4193.000 113.889 113.889 4194.000 113.888 113.888 4195.000 113.888 113.888 4196.000 113.888 113.888 4197.000 113.887 113.887 4198.000 113.887 . 113.887 4199.000 113.887 113.887 4200.000 113.886 113.886 4201.000 113.886 113.886 4202.000 113.886 113.886 4203.000 113.885 113.885 4204.000 113.885 113.885 4205.000 113.885 113.885 4206.000 113.884 113.884 4207.000 113.884 113.884 4208.000 113.884 113.884 4209.000 113.883 113.883 4210.000 113.883 113.883 4211.000 113.883 113.883 4212.000 113.883 113.883 4213.000 113.883 113.883 4214.000 113.883 113.883 4215.000 113.882 113.882 4216.000 113.882 113.882 4217.000 113.882 113.882 4218.000 113.882 113.882 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study, ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 93 11-17-2018 Attachment 1 Page 236 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time y. V+ Time V-V+ Time V-V+ 4219.000 113.882 113.882 4220.000 113.882 113.882 4221.000 113.882 113.882 4222.000 113.881 113.881 4223.000 113.881 113.881 4224.000 113.881 113.881 4225.000 113.881 113.881 4226.000 113.881 113.881 4227.000 113.881 113.881 4228.000 113.881 113.881 4229.000 113.880 113.880 4230.000 113.880 113.880 4231.000 113.880

  • 113.880 4232.000 113.880 113.880 4233.000 113.880 113.880 4234.000 113.880 113.880 4235.000 113.880 113.880 4236.000 113.879 113.879 4237.000 113.879 113.879 4238.000 113.879 113.879 4239.000 113.879 113.879 4240.000 113.879 113.879 4241.000 113.879 113.879 4242.000 113.878 113.878 4243.000 113.878 113.878 4244.000 113.878 113.878 4245.000 113.878 113.878 4246.000 113.878 113.878 4247.000 113.878 113.878 4248.000 113.878 113.878 4249.000 113.877 113.877 4250.000 113.877 113.877 4251.000 113.877 113.877 4252.000 113.877 113.877 4253.000 113.877 113.877 4254.000 113.877 113.877 4255.000 113.877 113.877 4256.000 113.876 113.876. 4257.000 113.876 113.876 4258.000 113.876 113.876 4259.000 113.876 113.876 4260.000 113.876 113.876 4261.000 113.876 113.876 4262.000 113.876 113.876 4263.000 113.875 113.875 4264.000 113.875 113.875 4265.000 113.875 113.875 4266.000 113.875 113.875 4267.000 113.875 113.875 4268.000 113.875 113.875 4269.000 113.874 113.874 4270.000 113.874 113.874 4271.000 113.874 113.874 4272.000 113.874 113.874 4273.000 113.874 113.874 4274.000 113.874 113.874 4275.000 113.874 113.874 4276.000 113.873 113.873 4277.000 113.873 113.873 4278.000 113.873 113.873 4279.000 113.873 113.873 4280.000 113.873 113.873 4281.000 113.873 .113.873 4282.000 113.873 113.873 4283.000 113.872 113.872 4284.000 113.872 113.872 4285.000 113.872 113.872 4286.000 113.872 113.872 4287.000 113.872 113.872 4288.000 113.872 113.872 4289.000 113.871 113.871 4290.000 113.871 113.871 4291.000 113.871 113.871 4292.000 113.871 113.871 4293.000 113.871 113.871 4294.000 113.871 113.871 4295.000 113.871 113.871 4296.000 113.870 113.870 4297.000 113.870 113.870 4298.000 113.870 113.870 4299.000 113.870 113.870 4300.000 113.870 113.870 4301.000 113.870 113.870 4302.000 113.869 113.869 4303.000 113.869 113.869 4304.000 113.869 113.869 4305.000 113.869 113.869 4306.000 113.869 113.869 4307.000 113.869 113.869 4308.000 113.869 113.869 4309.000 113.868 113.868 4310.000 113.868 113.868 4311.000 113.868 113.868 4312.000 113.868 113.868 4313.000 113.868 113.868 4314.000 113.868 113.868 4315.000 113.868 113.868 4316.000 113.867 113.867 4317.000 113.867 113.867 4318.000 113.867 113.867 4319.000 113.867 113.867 4320.000 113.867 113.867 4321.000 113.867 113.867 4322.000 113.866 113.866 4323.000 113.866 113.866 4324.000 113.866 113.866 4325.000 113.866 113.866 4326.000 113.866 113.866 4327.000 113.866 113.866 4328.000 113.866 113.866 4329.000 113.865 113.865 4330.000 113.865 113.865 4331.000 113.865 113.865 4332.000 113.865 113.865 4333.000 113.865 113.865 4334.000 113.865 113.865 4335.000 113.864 113.864 4336.000 113.864 113.864 4337.000 113.864 113.864 4338.000 113.864 113.864 4339.000 113.864 113.864 4340.000 113.864 113.864 4341.000 113.864 113.864 4342.000 113.863 113.863 4343.000 113.863 113.863 4344.000 113.863 113.863 4345.000 113.863 113.863 4346.000 113.863 113.863 4347.000 113.863 113.863 4348.000 113.862 113.862 4349.000 113.862 113.862 4350.000 113.862 113.862 4351.000 113.862 113.862 4352.000 113.862 113.862 4353.000 113.862 113.862 4354.000 113.862 113.862 4355.000 113.861 113.861 4356.000 113.861 113.861 4357.000 113.861 113.861 4358.000 113.861 113.861 4359.000 113.861 113.861 4360.000 113.861 113.861 4361.000 113.860 113.860 4362.000 113.860 113.860 . 4363.000 113.860 113.860 4364.000 113.860 113.860 4365.000 113.860 113.860 4366.000 113.860 113.860 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCCIA 94 11-17-2018 Attachment 1 Page 237 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4367.000 113.859 113.859 4368.000 113.859 113.859 4369.000 113.859 113.859 4370.000 113.859 113.859 4371.000 113.859 113.859 4372.000 113.859 113.859 4373.000 113.859 113.859 4374.000 113.858 113.858 4375.000 113.858 113.858 4376.000 113.858 113.858 4377.000 113.858 113.858 4378.000 113.858 113.858 4379.000 113.858 113.858 4380.000 113.857 113.857 4381.000 113.857 113.857 4382.000 113.857 113.857 4383.000 113.857 113.857 4384.000 113.857 113.857 4385.000 113.857 113.857 4386.000 113.856 113.856 4387.000 113.856 113.856 4388.000 113.856 113.856 4389.000 113.856 113.856 4390.000 113.856 113.856 4391.000 113.856 113.856 4392.000 113.856 113.856 4393.000 113.855 113.855 4394.000 113.855 113.855 4395.000 113.855 113.855 4396.000 113.855 113.855 4397.000 113.855 113.855 4398.000 113.855 113.855 4399.000 113.854 113.854 4400.000 113.854 113.854 4401.000 113.854 113.854 4402.000 113.854 113.854 4403.000 113.854 113.854 4404.000 113.854 113.854 4405.000 113.853 113.853 4406.000 113.853 113.853 4407.000 113.853 113.853 4408.000 113.853 113.853 4409.000 113.853 113.853 44!0.000 113.853 113.853 4411.000 113.853 113.853 4412.000 113.852 113.852 4413.000 I 13.852 113.852 4414.000 113.852 113.852 4415.000 113.852 113.852 4416.000 113.852 113.852 4417.000 113.852 113.852 4418.000 113.851 113.851 4419.000 113.851 113.851 4420.000 113.851 113.851 4421.000 113.851 113.851 4422.000 113.851 113.851 4423.000 113.851 113.851 4424.000 113.850 113.850 4425.000 113.850 113.850 4426.000 113.850 113.850 4427.000 113.850 113.850 4428.000 113.850 113.850 4429.000 113.850 113.850 4430.000 113.849 113.849 4431.000 113.849 113.849 4432.000 113.849 113.849 4433.000 113.849 113.849 4434.000 113.849 113.849 4435.000 113.849 113.849 4436.000 113.849 113.849 4437.000 113.848 113.848 4438.000 113.848 113.848 4439.000 113.848 113.848 4440.000

  • 113.848 113.848 4441.000 113.848 113.848 4442.000 113.848 113.848 4443.000 113.847 113.847 4444.000 113.847 113.847 4445.000 113.847 113.847 4446.000 113.847 113.847 4447.000 113.847 113.847 4448.000 113.847 113.847 4449.000 113.846 113.846 4450.000 113.846 113.846 4451.000 113.846 113.846 4452.000 113.846 113.846 4453.000 113.846 113.846 4454.000 113.846 113.846 4455.000 113.845 113.845 4456.000 113.845 113.845 4457.000 113.845 113.845 4458.000 113.845 113.845 4459.000 113.845 113.845 4460.000 113.845 113.845 4461.000 113.844 113.844 4462.000 113.844 113.844 4463.000 113.844 113.844 4464.000 113.844 113.844 4465.000 113.844 113.844 4466.000 113.844 113.844 4467.000 113.844 113.844 4468.000 113.843 113.843 4469.000 113.843 113.843 4470.000 113.843 113.843 4471.000 113.843 113.843 4472.000 113.843 113.843 4473.000 113.843 113.843 4474.000 113.842 113.842 4475.000 113.842 113.842 4476.000 113.842 113.842 4477.000 113.842 113.842 4478.000 113.842 113.842 4479.000 113.842 113.842 4480.000 113.841 113.841 4481.000 113.841 113.841 4482.000 113.841 113.841 4483.000 113.841 113.841 4484.000 113.841 113.841 4485.000 113.841 113.841 4486.000 113.840 113.840 4487.000 113.840 113.840 4488.000 113.840 113.840 4489.000 113.840 113.840 4490.000 113.840 113.840 4491.000 113.840 113.840 4492.000 113.839 113.839 4493.000 113.839 113.839 4494.000 113.839 113.839 4495.000 113.839 113.839 4496.000 113.839 113.839 4497.000 113.839 113.839 4498.000 113.838 113.838 4499.000 113.838 113.838 4500.000 113.838 113.838 4501.000 113.838 113.838 4502.000 113.838 113.838 4503.000 113.838 113.838 4504.000 113.837 113.837 4505.000 113.837 113.837 4506.000 113.837 113.837 4507.000 113.837 113.837 4508.000 113.837 113.837 4509.000 113.837 113.837 4510.000 113.836 113.836 4511.000 113.836 113.836 4512.000 113.836 113.836 4513.000 113.836 113.836 4514.000 113.836 113.836 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery. IA 48-Hour Coping Study DCMCCIA 95 11-17-2018 Attachment 1 Page 238 of 274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4515.000 113.836 113.836 4516.000 113.835 113.835 4517.000 113.835 113.835 4518.000 113.835 113.835 4519.000 113.835 113.835 4520.000 113.835 113.835 4521.000 113.835 113.835 4522.000 113.834 113.834 4523.000 113.834 113.834 4524.000 113.834 113.834 4525.000 113.834 113.834 4526.000 113.834 113.834 4527.000 113.834 113.834 4528.000 113.833 113.833 4529.000 113.833 113.833 4530.000 113.833 113.833 4531.000 113.833 113.833 4532.000 113.833 113.833 4533.000 113.833 113.833 4534.000 113.832 113.832 4535.000 113.832 113.832 4536.000 113.832 113.832 4537.000 113.832 113.832 4538.000 113.832 113.832 4539.000 113.832 113.832 4540.000 113.831 113.831 4541.000 113.831 113.831 4542.000 113.831 113.831 4543.000 113.831 113.831 4544.000 113.831 113.831 4545.000 113.831 113.831 4546.000 113.830 113.830 4547.000 113.830 113.830 4548.000 113.830 113.830 4549.000 113.830 113.830 4550.000 113.830 113.830 4551.000 113.830 113.830 4552.000 113.829 113.829 4553.000 113.829 113.829 4554.000 113.829 113.829 4555.000 113.829 113.829 4556.000 113.829 113.829 4557.000 113.829 113.829 4558.000 113.828 113.828 4559.000 113.828 113.828 4560.000 113.828 113.828 4561.000 113.828 113.828 4562.000 113.828 113.828 4563.000 113.827 113.827 4564.000 113.827 113.827 4565.000 113.827 113.827 4566.000 113.827 113.827 4567.000 113.827 113.827 4568.000 113.827 113.827 4569.000 113.826 113.826 4570.000 113.826 113.826 4571.000 113.826 113.826 4572.000 113.826 113.826 4573.000 113.826 113.826 4574.000 113.826 113.826 4575.000 113.825 113.825 4576.000 113.825 113.825 4577.000 113.824 113.824 4578.000 113.824 113.824 4579.000 113.824 113.824 4580.000 113.823 113.823 4581.000 113.823 113.823 4582.000 113.823 113.823 4583.000 113.822 113.822 4584.000 113.822 113.822 4585.000 113.822 113.822 4586.000 113.821 113.821 4587.000 113.821 113.821 4588.000 113.821 113.821 4589.000 113.820 113.820 4590.000 113.820 113.820 4591.000 113.819 113.819 4592.000 113.819 113.819 4593.000 113.819 113.819 4594.000 113.818 113.818 4595.000 113.818 113.818 4596.000 113.818 113.818 4597.000 113.817 113.817 4598.000 113.817 113.817 4599.000 113.817 113.817 4600.000 113.816 113.816 4601.000 113.816 113.816 4602.000 113.815 113.815 4603.000 113.815 113.815 4604.000 113.815 113.815 4605.000 113.814 113.814 4606.000 113.814 113.814 4607.000 113.814 113.814 4608.000 113.813 113.813 4609.000 113.813 113.813 4610.000 113.813 113.813 4611.000 113.812 113.812 4612.000 113.812 113.812 4613.000 113.812 113.812 4614.000 113 .. 811 113.811. 4615.000 113.811 113.811 4616.000 113.810

  • 113.810 4617.000 113.810 113.810 4618.000 113.810 113.810 4619.000 113.809 113.809 4620.000 113.809 113.809 4621.000 113.809 113.809 4622.000 113.808 113.808 4623.000 113.808 113.808 4624.000 113.808 113.808 4625.000 113.807 113.807 4626.000 113.807 113.807 4627.000 113.806 113.806 4628.000 113.806 113.806 4629.000 113.806 113.806 4630.000 113.805 113.805 4631.000 113.805 113.805 4632.000 113.805 113.805 4633.000 113.804 113.804 4634.000 113.804 113.804 4635.000 113.804 113.804 4636.000 113.803 113.803 4637.000 113.803 113.803 4638.000 113.802 113.802 4639.000 113.802 113.802 4640.000 113.802 113.802 4641.000 113.801 113.801 4642.000 113.801 113.801 4643.000 113.801 113.801 4644.000 113.800 113.800 4645.000 113.800 113.800 4646.000 113.800 113.800 4647.000 113.799 113.799 4648.000 113.799 113.799 4649.000 113.798 113.798 4650.000 113.798 119.798 4651.000 113.798 113.798 4652.000 113.797 113.797 4653.000 113.797 113.797 4654.000 113.797 113.797 4655.000 113.796 113.796 4656.000 113.796 113.796 4657.000 113.795 113.795 4658.000 113.795 113.795 4659.000 113.795 113.795 4660.000 113.794 113.794 4661.000 113.794 113.794 4662.000 113.794 113.794 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA48-HourCopingStudy DCMCClA 96 11-17-2018 Attachment 1 Page 239 of 27 4 KCICONSULT Base Nonna! Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 4663.000 113.793 113.793 4664.000 113.793 113.793 4665.000 113,.793 113.793 4666.000 113.792 113.792 4667.000 113.792 113.792 4668.000 113.791 113.791 4669.000 113.791 113.791 4670.000 113.791 113.791 4671.000 113.790 113.790 4672.000 113.790 113.790 4673.000 113.790 113.790 4674.000 113.789 113.789 4675.000 113.789 113.789 4676.000 113.788 113.788 4677.000 113.788 113.788 4678.000 113.788 113.788 4679.000 113.787 113.787 4680.000 113.787 113.787 4681.000 113.787 113.787 4682.000 113.786 113.786 4683.000 113.786 113.786 4684.000 113.786 113.786 4685.000 113.785 113.785 4686.000 113.785 113.785 4687.000 113.784 113.784 4688.000 113.784 113.784 4689.000 113.784 113.784 4690.000 113.783 113.783 ' 4691.000 113.783 113.783 4692.000 113.783 113.783 4693.000 113.782 113.782 4694.000 113.782 113.782 4695.000 113.781 113.781 4696.000 113.781 113.781 4697.000 113.781 113.781 4698.000 113.780 113.780 4699.000 113.780 113.780 4700.000 113.780 113.780 4701.000 113.779 113.779 4702.000 113.779 113.779 4703.000 113.778 113.778 4704.000 113.778 113.778 4705.000 113.778 113.778 4706.000 113.777 113.777 4707.000 113.777 113.777 4708.000 113.777 113.777 4709.000 113.776 113.776 4710.000 113.776 113.776 4711.000 113.775 113.775 4712.000 113.775 113.775 4713.000 113.775 113.775 4714.000 113.774 113.774 4715.000 113.774 p3.774 4716.000 113.774 113.774 4717.000 113.773 113.773 4718.000 113.773 113.773 4719.000 113.772 113.772 4720.000 113.772 113.772 4721.000 113.772 113.772 4722.000 113.771 113.771 4723.000 113.771 113.771 4724.000 113.771 113.771 4725.000 113.770 113.770 4726.000 113.770 113.770 4727.000 113.769 113.769 4728.000 113.769 113.769 4729.000 113.769 113.769 4730.000 113.768 113.768 4731.000 113.768 113.768 4732.000 113.768 113.768 4733.000 113.767 113.767 4734.000 113.767 113.767 4735.000 113.766 113.766 4736.000 113.766 113.766 4737.000 113.766 113.766 4738.000 113.765 113.765 4739.000 113.765 113.765 4740.000 113.765 113.765 4741.000 113.764 113.764 4742.000 113.764 113.764 4743.000 113.763 113.763 4744.000 113.763 113.763 4745.000 113.763 113.763 4746.000 113.762 113.762 4747.000 113.762 113.762 4748.000 113.762 113.762 4749.000 113.761 113.761 4750.000 113.761 113.761 4751.000 113.760 113.760 4752.000 113.760 113.760 4753.000 113.760 113.760 4754.000 113.759 il3.759 4755.000 113.759 113.759 4756.000 113.758 113.758 4757.000 113.758 113.758 4758.000 113.758 113.758 4759.000 113.757 113.757 4760.000 113.757 113.757 4761.000 113.757 113.757 4762.000 113.756 113.756 4763.000 113.756 113.756 4764.000 113.755 113.755 4765.000 113.755 113.755 4766.000 113.755 113.755 4767.000 113.754 113.754 4768.000 113.754 113.754 4769.000 113.754 113.754 4770.000 113.753 113.753 4771.000 113.753 113.753 4772.000 113.752 113.752 4773.000 113.752 113.752 4774.000 113.752 113.752 4775.000 113.751 113.751 4776.000 113.751 113.751 4777.000 113.750 113.750 4778.000 113.750 113.750 4779.000 113.750 113.750 4780.000 113.749 113.749 4781.000 113.749 113.749 4782.000 113.749 113.749 4783.000 113.748 113.748 4784.000 113.748 113.748 4785.000 113.747 113.747 4786.000 113.747 113.747 4787.000 113.747 113.747 4788.000 113.746 113.746 4789.000 113.746 113.746 4790.000 113.745 113.745 4791.000 113.745 113.745 4792.000 113.745 113.745 4793.000 113.744 113.744 4794.000 113.744 113.744 4795.000 113.744 113.744 4796.000 113.743 113.743 4797.000 113.743 113.743 4798.000 113.742 113.742 4799.000 113.742 113.742 4800.000 113.742 113.742 4801.000 113.741 113.741 4802.000 113.741 113.741 4803.000 113.740 113.740 4804.000 113.740 113.740 4805.000* 113.740 113.740 4806.000 113.739 113.739 4807.000 113.739 113.739 4808.000 113.739 113.739 4809.000 113.738 113.738 4810.000 113.738 113.738 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA48-HourCopingStudy DCMCCIA 97 11-17-2018 Attachment 1 Page 240 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time y. V+ Time V-V+ Time y. V+ 4811.000 113.737 113.737 4812.000 113.737 113.737 4813.000 113.737 113.737 4814.000 113.736 113.736 4815.000 113.736 113.736 4816.000 113,735 113.735 4817.000 113.735 113.735 4818.000, 113.735 113.735 4819.000 113.734 113.734 4820.000 113.734 113.734 4821.000 113.733 113.733 4822.000 113.733 113.733 4823.000 113.733 113.733 4824.000 113.732 113.732 4825.000 113.732 113.732 4826.000 113.732 113.732 4827.000 113.731 113.731 4828.000 113.731 113.731 4829.000 113.730 113.730 4830.000 113.730 113.730 4831.000 113.730 113.730 4832.000 113.729 113.729 4833.000 113.729 113.729 4834.000 113.728 113.728 4835.000 113.728 113.728 4836.000 113.728 113.728 4837.000 113.727 113.727 4838.000 113.727 113.727 ' 4839.000 113.726 113.726 4840.000 113.726 113.726 4841.000 113.726 113.726 4842.000 113.725 113.725 4843.000 113.725 113.725 4844.000 113.724 113.724 4845.000 113.724 113.724 4846.000 113.724 113.724 4847.000 113.723 113.723 4848.000 113.723 113.723 4849.000 113.723 113.723 4850.000 113.722 113.722 4851.000 113.722 113.722 4852.000 113.721 113.721 4853.000 113.721 113.721 4854.000 113.721 113.721 4855.000 113.720 113.720 4856.000 113.720 113.720 4857.000 113.719 113.719 4858.000 113.719 113.719 4859.000 113.719 113.719 4860.000 , 113.718 113.718 4861.000 113.718 113.718 4862.000 113.717 113.717 4863.000 113.717 113.717 4864.000 113.717 113.717 4865.000 113.716 113.716 4866.000 113.716 113.716 4867.000 113.715 113.715 4868.000 113.715 113.715 4869.000 113.715 113.715 4870.000 113.714 113.714 4871.000 113.714 113.714 4872.000 113.713 113.713 4873.000 113.713 113.713 4874.000 113.713 113.713 4875.000 113.712 113.712 4876.000 113.712 113.712 4877.000 113.711 113.711 4878.000 113.711 113.7-11 4879.000 113.711 113.711 4880.000 113.710 113.710 4881.000 113.710 113.710 4882.000 113.709 113.709 4883.000 113.709 113.709 4884.000 113.709 113.709 4885.000 113.708 113.708 4886.000 113.708 113.708 4887.000 113.707 113.707 4888.000 113.707 113.707 4889.000 113.707 113.707 4890.000 113.706 113.706 4891.000 113.706 113.706 4892.000 113.705 113.705 4893.000 113.705 113.705 4894.000 113.705 113.705 4895.000 113.704 113.704 4896.000 113.704 113.704 4897.000 113.703 113.703 4898.000 113.703 113.703 4899.000 113.703 113.703 4900.000 113.702 113.702 4901.000 113.702 113.702 4902.000 113.701 113.701 4903.000 113.701 113.701 4904.000 113.701 113.701 4905.000 113.700 113.700 4906.000 113.700 113.700 4907.000 113.699 113.699 4908.000 \ 113.699 113.699 4909.000 113.699 113.699 4910.000 113.698 113.698 4911.000 113.698 113.698 4912.000 113.697 113.697 4913.000 113.697 113.697 4914.000 113.697 113.697 4915.000 113.696 113.696 4916.000 113.696 113.696 4917.000 113.695 113.695 4918.000 113.695 113.695 4919.000 113.695 113.695 4920.000 113.694 113.694 4921.000 113.694 113.694 4922.000 113.693 113.693 4923.000 113.693 113.693 4924.000 113.693 113.693 4925.000 113.692 113.692 4926.000 113.692 113.692 4927.000 113.691 113.691 4928.000 113.691 113.691 4929.000 113.691 113.691 4930.000 113.690 113.690 4931.000 113.690 113.690 4932.000 113.689 113.689 4933.000 113.689 113.689 4934.000 113.688 113.688 4935.000 113.688 113.688 4936.000 113.688 113.688 4937.000 113.687 113.687 4938.000 113.687 113.687 4939.000 113.686 113.686 4940.000 113.686 113.686 4941.000 113.686 113.686 4942.000 113.685 113.685 4943.000 113.685 113.685 4944.000 113.684 113.684 4945.000 113.684 113.684 4946.000 113.684 113.684 4947.000 113.683 113.683 4948.000 113.683 113.683 4949.000 113.682 113.682 4950.000 113.682 113.682 4951.000 113.682 113.682 4952.000 113.681 113.681 4953.000 113.681 113.681 4954.000 113.680 113.680 4955.000 113.680 113.680 4956.000 113.680 113.680 4957.000 113.679 113.679 4958.000 113.679 113.679 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 98 II-17-2018 Attachment 1 Page 241 of 274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time y. V+ Time y. V+ Time V-V+ 4959.000 tt3.678 tt3.678 4960.000 113.678 tt3.678 4961.000 tt3.677 113.677 4962.000 tt3.677 tt3.677 4963.000 tt3.677 tt3.677 4964.000 113.676 tt3.676 4965.000 113.676 113.676 4966.000 tt3.675 tt3.675 4967.000 113.675 tt3.675 4968.000 tt3.675 tt3.675 4969.000 113.674 tt3.674 4970.000 tt3.674 tt3.674 4971.000 tt3.673 113.673 4972.000 tt3.673 113.673 4973.000 113.673 113.673 4974.000 tt3.672 113.672 4975.000 tt3.672 tt3.672 4976.000 tt3.671 113.671 4977.000 113.671 113.671 4978.000 113.670 tt3.670 4979.000 tt3.670 tt3.670 4980.000 tt3.670 tt3.670 4981.000 113.669 113.669 4982.000 113.669 tt3.669 4983.000 tt3.668 tt3.668 4984.000 113.668 113.668 4985.000 113.668 113.668 4986.000 113.667 113.667 4987.000 tt3:661 tt3.667 4988.000 tt3.667 tt3.667 4989.000 113.667 tt3.667 4990.000 113.667 tt3.667 4991.000 tt3.666 113.666 4992.000 tt3.666 tt3.666 4993.000 113.666 113.666 4994.000 113.666 113.666 4995.000 tt3.665 tt3.665 4996.000 tt3.665 113.665 4997.000 tt3.665 113.665 4998.000 113.665 113.665 4999.000 113.665 113.665 5000.000 113.664 tt3.664 5001.000 tt3.664 113.664 5002.000 _113.664 113.664 5003.000 113.664 113.664 5004.000 tt3.663 tt3.663 5005.000 113.663 113.663 5006.000 113.663 113.663 5007.000 tt3.663 tt3.663 5008.000 113.663 tt3.663 5009.000 113.662 113.662 5010.000 113.662 113.662 5011.000 tt3.662 113.662 5012.000 tt3.662 tt3.662 5013.000 tt3.661 113.661 5014.000 113.661 113.661 5015.000 113.661 113.661 5016.000 tt3.661 tt3.661 5017.000 113.661 113.661 5018.000 113.660 tt3.660 5019.000 tt3.660 113.660 5020.000 113.660 tt3.660 5021.000 113.660 113.660 5022.000 113.659 tt3.659 5023.000 113.659 tt3.659 5024.000 113.659 tt3.659 5025.000 113.659 113.659 5026.000 113.658 tt3.658 5027.000 tt3.658 tt3.658 5028.000 113.658 tt3.658 5029.000 113.658 113.658 5030.000 113.658 tt3.658 5031.000 113.657 tt3.657 5032.000 113.657 tt3.657 5033.000 113.657 113.657 5034.000 113.657 tt3.657 5035.000 tt3.656 tt3.656 5036.000 113.656 tt3.656 5037.000 113.656 113.656 5038.000 113.656 tt3.656 5039.000 113.655 113.655 5040.000 113.655 113.655 5041.000 113.655 tt3.655 5042.000 113.655 113.655 5043.000 tt3.655 113.655 5044.000 113.654 113.654 5045.000 113.654 113.654 5046.000 113.654 tt3.654 5047.000 tt3.654 tt3.654 5048.000 tt3.653 tt3.653 5049.000 tt3.653 113.653 5050.000 113.653 113.653 5051.000 tt3.653 tt3.653 5052.000 tt3.652 tt3.652 5053.000 tt3.652 113.652 5054.000 113.652 113.652 5055.000 tt3.652 tt3.652 5056.000 tt3.652 tt3.652 5057.000 tt3.651 113.651 5058.000 tt3.651 tt3.651 5059.000 113.651 113.651 5060.000 tt3.651 tt3.651 5061.000 113.650 tt3.650 5062.000 113.650 113.650 5063.000 tt3.650 tt3.650 5064.000 113.650 tt3.650 5065.000 113.649 113.649 5066.000 tt3.649 tt3.649 5067.000 tt3.649 113.649, 5068.000 tt3.649 tt3.649 5069.000 113.649 tt3.649 5070.000 113.648 tt3.648 5071.000 tt3.648 tt3.648 5072.000 tt3.648 tt3.648 5073.000 tt3.648 113.648 5074.000 113.647 113.647 5075.000 tt3.647 tt3.647 5076.000 tt3.647 113.647 5077.000 113.647 tt3.647 5078.000 113.646 113.646 5079.000 113.646 tt3.646 5080.000 tt3.646 tt3.646 5081.000

  • tt3.646 113.646 5082.000 113.646 113.646 5083.000 tt3.645 113.645 5084.000 tt3.645 tt3.645 5085.000 tt3.645 113.645 5086.000 113.645 113.645 5087.000 tt3.644 tt3.644 5088.000 tt3.644 tt3.644 5089.000 113.644 113.644 5090.000 tt3.644 tt3.644 5091.000 tt3.643 tt3.643 5092.000 113.643 tt3.643 5093.000 tt3.643 113.643 5094.000 tt3.643 113.643 5095.000 113.642 tt3.642 5096.000 tt3.642 tt3.642 5097.000 tt3.642 113.642 5098.000 113.642 113.642 5099.000 tt3.642 113.642 5100.000 tt3.641 tt3.641 5101.000 tt3.641 tt3.641 5102.000 113.641 tt3.641 5103.000 113.641 tt3.641 5104.000 tt3.640 tt3.640 5105.000 113.640 113.640 5106.000 113.640 tt3.640 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 99 11-17-2018 Attachment 1 Page 242 of 27 4 KCICONSULT Base Nonna) Voltage(V)

Voltage(V)

Voltage (V) Voltage (V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5107.000 113.640 113.640 5108.000 113.640 113.640 5109.000 113.639 113.639 5110.000 113.639 113.639 5111.000 113.639 113.639 5112.000 113.639 113.639' 5113.000 113.639 113.639 5114.000 113.639 113.639 5115.000 113.638 113.638 5116.000 113.638 113.638 5117.000 113.638 113.638 5118.000 113.638 113.638 5119.000 113.638 113.638 5120.000 113.637 113.637 5121.000 113.637 113.637 5122.000 113.637 113.637 5123.000 113.637 113.637 5124.000 113.637 113.637 5125.000 113.637 113.637 5126.000 113.636 113.636 5127.000 113.636 113.636 5128.000 113.636 113.636 5129.000 113.636 113.636 5130.000 113.636 113.636 5131.000 113.635 113.635 5132.000 113.635 113.635 5133.000 113.635 113.635 5134.000 113.635 113.635 5135.000 113.635 113.635 5136.000 113.634 113.634 5137.000 113.634 113.634 5138.000 113.634 113.634 5139.000 113.634 113.634 5140.000 113.634 113.634 5141.000 113.634 UJ.634 5142.000 113.633 113.633 5143.000 113.633 113.633 5144.000 113.633 113.633 5145.000 113.633 113.633 5146.000 113.633 113.633 5147.000 113.632 113.632 5148.000 113.632 113.632 5149.000 113.632 113.632 5150.000 113.632 113.632 5151.000 113.632 113.632 5152.000 113.631 113.631 5153.000 113.631 113.631 5154.000 113.631 113.631 5155.000 113.631 113.631 5156.000 113.631 113.631 5157.000 113.631 113.631 5158.000 113.630 113.630 5159.000 113.630 113.630 5160.000 113.630 113.630 5161.000 113.630 113.630 5162.000 113.630 113.630 5163.000 113.629 113.629 5164.000 113.629 113.629 5165.000 113.629 113.629 5166.000 113.629 113.629 5167.000 113.629 113.629 5168.000 113.628 113.628 5169.000 113.628 113.628 5170.000 113.628 113.628 5171.000 113.628 113.628 5172.000 113.628 113.628 5173.000 113.627 113.627 5174.000 113.627 113.627 5175.000 113.627 113.627 5176.000 113.627 113.627 5177.000 113.627 113.627 5178.000 113.626 113.626 5179.000 113.626 113.626 5180.000 113.626 113.626 5181.000 113.626 113.626 5182.000 113.626 113.626 5183.000 113.626 113.626 5184.000 113.625 113.625 5185.000 113.625 113.625 5186.000 113.625 113.625 5187.000 113.625 113.625 5188.000 113.625 113.625 5189.000 113.624 113.624 5190.000 113.624 113.624 5191.000 113.624 113.624 5192.000 113.624 113.624 5193.000 113.624 113.624 5194.000 113.623 113.623 5195.000 113.623 113.623 5196.000 113.623 113.623 5197.000 113.623 113.623 5198.000 113.623 113.623 5199.000 113.622 113.622 5200.000 113.622 113.622 5201.000 113.622 113.622 5202.000 113.622 113.622 5203.000 113.622 113.622 5204.000 113.621 113.621 5205.000 113.621 113.621 5206.000 113.621 113.621 5207.000 113.621 113.621 5208.000 113.621 113.621 5209.000 113.620 113.620 5210.000 113.620 113.620 5211.000 113.620 113.620 5212.000 113.620 113:620 5213.000 113.620 113.620 5214.000 113.619 113.619 5215.000 113.619 113.619 5216.000 113.619 113.619 5217.000 113.619 113.619 5218.000 113.61_9 113.619 L, 5219.000 113.618 113.618 5220.000 113.618 113.618 5221.000 113.618 113.618 5222.000 113.618 113.618 5223.000 113.618 113.618 5224.000 113.617 113.617 5225.000 113.617 113.617 5226.000 113.617 113.617 5227.000 113.617 113.617 5228.ooq 113.617 113.617 5229.000 113.616 113.616 5230.000 113.616 113.616 5231.000 113.616 113.616 5232.000 113.616 113.616 5233.000 113.616 113.616 5234.000 113.615 113.615 5235.000 113.615 113.615 5236.000 113.615 113.615 5237.000 113.615 113.615 5238.000 113.615 113.615 5239.000 113.614 113.614 5240.000 113.614 113.614 5241.000 113.614 113.614 5242.000 113.614 113.614 5243.000 113.614 113.614 5244.000 113.613 113.613 5245.000 113.613 113.613 5246.000 113.613 113.613 5247.000 113.613 113.613 5248.000 113.613 113.613 5249.000 113.612 113.612 5250.000 113.612 113.612 5251.000 113.612 . 113.612 5252.000 113.612 113.612 5253.000 113.612 113.612 5254.000 113.611 113.611 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 100 ll-17-2018 Attachment 1 Page 243 of 27 4 KCICONSULT Base Nonna! Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time y. V+ Time V-V+ Time V-V+ 5255.000 113.611 113.611 5256.000 113.611 113.611 5257.000 113.611 113.611 5258.000 113.611 113.611 5259.000 113.610 113.610 5260.000 113.610 113.610 5261.000 113.610 113.610 5262.000 113.610 113.610 5263.000 113.610 113.610 5264.000 113.609 113.609 5265.000 113.609 113.609 5266.000 113.609 113.609 5267.000 113.609 113.609 5268.000 113.609 113.609 5269.000 113.608 113.608 5270.000 113.608 113.608 5271.000 113.608 113.608 5272.000 113.608 113.608 5273.000 113.608 113.608 5274.000 113.607 113.607 5275.000 113.607 113.607 5276.000 113.607 113.607 5277.000 113.607 113.607 5278.000 113.607 113.607 5279.000 113.606 113.606 5280.000 113.606 113.606 5281.000 113.606 113.606 5282.000 113.606 113.606 5283.000 113.605 113.605 5284.000 113.605 113.605 5285.000 113.605 113.605 5286._000 113.605 113.605 5287.000 113.605 113.605 5288.000 113.604 113.604 5289.000 113.604 113.604 5290.000 113.604 113.604 5291.000 113.604 113.604 5292.000 113.604 113.604 5293.000 113.603 113.603 5294.000 113.603 113.603 5295.000 113.603 113.603 5296.000 113.603 113.603 5297.000 113.603 113.603 5298.000 113.602 113.602 5299.000 113.602 113.602 5300.000 113.602 113.602 5301.000 113.602 113.602 5302.000 113.602 113.602 5303.000 113.601 113.601 5304.000 113.601 113.601 5305.000 113.601 113.601 5306.000 113.601 113.601 5307.000 113.600 113.600 5308.000 113.600 113.600 5309.000 113.600 113.600 5310.000 113.600 113.600 5311.000 113.600 113.600 5312.000 113.599 113.599 5313.000 113.599 113.599 5314.000 113.599 113.599 5315.000 113.599 113.599 5316.000 113.599 113.599 5317.000 113.598 113.598 5318.000 113.598 113.598 5319.000 113.598 113.598 5320.000 113.598 113.598 5321.000 113.597 113.597 5322.000 113.597 113.597 5323.000 113.597 113.597 5324.000 113.597 113.597 5325.000 113.597 113.597 5326.000 113.596 113.596 5327.000 113.596 113.596 5328.000 113.596 113.596 5329.000 113.596 113.596 5330.000 113.596 113.596 5331.000 113.595 113.595 5332.000 113.595 113.595 5333.000 113.595 113.595 5334.000 113.595 113.595 5335.000 113.594 113.594 5336.000 113.594 113.594 5337.000 113.594 113.594 5338.000 113.594 113.594 5339.000 113.594 113.594 5340.000 113.593 113.593 5341.000 113.593 113.593 5342.000 113.593 113.593 5343.000 113.593 113.593 5344.000 113.593 113.593 5345.000 113.592 113.592 5346.000 113.592 113.592 ( 5347.000 113.592 113.592 5348.000 113.592 113.592 5349.000 113.591 113.591 5350.000 113.591 113.591 5351.000 113.591 113.591 5352.000 113.591 113.591 5353.000 113.591 113.591 5354.000 113.591 113.591 5355.000 113.591 113.591 5356.000 113.591 113.591 5357.000 113.590 113.590 5358.000 113.590 113.590 5359.000 113.590 113.590 5360.000 113.590 113.590 5361.000 113.590 113.590 5362.000 113.590 113.590 5363.000 113.590 113.590 5364.000 113.590 \13.590 5365.000 113.589 113.589 5366.000 113.589 113.589 5367.000 113.589 113.589 5368.000 113.589 113.589 5369.000 113.589 113.589 5370.000 113.589 113.589 5371.000 113.589 113.589 5372.000 113.589 113.589 5373.000 113.589 113.589 5374.000 113.588 113.588 5375.000 113.588 113.588 5376.000 113.588 113.588 5377.000 113.588 113.588 5378.000 113.588 113.588 5379.000 113.588 113.588 5380.000 113.588 113.588 5381.000 113.588 113.588 5382.000 113.587 113.587 5383.000 113.587 113.587 5384.000 113.587 113.587 5385.000 113.587 113.587 5386.000 113.587 113.587 5387.000 113.587 113.587 5388.000 113.587 113.587 5389.000 113.587 113.587 5390.000 113.586 113.586 5391.000 113.586 113.586 5392.000 113.586 113.586 5393.000 113.586 113.586 5394.000 113.586 113.586 5395.000 113.586 113.586 5396.000 113.586 113.586 5397.000 113.586 113.586 5398.000 113.585 113.585 5399.000 113.585 113.585 5400.000 113.585 113.585 5401.000 113.585 113.585 5402.000 113.585 113.585 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE" 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA Attachment

1. Page 244 of 27 4 101 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5403.000 113.585 113.585 5404.000 113.585 113.585 5405.000 113.585 113.585 5406.000 113.584 113.584 5407.000 113.584 113.584 5408.000 113.584 113.584 5409.000 113.584 113.584 5410.000 113.584 113.584 5411.000 113.584 113.584 5412.000 113.584 113.584 5413.000 113.584 113.584 5414.000 113.583 113.583 5415.000 113.583 113.583 5416.000 113.583 113.583 5417.000 113.583 113.583 5418.000 113.583 113.583 5419.000 113.583 113.583 5420.000 113.583 113.583 5421.000 113.583 113.583 5422.000 113.582 113.582 5423.000 113.582 113.582 5424.000 113.582 113.582 5425.000 113.582 113.582 5426.000 113.582 113.582 5427.000 113.582 113.582 5428.000 113.582 113.582 5429.000 113.582 113.582 5430.000 113.581 113.581 5431.000 113.581 113.581 5432.000 113.581 113.581 5433.000 113.581 113.581 5434.000 113.581 113.581 5435.000 113.581 113.581 5436.000 113.581 113.581 5437.000 113.581 113.581 5438.000 113.580 113.580 5439.000 113.580 113.580 5440.000 113.580 113.580 5441.000 113.580 113.580 5442.000 113.580 113.580 5443.000 113.580 113.580 5444.000 113.580 113.580 5445.000 113.580 113.580 5446.000 113.579 113.579 5447.000 113.579 113.579 5448.000 113.579 113.579 5449.000 113.579 113.579 5450.000 113.579 113.579 5451.000 113.579 113.579 5452.000 113.579 113.579 5453.000 113.579 113.579 5454.000 113.578 113.578 5455.000 113.578 113.578 5456.000 113.578 113.578 5457.000 113.578 113.578 5458.000 113.578 113.578 5459.000 113.578 113.578 . 5460.000 113.578 113.578 5461.000 113.577 113.577 5462.000 113.577 113.577 5463.000 113.577 113.577 5464.000 113.577 113.577 5465.000 113.577 113.577 5466.000 113.577 113.577 5467.000 113.577 113.577 5468.000 113.577 113.577 5469.000 113.576 113.576 5470.000 113.576 113.576 5471.000 113.576 113.576 5472.000 113.576 113.576 5473.000 113.576 113.576 5474.000 113.576 113.576 5475.000 113.576 113.576 5476.000 113.576 113.576 5477.000 113.575 113.575 5478.000 113.575 113.575 5479.000 113.575 113.575 5480.000 113.575 113.575 5481.000 113.575 113.575 5482.000 113.575 113.575 5483.000 113.575 113.575 5484.000 113.574 113.574 5485.000 113.574 113.574 5486.000 113.574 113.574 5487.000 113.574 113.574 5488.000 113.574 113.574 5489.000 113.574 113.574 5490.000 113.574 113.574 5491.000 113.574 113.574 5492.000 113.573 I 113.573 5493.000 113.573 113.573 5494.000 113.573 113.573 5495.000 113.573 113.573 5496.000 113.573 113.573 5497.000 113.573 113.573 5498.000 113.573 113.573 5499.000 113.572 113.572 5500.000 113.572 113.572 5501.000 113.572 113.572 5502.000 113.572 113.572 5503.000 113.572 113.572 5504.000 113.572 113.572 5505.000 113.572 113.572 5506.000 113.572 113.572 5507.000 113.571 113.571 5508.000 113.571 113.571 5509.000 113.571 113.571 5510.000 113.571 113.571 5511.000 113.571 113.571 5512.000 113.571 113.571 5513.000 113.571 113.571 5514.000 113.570 113.570 5515.000 113.5_70 113.570 5516.000 113.570 113.570 .5517.000 113.570 113.570 5518.000 113.570 113.570 5519.000 113.570 113.570 5520.000 113.570 113.570 5521.000 113.569 113.569 5522.000 113.569 113.569 5523.000 113.569 113.569 5524.000 113.569 113.569 5525.000 113.569 113.569 5526.000 113.569 113.569 5527.000 *113.569 113.569 5528.000 113.569 113.569 5529.000 113.568' 113.568 5530.000 113.568 113.568 5531.000 113.568 113.568 5532.000 113.568 113.568 5533.000 113.568 113.568 5534.000 113.568 113.568 5535.000 113.568 113.568 5536.000 113.567 113.567 5537.000 113.567 113.567 5538.000 113.567 113.567 5539.000 113.567 113.567 5540.000 113.567 113.567 5541.000 113.567 113.567 5542.000 113.567 113.567 5543.000 113.566 113.566 5544.000 113.566 113.566 5545.000 113.566 113.566 5546.000 113.566 113.566 5547.000 113.566 113.566 5548.000 113.566 113.566 5549.000 113.566 113.566 5550.000 113.565 113.565 EC 626319 Project: Location:

Contract:*

Engineer:

Filename:

10.4 ET AP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Pa*ge: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 102 11-17-2018 Attachment 1 Page 245 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 5551.000 113.565 113.565 5552.000 113.565 113.565 5553.000 113.565 113.565 5554.000 113.565 113.565 5555.000 113.565 113.565 5556.000 113.565 113.565 5557.000 113.564 113.564 5558.000 113.564 113.564 5559.000 113.564 113.564 5560.000 113.564 113.564 5561.000 113.564 113.564 5562.000 113.564 113.564 5563.000 113.564 113.564 5564.000 113.563 113.563 5565.000 113.563 113.563 5566.000 113.563 113.563 5567.000 113.563 113.563 5568.000 113.563 113.563 5569.000 113.563 113.563 5570.000 113.563 113.563 5571.000 113.562 113.562 5572.000 113.562 113.562 5573.000 113.562 113.562 5574.000 113.562 113.562 5575.000 113.562 113.562 5576.000 113.562 113.562 5577.000 113.562 113.562 5578.000 113.561 113.561 5579.000 113.561 113.561 5580.000 113.561 113.561 5581.000 113.561 113.561 5582.000 113.561 113.561 5583.000 113.561 113.561 5584.000 113.561 113.561 5585.000 113.560 113.560 5586.000 113.560 113.560 5587.000 113.560 113.560 5588.000 113.560 113.560 5589.000 113.560 113.560 5590.000 113.560 113.560 5591.000 113.560 113.560 5592.000 113.559 113.559 5593.000 113.559 113.559 5594.000 113.559 113.559 5595.000 113.559 113.559 5596.000 113.559 113.559 5597.000 113.559 113.559 5598.000 113.559 113.559 5599.000 113.558 113.558 5600.000 113.558 113.558 5601.000 113.558 113.558 5602.000 113.558 113.558 5603.000 113.558 113.558 5604.000 113.558 113.558 5605.000 113.558 113.558 5606.000 113.557 113.557 5607.000 113.557 113.557 5608.000 113.557 113.557 5609.000 113.557 113.557 5610.000 113.557 113.557 5611.000 113.557 113.557 5612.000 113.556 . 113.556 5613.000 113.556 113.556 5614.000 113.556 113.556 5615.000 113.556 113.556 5616.000 113.556 113.556 5617.000 113.556 113.556 5618.000 113.556 113.556 5619.000 113.555 113.555 5620.000 113.555 113.555 5621.000 113.555 113.555 5622.000 113.555 113.555 5623.000 113.555 113.555 5624.000 113.555 113.555 5625.000 113.555 113.555 5626.000 113.554 113.554 5627.000 113.554 113.554 5628.000 113.554 113.554 5629.000 113.554 113.554 5630.000 113.554 113.554 5631.000 113.554 113.554 5632.000 113.553 113.553 5633.000 113.553 113.553 5634.000 113.553 113.553 5635.000 113.553 113.553 5636.000 113.553 113.553 5637.000 113.553 113.553 5638.000 113.553 113.553 5639.000 113.552 113.552 5640.000 113.552 113.552 5641.000 113.552 113.552 5642.000 113.552 113.552 5643.000 113.552 113.552 5644.000 113.552 113.552 5645.000 113.552 113.552 5646.000 113.551 113.551 5647.000 113.551 113.551 5648.000 113.551 113.551 5649.000 113.551 113.551 5650.000 113.551 113.551 5651.000 113.551 113.551 5652.000 113.550 i13.550 5653.000 113.550 113.550 . 5654.000 113.550 113.550 5655.000 113.550 113.550 5656.000 113.550 113.550 5657.000 113.550 113.550 5658.000 113.550 113.550 5659.000 113.549 113.549 5660.000 113.549 113.549 5661.000 113.549 113.549 5662.000 113.549 113.549 5663.000 113.549 113.549 5664.000 113.549 113.549 5665.000 113.548 113.548 5666.000 113.548 113.548 5667.000 113.548 113.548 5668.000 113.548 113.548 5669.000 113.548 113.548 5670.000 113.548 113.548 5671.000 113.547 113.547 5672.000 113.547 113.547 5673.000 113.547 113.547 5674.000 113.547 113.547 5675.000 113.547 113.547 5676.000 113.547 113.547 5677.000 113.547 113.547 5678.000 -113.546 113.546 5679.000 113.546 113.546 5680.000 113.546 113.546 5681.000 113.546 113.546 5682.000 113.546 113.546 5683.000 113.546 113.546 5684.000 113.545 113.545 5685.000 113.545 113.545 5686.000 113.545 113.545 5687.000 113.545 113.545 5688.000 113.545 113.545 5689.000 113.545 113.545 5690.000 113.544 113.544 5691.000 113.544 113.544 5692.000 113.544 113.544 5693.000 113.544 113.544 5694.000 113.544 113.544 5695.000 113.544 113.544 5696.000 113.544 113.544 5697.000 113.543 , 113.543 5698.000 113.543 113.543 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 for greater than 24 Hrs Page 246 of 27 4 I \ Project: Clinton Flex Study ETAP Page: 103 Location:

KCI 14.1.0N Date: 11-17-2018 Contract:

SN: KCJCONSULT Engineer:

Badar Hussain Revision:

Base Study Case: BSIA-48 Filename:

CPS SBO Study Config.: Nonna! DIV I Battery IA 48-Hour Coping Study DCMCClA Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5699.000 113.543 113.543 5700.000 113.543 113.543 5701.000 113.543 113.543 5702.000 .113.543 113.543 5703.000 113.542 113.542 5704.000 113.542 113.542 5705.000 113.542 113.542 5706.000 113.542 113.542 5707.000 113.542 113.542 5708.000 113.542 113.542 5709.000 113.541 113.541 5710.000 113.541 113.541 5711.000 113.541 113.541 5712.000 113.541 113.541 5713.000 113.541 113.541 5714.000 113.541 113.541 5715.000 113.540 113.540 5716.000 113.540 113.540 5717.000 113.540 113.540 5718.000 113.540 113.540 5719.000 113.540 113.540 5720.000 , 113.540 113.540 5721.000 113.539 113.539 5722.000 113.539 113.539 5723.000 113.539 113.539 5724.000 113.539 113.539 5725.000 113.539 113.539 5726.000 113.539 113.539 5727.000 113.538 113.538 5728.000 113.538 113.538 5729.000 113.538 113.538 5730.000 113.538 113.538 5731.000 113.538 113.538 5732.000 113.538 113.538 5733.000 113.537 113.537 5734.000 113.537 113.537 5735.000 113.537 113.537 5736.000 113.537 113.537 5737.000 113.537 113.537 5738.000 113.537 113.537 5739.000 113.536 113.536 5740.000 113.536 113.536 5741.000 113.536 113.536 5742.000 113.536 113.536 5743.000 113.536 113.536 5744.000 113.536 113.536 5745.000 113.535 113.535 5746.000 113.535 113.535 5747.000 113.535 113.535 5748.000 113.535 113.535 5749.000 113.535 113.535 5750.000 113.535 113.535 5751.000 113.534 113.534 5752.000 113.534 113.534 5753.000 113.534 113.534 5754.000 113.534 113.534 5755.000 113.534 113.534 5756.000 113.534 113.534 5757.000 113.533 113.533 5758.000 113.533 113.533 5759.000 113.533 113.533 5760.000 113.533 113.533 5761.000 113.533 113.533 5762.000 113.533 113.533 5763.000 113.532 113.532 5764.000 113.532 113.532 5765.000 113.532 113.532 5766.000 113.532 113.532 5767.000 113.532 113.532 5768.000 113.532 113.532 5769.000 113.531 113.531 5770.000 113.531 113.531

  • 5771.000 113.531 113.531 5772.000 113.531 113.531 5773.000 113.531 113.531 5774.000 113.531 113.531 5775.000 113.530 113.530 5776.000 113.530 113.530 5777.000 113.530 113.530 5778.000 113.530 113.530 5779.000 113.530 113.530 5780.000 113.529 113.529 5781.000 113.529 113.529 5782.000 113.529 113.529 5783.000 113.529 113.529 5784.000 113.529 113.529 5785.000 113.529 113.529 5786.000 113.528 113.528 5787.000 113.528 113.528 5788.000 113.528 113.528 5789.000 113.528 113.528 5790.000 113.528 113.528 5791.000 113.528 113.528 5792.000 113.527 113.527 5793.000 113.527 113.527 5794.000 113.527 113.527 5795.000 113.527 113.527 5796.000 113.527 113.527 5797.000 113.527 113.527 5798.000 113.526 113.526 5799.000 113.526 113.526 5800.000 113.526 113.526 5801.000 113.526 113.526 5802.000 113.526 113.526 I 5803.000 113.525 113.525 5804.000 113.525 113.525 5805.000 113.525 113.525 5806.000 113.525 113.525 5807.000 113.525 113.525 5808.000 113.525 113.525 5809.000 113.525 113.525 5810.000 113.525 113.525 5811.000 113.525 113.525 5812.000 113.524 113.524 5813.000 113.524 113.524 5814.000 113.524 113.524 5815.000 113.524 113.524 5816.000 113.524 113.524 5817.000 113.524 113.524 5818.000 113.524 113.524 5819.000 113.524 113.524 5820.000 113.524 113.524 5821.000 113.524 113.524 5822.000 113.524 113.524 5823.000 113.524 113.524 5824.000 113.524 113.524 5825.000 113.524 113.524 5826.000 113.524 113.524 5827.000 113.523 113.523 5828.000 113.523 113.523 5829.000 113.523 113.523 5830.000 113.523 113.523 5831.000 113.523 113.523 5832.000 113.523 113.523 5833.000 113.523 113.523 5834.000 113.523 113.523 5835.000 113.523 113.523 5836.000 113.523 113.523 5837.000 113.523 113.523 5838.000 113.523 113.523 5839.000 113.523 113.523 5840.000 113.523 113.523 5841.000 113.522 113.522 5842.000 113.522 113.522 5843.000 113.522 113.522 5844.000 113.522 113.522 5845.000 113.522 113.522 5846.000 113.522 113.522 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hossain Revision:

Study Case: BSlA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 104 11-17-2018 Attachment 1 Page 247 of274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5847.000 113.522 113.522 5848.000 113.522 113.522 5849.000 113.522 113.522 5850.000 113.522 113.522 5851.000 113.522 113.522 5852.000 113.522 113.522 5853.000 113.522 113.522 5854.000 113.522 113.522 5855.000 113.521 113.521 5856.000 113.521 113.521 5857.000 113.521 113.521 5858.000 113.521 113.521 5859.000 113.521 113.521 5860.000 113.521 113.521 5861.000 113.521 113.521 5862.000 113.521 113.521 5863.000 113.521 113.521 5864.000 113.521 113.521 5865.000 113.521 113.521 5866.000 113.521 113.521 5867.000 113.521 113.521 5868.000 113.520 113.520 5869.000 113.520 113.520 5870.000 113.520 113.520 5871.000 113.520 113.520 5872.000 113.520 113.520 5873.000 113.520 113.520 5874.000 113.520 113.520 5875.000 113.520 113.520 5876.000 113.520 113.520 5877.000 113.520 113.520 5878.000 113.520 113.520 5879.000 113.520 113.520 5880.000 113.520 113.520 5881.000 113.519 113.519 5882.000 113.519 113.519 5883.000 113.519 113.519 5884.000 113.519 113.519 5885.000 113.519 113.519 5886.000 113.519 113.519 5887.000 113.519 113.519 5888.000 113.519 113.519 5889.000 113.519 113.519 5890.000 113.519 113.519 5891.000 113.519 113.519 5892.000 113.519 113.519 5893.000 113.519 113.519 5894.000 113.518 113.518 5895.000 113.518 113.518 5896.000 113.518 113.518 5897.000 113.518 113.518 5898.000 113.518 113.518 5899.000 113.518 113.518 5900.000 113.518 113.518 5901.000 113.518 113.518 5902.000 113.518 113.518 5903.000 113.518 113.518 5904.000 113.518 113.518 5905.000 113.518 113.518 5906.000 113.518 113.518 5907.000 113.517 113.517 5908.000 113.517 113.517 5909.000 113.517 113.517 5910.000 113.517 113.517 5911.000 113.517 113.517 5912.000 113.517 113.517 5913.000 113.517 113.517 5914.000 113.517 113.517 5915.000 113.517 113.517 5916.000 113.517 113.517 5917.000 113.517 113.517 5918.000 113.517 113.517 5919.000 113.517 113.517 5920.000 113.516 113.516 5921.000 113.516 113.516 5922.000 113.516 113.516 5923.000 113.516 113.516 5924.000 113.516 113.516 5925.000 113.516 113.516 5926.000 113.516 113.516 5927.000 113.516 113.516 5928.000 113.516 113.516 5929.000 113.516 113.516 5930.000 113.516 113.516 5931.000 113.516 113.516 5932.000 113.515 113.515 5933.000 113.515 113.515 5934.000 113.515 113.515 5935.000 113.515 113.515 5936.000 113.515 113.515 5937.000 113.515 113.515 5938.000 113.515 113.515 5939.000 113.515 113.515 5940.000 113.515 113.515 5941.000 113.515 113.515 5942.000 113.515 113.515 5943.000 113.515 113.515 5944.000 113.514 113.514 5945.000 113.514 113.514 5946.000 113.514 113.514

' 5947.000 113.514 113.514 5948.000 113.514 113.514 5949.000 113.514 113.514 5950.000 113.514 113.514 5951.000 113.514 113.514 , 5952.000 113.514 113.514 5953.000 113.514 113.514 5954.000 113.514 113.514 5955.000 113.514 113.514 5956.000 113.513 113.513 5957.000 113.513 113.513 5958.000 113.513 113.513 5959.000 113.513 113.513 5960.000 113.513 113.513 5961.000 113.513 113.513 5962.000 113.513 113.513 5963.000 113.513 113.513 5964.000 113.513 113.513 5965.000 113.513 113.513 5966.000 113.513 113.513 . \ 5967.000 113.512 113.512 5968.000 113.512 113.512 5969.000 113.512 113.512 5970.000 113.512 113.512 5971.000 ' 113.512 113.512 5972.000 113.512 113.512 5973.000 113.512 113.512 5974.000 113.512 113.512 5975.000 113.512 113.512 5976.000 113.512 113.512 5977.000 113.512 113.512 5978.000 113.511 113.511 5979.000 113.511 113.511 5980.000 113.511 113.511 5981.000 113.511 113.511 5982.000 113.511

  • 113.511 5983.000 113.511 113.511 5984.000 113.511 113.511 5985.000 113.511 113.511 5986.000 113.511 113.511 5987.000 113.511 113.511 5988.000 113.511 113.511 5989.000 113.511 113.511 5990.000 113.510 113.510 5991.000 113.510 113.510 5992.000 113.510 113.510 5993.000 113.510 113.510 5994.000 113.510 113.510 EC 626319 Project: Location:*

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battety IA 48-Hour Coping Study DCMCClA 105 11-17-2018 Attachment 1 Page 248 of 27 4 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 5995.000 113.510 113.510 5996.000 113.510 113.510 5997.000 113.510 113.510 5998.000 113.510 113.510 5999.000 113.510 113.510 6000.000 113.509 113.509 6001.000 113.509 113.509 6002.000 113.509 113.509 6003.000 113.509 113.509 6004.000 113.509 113.509 6005.000 113.509 113.509 6006.000 113.509 113.509 6007.000 113.509 113.509 6008.000 113.509 113.509 6009.000 113.509 113.509 6010.000 113.509 113.509 6011.000 113.508 113.508 6012.000 113.508 113.508 6013.000 113.508 113.508 6014.000 113.508 113.508 6015.000 113.508 113.508 6016.000 113.508 113.508 6017.000 113.508 113.508 6018.000 113.508 113.508 6019.000 113.508 113.508 6020.000 113.508 113.508 6021.000 113.508 113.508 6022.000 113.507 113.507 6023.000 113.507 113.507 6024.000 113.507 113.507 6025.000 113.507 113.507 6026.000 113.507 113.507 6027.000 113.507 113.507 6028.000 113.507 113.507 6029.000 113.507 113.507 6030.000 113.507 113.507 6031.000 113.507 113.507 6032.000 113.506 113.506 6033.000 113.506 113.506 6034.000 113.506 113.506 6035.000 113.506 113.506 6036.000 113.506 113.506 6037.000 113.506 113.506 6038.000 113.506 113.506 6039.000 113.506 113.506 6040.000 113.506 113.506 6041.000 113.506 113.506 6042.000 113.505 113.505 6043.000 113.505 113.505 6044.000 113.505 113.505 6045.000 113.505 113.505 6046.000 113.505 113.505 6047.000 113.505 113.505 6048.000 113.505 113.505 6049.000 113.505 113.505 6050.000 113.505 113.505 6051.000 113.505 113.505 6052.000 113.504 113.504 6053.000 113.504 113.504 6054.000 113.504 113.504 6055.000 113.504 113.504 6056.000 113.504 113.504 6057.000 113.504 113.504 6058.000 113.504 113.504 6059.000 113.504 113.504 6060.000 113.504 113.504 6061.000 113.504 113.504 6062.000 113.503 113.503 6063.000 113.503 113.503 6064.000 113.503 113.503 6065.000 113.503 113.503 6066.000 113.503 113.503 6067.000 113.503 113.503 6068.000 113.503 113.503 6069.000 113.503 113.503 6070.000 113.503 113.503 6071.000 113.503 113.503 6072.000 113.502 113.502 6073.000 113.502 113.502 6074.000 113.502 113.502 6075.000 113.502 113.502 6076.000 113.502 113.502 6077.000 113.502 113.502 6078.000 113.502 113.502 6079.000 113.502 113.502 6080.000 113.502 113.502 6081.000 113.501 113.501 6082.000 113.501 113.501 6083.000 113.501 113.501 6084.000 113.501 113.501 6085.000 113.501 113.501 6086.000 113.501 113.501 6087.000 113.501 113.501 6088.000 113.501 113.501 6089.000 113.501 113.501 6090.000 113.500 113.500 6091.000 113.500 113.500 6092.000 113.500 113.500 6093.000 113.500 113.500 6094.000 113.500 113.500 6095.000 113.500 113.500 6096.000 113.500 113.500 6097.000 113.500 113.500 6098.000 113.500 113.500 6099.000 113.499 113.499 6100.000 113.499 113.499 6101.000 113.499 113.499 6102.000 113.499 113.499 6103.000 113.499 113.499 6104.000 113.499 113.499 6105.000 113.499 113.499 6106.000 113.499 113.499 6107.000 113.499 113.499 6108.000 113.498 113.498 6109.000 113.498 113.498 6110.000 113.498 113.498 6111.000 113.498 113.498 6112.000 113.498 113.498 6113.000 113.498 113.498 6114.000 113.498 113.498 6115.000 113.498 113.498 6116.000 113.498 113.498 6117.000 113.497 113.497 6118.000 113.497 113.497 6119.000 113.497 113.497 6120.000 113.497 113.497 6121.000 113.497 113.497 6122.000 113.497 113.497 6123.000 113.497 113.497 6124.000 113.497 113.497 6125.000 113.497 113.497 6126.000 113.496 113.496 6127.000 113.496 113.496 6128.000 113.496 113.496 6129.000 113.495 113.495 6130.000 113.495 113.495 6131.000 113.495 113.495 6132.000 113.494 113.494 6133.000 113.494 113.494 6134.000 113.493 113.493 6135.000 113.493 113.493 6136.000 113.493 113.493 6137.000 113.492 113.492 6138.000 113.492 113.492 6139.000 113.492 113.492 6140.000 113.491 113.491 6141.000 113.491 113.491 6142.000 113.490 113.490 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC IA 106 11-17-2018 Attachment 1 Page 249 of 27 4 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6143.000 113.490 113.490 6144.000 113.490 113.490 6145.000 113.489 113.489 6146.000 113.489 113.489 6147.000 113.489 113.489 6148.000 113.488 113.488 6149.000 113.488 113.488 6150.000 113.488 113.488 6151.000 113.487 113.487 6152.000 113.487 113.487 6153.000 113.486 113.486 6154.000 113.486 113.486 6155.000 113.486 113.486 6156.000 113.485 113.485 6157.000 113.485 113.485 6158.000 113.485 113.485 6159.000 113.484 113.484 6160.000 113.484 113.484 6161.000 113.483 113.483 6162.000 113.483 113.483 6163.000 113.483 113.483 6164.000 113.482 113.482 6165.000 113.482 113.482 6166.000 113.482 113.482 6167.000 113.481 113.481 6168.000 113.481 113.481 6169.000 113.480 113.480 6170.000 113.480 113.480 6171.000 113.480 113.480 6172.000 113.479 113.479 6173.000 113.479 113.479 6174.000 113.479 113.479 6175.000 113.478 113.478 6176.000 113.478 113.478 6177.000 113.477 113.477 6178.000 113.477 113.477 6179.000 113.477 113.477 6180.000 113.476 113.476 6181.000 113.476 113.476 6182.000 113.476 113.476 6183.000 113.475 113.475 6184.000 113.475 113.475 6185.000 113.474 113.474 6186.000 113.474 113.474 6187.000 113.474 113.474 6188.000 113.473 113.473 6189.000 113.473 113.473 6190.000 113.472 113.472 6191.000 113.472 113.472 6192.000 113.472 113.472 6193.000 113.471 113.471 6194.000 113.471 113.471 6195.000 113.471 113.471 6196.000 113.470 113.470 6197.000 113.470 113.470 6198.000 113.469 113.469 6199.000 113.469 113.469 6200.000 113.469 113.469 6201.000 113.468 113.468 6202.000 113.468 113.468 6203.000 113.467 113.467 6204.000 113.467 113.467 6205.000 113.467 113.467 6206.000 113.466 113.466 6207.000 113.466 113.466 6208.000 113.466 113.466 6209.000 113.465 113.465 6210.000 113.465 113.465 6211.000 113.464 113.464 6212.000 113.464 113.464 6213.000 113.464 113.464 6214.000 113.463 113.463 6215.000 113.463 113.463 6216.000 113.462 113.462 6217.000 113.462 113.462 6218.000 113.462 113.462 6219.000 113.461 113.461 6220.000 113.461 113.461 6221.000 113.460 113.460 6222.000 113.460 113.460 6223.000 113.460 113.460 6224.000 113.459 113.459 6225.000 113.459 113.459 6226.000 113.458 113.458 6227.000 113.458 113.458 6228.000 113.458 113.458 6229.000 113.457 113.457 6230.000 113.457 113.457 6231.000 113.456 113.456 6232.000 113.456 113.456 6233.000 113.456 113.456 6234.000 113.455 113.455 6235.000 113.455 113.455 6236.000 113.454 113.454 6237.000 113.454 113.454 6238.000 113.454 113.454 6239.000 113.453 113.453 6240.000 113.453 113.453 6241.000 113.453 113.453 6242.000 113.452 113.452 6243.000 113.452 113.452 6244.000 113.451 113.451 6245.000 113.451 113.451 6246.000 113.451 113.451 6247.000 113.450 113.450 6248.000 113.450 113.450 6249.000 113.449 113.449 6250.000 113.449 113.449 6251.000 113.448 113.448 6252.000 113.448 113.448 6253.000 113.448 113.448 6254.000 113.447 113.447 6255.000 113.447 113.447 6256.000 113.446 113.446 6257.000 113.446 113.446 6258.000 113.446 113.446 6259.000 113.445 113.445 6260.000 113.445 113.445 6261.000 113.444 113.444 6262.000 113.444 113.444 6263.000 113.444 113.444 6264.000 113.443 113.443 6265.000 113.443 113.443 6266.000 113.442 113.442 6267.000 113.442 113.442 6268.000 113.442 113.442 6269.000 113.441 113.441 6270.000 113.441 113.441 6271.000 113.440 113.440 6272.000 113.440 113.440 6273.000 113.440 113.440 6274.000 113.439 113.439° 6275.000 113.439 113.439 6276.000 113.438 113.438 6277.000 113.438 113.438 6278.000 i 13.437 113.437 6279.000 113.437 113.437 6280.000 113.437 113.437 6281.000 113.436 113.436 6282.000 113.436 113.436 6283.000 113.435 113.435 6284.000 113.435 113.435 6285.000 113.435 113.435 6286.000 113.434 113.434 6287.000 113.434 113.434 6288.000 113.433 113.433 6289.000 113.433 113.433 6290.000 113.433 113.433 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 107 11-17-2018 Attachment 1 Page 250 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6291.000 113.432 113.432 6292.000 113.432 113.432 6293.000 113.431 113.431 6294.000 113.431 113.431 6295.000 113.430 113.430 6296.000 113.430 113.430 6297.000 113.430 113.430 . 6298.000 113.429 113.429 6299.000 113.429 113.429 6300.000 113.428 113.428 6301.000 113.428 113.428 6302.000 113.428 113.428 6303.000 113.427 113.427 6304.000 113.427 113.427 6305.000 113.426 113.426 6306.000 113.426 113.426 6307.000 113.425 113.425 6308.000 113.425 113.425 6309.000 113.425 113.425 6310.000 113.424 113.424 6311.000 113.424 113.424 6312.000 113.423 113.423 6313.000 113.423 113.423 6314.000 113.422 113.422 6315.000 113.422 113.422 6316.000 113.422 113,422 6317.000 113.421 113.421 6318.000 113.421 113.421 6319.000 113.420 113.420 6320.000 113.420 113.420 6321.000 113.419 113.419 6322.000 113.419 113.419 6323.000 113.419 113.419 6324.000 113.418 113.418 6325.000 113.418 113.418 6326.000 113.417 113.417 6327.000 113.417 113.417 6328.000 113.416 113.416 6329.000 113.416 113.416 6330.000 113.416 113.416 6331.000 113.415 113.415 6332.000 113.415 113.415 6333.000 113.414 113.414 6334.000 113.414 113.414 6335.000 113.413 113.413 6336.000 113.413 113.413 6337.000 113.413 113.413 6338.000 113.412 113.412 6339.000 113.412 113.412 6340.000 113.411 113.411 6341.000 113.411 113.411 6342.000 113.410 113.410 6343.000 113.410 113.410 6344.000 113.410 113.410 6345.000 113.409 113.409 6346.000 113.409 113.409 6347.000 113.408 113.408 6348.000 113.408 113.408 6349.000 113.407 113.407 6350.000 113.407 113.407 6351.000 113.406 113.406 6352.000 113.406 113.406 6353.000 113.406 113.406 6354.000 113.405 113.405 6355.000 113.405 113.405 6356.000 113.404 113.404 6357.000 113.404 113.404 6358.000 113.403 113.403 6359.000 113.403 113.403 6360.000 113.403 113.403 6361.000 113.402 113.402 6362.000 113.402 113.402 6363.000 113.401 113.401 6364.000 113.401 113.401 6365.000 113.400 113.400 6366.000 113.400 113.400" 6367.000 113.399 113.399 6368.000 113.399 113.399 6369.000 113.399 113.399 6370.000 113.398 113.398 6371.000 113.398 113.398 6372.000 113.397 113.397 6373.000 113.397 113.397 6374.000 113.396 113.396 6375.000 113.396 113.396

  • 6376.000 113.395 113.395 6377.000 113.395 113.395 6378.000 113.395 113.395 6379.000 113.394 113.394 6380.000 113.394 113.394 6381.000 113.393 113.393 6382.000 113.393 113.393 6383.000 113.392 113.392 6384.000 113.392 113.392 6385.000 113.391 113.391 6386.000 113.391 113.391 6387.000 113.390 113.390 6388.000 113.390 113.390 6389.000 113.390 113.390 6390.000 113.389 113.389 6391.000 113.389 113.389 6392.000 113.388 113.388 6393.000 113.388 113.388 6394.000 113.387 113.387 6395.000 113.387 113.387 6396.000 113.386 113.386 6397.000 113.386 113.386 6398.000 113.385 113.385 6399.000 113.385 113.385 6400.000 113.385 113.385 6401.000 113.384 113.384 6402.000 113.384 113.384 6403.000 113.383 113.383 6404.000 113.383 113.383 6405.000 113.382 113.382 6406.000 113.382 113.382 6407.000 113.381 113.381 6408.000 113.381 113.381 6409.000 113.380 113.380 6410.000 113.380 113.380 6411.000 113.379 113.379 6412.000 113.379 113.379 6413.000 113.379 113.379 6414.000 113.378 113.378 6415.000 113.378 113.378 6416.000 113.377 113.377 6417.000 113.377 113.377 6418.000 113.376 113.376 6419.000 113.376 113.376 6420.000 113.375 113.375 6421.000 113.375 113.375 6422.000 113.374 113.374 6423.000 113.374 113.374 6424.000 113.373 113.373 6425.000 113.373 113.373 6426.000 113.373 113.373 6427.000 113.372 113.372 6428.000 113.372 113.372 6429.000 113.371 113.371 6430.000 113.371 113.371 6431.000 113.370 113.370 6432.000 113.370 113.370 6433.000 113.369 113.369 6434.000 113.369 113.369 6435.000 113.368 113.368 6436.000 113.368 113.368 6437.000 113.367 113.367 6438.000 113.367 113.367 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCClA 108 11-17-2018 Attachment 1 Page 251 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6439.000 113.366 113.366 6440.000 113.366 113.366 6441.000 113.365 113.365 6442.000 113.365 113.365 6443.000 113.364 113.364 6444.000 113.364 113.364 6445.000 113.364 113.364 6446.000 113.363 113.363 6447.000 113.363 113.363 6448.000 113.362 113.362 6449.000 113.362 113.362 6450.000 113.361 113.361 6451.000 113.361 113.361 6452.000 113.360 113.360 6453.000 113.360 113.360 6454.000 113.359 113.359 6455.000 113.359 113.359 6456.000 113.358 113.358 6457.000 113.358 113.358 6458.000 113.357 113.357 6459.000 113.357 113.357 6460.000 113.356 113.356 6461.000 113.356 113.356 6462.000 113.355 113.355 6463.000 113.355 113.355 6464.000 113.354 113.354 6465.000 113.354 113.354 6466.000 113.353 113.353 6467.000 113.353 113.353 6468.000 113.352 113.352 6469.000.

113.352 113.352 6470.000 113.351 113.351 6471.000 113.351 113.351 6472.000 113.351 113.351 6473.000 113.350 113.350 6474.000 113.350 113.350 6475.000 113.349 113.349 6476.000 113.349 113.349 6477.000 113.348 113.348 6478.000 113.348 113.348 6479.000 113.347 113.347 6480.000 113.347 113.347 6481.000 113.346 113.346 6482.000 113.346 113.346 6483.000 113.345 113.345 6484.000 113.345 113.345 6485.000 113.344 113.344 6486.000 113.344 113.344 6487.000 113.343 113.343 6488.000 113.343 113.343 6489.000 113.342 113.342 6490.000 113.342 113.342 6491.000 113.341 113.341 6492.000 113.341 113.341 6493.000 113.340 113.340 6494.000 113.340 113.340 6495.000 113.339 113.339 6496.000 113.339 113.339 6497.000 113.339 113.339 6498.000 113.338 113.338 6499.000 113.338 113.338 6500.000 113.337 113.337 6501.000 113.337 113.337 6502.000 113.336 113.336 6503.000, 113.336 113.336 6504.000 113.336 113.336 6505.000 113.335 113.335 6506.000 113.335 113.335 6507.000 113.334 113.334 6508.000 113.334 113.334 6509.000 113.333 113.333 6510.000 113.333 113.333 6511.000 113.332 113.332 6512.000 113.332 113.332 6513.000 113.332 113.332 6514.000 113.331 113.331 6515.000 113.331 113.331 6516.000 113.330 113.330 6517.000 113.330 113.330 6518.000 113.329 113.329 6519.000 113.329 113.329 6520.000 113.328 113.328 6521.000 113.328 113.328 6522.000 113.328 113.328 6523.000 113.327 113.327 6524.000 113.327 113.327 6525.000 113.326 113.326 6526.000 113.326 113.326 6527.000 113.325 113.325 6528.000 113.325 113.325 6529.000 113.324 113.324 6530.000 113.324 113.324 6531.000 113.324 113.324 6532.000 113.323 113.323 6533.000 113.323 113.323 6534.000 113.322 113.322 6535.000 113.322 113.322 6536.000 113.321 113.321 6537.000 113.321 113.321 6538.000 113.320 113.320 6539.000 113.320 113.320 6540.000 113.319 113.319 6541.000 113.319 113.319 6542.000 113.319 113.319 6543.000 113.318 113.318 6544.000 113.318 113.318 6545.000 113.317 113.317 6546.000 113.317 113.317 6547.000 113.316 113.316 6548.000 113.316 113.316 6549.000 113.315 113.315 6550.000 113.315 113.315 6551.000 113.314 113.314 6552.000 113.314 113.314 6553.000 113.313 113.313 6554.000 113.313 113.313 6555.000 113.312 113.312 6556.000 113.312 113.312 6557.000 113.312 113.312 6558.000 113.311 113.311 6559.000 113.311 113.311 6560.000 113.310 113.310 6561.000 113.310 113.310 6562.000 113.309 113.309 6563.000 113.309 113.309 6564.000 113.308 113.308 6565.000 113.308 113.308 6566.000 113.307 113.307 6567.000 113.307 113.307 6568.000 113.306 113.306 6569.000 113.306 113.306 6570.000 113.305 113.305 6571.000 113.305 113.305 6572.000 113.304 113.304 6573.000 113.304 113.304 6574.000 113.303 113.303 6575.000 113.303 113.303 6576.000 113.302 113.302 6577.000 113.302 113.302 6578.000 113.301 113.301 6579.000 113.301 113.301 6580.000 113.301 113.301* 6581.000 113'.300 113.300 6582.000 113.300 113.300 6583.000 113.299 113.299 6584.000 113.299 113.299 6585.000 113.298 113.298 6586.000 113.298 113.298 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study DCMCCIA 109 11-17-2018 Attachment 1 Page 252 of 27 4 KCICONSULT

-Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6587.000 113.297 113.297 6588.000 113.297 113.297 6589.000 113.296 113.296 6590.000 113.296 113.296 6591.000 113.295 113.295 6592.000 113.295 113.295 6593.000 113.294 113.294 6594.000 113.294 113.294 6595.000 113.293

  • 113.293 6596.000 113.293 113.293 6597.000 113.292 113.292 6598.000 113.292 113.292 6599.000 113.291 113.291 6600.000 113.291 113.291 6601.000 113.290 113.290 6602.000 113.290 113.290 6603.000 113.289 113.289 6604.000 113.289 113.289 6605.000 113.288 113.288 6606.000 113.288 113.288 6607.000 113.287 113.287 6608.000 113.287 113.287 6609.000 113.286 113.286 6610.000 113.286 113.286 6611.000 113.285 113.285 6612.000 113.285 113.285 6613.000 113.284 113.284 6614.000 113.284 113.284 6615.000 i13.283 113.283 6616.000 113.282 113.282 6617.000 113.282 113.282 6618.000 113.281 113.281 6619.000 113.281 113.281 6620.000 113.280 113.280 6621.000 113.280 113.280 6622.000 113.279 113.279 6623.000 113.279 113.279 6624.000 l lJ.278 113.278 6625.000. 113.278 113.278 6626.000 113.277 113.277 6627.000 113.277 113.277 6628.000 113.276 113.276 6629.000 113.276 113.276 6630.000 113.275 113.275 6631.000 113.275 113.275 6632.000 113.274 113.274 6633.000 113.274 113.274 6634.000 113.273 113.273 6635.000 113.273 113.273 6636.000 113.272 113.272 6637.000 113.272 113.272 6638.000 113.271 113.271 6639.000 113.270 113.270 6640.000 113.270 113.270 6641.000 113.269 113.269 6642.000 113.269 113.269 6643.000 113.268 113.268
  • 6644.000 113.268 113.268 6645.000 113.267 113.267 6646.000 113.267 113.267 6647.000 113.266 113.266 6648.000 113.266 113.266 6649.000 113.265 113.265 6650.000 113.265 113.265 6651.000 113.264 113.264 6652.000 113.263 113.263 6653.000 113.263 113.263 6654.000 113.262 113.262 6655.000 113.262 113.262 6656.000 113.261 113.261 6657.000 113.261 113.261 6658.000 113.260 113.260 6659.000 113.260 113.260 6660.000 113.259 113.259 6661.000 113.259 113.259 6662.000 113.258 113.258 6663.000 113.257 113.257 6664.000 113.257 113.257 6665.000 113.256 113.256* 6666.000 113.256 113.256 6667.000 113.255 113.255 6668.000 113.255 113.255 6669.000 113.254 113.254 6670.000 113.254 113.254 6671.000 113.253 113.253 6672.000 113.252 113.252 6673.000 113.252 113.252 6674.000 -113.251 113.251 6675.000 113.251 113.251 6676.000 113.250 113.250 6677.000 113.250 113.250 6678.000 113.249 113.249 6679.000 , 113.248 113.248 6680.000 113.248 113.248 6681.000 113.247 113.247 6682.000 113.247 113.247 6683.000 113.246 113.246 6684.000 113.246 113.246 6685.000 113.245 113.245 6686.000 113.244 113.244
  • 6687.000 113.244 113.244 6688.000 113.243 113.243 6689.000 113.243 113.243 6690.000 113.242 113.242 6691.000 113.242 113.242 6692.000 113.241 113.241 6693.000 113.240 113.240 . 6694.000 113.240 113.240 6695.000 113.239 113.239 6696.000 113.239 113.239 6697.000 113.238 113.238 6698.000 113.237 113.237 6699.000 113.237 113.237 6700.000 113.236 113.236 6701.000 113.235 113.235 6702.000 113.234 113.234 6703.000 113.234 113.234 6704.000 113.233 113.233 6705.000 113.232 113.232 6706.000 113.232 113.232 6707.000 113.231 113.231 6708.000 113.230 113.230 6709.000 113.230 113.:230 6710.000 113.229 113.229' 6711.000 113.228 113.228 6712.000 113.227 113.227 6713.000 113.227 113.227 6714.000 113.226 113.226 6715.000 113.225 113.225 6716.000 113.225 113.225 6717.000 113.224 113.224 6718.000 113.223 113.223 6719.000 113.222 113.222 6720.000 113.222 113.222 6721.000 '!!3.221 113.221 6722.000 113.220 113.220 6723.000 113.220 113.220 6724.000 113.219 113.219 6725.000 113.218 113.218 6726.doo 113.218 113.218 6727.000 113.217 113.217 6728.000 113.216 113.216 6729.000 113.215 113.215 6730.000 113.215 113.215 6731.000 113.214 113.214 6732.000 113.213 113.213 6733.000 113.213 113.213 6734.000 113.212 113.212 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlA-48 CPS SBO Stndy Config.: DIV I Battery IA 48-Hour Coping Stndy DCMCC IA llO 11-17-2018 Attachment 1 Page 253 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time y. V+ 6735.000 113.211 113.211 6736.000 113.210 113.210 6737.000 113.210 113.210 6738.000 113.209 113.209 6739.000 113.208 113.208 6740.000 113.208 113.208 6741.000 113.207 113.207 6742.000 113.206 113.206 6743.000 113.205 113.205 6744.000 113.205 113.205 6745.000 113.204 113.204 6746.000 113.203 113.203 6747.000 113.203 113.203 6748.000 113.202 113.202 6749.000 113.201 113.201 6750.000 113.200 113.200 6751.000 113.200 113.200 6752.000 113.199 113.199 6753.000 113.198 113.198 6754.000 113.198 113.198 6755.000 113.197 113.197 6756.000 113.196 113.196 6757.000 113.195 113.195 6758.000 113.195 113.195 6759.000 113.194 113.194 6760.000 113.193 113.193 6761.000 113.193 113.193 6762.000 113.192 113.192 6763.000 113.191 113.19,1 6764.000 113.190 113.190 6765.000 113.190 113.190 6766.000 113.189 113.189 6767.000 113.188 113.188 6768.000 113.188 113.188 6769.000 113.187 113.187 6770.000 113.186 113.186 6771.000 113.185 113.185 6772.000 113.185 113.185 6773.000 113.184 113.184 6774.000 113.183 113.183 6775.000 113.182 113.182 6776.000 113.182 113.182 6777.000 113.181 113.181 6778.000 113.180 113.180 6779.000 113.180 113.180 6780.000 113.179 113.179 6781.000 113.178 113.178 6782.000 113.177 113.177 6783.000 113.177 113.177 6784.000 113.176 113.176 6785.000 113.175 113.175

  • 6786.000 113.174 113.174 6787.000 113.174 113.174 6788.000 113.173 113.173 6789.000 113.172 113.172 6790.000 113.172 113.172 6791.000 113.171 113.171 6792.000 113.170 113.170 6793.000 113.169 113.169 6794.000 113.169 113.169 6795.000 113.168 113.168 6796.000 113.167 113.167 6797.000 113.167 113.167 6798.000 113.166 113.166 6799.000 113.165 113.165 6800.000 113.164 113.164 6801.000 113.164 113.164 6802.000 113.163 113.163 6803.000 113.162 113.162 6804.000 113.161 113.161 6805.000 113.161 113.161 6806.000 113.160 113.160 6807.000 113.159 113.159 6808.000 113.158 113.158 6809.000 113.158 113.158 6810.000 113.157 113.157 6811.000 113.156 113.156 6812.000 113.156 113.156 6813.000 113.155 113.155 6814.000 113.154 113.154 6815.000 113.153 113.153 6816.000 113.153 113.153 6817.000 113.152 113.152 6818.000 113.151 113.151 6819.000 113.150 113.150 6820.000 113.150 113.150 6821.000 113.149 113.149 6822.000 113.148 113.148 6823.000 113.148 113.148 6824.000 113.147 113.147 6825.000 113.146 113.146 6826.000 113.145 113.145 6827.000 113.145 113.145 6828.000 113.144 113.144 6829.000 113.143 113.143 6830.000 113.142 113.142 6831.000 113.142 113.142 6832.000 113.141 113.141 6833.000 113.140 113.140 6834.000 113.139 113.139 6835.000 113.139 113.139 6836.000 113.138 113.138 6837.000 113.137 113.137 6838.000 113.136 113.136 6839.000 113.136 113.136 6840.000 113.135 113.135 6841.000 113.134 113.134 6842.000 113.134 113.134 6843.000 113.133 113.133 6844.000 113.132 113.132 6845.000 113.131 113.131 6846.000 113.131 113.131 6847.000 113.130 113.130 6848.000 113.129 113.129 6849.000 113.128 113.128 6850.000 113.128 113.128 6851.000 113.127 113.127 6852.000 113.126 113.126 6853.000 113.125 113.125 6854.000 113.125 113.125 6855.000 113.124 113.124 6856.000 113.123 113.123 6857.000 ,113.122 113.122 6858.000 113.122 113.122 6859.000 113.121 113.121 6860.000 113.120 113.120 6861.000 113.119 113.119 6862.000 113.119 113.119 6863.000 113.118 113.118 6864.000 113.117 113.117 6865.000 113.116 113.116 6866.000 11'3.116 113.116 6867.000 113.115 113.115 6868.000 113.114 113.114 6869.000 113.113 113.113 6870.000 113.113 113.113 6871.000 113.112 113.112 6872.000 113.111 113.111 6873.000 113.110 113.110 6874.000 113.110 113.110 6875.000 113.109 113.109 6876.000 113.108 113.108 6877.000 113.107 '113.107 6878.000 113.107 113.107 6879.000 113.106 113.106 6880.000 113.105 113.105 6881.000 113.104 113.104 6882.000 113.104 113.104 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC iA lll 11-17-2018 Attachment 1 Page 254 of274 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V)

  • Time V-V+ Time V-V+ Time V-V+ Time V-V+ 6883.000 113.103 113.103 6884.000 113.102 113.102 6885.000 113.101 113.101 6886.000 113.101 113.101 6887.000 113.100 113.100 6888.000 113.099 113.099 6889.000 113.098 113.098 6890.000 113.098 113.098 6891.000 ll3.097 113.097 6892.000 113.096 113.096 6893.000 113.095 113.095 6894.000 113.095 113.095 6895.000 113.094 ll3.094 6896.000 113.093 113.093 6897.000 113.092 113.092 6898.000 113.092 113.092 6899.000 113.091 113.091 6900.000 113.090 113.090 6901.000 113.089 113.089 6902.000 113.089 113.089 6903.000 113.088 113.088 6904.000 113.087 113.087 6905.000 113.086 113.086 6906.000 113.086 113.086 6907.000 113.085 113.085 6908.000 113.084 113.084 6909.000 113.083 113.083 6910.000 113.083 113.083 6911.000 113.082 113.082 6912.000 113.081 113.081 6913.000 113.080 113.080 6914.000 113.080 113.080 6915.000 113.079 113.079 6916.000 113.078 113.078 6917.000 113.077 113.077 6918.000 113.077 113.077 6919.000 113.076 ll3.076 6920.000 ll3.075 ll3.075 6921.000 113.074 113.074 .6922.000 113.074 113.074 6923.000 113.073 ll3.073 6924.000 113.072 113.072 6925.000 113.071 113.071 6926.000 113.070 113.070 6927.000 113.070 ll3.070 6928.000 113.069 113.069 6929.000 113.068 113.068 6930.000 113.067 113.067 6931.000 113.067 ll3.067 6932.000 113.066 ll3.066 6933.000 113.065 113.065 6934.000 113.064 113.064 6935.000 ll3.064 113.064 6936.000 113.063 ll3.063 6937.000 113.062 ll3.062 6938.000 113.061 113.061 6939.000 113.061 ll3.061 6940.000 113.060 ll3.060 6941.000 113.059 ll3.059 6942.000 113.058 113.058 6943.000 ll3.054 ll3.054 6944.000 113.054 ll3.054 6945.000 113.054 113.054 6946.000 113.054 113.054 6947.000 113.054 ll3.054 6948.000 113.054 ll3.054 6949.000 113:054 113.054 6950.000 113.054 113.054 6951.000 ll3.054 ll3.054 6952.000 113.051 ll3.051 6953.000 113.050 113.050 6954.000 113.049 113.049 6955.000 ll3.048 ll3.048 6956.000 113.047 ll3.047 6957.000 113.047 ll3.047 6958.000 113.046 113.046 6959.000 ll3.045 ll3.045 6960.000 113.044 ll3.044 6961.000 113.044 113.044 6962.000 113.043 113.043 6963.000 113.042 ll3.042 6964.000 ll3.041 113.041 6965.000 113.041 ll3.041 6966.000 113.040 113.040 6967.000 ll3.039 113.039 6968.000 113.038 113.038 6969.000 ll3.037 ll3.037 6970.000 113.037 113.037 6971.000 113.036 ll3.036 6972.000 113.035 ll3.035 6973.000 113.034 113.034 6974.000 113.034 113.034 6975.000 113.033 ll3.033 6976.000 113.032 113.032 6977.000 ll3.031 ll3.031 6978.000 113.030 113.030 6979.000 ll3.030 ll3.030 6980.000 113.029 113.029 6981.000 ll3.028 ll3.028 6982.000 113.027 113.027 6983.000 113.027 ll3.027 6984.000 ll3.026 113.026 6985.000 113.025 ll3.025 6986.000 113.024 113.024 6987.000 ll3.023 ll3.023 6988.000 ll3.023 ll3.023 6989.000 113.022 ll3.022 6990.000 113.021 ll3.021 6991.000 ll3.020 ll3.020 6992.000 ll3.020 ll3.020 6993.000 113.019 ll3.019 6994.000 113.018 113.018 6995.000 ll3.017 ll3.017 6996.000 ll3.016 ll3.016 6997.000 113.016 ll3.016 6998.000 ll3.015 113.015 6999.000 ll3.014 ll3.014 7000.000 ll3.013 ll3.013 7001.000 113.013 ll3.013 7002.000 113.012 113.012 7003.000 ll3.0ll ll3.011 7004.000 113.010 ll3.010 7005.000 113.009 113.009 7006.000 113.009 113.009 7007.000 ll3.008 ll3.008 7008.000 113.007 ll3.007 7009.000 113.006 113.006 7010.000 113.005 113.005 7011.000 113.005 ll3.005 7012.000 113.004 113.004 7013.000 113.003 ll3.003 7014.000 113.002 113.002 7015.000 113.002 ll3.002 7016.000 113.001 113.001 7017.000 113.000 ll3.000 7018.000 112.999 112.999 7019.000 112.998 ll2.998 7020.000 112.998 ll2.998 7021.000 112.997 112.997 7022.000 112.996 112.996 7023.000 ll2.995 ll2.995 7024.000 112.994 ll2.994 7025.000 112.994 ll2.994 7026.000 ll2.993 ll2.993 7027.000 ll2.992 ll2.992 7028.000 ll2.991 ll2.991 7029.000 112.990 ll2.990 7030.000 112.990 112.990 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 112 11-17-2018 Attachment 1 Page 255 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7031.000 112.989 112.989 7032.000 112.988 112.988 7033.000 112.987 112.987 7034.000 112.987 112.987 7035.000 112.986 112.986 7036.000 112.985 112.985 7037.000 112.984 112.984 7038.000 112.983 112.983 7039.000 112.983 112.983 7040.000 112.982 112.982 7041.000 112.981 112.981 7042.000 112.980 112.980 7043.000 112.979 112.979 7044.000 112.979 112.979 7045.000 112.978 112.978 7046.000 112.977 112.977 7047.000 112.976 112.976 7048.000 112.975 112.975 7049.000 112.975 112.975 7050.000 112.974 112.974 7051.000 112.973 112.973 7052.000 112.972 112.972 7053.000 112.971 112.971 7054.000 112.971 112.971 7055.000 112.970 112.970 7056.000 112.969 112.969 7057.000 112.968 112.968 7058.000 112.967 112.967 7059.000 112.967 112.967 7060.000 112.966 112.966 7061.000 112.965 112.965 7062.000 112.964 112.964 7063.000 112.963 112.963 7064.000 112.963 112.963 7065.000 112.962 112.962 7066.000 112.961 112.961 7067.000 112.960 112.960 7068.000 112.959 112.959 7069.000 112.959 112.959 7070.000 112.958 112.958 7071.000 112.957 112.957 7072.000 112.956 112.956 7073.000 112.955 112.955 7074.000 112.955 112.955 7075.000 112.954 112.954 7076.000 112.953 112.953 7077.000 112.952 112.952 7078.000.

112.951 112.951 7079.000 112.951 112.951 7080.000 112.950 112.950 7081.000 112.949 112.949 7082.000 112.948 112.948 7083.000 112.947 112.947 7084.000 112.946 112.946 7085.000 112.946 112.946 7086.000 112.945 112.945 7087.000 112.944 112.944 7088.000 112.943 112.943 7089.000 112.942 112.942 7090.000 112.942 112.942 7091.000 112.941 112.941 7092.000 112.940 112.940 7093.000 112.939 112.939 7094.000 112.938 112.938 7095.000 112.938 112.938 7096.000 112.937 112.937 7097.000 112.936 112.936 7098.000 112.935 112.935 7099.000 112.934 112.934 7100.000 *112.934 112.934 7101.000 112.933 112.933 7102.000 112.932 112.932 7103.000 112.931 112.931 7104.000 112.930 112.930 7105.000 112.929 112.929 7106.000 112.929 112.929 7107.000 112.928 112.928 7108.000 112.927 112.~27 7109.000 112.926 112.926 7110.000 112.925 112.925 7lll.OOO 112.925 112.925 7112.000 112.924 112.924 7113.000 112.923 112.923 7114.000 112.922 112.922 7115.000 112.921 112.921 7116.000 112.920 112.920 7117.000 112.920 112.920 7118.000 112.919 112.919 7119.000 112.918 112.918 7120.000 112.917 112.917 7121.000 112.916 112.916 7122.000 112.916 112.916 7123.000 112.915 . 112.915 7124.000 112.914 112.914 7125.000 112.913 112.913 7126.000 112.912 112.912 7127.000 112.911 112.911 7128.000 112.911 112.911 7129.000 112.910 112.910 7130.000 112.909 112.909 7131.000 0 112.908 112.908 7132.000 112.907 112.907 7133.000 112.907 112.907 7134.000 112.906 112.906 7135.000 112.905 112.905 7136.000 112.904 112.904 7137.000 112.903 112.903 7138.000 112.902 112.902 7139.000 112.902 112.902 7140.000 112.901 112.901 7141.000 112.900 112.900 7142.000 112.899 112.899 7143.000 112.898 112.898 7144.000 112.897 112.897 7145.000 112.897 112.897 7146.000 112.896 112.896 7147.000 112.895 112.895 7148.000 112.894 112.894 7149.000 112.893 112.893 7150.000 112.892 112.892 7151.000 112.892 112.892 7152.000 112.891 112.891 7153.000 112.890 112.890 7154.000 112.889 112.889 7155.000 112.888 112.888 7156.000 112.888 112.888 7157.000 112.887 112.887 7158.000 112.886 112.886 7159.000 112.885 112.885 7160.000 112.884 112.884 7161.000 112.883 112.883 7162.000 112.883 112.883 7163.000 112.882 112.882 7164.000 112.881 112.881 7165.000 112.880 112.880 7166.000 112.879 112.879 7167.000 112.878 112.878 7168.000 112.878 112.878 7169.000 112.877 112.877 7170.000 112.876 112.876 7171.000 112.875 112.875 7172.000 112.874 112.874 7173.000 112.873 112.873 7174.000 112.873 112.873 7175.000 112.872 112.872 7176.000 112.871 112.871 ~177.000 112.870 112.870 7178.000 112.869 112.869 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batte,y IA 48-Hour Coping Study DCMCC IA 113 11-17-2018 Attachment 1 Page 256 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(\')

Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7179.000 112.868 112.868 7180.000 112.867 112.867 7181.000 112.867 112.867 7182.000 112.866 112.866 7183.000 112.865 112.865 7184.000 112.864 112.864 7185.000 112.863 112.863 7186.000 112.862 112.862 7187.000 112.862 112.862 7188.000 112.861 112.861 7189.000 112.860 112.860 7190.000 112.859 112.859 7191.000 112.858 112.858 7192.000 112.857 112.857 7193.000 112.857 112.857 7194.000 112.856 112.856 7195.000 112.855 112.855 7196.000 112.854 112.854 7197.000 112.853 112.853 7198.000 112.852 112.852 7199.000 112.852 112.852 7200.000 112.851 112.851 7201.000 112.850 112.850 7202.000 112.849 112.849 7203.000 112.848 112.848 7204.000 112.847 112.847 7205.000 112.846 112.846 7206.000 112.846 112.846 7207.000 112.845 112.845 7208.000 112.844 112.844 7209.000 112.843 112.843 7210.000 112.842 112.842 7211.000 112.841 112.841 7212.000 112.841 112.841 7213.000 112.840 112.840 7214.000 112.839 112.839 7215.000 112.838 112.838 7216.000 112.837 112.837 7217.000 112.836 112.836 7218.000 112.835 112.835 7219.000 112.835 112.835 7220.000 112.834 112.834 7221.000 112.833 112.833 7222.000 112.832 112.832 7223.000 112.831 112.831 7224.000 112.830 112.830 7225.000 112.829 112.829 7226.000 112.829 112.829 7227.000 112.828 112.828 7228.000 112.827 112.827 7229.000 112.826 112.826 7230.000 112.825 112.825 7231.000 112.824 112.824 7232.000 112.823 112.823 7233.000 112.823 112.823 7234.000 112.822 112.822 7235.000 112.821 112.821 7236.000 112.820 112.820 7237.000 112.819 112.819 7238.000 112.818 112.818 7239.000 112.818 112.818 7240.000 112.817 112.817 7241.000 112.816 112.816 7242.000 112.815 112.815 7243.000 112.814 112.814 7244.000 112.813 112.813 7245.000 112.812 112.812 7246.000 112.812 112.812 7247.000 112.811 112.811 7248.000 112.810 112.810 7249.000 112.809 112.809 7250.000 112.808 112.808 7251.000 112.807 112.807 7252.000 112.806 112.806 7253.000 112.805 112.805 7254.000 112.805 112.805 7255.000 112.804 112.804 7256.000 112.803 112.803 7257.000 112.802 112.802 7258.000 112.801 112.801 7259.000 112.800 112.800 7260.000 112.799 112.799 7261.000 112.799 112.799 7262.000 112.798 112.798 7263.000 112.797 112.797 7264.000 112.796 112.796 7265.000 112.795 112.795 7266.000 112.794 112.794 7267.000 112.793 112.793 7268.000 112.793 112.793 7269.000 112.792 112.792 7270.000 112.791 112.791 7271.000 112.790 112.790 7272.000 112.789 112.789 7273.000 112.788 112.788 7274.000 112.787 112.787 7275.000 112.786 112.786 7276.000 112.786 112.786 7277.000 112.785 112.785 7278.000 112.784 112.784 7279.000 112.783 112.783 7280.000 112.782 112.782 7281.000 112.781 112.781 7282.000 112.780 112.780 7283.000 112.779 112.779 7284.000 112.779 112.779 7285.000 112.778 112.778 7286.000 112.777 112.777 7287.000 '112.776 112.776 7288.000 112.775 112.775 7289.000 112.774 112.774 7290.000 112.773 112.773 7291.000 112.772 112.772 7292.000 112.771 112.771 7293.000 112.771 112.771 7294.000 112.770 112.770 7295.000 112.769 112.769 7296.000 112.768 112.768 7297.000 112.767 112.767 7298.000 112.766 112.766 7299.000 112.765 112.765 7300.000 112.764 112.764 7301.000 112.763 112.763 7302.000 112.762 112.762 7303.000 112.762 112.762 7304.000 . 112.761 112.761 7305.000 112.760 112.760 7306.000 112.759 112.759 7307.000 112.758 112.758 7308.000 112.757 112.757 7309.000 112.756 112.756 7310.000 112.75_5 112.755 7311.000 112.754 112.754 7312.000 112.753 112.753 7313.000 112.752 112.752 7314.000 112.752 112.752 7315.000 112.751 112.751 7316.000 112.750 112.750 7317.000 112.749 112.749 7318.000 112.748 112.748 7319.000 112.747 112.747 7320.000 112.746 112.746 7321.000 112.745 112.745 7322.000 112.744 112.744 7323.000 112.743 112.743 7324.000 112.742 112.742 7325.000 112.741 112.741 7326.000 112.741 112.741 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC IA 114 11-17-2018 Attachment 1 Page 257 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7327.000 112.740 112.740 7328.000 112.739 112.739 7329.000 112.738 112.738 7330.000 112.737 112.737 7331.000 112.736 112.736 7332.000 112.735 112.735 7333.000 112.734 112.734 7334.000 112.733 112.733 7335.000 112.732 1!2.732 7336.000 112.731 112.731 7337:000 112.730 112.730 7338.000 112.729 112.729 7339.000 112.729 112.729 7340.000 112.728 112.728 7341.000 112.727 112.727 7342.000 112.726 112.726 7343.000 112.725 112.725 7344.000 112.724 112.724 7345.000 112.723 112.723 7346.000 112.722 112.722 7347.000 112.721 112.721 7348.000 112.720 112.720 7349.000 112.719 112.719 7350.000 112.718 112.718 7351.000 112.717 112.717 7352.000 112.717 112.717 7353.000 112.716 112.716 7354.000 112.715 112.715 7355.000 112.714 112.714 7356.000 112.713 112.713 7357.000 112.712 112.712 7358.000 112.711 112.711 7359.000 112.710 112.710 7360.000 112.709 112.709 7361.000 112.708 112.708 7362.000 112.707 112.707 7363.000 112.706 112.706 7364.000 112.705 112.705 7365.000 112.704 112.704 7366.000 112.703 112.703 7367.000 112.702 112.702 7368.000 112.702 112.702 7369.000 112.701 112.701 7370.000 112.700 lli.100 7371.000 112.699 112.699 7372.000 112.698 112.698 7373.000 112.697 112.697 7374.000 112.696 112.696 7375.000 112.695 112.695 7376.000.

112.694 112.694 7377.000 112.693 112.693 7378.000 112.692 112.692 7379.000 112.691 112.691 7380.000 112.690 112.690 7381.000 112.689 112.689 7382.000 112.688 112.688 7383.000 112.687 112.687 7384.000 112.686 112.686 7385.000 112.685 112.685 7386.000 112.685 112.685 7387.000 112.684 112.684 7388.000 112.683 112.683 7389.000 112.682 112.682 7390.000 112.681 112.681 . 7391.000 112.680 112.680 7392.000 112.679 112.679 7393.000 112.678 112.678 7394.000 112.677 112.677 7395.000 112.676 112.676 7396.000 112.675 112.675 7397.000 112.674 112.674 7398.000 112.673 112.673 7399.000 112.672 112.672 7400.000 112.671 112.671 7401.000 112.670 112.670 7402.000 112.669 112.669 7403.000 112.668 112.668 7404.000 112.667 112.667 7405.000 112.666 112.666 7406.000 112.665 112.665 7407.000 112.664 112.664 7408.000 112.663 112.663 7409.000 112.663 112.663 7410.000 112.662 112.662 7411.000 112.661 112.661 7412.000 112.660 112.660 7413.000 112.659 112.659 7414.000 112.658 112.658 7415.000 112.657 112.657 7416.000 112.656 112.656 7417.000 112.655 112.655 7418.000 112.654 112.654 7419.000 112.653 112.653 7420.000 112.652 112.652 7421.000 112.651 112.651 ' 7422.000 112.650 112.650 7423.000 112.649 112.649 7424.000 112.648 112.648 7425.000 112.647 112.647 7426.000 112.646 112.646 7427.000 112.645 112.645 7428.000 112.644 112.644 7429.000 112.643 112.643 7430.000 112.642 112.642 7431.000 112.641 112.641 7432.000 112.640 112.640 7433.000 112.639 112.639 7434.000 112.638 112.638 7435.000 112.637 112.637 7436.000 112.636 112.636 7437.000 112.635 112.635 7438.000 112.634 112.634 7439.000 112.633 112.633 7440.000 112.632 112.632 7441.000 112.631 112.631 7442.000 112.630 112.630 7443.000 112.629 112.629 7444.000 112.628 112.628 7445.000 112.628 112.628 7446.000 112.627 112.627 7447.000 112.626 112.626 7448.000 112.625 112.625 7449.000 112.624 112.624' 7450.000 112.623 112.623 7451.000 112.622 112.622 7452.000 112.621 112.621 7453.000 112.620 112.620 7454.000 112.619 112.619 7455.000 112.618 112.618 7456.000 112.617 112.617 7457.000 112.616 112.616 7458.000 112.615 112.615 7459.000 112.614 112.614 7460.000 112.613 112.613 7461.000 112.612 112.612 7462.000 112.611 112.611 7463.000 112.610 112.610 7464.000 112.609 112.609 7465.000 112.608 112.608 7466.000 112.607 112.607 7467.000 112.606 112.606 7468.000 112.605 112.605 7469.000 112.604 112.604 7470.000 112.603 112.603 7471.000 112.602 112.602 7472.000 112.601 112.601 7473.000 112.600 112.600 7474.000 112.599 112.599 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Pa_ge: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 115 11-17-2018 Attachment 1 Page 258 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time y. V+ Time V-V+ 7475.000 112.598 112.598 7476.000 112.597 112.597 7477.000 112.596 112.596 7478.000 112.595 112.595 7479.000 112.594 112.594 7480.000 112.593 112.593 7481.000 112.592 112.592 7482.000 112.591 112.591 7483.000 112.590 112.590 7484.000 112.589 112.589 7485.000 112.588 112.588 7486.000 112.587 112.587 7487.000 112.586 112.586 7488.000 112.585 112.585 7489.000 112.584 112.584 7490.000 112.583 112.583 7491.000 112.582 112.582 7492.000 112.581 112.581 7493.000 112.580 112.580 7494.000 112.579 112.579 7495.000 112.578 112.578 7496.000 112.577 112.577 7497.000 112.576 112.576 7498.000 112.575 112.575 7499.000 112.574 112.574 7500.000 112.573 112.573 7501.000 112.572 112.572 7502.000 112.570 112.570 7503.000 112.569 112.569 7504.000 112.568 112.568 7505.000 112.567 112.567 7506.000 112.566 112.566 7507.000 112.565 112.565 7508.000 112.564 112.564 7509.000 112.563 112.563 7510.000 112.562 112.562 7511.000 112.561 112.561 7512.000 112.560 112.560 7513.000 112.559 112.559 7514.000 112.558 112.558 7515.000 112.557 112.557 7516.000 112.556 112.556 7517.000 112.555 112.555 . 7518.000 112.554 112.554 7519.000 112.553 112.553 7520.000 112.552 112.552 7521.000 112.551 112.551 7522.000 112.550 112.550 7523.000 112.549 112.549 7524.000 112.548 112.548 7525.000 112.547 112.547 7526.000 112.546 112.546 7527.000 112.545 112.545 7528.000 112.544 112.544 7529.000 112.543 112.543 7530.000 112.542 112.542 7531.000 112.541 112.541 7532.000 112.540 112.540 7533.000 112.539 112.539 7534.000 112.538 112.538 7535.000 112.537 112.537 7536.000 112.536 112.536 7537.000 112.535 112.535 7538.000 112.533 112.533 7539.000 112.532 112.532 7540.000 112.531 112.531 7541.000 112.530 112.530 7542.000 112.529 112.529 7543.000 112.528 112.528 7544.000 112.527 112.527 7545.000 112.526 112.526 7546.000 112.525 112.525 7547.000 112.524 112.524 7548.000 112.523 112.523 7549.000 112.522 112.522 7550.000 112.521 112.521 7551.000 112.520 112.520 7552.000 112.519 112.519 7553.000 112.518 112.518 7554.000 112.517 112.517 7555.000 112.516 112.516 7556.000 112.515 112.515 7557.000 112.514 112.514 7558.000 112.513 112.513 7559.000 112.511 112.511 7560.000 112.510 112.510 7561.000 112.509 112.509 7562.000 112.508 112.508 7563.000 112.507 112.507 7564.000 112.506 112.506 7565.000 112.505 112.505 7566.000 112.504 112.504 7567.000 112.503 112.503 7568.000 112.502 112.502 7569.000 112.501 112.501 7570.000 112.500 112.500 7571.000 112.499 112.499 7572.000 112.498 112.498 7573.000 112.497 112.497 7574.000 112.496 112.496 7575.000 112.495 112.495 7576.000 112.493 112.493 7577.000 112.492 112.492 7578.000 112.491 112.491 7579.000 112.490 112.490 7580.000 112.489 112.489 7581.000 112.488 112.488 7582.000 112.487 112.487 7583.000 112.486 112.486 7584.000 112.485 112.485 7585.000 112.484 112.484 7586.000 112.483 112.483 1587.000 112.482 112.482 7588.000 112.481 112.481 7589.000 112.480 112.480 7590.000 112.479 112.479 7591.000 112.477 112.477 7592.000 112.476 112.476 75.93.000 112.475 112.475 7594.000 112.474 112.474 7595.000 112.473 112.473 7596.000 112.472 112.472 7597.000 112.471 112.471 7598.000 112.470 112.470 7599.000 112.469 112.469 7600.000 112.468 112.468 7601.000 112.467 112.467 7602.000 112.466 112.466 7603.000 112.465 112.465 7604.000 112.463 112.463 7605.000 112.462 112.462 7606.000 112.461 112.461 7607.000 112.460 112.460 7608.000 112.459 112.459 7609.000 112.458 112.458 7610.000 112.457 112.457 7611.000 112.456 112.456 7612.000 112.455 112.455 7613.000 112.454 112.454 7614.000 112.453 112.453 7615.000 112.451 112.451 7616.000 112.450 112.450 7617.ooo*

112.449 112.449 7618.000 112.448 112.448 7619.000 112.447 112.447 7620.000 112.446 112.446 7621.000 112.445 112.445 7622.000 112.444 112.444 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study DCMCC IA 116 11-17-2018 Attachment 1 Pag~ 259 of 27 4 KCICONSULT Base Normal I Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time V-V+ Time V-V+ Time V-V+ 7623.000 112.443 112.443 7624.000 112.442 112.442 7625.000 112.441 112.441 7626.000 112.439 112.439 7627.000 112.438 112.438 7628.000 112.437 112.437 7629.000 112.436 112.436 7630.000 112.435 112.435 7631.000 112.434 112.434 7632.000 112.433 112.433 7633.000 112.432 112.432 7634.000 112.431 112.431 7635.000 112.429 112.429 7636.000 112.428 112.428 7637.000 112.427 112.427 7638.000 112.426 112.426 7639.000 112.425 112.425 7640.000 112.424 112.424 7641.000 112.423 112.423 7642.000 112.421 112.421 7643.000 112.420 112.420 7644.000 112.419 112.419 7645.000 112.418 112.418 7646.000 112.417 112.417 7647.000 112.416 112.416 7648.000 112.415 112.415 7649.000 112.413 112.413 7650.000 112.412 112.412 .7651.000 112.411 112.411 7652.000 112.410 112.410 7653.000 112.409 112.409 7654.000 112.408 112.408 7655.000 112.406 112.406 7656.000 112.405 112.405 7657.000 112.404 112.404 7658.000 112.403 112.403 7659.000 112.402 112.402 7660.000 112.401 112.401 7661.000 112.399 112.399 7662.000 112.398 112.398 7663.000 112.397 112.397 7664.000 112.396 112.396 7665.000 112.395 112.395 7666.000 112.394 112.394 7667.000 112.392 112.392 7668.000 112.391 112.391 7669.000 112.390 112.390 7670.000 112.389 112.389 7671.000 112.388 112.388 7672.000 112.387 112.387 7673.000 112.385 112.385 7674.000 112.384 112.384 7675.000 112.383 112.383 7676.000 112.382 112.382 7677.000 112.381 112.381 7678.000 112.379 112.379 7679.000 112.378 112.378 7680.000 112.377 112.377 7681.000 112.376 112.376 7682.000 112.375 112.375 7683.000 112.374 112.374 7684.000 112.372 112.372 7685.000 112.371 112.371 7686.000 112.370 112.370 7687.000 112.369 112.369 7688.000 112.368 112.368 7689.000 112.366 112.366 7690.000 112.365 112.365 7691.000 112.364 112.364 7692.000 112.363 112.363 7693.000 112.362 112.362 7694.000 112.360 112.360 7695.000 112.359 112.359 7696.000 112.358 112.358 7697.000 112.357 112.357 7698.000 112.356 112.356 7699.000 112.354 112.354 7700.000 112.353 112.353 7701.000 112.352 112.352 7702.000 112.351 112.351 7703.000 112.350 112.350 7704.000 112.348 112.348 7705.000 112.347 112.347 7706.000 112.346 112.346 7707.000 . 112.345 112.345 7708.000 112.344 112.344 7709.000 112.342 112.342 7710.000 112.341 112.341 7711.000 112.340 112.340 7712.000 112.339 112.339 7713.000 112.338 112.338 7714.000 112.336 112.336 7715.000 112.335 112.335 7716.000 112.334 112.334 7717.000 112.333 112.333 7718.000 112.331 112.331 7719.000 112.330 112.330 7720.000 112.329 112.329 7721.000 112.328 112.328 7722.000 112.327 112.327 7723.000 112.325 112.325 7724.000 112.324 112.324 7725.000 112.323 112.323 7726.000 112.322 112.322 7727.000 112.320 112.320 7728.000 112.319 112.319 7729.000 112.318 112.318 7730.000 112.317 112.317 7731.000 112.316 112.316 7732.000 112.314 112.314 7733.000 112.313 112.313 7734.000 112.312 112.312 7735.000 112.311 112.311 7736.000 112.309 112.309 7737.000 112.308 112.308 7738.000 112.307 112.307 7739.000 112.306 112.306 7740.000 112.304 112.304 7741.000 112.303 112.303 7742.000 112.302 112.302 7743.000 112.301 112.301 7744.000 112.299 112.299 7745.000 112.298 112.298 7746.000 112.297 112.297 7747.000 112.296 112.296 7748.000 112.295 112.295 7749.000 112.293 112.293 7750.000 112.292 112.292 7751.000 112.291 112.291 7752.000 112.290 112.290 7753.000 112.288 112.288 7754.000 112.287 112.287 7755.000 112.286 112.286 7756.000 112.285 112.285 7757.000 112.283 112.283 7758.000 112.282 112.282 7759.000 112.281 112.281 7760.000 112.279 112.279 7761.000 112.278 112.278 7762.000 112.277 112.277 7763.000 112.276 112.276 7764.000 112.274 112.274 7765.000 112.273 112.273 7766.000 112.272 112.272 7767.000 112.271 112.271 7768.000 112.269 112.269 7769.000 112.268 112.268 7770.000 112.267 112.267 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Batte!)' IA 48-Hour Coping Study DCMCClA 117 11-17-2018 Attachment 1 Page 260 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 7771.000 112.266 112.266 7772.000 112.264 112.264 7773.000 112.263 112.263 7774.000 112.262 112.262 7775.000 112.260 112.260 7776.000 112.259 112.259 7777.000 112.258 112.258 7778.000 112.257 112.257 7779.000 112.255 112.255 7780.000 112.254 112.254 7781.000 112.253 112.253 7782.000 112.252 112.252 7783.000 112.250 112.250 7784.000 112.249 112.249 7785.000 112.248 112.248 7786.000 112.246 112.246 7787.000 112.245 112.245 7788.000 112.244 112.244 7789.000 112.243 112.243 7790.000 112.241 112.241 7791.000 112.240 112.240 7792.000 112.239 112.239 7793.000 112.237 112.237 7794.000 112.236 112.236 7795.000 112.235 112.235 7796.000 112.234 112.234 7797.000 112.232 112.232 7798.000 112.231 112.231 7799.000 112.230 112.230 7800.000 112.228 112.228 7801.000 112.227 112.227 7802.000 112.226 112.226 7803.000 112.224 112.224 7804.000 112.223 112.223 7805.000 112.222 112.222 7806.000 112.221 112.221 7807.000 112.219 112.219 7808.000 112.218 112.218 7809.000 112.217 112.217 7810.000 112.215 112.215 7811.000 112.214 112.214 7812.000 112.213 112.213 7813.000 112.211 112.211 7814.000 112.210 112.210 7815.000 112.209 112.209 7816.000 112.207 112.207 7817.000 112.206 112.206 7818.000 112.205 112.205 7819.000 112.203 112.203 7820.000 112.202 112.202 7821.000 112.201 112.201 7822.000 112.199 112.199 7823.000 112.198 112.198 7824.000 112.197 112.197 7825.000 112.196 112.196 7826.000 112.194 112.194 7827.000 112.193 112.193 7828.000 112.192 112.192 7829.000 112.190 112.190 7830.000 112.189 112.189 7831.000 112.188 112.188 7832.000 112.186 112.186 7833.000 112.185 112.185 7834.000 112.184 112.184 7835.000 112.182 112.182 7836.000 112.181 112.181 7837.000 112.180 112.180 7838.000 112.178 112.178 7839.000 112.177 112.177 7840.000 112.175 112.175 7841.000 112.174 112.174 7842.000 112.173 112.173 7843.000 112.171 112.171 7844.000 112.170 112.170 7845.000 112.169 112.169 7846.000 112.167 112.167 7847.000 112.166 112.166 7848.000 112.165 112.165 7849.000 112.163 112.163 7850.000 112.162 112.162 7851.000 112.161 112.161 7852.000 112.159 112.159 7853.000 112.158 112.158 7854.000 112.157 112.157 7855.000 112.155 112.155 7856.000 112.154 112.154 7857.000 112.153 112.153 7858.000 112.151 112.151 7859.000 112.150 112.150 7860.0QO 112.148 112.148 7861.000 112.147 112.147 7862.000 112.146 112.146 7863.000 112.144 112.144 7864.000 112.143 112.143 7865.000 112.142 112.142 7866.000 112.140 112.140 7867.000 112.139 112.139 7868.000 112.137 112.137 7869.000 112.136 112.136 7870.000 112.135 112.135 7871.000 112.133 112.133 7872.000 112.132 112.132 7873.000 112.131 112.131 7874.000 112.129 112.129 7875.000 lJ;!.128 112.128 7876.000 112.126 112.126 7877.000 112.125 112.125 7878.000 112.124 112.124 7879.000 112.122 112.122 7880.000 112.121 112.121 7881.000 112.120 112.120 7882.000 112.118 112.118 7883.000 112.117 112.117 7884.000 112.115 112.115 7885.000 112.114 112.114 7886.000 112.113 112.113 7887.000 112.111 112.111 7888.000 112.110 112.110 7889.000 112.108 112.108 7890.000 112.107 112.107 7891.000 112.106 112.106 7892.000 112.104 112.104 7893.000 112.103 112.103 7894.000 112.101 112.101 7895.000 112.100 112.100 7896.000 112.099 112.099 7897.000 112.097* 112.097 7898.000 112.096 112.096 7899.000 112.094 112.094

  • 7900.000 112.093 112.093 7901.000 112.092 112.092 7902.000 112.090 112.090 7903.000 112.089 112.089 7904.000 112.087 112.087 7905.000 112.086 112.086 7906.000 112.084 112.084 7907.000 112.083 ll2.083 7908.000 ll2.082 112.082 7909.000 112.080 112.080 7910.000 112.079 ll2.079 7911.000 112.077 ll2.077 7912.000 112.076 112.076 7913.000 ll2.075 112.075 7914.000 112.073 112.073 7915.000 112.072 ll2.072 7916.000 112.070 112.070 7917.000 ll2.069 ll2.069 7918.000 112.067 112.067 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC IA 118 11-17-2018 Attachment 1 Page 261 of 274 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 7919.000 112.066 112.066 7920.000 112.065 112.065 7921.000 112.063 112.063 7922.000 112.062 112.062 7923.000 112.060 112.060 7924.000 112.059 112.059 7925.000 112.057 112.057 7926.000 112.056 . 112.056 7927.000 112.054 112.054 7928.000 112.053 112.053 7929.000 112.052 112.052 7930.000 112.050 112.050 7931.000 112.049 112.049 7932.000 112.047 112.047 7933.000 112.046 112.046 7934.000 112.044 112.044 7935.000 112.043 112.043 7936.000 112.041 112.041 7937.000 112.040 112.040 7938.000 112.038 112.038 7939.000 112.037 112.037 7940.000' 112.036 11~.036 7941.000 112.034 112.034 7942.000 112.033 112.033 7943.000 112.031 112.031 7944.000 112.030 112.030 7945.000 112.028 112.028

  • 7946.000 112.027 112.027 7947.000 112.025 112.025 7948.000 112.024 112.024 7949.000 112.022 112.022 7950.000 112.021 112.021 7951.000 112.019 112.019 7952.000 112.018 112.018 7953.000 112.017 112.017 7954.000 112.015 112.015 7955.000 112.014
  • 112.014 7956.000 112.012 112.012 7957.000 112.011 112.011 7958.000 112.009 112.009 7959.000 112.008 112.008 7960.000 112.006 112.006 7961.000 112.005 112.005 7962.000 112.003 112.003 7963.000 112.002 112.002 7964.000 112.000 112.000 7965.000 111.999 111.999 7966.000 111.997 111.997 7967.000.

111.996 111.996 7968.000 111.994 111.994 7969.000 111.993 111.993 7970.000 111.991 111.991 7971.000 111.990 111.990 7972.000 111.988 111.988 7973.000 111.987 111.987 7974.000 111.985 111.985 7975.000 111.984 111.984 7976.000 111.982 111.982 7977.000 111.981 111.981 7978.000 111.979 111.979 7979.000 111.978 111.978 7980.000 111.976 111.976 7981.000 111.975 111.975 7982.000 111.973 111.973 7983.000 111.972 111.972 7984.000 111.970 111.970 7985.000 111.969 111.969 7986.000 111.967 111.967 7987.000 111.966 111.966 7988.000 111.964 111.964 7989.000 111.963 111.963 7990.000 111.961 111.961 7991.000 111.960 111.960 7992.000 111.958 111.958 7993.000 111.957 111.957 7994.000 111.955 111.955 7995.000 111.953 111.953 7996.000 111.952 lll.952 7997.000 111.950 111.950 7998.000 111.949 111.949 7999.000 111.947 111.947 8000.000 111.946 111.946 8001.000 111.944 111.944 8002.000 111.943 111.943 8003.000 111.941 111.941 8004.000 111.940 111.940 8005.000 111.938 111.938 8006.000 lil.937 111.937 8007.000 111.935 111.935 8008.000 111.933 111.933 8009.000 111.932 111.932 8010.000 111.930 111.930 8011.000 111.929 111.929 8012.000 111.927 111.927 8013.000 111.926 111.926 8014.000 111.924 111.924 8015.000 111.923 111.923 8016.000 111.921 111.921 8017.000 111.919 111.919 8018.000 111.918 111.918 8019.000 111.916 111.916 8020.000 111.915 111.915 8021.000 111.913 111.913 8022.000 111.912 111.912 8023.000 111.910 111.910 8024.000 111.909 111.909 8025.000 111.907 111.907 8026.000 111.905 111.905 8027.000 111.904 111.904 8028.000 111.902 111.902 8029.000 111.901 111.901 8030.000 111.899 111.899 8031.000 111.898 111.898 8032.000 111.896 lll.896 8033.000 111.894 111.894 8034.000 111.893 111.893 8035.000 111.891 111.891 8036.000 111.890 111.890 8037.000 111.888 111.888 8038.000 111.886 111.886 8039.000 111.885 111.885 8040.000 111.883 111.883 8041.000 111.882 111.882 8042.000 111.880 111.880 8043.000 111.878 111.878 8044.000 111.877 111.877 8045.000 111.875 111.875 8046.000 111.874 111.874 8047.000 111.872 111.872 8048.000 111.870 111.870 8049.000 111.869 111.869 8050.000 111.867 111.867 8051.000 111.866 111.866 8052.000 111.864 111.864 8053.000 111.862 111.862 8054.000 111.861 111.861 8055.000 111.859 111.859 8056.000 111.858 111.858 8057.000 111.856 111.856 8058.000 111.854 111.854 8059.000 111.853 111.853 8060.000 111.851 111.851 8061.000 111.850 111.850 8062.000 111.848 111.848 8063.000 111.846 111.846 8064.000 111.845 111.845 8065.000 111.843 111.843 8066.000 111.841 111.841 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC IA 119 11-17-2018 Attachment 1 Page 262 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8067.000 111.840 111.840 8068.000 111.838 111.838 8069.000 111.837 111.837 8070.000 111.835 111.835 8071.000 111.833 111.833 8072.000 111.832 111.832 8073.000 111.830 111.830 8074.000 111.828 111.828 8075.000 111.827 111.827 8076.000 111.825 111.825 8077.000 111.823 111.823 8078.000 111.822 111.822 8079.000 111.820 111.820 8080.000 111.818 111.818 8081.000 111.817 111.817 8082.000 111.815 111.815 8083.000 111.814 111.814 8084.000 111.812 lll.812 8085.000 111.810 111.810 8086.000 111.809 111.809 8087.000 111.807 111.807 8088.000 111.805 111.805 8089.000 111.804 111.804 8090.000 111.802 111.802 8091.000 111.800 111.800 8092.000 111.799 111.799 8093.000 111.797 111.797 8094.000 111.795 111.795 8095.000 111.794 111.794 8096.000 111.792 111.792 8097.000 111.790 111.790 8098.000 111.789 111.789 8099.000 111.787 . 111.787 8100.000 111.785 111.785 8101.000 111.784 111.784 8102.000 111.782 111.782 8103.000 111.780 111.780 8104.000 111.778 111.778 8105.000 111.777 111.777 8106.000 111.775 111.775 8107.000 111.773 111.773 8108.000 111.772 111.772 8109.000 111.770 111.770 8110.000 111.768 111.768 8111.000 111.767 111.767 8112.000 111.765 111.765 8113.000 111.763 111.763 8114.000 111.762 111.762 8115.000 111.760 111.760 8116.000 111.758 111.758 8117.000 111.756 111.756 8118.000 111.755 111.755 8119.000 111.753 111.753 8120.000 111.751 111.751 8121.000 111.750 111.750 8122.000 111.748 111.748 8123.000 111.746 111.746 8124.000 111.744 111.744 8125.000 111.743 111.743 8126.000 111.741 111.741 8127.000 111.739 111.739 8128.000 111.738 111.738 8129.000 111.736 111.736 8130.000 111.734 111.734 8131.000 111.732 111.732 8132.000 111.731 111.731 8133.000 111.729 lll.729 8134.000 111.727 111.727 8135.000 111.725 111.725 8136.000 111.724 111.724 8137.000 111.722 111.722 8138.000 111.720 111.720 8139.000 111.719 111.719 8140.000 111.717 111.717 8141.000 111.715 111.715 8142.000 111.713 111.713 8143.000 111.712 111.712 8144.000 111.710 111.710 8145.000 111.708 111.708 8146.000 111.706 111.706 8147.000 111.705 111.705 8148.000 111.703 111.703 8149.000 111.701 111.701 8150.000 111.699 111.699 8151.000 111.698 111.698 8152.000 111.696 111.696 8153.000 111.694 111.694 8154.000 111.692 111.692 8155.000 111.690 111.690 8156.000 111.689 111.689 8157.000 111.687 111.687 8158.000 111.685 111.685 8159.000 111.683 111.683 8160.000 111.682 111.682 8161.000 111.680 111.680 8162.000 111.678 111.678 8163.000 111.676 111.676 8164.000 111.675 111.675 8165.000 111.673 111.673 8166.000 111.671 111.671 8167.000 111.669 111.669 8168.000 111.667 111.667 8169.000 111.666 111.666 8170.000 111.664 111.664 8171.000 111.662 111.662 8172.000 111.660 111.660 8173.000 111.658 111.658 8174.000 111.657 111.657 8175.000 111.655 111.655 8176.000 111.653 111.653 8177.000 111.651 111.651 8178.000 111.649 111.649 8179.000 111.648 111.648 8180.000 111.646 111.646 8181.000 111.644 111.644 8182.000 111.642 111.642 8183.000 111.640 111.640 8184.000 111.639 111.639 8185.000 111.637 111.637 8186.000 111.635 111.635 8187.000 lll.633 111.633 8188.000 111.631 111.631 8189.000 111.629 111.629 8190.000 111.628 111.628 8191.000 111.626 111.626 8192.000 111.624 111.624 8193.000 111.622 111.622 8194.000 111.620 111.620 8195.000 111.618 111.618 8196.000 111.617 111.617 8197.000 lll.615 111.615 8198.000 111.613 111.613 8199.000 111.611 111.611 8200.000 111.609 111.609 8201.000 111.607 lll.607 8202.000 111.606 111.606 8203.000 111.604 111.604 8204.000 111.602 111.602 8205.000 111.600 111.600 8206.000 lll.598 111.598 8207.000 111.596 111.596 8208.000 111.595 111.595 8209.000 111.593 111.593 8210.000 111.591 111.591 8211.000 111.589 111.589 8212.000 111.587 111.587 8213.000 111.585 111.585 8214.000 111.583 111.583 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCC IA 120 11-17-2018 Attachment 1 Page 263 of 27 4 KCICONSULT

Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8215.000 111.581 111.581 8216.000 111.580 111.580 8217.000 111.578 111.578 8218.000 111.576 111.576 8219.000 111.574 111.574 8220.000 111.572 111.572 8221.000 111.570 111.570 8222.000 111.568 111.568 8223.000 111.566 111.566 8224.000 111.565 111.565 8225.000 111.563 111.563 8226.000 111.561 111.561 8227.000 111.559 111.559 8228.000 111.557 111.557 8229.000 111.555 111.555 8230.000 111.553 111.553 8231.000 111.551 111.551 8232.000 111.549 111.549 8233.000 111.548 111.548 8234.000 111.546 111.546 8235.000 111.544 111.544 8236.oo*o 111.542 111.542 8237.000 111.540 111.540 8238.000 111.538 111.538 8239.000 *111.536 111.536 8240.000 111.534 111.534 8241.000 111.532 111.532 8~42.000 111.530 111.530 8243.000 111.528 111.528 8244.000 111.526 111.526 8245.000 111.525 111.525 8246.000 111.523 111.523 8247.000 111.521 111.521 8248.000 111.519 111.519 8249.000 111.517 111.517 8250.000 111.515 111.515 8251.000 111.513 111.513 8252.000 111.511 111.511 8253.000 111.509 111.509 8254.000 111.507 111.507 8255.000 111.505 111.505 8256.000 111.503 111.503 8257.000 111.501 111.501 8258.000 111.499 111.499 8259.000 111.497 111.497 8260.000 111.495 111.495 8261.000 111.494 111.494 8262.000 111.492 111.492 8263.000 111.490 111.490 8264.000 111.488 111.488 8265.000 111.486 111.486 8266.000 111.484 111.484 8267.000 111.482 111.482 8268.000 111.480 111.480 8269.000 111.478 111.478 8270.000 111.476 111.476 8271.000 111.474 111.474 8272.000 111.472 111.472 8273.000 111.470 111.470 8274.000 111.468 111.468 8275.000 111.466 111.466 8276.000 111.464 111.464 8277.000 111.462 111.462 8278.000 111.460 111.460 8279.000 111.458 111.458 8280.000 111.456 111.456 8281.000 111.454 111.454 8282.000 111.452 111.452 8283.000 111.450 111.450 8284.000 111.448 111.448 8285.000 111.446 111.446 8286.000 111.444 111.444 8287.000 111.442 111.442 8288.000 111.440 111.440 8289.000 111.438 111.438 8290.000 111.436 111.436 8291.000 111.434 111.434 8292.000 111.432 111.432 8293.000 111.430 111.430 8294.000 111.428 111.428 8295.000 111.426 111.426 8296.000 111.424 111.424 8297.000 111.422 111.422 8298.000 111.420 111.420 8299.000 111.418 111.418 8300.000 111.416 111.416 8301.000 111.414 111.414 8302.000 . 111.412 111.412 8303.000 111.410 111.410 8304.000 111.408 111.408 8305.000 111.406 111.406 8306.000 111.404 111.404 8307.000 111.401 111.401 8308.000 111.399 111.399 8309.000 111.397 111.397 8310.000 111.395 111.395 8311.000 111.393 111.393 8312.000 111.391 111.391 8313.000 111.389 111.389 8314.000 111.387 111.387 8315.000 111.385 111.385 8316.000 111.383 111.383 8317.000 111.381 111.381 8318.000 111.379 111.379 8319.000 111.377 111.377 8320.000 111.375 111.375 . 8321.000 111.373 111.373 8322.000 111.371 111.371 8323.000 111.368 111.368 8324.000

  • 111.366 111.366 8325.000 111.364 111.364 8326.000 111.362 111.362 8327.000 111.360 111.360 8328.000 111.358 111.358 8329.000 111.356 111.356 8330.000 111.354 111.354 8331.000 111.352 111.352 8332.000 111.350 111.350 8333.000 111.348 111.348 8334.000 111.345 111.345 8335.000 111.343 111.343 8336.000 111.341 111.341 8337.000 111.339 111.339 8338.000 111.337 111.337 8339.000 111.335 111.335 8340.000 111.333 111.333 8341.000 111.331 111.331 8342.000 111.329 111.329 8343.000 111.326 111.326 8344.000 111.324 111.324 8345.000 111.322 111.322 8346.000 111.320 111.320 8347.000 111.318 111.318 8348.000 111.316 111.316 8349.000 111.314 111.314 8350.000 111.312 111.312 8351.000 111.309 111.309 8352.000 111.307 111.307 8353.000 111.305 111.305 8354.000 111.303 111.303 8355.000 111.301 111.301 8356.000 111.299 111.299 8357.000 111.297 111.297 8358.000 111.294 111.294 8359.000 111.292 111.292 8360.000 111.290 111.290 8361.000 111.288 111.288 8362.000 111.286 111.286 EC 626319 j Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCClA 121 11-17-2018 Attachment 1 Page 264 of274 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 8363.000 111.284 111.284 8364.000 111.281 111.281 8365.000 111.279 111.279 8366.000 111.277 111.277 8367.000 111.275 111.275 8368.000 111.273 111.273 8369.000 111.271 111.271 8370.000 111.268 111.268 8371.000 111.266 111.266

  • 8372.000 111.264 111.264 8373.000 111.262 111.262 8374.000 111.260 111.260 8375.000 111.257 111.257 8376.000 111.255 111.255 8377.000 111.253 111.253 8378.000 111.251 111.251 8379.000 111.249 111.249 8380.000 111.246 111.246 8381.000 111.244 111.244 8382.000 111.242 111.242 8383.000 111.240 111.240 8384.000 111.238 111.238 8385.000 111.235 111.235 8386.000 111.233 111.233 8387.000 111.231 111.231 8388.000 111.229 111.229 8389.000 111.226 111.226 8390.000 111.224 111.224 8391.000 111.222 111.222 8392.000 111.220 111.220 8393.000 111.218 111.218 8394.000 111.215 111.215 8395.000 111.213 111.213 8396.000 111.211 111.211 8397.000 111.209 111.209 8398.000 111.206 111.206 8399.000 111.204 111.204 8400.000 111.202 111.202 8401.000 111.200 111.200 8402.000 111.197 111.197 8403.000 111.195 111.195 8404.000 111.193 111.193 8405.000 111.191 111.191 8406.000 111.188 111.188 8407.000 111.186 111.186 8408.000 111.184 111.184 8409.000 111.181 111.181 8410.000 111.179 111.179 8411.000 111.177 111.177 8412.000 111.175 111.175 8413.000 111.172 111.172 8414.000 111.170 111.170 8415.000 111.168 111.168 8416.000 111.165 111.165 8417.000 111.163 111.163 8418.000 111.161 111.161 8419.000 111.159 111.159 8420.000 111.156 111.156 8421.000 111.154 111.154 8422.000 111.152 111.152 8423.000 111.149 )11.149 8424.000 111.147 111.147 8425.000 111.145 111.145 8426.000 111.142 111.'142 ' 8427.000 111.140 111.140 8428.000 111.138 111.138 8429.000 111.135 111.135 8430.000 111.133 111.133 8431.000 111.131 111.131 8432.000 111.128 111.128 8433.000 111.126 111.126 8434.000 111.124 111.124 8435.000 111.121 111.121 8436.000 111.119 111.119 8437.000 111.117 111.117 8438.000 111.114 111.114 8439.000 111.112 111.112 8440.000 111.110 111.110 8441.000 111.107 111.107 8442.000 111.105 111.105 8443.000 111.103 111.103 8444.000 111.100 111.100 8445.000 111.098 111.098 8446.000 111.096 111.096 8447.000 111.093 111.093 8448.000 111.091 111.091 8449.000 111.089 111.089 8450.000 111.086 111.086 8451.000 111.084 111.084 8452.000 111.081 111.081 8453.000 111.079 111.079 8454.000 111.077 111.077 8455.000 111.074 111.074 8456.000 111.072 111.072 8457.000 111.069 111.069 8458.000 111.067 111.067 8459.000 111.065 lli.065 8460.000 111.062 111.062 8461.000 111.060 111.060 8462.000 111.057 111.057 8463.000 111.055 111.055 8464.000 111.053 111.053 8465.000 111.050 111.050 8466.000 111.048 111.048 8467.000 111.045 111.045 8468.000 111.043 111.043 8469.000 111.041 111.041 8470.000 111.038 111.038 8471.000 111.036 111.036 8472.000 111.033 111.033 8473.000 111.031 111.031 8474.000 111.028 111.028 8475.000 111.026 111.026 8476.000 111.023 111.023 8477.000 111.021 111.021 8478.000 111.019 111.019 8479.000 111.016 111.016 8480.000 111.014 111.014 8481.000 111.011 111.011 8482.000 111.009 111.009 8483.000 111.006 111.006 8484.000 111.004 111.004 8485.000 111.001 111.001 8486.000 110.999 110.999 8487.000 110.996 110.996 8488.000 110.994 110.994 8489.000 110.991 110.991 8490.000 110.989 110.989 8491.000 110.986 110.986 8492.000 110.984 110.984 8493.000 110.982 110.982 8494.000 110.979 110.979 8495.000 110.977 110.977 8496.000 110.974 110.974 8497.000 110.972 110.972 8498.000 110.969 110.969 8499.000 110.967 110.967 8500.000 110.964 110.964 8501.000 110.961 110.961 8502.000 110.959 110.959 8503.000 110.956 110.956 8504.000 110.954 110.954 8505.000 110.951 110.951 8506.000 110.949 110.949 8507.000 110.946 110.946 8508.000 110.944 110.944 8509.000 110.941 110.941 8510.000 110.939 110.939 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCC IA 122 11-17-2018 Attachment 1 Page 265 of 274. KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8511.000 110.936 110.936 8512.000 110.934 110.934 8513.000 110.931 110.931 8514.000 110.929 110.929 8515.000 110.926 110.926 8516.000 110.923 110.923 8517.000 110.921 110.921 8518.000 110.918 110.918 8519.000 110.916 110.916 8520.000 110.913 110.913 8521.000 110.911 110.911 8522.000 110.908 110.908 8523.000 110.906 110.906 8524.000 110.903 110.903 8525.000 110.900 110.900 8526.000 110.898 110.898 8527.000 110.895 110.895 8528.000 110.893 110.893 8529.000 110.890 110.890 8530.000 110.887 110.887 8531.000 110.885 110.885 8532.000 110.882 110.882 8533.000 110.880 110.880 8534.000 110.877 110.877 8535.000 110.874 110.874 8536.000 110.872 110.872 8537.000 110.869 110.869 8538.000 110.867 110.867 8539.000 110.864 110.864 8540.000 110.861 110.861 8541.000 110.859 110.859 8542.000 110.856 110.856 8543.000 110.853 110.853 8544.000 110.851 110.851 8545.000 110.848 110.848 8546.000 110.845 110.845 8547.000 110.843 110.843 8548.000 110.840 110.840 8549.000 110.838 110.838 8550.000 110.835 110.835 8551.000 110.832 110.832 8552.000 110.830 110.830 8553.000 110.827 110.827 8554.000 110.824 110.824 8555.000 110.822 110.822 8556.000 110.819 110.819 8557.000 110.816 110.816 8558.000 110.814 110.814 8559.000 110.811 110.811 8560.000 110.808 110.808 8561.000 110.805 110.805 8562.000 110.803 110.803 8563.000 110.800 110.800 8564.000 110.797 110.797 8565.000 110.795 110.795 8566.000 110.792 110.792 8567.000 110.789 110.789 8568.000 110.787 110.787 8569.000 110.784 110.784 8570.000 110.781 110.781 8571.000 110.778 110.778 8572.000 110.776 110.776 8573.000 110.773 110.773 8574.000 110.770 110.7.70 8575.000 110.768 110.768 8576.000 110.765 110.765 8577.000 110.762 110.762 8578.000 110.759 110.759 8579.000 110.757 110.757 8580.000 110.754 110.754 8581.000 110.751 110.751 8582.000 110.748 110.748 8583.000 110.746 110.746 8584.000 110.743 110.743 8585.000 110.740 110.740 8586.000 110.737

  • 110.737 8,587.000 110.734 110.734 8588.000 110.732 110.732 8589.000 110.729 110.729 8590.000 110.726 110.726 8591.000 110.723 110.723 8592.000 110.721 110.721 8593.000 110.718 110.718 8594.000 110.715 110.715 8595.000 110.712 110.712 8596.000 110.709 110:709 8597.000 110.707 110.707 8598.000 110.704 110.704 8599.000 110.701 110.701 8\\()0.000 110.698 110.698 8601.000 110.695 110.695 8602.000 110.693 110.693 8603.000 110.690 110.690 8604.000 110.687 110.687 8605.000 110.684 110.684 8606.000 110.681 110.681 8607.000 110.678 110.678 8608.000 110.676 110.676 8609.000 110.673 110.673 8610.000 110.670 110.670 8611.000 110.667 110.667 8612.000 110.664 110.664 8613.000 110.661 110.661 8614.000 110.658 110.658 8615.000 110.656 110.656 8616.000, 110.653 110.653 8617.000 110.650 110.650 8618,000 110.647 110.647 8619.000 110.644 110.644 8620.000 110.641 110.641 8621.000 110.638 110.638 8622.000 110.635 110.635 8623.000 110.633 110.633 8624.000 110.630 110.630 8625.000 110.627 110.627 8626.000 110,624 110.624 8627.000 110.621 110,621 8628.000 110.618 110.618 8629.000 110.615 110.615 8~30.000 110.612 110.612 8631.000 110.609 110.609 8632.000 110.606 110.606 8633.000 110.603 110.603 8634.000 110.600 110.600 8635.000 110.598 110.598 8636.000 110.595 110.595 8637.000 110.592 110.592 8638.000 110.589 110.589 8639.000 110.586 110.586 8640.000 110.583 110.583 8641.000 110.580 110.580 8642.000 110.577 110.577 8643.000 110.574 110.574 8644.000 110.571 110.571 8645.000 110.568 110.568 8646,000 110.565 110.565 8647.000 110.562 110.562 8648.000 110.559 110.559 8649.000 110.556 110.556 8650.000 110.553 110.553 8651.000 110.550 110.550 8652.000 110.547 110.547 8653.000 110.544 110.544 8654,000 110.541 110.541 8655.000 110.538 110.538 8656.000 110.535 110.535 8657.000 110.532 110.532 8658.000 110.529 110.529 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BS!A-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCCIA 123 11-17-2018 Attachment 1 Page 266 of 27 4 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8659.000 110.526 110.526 8660.000 110.523 110.523 8661.000 110.520 110.520 8662.000 110.517 110.517 8663.000 110.514 110.514 8664.000 110.511 110.511 8665.000 110.508 110.508 8666.000 110.505 110.505 8667.000 110.502 110.502 8668.000 110.499 110.499 8669.000 fl0.496 110.496 8670.000 110.493 110.493 8671.000 110.490 110.490 8672.000 110.486 110.486 8673.000 110.483 110.483 8674.000 110.480 110.480 8675.000 110.477 110.477 8676.000 110.474 110.474 8677.000 110.471 110.471 8678.000 110.468 110.468 8679.000 110.465 110.465 8680.000 110.462 110.462 8681.000 110.459 110.459 8682.000 110.456 110.456 8683.000 110.452 110.452 8684.000 110.449 110.449 8685.000 110.446 110.446 8686.000 110.443 110.443 8687.000 110.440 110.440 8688.000 110.437

  • 110.437 8689.000 110.434 110.434 8690.000 110.431 110.431 8691.000 110.427 110.427 8692.000 110.424 110.424 8693.000 110.421 110.421 8694.000 110.418 110.418 8695.000 110.415 110.415 8696.000 110.412 110.412 8697.000 110.408 110.408 8698.000 110.405 110.405 8699.000 110.402 110.402 8700.000 110.399 110.399 8701.000 110.396 110.396 8702.000 110.393 110.393 8703.000 110.389 110.389 8704.000 110.386 110.386 8705.000 110.383 110.383 8706.000 110.380 110.380 8707.000 110.377 110.377 8708.000 110.373 110.373 8709.000 110.370 110.370 8710.000 110.367 110.367 8711.000 110.364 110.364 8712.000 110.361 110.361 8713.000 110.357 110.357 8714.000 110.354 110.354 8715.000 110.351 110.351 8716.000 110.348 110.348 8717.000 110.344 110.344 8718.000 110.341 110.341 8719.000 110.338 110.338 8720.000 110.335 110.335 8721.000 110.331 110.331 8722.000 110.328 110.328 8723.000 110.325 110.325 8724.000 110.322 110.322 8725.000 110.318 110.318 8726.000 110.315 110.315 8727.000 110.312 110.312 8728.000 110.308 110.308 8729.000 110.305 110.305 8730.000 110.302 110.302 8731.000 110.298 110.298 8732.000 110.295 110.295 8733.000 110.292 110.292 8734.000 110.289 110.289 8735.000 110.285 110.285 8736.000 110.282 110.282 8737.000 110.279 110.279 8738.000 110.275 110.275 8739.000 110.272 110.272 8740.000 110.269 110.269

' 8741.000 110.265 110.265 8742.000 110.262 110.262 8743,000 110.258 110.258 8744.000 110.255 110.255 8745.oilo 110.252 110.252 8746.000 110.248 110.248 8747.000 110.245 110.245 8748.000 110.242 110.242 8749.000 110.238 110.238 8750.000 110.235 110.235 8751.000 110.231 110.231 8752.000 110.228 110.228 8753.000 110.225 110.225 8754.000 110.221 110.221 8755.000 110.218 110.218 8756.000 110.214 110.214 8757,000 110.211 110.211 8758.000 110.208 110.208 8759.000 110.204 110.204 8760.000 110.201

  • 110.201 8761.000 110.197 110.197 8762.000 110.194 110.194 8763.000 110.190 110.190 8764.000 110.187 110.187 8765.000 110.184 110.184 8766,000 110.180 110.180 8767.000 110.177 110.177 8768.000 110.173 110.173 8769,000 110.170 110.170 8770.000 110.166 110.166 8771.000 110.163 110.163 8772.000 110.154 110.154 8773.000 110.154 110.154 8774.000 110.154 110.154 8775.000 110.154 110.154 8776.000 110.149 110.149 8777.000 110.147 110.147 8778.000 110.146 110.146 8779.000 110.144 110.144 8780.000 110.142 110.142 8781.000 110.140 110.140 8782.000 110.138 110.138 8783.000 110.136 110.136 8784.000 110.134 110.134 8785.000 110.132 110.132 8786.000 110.130 1.10.130 8787.000 110.129 110.129 8788.000 110.127 110.127 8789.000 110.125 110.125 8790.000 110.123 110.123 8791.000 110.121 110.121 8792.000 110.119 110.119 8793.000 110.117 110.117 8794.000 110.115 110.115 8795.000 110.114 110.114 8796.000 110.112 110.112 8797.000 110.110 110.110 8798.000 110.108 110.108 8799.000 110.106 110.106 8800.000 110.104 110.104 8801.000 110.102 110.102 8802.000 110.100 110.100 8803.000 110.098 110.098 8804.000 110.097 110.097 8805.000 110.095 110.095 8806.000 110.093 110.093 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 124 11-17-2018 Attachment 1 Page 267 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 8807.000 110.091 110.091 8808.000 110.089 110.089 8809.000 110.087 ]10.087 8810.000 ]10,085 110.085 8811.000 110.083 110.083 8812.000 110.082 110.082 8813.000 110.080 110.080 8814.000 ]10,078 110.078 8815.000 110.076 110.076 8816.000 110.074 110.074 8817.000 110.072 ll0.072 8818.000 ]10,070 110.070 8819.000 110.068 110.068 8820.000 ]10.067 110.067 8821.000 ll0.065 110.065 8822.000 110.063 110.063 8823.000 110.061 ll0.061 8824.000 ll0.059 110.059 8825.000 110.057 H0.057 8826.000 110.055 110.055 8827.000 110.054 110.054 8828.000 110.052 110.052 8829.000 110.050 110.050 8830.000 110.048 110.048 8831.000 110.046 ll0.046 8832.000 ll0.044 110.044 8833.000 ]10.042 110.042 8834.000 ]10.040 ]10.040 8835.000 110.039 110.039 8836.000 ]10,037 110.037 8837.000 ]10.035 ]10.035 8838.000 110.033 ll0.033 8839.000 110.031 110.031 8840.000 ll0.029 110.029 8841.000 110.027 110.027 8842.000 110.026 110.026 8843.000 110.024 110.024 8844.000 ll0.022 110.022 8845.000 110.020 110.020 8846.000 ll0.018 ll0.018 8847.000 ll0,!ll6 ll0.016 8848.000 110.014 110.014 8849.000 ll0.012 ll0.012 8850.000 ll0.011 110.011 8851.000 110.009 110.009 8852.000 110.007 110.007 8853.000

  • 110.005 110.005 8854.000 110.003 110.003 8855.000 110.001 110.001 8856.000 109.999 109.999 8857.000 109.998 109.998 8858.000 109.996 109.996 8859.000 109.994 109.994 8860.000 109.992 109.992 8861.000 109.990 109.990 8862.000 109.988 109.988 8863.000 109.986 109.986 8864.000 109.985 109.985 8865.000 109.983 109.983 8866.000 109.981 109.981 8867.000 109.979 109.979 8868.000 109.977 109.977 8869.000 109.975 109.975 8870.000 109.974 109.974 8871.000 109.972 109.972 8872.000 109.970 109.970 8873.000 109.968 109.968 8874.000 109.966 109.966 8875.000 109.964 109.964 8876.000 109.962 109.962 8877.000 109.961 109.961 8878.000 109.959 109.959 8879.000 109.957 109.957 8880.000 109.955 109.955 8881.000 109.953 109.953 8882.000 109.951 109.951 8883.000 109.949 109.949 8884.000 109.948 109.948 8885.000 109.946 109.946 8886.000 109.944 109.944 8887.000 109.942 109.942 8888.000 109.940 109.940 8889.000 109.938 109.938 8890.000 109.937 109.937 8891.000 . 109.935 109.935 8892.000 109.933 109.933 8893.000 109.931 109.931 8894.000 109.929 109.929 8895.000 109.927 109.927 8896.000 109.926 109.926 8897.000 109.924 109.924 8898.000 109.922 109.922 8899.000 109.920 109.920 8900.000 109.918 109.918 8901.000 109.916 109.916 8902.000 109.914 109.914 8903.000 109.913 109.913 8904.000 109.911 109.911 8905.000 109.909 109.909 8906.000 109.907 109.907 8907.000 109.905 109.905 8908.000 109.903 109.903 8909.000 109.902 109.902 8910.000 109.900 109.900 8911.000 109.898 109.898 8912.000 109.896 109.896 8913.000 109.894 109.894 8914.000 109.892 109.892 8915.000 109.891 109.891 8916.000 109.889 109.889 8917.000 109.887 109.887 8918.000 109.885 109.885 8919.000 109.883 109.883 8920.000 109.881 109.881 8921.000 109.880 109.880 8922.000 109.878 109.878 8923.000 109.876 109.876 8924.000 109.874 109.874 8925.000 109.872 109.872 8926.000 109.870 109.870 8927.000 109.869 109.869 8928.000 109.867 109.867 8929.000 109.865 109.865 8930.000 109.863 109.863 8931.000 109.861 109.861 8932.000 109.860 109.860 8933.000 109.858 109.858 8934.000 109.856 109.856 ' 8935.000 109.854 109.854 8936.000 109.852 109.852 8937.000 109.850 109.850 8938.000 109.849 109.849 8939.000 109.847 109.847 8940.!)00 109.845 109.845 8941.000 109.843 109.843 8942.000 109.841 109.841 8943.000 109.839 109.839 8944.000 109.838 109.838 8945.000 109.836 109.836 8946.000 109.834 109.834 8947.000 109.832 109.832 8948.000 109.830 109.830 8949.000 109.829 109.829 8950.000 109.827 109.827 8951.000 109.825 109.825 8952.000 109.823 109.823 8953.000 109.821' 109.821 8954.000 109.819 109.819 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study DCMCCIA 125 11-17-2018 Attachment 1 Page 268 of 27 4 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time* V-V+ Time V-V+ Time V-V+ ----8955.000 109.818

  • 109.818 8956.000 109.816 109.816 8957.000 109.814 109.814 8958.000 109.812 109.812 8959.000 109.810 109.810 8960.000 109.807 109.807 8961.000 109.805 109.805 8962.000 109.803 109.803 8963.000
  • 109.801 109.801 8964.000 109.799 109.799 8965.000 109.797 109.797 8966.000 109.795 109.795 8967.000 109.793 109.793 8968.000 109.791 109.791 8969.000 109.789 109.789 8970.000 109.786 109.786 8971.000 109.784 109.784 8972.000 109.782 109.782 8973.000 109.780 109.780 8974.000 109.778 109.778 8975.000 109.776' 109.776 8976.000 109.774 109.774 8977.000 109.771 109.771 8978.000 109.769 109.769 8979.000 109.767 109.767 8980.000 109.765 109.765 8981.000 109.763 109.763 8982.000 109.761 109.761 8983.000 109.759 109.759 8984.000 109.756 109.756 8985.000 109.754 109.754 8986.000 109.752 109.752 8987.000 109.750 109.750 8988.000 109.748 109.748 8989.000 109.746 109.746 8990.000 109.743 109.743 8991.000 109.741 109.741 8992.000 109.739 109.739 8993.000 109.737 109.737 8994.000 109.735 109.735 8995.000 109.732 109.732 8996.000 109.730 109.730 8997.000 109.728 109.728 8998.000 109.726 109.726 8999.000 109.724 109.724 9000.000 109.721 109.721 9001.000 109.719 109.719 9002.000 109.717 109.717 9003.000 109.715 109.715 9004.000 109.712 109.712 9005.000 109.710 109.710 9006.000 109.708 109.708 9007.000 109.706 109.706 9008.000 109.704 109.704 9009.000 109.701 109.701 9010.000 109.699 109.699 9011.000 109.697 109.697 9012.000 109.695 109.695 9013.000 109.692 109.692 9014.000 109.690 109.690 9015.000 109.688 109.688 9016.000 109.686 109.686 9017.000 109.683 109.683 9018.000 109.681 109.681 9019.000 109.679 109.679 9020.000 109.676 109.676 9021.000 109.674 109.674 9022.000 109.672 109.672 9023.000 109.670 109.670 9024.000 109.667 109.667 9025.000 109.665 109.665 9026.000 109.663 109.663 9027.000 109.660 109.660 9028.000 109.658 109.658 9029.000 109.656 109.656 9030.000 109.654 109.654 9031.000 109.651 109.651 9032.000 109.649 109.649 9033.000 109.647 109.647 9034.000 109.644 109.644 9035.000 109.642 109.642 9036.000 109.640 109.640 9037.000 109.637 109.637 9038.000 109.635 109.635 9039.000 109.633 109.633 9040.000 109.630 109.630 9041.000 109.628 109.628 9042.000 109.626 109.626 9043.000 109.623 109.623 9044.000 109.621 109.621 9045.000 109.619 109.619 9046.000 109.616 109.616 9047.000 109.614 109.614 9048.000 109.611 109.611 9049.000 109.609 109.609 9050.000 109.607 109.607 9051.000 109.604 109.604 9052.000 109.602 109.602 9053.000 109.600 109.600 9054.000 109.597 109.597 9055.000 109.595 109.595 9056.000 109.592 109.592 9057.000 109.590 109.590 9058.000 109.588 109.588 9059.000 109.585 109.585 9060.000 109.583 109.583 9061.000 109.580 109.580 9062.000 109.578 109.578 9063.000 109.576 109.576 9064.000 109.573 109.573 9065.000 109.571 109.571 9066.000 109.568 109.568 9067.000 109.566 109.566 9068.000 109.563 109.563 9069.000 109.561 109.561 9070.000 109.559 109.559 9071.000 109.556 109.556 9072.000 109.554 109.554 9073.000 109.551 109.551 9074.000 109.549 109.549 9075.000 109.546 109.546 9076.000 109.544 109.544 9077.000 109.541 109.541 9078.000 109.539 109.539 9079.000 109.536 109.536 9080.000 109.534 109.534 9081.000 109.531 109.531 9082.000 109.529 109.529 9083.000 109.526 109.526

-9084.000 109.524 109.524 9085.000 109.521 109.521 9086.000 109.519 109.519 9087.000 109.516 109.516 9088.000 109.514 109.514 9089.000 109.511 109.511 9090.000 109.509 109.509 9091.000 109.506 109.506 9092.000 109.504 109.504 9093.000 109.501 109.501 9094.000 109.499 109.499 9095.000 109.496 109.496 9096.000 109.494 109.494 9097.000 109.491 109.491 9098.000 109.489 109.489 9099.000 109.486 109.486 9100.000 109.483 109.483 9101.000 109.481 109.481 9102.000 109.478 109.478 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously Attachment 1 Page 269 of 27 4 for greater than 24 Hrs 0 Project: Clinton Flex Study ETAP

  • Page: 126 Location:

KC! 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Revision:

Base Study Case: BSIA-48 Filename:

CPS SBO Study Config.: Normal DIV I Batte!)' IA 48-Hour Coping Study DCMCClA Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 9103.000 109.476 109.476 9104.000 109.473 109.473 9105.000 109.471 109.471 9106.000 109.468 109.468 9107.000 109.465 109.465 9108.000 109.463 109.463 9109.000 109.460 109.460 9110.000 109.458 109.458 9111.000 109.455 109.455 9112.000 109.453 109.453 9113.000 109.450 109.450 9114.000 109.447 109.447 9115.000 109.445 109.445 9116.000 109.442 109.442 9117.000 109.439 109.439 9118.000 109.437 109.437 9119.000 109.434 109.434 9120.000 109.432 109.432 9121.000 109.429 109.429 9122.000 109.426 109.426 9123.000 109.424 109.424 9124.000 109.421 109.421 9125.000 109.418 109.418 9126.000 109.416 109.416 9127.000 109.413 109.413 9128.000 109.410 109.410 9129.000 109.408 109.408 9130.000 109.405 109.405 9131.000 109.402 109.402 9132.000 109.400 109.400 9133.000 109.397 109.397 9134.000 109.394 109.394 9135.000 109.392 109.392 9136.000 109.389 109.389 9137.000 109.386 109.386 9138.000 109.383 109.383 9139.000 109.381 109.381 9140.000 109.378 109.378 9141.000 109.375 109.375 9142.000 109.373 109.373 9143.000 109.370 109.370 9144.000 109.367 109.367 9145.000 109.364 109.364 9146.000 109.362 109.362 9147.000 109.359 109.359 9148.000 109.356 109.356 9149.000 109.353 109.353 9150.000 109.351 109.351 9151.000 109.348 109.348 9152.000 109.345 109.345 9153.000 109.342 109.342 9154.000 109.340 109.340 9155.000 109.337 109.337 9156.000 109.334 109.334 9157.000 109.331 109.331 9158.000 109.328 109.328 9159.000 109.326 109.326 9160.000 109.323 109.323 9161.000 109.320 109.320 9162.000 109.317 109.317 9163.000 109.314 109.314 9164.000 109.312 109.312 9165.000 109.309 109.309 9166.000 109.306 109.306 9167.000 109.303 109.303 9168.000 109.300 109.300 9169.000 109.297 109.297 9170.000 109.295 109.295 9171.000 109.292 109.292 9172.000 109.289 109.289 9173.000 109.286 109.286 9174.000 109.283 109.283 9175.000 109.280 109.280 9176.000 109.277 109.277 9177.000 109.274 109.274 9178.000 109.272 109.272 9179.000 109.269 109.269 9180.000 109.266 109.266 9181.000 109.263 109.263 9182.000 109.260 109.260 9183.000 109.257 109.257 9184.000 109.254 109.254 9185.000 109.251 109.251 9186.000 109.248 109.248 9187.000 109.245 109.245 9188.000 109.242 109.242 9189.000 109.240 109.240 9190.000 109.237 109.237 9191.000 109.234 109.234 9192.000 109.231 109.231 9193.000 109.228 109.228 9194.000 109.225 109.225 9195.000 109.222 109.222 9196.000 109.219 109.219 9197.000 109.216 109.216 9198.000 109.213 109.213 9199.000 109.210 109.210 9200.000 109.207 109.207 9201.000 109.204 109.204 9202.000 109.201 109.201 9203.000 109.198 109.198 9204.000 109.195 109.195 9205.000 109.192 109.192 9206.000 109.189 109.189 9207.000 109.186 109.186 9208.000 109.183 109.183 9209.000 109.180 109.180 9210.000 109.177 109.177 9211.000 109.174 109.174 9212.000 109.171 109.171 9213.000 109.168 109.168 9214.000 109.165 109.165 9215.000 109.162 109.162 9216.000 109.158 109.158 9217.000 109.155

  • 109.155 9218.000 109.152 109.152 9219.000 109.149 109.149 9220.000 109.146 109.146 9221.000 109.143 109.143 9222.000 109.140 109.140 9223.000 109.137 109.137 9224.000 109.134 109.134 9225.000 109.131 109.131 9226.000 109.128 109.128 9227.000 109.124 109.124 9228.000 109.121 109.121 9229.000 109.118 109.118 9230.000 109.115 109.115 9231.000 109.112 109.112 9232.000 109.109 109.109 9233.000 109.106 109.106 9234.000 109:102 109.102 9235.000 109.099 109.099 9236.000 109.096 109.096 9237.000 109.093 109.093 9238.000 109.090 109.090 9239.000 109.087 109.087 9240.000 109.083 109.083 9241.000 109.080 109.080 9242.000 109.077 109.077 9243.000 109.074 109.074 9244.000 109.071 109.071 9245.000 109.067 109.067 9246.000 109.064 109.064 9247.000 109.061 109.061 9248.000 109.058 109.058 9249.000 109.054 109.054 9250.000 109.051 109.051 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA 127 11-17-2018 Attachment 1 Page 270 of 27 4 KCICONSULT

Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 9251.000 109.048 109.048 9252.000 109.045 109.045 9253.000 109.041 109.041 9254.000 109.038 109.038 9255.000 109.035 109.035 9256.000 109.032 109.032 9257.000 109.028 109.028 9258.000 109.025 109.025 9259.000 109.022 109.022 9260.000 109.018 109.018 9261.000 109.015 109.015 9262.000

  • 109.012 109.012 9263.000 109.008 109.008 9264.000 109.005 109.005 9265.000 109.002 109.002 9266.000 108.998 108.998 9267.000 108.995 108.995 9268.000 108.992 108.992 9269.000 108.988 108.988 9270.000 108.985 108.985 9271.000 108.982 108.982 9272.000 108.978 108.978 9273.000 108.975 108.975 9274.000 108.972 108.972 9275.000 108.968 108.968 9276.000 108.965 108.965 9277.000 108.961 108.961 9278.000 108.958 108.958 9279.000 108.955 108.955 9280.000 108.951 108.951 9281.000 108.948 108.948 9282.000 108.944 108.944 9283.000 108.941 108.941 9284.000 108.937
  • 108.937 9285.000 108.934 108.934 9286.000 108.931 108.931 9287.000 108.927 108.927 9288.000 108.924 108.924 9289.000 108.920 108.920 9290.000 108.917 108.917 9291.000 108.913 108.913 9292.000 108.910 108.910 9293.000 108.906 108.906 9294.000 108.903 108.903 9295.000 108.899 108.899 9296.000 108.896 108.896 9297.000 108.892 108.892 9298.000 108.889 108.889 9299.000 108.885 108.885 9300.000 108.882 108.882 9301.000 108.878 108.878 9302.000 108.874 108.874 9303.000 108.871 108.871 9304.000 108.867 108.867 9305.000 108.864 108.864 9306.000 108.860 108.860 9307.000 108.857 108.857 9308.000 108.853 108.853 9309.000 108.849 108.849 9310.000 108.846 108.846 9311.000 108.842 108.842 9312.000 108.839 108.839 9313.000 108.835 108.835 9314.000 108.831 108.831 9315.000 108.828 108.828 9316.000 108.824 108.824 93!7.000 108.820 108.820 9318.000 108.817 108.817 9319.000 108.813 108.813 9320.000 108.809 108.809 9321.000 108.806 108.806 9322.000 108.802 108.802 9323.000 108.798 108.798 9324.000 108.795 108.795 9325.000 108.791
  • 108.791 9326.000 108.787 108.787 9327.000 108.784 108.784 9328.000 108.780 108.780 9329.000 108.776 108.776 9330.000 108.772 108.772 9331.000 108.769 108.769 9332.000 108 .. 765 108.765 9333.000 108.761 108.761 9334.000 108.757 108.757 9335.000 *. 108.754 108.754 9336.000 108.750 108.750 9337.000 108.746 108.746 9338.000 108.742 108.742 9339.000 108.738 108.738 9340.000 108.735 108.735 9341.000 108.731 108.731 9342.000 108.727 108.727 9343.000 108.723 108.723 9344.000 108.719 108.719 9345.000 108.716 108.716 9346.000 108.712 108.712 9347.000 108.708 108.708 9348.000 108.704 108.704 9349.000 108.700 108.700 9350.000 108.696 108.696 9351.000 108.692 108.692 9352.000 108.688 108.688 9353.000 108.685 108.685 9354.000 108.681 108.681 9355.000 108.677 108.677 9356.000 108.673 108.673 9357.000 108.669 108.669 9358.000 108.665 108.665 9359.000 108.661 108.661 9360.000 108.657 108.657 9361.000 108.653 108.653 9362.000 108.649 108.649 9363.000 108.645 108.645 9363.333 108.644 119.654 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Location:

Contract:

Engineer:

Clinton Flex Study KCI Badar Hussain DIV 1 Battery lA 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT lA Sizing 48 HR -DWIBA.1TU 2500 2000 1500 !000 500 1000 2000 3000 ETAP 14.1.0N Study Case: BSlA-48 Discharged Battery Capacity 4000 5000 Tlmt!{.\li11.)

6-000 7000 8000 Date: SN: Attachment 1 Page 271 of 274 11-16-2018 KC I CONSULT Revision:

Base Con fig.: Normal 9000 IO 00 EC 626319 10.4 ETAP Reports for.CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs ETAP Project: Clint.on Flex Study 14 .1. ON Location:

KC! Contract:

Engineer:

Badar Hussain Study Case: BSlA-48 DIV 1 Battery lA 4 8-Hour Coping Study Project File: CPS SBO Study Output Report: BATT 1A Sizing 48 HR Battery Voltage -D/1'/ BAIT IA 130 125 120 110 !OS Date: SN: Attachment 1 Page 272 of 27 4 11-16-2018 KCICONSULT Revision:

Base Config. : Normal 100+-+-+-+-+--+--+--+--+-+-+-+--t--t--1--1--1r-r-t-t-t-+-+-+-+-+-+-+--t--t--t--t--t--+-+-+-+-+--1--1r-t-t-t-+-+-+-+-+--+--+--, 1000 2000 3000 4000 ,ooo Time(J/i11.)

6000 7000 8000 9000 10000 EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain DIV 1 Battery lA 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT 1A Sizing 48 HR -DCMCCJA.

40 JO 10 1obo Jobo 40~ ETAP 14 .1. ON Study Case: B~lA-48 Bus Load sobo Tlnw(Min.)

1060 sobo Attachment 1 Page 273 of 27 4 Date: SN: 11-16-2018 KCICONSULT Revision:

Base Config. : Normal I 9060 10Joo EC 626319 10.4 ETAP Reports for CASE 1.1 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Clinton Flex Study Location:

KCI Contract:

Engineer:

Badar Hussain DIV 1 Battery lA 48-Hour Coping Study Project File: CPS SEO Study Output Report: BATT lA Sizing 4 8 HR -DCMCCIA IJO 125 120 110 105 ETAP 14.1.0N Study Case: BSlA-48 Bus Voltage Date: SN: Attachment 1 Page 274 of 274 11~16-2018 KC I CONSULT Revision:

Base Config. : Normal 1004--1--l--+--+-4--+-+-+-+-l--l--1---!--!--!---ll-l-l--l--l---l-4--l-4--l--l--l-4--+-+-+-l--l---!--!---l---ll-l--l--l---l-4-4--l--l--l-4--+-+--I 1000 2000 3000 4000 SOOD nme(Min.)

6000 7000 8000 9000 1000 EC 626319 Project: Location:

Contract:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KC! ETAP 14.1.0N Page: Date: SN: 11-17-2018 KCICONSULT Engineer:

Badar Hussain Revision:

Base Filename:-

CPS SBO Study DIV I Battery IA 48-Hour Coping Study Number of Buses: Number *of Converters:

Number of Branches:

Number of Batteries:

Number of Loads: Unit System: Project File: Output File: Voltage Reg. 0 Charger 0 Cable Battery Motor 0 English* CPS SBO Study Study Case: BS!AIRCIC-48 Electrical Transient Analyzer Program Battery Sizing Calculation Battery ID: DIV I BATT IA2 Duty Cycle Category:

Nonna) Duty Cycle from: DC Load Flow Calculation Load Duration:

Duty Cycle Span Diversity Factor: I 00 % Load Total 2 2 UPS Inverter DC Converter 0 0 0 Impedance Tie PD Total 0 0 Static Load Lumped Load Composite CSD 13 0 0 C:\Badar\CLINTON DC\CPS SBO Study\BATT IA2 Sizing48 Hr.OBIS Config.: Nonna! Total 0 Total 13 Attachment 1 Page 1 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCI~ for greater than 4 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Bus and Connected Load Data Bus Connected Load ID V ID Type V FLA DCMCC1A2 125.00 1A2 Load(Os-ls)

Static Load 120.00 280.20 DCMCC1A2 125.00 1A2 Load(ls-60s) . Static Load 120.00 109.20 2 11-17-2018 KCICONSULT Base Normal DCMCC1A2 125.00 1A2 Load(60s-lh)

Static Load 120.00 96.81 , DCMCC1A2 125.00 1A2 Load(lh-24h)

Static Load 120.00 12.24 DCMCC 1A2 125.00 1A2 Load(20h8s-20hlls)

Static Load 120.00 ll0.00 DCMCC1A2 125.00 1A2 Load(20hl ls-20h60s)

Static Load 120.00 55.00 DCMCC1A2 125.00 1 A2 Load(20h l 5s-20hl 8s) Static Load 120.00 181.40 DCMCC 1A2 125.00 1A2 Load(20hl8s-20h45s)

  • Static Load 120.00-44.40 DCMCC 1A2 125.00 1A2 Load(24h-48h)

Static Load 120.00 12.24 DCMCC 1A2 125.00 1A2 ADS(lh-24h)

Static Load 120.00 0.38 DCMCC 1A2 125.00 1 A2 ADS(24h-48h)

Static Load 120.00 0.38 DCMCC 1A2 125.00 1 A2 Load(20h-24h)

Static Load 120.00 62.86 DCMCC 1A2 125.00 1 A2 Load(24h-40h)

Static Load 120.00 62.86 Attachment 1 Page 2 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously. . for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Cable Input Data 3 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 3 of 85 Cable Connected Buses ohms or micro H / l 000 ft per Conductor ID From To Length(ft)

  1. /Phase T('C) R L IDC01A/B2 BATT1ABUS2 DCMCC 1A2 10.0 90 0.15400 0.00 , Cable resistance listed at the specified temperature EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KC! Badar Hussain CPS_SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: SN: Revision:

Config.: 4 11-17-2018 KCICONSULT Base Normal DIV I Battery IA 48-Hour Coping Study Branch/ Converter/

UPS Connections CKT/Branch Connected Bus ID Impedance ID Type From Bus To Bus (ohm) (%) 100 MVAb IDCOIA/B2 Cable BATTIABUS2 ,DCMCCIA2 0.00364 2543.13 Attachment 1 Page 4 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KCI Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study ,/ Duty Cycle Load ID: 1A2 ADS(lh-24h)

Constant Current Load Non-Random Load Random Load t1 (s) 3600.000 t2 (s) 86599.980 Amp. 0.38 Duration (s) Load ID: 1A2 ADS(24h-48h)

Constant Current Load Amp Non-Random Load Random Load t1 (s) t2 (s) Amp . 86599. 980 144199. 980 0.38 Duration (s) Amp Load ID: 1A2 Load(Os-ls)

Constant Current Load Non-Random Load Random Load ti (s) 0.000 t2 (s) 1.000 Amp 280.20 Duration (s) Amp Load ID: 1A2 Load(lh-24h)

Constant Current Load Non-Random Load Random Load ti (s) 3600.000 t2 (s) 86599.980 Amp 12.24 Duration (s) Amp Load ID: 1A2 Load(ls-60s)

Constant Current Load Non-Random Load Random Load ti (s) 1.000 12 (s) 60.000 Amp 109.20 Duration (s) Amp 5 11-17-2018 KCICONSULT Base Normal ,/ Attachment 1 Page 5 of 85 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously Project: Location:

Contract:

Clinton Flex Study KC! Engineer:

Hadar Hussain Filename:

'cps SBO Study DIV I Battery IA 48-Hour Coping Study for greater than 24 Hrs and with RCIC for greater than 4 Hrs 1

Constant Current Load Non-Random Load Random Load t1 (s) 72010.980 t2 (s) 72060.000 Amp 55.00 Duration (s) Load ID: 1A2 Load(20h15s-20h18s)

Constant Current Load Amp Non-Random Load Random Load tl (s) 72015.000 t2 (s) 72018.000 Amp 181.40 Duration (s) Load ID: 1A2 Load(20h18s-20h45s)

Constant Current Load Amp Non-Random Load Random Load t1 (s) 72018.000 t2 (s) 72045.000 Amp 44.40 Duration (s) Load ID: 1A2 Load(20h-24h)

Constant Current Load Amp Non-Random Load Random Load t1 (s) 72000.000 t2 (s) 86599.980 Amp 62.86 Duration (s) Load ID: 1A2 Load(20h8s-20hlls)

Constant Current Load Amp Non-Random Load Random Load t1 (s) 72007.980 t2 (s) 72010.980 Amp ll0.00 Duration (s) Amp Page: Date: SN: Revision:

Config.: 6 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 6 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BS!AIRCIC-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Load ID: IA2 Load(24h-40h)

Constant Current Load Non-Random Load Random Load 11 (s) 12 (s) Amp Duration (s) 86599.980 144199.980 62.86 Load ID: 1A2 Load(24h-48h)

Constant Current Load Amp Non-Random Load Random Load t1 (s) 12 (s) Amp 86599.980 144199.980 12.24 Duration (s) Amp Load ID: 1A2 Load(60s-lh)

Constant Current Load Non-Random Load Random Load ti (s) 60.000 12 (s) 3600.000 . Amp 96.81 Duration (s) Amp 7 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 7 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ET AP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KCI Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: 8 11-17-2018 SN: KCICONSULT Revision:

Base , Config.: _.,I Nonna! DIV I Battery IA 48-Hour Coping Study Battery ID: DIV I BATT 1A2 Method: Load Flow Calculation Battery Load Profile for Sizing Non-Random Load Random Load ti 12 ti t2 (s) (s) Amp (s) (s) Amp 0.000 60.000 280.20 0.000 0.000 0.00 60.000 3600.000 96.81 3600.000 72000.000 12.62 72000.000 72060.000 311.88 72060.000 144199.980 75.48 144199.980 0.00 Batterv Load Profile for Discharge Non-Random Load Random Load ti 12 ti t2 (s) (s) Amp ,.J (s) (s) Amp 0.000 1.000 280.20 0.000 0.000 0.00 1.000 60.000 109.20 60.000 3600.000 96.81 3600.000 72000.000 12.62 72000.000 72007.980 75.48 72007.980 72010.980 185.48 72010.980 72015.000 130.48 72015.000 72018.000 311.88 72018.000 72045.000 174.88 72045.000 72060.000 130.48 72060.000 144199.980 75.48 144199.980 0.00 Attachment 1 Page 8 of 85 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Project: Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain Filename:

CPS SBO Study DIV I Battery IA 48-Hour Coping Study MFR: C&D Tech Model: CPS LCR-25 Type: Time vs amp No of Plates: 25 Capacity:

1800 AH I Min. A Rate: 1800 ETAP 14.1.0N Study Case: BSIAIRCIC-48 Battery Characteristics V/Cell: 2.063 Rp: 0.001404 Resistance/Positive Plate Temp: 25 °C Battery sizes given in the library are used. Ampere per Positive Plate as a Function of Time (minutes) and Voltage (volts)* Time 1.75 1.78 1.81 # 1.85 1.90 1.95 ------------------

1.00 150.00 129.75 109.00 83.83 50.34 21.42 15.00 121.42 109.17 95.50 76.17 47.26 20.78 30.00 101.00 92.92 83.58 68.75 42.00 19.10 60.00 76.25 71.83 66.42 56.75 38.27 19.76 120.00 52.00 49.88 47.00 41.63 29.70 18.00 180.00 40.00 38.50 36.63 33.00 24.89 14.70 240.00 31.20 31.63 30.25 27.50 20.00 12.00 300.00 27.50 26.75 24.80 23.63 17.75 10.80 480.00 18.88 18.50 17.88 16.75 13.46 8.90 720.00 13.38 13.13 12.75 12.13 10.00 6.65 960.00 10.70 10.34 10.10 9.35 7.85 5.35 1200.00 8.74 8.50 8.30 7.74 6.60 4.60 1440.00 7.40 7.30 7.15 6.70 5.65 4.10 1920.00 5.70 5.64 5.50 5.24 4.56 3.30 2400.00 4.70 4.62 4.58 4.38 3.80 2.80 2880.00 4.00 3.88 3.85 3.70 3.25 2.45 # Indicates the curve used in battery sizing.

  • The ampere value is missing in the battery library and this value was estimated based on user entered libraiy data. Page: Date: SN: Revision:

Config.: 9 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 9 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: SN: Revision:

Config.: DIV I Battery IA 48-Hour Coping Study Section Size for Non-Rand.

Load Calculation Results (I Strings) Section Size for Rand. Load 10 11-17-2018 KCICONSULT Base Nonual # t start tend Size/String Total Size # t start 0.000 tend 0.000 Size/String 0.000 Total Size ------0.000 1.000 2.571 2.571 0.000 2 0.000 60.000 1.473 1.473 3 0.000 1200.000 0.000 0.000 4 0.000 1201.000 4.729 4.729 5 0.000 2403.333 10.766 10.766 Attachment 1 Page 10 of 85 EC 626319 Project: Location:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP 14.1.0N Page: KCI Date: II 11-17-2018 .Attachment 1 Page 11 of 85 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Filename:

CPS SBO Study DIV I Battery IA 48-Hour Coping Study Period Study Case: BSIAIRCIC-48 Non-Random Loads (I Strings) Required Section Size (Positive Plates/String)

Revision:

Base Config.: Normal Required Total Section Size (Positive Plates) Load (amperes)

Change in Load (amperes)

Duration of Period (minutes)

Time to End of Section (minutes)

Capacity at T Min Rate (RT) (Str*Amp/PP)

Pos. Values ____ N~o.Values_Fos.

Values ___ Neg.Vnlues=:J Section I -First period only-If A2 is greater than Al, go to Section 2. A1=280 Al-0=280 Ml=! T=Ml=l 109.0 Section 1 Sub-Total:

Section 2 -First two periods only -If A3 is greater than A2, go to Section 3. A1=280 2 A2=97 Al-0=280 A2-Al~183 Ml=! M2=59 T=Ml+M2=60 T=M2=59 Total: 66.4 66.8 Section 2 Sub-Total:

Section 3 -First three periods only -If A4 is greater than A3, go to Section 4. Al= 2 A2= 3 A3= Al-0= A2-AI= A3-A2= Ml= M2= M3= T=Ml+M2+M3=

T=M2+M3= T=M3= Total: Section 3 Sub-Total:

Total: Section 4 -First four periods only -If AS is greater than A4, go to Section 5. A1=280 Al-0=280 Ml=i T=Ml+ ... +M4=1,201 8.3 2 A2=97 A2-A1~183 M2=59 T=M2+M3+M4=:I,200 8.3 3 A3=13 A3-A2~84 M3=1,140 T=M3+M4=1,141 8.7 4 A4=312 A4-A3=299 M4=1 T=M4e=I 109.0 Section 4 Sub-Total:

Total: Section 5 -First five periods only -If A6 is greater than AS, go to Section 6. Al=280 Al-0=280 Ml=! T=MI + ... +M5=2,403 4.6 2 A2=97 A2-Al~l83 M2=59 T=M2+ ... +M5=2,402 4.6 3 A3=13 A3-A2-84 M3=1,140 T=M3+M4+M5=2,343 4.7 4 A4=312 A4-A3=299 M4=1 T=M4+M5=1,203 8.3 5 A5=75 A5-A4-236 M5=1,202 T=M5=1,202 8.3 2.57 2.57 2.57 2.57 2.57 2.57 4.22 4.22 -2.75 -2.75 4.22 -2.75 4.22 -2.75 1.47 1.47 33.78 33.78 -22.10 -22.10 -9.70 -9.70 2.75 2.75 36.53 -31.80 36.53 -31.80 4.73 4.73 61.26 61.26 -40.08 -40.08 -18.03 -18.03 36.14 36.14 -28.53 -28.53 EC 626319 Pr.oject:

Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRCIC-48 Page: Date: SN: Revision:

Config.: 12 11-17-2018 KCICONSULT

Base Normal Attachment 1 Page 12 of 85 DIV I Battery IA 48-Hour Coping Study Period Load (amperes)

Change in Load (amperes)

Duration o(Period (minutes) (I Strings) Time to End Capacity at T of Section Min Rate (RT) (minutes) (Str*Amp/PP)

Section 5 Sub-Total:

Total: Required Section Size (Positive Plates/String)

Pos. Values 97.40 -86.63 10.77 Required Total Section Size (Positive Plates) Pos. Values 97.40 10.77 -86.63 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Project: Clinton Flex Study Location: , KC! Contract:

Engineer:

Filename:

Badar Hussain CPS SBO Study DIV I Battery IA 48-Hour Coping Study _Battery ID: Duty Cycle Category:

Load Duration:

Voltage Requirements:

System: Battery: Correction Factors(%):

Temperature 108.0 DIV I BATT 1A2 Nonna! Duty Cycle Span ETAP 14.1.0N Study Case: BSIAIRCIC-48 Batterv Sizing Summary Page Nominal Voltage = 125.00 Maximum System Voltage Deviation

= 120 % Minimum System Voltage Deviation

= 80 % Battery Charge Voltage= 2.30 V/Cell Battery Minimum Discharge Voltage= 1.81 V/Cell Temperature

= 18 *c (Battery minimum temperature)

Desirable Number of Cells =. 58 Design Margin 100 Aging 100 Initial Capacity 100 Calculated BatterySize Based on the Curve for 25 Plates: Required Number of Positive Plates Per String Total Max. Non-Rand.

Load: 10.766 10.766 Max Rand. Load: 0.000 0.000 Uncorrected:

10.766 10.766 Page: Date: SN: Revision:

Config.: Total 108.0 Corrected:

11.622 11.622 (Corrected by multiplying correction factor) Recommended Number of Total Plates per String: 25 Number of cells: Number of Strings: Rated Voltage: Rated Capacity:

Existing Battery: Number of Strings: Number of Positive Plates per String: Number of Total Positive Plates: 58 119.65 1800 Difference in Total Positive Plates between Existing and Required:

12 12 0.378 13 11-17-2018 Attachment 1 Page 13 of 85 KClCONSULT Base Nonna(

EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study KCI Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BSIAIRClC-48 Page: Date: SN: Revision:

Config.: DIV I Batteiy IA 48-Hour Coping Study Battery ID: Number of cells: Number of Strings: Rated Voltage:, Rated Capacity:

Duty Cycle Categoiy:

Load Duration:

Voltage Requirements:

System: Battery: Batterv Discharge Summarv Page DIV I BATT 1A2 58 119.65 1800 AH Normal Duty Cycle Span Nominal Voltage = 125.00 Maximum System Voltage Deviation

= 120 % Minimum System Voltage Deviation

80 % Batteiy Charge Voltage = 2.30 V /Cell Batteiy Minimum Discharge Voltage = 1.8 I V /Cell Temperature

18 *c (Batteiy minimum temperature)

Voltage Drop Calculation Parameters:

Time Step = 1.00 Minute Maximum Voltage Limit = 100.0 % Voltage Drop Calculation Parameters:

Load Duty Cycle -No One-minute Span Correction Factors (% ): Temperature Aging 108.0 100 Initial Capacity Total 100 108.0 14 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 14 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRC!C-48 Revision:

CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study Battery Discharge Tabulation Dischar2e Dischar2e 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ ----0.000 280.2 132.67 119.654 112.674 0.017 109.2 132.75 112.674 114.136 1.000 96.8 134.54 114.139 114.244 2.000 96.8 136.15 114.247 114.247 3.000 96.8 137.77 114.250 114.250 4.000 96.8 139.38 114.253 114.253 5.000 96.8 140.99 114.256 114.256 6.000 96.8 142.61 114.259 114.259 7.000 96.8 144.22 114.264 114.264 8.000 96.8 145.83 114.268 114.268 9.000 96.8 147.45 114.273 114.273 10.000 96.8 149.06 114.277 114.277 '11.000 96.8 150.67 114.282 114.282 12.000 96.8 152.29 114.287 114.287 13.000 96.8 153.90 114.291 114.291 14.000 96.8 155.51 114.296 114.296 15.000 96.8 157.13 114.301 114.301 16.000 96.8 158.74 114.305 114.305 17.000 96.8 160.36 114.310 114.~10 18.000 96.8 161.97 114.315 114.315 19.000 96.8 163.58 114.320 114.320 20.000 96.8 165.20 114.324 114.324 21.000 96.8 166.81 114.329 114.329 22.000 96.8 168.42 114.334 114.334 23.000 96.8 170.04 114.339 114.339 24.000 96.8 171.65 114.344 114.344 25.000 96.8 173.26 114.349 114.349 26.000 96.8 174.88 114.354 114.354 27.000 96.8 176.49 114.359 114.359 28.000 96.8 178.10 114.364 114.364 29.000 96.8 179.72 114.370 114.370 30.000 96.8 181.33 114.375 114.375 31.000 96.8 182.94 114.380 114.380 32.000 96.8 184.56 114.385 114.385 33.000 96.8 186.17 114.390 114.390 34.000 96.8 187.78 114.396 114.396 35.000 96.8 189.40 114.401

  • 114.401 36.000 96.8 191.01 114.406 114.406 37.000 96.8 192.63 114.412 114.412 38.000 96.8 194.24 114.417 114.417 39.000 96.8 195.85 114.423 114.423 40.000 96.8 197.47 114.428 114.428 41.000 96.8 199.08 114.434 114.434 42.000 96.8 200.69 -114.440 114.440 43.000 96.8 202.31 114.445 114.445 44.000 96.8 203.92 114.451 114.451 45.000 96.8 205.53 114.457 114.457 46.000 96.8 207.15 114.462 114.462 47.000 96.8 208.76 114.468 114.468 48.000 96.8 210.37 114.474 114.474 49.000 96.8 211.99 114.480 114.480 50.000. 96.8 213.60 114.486 114.486 51.000 96.8 215.21 114.492 114.492 52.000 96.8 216.83 114.498 114.498 53.000 96.8 218.44 114.504 114.504 54.000 96.8 220.05 114.510 114.510 55.000 96.8 221.67 114.516 114.516 56.000 96.8 223.28 114.522 114.522 51.000 96.8 224.90 114.528 114.528 58.000 96.8 226.51 114.535 114.535 59.000 96.8 228.12 114.541 114.541 60.000 12.6 229.74 114.547 115.420 61.000 12.6 229.95 . 115.421 115.421 62.000 12.6 230.16 115.422 115.422 63.000 12.6 230.37 115.423 115.423 64.000 12.6 230.58 115.425 115.425 65.000 12.6 230.79 115.426 115.426 66.000 12:6 231.00 115.427 115.427 Attachment 1 Page 15 of 85 EC 626319 l_ Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battety IA 48-Hour Coping Study Discharge Discharge 2 11-17-2018 KCICONSULT Base Nonnal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 67.000 12.6 231.21 115.428 115.428 68.000 12.6 231.42 115.430 115.430 69.000 12.6 231.63 115.431 115.431 70.000 12.6* 231.84 115.432 115.432 71.000 12.6 232.05 115.433 115.433 72.000 12.6 232.26 115.435 115.435 73.000 12.6 232.47 115.436 115.436 74.000 12.6 232.68 115.437 115.437 75.000 12.6 232.89 115.438 115.438 76.000 12.6 233.10 115.440 115.440 77.000 12.6 233.31 115.441 115.441 78.000 12.6 233.52 115.442 115.442 79.000 12.6 233.73 115.444 115.444 80.000 12.6 233.94 115.445 115.445 81.000 12.6 234.15 115.446 115.446 82.000 12.6 234.36 115.447 115.447 83.000 12.6 234.57 115.449 115.449 84.000 12.6 234.78 115.450 115.450 85.000 12.6 234.99 115.451 115.451 86.000 12.6 235.20 115.453 115.453 87.000 12.6 235.41 115.454 115.454 88.000 12.6 235.62 115.455 115.455 89.000 12.6 235.83 115.456 115.456 90.000 12.6 236.04 115.458 115.458 91.000 12.6 236.25 115.459 115.459 92.000 12.6 236.46 115.460 115.460 93.000 12.6 236.68 115.462 115.462 94.000 12.6 236.89 115.463 115.463 95.000 12.6 237.10 115.464 115.464 96.000 12.6 237.31 115.46°5 115.465 97.000 12.6 -237.52 115.465 115.465 98.000 12.6 237.73 115.466 .. 115.466 99.000 12.6 237.94 115.467 115.467 100.000 12.6 238.15 115.467 115.467 101.000 12.6 238.36 115.468 115.468 102.000 12.6 238.57 115.468 115.468 103.000 12.6 238.78 115.469 115.469 104.000 12.6 238.99 115.470 115.470 105.000 12.6 239.20 115.470 115.470 106.000 12.6 239.41 115.471 115.471 107.000 12.6 239.62 115.471 115.471 108.000 12.6 239.83 115.472 115.472 109.000 12.6 240.04 115.473 115.473 110.000 12.6 240.25 115.473 115.473 111.000 12.6 240.46 115.474 115.474 112.000 12.6 240.67 115.474 115.474 113.000 12.6 240.88 115.475 115.475 114.000 12.6 241.09 115.476 115.476 115.000 12.6 241.30 115.476 115.476 116.000 12.6 241.51 115.477 115.477 117.000 12.6 241.72 115.477 115.477 118.000 12.6 241.93 115.478 115.478 119.000 12.6 242.14 115.479 115.479 120.000 12.6 242.35 115.479 115.479 121.000 12.6 242.56 115.480 115.480 122.000 12.6 242.77 115.481 115.481 123.000 12.6 242.98 115.481 115.481 124.000 12.6 243.19 115.482 115.482 125.000 12.6 243.40 115.482 115.482 126.000 12.6 243.61 115.483 115.483 127.000 12.6 243.82 115.484 115.484 128.000 12.6 244.04 115.484 115.484 129.000 12.6 244.25 115.485 115.485 130.000 12.6 244.46 115.485 115.485 131.000 12.6 244.67 115.486 115.486 132.000 12.6 244.88 115.487 115.487 133.000 12.6 245.09 115.487 115.487 134.000 12.6 245.30 115.488 115.488 135.000 12.6 245.51 115.488 115.488 136.000 12.6 245.72 115.489 115.489 137.000 12.6 245.93 115.490 115.490 138.000 12.6 246.14 115.490 115.490 Attachment 1 Page 16 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ET.A.P Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 3 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)
y. V+ 139.000 12.6 246.35 115.491 115.491 140.000 12.6 246.56 115.492 115.492 141.000 12.6 246.77 115.492 115.492 142.000 12.6 246.98 115.493 115.493 143.000 12.6 247.19 115.493 115.493 144.000 12.6 247.40 115.494 115.494 145.000 12.6 247.61 115.495 115.495 146.000 12.6 247.82 115.495 115.495 147.000 12.6 248.03 115.496 115.496 148.000 12.6 248.24 115.497 115.497 149.000 12.6 248.45 115.497 115.497 150.000 12.6 248.66 115.498 115.498 151.000 12.6 248.87 115.498 115.498 152.000 12.6 249.08 115.499 115.499 153.000 12.6 249.29 115.500 115.500 154.000 12.6 249.50 115.500 115.500 155.000 12.6 249.71 115.501 115.501 156.000 12.6 249.92 115.501 115.501 157.000 12.6 250.13 115.502 115.502 158.000 12.6 250.34 115.503 115.503 159.000 12.6 250.55 115.503 115.503 160.000 12.6 250.76 115.504 115.504 161.000 12.6 250.97 115.505 115.505 162.000 12.6 251.18 115.505 115.505 163.000 12.6 251.39 115.506 115.506 164.000 12.6 251.61 115.507 115.507 165.000 12.6 251.82 115.507 115.507 166.000 12.6 252.03 115.508 115.508 167.000 12.6 252.24 115.508 115.508 168.000 12.6 252.45 115.508 115.508 169.000 12.6 252.66 115.508 115.508 170.000 12.6 252.87 115.508 115.508 171.000 12.6 253.08 115.507 115.507 172.000 12.6 253.29 115.507 115.507 173.000 12.6 253.50 115.507 115.507 174.000 12.6 253.71 115.507 115.507 175.000 12.6 253.92
  • 115.507 115.507 176.000 12.6 254.13 115.507 115.507 177.000 12.6 254.34 115.507 115.507 178.000 12.6 254.55 115.50~ 115.507 179.000 12.6 254.76 115.507 115.507 180.000 12.6 254.97 115.507 115.507 181.000 12.6 255.18 115.507 115.507 182.000 12.6 255.39 115.507 115.507 183.000 12.6 255.60 115.507 115.507 184.000 12.6 255.81 115.507 115.507 185.000 12.6 256.02 115.507 115.507 186.000 12.6 256.23 115.507 115.507 187.000 12.6 256.44 115.507 115.507 188.000 12.6 256.65 115.507 115.507 189.000 12.6 256.86 115.507 115.507 190.000 12.6 257.07 115.507 115.507 191.000 12.6 257.28 115.507 115.507 192.000 12.6 257.49 115.507 115.507 193.000 12.6 257.70 115.507 115.507 194.000 12.6 257.91 115.506 115.506 195.000 12.6 258.12 115.506 115.506 196.000 12.6 258.33 115.506 115.506 197.000 12.6 258.54 115.506 115.506 198.000 12.6 258.75 115.506 115.506 199.000 12.6 258.97 115.506 115.506 200.000 12.6 259.18 115.506 115.506 201.000 12.6 259.39 115.506 115.506 202.000 12.6 259.60 115.506 115.506 203.000 12.6 259.81 115.506 115.506 204.000 12.6 260.02 115.506 115.506 205.000 12.6 260.23 115.506 115.506 206.000 12.6 260.44 115.506 115.506 207.000 12.6 260.65 115.506 115.506 208.000 12.6 260.86 115.506 115.506 209.000 12.6 261.07 115.506 115.506 210.000 12.6 261.28 115.506 115.506 Attachment 1 Page 17 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIGfor greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Dischar2e Dischar2e 4 11-17-2018 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Volta2e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 211.000 12.6 261.49 115.506 115.506 212.000 12.6 261.70 115.506 115.506 213.000 12.6 261.91 115.506 115.506 214.000 12.6 262.12 115.506 115.506 215.000 12.6 262.33 115.506 115.506 216.000 12.6 262.54 115.506 115.506 217.000 12.6 262.75 115.505 115.505 218.000 12.6 262.96 115.505 115.505 219.000 12.6 263.17 115.505 115.505 220.000 12.6 263.38 115.505 115.505 221.000 12.6 263.59 115.505 115.505 222.000 12.6 263.80 115.505 115.505 223.000 12.6 264.01 115.505 115.505 224.000 12.6 264.22 115.505 115.505 225.000 12.6 264.43 115.505 . 115.505 226.000 12.6 264.64 115.505 115.505 227.000 12.6 264.85 115.505 115.505 228.000 12.6 265.06 115.505 115.505 229.000 12.6 265.27 115.505 115.505 230.000

  • 12.6 265.48 115.505 115.505 231.000 12.6 265.69 115.505 115.505 232.000 12.6 265.90 115.505 115.505 233.000 12.6 266.11 115.505 115.505 234.000 12.6 266.33 115.505 115.505 235.000 12.6 266.54 115.505 115.505 236.000 12.6 266.75 115.505 115.505 237.000 12.6 266.96 115.505 115.505 238.000 12.6 267.17 115.505 115.505 239.000 12.6 267.38 115.504 115.504 240.000 12.6 267.59 115.504 115.504 241.000 12.6 267.80 115.504 115.504 242.000 12.6 268.01 115.504 115.504 243.000 12.6 268.22 115.504 115.504 244.000 12.6 268.43 115.504 115.504 245.000 12.6 268.64 115.504 115.504 246.000 12.6 268.85 115.504 115.504 247.000 12.6 269.06 115.504 115.504 248.000 12.6 269.27 115.504 115.504 249.000 12.6 269.48 115.504 115.504 250.000 12.6 269.69 115.504 115.504 251.000 12.6 269.90 115.504 115.504 252.000 12.6 270.11 115.504 115.504 253.000 12.6 270.32 115.504 115.504 254.000 12.6 270.53 115.504 115.504 255.000 12.6 270.74 115.504 115.504 256.000 12.6 270.95 115.504 115.504 257.000 12.6 271.16 115.504 115.504 258.000 12.6 271.37 115.504 115.504 259.000 12.6 271.58 115.504 115.504 260.000 12.6 271.79 115.504 115.504 261.000 12.6 272.00 115.504 115.504 262.000 12.6 272.21 115.503 115.503 263.000 12.6 272.42 115.503 115.503 264.000 12.6 272.63 115.503 115.503 265.000 12.6 272.84 115.503 115.503 266.000 12.6 : 213.05 115.503 115.503 267.000 12.6 273.26 115.503 115.503 268.000 12.6 273.47 115.503 115.503 269.000 12.6 273.68 115.503 . 115.503 270.000 12.6 273.90 115.503 115.503 271.000 12.6 274.11 115.503 115.503 272.000 12.6 274.32 115.503 115.503 273.000 12.6 274.53 115.503 115.503 274.000 12.6 274.74 115.503 115.503 275.000 12.6 274.95 115.503 115.503 276.000 12.6 275.16 115.503 . 115.503 277.000 12.6 275.37 115.503 115.503 278.000 12.6 275.58 115.503 115.503 279.000 12.6 275.79 115.503 115.503 280.000 12.6 276.00 115.503 115.503 281.000 12.6 276.21 115.503 115.503 282.000 12.6 276.42 115.503 115.503 Attachment 1 Page 18 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BS!AlRCIC-48 Revision:

CPS SBO Study Config.: DIV 1 Batteiy IA 48-Hour Coping Study Discharge Discharge 5 11-17-2018 KCJCONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 283.000 12.6 276.63 115.503 115.503 284.000 12.6 276.84 115.503 115.503 285.000 12.6 277.05 115.502 115.502 286.000 12.6 277.26 115.502 115.502 287.000 12.6 277.47 '115.502 115.502 288.000 12.6 277.68 115.502 115.502 289.000 12.6 277.89 115.502 115.502 290.000 12.6 278.10 115.502 115.502 291.000 12.6 278.31 115.502 115.502 292.000 12.6 278.52 115.502 115.502 293.000 12.6 278.73 115.502 115.502 294.000 12.6 278.94 115.502 115.502 295.000 12.6 279.15 115.502 115.502 296.000 12.6 279.36 115.502 115.502 297.000 12.6 279.57 115.502 115.502 298.000 12.6 279.78 115.502 115.502 299.000 12.6 279.99 115.502 115.502 300.000 12.6 280.20 115.502 115.502 301.000 12.6 280.41 115.502 115.502 302.000 12.6 280.62 115.502 115.502 303.000 12.6 280.83 115.502 115.502 304.000 12.6 281.04 115.502 115.502 305.000 12.6 281.26 115.502 1)5.502 306.000 12.6 281.47 115.502 115.502 307.000 12.6 281.68 115.502 115.502 308.000 12.6 281.89 115.501 115.501 309.000 12.6 282.10 115.501 115.501 310.000 12.6 282.31 115.501 115.501 311.000 12.6 282.52 115.501 115.501 312.000 12.6 282.73 115.501 115.501 313.000 12.6 282.94 115.501 115.501 314.000 12.6 283.15 115.501 115.501 315.000 12.6 283.36 115.501 115.501 316.000 12.6 283.57 115.501 115.501 317.000 12.6 283.78 115.501 115.501 318.000 12.6 283.99 115.501 115.501 319.000 12.6 2~.20 115.501 115.501 320.000 12.6 284.41 115.501 115.501 321.000 12.6 284.62 115.501 115.501 322.000 12.6 284.83 115.501 115.501 323.000 12.6 285.04 115.501 115.501 324.000 12.6 285.25 115.501 115.501 325.000 12.6 285.46 115.501 115.501 326.000 12.6 285.67 115.501 115.501 327.000 12.6 285.88 115.501 115.501 328.000 12.6 286.09 115.501 115.501 329.000 12.6 286.30 115.501 115.501 330.000 12.6 286.51 115.500 115.500 331.000 12.6 286.72 115.500 115.500 332.000 12.6 286.93 115.500 115.500 333.000 12.6 287.14 115.500 115.500 334.000 12.6 287,35 115.500 115.500 335.000 12.6 287.56 115.500 115.500 336.000 12.6 287.77 115.500 115.500 337.000 12.6 287.98 115.500 115.500 338.000 12.6 288.19 115.500 115.500 339.000 12.6 288.40 115.500 115.500 340.000 12.6 288.62 115.500 115.500 341.000 12.6 288.83 115.500 115.500 342.000 12.6 289.04 115.500 115.500 343.000 12.6 289.25 115.500 115.500 344.000 12.6 289.46 115.500 115.500 345.000 12.6 289.67 115.500 115.500 346.000 12.6 289.88 115.500 115.500 347.000 12.6 290.09 115.500 115.500 348.000 12.6 290.30 115.500 115.500 349.000 12.6 290.51 115.500 115.500 350.000 12.6 290.72 115.500 115.500 351.000 12.6 290.93 115.500 115.500 352.000 12.6 291.14 115.500 115.500 353.000 12.6 291.35 115.499 115.499 354:000 12.6 291.56 115.499 115.499 Attachment 1 Page 19 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater-than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Dischar2e Dischar2e 6 11-17-2018 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Volta2e (V) Time ' (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 355.000 12.6 291.77 115.499 115.499 356.000 12.6 291.98 115.499 115.499 357.000 12.6 292.19 115.499 115.499 358.000 12.6 292.40 115.499 115.499 359.000 12.6 292.61 115.499 115.499 360.000 12.6 292.82 115.499 115.499 361.000 12.6 293.03 115.499 115.499 362.000 12.6 293.24 115.499 115.499 363.000 12.6 293.45 115.499 115.499 364.000 12.6 293.66 115.499 115.499 365.000 12.6 293.87 115.499 115.499 366.000 12.6 294.08* 115.499 115.499 / 367.000 12.6 294.29 115.499 115.499 368.000 12.6 294.50 115.499 115.499 369.000 .12.6 294.71 115.499 115.499 370.000 12.6 294.92 115.499 115.499 371.000 12.6 295.13 115.499 115.499 372.000 12.6 295.34 115.499 115.499 373.000 12.6 295.55 115.499 115.499 374.000 12.6 295.76 115.499 115.499 375.000 12.6 295.97 115.498 115.498 376.000 12.6 296.19 115.498 115.498

  • 377.000 12.6 296.40 .. 115.498 115.498 378.000 12.6 296.61 115.498 115.498 379.000 12.6 296.82 115.498 115.498 380.000 12.6 297.03 115.498 115.498 381.000 12.6 297.24 115.498 115.498 382.000 12.6 297.45 115.498 115.498 383.000 12.6 297.66 115.498 115.498 384.000 12.6 297.87 , 115.498 . 115.498 385.000 12.6 298.08 115.498 115.498 386.000 12.6 298.29 115.498 115.498 387.000 12.6 298.50 115.498 115.498 388.000 12.6 298.71 .115.498 115.498 389.000 12.6 298.92 115.498 115.498 390.000 12.6 299.13 115.498 115.498 391.000 12.6 299.34 115.498 115.498 392.000 12.6 299.55 115.498 115.498 393.000 12.6 299.76 115.498 115.498 394.000 12.6 299.97 115.498 115.498 395.000 12.6 300.18 115.498 115.498 396.000 12.6 300.39 115.498 115.498 397.000 12.6 300.60 115.497 115.497 398.000 12.6 300.81 115.497 115.497 399.000 / 12.6 301.02 115.497 . 115.497 400.000 12.6 301.23 115.497 115.497 401.000 12.6 301.44 115.497 115.497 402.000 12.6 301.65 115.497 115.497 403.000 12.6 301.86 115.497 115.497 404.000 12.6 302.07 115.497 115.497 405.000 12.6 302.28 115.497 115.497 406.000 12.6 302.49 115.497 115.497 407.000 12.6 302.70 115.497 115.497 408.000 12.6 302.91 115.497 . ' 115.497 409.000 12.6 303.12 115.497 115.497 410.000 12.6 303.33 115.497 115.497 411.000 12.6 303.55 115.497 115.497 412.000 12.6 303.76 115.497 115.497 413.000 12.6 303.97 115.497 115.497 414.000 12.6 304.18 115.497 115.497 415.000 12.6 304.39 115.497 115.497 416.000 12.6 304.60 115.497 115.497 417.000 12.6 304.81 115.497 115.497 418.000 12.6 305.02 115.497 115.497 419.000 12.6 305.23 115.497 115.497 420.000 12.6 305.44 115.496 115.496 421.000 12.6 305.65 115.496 115.496 422.000
  • 12.6 305.86 115.496 115.496 423.000 12.6 306.07 115.496 115.496 424.000 12.6 306.28 115.496 115.496 425.000 12.6 306.49 115.496 115.496 426.000 12.6 306.70 115.496 115.496 Attachment 1 Page 20 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Contig.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 7 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 427.000 12.6 306.91 115.496 115.496 428.000 12.6 307.12 115.496 115.496 429.000 12.6 307.33 115.496 115.496 430.000 12.6 307.54 115.496 115.496 431.000 12.6 307.75 115.496 115.496 432.000 12.6 307.96 115.496 115.496 433.000 12.6 308.17 115.496 115.496 434.000 12.6 308.38 115.496 115.496 435.000 12.6 308.59 115.496 115.496 436.000 12.6 308.80 115.496 115.496 437.000 12.6 309.01 115.496 115.496 438.000 12.6 309.22 115.496 115.496 439.000 12.6 309.43 115.496 115.496 440.000 12.6 309.64 115.496 115.496 441.000 12.6 309.85 115.496 115.496 442.000 12.6 310.06 115.495 115.495 443.000 12.6 310.27 115.495 115.495 444.000 12.6 310.48 115.495 115.495 445.000 12.6 310.69 115.495 115.495 446.000 12.6 310.91 115.495 115.495 447.000 12.6 311.12 115.495 115.495 448.000 12.6 311.33 115.495 115.495 449.000 12.6 311.54 115.495 115.495 450.000 12.6 311.75 115.495 115.495 451.000 12.6 311.96 115.495 115.495 452.000 12.6 312.17 115.495 115.495 453.000 12.6 312.38 115.495 115.495 454.000 12.6 312.59 115.495 115.495 455.000 12.6 312,80 115.495 115.495 456.000 12.6 313.01 115.495 115.495 457.000 12.6 313.22 115.495 115.495 458.000 12.6 313.43 115.495 115.495 459.000 12.6 313.64 115.495 115.495 460.000 12.6 313.85 115.495 115.495 461.000 12.6 314.06 115.495 115.495 462.000 12.6 314.27 115.495 115.495 463.000 12.6 314.48 115.495 115.495 464.000 12.6 314.69 115.494 115.494 465.000 12.6 314.90 115.494 115.494 466.000 12.6 315.11 115.494 115.494 467.000 12.6 315.32 115.494 115.494 468.000 12.6 315.53 115.494 115.494 469.000 12.6 315.74 115.494 115.494 470.000 12.6 315.95 115.494 115.494 471.000 12.6 316.16 115.494 115.494 472.000 12.6 316.37 115.494 115.494 473.000 12.6 316.58 115.494 115.494 474.000 12.6 316.79 115.494 115.494 475.000 12.6 317.00 115.494 115.494 476.000 12.6 317.21 115.494 115.494 477.000 12.6 317.42 115.494 115.494 478.000 12.6 317.63 115.494 115.494 479.000 12.6 317.84 115.494 115.494 480.000 12.6 '318.05 115.494 115.494 481.000 12.6 318.27 115.494 115.494 482.000 12.6 318.48 115.494 115.494 483.000 12.6 318.69 115.494 115.494 484.000 12.6 318.90 115.494 115.494 485.000 12.6 319.11 115.494 115.494 486.000 12.6 319.32 115.493 115.493 487.000 12.6 319.53 115.493 115.493 488.000 12.6 319.74 115.493 115.493 489.000 12.6 319.95 115.493 115.493 490.000 12.6 320.16 115.493 115.493 491.000 12.6 320.37 115.493 115.493 492.000 12.6 320.58 115.493 115.493 493.000 12.6 320.79 115.493 115.493 494.000 12.6 321.00 115.493 115.493 495.000 12.6 321.21 115.493 115.493 496.000 12.6 321.42 115.493 115.493 497.000 12:6 321.63 i 115.493 115.493 498.000 12.6 321.84 115.493 115.493 Attachment 1 Page 21 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BS!A!RCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharj!e Discharl!e 8 11-17-2018 KCICONSULT Base Normal Current Capacity Voltal!e(V)

Current Capacity Voltal!e (V) Time (Amp) (Amp-Hout')

V-Y+ Time (Amp) (Amp-Hout')

y. V+ 499.000 12.6 322.05 115.493 115.493 500.000 12.6 322.26 115.493 115.493 501.000 12.6 322.47 115.493
  • 115.493 502.000 12.6 322.68 115.493 115.493 503.000 12.6 322.89 115.493 115.493 504.000 12.6 323.10 115.493 115.493 505.000 12.6 323.31 115.493 115.493 506.000 12.6 323.52 115.493 115.493 507.000 12.6 323.73 115.492 115.492 508.000 12.6 323.94 115.492 115.492 509.000 12.6 324.15 115.492 115.492 510.000 12.6 324.36 115.492 115.492 511.000 12.6 324.57 115.492 115.492 512.000 12.6 324.78 115.492 115.492 513.000 12.6 324.99 115.492 115.492 514.000 12.6 325.20 115.492 115.492 515.000 12.6 325.41 115.492 115.492 516.000 12.6 325.62 115.492 115.492 517.000 12.6 325.84 115.492 115.492 518.000 12.6 326.05 115.492 115.492 519.000 12.6 326.26 115.492 115.492 520.000 12.6 326.47 115.492 115.492 521.000 12.6 326.68 115.492 115.492 522.000 12.6 326.89 115.492 115.492 523.000 12.6 327.10 115.492 115.492 524.000 12.6 327.31 115.492 115.492 525.000 12.6 327.52 115.492 115.492 526.000 12.6 327.73 115.492 115.492 527.000 12.6 327.94 115.492 115.492 528.000 12.6 328.15 115.492 115.492 529.000 12.6 328.36 115.491 115.491 530.000 12.6 328.57 115.491 115.491 531.000 12.6 328.78 115.491 115.491 532.000 12.6 328.99 115.491 115.491 533.000 12.6 329.20 115.491 115.491 534.000 12.6 329.41 115.491 115.491 535.000 12.6 329.62 115.491 115.491 536.000 12.6 329.83 115.491 115.491 537.000 12.6 330.04 115.491 115.491 538.000 12.6 330.25 115.491 115.491 539.000 12.6 330.46 115.491 115.491 540.000 12.6 330.67 115.491 115.491 541.000 12.6 330.88 115.491 115.491 542.000 12.6 331.09 115.491 115.491 543.000 12.6 331.30 115.491 115.491 544.000 12.6 331.51 115.491 115.491 545.000 12.6 331.72 115.491 115.491 546.000 12.6 331.93 115.491 115.491 547.000 12.6 332.14 115.491 115.491 548.000 12.6 332.35 115.491 115.491 549.000 12.6 332.56 115.491 115.491 550.000 12.6 332.77 115.491 115.491 551.000 12.6 332.98 115.490 115.490 552000 12.6 333.20 115.490 115.490 553.000 12.6 333.41 115.490 115.490 554.000 12.6 333.62 115.490 115.490 555.000 12.6 333.83 115.490 115.490 556.000 12.6 334.04 115.490 115.490 557.000 12.6 334.25 115.490 115.490 558.000 12.6 334.46 115.490 115.490 559.000 12.6 334.67 115.490 115.490 560.000 12.6 334.88 . 115.490 115.490 561.000 12.6 335.09 115.490 115.490 562.000 12.6 335.30 115.490 115.490 563.000 12.6 335.51 115.490 115.490 564.000 12.6 335.72 115.490 115.490 565.000 12.6 335.93, 115.490 115.490 566.000 12.6 336.14 115.490 115.490 567.000 12.6 336.35 115.490 115.490 568.000 12.6 336.56 115.490 115.490 569.000 12.6 336.77 115.490 115.490 570.000 12.6 336.98 115.490 115.490 Attachment 1 Page 22 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP . Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 9 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hom*)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 571.000 12.6 337.19 115.490 115.490 572.000 12.6 337.40 115.489 115.489 573.000 12.6 337.61 115.489 115.489 574.000 12.6 337.82 115.489 115.489 575.000 12.6 338.03 115.489 115.489 576.000 12.6 338.24 115.489 115.489 577.000 12.6 338.45 115.489 115.489 578.000 12.6 338.66 115.489 115.489 579.000 12.6 338.87 115.489 115.489 580.000 12.6 339.08 115.489 115.489 581.000 12.6 339.29 115.489 115.489 582.000 .12.6 339.50 115.489 115.489 583.000 12.6 339.71 115.489 115.489 584.000 12.6 339.92 115.489 115.489 585.000 12.6 340.13 115.489 115.489 586.000 12.6 340.34 115.489 115.489 587.000 12.6 340.56 115.489 115.489 588.000 12.6 340.77 115.489 115.489 589.000 12.6 340.98 115.489 115.489 590.000 12.6 341.19 115.489 115.489 591.000 12.6 341.40 . 115.489 115.489 592.000. 12.6 341.61 115.489 115.489 593.000 12.6 341.82 115.489 115.489 594.000 12.6 342.03 115.488 115.488 595.000 12.6 342.24 115.488 115.488 596.000 12.6 342.45 115.488 115.488 597.000 12.6 342.66 115.488 115.488 598.000 12.6 342.87 115.488 115.488 I 599.000 12.6 343.08 115.488 115.488 600.000 12.6 343.29 115.488 115.488 601.000 12.6 343.50 115.488 115.488 602.000 12.6 343.71 115.488 115.488 603.000 12.6 343.92 115.488 115.488 604.000 12.6 344.13 115.488 115.488 605.000 12.6 344.34 115.488 115.488 606.000 12.6 344.55 115.488 115.488 607.000 12.6 344.76 115.488 115.488 608.000 12.6 344.97 115.488 115.488 609.000 12.6 345.18 115.488 115.488 610.000 !2.6 345.39 115.488 115.488 611.000 12.6 345.60 115.488 115.488 612.000 12.6 345.81 115.488 115.488 613.000 12.6 346.02 115.488 115.488 614.000 12.6 346.23 115.488 115.488 615.000 12.6 346.44 115.487 115.487 616.000 12.6 346.65 115.487 115.487 617.000 12.6 346.86 115.487 115.487 618.000 12.6 . 347.07 115.487 115.487 619.000 12.6 347.28 115.487 115.487 620.000 12.6 347.49 115.487 115.487 621.000 12.6 347.70 115.487 115.487 622.000 12.6 347.91 115.487 115.487 623.000 12.6 348.13 115.487 115.487 624.000 12.6 348.34 115.487 115.487 625.000 12.6 348.55 115.487 115.487 626.000 12.6 348.76 115.487 115.487 627.000 12.6 348.97 115.487 115.487 628.000 12.6 349.18 115.487 115.487 629.000 12.6 349.39 115.487 115.487 630.000 12.6 349.60 115.487 115.487 631.000 12.6 349.81 115.487 115.487 632.000 12.6 350.02 115.487 .* 115.487 633.000 12.6 350.23 115.487 115.487 634.000 12.6 350.44 115.487 115.487 635.000 12.6 350.65 115.487 115.487 636.000 12.6 350.86 115.487 115.487 637.000 12.6 351.07 115.486 115.486 638.000 12.6 351.28 115.486 115.486 639.000 12.6 351.49 115.486 115.486 640.000 12.6 351.70 115.486 115.486 641.000 12.6 351.91 115.486 115.486 642.000 12.6 352.12 115.486 115.486 Attachment 1 Page 23 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for gre\'lter than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 10 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 643.000 12.6 352.33 \15.486 115.486 644.000 12.6 352.54 115.486 115.486 645.000 12.6 352.75 115.486 115.486 646.000 12.6 352.96 115.486 115.486 647.000 12.6 353.17 115.486 115.486 648.000 12.6 353.38 115.486 115.486 649.000 12.6 353.59 115.486 115.486 650.000 12.6 353.80 115.486 115.486 651.000 12.6 354.01 115.486 115.486 652.000 12.6 354.22 115.486 115.486 653.000 12.6 354.43 115.486 115.486 654.000 12.6 354.64 115.486 115.486 655.000 12.6 354.85 115.486 115.486 656.000 12.6 355.06 115.486 115.486 657.000 12.6 355.27 115.486 115.486 658.000 12.6 355.49 115.485 115.485 659.000 12.6 355.70 115.485 115.485 660.000 12.6 355.91 115.485 115 485 661.000 12.6 356.12 115.485 115.485 662.000 12.6 356.33 115.485 115.485 663.000 12.6 356.54 115.485 115.485 664.000 12.6 356.75 115.485 115.485 665.000 12.6 356.96 115.485 115.485 666.000 12.6 357.17 115.485 115.485 667.000 12.6 357.38 115.485 115.485 668.000 12.6 357.59 115.485 115.485 669.000 12.6 357.80 115.485 115.485 670.000 12.6 358.01 115.485 115.485 671.000 12.6 358.22 115.485 115.485 672.000 12.6 358.43 115.485 115.485 673.000 12.6 358.64 115.485 115.485 674.000 12.6 358.85 115.485 115.485 675.000 12.6 359.06 115.485 115.485 676.000 12.6 359.27 115.485 115.485 677.000 12.6 359.48 115.485 115.485 678.000 12.6 359.69 115.485 115.485 679.000 12.6 359.90 115.484 115.484 680.000 12.6 360.11 115.484 115.484 681.000 12.6 360.32 115.484 115.484 682.000 12.6 360.53 115.484 115.484 683.000 12.6 360.74 115.484 115.484 684.000 12.6 360.95 115.484 115.484 685.000 12.6 361.16 115.484 115.484 686.000 12.6 361.37 115.484 115.484 687.000 12.6 361.58 115.484 115.484 688.000 12.6 361.79 115.484 115.484 689.000 12.6 362.00 115.484 115.484 690.000 12.6 362.21 115.484 115.484 691.000 12.6 362.42 115.484 115.484 692.000 12.6 362.63 115.484 115.484 693.000 12.6 362.85 115.484 115.484 694.000 12.6 363.06 115.484 115.484 695.000 12.6 363.27 115.484 115.484 696.000 12.6 363.48 115.484 115.484 697.000 12.6 363.69 115.484 115.484 698.000 12.6 363.90 115.484 '115.484 699.000 12.6 364.11 115.484 115.484 700.000 12.6 364.32 115.484 115.484 701.000 12.6 364.53 115.483 115.483 702.000 12.6 364.74 115.483 115.483 703.000 12.6 364.95 115.483 115.483 704.000 12.6 365.16 115.483 115.483 705.000 12.6 365.37 115.483 115.483 706.000 12.6 365.58 115.483 115.483 707.000 12.6 365.79 115.483 115.483 708.000 12.6 366.00 115.483 115.483 709.000 12.6 366.21 115.483 115.483 710.000 12.6 366.42 115.483 115.483 711.000 12.6 366.63 115.483 115.483 712.000 12.6 366.84 115.483 115.483 713.000 12.6 367.05 115.483 115.483 714.000 12.6 367.26 115.483 115.483 Attachment 1 Page 24 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharj!e Discharl!e 11 11-17-2018 KCICONSULT Base Normal Current Capacity V~ltaj!e (V) Current Capacity Voltal!e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 715.000 12.6 367.47 115.483 115.483 716.000 12.6 367.68 115.483 115.483 717.000 12.6 367.89 115.483 115.483 718.000 12.6 368.10 115.483 115.483 719.000 12.6 368.31 115.483 115.483 720.000 12.6 368.52 115.483 115.483 721.000 12.6 368.73 115.483 115.483 722.000 12.6 368.94 115.482 115.482 723.000 12.6 369.15 115.482 115.482 724.000 12.6 369.36 115.482 115.482 725.000 12.6 ' 369.57 115.482 115.482 726.000 12.6 369.78 115.482 115.482 727.000 12.6 369.99 115.482 il5.482 728.000 12.6 370.21 115.482 115.482 729.000 12.6 370.42 115.482 115.482 730.000 12.6 370.63 115.482 115.482 731.000 . 12.6 370.84 115.482 115.482 732.000 12.6 371.05 115.482 115.482 733.000 12.6 371.26 115.482 115.482 734.000 12.6 371.47 115.482 115.482 735.000 12.6 371.68 115.482 115.482 736.000 12.6 371.89 115.482 . -115.482 737.000 12.6 372.10 115.482 115.482 738.000 12.6 372.31 115.482 115.482 739.000 12.6 372.52 115.482 115.482 740:000 12.6 372.73 115.482 115.482 741.000 12.6 372.94 115.482 115.482 742.000 12.6 373.15 115.482 115.482 743.000 12.6 373.36 115.481 115.481 744.000 12.6 373.57 115.481 115.481 745.000 12.6 373.78 115.481 115.481 746.000 12.6 373.99 115.481 115.481 747.000 12.6 374.20 115.481 115.481 748.000 12.6 374.41 115.481 li5.481 749.000 12.6 374.62 115.481 115.481 750.000 12.6 374.83 115.481 115.481 751.000 12.6 375.04 115.481 115.481 752.000 12.6 375.25 115.481 115.481 753.000 12.6 375.46 115.481 115.481 754.000 12.6 375.67 115.481 115.481 755.000 12.6 375.88 115.481 115.481 756.000 12.6 376.09 115.481 115.481 757.000 12.6 376.30 115.481 . 115.481 758.000 12.6 376.51 115.481 115.481 759.000 12.6 376.72 115.481 115.481 760.000 12.6 376.93 115.481 115.481 761.000 12.6 377.14 115.481 115.481 762.000 12.6 377.35 115.481 115.481 763.000 12.6 377.56 115.480 115.480 764.000 12.6 377.78 115.480 115.480 765.000 12.6 377.99 115.480 115.480 766.000 12.6 378.20 115.480 115.480 767.000 12.6 378.41 115.480 115.480 768.000 12.6 378.62 115.480 115.480 769.000 12.6 378.83 115.480 115.480 770.000 12.6 379.04 115.480 115.480 771.000

  • 12.6 379.25 115.480 115.480 772.000 12.6 379.46 115.480 115.480 773.000 12.6 379.67 115.480 115.480 774.000 12.6 379.88 115.480 115.480 775.000 12.6 380.09 115.480 115.480 776.000 12.6 380.30 115.480 115.480 777.000 12.6 380.51 115.480 115.480 778.000 12.6 380.72 115.480 115.480 779.000 12.6 380.93 115.480 115.480 780.000 12.6 381.14 115.480 115.480 781.000 12.6 38.J.35 115.480 115.480 782.000 12.6 381.56 115.480 115.480 783.000 12.6 381.77 115.480 115.480 784.000 12.6 381.98 115.479 115.479 785.000 12.6 382.19 115.479 115.479 786.000 12.6 382.40 115.479 115.479 Attachment 1 Page 25 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-HourCoping Study Discharge Discharge 12 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 787.000 12.6 382.61 115.479 115.479 788.000 12.6 382.82 115.479 115.479 789.000 12.6 383.03 115.479 115.479 790.000 12.6 383.24 115.479 115.479 791.000 12.6 383.45 115.479 115.479 792.000 12.6 383.66 115.479 115.479 793.000 12.6 383.87 115.479 115.479 794.000 12.6 384.08 115.479 115.479 795.000 12.6 384.29 115.479 115.479 796.000 12.6 384.50 115.479 115.479 797.000 12.6 384.71 115.479 115.479 798.000 12.6 384.92 115.479 115.479 799.000 12.6 385.14 115.479 115.479 800.000 12.6 385.35 115.479 115.479 801.000 12.6 385.56 115.479 115.479 802.000 12.6 385.77 115.479 115.479 803.000 12.6 385.98 115.479 115.479 804.000 12.6 386.19 115.479 115.479 805.000 12.6 386.40 115.478 115.478 806.000 12.6 386.61 115.478 115.478 807.000 12.6 386.82 115.478 115.478 808.000 12.6 387.03 115.478 115.478 809.000 12.6 387.24 115.478 115.478 810.000 12.6 387.45 115.478 115.478 811.000 12.6 387.66 115.478 115.478 812:000 12.6 387.87 115.478 115.478 813.000 12.6 388.08 115.478 115.478 '814.000 12.6 388.29 115.478 115.478 815.000 12.6 388.50 115.478 115.478 816.000 12.6 388.71 115.478 115.478 817.000 12.6 388.92 . 115.478 115.478 818.000 12.6 389.13 115.478 115.478 819.000 12.6 389.34 115.478 115.478 820.000 12.6 389.55 115.478 115.478 821.000 12.6 389.76 115.478 115.478 822.000 12.6 389.97 115.478 115.478 823.000 12.6 390.18 115.478 115.478 824.000 12.6 390.39 115.478 115.478 825.000 12.6 390.60 115.478 115.478 826.000 12.6 390.81 115.477 i15.477 827.000 12.6 391.02 115.477 115.477 828.000 12.6 391.23 115.477 115.477 829.000 12.6 391.44 115.477 115.477
  • 830.000 12.6 391.65 115.477 115.477 831.000 12.6 391.86 115.477 115.477 832.000 12.6 392.07 115.477 115.477 833.000 12.6 392.28 .* 115.477 115.477 834.000 12.6 392.50 115.477 115.477 835.000_ 12.6 392.71 115.477 115.477 836.000 12.6 392.92 115.477 115.477 837.000 12.6 393.13 115.477 115.477 838.000 12.6 393.34 115.477 115.477 839.000 12.6 393.55 115.477 115.477 840.000 12.6 393.76 115.477 115.477 841.000 12.6 393.97 115.477 115.477 842.000 12.6 394.18 115.477 115.477 843.000 12.6 394.39 115.47? 115.477 844.000 12.6 394.60 115.477 115.477 845.000 12.6 394.81 115.477 115.477 846.000 12.6 395.02 115.476 115.476 847.000 12.6 395.23 115.476 115.476 848.000 12.6 395.44 115.476 115.476 849.000 12.6 395.65 115.476 115.476 850.000 12.6 395.86 115.476 115.476 851.000 12.6 396.07 115.476 115.476 852.000 12.6 396.28 115.476 115.476 853.000 12.6 396.49 115.476 115.476 854.000 12.6 396.70 115.476 115.476 855.000 12.6 396.91 115.476 115.476 856.000 12.6 397.12 115.476 115.476 857.000 12.6 397.33 115.476 115.476 858.000 12.6 397.54 115.476 115.476 Attachment 1 Page 26 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 13 11-17-2018 KCICONSULT Base Normal Cnrrent Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 859.000 12.6 397.75 115.476 115.476 860.000 12.6 397.96 115.476 115.476 861.000 12.6 398.17 115.476 115.476 862.000 12.6 398.38 115.476 115.476 863.000 12.6 398.59 115.476 115.476 864.000 12.6 398.80 115.476 115.476 865.000 12.6 399.01 115.476 115.476 866.000 12.6 399.22 115.476 115.476 867.000 12.6 399.43 115.475 115.475 868.000 12.6 399.64

  • 115.475 115.475 869.000 12.6 399.85 115.475 115.475 870.000 12.6 400.07 115.475 115.475 871.000 12.6 400.28 115.475 115.475 872.000 12.6 400.49 115.475 115.475 873.000 12.6 400.70 115.475 115.475 874.000 12.6 400.91 115.475 115.475 875.000 12.6 401.12 115.475 115.475 876.000 12.6 401.33 115.475 115.475 877.000 12.6 401.54 115.475 115.475 878.000 12.6 401.75 115.475 115.475 879.000 12.6 401.96 115.475 115.475 880.000 12.6 402.17 115.475 115.475 881.000 12.6 402.38 115.475 115.475 882.000 12.6 402.59 115.475 115.475 883.000 12.6 402.80 115.475 115.475 884.000 12.6 403.01 115.475 115.475 885.000 12.6 403.22 115.475 115.475 886.000 12.6 403.43 115.475 115.475 887.000 12.6 403.64 115.474 115.474 888.000 12.6 403.85 115.474 115.474 889.000 12.6 404.06 115.474 115.474 890.000 12.6 404.27 115.474
  • 115.474 891.000 12.6 404.48 115.474 115.474 892.000 12.6 404.69 115.474 115.474 893.000 12.6 404.90 115.474 115.474 894.000 12.6 405.11 115.474 115.474 895.000 12.6 405.32 115.474 115.474 896.000 12.6 405.53 115.474 115.474 897.000 12.6 405.74 115.474 115.474 898.000 12.6 405.95 115.474 115.474 899.000 12.6 406.16 115.474 115.474 900.000 12.6 406.37 115.474 115.474
  • 901.000 12.6 406.58 115.474 115.474 902.000 12.6 406.79 115.474 115.474 903.000 12.6 407.00 115.474 115.474 904.000 12.6 407.21 115.474 115.474 905.000 12.6 407.43 115.474 115.474 906.000 12.6 407.64 115.474 115.474 907.000 12.6 407.85 115.473 115.473 908.000 12.6 408.06 115.473 115.473 909.000 12.6 408.27 115.473 115.473 910.000 12.6 408.48 115.473 115.473 911.000 12.6 408.69 115.473 115.473 912.000 12.6 408.90 115.473 115.473 913.000 12.6 409.11 115.473 115.473 914.000 12.6 409.32 115.473 115.473 915.000 12.6 409.53 115.473 115.473 916.000 12.6 409.74 115.473 115.473 917.000 12.6 409.95 115.473 115.473 918.000 12.6 410.16 115.473 115.473 919.000 12.6 410.37 115.473 115.473 920.000 12.6 410.58 115.473 115.473 921.000 12.6 410.79 115.473 115.473 922.000 12.6 411.00 115.473 115.473 923.000 12.6 411.21 115.473 115.473 924.000 12.6 411.42 115.473 .
  • 115.473 925.000 12.6 411.63 115.473 115.473 926.000 12.6 411.84 115.473 115.473 927.000 12.6 412.05 115.473 115.473 928.000 12.6 412.26 115.472 115.472 929.000 12.6 412.47 115.472 115.472 930.000 12.6 412.68 . . 115.472 115.472 Attachment 1 Page 27 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Stndy ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Sn1dy Case: BSlAlRCIC-48 Revision:

CPS SBO Stndy Config.: DIV 1 Batteiy I A 48-Hour Coping Stndy Discharge Discharge 14 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Cnrrent Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 931.000 12.6 412.89 115.472 115.472 932.000 12.6 413.10 115.472 115.472-933.000 12.6 413.31 115.472 115.472 934.000 12.6 413.52 115.472 115.472 935.000 12.6 413.73 115.472 115.472 936.000 12.6 413.94 115.472 115.472 937.000 12.6 414.15 115.472 115.472 938.000 12.6 414.36 115.472 115.472 939.000 12.6 414.57 115.472 115.472 940.000 12.6 414.79 115.472 115.472 941.000 12.6 415.00 115.472 115.472 942.000 12.6 415.21 115.472 115.472 943.000 12.6 415.42 115.472 115.472 944.000 12.6 415.63 115.472 115.472 945.000 12.6 415.84 . *115.472 115.472 946.000 12.6 416.05 115.472 115.472 947.000 12.6 416.26 115.472 115.472 948.000 12.6 416.47 115.471 115.471 949.000 12.6 416.68 115.471 115.471 950.000 12.6 416.89 115.471 115.471 951.000 12.6 417.10 115.471 115.471 952.000 12.6 417.31 115.471 115.471 953.000 12.6 417.52 115.471 115.471 954.000 12.6 417.73 115.471 115.471 955.000 12.6 417.94 115.471 115.471 956.000 12.6 418.15 115.471 115.471 957.000 12.6 418.36 115.471 115.471 958.000 12.6 418.57 115.471 115.471 959.000 12.6 418.78, 115.471 115.471 960.000 12.6 418.99 115.471 115.471 961.000 12.6 419.20 115.471 115.471 962.000 12.6 419.41 115.471 115.471 963.000 12.6 419.62 115.471 115.471 964.000 12.6 419.83 115.471 115.471 965.000 12.6 420.04 115.471 115.471 966.000 12.6 420.25 115.471 115.471 967.000 12.6 420.46 115.471 115.471 968.000 12.6 420.67 115.470 115.470 969.000 12.6 420.88 115.470 115.470 970.000 12.6 421.09 115.470 115.470 971.000 12.6 421.30 115.470 115.470 972.000 12.6 421.51 115.470 115.470 973.000 12.6 421.72 115.470 115.470 974.000 12.6 421.93 115.470 115.470 975.000 12.6 422.14 115.470 115.470 976.000 12.6 422.36 115.470 H5.470 977.000 12.6 422.57 115.470 115.470 978.000 12.6 422.78 115.470 115.470 979.000 12.6 422.99 115.470 115.470 980.000 12.6 423.20 115.470 115.470 981.000 12.6 423.41 115.470 115.470 982.000 12.6 423.62 115.470 115.470 983.000 12.6 423.83 115.470 115.470 984.000 12.6 424.04 115.470 115.470 985.000 12.6 424.25 115.470 115.470 986.000 12.6 424.46 115.470 115.470 987.000 12.6 424.67 115.470 115.470 988.000 12.6 424.88 115.469 115.469 989.000 12.6 425.09 115.469 115.469 990.000 12.6 425.30 115.469 115.469 991.000 12.6 425.51 115.469 115.469 992.000 12.6 425.72 , . 115.469 115.469 993.000 12.6 425.93 115.469 115.469 994.000 12.6 426.14 115.469 115.469 995.000 12.6 426.35 115.469 115.469 996.000 12.6 426.56 115.469 115.469 997.000 12.6 426.77 115.469 115.469 998.000 12.6 426.98 115.469 115.469 999.000 12.6 427.19 115.469 115.469 1000.000 12.6 427.40 115.469 115.469 1001.000 12.6 427.61 115.469 115.469 1002.000 12.6 427.82 115.469 115.469 Attachment 1 Page 28 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 15 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage(V)

Cnrrent Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 1003.000 12.6 428.03 115.469 115.469 1004.000 12.6 428.24 115.469 115.469 1005.000 12.6 428.45 115.469 115.469 1006.000 12.6 428.66 115.469 115.469 1007.000 12.6 428.87 115.469 115.469 1008.000 12.6 429.08 115.468 115.468 1009.000 12.6 429.29 115.468 115.468 1010.000 12.6 429.50 115.468 115.468 1011.000 12.6 429.72 115.468 115.468 1012.000 12.6 429.93 115.468 115.468 1013.000 12.6 430.14 115.468 115.468 1014.000 12.6 430.35 .. 115.468 115.468 1015,000 *12.6 430.56 115.468 115.468 1016.000 12.6 430.77 115.468 115.468 1017.000 12.6 430.98 115.468 115.468 1018.000 12.6 431.19 115.468 115.468 1019.000 12.6 431.40 115.468 115.468 1020.000 12.6 431.61 115.468 115.468 1021.000 12.6 431.82 .. 115.468 115.468 1022.000 12.6 432.03 115.468 115.468 1023.000 12.6 432.24 115.466 115.466 1024.000 12.6 432.45 115.465 115.465 1025.000 12.6 432.66 115.463 115.463 1026.000 12.6 432.87 115.462 115.462 1027.000 12.6 433.08 115.461 115.461 1028.000 12.6 433.29 115.459 115.459 1029.000 *12.6 433.50 115.458 115.458 1030.000 12.6 433.71 115.457 115.457 1031.000 12.6 433.92 115.455 115.455 1032.000 12.6 434.13 115.454 115.454 1033.000 12.6 434.34 115.452 115.452 1034.000 12.6 434.55 115.451 115.451 1035.000 12.6 434.76 115.450 115.450 1036.000 12.6 434.97 115.448 115.448 1037.000 12.6 435.18 115.447 115.447 1038.000 12.6 435.39 115.446 115.446 1039.000 12.6 435.60 115.444 115.444 1040.000 12.6 435.81 115.443 115.443 1041.000 12.6 436.02 115.441 115.441 1042.000 12.6 436.23 115.440 115.440 1043.000 12.6 436.44 115.439 115.439 1044.000 12.6 436.65 115.437 115.437 1045.000 12.6 436.86 115.436 115.436 1046.000 12.6 437.08 115.435 115.435 1047.000 12.6 437.29 115.433 115.433 1048.000 12.6 437.50 115.432 115.432 1049.000 12.6 437.71 115.431 115.431 1950.000 12.6 437.92 115.429 115.429 1051.000 12.6 438.13 115.428 115.428 1052.000 12.6 438.34 115.426 115.426 1053.000 12.6 438.55 115.425 115.425 1054.000 12.6 438.76 115.424 115.424 1055.000 12.6 438.97 115.422 115.422 1056.000 12.6 439.18 . 115.421 115.421 1057.000 12.6 439.39 115.420 115.420 1058.000 12.6 439.60 115.418 115.418* 1059.000 12.6 439.81 115.417 115.417 1060.000 12.6 440.02 115.415 115.415 1061.000 12.6 440.23 115.414 115.414 1062.000 12.6 440.44 115.413 115.413 1063.000 12.6 440.65 115.411 115.411 1064.000 12.6 440.86 115.410 115.410 1065.000 12.6 441.07 115.409 115.409 1066.000 12.6 441.28 115.407 115.407 1067.000 12.6 441.49 115.406 115.406 1068.000 12.6 441.70 115.405 115.405 1069.000 12.6 441.91 115.403 115.403 1070.000 12.6 442.12 115.402 115.402 1071.000 12.6 442.33 115.401 115.401 1072.000 12.6 442.54 115.399 115.399 1073.000 12.6 442.75 115.398 115.398 1074.000 12.6 442.96 115.396 115.396 Attachment 1 Page 29 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSlAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 16 11-17-2018 Attachment 1 Page 30 of 85 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)

V-V+ 1075.000 12.6 443.17 115.395 115.395 1076.000 12.6 443.38 115.394 115.394 1077.000 12.6 443.59 115.392 115.392 1078.000 12.6 443.80 115.391 115.391 1079.000 12.6 444.01 115.390 115.390 1080.000 12.6 444.22 115.388 115.388 1081.000 12.6 444.44 115.387 115.387 1082.000 12.6 444.65 115.386 115.386

'-1083.000 12.6 444.86 115.384 115.384 1084.000 12.6 445.07 115.383 115.383 1085.000 12.6 445.28 115.382 115.382 1086.000 12.6 445.49 115.380 115.380 1087.000 12.6 445.70 115.379 115.379 1088.000 12.6 445.91 115.377 115.377 1089.000 12.6 446.12 115.376 115.376 1090.000 12.6 446.33 115.375 115.375 1091.000 12.6 446.54 115.373 115.373 1092.000 12.6 446.75 115.372 115.372 1093.000 12.6 446.96 115.371 115.371 1094.000 12.6 447.17 115.369 115.369 1095.000 12.6 447.38 115.368 115.368 1096.000 12.6 447.59 115.367 115.367 1097.000 12.6 447.80 115.365 115.365 1098.000 12.6 448.01 115.364 115.364 1099.000 12.6 448.22 115.363 115.363 1100.000 12.6 448.43 115.361 115.361 1101.000 12.6 448.64 115.360 115.360 1102.000 12.6 448.85 115.359 115.359 1103.000 12.6 449.06 115.357 115.357 1104.000 12.6 449.27 115.356 115.356 1105.000 12.6 449.48 115.355 115.355 1106.000 12.6 449.69 115.353 115.353 1107.000 12.6 449.90 115.352 115.352 1108.000 12.6 450.11 115.351 115.351 1109.000 12.6 450.32 115.349 115.349 1110.000 12.6 450.53 115.348 115.348 llll.000 12.6 450.74 115.347 115.347 1112.000 12.6 450.95 115.345 115.345 lll3.000 12.6 451.16 115.344 115.344 lll4.000 12.6 451.37 . 115.343 115.343 lll5.000 12.6 451.58 115.341 115.341 1116.000 12.6 451.79 115.340 115.340 1117.000 12.6 452.01 115.339 115.339 1118.000 12.6 452.22 115.337 115.337 lll9.000 12.6 452.43 115.336 115.336 1120.000 12.6 452.64 115.334 115.334 1121.000 12.6 452.85 115.333 115.333 1122.000 12.6 453.06 115.332 115.332 1123.000 12.6 453.27 115.330 115.330 1124.000 12.6 453.48 115.329 115.329 1125.000 12.6 453.69 115.328 115.328 1126.000 12.6 453.90 115.326 115.326 1127.000 12.6 454.11 115.325 115.325 1128.000 12.6 454.32 115.324 115.324 1129.000 12.6 454.53 115.322 115.322 1130.000 12.6 454.74 115.321 115.321 1131.000 12.6 454.95 115.320 115.320 1132.000 12.6 455.16 115.318 115.318 1133.000 12.6 455.37 115.317 115.317 1134.000 12.6 455.58 115.316 115.316 1135.000 12.6 455.79 115.314 115.314 1136.000 12.6 456.00 115.313 115.313 1137.000 12.6 456.21 115.312 115.312 1138.000 12.6 456.42 115.310 115.310 1139.000 12.6 456.63 115.309 115.309 1140.000 12.6 456.84 115.308 115.308 1141.000 12.6 457.05 115.307 115.307 1142.000 12.6 457.26 115.305 115.305 1143.000 12.6 457.47 115.304 115.304 1144.000 12.6 457.68 115.303 115.303 1145.000 12.6 457.89 115.301 115.301 1146.000 12.6 458.10 115.300 115.300 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than. 4 Hrs Clinton Flex Study

  • ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery lA 48-Hour Coping Study Discharge Discharge 17 11-17-2018 KCICONSULT

Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1147.000 12.6 458.31 .115.299 115.299 1148.000 12.6 458.52 115.297 115.297 1149.000 12.6 458.73 115.296 115.296 1150.000 12.6 458.94 115.295 115.295 1151.000 12.6 459.15 115.293 115.293 1152.000 12.6 459.37 115.292 115.292 1153.000 12.6 459.58 115.291 115.291 1154.000 12.6 459.79 115.290 115.290 1155.000 12.6 460.00 115.289 115.289 1156.000 12.6 460.21 115.288 115.288 1157.000 12.6 460.42 115.287 115.287 1158.000 12.6 460.63 115.286 115.286 1159.000 12.6 460.84 115.285 115.285 1160.000 12.6 461.05 115.284 115.284 1161.000 12.6 461.26 115.283 115.283 1162.000 12.6 461.47 115.282 115.282 1163.000 12.6 461.68 115.281 115.281 1164.000 12.6 461.89 115.280 115.280 1165.000 12.6 462.10 115.279 115.279 1166.000 12.6 462.31 115.278 115.278 1167.000 12.6 462.52 115.277 115.277 1168.000 12.6 462.73 115.276 115.276 1169.000 12.6 462.94 115.275 115.275 1170.000 12.6 463.15 115.274 115.274 1171.000 12.6 463.36 115.274 115.274 1172.000 12.6 463.57 115.273 115.273 1173.000 12.6 463.78 115.272 115.272 1174.000 12.6 463.99 115.271 115.271 1175.000 12.6 464.20 115.270 115.270 1176.000 12.6 464.41 115.269 115.269 1177.000 12.6 464.62 115.268 115.268 1178.000 12.6 464.83 115.267 115.267 1179.000 12.6 465.04 115.266 115.266 1180.000 12.6 465.25 115.265 115.265 1181.00_0 12.6 465.46 115.264 115.264 1182.000 12.6 465.67 115.263 115.263 1183.000 12.6 465.88. 115.262 115.262 1184.000 12.6 466.09 115.261 115.261 1185.000 12.6 466.30 115.260 115.260 1186.000 12.6 466.51 115.259 115.259 1187.000 12.6 466.73 115.258 115.258 1188.0QO 12.6 466.94 115.257 115.257 1189.000 12.6 467.15 115.256 115.256 1190.000 12.6 467.36 115.255 115.255 1191.000 12.6 467.57 115.254 115.254 1192.000 12.6 467.78 115.253 115.253 1193.000 12.6 467.99 115.252" . 115.252 1194.000 12.6 468.20 Ir5,251 115.251 1195.000 12.6 468.41 115.250 115.250 1196.000 12.6 468.62 115.249 115.249 1197.000 12.6 468.83 115.248 115.248 1198.000 12.6 469.04 115.247 115.247 1199.000 12.6 469.25 115.246 115.246 1200.000 75.5 469.46 115.245 114.528 1200.133 185.5 469.63 114.527 113.273 1200.183 130.5 469.78 113.272 113.900 1200.250 311.9 469.93 113.899 111.831 1200.300 174.9 470.19 111.830 113.392 1200.750 130.5 471.50 113.386 113.892 1201.000 75.5 472.04 113.890 114.516 1202.000 15.5 473.30 114.510 114.510 1203.000 75.5 474.56 114.504 114.504 1204.000 75.5 475.81 114.499 114.499 1205.000 75.5 477.07 114.493 114.493 1206.000 75.5 478.33 114.487 114.487 1207.000 75.5 479.59 114.481 114.481 1208.000 75.5 480.85 114.475 114.475 1209.000 75.5 482.10 114.469 114.469 1210.000 15.5 483.36 114.463 114.463 1211.000 75.5 484.62 114.458 114.458 1212.000 75.5 485.88 114.452 114.452 1213.000 15.5 487.14 114.446 114.446 Attachment 1 Page 31 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! I 14.1.0N Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 18 11-17-2018 Attachment 1 Page 32 of 85

  • KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1214.000 75.5 488.39 114.440 114.440 1215.000 75.5 489.65 114.434 114.434 1216.000 75.5 490.91 114.428 114.428 1217.000 75.5 492.17 114.422 114.422 1218.000 75.5 493.43 114.417 114.417 1219.000 75.5 494.68 114.411 114.411 1220.000 75.5 495.94 114.405 114.405 1221.000 75.5 497.20 114.399. . 114.399 1222.000 75.5 498.46 114.393 114.393 1223.000 75.5 499.72 114.387 114.387 1224.000 75.5 500.97 114.381 114.381 1225.000 75.5 502.23 114.376 114.376 1226.000 75.5 503.49 114.370 114.370 1227.000 75.5 504.75 114.364 114.364 1228.000 75.5 506.01 114.358 114.358 1229.000 75.5 507.26 114.352 114.352 1230.000 75.5 508.52 114.346 114.346 1231.000 75.5 509.78 114.341 114.341 1232.000 75.5 511.04 114.335 114.335 1233.000 75.5 512.30 114.329 114.329 1234.000 75.5 513.55 114.323 114.323 1235.000 75.5 514.81 114.317 114.317 1236.000 75.5 516.07 114.311 114.311 1237.000 75.5 517.33 114.305 114.305 1238.000 75.5 518.59 114.300 114.300 1239.000 75.5 519.84 114.294 114.294 1240.000 75.5 521.10 114.288 114.288 1241.000 75.5 522.36 114.282 114.282 1242.000 75.5 523.62 114.276 114.276 1243.000 75.5 524.88 114.270 11.4.270 1244.000 75.5 526.13 114.264 114.264 1245.000 75.5 527.39 114.259 114.259 1246.000 75.5 528.65 114.253 114.253 1247.000 75.5 529.91 114.244 114.244 1248.000 75.5 531.16 114.232 114.232 1249.000 75.5 532.42 114.221 114.221 1250.000 75.5 533.68 114.209 114.209 1251.000 75.5 534.94 114.198 114.198 1252.000 75.5 536.20 114.186 114.186 1253.000 75.5 537.45 114.175 114.175 1254.000 75.5 538.71 114.164 114.164 1255.000 75.5 539.97 114.152 114.152 1256.000 75.5 541.23 114.141 114.141 1257.000 75.5 542.49 114.130 114.130 1258.000 75.5 543.74 114.119 114.119 1259.000 75.5 545.00 114.108 114.108 1260.000 75.5 546.26 114.096 114.096 1261.000 75.5 547.52 114.085 114.085 1262.000 75.5 548.78 114.074 114.074 1263.000 75.5 550.03 114.063 114.063 1264.000 75.5 551.29 114.052 114.052 1265.000 75.5 552.55 114.041 114.041 1266.000 75.5 553.81 114.030 114.030 1267.000 75.5 555.07 114.019 114.019 1268.000 75.5 556.32 114.008 114.008 1269.000 75.5 557.58 113.998 113.998 1270.000 75.5 558.84 113.987 113.987 1271.000 75.5 560.10 113.976 113.976 1272.000 75.5 561.36 113.965 113.965 1273.000 75.5 562.61 113.954 113.954 1274.000 75.5 563.87 113.944 113.944 1275.000 75.5 565.13 113.933 113.933 1276.000 75.5 566.39 113.922 113.922 1277.000 75.5 567.65 113.912 113.912 1278.000 75.5 568.90 113.901 113.901 1279.000 75.5 570.16 113.891 113.891 1280.000 75.5 571.42 113.880 113.880 1281.000 75.5 572.68 113.869 113.869 1282.000 75.5 573.94 113.859 113.859 1283.000 75.5 575.19 113.849 113.849 1284.000 75.5 576.45 113.841 113.841 1285.000 75.5 577.71 113.839 113.839 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BS!AlRCJC-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 19 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hom*)

V-V+ Time (Amp) (Amp-Hour)

V-V+ ----1286.000 75.5 578.97 113.837 113.837 1287.000 75.5 580.22 113.835 113.835 1288.000 75.5 581.48 113.833 113.833 1289.000 75.5 582.74 113.831 113.831 1290.000 75.5 584.00 113.829 113.829 1291.000 75.5 585.26 113.827 113.827 1292.000 75.5 586.51 113.825 113.825 1293.000 75.5 587.77 113.823 113.823 1294.000 75.5 589.03 113.821 113.821 1295.000 75.5 590.29 113.819 113.819 1296.000 75.5 591.55 113.817 113.817 1297.000 75.5 592.80 113.815 113.815 1298.000 75.5 594.06 113.813 113.813 1299.000 75.5 595.32 113.811 113.811 1300.000 75.5 596.58 113.808 113.808 1301.000 75.5 597.84 113.806 113.806 1302.000 75.5 599.09 113.804 113.804 1303.000 75.5 600.35 113.802 113.802 1304.000 75.5 601.61 113.800 113.800 1305.000 75.5 602.87 113.798 113.798 1306.000 75.5 604.13 113.796 113.796 1307.000 75.5 605.38 113.794 113.794 1308.000 75.5 606.64 113.792 113.792 1309.000 75.5 607.90 113.790 113.790 1310.000 75.5 609.16 113.788 113.788 1311.000 75.5 610.42 113.785 113.785 1312.000 75.5 611.67 113.783 113.783 1313.000 75.5 612.93 113.781 113.781 1314.000 75.5 614.19 113.779 113.779 1315.000 75.5 615.45 113.777 113.777 1316.000 75.5 616.71 113.775 113.775 1317.000 75.5 617.96 113.773 113.773 1318.000 75.5 619.22 113.770 113.770 1319.000 75.5 620.48 113.768 113.768 1320.000 75.5 621.74 113.766 113.766 1321.000 75.5 623.00 113.764 113.764 1322.000 75.5 624.25 113.762 113.762 1323.000 75.5 625.51 113.760 113.760 1324.000 75.5 626.77 113.758 113.758 1325.000 75.5 628.03 113.755 113.755 1326.000 75.5 629.28 113.753 113.753 1327.000 75.5 630.54 113.751 113.751 1328.000 75.5 631.80 113.749 113.749 1329.000 75.5 633.06 113.747 113.747 1330.000 75.5 634.32 113.744 113.744 1331.000 75.5 635.57 113.742 113.742 1332.000 75.5 636.83 113.740 113.740 1333.000 75.5 638.09 ** 113.738 113.738 1334.000 75.5 639.35 113.736 113.736 1335.000 75.5 640.61 113.733 113.733 1336.000 75.5 641.86 113.731 113.731 1337.000 75.5 643.12 113.729 113.729 1338.000 75.5 644.38 113.727 113.727 1339.000 75.5 645.64 113.724 113.724 1340.000 75.5 646.90 113.722 113.722 1341.000 75.5 648.15 113.720 113.720 1342.000 75.5 649.41 113.719 113.719 1343.000 75.5 650.67 113.719 113.719 1344.000 75.5 651.93 113.718 113.718 1345.000 75.5 653.19 113.717 113.717 1346.000 75.5 654.44 113.717 113.717 1347.000 75.5 655.70 113.716 113.716 1348.000 75.5 656.96 113.715 113.715 1349.000 75.5 658.22 113.715 113.715 1350.000 75.5 659.48 113.714 113.714 1351.000 75.5 660.73 113.713 113.713 1352.000 75.5 661.99 113.712 113.712 1353.000 75.5 663.25 113.712 113.712 1354.000 75.5 664.51 113.711 113.711 1355.000 75.5 665.77 113.710 113.710 1356.000 75.5 667.02 113.710 113.710 1357.000 75.5 668.28 113.709 113.709 Attachment 1 Page 33 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: 20 11-17-2018 KCICONSULT Base Normal DIV I Battery IA48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current -Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1358.000 75.5 669.54 113.708 113.708 1359.000 75.5 670.80 113.707 113.707 1360.000 75.5 672.06 113.707 113.707 1361.000 75.5 673.31 113.706 113.706 1362.000 75.5 674.57 113.705 113.705 1363.000 75.5 675.83 113.705 113.705 1364.000 75.5 677.09 113.704 113.704 1365.000 75.5 678.34 113.703 * . 113.703 1366.000 75.5 679.60 113.702 113.702 1367.000 75.5 680.86 113.702 113.702 1368.000 75.5 682.12 113.701 113.701 1369.000 75.5 683.38 113.700 113.700 1370.000 75.5 684.63 113.699 113.699 1371.000 75.5 685.89 113.699 113.699 1372.000 75.5 687.15 113.698 113.698 1373.000 75.5 688.41 113.697 113.697 1374.000 75.5 689.67 113.696 113.696 1375.000 75.5 690.92 113.696 113.696 1376.000 75.5 692.18 113.695 113.695 1377.000 75.5 693.44 113.694 113.694 1378.000 75.5 694.70 113.693 113.693 1379.000 75.5 695.96 113.693 113.693 1380.000 75.5 697.21 113.692 113.692 1381.000 75.5 698.47 113.691 113.691 1382.000 75.5 699.73 113.690 113.690 1383.000 75.5 700.99 113.690 113.690 1384.000 75.5 702.25 113.689 113.689 1385.000 75.5 703.50

  • 113.688 113.688 1386.000 75.5 704.76 113.687 113.687 1387.000 75.5 706.02 113.686 113.686 1388.000 75.5 707.28 113.686 113.686 1389.000 75.5 708.54 113.685 113.68_5 1390.000 75.5 709.79 113.684 113.684 1391.000 75.5 711.05 113.683 113.683 1392.000 75.5 712.31 113.682 113.682 1393.000 75.5 713.57 113.681 113.681 1394.000 75.5 714.83 113.680 113.680 1395.000 75.5 716.08 113.679 113.679 1396.000 75.5 717.34 113.678 113.678 1397.000 75.5 718.60 113.677 113.677 1398.000 75.5 719.86 113.676 113.676 1399.000 75.5 721.12 113.675 113.675 1400.000 75.5 722.37 113.674 113.674

' 1401.000 75.5 723.63 113.673 113.673 1402.000 75.5 724.89 113.672 113.672 1403.000 75.5 726.15 113.671 113.671 1404.000 75.5 727.40 113.669 113.669 1405.000 75.5 728.66 113.668 113.668 1406.000 75.5 729.92 113.667 113.667 1407.000 75.5 731.18 113.666 113.666 1408.000 75.5 732.44 113.665 113.665 1409.000 75.5 733.69 113.664 113.664 1410.000 75.5 734.95 113.663 113.663 1411.000 75.5 736.21 113.662 113.662 1412.000 75.5 737.47 113.660 113.660 1413.000 75.5 738.73 113.659 113.659 1414.000 75.5 739.98 113.658 113.658 1415.000 75.5 741.24 113.657 113.657 1416.000 75.5 742.50 113.656 113.656 1417.000 75.5 743.76 113.655 113.655 1418.000 75.5 745.02 113.654 113.654 1419.000 75.5 746.27 113.652 113.652 1420.000 75.5 747.53 113.651 113.651 1421.000 75.5 748.79 113.650 113.650 1422.000 75.5 750.05 113.649 113.649 1423.000 75.5 751.31 113.648

  • 113.648 1424.000 75.5 752.56 113.647 113.647 1425.000 75.5 753.82 113.646 113.646 1426.000 75.5 755.08 113.644 113.644 1427.000 75.5 756.34 113.643 113.643 1428.000 75.5 757.60 113.642 113.642 1429.000 75.5 758.85 113.641 113.641 Attachment 1 Page 34 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads. with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 21 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time * (Amp) (Amp-Hour)

V-V+ 1430.000 75.5 760.11 ll3.640 113.640 1431.000 75.5 761.37 113.639 ll3.639 1432.000 75.5 762.63 113.637 113.637 1433.000 75.5 763.89 113.636 113.636 1434.000 75.5 765.14 113.635 113.635 1435.000 75.5 766.40 113.634 113.634 1436.000 75.5 767.66 ll3.633 113.633 1437.000 75.5 768.92 113.631 ll3.631 1438.000 75.5 770.18 ll3.630 ll3.630 1439.000 75.5 771.43 113.629 113.629 1440.000 75.5 772.69 ll3.628 113.628 1441.000 75.5 773.95 113.627 113.627 1442.000 75.5 775.21 ll3._625 113.625 1443.000 75.5 776.47 113.624 113.624 1444.000 75.5" 777.72 113.623 113.623 1445.000 75.5 778.98 113.622 113.622 '1446.000 75.5 780.24 ll3.621 ll3.621 1447.000 75.5 781.50 113.619 113.619 1448.000 75.5 782.75 ll3.618 113.618 1449.000 75.5 784.01 113.617 113.617 1450.000 75.5 785.27 113.616 113.616 1451.000 75.5 786.53 113.614 113.614 1452.000 75.5 787.79 113.613 113.613 1453.000 75.5 789.04 113.612 113.612 1454.000 75.5 790.30 ll3.6l] 113.61] 1455.000 75.5 791.56 113.609 113.609 1456.000 75.5 792.82 ll3.608 113.608 1457.000 75.5 794.08 113.607 113.607 1458.000 75.5 795.33 113.606 113.606 1459.000 75.5 796.59 113.604 113.604 1460.000 75.5 797.85 113.603 113.603 1461.000 75.5 799.11 113.602 113.602 1462.000 75.5 800.37 113.601 113.601 1463.000 75.5 801.62 113.599 113.599 1464.000 75.5 802.88 ll3.598 113.598 1465.000 75.5 804.14 113.597 113.597 1466.000 75.5 805.40 ll3.595 113.595 1467.000 75.5 806.66 113.594 113.594 1468.000 75.5 807.91 113.593 113.593 1469.000 75.5 809.17 113.592 113.592 1470.000 75.5 810.43 113.590 113.590 1471.000 75.5 811.69 113.589 113.589 1472.000 75.5 812.95 113.588 113.588 1473.000

  • 75.5 814.20 113.586 113.586 1474.000 75.5 815.46 ll3.585 113.585 1475.000 75.5 816.72 113.584 ll3.584 1476.000 75.5 817.98 113.583 113.583 1477.000 75.5 819.24 113.581 113.581 1478.000 75.5 820.49 113.580 113.580 1479.000 75.5 821.75 113.579 113.579 1480.000 75.5 823.01 ll3.577 113.577 1481.000 75.5 824.27 113.576 ll3.576 1482.000 75.5 825.53 113.575 113.575 1483.000 75.5 826.78 113.573 ll3.573 1484.000 75.5 828.04 113.572 113.572 1485.000 75.5 829.30 113.571 113.571 1486.000 75.5 830.56 113.569 113.569 1487.000 75.5 831.81 ll3.568 113.568 1488.000 75.5 833.07 113.567 ll.3.567 1489.000 75.5 834.33 113.565 ll3.565 1490.000 75.5 835.59 113.564 113.564 1491.000 75.5 836.85 113.562 113.562 1492.000 75.5 838.10 113.561 113.561 1493.000 75.5 839.36 113.560 113.560 1494.000 75.5 840.62 ll3.558 113.558 1495.000 75.5 841.88 113.557 113.557 1496.000 75.5 843.14 ll3.556 113.556 1497.000 75.5 844.39 113.554 ll3.554 1498.000 75.5 845.65 113.553 113.553 1499.000 75.5 846.91 113.551 113.551 1500.000 75.5 848.17 113.550 113.550 1501.000 75.5 849.43 113.549 113.549 Attachment 1 Page 35 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE .1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 22 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1502.000 75.5 850.68 113.547 113.547 1503.000 75.5 851.94 113.546 113.546 1504.000 75.5 853.20 113.544 113.544 1505.000 75.5 854.46 113.543 113.543 1506.000 75.5 855.72 113.538 113.538 1507.000 75.5 856.97 113.534 113.534 1508.000 75.5 858.23 113.529 113.529 1509.000 75.5 859.49 113.525 113.525 1510.000 75.5 860.75 113.520 113.520 1511.000 75.5 862.01 113.516 113.516 1512.000 75.5 863.26 113.511 113.511 1513.000 75.5 864.52 113.507 113.507 1514.000 75.5 865.78 113.502 113.502 1515.000 75.5 867.04 113.498 113.498 1516.000 75.5 868.30 113.493 113.493 1517.000 75.5 869.55 113.489 113.489 1518.000 75.5 870.81 113.484 113.484 1519.000 75.5 872.07 113.479 113.479 1520.000 75.5 873.33 113.475 113.475 1521.000 75.5 874.59 113.470 113.470 1522.000 75.5 875.84 113.466 113.466 1523.000 75.5 877.10 113.461 113.461 1524.000 75.5 878.36 113.457 113.457 1525.000 75.5 879.62 113.452 113.452 1526.000 75.5 880.87 113.448 113.448 1527.000 75.5 882.13 113.443 113.443 1528.000 75.5 883.39 113.438 113.438 1529.000 75.5 884.65 113.434 113.434 1530.000 75.5 885.91 113.429 113.429 1531.000 75.5 887.16 113.425 113.425 1532.000 75.5 888.42 113.420 113.420 1533.000 75.5 889.68 113.415 113.415 1534.000 75.5 890.94 113.411 113.411 1535.000 75.5 892.20 113.406 113.406 1536.000 75.5 893.45 113.402 113.402 1537.000 75.5 894.71 113.397 113.397 1538.000 75.5 895.97 113.392 113.392 1539.000 75.5 897.23 113.389 113.389 1540.000 75.5 898.49 113.385 113.385 1541.000 75.5 899.74 113.382 113.382 1542.000 75.5 901.00 113.378 113.378 1543.000 75.5 902.26 113.374 113.374 1544.000 75.5 903.52 113.371 113.371 1545.000 75.5 904.78 113.367 113.367 1546.000 75.5 906.03 113.363 113.363 1547.000 75.5 907.29 113.360 113.360 1548.000 75.5 908.55 113.356 113.356 1549.000 75.5 909.81 113.352 113.352 1550.000 75.5 911.07 113.348 113.348 1551.000 75.5 912.32 113.344 113.344 1552.000 75.5 913.58 113.340 113.340 1553.000 75.5 914.84 113.336 113.336 1554.000 75.5 916.10 113.332 . 113.332 1555.000 75.5 917.36 113.328 113.328 1556.000 75.5 918.61 113.324 113.324 1557.000 75.5 919.87 113.320 113.320 1558.000 75.5 921.13 113.316 113.316 1559.000 75.5 922.39 113.312 113.312 1560.000 75.5 923.65 ilJ.307 113.307 1561.000 75.5 924.90 113.303 113.303 1562.000 75.5 926.16 113.299 113.299 1563.000 75.5 927.42 113.294 113.294 1564.000 75.5 928.68 113.290 113.290 1565.000 75.5, 929.93 113.286 113.286 1566.000 75.5 931.19 113.281 113.281 1567.000 75.5 932.45 113.277 113.277 1568.000 75.5 933.71 113.272 113.272 1569.000 75.5 934.97 113.268 113.268 1570.000 75.5 936.22 113.263 113.263 1571.000 75.5 937.48 113.258 113.258 1572.000 75.5 938.74 113.254 113.254 1573.000 75.5 940.00 113.249 113:249 Attachment 1 Page 36 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge

' 23 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Houl')

V-V+ Time (Amp) (Amp-Houl')

V-V+ 1574.000 75.5 941.26 113.244 113.244 1575.000 75.5 942.51 . 113.239 113.239 1576.000 75.5 943.77 113.234 113.234 1577.000 75.5 945.03 113.229 113.229 1578.000 75.5 946.29 113.224 113.224 1579.000 75.5 947.55 113.219 113.219 1580.000 . 75.5 948.80 113.214 113.214 1581.000 75.5 950.06 113.209 113.209 1582.000 75.5 951.32 113.204 113.204 1583.000 75.5 952.58 113.199 113.199 1584.000 75.5 953.84 113.193 113.193 1585.000 75.5 955.09 113.188 113.188 1586.000 75.5 956.35 113.183 113.183 1587.000 75.5 957.61 113.177 113.177 1588.000 75.5 958.87 113.173 113.173 1589.'000 75.5 960.13 113.168 113.168 1590.000 75.5 961.38 113.163 113.163 1591.000 75.5 962.64 113.158 113.158 1592.000 75.5 963.90 113.153 113.153 1593.000 75.5 965.16 113.147 113.147 1594.000 75.5 966.42 113.142 113.142 1595.000 75.5 967.67 113.137 113.137 1596.000 75.5 968.93 113.132 113.132 1597.000 75.5 970.19 113.127 113.127 1598.000 75.5 971.45 113.122 113.122 1599.000 75.5 972.71 113.117 113.117 1600.000 75.5 973.96 113.112 113.112 1601.000 75.5 975.22 113.107 113.107 1602.000 75.5 976.48 113.102 113.102 1603.000 75.5 977.74 113.097 113.097 1604.000 75.5 978.99 113.091 113.091 1605.000 75.5 980.25 113.086 113.086 1606.000 75.5 981.51 113.081 113.081 1607.000 75.5 982.77 113.076 113.076 1608.000 75.5 984.03 113.071 113.071 1609.000 75.5 985.28 113.066 113.066 1610.000 75.5 986.54 113.061 113.061 1611.000 75.5 987.80 113.056 113.056 1612.000 75.5 989.06 113.050 113.050 1613.000 75.5 990.32 113.045 113.045 1614.000 75.5 991.57 113.040 113.040 1615.000 75.5 992.83 113.035 113.035 1616.000 75.5 994.09 113.030 113.030 1617.000 75.5 995.35 113.025 113.025 1618.000 75.5 996.61 113.020 113.020 1619.000 75.5 997.86 113.015 113.015 1620.000 75.5 999.12 113.009 113.009 1621.000 75.5 1000.38 113.004 113.004 1622.000 75.5 1001.64 112.999 112.999 1623.000 75.5 1002.90 112.994 112.994 1624.000 75.5 1004.15 112.989 112.989 1625.000 75.5 1005.41 112.984 112.984 1626.000 75.5 1006.67 112.978 112.978 1627.000 75.5 1007.93 112.973 112.973 1628.000 75.5 1009.19 112.968 112.968 1629.000 75.5 1010.44 112.963 112.963 1630.000 75.5 1011.70 112.958 112.958 1631.000 75.5 1012.96 112.953 112.953 1632.000 75.5 1014.22 112.947 112.947 1633.000 75.5 1015.48 112.942 112.942 1634.000 75.5 1016.73 112.937 112.937 1635.000 75.5 1017.99 112.932 112.932 1636.000 75.5 1019.25 112.927 112.927 1637.000 75.5 1020.51 112.921 112.921 1638.000 75.5 1021.77 112.916 112.916 1639.000 75.5 1023.02 112.911 112.911 1640.000 75.5 1024.28 112.906 112.906 1641.000 75.5 1025.54 112.901 112.901 1642.000 75.5 1026.80 112.895 112.895 1643.000 75.5 1028.06 112.892 112.892 1644.000 75.5 1029.31 112.889 112.889 1645.000 75.5 1030.57 112.886 112.886 Attachment 1 Page 37 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC!' 14.1.0N .Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 24 11-17-2018 Attachment 1 . Page 38 of 85 KCICONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1646.000 75.5 1031.83 112.883 112.883 1647.000 75.5 1033.09 112.880 112.880 1648.000 75.5 1034.35 112.877 112.877 1649.000 75.5 1035.60 112.874 112.874 1650.000 75.5 1036.86 112.871 112.871 1651.000 75.5 1038.12 112.868 112.868 1652.000 75.5 1039.38 112.865 112.865 1653.000 75.5 1040.64 112.862 112.862 1654.000 75.5 1041.89 112.859 112.859 1655.000 75.5 1043.15 112.856 112.856 1656.000 75.5 1044.41 112.853 112.853 1657.000 75.5 1045.67 112.850 112.850 1658.000 75.5 1046.92 112.847 112.847 1659.000 75.5 1048.18 112.844 112.844 1660.000 75.5 1049.44 112.841 112.841 1661.000 75.5 1050.70 112.838 112.838 1662.000 75.5 1051.96 112.835 112.835 1663.000 75.5 1053.21 112.832 112.832 1664.000 75.5 1054.47 112.829 112.829 1665.000 75.5 1055.73 112.826 112.826 1666.000 75.5 1056.99 112.823 112.823 1667.000 75.5 1058.25 112.819 112.819 1668.000 75.5 1059.50 112.816 112.816 1669.000 75.5 1060.76 112.813 112.813 1670.000 75.5 1062.02 112.810 112.810 1671.000 75.5 1063.28 112.807 112.807 1672.000 75.5 1064.54 112.804 112.804 1673.000 75.5 1065.79 112.801 112.801 1674.000 75.5 1067.05 112.798 112.798 1675.000 75.5 1068.31 112.795 112.795 1676.000 75.5 1069.57 112.792 112.792 1677.000 75.5 1070.83 112.789 112.789 1678.000 75.5 1072.08 112.785 112.785 1679.000 75.5 1073.34 112.782 112.782 1680.000 75.5 1074.60 112.779 112.779 1681.000 75.5 1075.86 112.776 112.776 1682.000 75.5 1077.12 112.773 112.773 1683.000 75.5 1078.37 112.770 112.770 1684.000 75.5 1079.63 112.767 112.767 1685.000 75.5 1080.89 112.764 112.764 1686.000 75.5 1082.15 112.761 112.761 1687.000 75.5 1083.41 112.757 112.757 1688.000 75.5 1084.66 112.754 112.754 1689.000 75.5 1085.92 112.751 112.751 1690.000 75.5 1087.18 112.748 112.748 1691.000 75.5 1088.44 112.745 112.745 1692.000 75.5 1089.70 112.742 112.742 1693.000 75.5 1090.95 112.738 112.738 1694.000 75.5 1092.21 112.735 112.735 1695.000 75.5 1093.47 112.732 112.732 1696.000 75.5 1094.73 112.729 112.729 1697.000 75.5 1095.98 112.726 112.726 1698.000 75.5 1097.24 112.723 112.723 1699.000 75.5 1098.50 112.719 112.719 1700.000 75.5 1099.76 112.716 112.716 1701.000 75.5 1101.02 112.713 112.713 1702.000 75.5 1102.27 112.710 112.710 1703.000 75.5 1103.53 112.706 112.706 1704.000 75.5 1104.79 112.704 112.704 1705.000 75.5 1106.05 112.701 112.701 1706.000 75.5 1107.31 112.699 112.699 1707.000.

75.5 1108.56 112.696 112.696 1708.000 75.5 1109.82 112.694 112.694 1709.000 75.5 1111.08 112.692 112.692 1710.000 75.5 1112.34 112.689 112.689 1711.000 75.5 1113.60 112.687 112.687 1712.000 75.5 1114.85 112.684 112.684 1713.000 75.5 1116.11 112.682 112.682 1714.000 75.5 1117.37 112.679 112.679 1715.000 75.5 1118.63 112.677 112.677 1716.000 75.5 1119.89 112.674 112.674 1717.000 75.5 1121.14 112.672 112.672 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain , Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery lA48-HourCoping Study Discharl!e Discharj!e 25 11-17-2018 KCICONSULT Base Normal Current Capacity Voltal!e (V)

  • Current Capacity Voltal!e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1718.000 75.5 1122.40 112.669 112.669 1719.000 75.5 1123.66 112.667 112.667 1720.000 75.5 1124.92 ' ll2.664 ll2.664 1721.000 75.5 ll26.18 112.662 112.662 1722.000 75.5 1127.43 ll2.659 112.659 1723.000 75.5 ll28.69 112.657 112.657 1724.000 75.5

  • 1129.95 112.654 112.654 1725.000 75.5 1131.21 112.652 112.652 1726.000 75.5 1132.47 112.649 112.649 1727.000 75.5 1133.72 112.647 112.647 1728.000 75.5 1134.98 112.644 112.644 1729.000 75.5 , 1136.24 112.641 112.641 1730.000 75.5 1137.50 112.639 112.639 1731.000 75.5 1138.76 112.636 112.636 1732.000 75.5 ll40.01 112.634 112.634 1733.000 75.5 ll41.27 112.631 ll2.631 1734.000 75.5 . 1142.53 112.629 ll2.629 1735.000 75.5 1143.79 ll2.626 112.626 1736.000 75.5 ll45.04 112.623 112.623 1737.000 75.5 ll46.30 112.621 112.621 1738.000 75.5 1147.56 112.618 112618 1739.000 75.5 1148.82 112.615 112615 1740.000 75.5 1150.08 112.613 ll2.613 1741.000 75.5 1151.33 ll2.610 ll2.610 1742.000 75.5 1152.59 ll2.607 112.607 1743.000' 75.5 ll53.85 112.605 112.605 1744.000 75.5 1155.11 112.602 112.602 1745.000 75.5 1156.37 112.599 112.599 1746.000 75.5 1157.62 112.597 112.597 1747.000 75.5 1158.88 ll2.594 112.594 1748.000 75.5 ll60.14 ll2.591 112.591 1749.000 75.5 ll61.40 112.589 112.589 1750.000 75.5 1162.66 ll2.586 112.586 1751.000 75.5 1163.91 112.583 112.583 1752.000 75.5 1165.17' ll2.581 112.581 1753.000 75.5 1166.43 112.578 112.578 1754.000 75.5 1167.69 ll2.575 112.575 1755.000 75.5 1168.95 112.572 112.572 1756.000 75.5 1170.20 112.570 112.570 1757.000 75.5 1171.46 112.567 112.567 1758.000 75.5 1172.72 112.564 112.564 1759.000 75.5 1173.98 112.561 112.561 1760.000 75.5 1175.24 112.558 112.558 1761.000 75.5 1176.49 112.556 112.556 1762.000 75.5 1177.75 112.553 112.553 1763.000 75.5 117~.Ql 112.550 112.550 1764.000 75.5 1180.27 112.547 112.547 1765.000.

75.5 1181.53 112.544 112.544 1766.000 75.5 1182.78 112.540 112.540 1767.000 75.5 1184.04 112.537 112.537 1768.000 75.5 1185.30 112.533 -112.533 1769.000 75.5 1186.56 112.530 112.530 1770.000 75.5 1187.82 112.526 112.526 1771.000 75.5 1189.07 112.523 112.523 1772.000 75.5 1190.33 112.519 112.519 1773.000 75.5 1191.59 112.515 112.515 1774.000 75.5 1192.85 112.512 112.512 1775.000 75.5 1194.10 112.508 112.508 1776.000 75.5 1195.36 112.505 112.505 1777.000 75.5 1196.62 112.501 112.501 1778.000 75.5 1197.88 112.'<197 112.497 1779.000 75.5 1199.14 112.494 112.494 1780.000 75.5 1200.39 112:490 112.490 1781.000 75.5 1201.65 112.486 112.486 1782.000 75.5 1202.91 ll2.483 112.483 1783.000 75.5 1204.17 ll2.479 112.479 1784.000 75.5 1205.43 112.475 112.475 1785.000 75.5 1206.68 112.472 112.472 1786.000 75.5 1207.94 112.468 112.468 1787.000 75.5 1209.20 112.464 112.464 1788.000 75.5 1210.46 112.461 112.461 1789.000 75.5 1211.72 112.457 112.457 Attachment 1 Page 39 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Discharge Discharge 26 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1790.000 75.5 1212.97 112.453 112.453 1791.000 75.5 1214.23 112.449 112.449 1792.000 75.5 1215.49 112.446 112.446 1793.000 75.5 1216.75 112.442 112.442 1794.000 75.5 1218.01 112.438 112.438 1795.000 75.5 1219.26 112.434 112.434 1796.000 75.5 1220.52 112.431 112.431 1797.000 75.5 1221.78 112.427 112.427 1798.000 75.5. 1223.04 112.423 112.423 1799.000 75.5 1224.30 112.419 112.419 1800.000 75.5 1225.55 112.415 112.415 1801.000 75.5 1226.81 112.412 112.412 1802.000 75.5 1228.07 112.408 112.408 1803.000 75.5 1229.33 112.404 112.404 1804.000 75.5 1230.59 112.400 112.400 1805.000 75.5. 1231.84 112.396 112.396 1806.000 75.5 1233.10 112.392 112.392 1807.000 75.5 1234.36 112.389 112.389 1808.000 75.5 1235.62 112.385* li2.385 1809.000 75.5 1236.88 112.381 112.381 1810.000 75.5, 1238.13 112.377 112.377 1811.000 75.5 1239.39 112.373 112.373 1812.000 75.5 1240.65 112.369 112.369 1813.000 75.5 1241.91 112.365 112.365 1814.000 75.5 1243.16 112.361 112.361 1815.000 75.5 1244.42 112.357 112.357 1816.000 75.5 1245.68 112.353 112.353 1817.000 75.5 1246.94 112.349 112.349 1818.000 75.5 1248.20 112.345 112.345 1819.000 75.5 1249.45 112.341 112.341 1820.000 75.5 1250.71 112.337 112.337 1821.000 75.5 1251.97 112.333 112.333 1822.000 75.5 1253.23 112.329 112.329 1823.000 75.5. 1254.49 112.325 112.325 1824.000 75.5 1255.74 112.321 112.321 1825.000 75.5 1257.00 112.317 112.317 1826.000 75.5 1258.26 112.313 112.313 1827.000 75.5 1259.52 112.309 112.309 1828.000 75.5 1260.78 112.305 112.305 1829.000 75.5 1262.03 112.301 112.301 1830.000 75.5 1263.29 112.297 112.297 1831.000 75.5 1264.55 112.293 112.293 1832.000 75.5 1265.81 112.289 112.289 1833.000 75.5 1267.07 112.285 , 112.285 1834.000 75.5 1268.32 112.281 112.281 1835.000 75.5 1269.58 112.278 112.278 1836.000 75.5 1270.84 112.274 112.274 1837.000 75.5 1272.10 112.271 112.271 1838.000 75.5 1273.36 *112.268 112.268 1839.000 75.5 1274.61 112.264 112.264 1840.000 75.5 1275.87 112.261 112.261 1841.000 75.5 1277.13 112.257 112.257 1842.000 75.5 1278.39 112.254 112.254 1843.000 75.5 1279.65 112.250 112.250 1844.000 75.5 1280.90 112.246 112.246 1845.000 75.5 1282.16 112.243 112.243 1846.000 75.5 1283.42 112.239 112.239 1847.000 75.5 1284.68 112.236 112.236 1848.000 75.5 1285.94 112.232 112.232 1849.000 75.5 1287.19 112.229 112.229 1850.000 75.5 1288.45 112.225 112.225 1851.000 75.5 1289.71 112.221 112.221 1852.000 75.5 1290.97 112.218 112.218 1853.000 75.5 1292.22 112.214 112.214 1854.000 75.5 1293.48 112.210 112.210 1855.000 75.5 1294.74 112.206 112.206 1856.000 75.5 1296.00 112.202 112.202 1857.000 75.5 1297.26 112.198 112.198 1858.000 75.5 1298.51 112.193 112.193 1859.000 75.5 1299.77 112.189 112.189 1860.000 75.5 1301.03 112.185 112.185 1861.000 75.5 1302.29 112.181 112.181 Attachment 1 Page 40 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study Dischar2e Dischar2e 27 11-17-2018 Attachment 1 Page 41 of 85 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Volta2e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-H~ur)

V-V+ 1862.000 75.5 1303.55 112.176 112.176 1863.000 75.5 1304.80 112.172 112.172 1864.000 75.5 1306.06 112.168 112.168 1865.000 75.5 1307.32 112.163 112.163 1866.000 75.5 1308.58 112.159 112.159 1867.000 75.5 1309.84 112.155 112.155 1868.000 75.5 1311.09 112.150 112.150 1869.000 75.5 1312.35 112.146 112.146 1870.000 75.5 1313.61 112.142 112.142 1871.000 75.5 1314.87 112.137 112.137 1872.000 75.5 1316.13 112.133 112.133 1873.000 75.5 1317.38 112.128 112.128 1874.000 75.5 1318.64 112.124 112.124 1875.000 75.5 1319.90 112.119 112.119 1876.000 75.5 1321.16 112.115 112.115 1877.000 75.5 1322.42 112.110 112.110 1878.000 75.5 1323.67 112.105 112.105 1879.000 75.5 1324.93 112.101 112.101 1880.000 75.5 1326.19 112.096 112.096 1881.000 75.5 1327.45 112.092 112.092 1882.000 75.5 1328.71 112.087 112.087 1883.000 75.5 1329.96 112.082 112.082 1884.000 75.5 1331.22 112.078 112.078 1885.000 75.5 1332.48 112.073 112.073 1886.000 75.5 1333.74 112.068 112.068 1887.000 75.5 1335.00 112.063 112.063 1888.000 75.5 1336.25 112.059 112.059 1889.000 75.5 1337.51 112.054 112.054 1890.000 75.5 1338.77 112.049 112.049 1891.000 75.5 1340.03 112.044 112.044 1892.000 75.5 1341.29 112.039 112.039 1893.000 75.5 1342.54 112.034 112.034 1894.000 75.5 1343.80 112.029 112.029 1895.000 75.5 1345.06 112.025 112.025 1896.000 75.5 1346.32 112.020 112.020 1897.000 75.5 1347.57 112.015 112.015 1898.~00 75.5 1348.83 112.011 112.011 1899.000 75.5 1350.09 112.006 112.006 1900.000 75.5 1351.35 112.001 112.001 1901.000 75.5 1352.61 111.997 111.997 1902.000 75.5 1353.86 111.992 111.992 1903.000 75.5 1355.12 111.987 111.987 1904.000 75.5 1356.38 111.982 111.982 1905.000 75.5 1357.64 111.977 111.977 1906.000 75.5 1358.90 lll.973 111.973 1907.000 75.5 1360.15 111.968 111.968 1908.000 75.5 1361.41 111.963 111.963 1909.000 75.5 1362.67 111.958 111.958 1910.000 75.5 1363.93 111.953 lll.953 1911.000 75.5 1365.19 111.948 111.948 1912.000 75.5 1366.44 111.943 111.943 1913.000 75.5 1367.70 111.938 111.938 1914.000 75.5 1368.96 111.933 lll.933 1915.000 75.5 1370.22 111.928 lll.928 1916.000 75.5 1371.48 111.922 111.922 1917.000 75.5 1372.73 111.917 111.917 1918.000 75.5 1373.99 111.912 lll.912 1919.000 75.5 1375.25 111.907 111.907 1920.000 75.5 1376.51 111.902 111.902 1921.000 75.5 1377.77 111.896 111.896 1922.000 75.5 1379.02 111.891 111.891 1923.000 75.5 1380.28 111.886 111.886 1924.000 75.5 1381.54 111.880 111.880 1925.000 75.5 1382.80 111.875 111.875 1926.000 75.5 1384.06 lll.870 111.870 1927.000 75.5 1385.31 111.864 111.864 1928.000 75.5 1386.57 111.859 111.859 1929.000 75.5 1387.83 lll.853 111.853 1930.000 75.5 1389.09 lll.848 111.848 1931.000 75.5 1390.35 111.842 111.842 1932.000 75.5 1391.60 lll.837 111.837 1933.000 75.5 1392.86 111.831 111.831 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery 1A48-Hour Coping Study Discharge Discharge 28 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1934.000 75.5 1394.12 111.826 111.826 1935.000 75.S 1395.38 111.820 111.820 1936.000 75.5 1396.63 111.814 111.814 1937.000 75.5 1397.89 111.808 111.808 1938.000 75.5 1399.15 111.803 111.803 1939.000 75.5 1400.41 111.797 111.797 1940.000 75.5 1401.67 111.791 111.791 1941.000 75.5 1402.92 111.785 111.785 1942.000 75.S 1404.18 111.779 111.779 1943.000 75.5 1405.44 111.773 111.773 1944.000 75.5 1406.70 111.768 111.768 1945.000 75.S 1407.96 111.762 111.762 1946.000 75.5 1409.21 111.756 111.756 1947.000 75.5 1410.47 111.749 111.749 1948.000 75.5 1411.73 111.743 111.743 1949.000 75.S 1412.99 111.737 111.737 1950.000 75.5 1414.25 111.731 111.731 1951.000 75.5 1415.50 111.725 111.725 1952.000 75.S 1416.76 111.719 111.719 1953.000 75.5 1418.02 111.713 111.713 1954.000 75.S 1419.28 111.706 111.706 1955.000 75.5 1420.54 111.700 111.700 1956.000 75._5 1421.79 111.694 111.694 1957.000 75.5 1423.05 111.687 111.687 1958.000 75.5 1424.31 111.681 111.681 1959.000 75.5 1425.57 111.674 111.674 1960.000 75.5 1426.83 111.668 111.668 1961.000 75.S 1428.08 111.661 111.661 1962.000 75.5 1429.34 111.655 111.655 1963.000 75.S 1430.60 111.648 111.648 1964.000 75.5 1431.86 111.641 111.641 1965.000 75.S 1433.12 111.635 111.635 1°966.000 75.5 1434.37 11L628 111.628 1967.000 75.S 1435.63 111.621 111.621 1968.000 75.5 1436.89 111.614 111.614 1969.000 75.S 1438.15 111.607 111.607 1970.000 75.5 1439.41 111.601 111.601 1971.000 75.5 1440.66 111.593 111.593 1972.000 75.5 1441.92 111.583 111.583 1973.000 75.5 1443.18 111.574 111.574 1974.000 75.5 1444.44 111.565 111.565 1975.000 75.5 1445.69 lll.556 111.556 1976.000 75.S 1446.95 111.546 111.546 1977.000 75.5 1448.21 111.537 111.537 1978.000 75.5 1449.47 111.527 111.527 1979.000 75.5 1450.73 111.517 111.517 1980.000 75.5 1451.98 111.507 111.507 1981.000 75.5 1453.24 111.498 111.498 1982.000 75.5 , 1454.50 111.488 111.488 1983.000 75.5 1455.76 111.477 111.477 1984.000 75.5 1457.02 111.467 111.467 1985.000 75.5 1458.27 111.457 111.457 1986.000 75.S 1459.53 111.447 111.447 1987.000 75.5 1460.79 111.436 111.436 1988.000 75.5 1462.05 111.426 111.426 1989.000 75.5 1463.31 111.415 111.415 1990.000 75.5 1464.56 111.404 111.404 1991.000 75.5 1465.82 111.393 111.393 1992.000 75.5 1467.08 111.382 111.382 1993.000 75.5 1468.34 111.371 lll.371 1994.000 75.5 1469.60 111.360 111.360 1995.000 75.5 1470.85 111.349 111.349 1996.000 75.5 1472.11 111.337 111.337 1997.000 75.5 1473.37 111.326 111.326 1998.000 75.5 1474.63 111.314 111.314 1999.000 75.5 1475.89 111.303 111.303 2000.000 75.5 1477.14 111.291 111.291 2001.000 75.5 1478.40 111.279 111.279 2002.000 75.5 1479.66 111.267 111.267 2003.000 75.5 1480.92 111.254 111.254 2004.000 75.5 1482.18 111.242 111.242 2005.000 75.5 1483.43 111.230 111.230 Attachment 1 Page 42 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study Discharge Discharge 29 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2006.000 75.5 1484.69 111.217 111.217 2007.000 75.5 1485.95 111.204 111.204 2008.000 75.5 1487.21 111.191 111.191 2009.000 75.5 1488.47 111.178 111.178 2010.000 75.5 1489.72 111.165 lll.165 2011.000 75.5 1490.98 111.152 111.152 2012.000 75.5 1492.24 111.138 111.138 2013.000 75.5 1493:50 111.125 lll.125 2014.000 75.5 1494.75 111.111 111.111 2015.000 75.5 1496.01 111.097 111.097 2016.000 75.5 1497.27 111.083 111.083 2017.000 75.5 1498.53 111.069 111.069 2018.000 75.5 1499.79 111.055 111.055 2019.000 75.5 1501.04 111.040 111.040 2020.000 75.5 1502.30 111.026 111.026 2021.000 75.5 1503.56 111.011 111.011 2022.000 75.5 1504.82 110.996 110.996 2023.000 75.5 1506.08 110.981 *110.981 2024.000 75.5 1507.33 110.966 110.966 2025.000 75.5 1508.59 110.958 110.958 2026.000 75.5 1509.85 110.949 110.949 2027.000 75.5 1511.11 110.941 110.941 2028.000 75.5 1512.37 110.933 110.933 2029.000 75.5 1513.62 110.924 110.924 2030.000 75.5 1514.88 110.916 110.916 2031.000 75.5 1516.14 110.907 110.907 2032.000 75.5 1517.40 110.899 110.899 2033.000 75.5 1518.66 110.890 110.890 2034.000 75.5 1519.91 110.881 110.881 2035.000 75.5 1521.17 110.873 110.873 2036.000 75.5 1522.43 110.864 110.864 2037.000 75.5 1523.69 110.855 110.855 2038.000 75.5 1524.95 110.846 110.846 2039.000 75.5 1526.20 110.838 110.838 2040.000 75.5 1527.46 110.829 110.829 2041.000 75.5 1528.72 110.820 110.820 2042.000 75.5 1529.98 110.811 110.811 2043.000 75.5 1531.24 110.802 110.802 2044.000 75.5 1532.49 110.793 110.793 2045.000 75.5 1533.75 110.783 110.783 2046.000 75.5 1535.01 110.774 110.774 2047.000 75.5 1536.27 110.765 110.765 2048.000 75.5 1537.53 110.756 110.756 2049.000 75.5 1538.78 110.747 110.747 2050.000 75.5 1540.04 110.737 110.737 2051.000 75.5 1541.30 110.728 110.728 2052.000 75.5 1542.56 110.718 110.718 2053.000 75.5 1543.81 110.709 110.709 2054.000 75.5 1545.07 110.699 110.699 2055.000 75.5 1546.33 110.690 110.690 2056.000 75.5 1547.59 110.680 110.680 2057.000 75.5 1548.85 110.670 110.670 2058.000 75.5 1550.10 110.661 110.661 2059.000 75.5 1551.36 110.651 110.651 2060.000 75.5 1552.62 110.641 110.641 2061.000 75.5 1553.88 110.631 110.631 2062.000 75.5 1555.14 110.621 110.621 2063.000 75.5 1556.39 110.611 110.611 2064.000 75.5 1557.65 110.601 110.601 2065.000 75.5 1558.91 110.591 110.591 2066.000 75.5 1560.17 110.581 110.581 2067.000 75.5 1561.43 110.571 110.571 2068.000 75.5 1562.68 110.560 110.560 2069.000 75.5 1563.94 110.550 110.550 2070.000 75.5 1565.20 110.540 110.540 2071.000 75.5 1566.46 110.529 110.529 2072.000 75.5 1567.72 110.519 110.519 2073.000 75.5 1568.97 110.508 110.508 2074.000 75.5 1570.23 110.498 110.498 2075.000 75.5 1571.49 110.487 110.487 2076.000 75.5 1572.75 110.476 110.476 2077.000 75.5 1574.01 110.466 110.466 Attachment 1 Page 43 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study Discharge Discharge 30 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2078.000 75.5 1575.26 110.455 110.455 2079.000 75.5 1576.52 I 10.444 110.444 2080.000 15.5 1577.78 110.433 110.433 2081.000 15.5 1579.04 110.422 110.422 2082.000 75.5 1580.30 110.411 110.411 2083.000 15.5 1581.55 110.400 110.400 2084.000 15.5 1582.81 110.389 110.389 2085.000 15.5 1584.07 110.377 110.377 2086.000 15.5 1585.33 110.362 110.362 2087.000 75.5 1586.59 110.347 110.347, 2088.0QO 15.5 1587.84 110.331 110.331 2089.000 15.5 1589.10 110.316 110.316 2090.000 15.5 1590.36 110.300 110.300 2091.000 15.5 1591.62 110.284 110.284 2092.000 15.5 1592.88 110.268 110.268 2093.000 15.5 1594.13 110.252 110.252 2094.000 15.5 1595.39 110.236 110.236 2095.000 15.5 1596.65 110.219 110.219 2096.000 15.5 1597.91 110.200 110.200 2097.000 75.5 1599.16 110.194 110.194 2098.000 75.5 1600.42 110.186 110.186 2099.000 15.5 1601.68 110.179 110.179 2100.000 15.5 1602.94 110.171 110.171 2101.000 15.5 1604.20 110.164 110.164 2102.000 15.5 1605.45 110.156 110.156 2103.000 15.5 1606.71 110.149 .!10.149 2104.000 15.5 1607.97 110.141 110.141 2105.000 75.5 1609.23 110.133 110.133 2106.000 15.5 1610.49 110:126 110.126 2107.000 15.5 1611.74 110.118 110.118 2108.000 75.5 1613.00 110.111 110.111 2109.000 75.5 1614.26 110.103 110.103 2110.000 15.5 1615.52 110.095 110.095 2111.000 15.5 1616.78 110.087 110.087 2112.000 15.5 1618.03 110.080 110.080 2113.000 15.5 1619.29 110.072 110.072 2114.000 15.5 1620.55 110.064 110.064 2115.000 15.5 1621.81 110.056 110.056 2116.000 15.5 1623.07 lJ0.049 110.049 2117.000 15.5 1624.32 110.041 110.041 2118.000 15.5 1625.58 110.033 110.033 -2119.000 15.5 1626.84 110.025 110.025 2120.000 15.5 1628.10 110.020 110.020 2121.000 15.5 1629.36 110.016 110.016 2122.000 15.5 1630.61 110.013 110.013 2123.000 15.5 1631.87 110.009 110.009 2124.000 15.5 1633.13 110.005 110.005 2125.000 15.5 1634.39 110.002 110.002 2126.000 15.5 1635.65 109.998 109.998 2127.000 75.5 1636.90 109.994 109.994 2128.000 15.5 1638.16 109.990 109.990 2129.000 75.5 1639.42 109.987 109.987 2130.000 15.5 1640.68 109.983 109.983 2131.000 75.5 1641.94 109.979 109.979 2132.000 15.5 1643.19 109.975 109.975 2133.000 75.5 1644.45 109.971 109.971 2134.000 15.5 1645.71 109.967 109.967 2135.000 75.5 1646.97 109.963 109.963 2136.000 15.5 1648.22 109.959 109.959 2137.000 75.5 1649.48 109.955 109.955 2138.000 15.5 1650.74 109.951 109.951 2139.000 75.5 1652.00 109.947 109.947 2140.000 75.5 1653.26 109.943 109.943 2141.000 15.5 1654.51 109.939 109.939 2142.000 75.5 1655.77 109.935 109.935 2143.000 15.5 1657.03 109.931 109.931 2144.000 15.5 1658.29 109.927 109.927 2145.000 15.5 1659.55 109.923 109.923 2146.000 75.5 1660.80 109.918 109.918 2147.000 15.5 1662.06 109.914 109.914 2148.000 75.5 1663.32 109.910 109.910 2149.000 15.5 1664.58 109.906 109.906 Attachment 1 Page 44 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 Revision:

CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study ,Discharge Discharge 31 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2150.000 75.5 1665.84 109.901 109.901 2151.000 75.5 1667.09 109,897 109.897 2152.000 75.5 1668.35 109.893 109.893 2153.000 75.5 1669.61 109.888 109.888 2154.000 75.5 1670.87 109.884 109.884 2155.000 75.5 1672.13 109.879 109.879 2156.000 75.5 1673.38 109.875 109.875 2157.000 75.5 1674.64 109.870 109.870 2158.000 75,5 1675.90 109.866 109.866 2159.000 75.5 1677.16 109.861 109.861 2160.000 75.5 1678.42 109.856 109.856 2161.000 75.5 1679.67 109.852 109.852 2162.000 75.5 1680.93 109.847 109.847 2163,000 75.5 1682.19 109,842 109.842 2164.000 75.5 1683.45 109.838 109.838 2165.000 75.5 1684.71 109,833 109.833 2166.000 75.5 1685.96 109.828 109.828 2167.000 75.5 1687.22 109.823 109.823 2168.000 75.5 1688.48 109.818 109.818 2169.000 75.5 1689.74 109,813 109.813 2170.000 75.5 1691.00 109.808 109.808 2171.000 75.5 1692.25 109.803 109,803 2172.000 75.5 1693.51 109.798 109.798 2173.000 75.5 1694.77 109.793 109,793 2174.000 75.5 1696.03 109.788 109.788 2175.000 75.5 1697.28 109,783 109.783 2176.000 75.5 1698.54 109.778 109.778 2177,000 75.5 1699.80 109.773 109.773 2178.000 75,5 1701.06 109.768 109.768 2179.000 75.5 1702.32 109.762 109.762 2180.000 75.5 1703.57 109.757 109.757 2181.000 75.5 1704:83 109.752 109.752 2182.000 75.5 1706.09 109.746 109.746 2183.000 75.5 1707.35 109.741 109.741 2184.000 75.5 1708.61 109.735 109.735 2185.000 75.5 1709.86 109.730 109.730 2186.000 75.5 1711.12 109.724 109.724 2187.000 75.5 1712,38 109.719 109.719 2188.000 75.5 1713.64 109.713 109.713 2189.000 75.5 1714.90 109.707 109.707 2190.000 75.5 1716.15 109.702 109.702 2191.000 75.5 1717.41 109.696 109.696 2192.000 75.5 1718,67 109.690 109.690 2193.000 75.5 1719.93 109.684 109.684 2194.000 75.5 1721.19 109.678 109.678 2195.000 75.5 1722.44 109.673 109.673 ' 2196.000 75.5 1723.70 109.667 109.667 2197.000 75.5 1724.96 109.661 109.661 2198.000 75.5 1726.22 109.654 109.654 2199.000 75.5 1727.48 109,648 109,648 2200.000 75.5 1728,73 109.642 109.642 2201.000 75.5 1729.99 109,636 109.636 2202.000 75.5 1731.25 109.630 109.630 2203.000 75.5 1732.51 109.623 109.623 2204.000 75.5 1733.77 109.617 109.617 2205.000 75.5 1735.02 109.611 109.611 2206.000 75.5 1736.28 109.604 109.604 2207.000 75.5 1737.54 109.598 109.598 2208.000 75.5 1738.80 109.591 109.591 2209.000 75.5 1740.06 109.585 109.585 2210.000 75.5 1741.31 109.578 109,578 2211.000 75.5 1742.57 109.571 109.571 2212.000 75.5 1743.83 109.564 109.564 2213.000 75.5 1745.09 109.558 109.558 2214.000 75.5 1746.34 109.551 109.551 2215.000 75.5 1747.60 109.542 109.542 2216.000 75.5 1748.86 109.532 109.532 2217.000 75.5 1750.12 109.522 109.522 2218.000 75.5 1751.38 109.512 109.512 2219.000 75.5 1752.63 109.501 109.501 2220.000 75.5 1753.89 109.490 109.490 2221.000 75.5 1755.15 109.479 109.479 Attachment 1 Page 45 of 85 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously

  • for greater than 24 Hrs and with RCIC for greater than 4 Hrs Project: Clinton Flex Study ETAP Page: 32 14.1.0N Location:

KC! Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSIAIRCIC-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal DIV I Battecy IA 48-Hour Coping Study Dischare.e Dischare.e Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2222.000 75.5 1756.41 109.468 109.468 2223.000 75.5 1757.67 109.456 109.456 2224.000 75.5 1758.92 109.444 109.444 2225.000 75.5 1760.18 109.432 109.432 2226.000 75.5 1761.44 109.420 109.420 2227.000 75.5 1762.70 109.408 109.408 2228.000 75.5 1763.96 109.395 109.395 2229.000 75.5 1765.21 109.382 109.382 2230.000 75.5 1766.47 109.369 109.369 2231.000 75.5 1767.73 109.356 109.356 2232.000 75.5 1768.99 109.342 109.342 2233.000 75.5 1770.25 109.328 109.328 2234.000 75.5 1771.50 109.314 109.314 2235.000 75.5 1772.76 109.300 109.300 2236.000 75.5 1774.02 109.285 109.285 2237.000 75.5 1775.28 109.271 f09.271 2238.000 75.5 1776.54 109.255 109.255 2239.000 75.5 1777.79 109.240 109.240 2240.000 75.5 1779.05 109.224 109.224 2241.000 75.5 1780.31 109.208 109.208 2242.000 75.5 1781.57 109.192 109.192 2243.000 75.5 1782.83 109.175

  • 109.175 2244.000 75.5 1784.08 109.158 109.158 2245.000 75.5 1785.34 109.140 109.140 2246.000 75.5 1786.60 109.123 109.123 2247.000 75.5 1787.86 109.104 109.104 2248.000 75.5 1789.12 109.086 109.086 2249.000 75.5 1790.37 109.067 109.067 2250.000 75.5 1791.63 109.048 109.048 2251.000 75.5 1792.89 109.028 109.028 2252.000 75.5 1794.15 109.008 109.008 2253.000 75.5 1795.41 108.988 108.988 2254.000 75.5 1796.66 108.977 108.977 2255.000 75.5 1797.92 108.965 108.965 2256.000 75.5 1799.18 108.953 108.953 2257.000 75.5 1800.44 108.941 108.941 2258.000 75.5 1801.69 108.929 108.929 2259.000 75.5 1802.95 108.917 108.917 2260.000 75.5 1804.21 108.904 108.904 2261.000 75.5 1805.47 108.892 108.892 2262.000 75.5 1806.73 108.879 108.879 2263.000 75.5 1807.98 108.867 108.867 2264.000 75.5 1809.24 108.854 108.854 2265.000 75.5 1810.50 108.841 108.841 2266.000 75.5 1811.76 108.829 108.829 2267.000 75.5 1813.02 108.816 108.816 2268.000 75.5 1814.27 108.802 108.802 2269.000 75.5 1815.53 108.789 108.789 2270.000 75.5 1816.79 108.776 108.776 2271.000 75.5 1818.05 108.763 108.763 2272.000 75.5 1819.31 108.749 108.749 2273.000 75.5 1820.56 108.736 108.736 2274.000 75.5 1821.82 108.722 108.722 2275.000 75.5 1823.08 108.708 108.708 2276.000 75.5 1824.34 108.694 108.694 2277.000 75.5 1825.60 108.680 108.680 2278.000 75.5 1826.85 108.665 108.665 2279.000 75.5 1828.11 108.650 108.650 2280.000 75.5 1829.37 108.636 108.636 2281.000 75.5 1830.63 108.621 108.621 2282.000 75.5 1831.89 108.606 108.606 2283.000 75.5 1833.14 108.591 108.591 2284.000 75.5 1834.40 108.576 108.576 2285.000 75.5 1835.66 108.560 108.560 2286.000 75.5 1836.92 108.545 108.545 2287.000 75.5 1838.18 108.529 108.529 2288.000 75.5 1839.43 108.513 108.513 2289.000 75.5 1840.69 108.498 108.498 2290.000 75.5 1841.95 108.482 108.482 2291.000 75.5 1843.21 108.466 108.466 2292.000 15.5 1844.47 108.449 108.449 2293.000 15.5 1845.72 108.433 108.433 Attachment 1 Page 46 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCl 14.1.0N Date: SN: Badar Hussain Study Case: BSlAlRClC-48 Revision:

CPS SBO Study Config.: DIV I Battery 1A48-Hour Coping Study Discharge Discharge 33 11-17-2018 KCICONSULT Base Nonnal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2294.000 75.5 1846.98 108.417 108.417 2295.000 75.5 1848.24 108.400 108.400 2296.000 75.5 1849.50 108.383 108.383 2297.000 75.5 1850.75 108.367 108.367 2298.000 75.5 1852.01 108.350 108.350 2299.000 75.5 1853.27 108.332 108.332 2300.000 75.5 1854.53' 108.315 108.315 2301.000 75.5 1855.79 108.298 108.298 2302.000 75.5 1857.04 108.280 108.280 2303.oop 75.5 1858.30 108.266 108.266 2304.000 75.5 1859.56 108.255 108.255 2305.000 75.5 1860.82 108.243 108.243 2306.000 75.5 1862.08 108.232 108.232 2307.000 75.5 1863.33 108.220 108.220 2308.000 75.5 1864.59 108.209 108.209 2309.000 75.5 1865.85 108.198 108.198 2310.000 75.5 1867.11 108.186 108.186 2311.000 75.5 1868.37 108.175 108.175 2312.000 ' 75.5 1869.62 108.163 108.163 2313.000 75.5 1870.88 108.151 108.151 2314.000 75.5 1872.14 108.140 108.140 2315.000 75.5 1873.40 108.128 108.128 2316.000 75.5 1874.66 108.117 108.117 2317.000 75.5 1875.91 108.105 108.105 2318.000 75.5 1877.17 108.093 108.093 2319.000 75.5 1878.43 108.082 108.082 2320.000 75.5 1879.69 108.070 108.070 2321.000 75.5 1880.95 108.058 108.058 2322.000 75.5 1882.20 108.047 108.047 2323.000 75.5 1883.46 . 108.035 108.035 2324.000 75.5 1884.72 108.023 108.023 2325.000 75.5 1885.98 108.011 108.011 2326.000 75.5 1887.24 108.000 108.000 2327.000 75.5 1888.49 107.988 107.988 2328.000 75.5 1889.75 107.976 107.976 2329.000 75.5 1891.01 107.964 107.964 2330.000 75.5 1892.27 107.952 107.952 2331.000 75.5 1893.53 107.940 107.940 2332.000 75.5 1894.78 107.928 107.928 2333.000 75.5 1896.04 107.916 107.916 2334.000 75.5 1897.30 107.904 107.904 2335.000 75.5 1898.56 107.892 107.892 2336.000 75.5 1899.81 107.880 107.880 2337.000 75.5 1901.07 107.868 107.868 2338.000 75.5 1902.33 107.856 107.856 2339.000 75.5 1903.59 107.844 107.844 2340.000 75.5 1904.85 107.832 107.832 2341.000 75.5 1906.10 107.820 107.820 2342.000 75.5 1907.36 107.808 107.808 2343.000 75.5 1908.62 107.796 107.796 2344.000 75.5 1909.88 107.783 107.783 2345.000 75.5 1911.14 107.771 107.771 2346.000 75.5 1912.39 107.759 107.759 2347.000 75.5 1913.65 107.747 107.747 2348.000 75.5 1914.91 107.734 107.734 2349.000 75.5 1916.17 107.722 107.722 2350.000 75.5 1917.43 107.710 107.710 2351.000 75.5 1918.68 . 107.697 107.697 2352.000 75.5 1919.94 107.685 107.685 2353.000 75.5 1921.20 107.673 107.673 2354.000 75.5 1922.46 107.660 107.660 2355.000 75.5 1923.72 107.648 107.648 2356.000 75.5 1924.97 107.635 107.635 2357.000 75.5 1926.23 107.623 107.623 2358.000 75.5 1927.49 107.610 107.610 2359.000 75.5 1928.75 107.598 107.598 2360.000 75.5 1930.01 107.584 107.584 2361.000 75.5 1931.26 107.569 107.569 2362.000 75.5 1932.52 107.554 107.554 2363.000 75.5 1933.78 107.539 107.539 2364.000 75.5 1935.04 107.523 107.523 2365.000 75.5 1936.30 107.508 107.508 Attachment 1 Page 47 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIAIRCIC-48 , Revision:

CPS SBO Study Config.: 34 11-17-2018 KCJCONSULT

Base Nonnal DIV I Batte,y IA 48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 2366.000 75.5 1937.55 107.492 107.492 2367.000 75.5 1938.81 107.477 107.477 2368.000 75.5 1940.07 107.461 107.461 2369.000 75.5 1941.33 107.446 107.446 2370.000 75.5 1942.59 107.430 107.430 2371.000 75.5 1943.84 107.414 107.414 2372.000 75.5 1945.10 107.398 107.398 2373.000 75.5 1946.36 107.382 107.382 2374.000 75.5 1947.62 107.366 107.366 2375.000 75.5 1948.87 107.350 107.350 2376.000 75.5 1950.13 107.334 107.334 2377.000 75.5 1951.39 107.318 107.318 2378.000 75.5 1952.65 107.300 107.300 2379.000 75.5 1953.91 107.286 . 107.286 2380.000 75.5 1955.16 107.271 107.271 2381.000 75.5 1956.42 107.255 107.255 2382.000 75.5 1957.68 107.239 107.239 2383.000 75.5 1958.94 107.222 107.222 2384.000 75.5 1960.20 107.206 107.206 2385.000 75.5 1961.45 107.189 107.189 2386.000 75.5 1962.71 107.172 107.172 2387.000 75.5 1963.97 107.155 107.155 2388.000 75.5 1965.23 107.138 107.138 2389.000 75.5 1966.49 107.120 107.120 2390.000 75.5 1967.74 107.102 107.102 2391.000 75.5 1969.00 107.084 107.084 2392.000 75.5 1970.26 107.066 107.066 2393.000 75.5. 1971.52 107.047 107.047 2394.000 75.5 1972.78 107.028 107.028 2395.000 75.5 1974.03 107.009 107.009 2396.000 75.5 1975.29 106.990 106.990 2397.000 75.5 1976.55 106.970 106.970 2398.000 75.5 1977.81 106.950 106.950 2399.000 75.5 1979.07 106.930 106.930 2400.000 75.5 1980.32 106.910 106.910 2401.000 75.5 1981.58 106.889 106.889 2402.000 75.5 1982.84 106.868 106.868 2403.000 75.5 1984.10 106.847 106.847 2403.333 0.0 1984.52 106.839 119.654

  • This voltaJ1;e result was obtained usinJ1; extrapolated battery data. Attachment 1 Page 48 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battecy IA 48-Hour Coping Study Bus Voltage Tabulation During Battery Discharge BATTIABUS2 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ . Time V-V+ Time V-V+ 0.000 119.654 112.674 0.017 112.674 ll4.q6 1.000 ll4.139 114.244 2.000 114.247 ll4.247 3.000 114.250 114.250 4.000 ll4.253 ll4.253 5.000 ll4.256 ll4.256 6.000 ll4.259 ll4.259 7.000 114.264 114.264 8.000 114.268 ll4.268 9.000 ll4.273 114.273 10.000 ll4.277 114.277 11.000 114.282 114.282 12.000 114.287 114.287 13.000 ll4.291 114.291 14.000 114.296 114.296 15.000 114,301 114.301 16.000 114.305 114.305 17.000 114.310 114.310 18.000 114.315 114.315 19.000 114.320 114.320 20.000 114.324 114.324 21.000 ll4.329 114.329 22.000 114.334 114.334 23.000 114.339 114.339 24.000 114.344 114.344 25.000 ll4.349 114.349 26.000 114.354 114.354 27.000 114.359 114.359 28.000 114.364 114.364 29.000 114.370 114.370 30.000 114.375 114.375 31.000 114.380 114.380 32.000 114.385 114.385 33.000 114.~90 114.390 34.000 114.396 114.396 35.000 114.401 114.401 36.000 114.406 114.406 37.000 114.412 114.412 38.000 114.417 114.417 39.000 114.423 114.423 40.000 114.428 114.428 41.000 114.434 114.434 42.000 114.440 114.440 43.000 ll4.445 114.445 44.000 ll4.451 114.451 45.000 ll4.457 114.457 46.000 114.462 114.462 47.000 114.468 114.468 48.000 ll4.474 114.474 49.000 ll4.480 ll4.480 50.000 ll4.486 114.486 51.000 114.492 114.492 52.000 114.498 11,4.498 53.000 114.504 114.504 54.000 114.510 114.510 55.000 114.516 114.516 56.000 114.522 114.522 57.000 114.528 ll4.528 58.000 114.535 114.535 59.000 114.541 114.541 60.000 114.547 115.420 61.000 ll5.421 115.421 62.000 115.422 115.422 63.000 115.423 115.423 64.000 115.425 115.425 65.000 115.426 ll5.426 66.000 115.427 115.427 67.000 115.428 115.428 68.000 115.430 115.430 69.000 115.431 115.431 70.000 115.432 115.432 71.000 115.433 115.433 72.000 115.435 115.435 73.000 115.436 115.436 74.000 115.437 115.437 75.000 115.438 115.438 76.000 115.440 115.440 77.000 115.441 115.441 78.000 115.442 115.442 79.000 115.444 115.444 80.000 115.445 115.445 81.000 115.446 115.446 82.000 115.447 llS.447 83.000 115.449 115.449 84.000 115.450 115.450 85.000 115.451 115.451 86.000 115.453 115.453 87.000 115.454 115.454 88.000 115.455 115.455 89.000 115.456 115.456 90.000 115.458 115.458 91.000 115.459 115.459 92.000 115.460 115.460 93.000 115.462 115.462 94.000 115.463 115.463 95.000 115.464 115.464 96.000 115.465 115.465 97.000 115.465 115.465 98.000 115.466 115.466 99.000 115.467 115.467 100.000 115.467 115.467 101.000 115.468 115.468 102.000 115.468 115.468 103.000 115.469 115.469 104.000 115.470 115.470 105.000 115.470 115.470 106.000 115.471 115.471 107.000 115.471 115.471 108.000 115.472 115.472 109.000 115.473 115.473 110.000 115.473 115.473 111.000 115.474 115:414 112.000 115.474 115.474 113.000 115.475 115.475 114.000 115.476 115.476 115.000 115.476 115.476 116.000 115.477 115.477 117.000 115.477 115.477 118.000 115.478 115.478 119.000 115.479 115.479 120.000 115.479 115.479 121.000 115.480 115.480 122.000 115.481 115.481 123.000 115.481 115.481 124.000 115.482 115.482 125.000 115.482 115.482 126.000J 115.483 115.483 127.000 115.484 115.484 128.000 115.484 115.484 129.000 115.485 115.485 130.000 115.485 115.485 131.000 115.486 H5.486 132.000 115.487 115.487 133.000 115.487 115.487 134.000 115.488 115.488 Attachment 1 Page 49 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT IABUS2 2 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 135.000 115.488 115.488 136.000 115.489 115.489 137.000 115.490 115.490 138.000 115.490 115.490 139.000 115.491 115.491 140.000 115.492 115.492 141.000 115.492 115.492 142.000 115.493 115.493 143.000 115.493 115.493 144.000 115.494 115.494 145.000 115.495 115.495 146.000 115.495 115.495 147.000 115.496 115.496 148.000 115.497 115.497 149.000 115.497 115.497 150.000 115.498 115.498 151.000 115.498 115.498 152.000 115.499 115.499 153.000 115.500 115.500 154.000 115.500 115.500 155.000 115.501 115.501 156.000 115.501 115.501 157.000 115.502 115.502 158.000 115.503 115.503 159.000 115.503 115.503 160.000 115.504 115.504 161.000 115.505 115.505 162.000 115.505 115.505 163.000 115.506 115.506 164.000 115.507. 115.507 165.000 115.507 115.507 166.000 115.508 115.508 167.000 115.508 115.508 168.000 115.508 115.508 169.000 115.508 115.508 170.000 115.508 115.508 171.000 115.507. 115.507 172.000 115.507 115.507 173.000 115.507 115.507 174.000 115.507 115.507 175.000 115.507 115.507 176.000 115.507 115.507 177.000 115.507 115.507 178.000 115.507 115.507 179.000 115.507 115.507 180.000 115.507 115.507 181.000 115.507 115.507 182.000 115.507 115.507 183.000 115.507 115.507 184.000 115.507 115.507 185.000 115.507 115.507 186.000 115.507 115.507 187.000 115.507 115.507 188.000 115.507 115.507 189.000 115.507 115.507 190.000 115.507 115.507 191.000 115.507 115.507 192.000 115.507 115.507 193.000 115.507 115.507 194.000 115.506 115.506 195.000 115.506 115.506 196.000 115.506 115.506 197.000 115.506 115.506 198.000 115.506 115.506 199.000 115.506 115.506 200.000 115.506 115.506 201.000 115.506 115.506 202.000 115.506 115.506 203.000 115.506 115.506 204.000 115.506 115.506 205.000 115.506 115.506 206.000 115.506 115.506 207.000 115.506 115.506 208.000 115.506 115.506 209.000 115.506 115.506 210.000 115.506 115.506 211.000 115.506 115.506 212.000 115.506 115.506 213.000 115.506 115.506 214.000 115.506 115.506 215.000 115.506 115.506 216.000 115.506 115.506 217.000 115.505 115.505 218.000 11:S.505 115.505 219.000 115.505 115.505 220.000 115.505 115.505 221.000 115.505 115.505 222.000 115.505 115.505 223.000 115.505 115.505 224.000 115.505 115.505 225.000 115.505 115.505 226.000 115.505 115.505 227.000 115.505 115.505 228.000 115.505 115.505 229.000 115.505 115.505 230.000 115.505 115.505 231.000 115.505 115.505 232.000 115.505 115.505 233.000 115.505 115.505 234.000 115.505 115.505 235.000 115.505 115.505 236.000 115.505 115.505 237.000 115.505 115.505 238.000 115.505 115.505 239.000 115.504 115.504 240.000 115.504 115.504 ~41.000 115.504 115.504 242.000 115.504 115.504 243.000 115.504 115.504 244.000 115.504 115.504 245.000 115.504 115.504 246.000 115.504 115.504 247.000 115.504 115.504 248.000 115.504 115.504 249.000 115.504 115.504 250.000 115.504 115.504 251.000 115.504 115.504 252.000 115.504 115.504 253.000 115.504 115.504 254.000 115.504 115.504 255.000 115.504 115.504 256.000 115.504 115.504 257.000 115.504 115.504 258.000 115.504 115.504 259.000 115.504 115.504 260.000 115.504 115.504 261.000 115.504 115.504 262.000 115.503 115.503 263.000 115.503 115.503 264.000 115.503 115.503 265.000 115.503 115.503 266.000 115.503 115.503 267.000 115.503 115.503 268.000 115.503 115.503 269.000 115.503 115.503 270.000 115.503 115.503 271.000 115.503 115.503 272.000 115.503 115.503 273.000 115.503

  • 115.503 274.000 115.503 115.503 275.000 115.503 115.503 276.000 115.503 115.503 277.000 115.503 115.503 278.000 115.503 115.503 279.000 115.503 115.503 280.000 115.503 115.503 281.000 115.503 115.503 282.000 115.503 115.503 Attachment 1 Page 50 of 85 EC 626319 Project: Location:
  • Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study BATT IABUS2 3 11-17-2018 KCJCONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time v-V+ 283.000 115.503 115.503 284.000 115.503 115.503 285.000 115.502 115.502 286.000 115.502 115.502 287.000 115.502 115.502 288.000 115.502 115.502 289.000 115.502 115.502 290.000 115.502 115.502 291.000 115.502 115.502 292.000 115.502 115.502 293.000 115.502 115.502 294.000 115.502 115.502 295.000 115.502 115.502 296.000 115.502 115.502 297.000 115.502 115.502 298.000 115.502 115.502 299.000 115.502 115.502 300.000 115.502 115.502 301.000 115.502 115.502 302.000 115.502 115.502 303.000 115.502 115.502 304.000 115.502 115.502 305.000 115.502 115.502 306.000 115.502 115.502 307.000 115.502 115.502 308.000 115.501 115.501 309.000 115.501 115.501 310.000 115.501 115.501 311.000 115.501 115.501 312.000 115.501 115.501 313.000 115.501 115.501 314.000 115.501 115.501 315.000 115.501 115.501 316.000 115.501 115.501 317.000 115.501 115.501 318.000 115.501 115.501 319.000 115.501 115.501 320.000 115.501 115.501 321.000 115.501 115.501 322.000 115.501 115.501 323.000 115.501 115.501 324.000 115.501 115.501 325.000 115.501 115.501 326.000 115.501 115.501 327.000 115.501 115.501 328.000 115.501 115.501 329.000 115.501 115.501 330.000 115.500 115.500 331.000 115.500 115.500 332.000 115.500 115.500 333.000 115.500 115.500 334.000 115.500 115.500 335.000 115.500 115.500 336.000 115.500 115.500 337.000 115.500 115.500 338.000 115.500 115.500 339.000 115.500 115.500 340.000 115.500 115.500 341.000 115.500 115.500 342.000 115.500 115.500 343.000 115.500 115.500 344.000 115.500 115.500 345.000 115.500 115.500 346.000 115.500 115.500 347.000 115.500 115.500 348.000 115.500 115.500 349.000 115.500 115.500 350.000 115.500 115.500 351.000 115.500 115.500 352.000 115.500 115.500 353.000 115.499 115.499 354.000 115.499 115.499 355.000 115.499 115.499 356.000 115.499 115.499 357.000 115.499 115.499 358.000 115.499 115.499 359.000 115.499 115.499 360.000 115.499 115.499 361.000 115.499 115.499 362.000 115.499 115.499 363.000 115.499 115.499 364.000 115.499 115.499 365.000 115.499 115.499 366.000 115.499 115.499 367.000 115.499 115.499 368.000 115.499 115.499 369.000 115.499 115.499 370.000 115.499 115.499 371.000 115.499 115.499 372.000 115.499 115.499 373.000 115.499 115.499 374.000 115.499 115.499 375.000 115.498 115.498 376.000 115.498 115.498 377.000 115.498 115.498 378.000 115.498 115.498 379.000 115.498 115.498 380.000 115.498 115.498 381.000 115.498 115.498 382.000 115.498 115.498 383.000 115.498 115.498 384.000 115.498 115.498 385.000 115.498 115.498 386.000 115.498 115.498 387.000 115.498 115.498 388.000 115.498 115.498 389.000 115.498 115.498 390.000 115.498 115.498 391.000 115.498 115.498 392.000 115.498 115.498 393.000 115.498 115.498 394.000 115.498 115.498 395.000 115.498 115.498 396.000 115.498 115.498 397.000 115.497 115.497 398.000 115.497 115.497 399.000 115.497 115.497 400.000 115.497 115.497 401.000 *115.497 115.497 402.000 115.497 115.497 403.000 115.497 115.497 404.000 115.497 115.497 405.000 115.497 115.497 406.000 115.497 115.497 407.000 115.497 115.497 408.000 115.497 115.497 409.000 115.497 115.497 410.000 115.497 115.497 411.000 115.497 115.497 412.000 115.497 115.497 413.000 115.497 115.497 414.000 115.497 115.497 415.000 115.497 115.497 416.000 115.497 115.497 417.000 115.497 115.497 418.000 115.497 115.497 419.000 115.497 115.497 420.000 115.496 115.496 421.000 115.496 115.496 422.000 115.496 115.496 423.000 115.496 115.496 424.000 115.496 115.496 425.000 115.496 115.496 426.000 115.496 115.496 427.000 115.496 115.496 428.000 115.496 115.496 429.000 115.496 115.496 430.000 115.496 115.496 Attachment 1 Page 51 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT1ABUS2 4 11-17-2018 KCICONSULT Base Nonna! Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 431.000 115.496 115.496 432.000 115.496 115.496 433.000 115.496 115.496 434.000 115.496 115.496 435.000 115.496 115.496 436.000 115.496 115.496 437.000 115.496 115.496 438.000 115.496 115.496 439.000 115.496 115.496 440.000 115.496 115.496 441.000 115.496 115.496 442.000 115.495 115.495 443.000 115.495 115.495 444.000 115.495 115.495 445.000 115.495 115.495 446.000 115.495 -115.495 447.000 115.495 115.495 448.000 115.495 115.495 449.000 115.495 115.495 450.000 115.495 115.495 451.000 115.495 115.495 452.000 115.495 115.495 453.000 115.495 115.495 454.000 115.495 115.495 455.000 115.495 115.495 456.000 115.495 115.495 457.000 115.495 115.495 458.000 115.495 115.495 459.000 115.495 115.495 460.000 115.495 115.495 461.000 115.495 115.495 462.000 115.495 115.495 463.000 115.495 115.495 464.000 115.494 115.494 465.000 115.494 115.494 466.000 115.494 115.494 467.000 115.494 115.494 468.000 115.494 115.494 469.000 115.494 115.494 470.000 115.494 115.494 471.000 115.494 115.494 472.000 115.494 115.494 473.000 115.494 115.494 474.000 115.494 115.494 475.000 115.494 115.494 476.000 115.494 115.494 477.000 115.494 115.494 478.000 115.494 115.494 479.000 115.494 115.494 480.000 115.494 115.494 481.000 115.494 115.494 482.000 115.494 115.494 483.000 115.494 115.494 484.000 115.494 li5.494 485.000 115.494 115.494 486.000 115.493 115.493 487.000 115.493 115.493 488.000 115.493 115.493 489.000 115.493 115.493 490.000 115.493 115.493 491.000 115.493 115.493 492.000 115.493 115.493 493.000 115.493 115.493 494.000 115.493 115.493 495.000 115.493 115.493 496.000 115.493 115.493 497.000 115.493 115.493 498.000 115.493 115.493 499.000 115.493 115.493 500.000 115.493 115.493 501.000 115.493 115.493 502.000 115.493 115.493 503.000 115.493 115.493 504.000 115.493 115.493 505.000 115.493 115.493 506.000 115.493 115.493 507.000 115.492 115.492 508.000 115.492 115.492 509.000 115.492 115.492 510.000 115.492 115.492 511.000 115.492 115.492 512.000 115.492 115.492 513.000 115.492 115.492 514.000 115.492 115.492 515.000 115.492 115.492 516.000 115.492 115.492 517.000 115.492 115.492 518.000 115.492 115.492 519.000 115.492 115.492 520.000 115.492 115.492 521.000 115.492 115.492 522.000 115.492 115.492 523.000 115.492 115.492 524.000 115.492 115.492 525.000 115.492 115.492 526.000 115.492 115.492 527.000 115.492 115.492 528.000 115.492 115.492 529.000 115.491 115.491 530.000 115.491 115.491 531.000 115.491 115.491 532.000 115.491 115.491 533.000 115.491 115.491 534.000 115.491 115.491 535.000 115.491 115.491 536.000 115.491 115.491 537.000 115.491 115.491 538.000 115.491 115.491 539.000 115.491 115.491 540.000 115.491 115.491 541.000 115.491 115.491 542.000 115.491 115.491 543.000 115.491 115.491 544.000 115.491 115.491 545.000 115.491 115.491 546.000 115.491 115.491 547.000 115.491 115.491 548.000 115.491 115.491 549.000 115.491 115.491 550.000 115.491 115.491 551.000 115.490 115.490 552.000 115.490 115.490 553.000 115.490 115.490 554.000 115.490 115.490 555.000 115.490 115.490 556.000 115.490 115.490 557.000 115.490 115.490 558.000 115.490 115.490 559.000 115.490 115.490 560.000 115.490 115.490 561.000 115.490 115.490 562.000 115.4?0 115.490 563.000 115.490 115.490 564.000 115.490 115.490 565.000 115.490 115.490 566.000 115.490 115.490 567.000 115.490 115.490 568.000 115.490 115.490 569.000 115.490 115.490 570.000 115.490 115.490 571.000 115.490 115.490 572.000 115.489 115.489 573.000 115.489 115.489 574.000 115.489 115.489 575.000 115.489 115.489 576.000 115.489 115.489 577.000 115.489 115.489 578.000 115.489 115.489 Attachment 1 Page 52 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATT1ABUS2 5 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 579.000 115.489 115.489 580.000 115.489 115.489 581.000 115.489 115.489 582.000 115.489 115.489 583.000 115.489 115.489 584.000 115.489 115.489 585.000 115.489 115.489 586.000 115.489 -115.489 587.000 115.489 115.489 588.000 115.489 115.489 589.000 115.489 115.489 590.000 115.489 115.489 591.000 115.489 115.489 592.000 115.489 115.489 593.000 115.489

  • 115.439 594.000 115.488 115.488 595.000 115.488 115.488 596.000 115.488 115.488 597.000 115.488 115.488 598.000 115.488 115.488 599.000 115.488 115.488 600.000 115.488 115.488 601.000 115.488 115.488 602.000 115.488 115.488 603.000 115.488 115.488 604.000 115.488 115.488 605.000 115.488 115.488 606.000 115.488 115.488 607.000 115.488 115.488 608.000 115.488 115.488 609.000 115.488 115.488 6!0.000 115.488 115.488 611.000 115.488 115.488 612.000 115.488 115.488 613.000 115.488 115.488 614.000 115.488 115.488 615.000 115.487 115.487 616.000 115.487 115.487 617.000 115.487 115.487 618.000 115.487 115.487 619.000 115.487 115.487 620.000 115.487 115.487 621.000 115.487 115.487 622.000 115.487 115.487 623.000 115.487 115.487 624.000 115.487 115.487 625.000 115.487 115.487 626.000 115.487 115.487 627.000 115.487 115.487 628.000 115.487 115.487 629.000 115.487 115.487 630.000 115.487 115.487 631.000 115.487 115.487 632.000 115.487 115.487 633.000 115.487 115.487 634.000 115.487 115.487 635.000 115.487 115.487 636.000 115.487 115.487 637.000 115.486 115.486 638.000 115.486 115.486 639.000 115.486 115.486 640.000 115.486 115.486 641.000 115.486 115.486 642.000 115.486 115.486 643.000 115.486 115.486 644.000 115.486 115.486 645.000 115.486 115.486 646.000 115.486 115.486 647.000 115.486 115.486 648.000 115.486 115.486 649.000 115.486 115.486 650.000 115.486 115.486 651.000 115.486 115.486 652.000 115.486 115.486 653.000 115.486 115.486 654.000 115.486 115.486 655.000 115.486 115.486 656.000 115.486 115.486 657.000 115.486 115.486 658.000 115.485 115.485 659.000 115.485 115.485 660.000 115.485 115.485 661.000 115.485 115.485 662.000 115.485 115.485 663.000 115.485 115.485 664.000 115.485 115.485 665.000 115.485 115.485 666.000 115.485 115.485 667.000 115.485 115.485 668.000 115.485 115.485 669.000 115.485 115.485 670.000 115.485 115.485 671.000 115.485 115.485 672.000 115.485 115.485 673.000 115.485 115.485 674.000 115.485 115.485 675.000 115.485 115.485 676.000 115.485 115.485 677.000 115.485 115.485 678.000 115.485 115.485 679.000 115.484 115.484 680.000 115.484 115.484 681.000 115.484 115.484 682.000 115.484 115.484 683.000 115.484 115.484 684.000 115.484 115.484 685.000 115.484 115.484 686.000 115.484 115.484 687.000 115.484 11,5.484 688.000 115.484 115.484 689.000 115.484 115.484 690.000 115.484 115.484 691.000 115.484 115.484 692.000 115.484 115.484 693.000 115.484 115.484 694.000 115.484 115.484 695.000 115.484 115.484 696.000 1 i5.484 115.484 697.000 115.484 115.484 698.000 115.484 115.484 699.000 115.484 115.484 700.000 115.484 115.484 701.000 115.483 115.483 1 702.000 115.483 115.483 703.000 115.483 115.483 704.000 115.483 115.483 705.000 115.483 115.483 706.000 115.483 115.483 707.000 115.483 115.483 708.000 115.483 ll5.483 709.000 115.483 115.483 7!0.000 ll5.483 115.483 711.000 115.483 115.483 . 712.000 115.483 115.483 713.000 115.483 115.483 714.000 115.483 115.483 715.000 115.483 ll5.483 716.000 ll5.483 ll5.483 717.000 ll5.483 115.483 718.000 115.483 115.483 719.000 ll5.483 ll5.483 720.000 l!5.483 ll5.483 721.000 115.483 ll5.483 722.000 ll5.482 115.482 723.000 115.482 ll5.482 724.000 115.482 115.482 725.000 115.482 115.482 726.000 115.482 115.482 Attachment 1 Page 53 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA48-HourCoping.Study BATT 1ABUS2 6 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Tim~ V-* V+ Time V-V+ Time V-V+ Time V-V+ 727.000 115.482 115.482 728.000 115.482 115.482 729.000 115.482 115.482 730.000 115.482 115.482 731.000 115.482 115.482 732.000 115.482 115.482 733.000 115.482 115.482 734.000 115.482 115.482 735.000 !15.482 !15.482 736.000 115.482 !15.482 737.000 !15.482 !15.482 738.000 !15.482 115.482 739.000 !15.482 115.482 740.000 115.482 !15.482 741.000 !15.482 !15.482 742.000 115.482 115.482 743.000 !15.481 !15.481 744.000 115.481 115.481 745.000 115.481 115.481 746.000 !15.481 115.481 747.000 115.481 !15.481 748.000 115.481 115.481 749.000 115.481 115.481 750.000 115.481 115.481 751.000 !15.481 !15.481 752.000 115.481 115.481 753.000 115.481 115.481 754.000 115.481 115.481 755.000 !15.481 115.481 756.000 115.481 115.481 757.000 115.481 115.481 758.000 115.481 115.481 759.000 !15.481 115.481 760.000 115.481 115.481 761.000 115.481 115.481 762.000 115.481 115.481 763.000 115.480 115.480 764.000 115.480, 115.480 765.000 115.480 115.480 766.000 115.480 115.480 767.000 !15.480 115.480 768.000 115.480 115.480 769.000 115.480 115.480 770.000 115.480 115.480 771.000 !15.480 !15.480 772.000 115.480 115.480 773.000 115.480 115.480 774.000 115.480 115.480 775.000 115.480 115.480 776.000 115.480 115.480 777.000 115.480 115.480 778.000 115.480 115.480 779.000 115.480 115.480 780.000 115.480 115.480 781.000 115.480 115.480 782.000 115.480 115.480 783.000 115.480 115.480 784.000 115.479 115.479 785.000 115.479 115.479 786.000 115.479 115.479 787.000 115.479 115.479 788.000 115.479 115.479 789.000 115.479 115.479 790.000 115.479 115.479 791.000 115.479 115.479 792.000 115.479 115.479 793.000 115.479 115.479 794.000 115.479 115.479 795.000 115.479 115.479 796.000 115.479 115.479 797.000 115.479 115.479 798.000 115.479 115.479 799.000 115.479 115.479 800.000 115.479 115.479 801.000 115.479 115.479 802.000 115.479

  • 115.479 803.000 115.479 115.479 804.000 115.479 115.479 805.000 115.478 115.478 806.000 115.478 115.478 I 807.000 115.478 115.478 808.000 115.478 115.478 809.000 115.478 115.478 810.000 115.478 115.478 811.000 115.478 115.478 812.000 115.478 115.478 813.000 115.478 115.478 814.000 115.478 115.478 815.000 115.478 115.478 816.000 115.478 115.478 817.000 115.478 115.478 818.000 115.478 115.478 819.000 115.478 115.478 820.000 115.478 115.478 821.000 115.478 115.478 822.000 115.478 115.478 823.000 115.478 115.478 824.000 115.478 115.478 825.000 115.478 115.478 826.000 115.477 115.477 827.000 115.477 115.477 828.000 115.477 115.477 829.000 115.477 115.477 830.000 115.477 115.477 831.000 115.477 !15.477 832.000 115.477 115.477 833.000 115.477 115.477 834.000 115.477 115.477 835.000 115.477 !15.477 836.000 115.477 115.477 837.000 115.477 115.477 838.000 115.477 115.477 839.000 115.477 115.477 840.000 115.477 115.477 841.000 115.477 115.477 842.000 115.477 115.477 843.000 115.477 115.477 844.000 115.477 115.477 845.000 115.477 115.477 846.000 115.476 115.476 847.000 115.476 115.476 848.000 115.476 115.476 849.000 115.476 115.476 850.000 115.476 115.476 851.000 115.476 115.476 852.000 115.476 115.476 853.000 115.476 115.476 854.000 ll~.476 115.476 855.000 115.476 115.476 856.000 115.476 115.476 857.000 115.476 115.476 858.000 115.476 115.476 859.000 115.476 115.476 860.000 115.476 115.476 861.000 115.476 115.476 862.000 115.476 115.476 863.000 115.476 !15.476 864.000 115.476 115.476 865.000 115.476 115.476 866.000 115.476 115.476 867.000 115.475 115.475 868.000 115.475 115.475 869.000 115.475 115.475 870.000 115.475 115.475 871.000 115.475 115.475 872.000 115.475 115.475 873.000 115.475 115.475 874.000 115.475 115.475 Attachment 1 Page 54 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study BATT 1ABUS2 7 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 875.000 115.475 115.475 876.000 115.475 115.475 877.000 115.475 115.475 878.000 115.475 115.475 879.000 115.475 115.475 880.000 115.475 115.475 881.000 115.475 115.475 882.000 115.475 115.475 883.000 115.475 115.475 884.000 115.475 115.475 885.000 115.475 115.475 886.000 115.475 115.475 887.000 115.474 115.474 888.000 115.474 115.474 889.000 115.474 115.474 890.000 115.474 115.474 891.000 115.474 115.474 892.000 115.474 115.474 893.000 115.474 115.474 894.000 115.474 115.474 895.000 115.474 115.474 896.000 115.474 115.474 897.000 115.474 115.474 898.000 115.474 115.474 899.000 115.474 115.474 900.000 115.474 115.474 901.000 115.474 115.474 902.000 115.474 115.474 903.000 115.474 115.474 904.000 115.474 115.474 905.000 115.474 115.474 906.000 115.474 115.474 907.000 115.473 115.473 908.000 115.473 115.473 909.000 115.473 115.473 910.000 115.473 115.473 911.000 115.473 115.473 912.000 115.473 115.473 913.000 115.473 115.473 914.000 115.473 115.473 915.000 115.473 115.473 916.000 115.473 115.473 917.000 115.473 115.473 918.000 115.473 115.473 919.000 115.473 115.473 920.000 115.473 115.473 921.000 115.473 115.473 922.000 115.473 115.473 923.000 115.473 115.473 924.000 115.473 115.473 925.000 115.473 115.473 926.000 115.473 115.473 927.000 115.473 115.473 928.000 115.472 115.472 929.000 115.472 115.472 930.090 115.472 115.472 931.000 115.472 115.472 932.000 115.472 115.472 933.000 115.472 115.472 934.000 115.472 115.472 935.000 115.472 115.472 936.000 115.472 115.472 937.000 115.472 115.472 938.000 115.472 115.472 939.000 115.472 115.472 940.000 115.472 115.472 941.000 115.472 115.472 942.000 115.472 115.472 943.000 115.472 115.472 944.000 115.472 115.472 945.000 115.472 115.472 946.000 115.472 115.472 947.000 115.472 115.472 948.000 115.471 115.471 949.000 115.471 115.471 950.000 115.471 115.471 951.000 115.471 115.471 952.000 115.471 115.471 953.000 115.471 115.471 954.000 115.471 115.471 955.000 115.471 115.471 956.000 115.471 115.471 957.000 115.471 115.471 958.000 115.471 115.471 959.000 115.471 115.471 960.000 115.471 115.471 961.000 115.471 115.471 962.000 115.471 115.471 963.000 11,5.471 115.471 964.000 115.471 115.471 965.000 115.471 115.471 966.000 115.471 115.471 967.000 115.471 115.471 968.000 115.470 115.470 969.000 115.470 115.470 970.000 115.470 115.470 971.000 115.470 115.470 972.000 115.470 115.470 973.000 115.470 115.470 974.000 115.470 115.470 975.000 115.470 115.470 976.000 115.470 115.470 977.000 115.470 115.470 978.000 115.470 115.470 979.000 115.470 115.470 980.000 115.470 115.470, 981.000 115.470 115.470 982.000 115.470 115.470 983.000 115.470 115.470 984.000 115.470 115.470 985.000 115.470 115.470 986.000 115.470 115.470 987.000 115.470 115.470 988.000 115.469 115.469 989.000 115.469 115.469 990.000 115.469 115.469 991.000 115.469 115.469 992.000 115.469 115.469 993.000 115.469 115.469 994.000 115.469 115.469 995.000 115.469 115.469 996.000 115.469 115.469 997.000 115.469 115.469 998.000 115.469 115.469 999.000 115.469 115.469 1000.000 115.469 115.469 1001.000 115.469 115.469 1002.000 115.469 115.469 1003.000 115.469 115.469 1004.000 115.469 115.469 1005.000 115.469 115.469 1006.000 115.469 115.469 1007.000 115.469 115.469 1008.000 115.468 115.468 1009.000 115.468 115.468 1010.000 115.468 115.468 1011.000 115.468 115.468 1012.000 115.468 115.468 1013.000 115.468 115.468 1014.000 115.468 115.468 1015.000 115.468 115.468 1016.000 115.468 115.468 1017.000 115.468 115.468 1018.000 115.468 115.468 1019.000 115.468 115.468 1020.000 115.468 115.468 1021.000 115.468 115.468 1022.000 115.468 115.468 Attachment 1 Page 55 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIA!RCIC-48 CPS SBO Study Config.: DIV I Banery IA 48-Hour Coping Study BATTIABUS2 8 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-* V+ Time V-V+ 1023.000 115.466 115.466 1024.000 115.465 115.465 1025.000 115.463 115.463 1026.000 115.462 115.462 1027.000 115.461 115.461 1028.000 115.459 115.459 1029.000 115.458 115.458 1030.000 115.457 115.457 1031.000 115.455 115.455 1032.000 115.454 115.454 1033.000 115.452 115.452 1034.000 115.451 115.451 1035.000 115.450 115.450 1036.000 115.448 115.448 1037.000 115.447 115.447 1038.000 115.446 , 115.446 1039.000 115.444 115.444 1040.000 115.443 115.443 1041.000 115.441 115.441 1042.000 115.440 115.440 1043.000 115.439 115.439 1044.000 115.437 115.437 1045.000 115.436 115.436 1046.000 115.435 115.435 1047.000 115.433 115.433 1048.000 115.432 115.432 1049.000 115.431 115.431 1050.000 115.429 115.429 1051.000 115.428 115.428 1052.000 115.426 115.426 1053.000 115.425 115.425 1054.000 115.424 115.424 1055.000 115.422 115.422 1056.000 115.421 115.421 1057.000 115.420 115.420 1058.000 115.418 115.418 1059.000 115.417 115.417, 1060.000 115.415 115.415 1061.000 115.414 115.414 1062.000 115.413 115.413 1063.000 115.411 115.411 1064.000 115.410 115.410 1065.000 115.409 115.409 1066.000 115.407 115.407 1067.000 115.406 115.406 1068.000 115.405 115.405 1069.000 115.403 115.403 1070.000 115.402 115.402 1071.000 115.401 115.401 1072.000 115.399 115.399 1073.000 115.398 115.398 1074.000 115.396 115.396 1075.000 115.395 115.395 1076.000 115.394 115.394 1077.000 115.392 115.392 1078.000 115.391 115.391 1079.000 115.390 115.390 1080.000 115.388 115.388 1081.000 115.387 115.387 1082:000 115.386 115.386 1083.000 115.384 115.384 1084.000 115.383 115.383 1085.000 115.382 115.382 1086.000 115.380 115.380 1087.000 115.379 115.379 1088.000 115.377 115.377 1089.000 115.376 115.376 1090.000 115.375 115.375 1091.000 115.373 115.373 1092.000 115.372 115.372 1093.000 115.371 115.371 1094.000 115.369 115.369 1095.000 115.;368 115.368 1096.000 115.367 115.367 1097.000 115.365 115.365 1098.000 115.364 115.364 1099.000 115.363 115.363 1100.000 115.361 115.361 1101.000 115.360 115.360 1102.000 115.359 115.359 1103.000 115.357 115.357 1104.000 115.356 115.356 1105.000 115.355 115.355 1106.000 115.353 115.353 1107.000 115.352 115.352 1108.000 115.351 115.351 1109.000 115.349 115.349 1110.000 115.348 115.348 1111.000 115.347 115.347 1112.000 115.345 115.345 1113.000 115.344 115.344 1114.000 115.343 115.343 1115.000 115.341 115.341 1116.000 115.340 115.340 1117.000 115.339 115.339 1118.000 115.337 115.337 1119.000 115.336 115.336 1120.000 115.334 115.334 1121.000 115.333 115.333 1122.000 115.332 115.332 1123.000 115.330 115.330 1124.000 115.329 115.329 1125.000 115.328 115.328 1126.000 115.326 115.326 1127.000 115.325 115.325 1128.000 115.324 115.324 1129.000 115.322 115.322 1130.000 115.321 115.321 1131.000 115.320 115.320 1132.000 115.318 115.318 1133.000 115.317 115.317 1134.000 115.316 li5.316 1135.000 115.314 115.314 1136.000 115.313 115.313 1137.000 115.312 115.312 1138.000 115.310 115.310 1139.000 115.309 115.309 1140.000 115.308 115.308 1141.000 115.307 115.307 1142.000 . 115.305 115.305 1143.000 115.304 115.304 1144.000 115.303 115.303 1145.000 115.301 115.301 1146.000 115.300 115.300 1147.000 115.299 115.299 1148.000 115.297 115.297 1149.000 115.296 115.296 1150.000 115.295 115.295 1151.000 115.293 115.293 1152.000 115.292 115.292 1153.000 115.291 115.291 1154.000 115.290 115.290 1155.000 115.289 115.289 1156.000 115.288 115.288 1157.000 115.287 115.287 1158.000 115.286 115.286 1159.000 115.285 115.285 1160.000 115.284 115.284 1161.000 115.283 115.283 1162.000 115.282 115.282 1163.000 115.281 115.281 1164.000 115.280

  • 115.280 1165.000 115.279 115.279 1166.000 115.278 115.278 1167.000 115.277 115.277 1168.000 115.276 115.276 1169.000 115.275 115.275 1170.000 115.274 115.274 Attachment 1 Page 56 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for grea_ter than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Batteiy IA 48-Hour Coping Study BATT 1ABUS2 9 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time v-V+ 1171.000 115.274 115.274 1172.000 115.273 115.273 1173.000 115.272 115.272 1174.000 115.271 115.271 1175.000 115.270 115.270 1176.000 115.269 115.269 1177.000 115.268 115.268 1178.000 115.267 115.267 1179.000 115.266 115.266 1180.000 115.265 115.265 1181.000 115.264 115.264 1182.000 115.263 115.263 1183.000 115.262 115.262 1184.000 115.261 115.261 1185.000 115.260 115.260 1186.000 115.259 115.259 1187.000 115.258 115.258 1188.000 115.257 115.257 1189.000 115.256 115.256 1190.000 115.255 115.255 1191.000 115.254 115.254 1192.000 115.253 115.253 1193.000 115.252 115.252 1194.000 115.251 115.251 1195.000 115.250 115.250 1196.000 115.249 115.249 1197.000 115.248 115.248 1198.000 115.247 115.247 1199.000 115.246 115.246 1200.000 115.245 114.528 1200.133 114.527 113.273 1200.183 113.272 113.900 1200.250 113.899 111.831 1200.300 111.830 113.392 1200.750 113.386 113.892 1201.000 113.890 114.516 1202.000 114.510 114.510 1203.000 114.504 114.504 1204.000 114.499 114.499 1205.000 114.493 114.493 1206.000 114.487 114.487 1207.000 114.481 114.481 1208.000 114.475 114.475 1209.000 114.469 114.469 1210.000 114.463 114.463 1211.000 114.458 114.458 1212.000 114.452 114.452 1213.000 114.446 114.446 1214.000 114.440 114.440 1215.000 114.434 114.434 1216.000 114.428 114.428 1217.000 114.422 114.422 1218.000 114.417 114.417 1219.000 114.411 114.411 1220.000 114.405 114.405 1221.000 114.399 114.399 1222.000 114.393 114.393 1223.000 114.387 114.387 1224.000 114.381 114.381 1225.000 114.376 114.376 1226.000 114.370 114.370 1227.000 114.364 114.364 1228.000 114.358 114.358 1229.000 114.352 114.352 1230.000 114.346 114.346 1231.000 114.341 114.341 1232.000 114.335 114.335 1233.000 114.329 114.329 1234.000 114.323 114.323 1235.000 114.317

  • 114.317 1236.000 114.311 114.311 1237.000 114.305 114.305 1238.000 114.300 114.300 1239.000 114.294 114.294 1240.000 114.288 114.288 1241.000 114.282 114.282 1242.000 114.276 114.276 1243.000 114.270 114.270 1244 000 114.264 114.264 1245.000 114.259 114.259 1246.000 114.253 114.253 1247.000 114.244 114.244 1248.000 114.232 114.232 1249.000 114.221 *114.221 1250.000 114.209 114.209 1251.000 114.198 114.198 1252.000 114.186 114.186 1253.000 114.175 114.175 1254.000 114.164 114.164 1255.000 114.152 114.152 1256.000 114.141 114.141 1257.000 114.130 114.130 1258.000 114.119 114.119 1259.000 114.108 114.108 1260.000 114.096 114.096 1261.000 114.085 114.085 1262.000 114.074 114.074 1263.000 114.063 114.063 1264.000 114.052 114.052 1265.000 114.041 114.041 1266.000 114.030 114.030 1267.000 114.019 114.019 1268.000 114.008 114.008 1269.000 113.998 113.998 1270.000 113.987 113.987 1271.000 113.976 113.976 1272.000 I13.965 113.965 1273.000 113.954 113.954 1274.000 113.944 113.944 1275.000 113.933 113.933 1276.000 113.922 113.922 1277.000 113.912 113.912 1278.000 113.901 113.901 1279.000 113.891 113.891 1280.000 113.880 113.880 1281.000 113.869 113.869 1282.000 113.859 113.859 1283.000 113.849 113.849 1284.000 113.841 113.841 1285.000 113.839 113.839 1286.000 113.837 113.837 1287.000 113.835 113.835 1288.000 113.833 113.833 1289.000 113.831 113.831 1290.000 113.829 113.829 1291.000 113.827 113.827 1292.000 113.825 113.825 1293.000 113.823 113.823 1294.000 113.821 113.821 1295.000 113.819 113.819 1296.000 113.817 113.817 1297.00,0 113.815 113.815 1298.000 113.813 i13.813 1299.000 113.811 113.811 1300.000 113.808 113.808 1301.000 113.806 113.806 1302.000 113.804 113.804 1303.000 113.802 113.802 J.304.000 113.800 113.800 1305.000 113.798 113.798 1306.000 113.796 113.796 1307.000 113.794 113.794 1308.000 113.792 113.792 1309.000 113.790 113.790 1310.000 113.788 113.788 1311.000 113.785 113.785 1312.000 113.783 113.783 1313.000 113.781 113.781 Attachment 1 Page 57 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping Study BATT1ABUS2 10 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time V-V+ Time V-V+ Time y. V+ 1314.000 113.779 113.779 1315.000 113.777 113.777 1316.000 113.775 113.775 1317.000 113.773 113.773 1318.000 113.770 113.770 1319.000 113.768 113.768 1320.000 113.766 113.766 1321.000 113.764 113.764 1322.000 113.762 113.762 1323.000 113.760 113.760 1324.000 113.758 113.758 1325.000 113.755 113.755 1326.000 113.753 113.753 1327.000 113.751 113.751 1328.000 113.749 113.749 1329.000 113.747 113.747 1330.000 113.744 113.744 1331.000 113.742 113.742 1332.000 113.740 113.740 1333.000 113.738 113.738 1334.000 113.736 113.736 1335.000 113.733 113.733 1336.000 113.731 113.731 1337.000 113.729 113.729 1338.000 113.727 113.727 1339.000 113.724 113.724 1340.000 113.722 113.722 1341.000 113.720 113.720 1342.000 113.719 113.719 1343.000 113.719 113.719 1344.000 113.718 113.718 1345.000 113.717 113.717 1346.000 113.717 113.717 1347.000 113.716 113.716 1348.000 113.715 113.715 1349.000 113.715 113.715 1350.000 113.714 113.714 1351.000 113.713 113.713 1352.000 113.712 113.712 1353.000 113.712 113.712 1354.000 113.711 113.711 1355.000 113.710 113.710 1356.000 113.710 113.710 1357.000 113.709 113.709 1358.000 113.708 113.708 1359.000 113.707 113.707 1360.000 113.707 113.707 1361.000 113.706 113.706 1362.000 113.705 113.705 1363.000 113.705 113.705 1364.000 113.704 113.704 1365.000 113.703 113.703 1366.000 113.702 113.702 1367.000 113.702 113.702 1368.000 113.701 113.701 1369.000 113.700 113.700 1370.000 113.699 113.699 1371.000 113.699 113.699 1372.000 113.698 113.698 1373.000 113.697 113.697 1374.000 113.696 113.696 1375.000 113.696 113.696 1376.000 113.695 113.695 1377.000 113.694 113.694 1378.000 113.693 113.693 1379.000 113.693 113.693 1380.000 113.692 113.692 1381.000 113.691 113.691 1382.000 113.690 113.690 1383.000 113.690 113.690 1384.000 113.689 113.689 1385.000 113.688 113.688 1386.000 113.687 113.687 1387.000 113.686 113.686 1388.000 113.686 113.686 1389.000 113.685 113.685 1390.000 113.684 113.684 1391.000 113.683 113.683 1392.000 113.682 113.682 1393.000 113.681 113.681 1394.000 113.680 113.680 1395.000 113.679 113.679 1396.000 113.678 113.678 1397.000 113.677 113.677 1398.000 113.676 113.676 1399.000 113.675 113.675 1400.000 113.674 113.674 1401.000 113.673 113.673 1402.000 113.672 113.672 1403.000 113.671 113.671 1404.000 113.669 113.669 1405.000 113.668 113.668 1406.000 113.667 113.667 1407.000 113.666 113.666 1408.000 113.665 113.665 1409.000 113.664 113.664 1410.000 113.663 113.663 1411.000 113.662 113.662 1412.000 113.660 113.660 1413.000 113.659 113.659 1414.000 113.658 113.658 1415.000 113.657 113.657 1416.000 113.656 113.656 1417.000 113.655 113.655 1418.000 113.654 113.654 1419.000 113.652 113.652 1420.000 113.651 113.651 1421.000 113.650 113.650 1422.000 113.649 113.649 1423.000 113.648 113.648 1424.000 113.647 113.647 1425.000 113.646 113.646 1426.000 113.644 113.644 1427.000 113.643 113.643 1428.001?, 113.642 113.642 1429.000 113.641 113.641 1430.000 113.640 113.640 1431.000 113.639 113.639 1432.000 113.637 113.637 1433.000 113.636 113.636 1434.000 113.635 113.635 1435.000 113.634 113.634 1436.000 113.633 113.633 1437.000 113.631 113.631 1438.000 113.630 113.630 1439.000 113.629 113.629 1440.000 113.628 113.628 1441.000 113.627 113.627 1442.000 113.625 113.625 1443.000 113.624 113.624 1444.000 113.623 113.623 1445.000 113.622 113.622 1446.000 113.621 113.621 1447.000 113.619 113.619 1448.000 113.618 113.618 1449.000 113.617 113.617 1450.000 113.616 113.616 1451.000 113.614 113.614 1452.000 113.613 113.613 1453.000 113.612 113.612 1454.000 113.611 113.611 1455.000 113.609 113.609 1456.000 113.608 113.608 1457.000 113.607 113.607 1458.000 113.606 113.606 1459.000 113.604 113.604 1460.000 113.603 113.603 1461.000 113.602 113.602 Attachment 1 Page 58 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Hadar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DN I Battery IA48-Hour_CopingStudy BATT 1ABUS2 11 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Tim~ V-V+ 1462.000 113.601 113.601 1463.000 113.599 113.599 1464.000 113.598 113.598 1465.000 113.597 113.597 1466.000 113.595 113.595 1467.000 113.594 113.594 1468.000 113.593 113.593 1469.000 113.592 113.592 1470.000 113.590 113.590 1471.000 113.589 113.589 1472.000 113.588 113.588 1473.000 113.586 113.586 1474.000 113.585" 113.585 1475.000 113.584 113.584 1476.000 113.583 113.583 1477.000 113.581 113.581 1478.000 113.580 113.580 1479.000 113.579 113.579 1480.000 113.577 113.577 1481.000 113.576 113.576 1482.000 113.575 113.575 1483.000 113.573 113.573 1484.000 113.572 113.572 1485.000 113.571 113.571 1486.000 113.569 113.569 1487.000 113.568 113.568 1488.000 113.567 113.567 1489.000 113.565 113.565 1490.000 113.564 113.564 1491.000 113.562 113.562 1492.000 113.561 113.561 1493.000 113.560 113.560 1494.000 )13.558 113.558 1495.000 113.557 113.557 1496.000 113.556 113.556 1497.000 113.554 113.554 1498.000 113.553 113.553 1499.000 113.551 113.551 1500.000 113.550 113.550 1501.000 113.549 113.549 1502.000 113.547 113.547 1503.000 113.546 113.546 1504.000 113.544 113.544 1505.000 113.543 113.543 1506.000 113.538 113.538 1507.000 113.534 113.534 1508.000 113.529 113.529 1509.000 113.525 113.525 1510.000 113.520 113.520 1511.000 113.516 113.516 1512.000 113.511 113.511 1513.000 113.507 113.507 1514.000 113.502 113.502 1515.000 113.498 113.498 1516.000 113.493 113.493 1517.000 113.489 113.489 1518.000 113.484 113.484 1519.000 113.479 113.479 1520.000 113.475 113.475 1521.000 113.470 113.470 1522.000 113.466 113.466 1523.000 113.461 113.461 1524.000 113.457 113.457 1525.000 113.452 113.452 1526.000 113.448 113.448 1527.900 113.443 113.443 1528.000 113.438 113.438 1529.000 113.434 113.434 *1530.000 n3.429 113.429 1531.000 113.425 113.425 1532.000 113.420 113.420 1533.000 113.415 113.415 1534.000 113.411 113.411 1535.000 113.406 113.406 1536.000 113.402 113.402 1537.000 113.397 113.397 1538.000 113.392 113.392 1539.000 113.389 113.389 1540.000 113.385 113.385 1541.000 113.382 113.382 1542.000 113.378 113.378 1543.000 113.374 113.374 1544.000 113.371 113.371 1545.000 113.367 113.367 1546.000 113.363 113.363 1547.000 113.360 113.360 1548.000 113.356 113.356 1549.000 113.352 113.352 1550.000 113.348 113.348 1551.000 113.344 113.344 1552.000 113.340 113.340 1553.000 113.336 113.336 1554.000 113.332 113.332 1555.000 113.328 113.328 1556.000 113.324 113.324 1557.000 113.320 113.320 1558.000 113.316 113.316 1559.000 113.312 113.312 1560.000 113.307 113.307 1561.000 113.303 113.303 1562.000 113.299 '-113.299 1563.000 113.294 113.294 1564.000 113.290 113.290 1565.000 113.286 113.286 1566.000 113.281 113.281 1567.000 113.277 113.277 1568.000 113.272 113.272 1569.000 113.268 113.268. 1570.000 113.263 113.263 1571.000 113.258 113.258 1572.000 113.254 113.254 1573.000 113.249 113.249 1574.000 113.244 113.244 1575.000 113.239 113.239 1576.000 113.234 113.234 1577.000 113.229 113.229 1578.000 113.224 113.224 1579.000 113.219 113.219 1580.000 113.214 113.214 1581.000 113.209 113.209 1582.000 113.204 113.204 1583.000 113.199 113.199 1584.000 113.193 113.193 1585.000 113.188 113.188 1586.000 113.183 113.183 1587.000 113.177 113.177 1588.000 113.173 113.173 1589.000 113.168 113.168 1590.000 113.163 113.163 1591.000 113.158 113.158 1592.000 113.153 113.153 1593.000 113.147 113.147 1594.000 113.142 113.142 1595.000 113.137 113.137 1596.000 113.132 113.132 1597.000 113.127 113.127 1598.000 113.122 113.122 1599.000 113.117 113.117 1600.000 113.112 113.112 1601.000 113.107 113.107 1602.000 113.102 113.102 1603.000 113.097 113.097 1604.000 113.091 113.091 1605.000 113.086 113.086 1606.000 113.081 113.081 1607.000 113.076 113.076 1608.000 113.071 113.071 1609.000 113.066 113.066 Attachment 1 Page 59 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT1ABUS2 12 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1610.000 113.061 113.061 1611.000 113.056 113.056 1612.000 113.050 113.050 1613.000 113.045 113.045 1614.000 113.040 113.040 1615.000 113.035 113.035 1616.000 113.030 113.030 1617.000 113.025 113.025 1618.000 113.020 113.020 1619.000 113.015 113.015 1620.000 113.009 113.009 1621.000 113.004 113.004 1622.000 112.999 112.999 1623.000 112.994 112.994 1624.000 112.989 112.989 1625.000 112.984 112.984 1626.000 112.978 112.978 1627.000 112.973 112.973 1628.000 112.968 112.968 1629.000 112.963 112.963 1630.000 112.958 112.958 1631.000 112.953 112.953 1632.000 112.947 112.947 1633.000 112.942 112.942 1634.000 112.937 112.937 1635.000 112.932 112.932 1636.000 112.927 112.927 1637.000 112.921 112.921 1638.000 112.916 112.916 1639.000 112.911 112.911 1640.000 112.906 112.906 1641.000 112.901 112.901 1642.000 112.895 112.895 1643.000 112.892 112.892 1644.000 112.889 112.889 1645.000 112.886 112.886 1646.000 112.883 112.883 1647.000 112.880 112.880 1648.000 112.877 112.877 1649.000 112.874 112.874 °!650.000 112.871 112.871 1651.000 112.868 112.868 1652.000 112.865 112.865 1653.000 112.862 112.862 1654.000 112.859 112.859 1655.000 112.856 112.856 1656.000 112.853 112.853 1657.000 112.850 112.850 1658.000 112.847 112.847 1659.000 112.844 112.844 1660.000 112.841 112.841 1661.000 112.838 112.838 1662.000 112.835 112.835 1663.000 112.832 112.832 1664.000 112.829 112.829 1665.000 112.826 112.826 1666.000 112.823 112.823 1667.000 112.819 112.819 1668.000 112.816 112.816 1669.000 112.813 112.813 1670.000 112.810 112.810 1671.000 112.807 112.807 1672.000 112.804 112.804 1673.000 112.801 112.801 1674.000 112.798 112.798 1675.000 112.795 ll2.795 1676.000 112.792 ll2.792 1677.000 112.789 112.789 1678.000 112.785 ll2.785 1679.000 112.782 112.782 1680.000 112.779 112.779 1681.000 112.776 112.776 1682.000 112.773 ll2.773 1683.000 112.770 112.770 1684.000 112.767 ll2.767 1685.000 112.764 112.764 1686.000 112.761 112.761 1687.000 112.757 112.757 1688.000 112.754 ll2.754 1689.000 112.751 112.751 1690.000 112.748 112.748 1691.000 112.745 112.745 1692.000 112.742 112.742 1693.000 112.738 112.738 1694.000 112.735 112.735 1695.000 112.732 112.732 1696.000 112.729 112.729 1697.000 112.726 112.726 1698.000 112.723 112.723 1699.000 112.719 112.719 1700.000 112.716 112.716 1701.000 112.713 112.713 1702.000 112.710 112.710 1703.000 112.706 112.706 1704.000 112.704 ll2.704 1705.000 112.701 112.701 1706.000 112.699 112.699 1707.000 112.696 112.696 1708.000 112.694 ll2.694 1709.000 112.692 112.692 1710.000 ll2.689 112.689 1711.000 112.687 112.687 1712.000 112.684 112.684 . 1713.000 112.682 112.682 1714.000 112.679 112.679 1715.000 112.677 112.677 1716.000 112.674 112.674 1717.000 112.672 112.672 1718.000 *112.669 ll2.669 1719.000 112.667 112.667 1720.000 112.664 112.664 1721.000 112.662 112.662 1722.000 112.659 112.659 1723.000 112.657 112.657 1724.000 112.654 112.654 1725.000 112.652 112.652 1726.000 112.649 112.649 1727.000 112.647 112.647 1728.000 112.644 112.644 1729.000 112.641 112.641 1730.000 112.639 112.639 1731.000 112.636 112.636 1732.000 112.634 112.634 1733.000 112.631 112.631 1734.000 112.629 112.629 1735.000 112.626 112.626 1736.000 112.623 112.623 1737.000 112.621 112.621 1738.000 ll2.618 ll2.618 1739.000 112.615 112.615 1740.000 112.613 112.613 1741.000 112.610 112.610 1742.000 112.607 112.607 1743.000 112.605 112.605 1744.000 112.602 112.602 1745.000 112.599 112.599 1746.000 112.597 112.597 1747.000 112.594 112.594 1748.000 112.591 112.591 1749.000 112.589 112.589 1750.000 112.586 112.586 1751.000 112.583 112.583 1752.009 112.581 112.581 1753.000 112.578 112.578 1754.000 112.575 112.575 1755.000 112.572 112.572 1756.000 112.570 112.570 1757.000 112.567 ll2.567 Attachment 1 Page 60 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT 1ABUS2 13 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time y. V+ Time V-V+ Time V-V+ Time V-V+ 1758.000 112.564 112.564 1759.000 112.561 112.561 1760.000 112.558 112.558 1761.000 112.556 112.556 1762.000 112.553 112.553 1763.000 112.550 112.550 1764.000 112.547 112.547 1765.000 112.544 112.544 1766.000 112.540 112.540 1767.000 112.537 112.537 1768.000 112.533 112.533 1769.000 112.530 112.530 1770.000 112.526 112.526 1771.000 112.523 112.523 1772.000 112.519 112.519 1773.000 112.515 112.515 1774.000 112.512 112.512 1775.000 112.508 112.508 1776.000 112.505 112.505 1777.000 112.501 112.501 1778.000 112.497 112.497 1779.000 112.494 112.494 1780.000 112.490 112.490 1781.000 112.486 112.486 1782.000 112.483 112.483 1783.000 112.479 112.479 1784.000 112.475 112.475 1785.000 112.472 112.472 1786.000 112.468 112.468 1787.000 112.464 112.464 1788.000 112.461 112.461 1789.000 112.457 112.457 1790.000 112.453 112.453 1791.000 112.449 112.449 1792.000 112.446 112.446 1793.000 112.442 112.442 1794.000 112.438 112.438 1795.000 112.434 112.434 1796.000 112.431 112.431 1797.000 112.427 112.427 1798.000 112.423 112.423 1799.000 112.419 112.419 1800.000 112.415 112.415 1801.000 112.412 112.412 1802.000 112.408 112.408 1803.000 112.404 112.404 1804.000 112.400 112.400 1805.000 112.396 112.396 1806.000 112.392 112.392 1807.000 112.389 112.389 1808.000 112.385 112.385 1809.000 112.381 112.381 1810.000 112.377 112.377 1811.000 112.373 112.373 1812.000 112.369 112.369 1813.000 112.365 112.365 1814.000 112.361 112.361 1815.000 112.357 112.357 1816.000 112.353 112.353 1817.000 112.349 112.349 1818.000 112.345 112.345 1819.000 112.341 112.341 1820.000 112.337 112.337 1821.000 112.333 112.333 1822.000 112.329 112.329 1823.000 112.325 112.325 1824.000 112.321 112.321 1825.000 112.317 112.317 1826.000 112.313 112.313 1827.000 112.309 112.309 1828.000 112.305 112.305 1829.000 112.301 112.301 1830.000 112.297 112.297 1831.000 112.293 112.293 1832.000 112.289 112.289 1833.000 112.285 112.285 1834.000 112.281 112.281 1835.000 112.278 112.278 1836.000 112.274 112.274 1837.000 112.271 112.271 1838.000 112.268 112.268 1839.000 112.264 112.264 1840.000 112.261 112.261 1841.000 112.257 112.257 1842.000 112.254 112.254 1843.000 112.250 112.250 1844.000 112.246 112.246 1845.000 112.243 112.243 1846.000 112.239 112.239 1847.000 112.236 112.236 1848.000 112.232 112.232 1849.000 112.229 112.229 1850.000 112.225 112.225 1851.000 112.221 112.221 1852.000 112.218 112.218 1853.000 112.214 112.214 1854.000 112.210 112.210 1855.000 112.206 112.206 1856.000 112.202 112.202 1857.000 112.198 112.198 1858.000 112.193 112.193 1859.000 112.189 112.189 1860.000 112.185 112.185 1861.000 112.181 112.181 1862.000 112.176 112.176 1863.000 112.172 112.172 1864.000 112.168 112.168 1865.000 112.163 112.163 1866.000 112.159 112.159 1867.000 112.155 112.155 1868.000 112.150 112.150 1869.000 112.146 112.146 1870.000 112.142 112.142 1871.000 112.137 112.137 1872.000 112.133 112.133 1873.000 112.128 112.128 1874.000 112.124 112.124 1875.000 112.119 112.119 1876.000 112.115 112.115 1877.000 112.110 112.110 1878.000 112.105 112.105 1879.000 112.101 112.101 1880.000 112.096 112.096 1881.000 112.092 112.092 1882.000 112.087 112.087 1883.000 112.082 112.082 1884.000 112.078 112.078 1885.000 112.073 112.073 1886.000 112.068 112.068 1887.000 112.063 112.063 1888.000 112.059 112.059 1889.000 112.054 112.054 1890.000 112.049 112,049 1891.000 112.044 112,044 1892.000 112.039 112.039 1893.000 112.034 112.034 1894.000 112.029 112.029 1895.000 112.025 112.025 1896.000 112.020 112.020 1897.000 112.015 112.015 1898.000 112.011 112.011 1899.000 112.006 112.006 1900.000 112.001 112.001 1901.000 111.997 111.997 1902.000 111.992 111.992 1903.000 111.987 111.987 1904.000 111.982 111.982 1905.000 111.977 111.977 Attachment 1 Page 61 of 85 EC 626319 Project:*

Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and* with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT1ABUS2 14 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1906.000 111.973 111.973 1907.000 111.968 111.968 1908.000 111.963 111.963 1909.000 111.958 111.958 1910.000 111.953 111.953 1911.000 111.948 111.948 1912.000 111.943 111.943 1913.000 111.938 111.938 1914.000 111.933 111.933 1915.000 111.928 111.928 1916.000 111.922 111.922 1917.000 111.917 111.917 1918.000 111.912 111.912 1919.000 111.907 111.907 1920.000 111.902 111.902 1921.000 111.896 111.896 1922.000 111.891 111.891 1923.000 111.886 111.886 1924.000 111.880 111.880 1925.000 111.875 111.875 1926.000 111.870 111.870 1927.000 111.864 111.864 1928.000 111.859 111.859 1929.000 111.853 111.853 1930.000 111.848 111.848 1931.000 111.842 111.842 1932.000 111.837 111.837 1933.000 111.831 111.831 1934.000 111.826 111.826 1935.000 111.820 111.820 1936.000 111.814 111.814 1937.000 111.808 111.808 1938.000 111.803 111.803 1939.000 111.797 111.797 1940.000 111.791 111.791 1941.000 111.785 111.785 1942.000 111.779 111.779 1943.000 111.773 111.773 1944.000 111.768 111.768 1945.000 111.762 111.762 1946.000 111.756 111.756 1947.000 111.749 111.749 1948.000 111.743 111.743 1949.000 111.737 111.737 1950.000 111.731 111.731 1951.000 111.725 111.725 1952.000 111.719 111.719 1953.000 111.713 111.713 1954.000 111.706 111.706 1955.000 111.700 111.700 1956.000 111.694 111.694 1957.000 111.687 111.687 1958.000 111.681 111.681 1959.000 111.674 111.674 1960.000 111.668 111.668 1961.000 111.661 111.661 1962.000 111.655 111.655 1963.000 111.648 111.648 1964.000 111.641 111.641 1965.000 111.635 111.635 1966.000 111.628 111.628 1967.000 111.621 111.621 1968.000 111.614 111.614 1969.000 111.607 111.607 1970.000 111.601 111.601 1971.000 111.593 111.593 1972.000 111.583 111.583 1973.000 111.574 111.574 1974.000 111.565 111.565 1975.000 111.556 111.556 1976.000 111.546 111.546 1977.000 111.537 111.537 1978.000 111.527 111.527 1979.000 111.517 111.517 1980.000 111.507 111.507 1981.000 111.498 111.498 1982.000 111.488 111.488 1983.000 111.477 111.477 1984.000 111.467 111.467 1985.000 111.457 111.457 1986.000 111.447 111.447 1987.000 111.436 111.436 1988.000 111.426 111.426 1989.000 111.415 ' 111.415 1990.000 111.404 111.404 1991.000 111.393 111.393 1992.000 111.382 111.382 1993.000 111.371 111.371 1994.000 111.360 111.360 1995.000 111.349 111.349 19%.000 111.337 111.337 1997.000 111.326 111.326 1998.000 111.314 111.314 1999.000 111.303 111.303 2000.000 111.291 111.291 2001.000 111.279 111.279 2002.000 111.267 111.267 2003.000 111.254 111.254 2004.000 111.242 111.242 2005.000 111.230 111.230 2006.000 111.217 111.217 2007.000 111.204 111.204 2008.000 111.191 111.191 2009.000 111.178 111.178 2010.000 111.165 111.165 2011.000 111.152 111.152 2012.000 111.138 111.138 2013.000 111.125 111.125 2014.000 111.111 111.111 2015.000 111.097 111.097 2016.000 111.083 111.083 2017.000 111.069 111.069 2018.000 111.055 111.055 2019.000 111.040 111.040 2020.000 111.026 111.026 2021.000 111.011 111.011 2022.000 110.996 110.996 2023.000 110.981 110.981 2024.000 110.966 110.966 2025.000 110.958 110.958 2026.000 110.949 110.949 2027.000 110.941 110.941 2028.000 110.933 110.933 2029.000 110.924 110.924 2030.000 110.916 110.916 2031.000 110.907 110.907 2032.000 110.899 110.899 2033.000 110.890 110.890 2034.000 110.881 110.881 2035.000 110.873 110.873 2036.000 110.864 110.864 2037.000 110.855 110.855 2038.000 110.846 110.846 2039.000 110.838 110.838 2040.000 110.829 110.829 2041.000 110.820 110.820 2042.000 110.811 110.811 2043.000 110.802 110.802 2044.000 110.793 110.793 2045.000 110.783 110.783 2046.000 110.774 110.774 2047.000 110.765 110.765 2048.000 110.756 110.756 2049.000 110.747 110.747 2050.000 110.737 110.737 2051.000 110.728 110.728 2052.000 110.718 110.718 2053.000 110.709 110.709 Attachment 1 Page 62 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study BATT 1ABUS2 15 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2054.000 110.699 110.699 2055.000 110.690 110.690 2056.000 110.680 110.680 2057.000 110.670 110.670 2058.000 110.661 110.661 2059.000 110.651 110.651 2060.000 110.641 110.641 2061.000 110.631 110.631 2062.000 110.621 110.621 2063.000 110.611 li°0.611 2064.000 110.601 110.601 2065.000 110.591 110.591 2066.000 110.581 110.581 2067.000 110.571 110.571 2068.000 110.560 110.560 2069.000 110.550 . 110.550 2070.000 110.540 110.540 2071.000 110.529 110.529 2072.000.

110.519 110.519 2073.000 110.508 110.508 2074.000 110.498 110.498 2075.000 110.487 110.487 2076.000 110.476 110.476 2077.000 110.466 110.466 2078.000 110.455 110.455 2079.000 110.444 110.444 2080.000 110.433 110.433 2081.000 110.422 110.422 2082.000 110.411 110.411 2083.000 110.400 110.400 2084.000 110.389 110.389 2085.000 110.377 110.377 2086.000 110.362 110.362 2087.000 110.347 110.347 2088.000 110.331 110.331 2089.000 110.316 110.316 2090.000 110.300 110.300 2091.000 110.284 110.284 2092.000 110.268 110.268 2093.000 110.252 110.252 2094.000 110.236 110.236 2095.000 110.219 110.219 2096.000 110.200 110.200 2097.000 110.194 110.194 2098.000 110.186 110.186 2099.000 110.179 110.179 2100.000 110.171 110.171 2101.000 110.164 110.164 2102.000 110.156 110.156 2103.000 110.149 110.149 2104.000 110.141 110.141 2105.000 110.133 110.133 2106.000 110.126 110.126 2107.000 110.118 110.118 2108.000 110.111 110.111 2109.000 110.103 110.103 2110.000 110.095 110.095 2111.000 110.087 110.087 2112.000 110.080 110.080 2113.000 110.072 110.072 2114.000 110.064 110.064 2115.000 110.056 110.056 2116.000 110.049 110.049 2117.000 110.041 110.041 2118.000 110.033 110.033 2119.000 110.025 110.025 2120.000 110.020 110.020 2121.000 110.016 110.016 2122.000 110.013 110.013 2123.000 110.009 110.009 2124.000 110.005 110.005 2125.000 110.002 110.002 2126.000 109.998 109.998 2127.000 109.994 109.994 2128.000 109.990 109.990 2129.000 109.987 109.987 2130.000 109.983 109.983 2131.000 109.979 109.979 2132.000 109.975 109.975 2133.000 109.971 109.971 2134.000 109.967 109.967 2135.000 109.963 109.963 2136.000 109.959 109.959 2137.000 109.955 109.955 2138.000 109.951 109.951 2139.000 109.947 109.947 2140.000 109.943 109.943 2141.000 109.939 109.939 2142.000 109.935 109.935 2143.000 109.931 109.931 2144.000 109.927 109.927 2145.000 109.923 109.923 2146.000 109.918 109.918 2147.000 109.914 109.914 2148.000 109.910 109.910 2149.000 109.906 109.906 2150.000 109.901 109.901 2151.000 109.897 109.897 2152.000 109.893 109.893 2153.000 109.888 109.888 2154.000 109.884 109.884 2155.000 109.879 109.879 2156.000 109.875 109.875 2157.000 109.870 109.870 2158.000 109.866 109.866 2159.000 109.861 109.861 2160.000 109.856 109.856 2161.000 109.852 109.852 2162.000 109.847 109.847 2163.000 109.842 109.842 2164.000 109.838 109.838 2165.000 109.833 109.833 2166.000 109.828 109.828 2167.000 109.823 109.823 2168.000 109.818 109.818 2169.000 109.813 109.813 2170.000 109.808 109.808 2171.000 109.803 109.803 2172.000 109.798 109.798 2173.000 109.793 109.793 2174.000 109.788 109.788 2175.000 109.783 109.783 2176.000 109.778 109.778 2177.000 109.773 109.773 2178.000 109.768 109.768 2179.000 109.762 109.762 2180.000 109.757 109.757 2181.000 109.752 109.752 2182.000 109.746 109.746 2183.000 109.741 109.741 2184.000 109.735 . 109.735 2185.000 109.730 109.730 2186.000 109.724 109.724 2187.000 , 109.719 109.719 2188.000 109.713 109.713 2189.000 109.707 109.707 2190.000 109.702 109.702 2191.000 109.696 109.696 2192.000 109.690 109.690 2193.000 109.684 109.684 2194.000 109.678 109.678 2195.000 109.673 109.673 2196.000 109.667 109.667 2197.000 109.661 109.661 2198.000 109.654 109.654 2199.000 109.648 109.648 2200.000 109.642 109.642 2201.000 109.636 109.636 Attachment 1 Page 63 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study BATT1ABUS2 16 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-' V+ Time V-V+ ----2202.000 109.630 109.630 2203.000 109.623 109.623 2204.000 109.617 109.617 2205.000 109.611 109.611 2206.000 109.604 109.604 2207.000 109.598 109.598 2208.000 109.591 109.591 2209.000 109.585 109.585 2210.000 109.578 109.578 2211.000 109.571 109.571 2212.000 109.564 109.564 2213.000 109.558 109.558 2214.000 109.551 109.551 2215.000 109.542 109.542 2216.000 109.532 109.532 2217.000 109.522 109.522 2218.000 109.512 109.512 2219.000 109.501 109.501 2220.000 109.490 109.490 2221.000 109.479 109.479 2222.000 109.468 109.468 2223.000 109.456 109.456 2224.000 109.444 109.444 2225.000 109.432 109.432 2226.000 109.420 109.420 2227.000 109.408 109.408 2228.000 109.395 109.395 2229.000 109.382 109.382 2230.000 109.369 109.369 2231.000 109.356 109.356 2232.000 109.342 109.342 2233.000 109.328 109.328 2234.000 109.314 109.314 2235.000 109.300 109.300 2236.000 109.285 109.285 2237.000 109.271 109.271 2238.000 109.255 109.255 2239.000 109.240 109.240 2240.000 109.224 109.224 2241.000 109.208 109.208 2242.000 109.192 109.192 2243.000 109.175 109.175 2244.000 109.158 109.158 2245.000 109.140 109.140 2246.000 109.123 109.123 2247.000 109.104 109.104 2248.000 109.086 109.086 2249.000 109.067 109.067 2250.000 109.048 109.048 2251.000 109.028 109.028 2252.000 109.008 109.008 2253.000 108.988 108.988 2254.000 108.977 108.977 2255.000 108.965 108.965 2256.000 108.953 108.953 2257.000 108.941 108.941 2258.000 108.929 108.929 2259.000 108.917 108.917 2260.000 108.904 108.904 2261.000 108.892 108.892 2262.000 108.879 108.879 2263.000 108.867 108.867 2264.000 108.854 108.854 2265.000 108.841 108.841 2266.000 108.829 108.829 *2267.000 108.816 108.816 2268.000 108.802 108.802 2269.000 108.789 108.789 2270.000 108.776 108.776 2271.000 108.763 108.763 2272.000 108.749 108.749 2273.000 108.736 108.736 2274.000 108.722 108.722 2275.000 108.708 108.708 2276.000 108.694 108.694 2277.000 108.680 108.680 2278.000 108.665 108.665 22~9.000 108.650 108.650 2280.000 108.636 108.636 2281.000 108.621 108.621 2282.000 108.606 108.606 2283.000 108.591 108.591 2284.000 108.576 108.576 2285.000 108.560 108.560 2286.000 108.545 108.545 2287.000 108.529 108.529 2288.000 108.513 108.513 2289.000 108.498 108.498 2290.000 108.482 108.482 2291.000 108.466 108.466 2292.000 108.449 108.449 2293.000 108.433 108.433 2294.000 108.417 108.417 2295.000 108.400 108.400 2296.000 108.383 108.383 2297.000 108.367 108.367 2298.000 108.350 108.350 ' 2299.000 108.332 108.332 2300.000 108.315 108.315 2301.000 108.298 108.298 2302.000 108.280 108.280 2303.000 108.266 108.266 2304.000 108.255 108.255 2305.000 108.243 108.243 2306.000 108.232 108.232 2307.000 108.220 108.220 2308.000 108.209 108.209 2309.000 108.198 108.198 2310.000 108.186 108.186 2311.000 108.175 108.175 2312.000 108.163 108.163 2313.000 108.151 108.151 2314.000 108.140 108.140 2315.000 108.128 108.128 2316.000 108.117 108.117 2317.000 108.105 108.105 2318.000 108.093 108.093 2319.000 108.082 108.082 2320.000 108.070 108.070 2321.000 108.058 108.058 2322.000 108.047 108.047 2323.000 108.035 108.035 2324.000 108.023 108.023 2325.000 108.011 108.011 2326.000 108.000 108.000 2327.000 107.988 107.988 2328.000 107.976 107.976 2329.000 107.964 107.964 2330.000 107.952 107.952 2331.000 107.940 107.940 2332.000 107.928 107.928 2333.000 107.916 107.916 2334.000 107.904 107.904 2335.000 107.892 107.892 2336.000 107.880 107.880 2337.000 107.868 107.868 2338.000 107.856 107.856 2339.000 107.844 107.844 2340.000 107.832 107.832 2341.000 107.820 107.820 2342.000 107.808 107.808 2343.000 107.796 107.796 2344.000 107.783 107.783 2345.000 107.771 107.771 2346.000 107.759 107.759 2347.000 107.747 107.747 2348.000 107.734 107.734 2349.000 107.722 107.722 Attachment 1 Page 64 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.:*

17 11-17-2018 KCICONSULT Base Normal DIV I Battery IA 48-Hour Coping Study BATT 1ABUS2 Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time y. V+ Time V-V+ 2350.000 107.710 107.710 2351.000 107.697 107.697 2352.000 107.685 107.685 2353.000 107.673 107.673 2354.000 107.660 107.660 2355.000 107.648 107.648 2356.000 107.635 107.635 2357.000 107.623 107.623 2358.000 107.610 107.610 2359.000 107.598 107.598 2360.000 107.584 107.584 2361.000 107.569 107.569 2362.000 107.554 107.554 2363.000 107.539 107.539 2364.000 107.523 107.523 2365.000 107.508 107.508 2366.000 107.492 107.492 2367.000 107.477 107.477 2368.000 107.461 107.461 2369.000 107.446 107.446 2370.000 107.430 107.430 2371.000 107.414 107.414 2372.000 107.398 107.398 2373.000 107.382 107.382 2374.000 107.366 107.366 2375.000 107.350 107.350 2376.000 107.334 107.334 2377.000 107.318 107.318 2378.000 107.300 107.300 2379.000 107.286 107.286 2380.000 107.271 107.271 2381.000 107.255 107.255 2382.000 107.239 107.239 2383.000 107.222 107.222 2384.000 107.206 107.206 2385.000 107.189 107.189 2386.000 107.172 107.172 2387.000 107.155 107.155 2388.000 107.138 107.138 2389.000 107.120 107.120 ' 2390.000 107.102 107.102 2391.000 107.084 107.084 2392.000 107.066 107.066 2393.000 107.047 107.047 2394.000 107.028 107.028 2395.000 107.009 107.009 2396.000 106.990 106.990 2397.000 106.970 106.970 2398.000 106.950 106.950 2399.000 106.930 106.930 2400.000 106.910 106.910 2401.000 106.889 106.889 2402.000 106.868 106.868 2403.000 106.847 106.847 2403.333 106.839 119.654 DCMCC 1A2 Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time v-V+ Time V-V+ Time V-V+ Time V-V+ 0.000 119.654 111.654 0.017 111.654 113.738 1.000 113.741 113.892 2.000 113.895 113.895 3.000 113.898 113.898 4.000 113.900 113.900 5.000 113.903 113.903 6.000 113.907 113.907 7.000 113.911 113.911 8.000 113.916 113.916 9.000 113.920 113.920 10.000 113.925 113.925 11.000 113.929 113.929 12.000 113.934 113.934 13.000 113.939 113.939 14.000 113.943 113.943 15.000 113.948 113.948 16.000 113.953 113.953 17.000 113.958 113.958 18.000 113.962 113.962 19.000 113.967 113.967 20.000 113.972 113.972 21.000 113.977 113.977 22.000 113.982 113.982 23.000 113.987 113.987 24.000 113.992 113.992 25.000 113.997 113.997 26.000 114.002 114.002 27.000 114.007 114.007 28.000 114.012 114.012 29.000 114.017 114.017 30.000 114.022 114.022 31.000 114.027 114.027 32.000 114.033 114.033 33.000 114.038 114.038 34.000 . 114.043 114.043 35.000 114.049 114.049 36.000 114.054 114.054 37.000 114.059 114.059 38.000 114.065 114.065 39.000 114.070 114.070 40.000 114.076 114.076 41.000 114.081 114.081 42.000 114.087 114.087 43.000 114.093 114.093 44.000 114.098 114.098 45.000 114.104 114.104 46.000 114.110 114.110 47.000 114.116 114.116 48.000 114.121 114.121 49.000 114.127 114.127 50.000 114.133 114.133 51.000 114.139 114.139 52.000 114.145 114.145 53.000 114.151 114.151 54.000 114.157 114.157 55.000 114.164 114.164 56.000 114.170 114.170 57.000 114.176 114.176 58.000 114.182 114.182 59.000 114.189 114.189 60.000 114.195 115.374 61.000 115.375 115.375 62.000 115.376 115.376 63.000 115.377 115.377 64.000 115.379 115.379 65.000 115.380 115.380 66.000 115.381 115.381 67.000 115.382 115.382 68.000 115.384 115.384 69.000 115.385 115.385 70.000 115.386 115.386 71.000 115.387 115.387 72.000 115.389 115.389 73.000 115.390 115.390 74.000 115.391 115.391 Attachment 1 Page 65 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCJA2 18 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 75.000 115.393 115.393 76.000 115.394 115.394 77.000 115.395 115.395 78.000 115.396 115.396 79.000 115.398 115.398 80.000 115.399 115.399 81.000 115.400 115.400 82.000 115.401 115.401 83.000 115.403 115.403 84.000 115.404 115.404 85.000 115.405 115.405 86.000 115.407 115.407 87.000. 115.408 115.408 88.000 115.409 115.409 89.000 115.410 115.410 90.000 115.412 115.412 91.000 115.413 115.413 92.000 115.414 115.414 93.000 115.416 115.416 94.000 115.417 115.417 95.000 115.418 115.418 96.000 115.419 115.419 97.000 115.419 115.419 98.000 115.420 115.420 99.000 115.421 115.421 100.000 115.421 115.421 101.000 115.422 115.422 102.000 115.422 115.422 103.000 115.423 115.423 104.000 115.424 115.424 105.000 115.424 115.424 106.000 115.425 115.425 107.000 115.425 115.425 108.000 115.426 115.426 109.000 115.427 115.427 110.000 115.427 115.427 111.000 115.428 115.428 112.000 115.428 115.428 113.000 115.429 115.429 114.000 115.430 115.430 115.000 115.430 115.430 116.000 115.431 115.431 117.000 115.432 115.432 118.000 115.432 115.432 119.000 115.433 115.433 120.000 115.433 115.433 121.000 115.434 115.434 122.000 115.435 115.435 123.000 115.435 115.435 124.000 115.436 115.436 125.000 115.436 115.436 126.000 115.437 115.437 127.000 115.438 115.438 128.000 115.438 115.438 129.000 115.439 115.439 130.000 115.439 115.439 131.000 115.440 115.440 132.000 115.441 115.441 133.000 115.441 115.J41 134.000 115.442 115.442 135.000 115.443 115.443 136.000 115.443 115.443 137.000 115.444 115.444 138.000 115.444 115.444 139.000 115.445 115.445 140.000 115.446 115.446 141.000 115.446 115.446 142.000 115.447 115.447 143.000 115.447 115.447 144.000 115.448 115.448 145.000 115.449 115.449 146.000 115.449 115.449 147.000 115.450 115.450 148.000 115.451 115.451 149.000 115.451 115.451 150.000 115.452 115.452 151.000 115.452 115.452 152.000 115.453 115.453 153.000 115.454 115.454 154.000 115.454 115.454 155.000 115.455 115.455 156.000 115.456 115.456 157.000 115.456 115.456 158.000 115.457 115.457 159.000 115.457 115.457 160.000 115.458 115.458 161.000 115.459 115.459 162.000 115.459 115.459 163.000 115.460 115.460 164.000 115.461 115.461 165.000 115.461 115.461 166.000 115.462 115.462 167.000 115.462 115.462 168.000 115.462 115.462 169.000 115.462 115.462 170.000 115.462 115.462 171.000 115.462 115.462 172.000 115.461 115.461 173.000 115.461 115.461 174.000 115.461 115.461 175.000 115.461 115.461 176.000 115.461 115.461 177.000 115.461 115.461 178.000 115.461 115.461 179.000 115.461 115.461 180.000 115.461 115.461 181.000 115.461 115.461 182.000 115.461 115.461 183.000 115.461 115.461 184.000 115.461 115.461 185.000 115.461 115.461 186.000 115.461 115.461 187.000 115.461 115.461 188.000 115.461 115.461 189.000 115.461 115.461 190.000 115.461 115.461 191.000 115.461 115.461 192.000 115.461 115.461 193.000 115.461 115.461 194.000 115.461 115.461 195.000 115.460 115.460 196.000 115.460 115.460 197.000 115.460 115.460 198.000 115.460 115.460 199.000 115.460 115.460 200.000 115.460 115.460 201.000 115.460 115.460 202.000 115.460 115.460 203.000 115.460 115.460 204.000 115.460 115.460 205.000 115.460 115.460 206.000 115.460 115.460 207.000 115.460 115.460 208.000 115.460 115.460 209.000 115.460 . 115.460 210.000 115.460 115.460 211.000 115.460 115.460 212.000 115.460 115.460 213.000 115.460 115.460 214.000 115.460 115.460 215.000 115.460 115.460 216.000 115.460 115.460 217.000 115.460 115.460 218.000 115.459 115.459 219.000 115.459 115.459 220.000 115.459 115.459 221.000 115.459 115.459 222.000 115.459 115.459 Attachment 1 Page 66 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: \.. DIV I Battery IA 48-Hour Coping Study DCMCCIA2 19 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 223.000 115.459 115.459 224.000 115.459 115.459 225.000 115.459 115.459 226.000 115.459 115.459 227.000 115.459 115.459 228.000 115.459 115.459 229.000 115.459 115.459 230.000 115.459 115.459 231.000 115.459 115.459 232.000 115.459 115.459 233.000 115.459 115.459 234.000 115.459 115.459 235.000 115.459 115.459 236.000 115.459 115.459 237.000 115.459 115.459 238.000 115.459 115.459 239.000 115.459 115.459 240.000 115.459 115.459 241.000 115.458 115.458 242.000 115.458 115.458 243.000 115.458 115.458 244.000 115.458 115.458 245.000 115.458 115.458 246.000 115.458 115.458 247.000 115.458 115.458 248.000 115.458 115.458 249.000 115.458 115.458 250.000 115.458 115.458 251.000 115.458 115.458 252.000 115.458 115.458 253.000 115.458 115.458 254.000 115.458 115.458 255.000 115.458 115.458 256.000 115.458 115.458 257.000 115.458 115.458 258.000 115.458 115.458 259.000 115.458 115.458 260.000 115.458 115.458 261.000 115.458 115.458 262.000 115.458 115.458 263.000 115.458 115.458 264.000 115.457 115.457 265.000 115.457 115.457 266.000 115.457 115.457 267.000 115.457 115.457 268.000 115.457 115.457 269.000 115.457 115.457 270.000 115.457 115.457 271.000 115.457 115.457 272.000 115.457 115.457 273.000 115.457 115.457 274.000 115.457 115.457 275.000 115.457 115.457 276.000 115.457

  • 115.457 277.000 115.457 115.457 278.000 115.457 115.457 279.000 115.457 115.457 280.000 115.457 115.457. 281.000 115.457 115.457 282.000 115.457 115.457 283.000 115.457 115.457 284.000 115.457 115.457 285.000 115.457 115.457 286.000 115.456 115.456 287.000 115.456 115.456 288.000 115.456 115.456 289.000 115.456 115.456 290.000 115.456 115.456 291.000 115.456 115.456 292.000 115.456 115.456 293.000 115.456 115.456 294.000 115.456 115.456 295.000 115.456 115.456 296.000 115.456 115.456 297.000 115.456 115.456 298.000 115.456 115.456 299.000 115.456 115.456 300.000 115.456 115.456 301.000 115.456 115.456 302.000 115.456 115.456 303.000 115.456 115.456 304.000 115.456 115.456 305.000 115.456 115.456 306.000 115.456 115.456 307.000 115.456 115.456 308.000 115.456 115.456 309.000 115.455 115.455 310.000 115.455 115.455 311.000 115.455 115.455 312.000 115.455 115.455 313.000 115.455 115.455 314.000 115.455 115.455 315.000 115.455 115.455 316.000 115.455 115.455 317.000 115.455 115.455 318.000 115.455 115.455 319.000 115.455 115.455 320.000 115.455 115.455 321.000 115.455 115.455 322.000 115.455 115.455 323.000 115.455 115.455 324.000 115.455 115.455 325.000 115.455 115.455 326.000 115.455 115.455 327.000 115.455 115.455 328.000 115.455 115.455 329.000 115.455 115.455 330.000 115.455 115.455 331.000 115.455 115.455 332.000 115.454 115.454 333.000 115.454 115.454 334.000 115.454 115.454 335.000 115.454 115.454 336.000 115.454 115.454 337.000 115.454 115.454 338.000 115.454 115.454 339.000 115.454 115.454 340.000 115.454 115.454 341.000 115.454 115.454 342.000 115.454 115.454 343.000 115.454 115.454 344.000 115.454 115.454 345.000 115.454 115.454 346.000 115.454 115.454 347.000 115.454 115.454 348.000 115.454 115.454 349.000 115.454 115.454 350.000 115.454 115.454 351.000 115.454 115.454 352.000 115.454 115.454 353.000 115.454 115.454 354.000 115.453 115.453 355.000 115.453 115.453 356.000 115.453 115.453 357.000 115.453 115.453 358.000 115.453 115.453 359.000 115.453 115.453 360.000 115.453 115.453 361.000 115.453 115.453 362.000 115.453 115.453 363.000 115.453 115.453 364.000 115.453 115.453 365.000 115.4_53 115.453 366.000 115.453 115.453 367.000 115.453 115.453 368.000 115.453 115.453 369.000 115.453 115.453 370.000 115.453 115.453 Attachment 1 Page 67 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1

  • SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Fl~x Study ETAP Page: KC! ) 14.LON Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC1A2 20 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 371.000 115.453 115.453 372.000 115.453 115.453 373.000 115.453 115.453 374.000 115.453 115.453 375.000 115.453 115.453 376.000 115.452 115.452 377.000 115.452 115.452 378.000 115.452 115.452 379.000 115.452 115.452 380.000 115.452 115.452 381.000 115.452 115.452 382.000 115.452 115.452 383.000 115.452 115.452 384.000 115.452 115.452 385.000 115.452 115.452 386.000 115.452 115.452 387.000 115.452 115.452 388.000 115.452 115.452 389.000 115.452 115.452 390.000 115.452 115.452 391.000 115.452 115.452 392.000 115.452 115.452 393.000 115.452 115.452 394.000 115.452 115.452 395.000 115.452 115.452 396.000 115.452 115.452 397.000 115.452 115.452 398.000 115.452 115.452 399.000 115.451 115.451 400.000 115.451 115.451 401.000 115.451 115.451 402.000 115.451 115.451 403.000 115.451 115.451 404.000 115.451 115.451 405.000 115.451 115.451 406.000 115.451 115.451 407.000 115.451 115.451 408.000 115.451 115.451 409.000 115.451 115.451 410.000 115.451 115.451 411.000 115.451 115.451 412.000 115.451 115.451 413.000 115.451 115.451 414.000 115.451 115.451 415.000 115.451 115.451 416.000 115.451 115.451 417.000 115.451 115.451 418.000 115.451 115.451 419.000 115.451 115.451 420.000 115.451 115.451 421.000 115.450 115.450 422.000 115.450 115.450 423.000 115.450 115.450 424.000 115.450 115.450 425.000 115.450 115.450 426.000 115.450 115.450 427.000 115.450 115.450 428.000 115.450 115.450 429.000 115.450 115.450 430.000 115.450 115.450 431.000 115.450 115.450 432.000 115.450 115.450 433.000 115.450 115.450 434.000 115.450 115.450 435.000 115.450 115.450 436.000 115.450 115.450 437.000 115.450 115.450 438.900 115.450 115.450 439.000 115.450 115.450 440.000 115.450 115.450 441.000 115.450 115.450 442.000 115.450 115.450 443.000 115.449 115.449 444.000 115.449 115.449 445.000 115.449 115.449 446.000 115.449 115.449 447.000 115.449 115.449 448.000 115.449 115.449 449.000 115.449 115.449 450.000 115.449 115.449 451.000 115.449 115.449 452.000 115.449 115.449 453.000 115.449 115.449 454.000 115.449 115.449 455.000 115.449 115.449 456.000 115.449 115.449 457.000 115.449 115.449 458.000 115.449 115.449 459.000 115.449 115.449 460.000 115.449 115.449 461.000 115.449 115.449 462.000 115.449 115.449 463.000 115.449 115.449 464.000 115.449 115.449 465.000 115.448 115.448 466.000 115.448 115.448 467.000 115.448 115.448 468.000 115.448 115.448 469.000 115.448 115.448 470.000 115.448 115.448 471.000 115.448 115.448 472.000 115.448 115.448 473.000 115.448 115.448 474.000 115.448 115.448 475.000 115.448 115.448 476.000 115.448 115.448 477.000 115.448 115.448 478.000 115.448 115.448 479.000 115.448 115.448 480.000 115.448 115.448 481.000 115.448 115.448 482.000 115.448 115.448 483.000 115.448 115.448 484.000 115.448 115.448 485.000 115.448 115.448 486.000 115.448 115.448 487.000 115.447 115.447 488.000 115.447 115.447 489.000 115.447 115.447 490.000 115.447 115.447 491.000 115.447 115.447 492.000 115.447 115.447 493.000 115.447 115.447 494.000 115.447 115.447 495.000 115.447 115.447 496.000 115.447 115.447 497.000 115.447 115.447 498.000 115.447 115.447 499.000 115.447 115.447 500.000 115.447 115.447 501.000 115.447 115.447 502.000 115.447 115.447 503.000 115.447 115.447 504.000 115.447 115.447 505.000 115.447 115.447 506.000 115.447 115.447 507.000 115.447 115.447 508.000 115.447 115.447 509.000 115.446 115.446 510.000 115.446 115.446 511.000 115.446 115.446 512.000 115.446 115.446 513.000 115.446 115.446 514.000 115.446 115.446 515.000 115.446 115.446 516.000 115.446 115.446 517.000 115.446 115.446 518.000 115.446 115.446 Attachment 1 Page 68 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC 1A2 21 11-17-2018 KCICONSULT . Base Nonnal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time V-V+ Time V-V+ Time y. V+ 519.000 115.446 115.446 520.000 115.446 115.446 521.000 115.446 115.446 522.000 115.446 115.446 523.000 115.446 115.446 524.000 115.446 115.446 525.000 115.446 115.446 526.000 115.446 115.446 527.000 115.446 115.446 528.000 115.446 115.446 529.000 115.446 115.446 530.000 115.445 llS.445 531.000 115.445 115.445 532.000 115.445 115.445 533.000 115.445 115.445 534.000 115.445 115.445 535.000 115.445 115.445 536.000 115.445 115.445 537.000 115.445 115.445 538.000 115.445 115.445 539.000 115.445 115.445 540.000 115.445 115.445 541.000 115.445 115.445 542.000 115.445 115.445 543.000 115.445 115.445 544.000 115.445 115.445 545.000 115.445 115.445 546.000 115.445 115.445 547.000 115.445 115.445 548.000 115.445 115.445 549.000 115.445 115.445 550.000 115.445 115.445 551.000 115.445 115.445 552.000 115.444 115.444 553.000 115.444 115.444 554.000 115.444 115.444 555.000 115.444 115.444 556.000 115.444 115.444 557.000 115.444 115.444 558.000 115.444 115.444 559.000 115.444 . 115.444 560.000 115.444 115.444 561.000 115.444 115.444 562.000 115.444 115.444 563.000 115.444 115.444 564.000 115.444 115.444 565.000 115.444 115.444 566.000 115.444 115.444 567.000 115.444 115.444 568.000 115.444 115.444 569.000 115.444 115.444 570.000 115.444 115.444 571.000 115.444 115.444 572.000 115.444 115.444 573.000 115.444 115.444

  • 574.000 115.443 115.443 575.000 115.443 115.443 576.000 115.,443 115.443 577.000 115.443 115.443 578.000 115.443 115.443 579.000 115.443 115.443 580.000 115.443 115.443 581.000 115.443 115.443 582.000 115.443 115.443 583.000 115.443 115.443 584.000 115.443 115.443 585.000 115.443 115.443 586.000 115.443 115.443 587.000 115.443 115.443 588.000 115.443 115.443 589.000 115.443 115.443 590.000 115.443 115.443 591.000 115.443 115.443 592.000 115.443 115.443 593.000 115.443 115.443 594.000 115.443 115.443 595.000 115.442 115.442 596.000 115.442 115.442 597.000 115.442 115.442 598.000 115.442 115.442 599.000 115.442 115.442 600.000 115.442 115.442 601.000 115.442 115.442 602.000 115.442 115.442 603.000 115.442 115.442 604.000 115.442 115.442 605.000 115.442 115.442 606.000 115.442 115.442 607.000 115.442 115.442 608.000 115.442 115.442 609.000 115.442 115.442 610.000 115.442 115.442 611.000 115.442 115.442 612.000 115.4~2 115.442 613.000 115.442 115.442 614.000 115.442 115.442 615.000 115.442 115.442 616.000 115.442 115.442 617.000 115.441 115.441 618.000 115.441 115.441 619.000 115.441 115.441 620.000 115.441 115.441 621.000 115.441 115.441 622.000 115.441 115.441 623.000 115.441 115.441 624.000 115.441 115.441 625.000 115.441 115.441 626.000 115.441 115.441 627.000 115.441 115.441 628.000 115.441 115.441 629.000 115.441 115.441 630.000 115.441 115.441 631.000 115.441 115.441 632.000 115.441 115.441 633.000 115.441 115.441 634.000 115.441 115.441 635.000 115.441 115.441 636.000 115.441 115.441 637.000 115:441 115.441 638.000 115.440 115.440 639.000 115.440 115.440 640.000 115.440 115.440 641.000 115.440 115.440 642.000 115.440 115.440 643.000 115.440 115.440 644.000 115.440 115.440 645.000 115.440 115.440 646.000 115.440 115.440 647.000 115.440 115.440 648.000 115.440 115.440 649.000 115.440 115.440 650.000 115.440 115.440 651.000 115.440 115.440 65iooo 115.440 115.440 653.000 115.440 115.440 654.000 115.440 115.440 655.000 115.440 115.440 656.000 115.440 115.440 657.000 115.440 115.440 658.000 115.440 115.440 659.000 115.439 115.439 660.000 115.439 115.439 661.000 115.439 115.439 662.000 115.439 115.439 663.000 115.439 115.439 664.000 115.439 115.439 665.000 115.439 115.439 666.000 115.439 115.439 Attachment 1 Page 69 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRC!C-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC 1A2 22 11-17-2018 KC!CONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 667.000 115.439 115.439 668.000 115.439 115.439 669.000 115.439 115.439 670.000 115.439 115.439 671.000 115.439 115.439 672.000 115.439 115.439 673.000 115.439 115.439 674.000 115.439 115.439 675.000 115.439 115.439 676.000 115.439 115.439 677.000 115.439 115.439 678.000 115.439 115.439 679.000 115.439 115.439 680.000 115.439 115.439 681.000 115.438 115.438 682.000 115.438 115.438 683.000 115.438 115.438 684.000 115.438 115.438 685.000 115.438 115.438 686.000 115.438 115.438 687.000 115.438 115.438 688.000 115.438 115.438 689.000 115.438 115.438 690.000 115.438 115.438 691.000 115.438 115.438 692.000 115.438 115.438 693.000 115.438 115.438 694.000 115.438 115.438

\., 695.000 115.438 115.438 696.000 115.438 115.438 697.000 115.438 115.438 698.000 115.438 115.438 699.000 115.438 115.438 700.000 115.438 115.438 701.000 115.438 115.438 702.000 115.437 115.437 703.000 115.437 115.437 704.000 115.437 115.437 705.000 115.437 115.437 706.000 115.437 115.437 707.000 115.437 115.437 708.000 115.437 115.437 709.000 115.437 115.437 710.000 115.437 115.437 711.000 115.437 115.437 712.000 115.437 115.437 713.000 115.437 115.437 714.000 115.437 115.437 715.000 115.437 115.437 716.000 115.437 115.437 717.000 115.437 115.437 718.000 115.437 115.437 719.000 115.437 115.437 720000 115.437 115.437 721.000 115.437 115.437 722.000 115.437 115.437 723.000 115.436 115.436 724.000 115.436 115.436 725.000 115.436 115.436 726.000 115.436 115.436 727.000 115.436 115.436 728.000 115.436 115.436 729.000 115.436 115.436 730.000 115.436 115.436 731.000 115.436 115.436 732.000 115.436 115.436 733.000 115.436 115.436 734.000 115.436 115.436 735.000 115.436 115.436 736.000 115.436 115.436 737.000 115.436 115.436 738.000 115.436 115.436 739.000 115.436 115.436 740.000 115.436 115.436 741.000 115.436 115.436 742.000 115.436 115.436 743.000 115.~36 115.436 744.000 115.435 115.435 745.000 115.435 115.435 746.000 115.435 115.435 747.000 115.435 115.435 748.000 115.435 115.435 749.000 115.435 115.435 750.000 115.435 115.435 751.000 115.435 115.435 752.000 115.435 115.435 753.000 115.435 115.435 754.000 115.435 115.435 755.000 115.435 115.435 756.000 115.435 115.435 757.000 115.435 115.435 758.000 115.435 115.435 759.000 115.435 115.435 760.000 115.435 115.435 761.000 115.435 115.435 762.000 115.435 115.435 763.000 115.435 115.435 764.000 115.435 115.435 765.000 115.434 115.434 766.000 115.434 115.434 767.000 115.434 115.434 768.000 115.434 115.434 769.000 115.434 115.434 770.000 115.434 115.434 771.000 115.434 115.434 772.000 115.434 115.434 773.000 115.434 115.434 774.000 115.434 115.434 775.000 115.434 115.434 776.000 115.434 115.434 777.000 115.434 115.434 778.000 115.434 115.434 779.000 115.434 115.434 780.000 115.434 115.434 781.000 115.434 115.434 782.000 115.434 115.434 783.000 115.434 115.434 784.000 115.434 115.434 785.000 115.433 115.433 786.000 115.433 115.433 787.000 115.433 115.433 788.000 115.433 115.433 789.000 115.433 115.433 790.000 115.433 115.433 791.000 115.433 115.433 792.000 115.433 115.433 793.000 115.433 115.433 794.000 115.433 115.433 795.000 115.433 115.433 796.000 115.433 115.433 797.000 115.433 115.433 '798.000 115.433 115.433 799.000 115.433 115.433 800.000 115.433 115.433 801.000 115.433 115.433 802.000 115.433 115.433 803 000 115.433 115.433 804.000 115.433 115.433 805.000 115.433 115.433 806.000 115.432 115.432 807.000 115.432 115.432 808.000 115.432 115.432 809.000 115.432 115.432 810.000 115.432 115.432 811.000 115.432 115.432 812.000 115.432 115.432 813.000 115.432 115.432 814.000 115.432 115.432 Attachment 1 Page 70 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC1A2 23 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 815.000 115.432 115.432 816.000 115.432 115.432 817.000 115.432 115.432 818.000 115.432 115.432 819.000 115.432 115.432 820.000 115.432 115.432 821.000 115.432 115.432 822.000 115.432 115.432 823.000 115.432 115.432 824.000 115.432 115.432 825.000 115.432 115.432 826.000 115.432 115.432 827.000 115.431 115.431 828.000 115.431 115.431 829.000 115.431 115.431 830.000 115.431 115.431 831.000 115.431 115.431 832.000 115.431 115.431 833.000 115.431 115.431 834.000 115.431 115.431 835.000 115.431 115.431 836.000 115.431 115.431 837.000 115.431 115.431 838.000 115.431

  • 115.431 839.000 115.431 115.431 840.000 115.431 115.431 841.000 115.431 115.431 842.000 115.431 115.431 843.000 115.431 115.431 844.000 115.431 115.431 845.000 115.431 115.431 846.000 115.431 115.431 847.000 115.431 115.431 848.000 115.430 115.430 849.000 115.430 115.430 850.000 115.430 115.430 851.000 115.430 115.430 852.000 115.430 115.430 853.000 115.430 115.430 854.000 115.430 115.430 855.000 115.430 115.430 856.000 115.430 115.430 857.000 115.430 115.430 858.000 115.430 115.430 859.000 115.430 115.430 860.000 115.430 115.430 861.000 115.430 115.430 862.000 115.430 115.430 863.000 115.430 115.430 864.000 115.430 115.430 865.000 115.430 115.430 866.000 115.430 11-5.430 867.000 115.430 115.430 868.000 115.429 115.429 869.000 115.429 115.429 870.000 115.429 115.429 871.000 115.429 115.429 872.000 115.429 115.429 873.000 115.429 115.429 874.000 115.429 115.429 875.000 115.429 115.429 876.000 115.429 115.429 877.000 115.429 115.429 878.000 115.429 115.429 879.000 115.429 115.429 880.000 115.429 115.429 881.000 115.429 115.429 882.000 115.429 115.429 883.000 115.429 115.429 884.000 115.429 115.429 885.000 115.429 115.429 886.000 115.429 115.429 887.000 115.429 115.429 888.000 115.428 115.428 889.000 115.428 115.428 890.000 115.428 115.428 891.000 115.428 115.428 892.000 115.428 115.428 893.000 115.428 115.428 894.000 115.428 115.428 895.000 115.428 115.428 896.000 115.428 115.428 897.000 115.428 115.428 898.000 115.428 115.428 899.000 115.428 115.428 900.000 115.428 115.428 901.000 115.428 115.428 902.000 115.428 115.428 903.000 115.428 115.428 904.000 115.428 115.428 905.000 115.428 115.428 906.000 115.428 115.428 907.000 115.428 115.428 908.000 115.428 115.428
  • 909.000 115.427 115.427 910.000 115.427 115.427 911.000 115.427 115.427 912.000 115.427 115.427 913.000 115.427 115.427 914.000 115.427 115.427 915.000 115.427 115.427 916.000 115.427 115.427 917.000 115.427 115.427 918.000 115.427 115.427 919.000 115.427 115.427 920.000 115.427 115.427 921.000 115.427 115.427 922.000 115.427 115.427 923.000 115.427 115.427 924.000 115.427 115.427 925.000 115.427 115.427 926.000 115.427 115.427 927.000 115.427 115.427 928.000 115.427 115.427 929.000 115.426 115.426 930.000 115.426 115.426 931.000 115.426 115.426 932.000 115.426 115.426 933.000 115.426 115.426 934.000 115.426 115.426 935.000 115.426 115.426 936.000 115.426 115.426 937.000 115.426 115.426 938.000 115.426 115.426 939.000 115.426 115.426 940.000 115.426 115.426 941.000 115.426 115.426 942.000 115.426 115.426 943.000 115.426 115.426 944.000 115.426 115.426 945.000 115.426 115.426 946.000 115.426 115.426 947.000 115.426 115.426 948.000 115.426 115.426 949.000 115.425 115.425 950.000 115.425 115.425 951.000 115.425 115.425 952.000 115.425 115.425 953.000 115.425 115.425 954.000 115.425 115.425 955.000 115.425 115.425 956.000 115.425 115.425 957.000 115.425 115.425 958.000 115.425 115.425 959.000 115.425 115.425 960.000 115.425 115.425 961.000 115.425 115.425 962.000 115.425 115.425 Attachment 1 Page 71 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlAlRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA2 24 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time y. V+ Time y. V+ Time V-V+ Time V-V+ 963.000 115.425 115.425 964.000 115.425 115.425 965.000 115.425 115.425 966.000 115.425 115.425 967.000 115.425 115.425 968.000 115.425 115.425 969.000 115.424 115.424 970.000 115.424 115.424 971.000 115.424 1°15.424 972.000 115.424 115.424 973.000 115.424 115.424 974.000 115.424 115.424 975.000 115.424 115.424 976.000 115.424 115.424 977.000 '115.424 115.424 978.000 115.424 115.424 979.000 115.424 115.424 980.000 115.424 115.424 981.000 115.424 115.424 982.000 115.424 115.424 983.000 115.424 115.424 984.000 115.424 115.424 985.000 115.424 115.424 986.000 115.424 115.424 987.000 115.424 115.424 988.000 115.424 115.424 989.000 115.423 115.423 990.000 115.423 115.423 991.000 115.423 115.423 992.000 115.423 115.423 993.000 115.423 115.423 994.000 115.423 115.423 995.000 115.423 115.423 996.000 115.423 115.423 997.000 115.423 115.423 998.000 115.423 115.423 999.000 115.423 115.423 1000.000 115.423 115.423 1001.000 115.423 115.423 1002.000 115.423 115.423 1003.000 115.423 115.423 1004:000 115.423 115.423 1005.000 115.423 115.423 1006.000 115.423 115.423 1007.000 115.423 115.423 1008.000 115.423 115.423 1009.000 115.422 115.422 1010.000 115.422 115.422 1011.000 115.422 115.422 1012.000 115.422 115.422 1013.000 115.422 115.422 1014.000 115.422 115.422 1015.000 115.422 115.422 1016.000 115.422 115.422 1017.000 115.422 115.422 1018.000 115.422 115.422 1019.000 115.422 115.422 1020.000 115.422 115.422 1021.000 115.422 115.422 1022.000 115.422 '115.422 1023.000 115.420 115.420 1024.000 115.419 115.419 1025.000 115.418 115.418 1026.000 115.416 115.416 1027.000 115.415 115.415 1028.000 115.413 115.413 1029.000 115.412 115.412 1030.000 115.411 115.411 1031.000 115.409 115.409 1032.000 115.408 115.408 1033.000 115.407 115.407 1034.000 115.405 115.405 1035.000 115.404 115.404 1036.000 115.402 115.402 1037.000 115.401 115.401 1038.000 115.400 115.400 1039.000 115.398 115.398 1040.000 115.397 115.397 1041.000 115.396 115.396 1042.000 115.394 115.394 1043.000 115.393 115.393 1044.000 115.391 115.391 1045.000 115.390 115.390 1046.000 115.389 115.389 1047.000 115.387 115.387 1048.000 115.386 115.386 1049.000 115.385 115.385 1050.000 115.383 115.383 1051.000 115.382 115.382 1052.000 115.380 115.380 1053.000 115.379 115.379 1054.000 115.378 115.378 1055.000 115.376 115.376 1056.000 115.375 115.375 1057.000 115.374 115.374 1058.000 . 115.372 115.372 1059.000 115.371 115.371 1060.000 115.370 115.370 1061.000 115.368 115.368 1062.000 115.367 115.367 1063.000 115.365 115.365 1064.000 115.364 115.364 1065.000 115.363 115.363 1066.000 115.361 115.361 1067.000 115.360 115.360 1068.000 115.359 -115.359 1069.000 115.357 115.357 1070.000 115.356 115.356 1071.000 115.355 115.355 1072.000 115.353 115.353 1073.000 115.352 115.352 1074.000 115.351 115.351 1075.000 115.349 115.349 1076.000 115.348 115.348 1077.000 115.346 115.346 1078.000 115.345 115.345 1079.000 115.344 115.344 1080.000 115.342 115.342 1081.000 115.341 115.341 1082.000 115.340 115.340 1083.000 115.338 115.338 1084.000 115.337 115.337 1085.000 115.336 115.336 1086.000 115.334 115.334 1087.000 115.333 115.333 1088.000 115.332 115.332 1089.000 115.330 115.330 1090.000 115.329 115.329 1091.000 115.328 115.328 1092.000 115.326 115.326 1093.000 115.325 115.325 1094.000 115.323 115.323. 1095.000 115.322 115.322 1096.000 115.321 115.321 1097.000 115.319 115.319 1098.000 115.318 115.318 1099.000 115.317 115.317 1100.000 115.315 115.315 1101.000 '115.314 115.314 1102.000 115.313 115.313 1103.000 115.311 115.311 1104.000 115.310 115.310 1105.000 115.309 115.309 1106.000 115.307 115.307 1107.000 115.306 115.306 1108.000 115.305 115.305 1109.000 115.303 115.303 1110.000 115.302 115.302 Attachment 1 Page 72 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs 1 Clinton Flex Study ETAP Page: KC! 14.LON Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA2 25 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time V-V+ Time V-V+ 1111.000 115.301 115.301 1112.000 115.299 115.299 1113.000 115.298 115.298 1114.000 115.297 115.297 1115.000 115.295 115.295 1116.000 115.294 115.294 1117.000 115.293 115.293 1118.000 115.291 115.291 1119.000 115.290 115.290 1120.000 115.289 115.289 1121.000 115.287 115.287 1122.000 115.286 115.286 1123.000 115.285 115.285 1124.000 115.283 115.283 1125.000 115.282 115.282 1126.000 115.281 115.281 1127.000 115.279 115.279 1128.000 115.278 115.278 1129.000 115.277 115.277 1130.000 115.275 115.275 1131.000 115.274 115.274 1132.000 115.273 115.273 1133.000 115.271 115.271 1134.000 115.270 115.270 1135.000 115.269 115.269 1136.000 115.267 115.267 1137.000 115.266 115.266 1138.000 115.265 115.265 1139.000 115.263 115.263 1140.000 115.262 115.262 1141.000 115.261 115.261 1142.000 115.259 115.259 1143.000 115.258 115.258 1144.000 115.257 115.257 1145.000 115.255 115.255 1146.000 115.254 115.254 1147.000 115.253 115.253 1148.000 115.251 115.251 1149.000 115.250 115.250 1150.000 115.249 115.249 1151.000 115.247 115.247 1152.000 115.246 115.246 1153.000 115.245 115.245 1154.000 115.244 115.244 1155.000 115.243 115.243 1156.000 115.242 115.242 1157.000 115.241 115.241 1158.000 115.240 115.240 1159.000 115.239 115.239 1160.000 115.238 115.238 1161.000 115.237 115.237 1162.000 115.236 115.236 1163.000 115.235 115.235 1164.000 115.234 115.234 1165.000 115.233 115.233 1166.000 115.232 115.232 \ 1167.000 115,231 115.231 1168.000 115.231 115.231 1169.000 115.230 115.230 1170.000 115.229 115.229 1171.000 115.228 115.228 1172.000 115.227 115.227 1173.000 115.226 115.226 1174.000 115.225 115.225 1175.000 115.224 115.224 1176.000 115.223 115.223 1177.000 115.222 115.222 1178.000 115.221 115.221 1179.000 115.220 115.220 1180.000 115.219 115.219 1181.000 115.218 115.218 1182.000 115.217 115.217 1183.000 115.216 115.216 1184.000 115.215 115.215 1185.000 115.214 115.214 1186.000 115.213 115.213 1187.000 115.212 115.212 1188.000 115.211 115.211 1189.000 115.210 115.210 1190.000 115.209 115.209 1191.000 115.208 115.208 1192.000 115.207 115.207 1i93.000 115.206 115.206 1194.000 115.205 115.205 1195.000 115.204 115.204 1196.000 115.203 115.203 1197.000 115.202 115.202 1198.000 115.201 115.201 1199.000 115.200 115.200 1200.000 115.199 114.253 1200.133 114.253 112.597 1200.183 112.597 113.425 1200.250 113.424 110.695 1200.300 110.694 112.755 1200.750 112.749 113.417 1201.000 113.414 114.241 1202.000 114.235 114.235 1203.000 114.230 114.230 1204.000 114.224 114.224 1205.000 114.218 114.218 1206.000 114.212 114.212 1207.000 114.206 114.206 1208.000 114.200 114.200 1209.000 114.194 114.194 1210.000 114.189 114.189 1211.000 114.183 114.183 1212.000 114.177 114.177 1213.000 114.171 114.171 1214.000 114.165 114.165 1215.000 114.159 114.159 1216.000 114.154 114.154 1217.000 114.148 114.148 1218.000 114.142 114.142 1219.000 114.136 114.136 1220.000 114.130 114.130 1221.000 114.124 114.124 1222.000 114.118 114.118 1223.000 114.113 114.113 1224.000 114.107 114.107 1225.000 114.101 114.101 1226.000 114.095 114.095 1227.000 114.089 114.089 1228.000 114.083 114.083 1229.000 114.077 114.077 1230.000 114.072 114.072 1231.000 114.066 114.066 1232.000 114.060 114.060 1233.000 114.054 114.054 1234.000 114.048 114.048 1235.000 114.042 114.042 1236.000 114.036 114.036 1237.000 114.031 114.031 1238.000 114.025 114.025 1239.000 114.019 114.019 1240.000 114.013 114.013 1241.000 114.007 114.007 1242.000 114.001 114.001 1243.000 113.995 113.995 1244.000 113.990 113.990 1245.000 113.984 113.984 1246.000 113.978 113.978 1247.000 113.969 113.969 1248.000 113.957 113.957 1249.000 113.946 113.946 1250.000 113.934 113.934 1251.000 113.923 113.923 1252.000 113.912 113.912 1253.000 113.900 113.900 Attachment 1 Page 73 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA48-Hour Coping Study DCMCC1A2 26 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1254.000 113.889 113.889 1255.000 113.878 113.878 1256.000 113.866 113.866 1257.000 113.855 113.855 1258.000 113.844 113.844 1259.000 113.833 113.833 1260.000 113.822 113.822 1261.000 113.811 113.811 1262.000 113.799 113.799 1263.000 113.788 113.788 1264.000 113.777 113.777 1265.000 113.766 113.766 1266.000 113.755 113.755 1267.000 113.744 113.744 1268.000 113.734 113.734 1269.000 113.723 113.723 1270.000 113.712 113.712 1271.000 113.701 113.701 1272.000 113.690 113.690 1273.000 113.680 113.680 1274.000 113.669 113.669 1275.000 113.658 113.658 1276.000 113.648 113.648 1277.000 113.637 113.637 -1278.000 113.626 113.626 1279.000 113.616 113.616 1280.000 113.605 113.605 1281.000 113.595 113.595 1282.000 113.584 113.584 1283.000 113.574 113.574 1284.000 113.566 113.566 1285.000 113.564 113.564 1286.000 113.562 113.562 1287.000 113.560 113.560 1288.000 113.558 113.558 1289.000 113.556 113.556 1290.000 113.554 113.554 1291.000 113.552 113.552 1292.000 113.550 113.550 1293.000 113.548 113.548 1294.000 113.546 113.546 1295.000 113.544 113.544 1296.000 113.542 113.542 1297.000 113.540 113.540 1298.000 113.538 113.538 1299.000 113.536 113.536 1300.000 113.534 113.534 1301.000 113.532 113.532 1302.000 113.529 113.529 1303.000 113.527 113.527 1304.000 113.525 113.525 1305.000 113.523 113.523 1306.000 113.521 113.521 1307.000 113.519 113.519 1308.000 113.517 113.517 1309.000 113.515 113.515 1310.000 113.513 113.513 1311.000 113.511 113.511 1312.000 113.508 113.508 1313.000 113.506 113.506 1314.000 113.504 113.504 1315.000 113.502 113.502 1316.000 113.500 113.500 1317.000 113.498 113.498 1318.000 113.496 113.496 1319.000 113.494 113.494 1320.000 113.491 113.491 1321,000 113.489 113.489 1322.000 113.487 113.487 1323.000 113.485 113.485 1324.000 113.483 113.483 1325.000 113.481 113.481 1326.000 113.478 113.478 1327.000 113.476 113.476 1328.000 113.474 113.474 1329.000 113.472 113.472 1330.000 113.470 113.470 1331.000 113.467 113.467 1332.000 113.465 113.465 1333.000 113.463 113.463 1334.000 113.461 113.461 1335.000 113.459 113.459 1336.000 113.456 113.456 1337.000 113.454 113.454 1338.000 113.452 113.452 1339.000 113.450 113.450 1340.000 113.447 113.447 1341.000 113.445 113.445 1342.000 113.445 113.445 1343.000 113.444 113.444 1344.000 113.443 113.443 1345.000 113.443 113.443 1346.000 113.442 113.442 1347.000 113.441 113.441 1348.000 113.440 113.440 1349.000 113.440 11J:440 1350.000 113.439 113.439 1351.000 113.438 113.438 1352.000 113.438 113.438 1353.000 113.437 113.437 1354.000 113.436 113.436 1355.000 113.436 113.436 1356.000 113.435 113.435 1357.000 113.434 113.434 1358.000 113.433 113.433 1359.000 113.433 113.433 1360.000 113.432 113.432 1361.000 113.431 113.431 1362.000 113.431 113.431 1363.000 113.430 113.430 1364.000 113.429 113.429 1365.000 113.428 113.428 1366.000 113.428 113.428 1367.000 113.427 113.427 1368.000 113.426 113.426 1369.000 113.425 113.425 1370.000 113.425 113.425 1371.000 113.424 113.424 1372.000 113.423 113.423 1373.000 113.422 113.422 1374.000 113.422 113.422 1375.000 113.421 113.421 1376.000 113.420 113.420 1377.000 113.419 113.419 1378.000 113.419 113.419 1379.000 113.418 113.418 1380.000 113.417 113.417 1381.000 113.416 113.416 1382.000 113.416 113.416 1383.000 113.415 113.415 1384.000 113.414 113.414 1385.000 113.413 113.413 1386.000 113.412 113.412 1387.000 113.412 113.412 1388.000 113.411 113.411 1389.000 113.410 113.410 1390.000 113.409 113.409 1391.000 113.408 113.408 1392.000 113.408 113.408 1393.000 113.407 113.407 1394.000 113.406 113.406 1395.000 113.405 113.405 1396.000 113.403 113.403 1397.000 113.402 113.402 1398.000 113.401 113.401 1399.000 113.400 113.400 1400.000 113.399 113.399 1401.000 113.398 113.398 Attachment 1 Page 74 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study , ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BS!A!RClC-48 CPS SBO Study Config.: DIV 1 Battery lA48-HourCopingStudy DCMCCIA2 27 11-17-2018 KC!CONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 1402.000 113.397 113.397 1403.000 113.396 113.396 1404.000 113.395 113.395 1405.000 113.394 113.394 1406.000 113.392 113.392 1407.000 113.391 113.391 1408.000 113.390 113.390 1409.000 113.389 113.389 1410.000 113.388 113.388 1411.000 113.387 113.387 1412.000 113.386 113.386 1413.000 113.385 113.385 1414.000 113.383 113.383 1415.000 113.382 113.382 1416.000 113.381 113.381 1417.000 113.380 113.380 *1418.000 113.379 113.379 1419.000 113.378 113.378 1420.000 113.377 113.377 1421.000 113.375 113.375 1422.000 113.374 113.374 1423.000 113.373 113.373 1424.000 113.372 113.372 1425.000 113.371 113.371 1426.000 113.370 113.370 1427.000 113.368 113.368 1428.000 113.367 113.367 1429.000 113.366 113.366 1430.000 113.365 113.365 1431.000 113.364 113.364 1432.000 113.363 113.363 1433.000 113.361 113.361 1434.000 113.360 113.360 1435.000 113.359 113.359 1436.000 113.358 113.358 1437.000 113.357 113.357 1438.000 113.355 113.355 1439.000 113.354 113.354 1440.000 113.353 113.353 1441.000 113.352 113.352 1442.000 113.351 113.351 1443.000 113.349 113.349 1444.000 113.348 113.348 1445.000 113.347 113.347 1446.000 113.346 113.346 1447.000 113.344 113.344 1448.000 113.343 113.343 1449.000 113.342 . 113.342 1450.000 113.341 113.341 1451.000 113.340 113.340 1452.000 113.338 113.338 1453.000 113.337 113.337 1454.000 113.336 113.336 1455.000 113.335 113.335 1456.000 113.333 113.333 1457.000 113.332 113.332 1458.000 113.331 113.331 1459.000 113.330 113.330 1460.000 113.328 113.328 1461.000 113.327 113.327 1462.000 113.326 113.326 1463.000 113.324 113.324 1464.000 113.323 113.323 1465.000 -113.322 113.322 1466.000 113.321 113.321 1467.000 113.319 113.319 1468.000 113.318 113.318 1469.000 113.317 113.317 1470.000 113.316 113.316 1471.000 113.314 113.314 1472.000 113.313 113.313 1473.000 113.312 113.312 1474.000 113.310 113.310 1475.000 113.309 113.309 1476.000 113.308 113.308 1477.000 113.306 113.306 1478.000 113.305 113.305 1479.000 113.304 113.304 1480.000 113.302 113.302 1481.000 113.301 113.301 1482.000 113.300 113.300 1483.000 113.298 113.298 1484.000 113.297 113.297 1485.000 113.296 113.296 1486.000 113.294 !J3.294 1487.000 113.293 113.293 1488.000 113.292 113.292 1489.000 113.290 113.290 1490.000 113.289 113.289 1491.000 113.288 113.288 1492.000 113.286 113.286 1493.000 113.285 113.285 1494.000 113.284 113.284 1495.000 113.282 113.282 1496.000 113.281 113.281 1497.000 113.279 113.279 1498.000 113.278 113.278 1499.000 113.277 113.277 1500.000 113.275 113.275 1501.000 113.274 113.274 1502.000 113.272 113.272 1503.000 113.271 113.271 1504.000 113.270 113.270 1505.000 113.268 113.268 1506.000 113.264 113.264 1507.000 113.259 113.259 1508.000 113.255 113.255 1509.000 113.250 113.250 1510.000 113.246 113.246 1511.000 113.241 113.241 1512.090 113.236 113.236 1513.000 113.232 113.232 1514.000 113.227 113.227 1515.000 113.223 113.223 1516.000 113.218 113.218 1517.000 113.214 113.214 1518.000 113.209 113.209 1519.000 113.205 113.205 1520.000 113.200 113.200 1521.000 113.196 113.196 1522.000 113.191 113.191 1523.000 113.186 113.186 1524.oqo 113.182 113.182 1525.000 113.177 113.177 1526.000 113.173 113.173 1527.000 113.168 113.168 1528.000 113.164 113.164 1529.000 113.159 113.159 1530.000 113.154 113.154 1531.000 113.150 113.150 1532.000 113.145 113.145 1533.000 113.141 113.141 1534.000 113.136 113.136 1535.000 113.131 113.131 1536.000 113.127 113.127 1537.000 113.122 113.122 1538.000 113.118 113.118 1539.000 113.114 113.114 1540.000 113.110 113.110 1541.000 113.107 113.107 1542.000 113.103 113.103 1543.000 113.100 113.100 1544.000 113.096 113.096 1545.000 113.092 113.092 1546.000 113.088 113.088 1547.000 113,085 113.085 1548.000 113.081 113.081 1549.000 113.077 113.077 Attachment 1 Page 75 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSlAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA2 28 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1550.000 ll3.073 ll3.073 1551.000 ll3.069 113.069 1552.000 ll3.065 113.065 1553.000 ll3.061 ll3.061 1554.000 ll3.057 ll3.057 1555.000 113.053 113.053 1556.000 ll3.049 113.049 1557.000 ll3.045 ll3.045 1558.000 ll3.041 ll3.041 1559.000 113.037 ll3.037 1560.000 ll3.033 113.033 1561.000 ll3.028 ll3.028 1562.000 ll3.024 ll3.024 1563.000 ll3.020 ll3.020 1564.000 ll3.015 113.015 1565.000 ll3.011 ll3.011 l 1566.000 ll3.006 ll3.006 1567.000 113.002 113.002 1568.000 112.997 112.997 1569.000 ll2.993 ll2.993 1570.000 ll2.988 ll2.988 1571.000 112.984 ll2.984 1572.000 112.979 112.979 1573.000 ll2.974 112.974 1574.000 ll2.969 ll2.969 1575.000 112.964 ll2.964 1576.000 ll2.959 112.959 1577.000 ll2.955 ll2.955 1578.000 ll2.950 ll2.950 1579.000 112.945 ll2.945 1580.000 ll2.939 112.939 1581.000 ll2.934 ll2.934 1582.000 ll2.929 ll2.929 1583.000 112.924 ll2.924 1584.000 112.919 112.919 1585.000 ll2.913 112.913 1586.000 ll2.908 ll2.908 1587.000 112.902 ll2.902 1588.000 112.898 112.898 1589.000 ll2.893 112.893 1590.000 ll2.888 112.888 1591.000 112.883 ll2.883 1592.000 112.878 112.878 1593.000 112.873 112.873 1594.000 ll2.868 ll2.868 1595.000 112.862 ll2.862 1596.000 112.857 112.857 1597.000 112 852 112.852 1598.000 ll2.847 ll2.847 1599.000 ll2.842 ll2.842 1600.000 112.837 112.837 1601.000 112.832 112.832 1602.000 ll2.827 112.827 1603.000 ll2.822 ll2.822 1604.000 112.817 112.817 1605.000 112.812 112.812 1606.000 ll2.806 112.806 1607.000 112.801 ll2.801 1608.000 112.796 112.796 1609.000 112.791 112.791 1610.000 ll2.786 -ll2.786 1611.000 ll2.781 ll2.781 1612.000 112.776 112.776 1613.000 112.771 112.771 1614.000 ll2.765 112.765 1615.000 li2.760 ll2.760 1616.000 112.755 112.755 1617.000 112.750 112.750 1618.000 ll2.745 ll2.745 1619.000 ll2.740 112.740 1620.000 112.735 112.735 1621.000 112.729 112.729 1622.000 112.724 ll2.724 1623.000 112.719 ll2.719 1624.000 112.714 112.714 1625.000 112.709 ll2.709 1626.000 ll2.704 ll2.704 1627.000 ll2.698 ll2.698 1628.000 112.693 ll2.693 1629.000 112.688 ll2.688 1630.000 ll2.683 ll2.683 1631.000 112.678 112.678 1632.000 112.673 112.673 1633.000 112.667 112.667 \634.000 ll2.662 ll2.662 1635.000 ll2.657 ll2.657 1636.000 112.652 112.652 1637.000 112.647 112.647 1638.000 ll2.641 ll2.641 1639.000 ll2.636 ll2.636 1640.000 112.631 112.631 1641.000 112.626 112.626 1642.000 ll2.621 ll2.621 1643.000 ll2.617 ll2.617 1644.000. 112.614 112.614 1645.000 112.611 112.6ll 1646.000 ll2.608 ll2.608 1647.000 112.605 112.605 1648.000 112.602 112.602 1649.000 112.599 ll2.599 1650.000 ll2.596 ll2.596 1651.000 112.593 ll2.593 1652.000 112.590 112.590 1653.000 ll2.587 112.587 1654.000 ll2.584 ll2.584 1655.000 112.581 ll2.581 1656.000 112.578 Il2.578 1657.000 ll2.575 112.575 1658.000 ll2.572 112.572 1659.000 112.569 112.569 1660.000 112.566 112.566 1661.000 112.563 112.563 1662.000 ll2.560 ll2.560 1663.000 112.557 ll2.557 1664.000 112.554 112.554 1665.000 112.551 112.551 1666.000 ll2.548 ll2.548 1667.000 112.545 ll2.545 1668.000 112.542 112.542 1669.000 112.538 112.538 1670.000 ll2.535 ll2.535 1671.000 112.532 ll2.532 1672.000 112.529 112.529 1673.000 112.526 112.526 1674.000 ll2.523 ll2.523 1675.000 112.520 112.520 1676.000 ll2.517 ll2.517 1677.000 112.514 112.514 1678.000 112.5ll 112.5ll 1679.000 112.508 112.508 1680.000 112.504 ll2.504 1681.000 112.501 112.501 1682.000 ll2.498 112.498 1683.000 ll2.495 ll2.495 1684.000 112.492 ll2.492 1685.000 112.489 ll2.489 1686.000 112.486 ll2.486 1687.000 ll2.483 ll2.483 1688.000 112.479 ll2.479 1689.000 112.476 112.476 1690.000 112.473 ll2.473 1691.000 ll2.470 ll2.470 1692.000 112.467 112.467 1693.000 ll2.464 ll2.464 1694.000 112.460 ll2.460 1695.000 ll2.457 ll2.457 1696.000 112.454 112.454 1697.000 112.451 112.451 Attachment 1 Page 76 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC 1A2 29 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1698.000 112.448 112.448 1699.000 112.445 112.445 1700.000 112.441 112.441 1701.000 112.438 112.438 1702.000 112.435 112.435 1703.000 112.432 112.432 1704.000 112.429 112.429 1705.000 112.426 112.426 1706.000 112.424 112.424 1707.000 112.422 112.422 1708.000 112.419 112.419 1709.000 112.417 112.417 1710.000 112.414 112.414 1711.000 112.412 112.412 1712.000 112.409 112.409 1713.000 112.407 112.407 1714.000 112.404 112.404 1715.000 112.402 112.402 1716.000 112.400 112.400 1717.000 112.397 112.397 1718.000 112.395 112.395 1719.000 112.392 112.392 1720.000 112.390 112.390 1721.000 112.387 112.387 1722.000 112.384 112.384 1723.000 112.382 112.382 1724.000 112.379 112.379 1725.000 112.377 112.377 1726.000 112.374 112.374 1727.000 112.372 112.372 1728.000 112.369 112.369 1729.000 112.367 112.367 1730.000 112.364 112.364 1731.000 112.362 112.362 1732.000 112.359 i 12.359 1733.000 112.356 112.356 1734.000 112.354 112.354 1735.000 112.351 112.351 1736.000 112.348 112.348 1737.000 112.346 112.346 1738.000 112.343 112.343 1739.000 112.341 112.341 1740.000

  • 112.338 112.338 1741.000 112.335 112.335 1742.000 112.333 112.333 1743.000 112.330 112.330 1744.000 112.327 112.327 1745.000 112.325 112.325 1746.000 112.322 112.322 1747.000 112.319 112.319 1748.000 112.317 112.317 1749.000 112.314 112.314 1750.000 112.311 112.311 1751.000 112}08 112.308 1752.000 112.306 112.306 1753.000 112.303 112.303 1754.000 112.300 112.300 1755.000 112.297 112.297 1,756.000 112.295 112.295 1757.000 112.292 112.292 1758.000 112.289 112.289 1759.000 112.286 112.286 1760.000 112.284 112.284 1761.000 112.281 112.281 1762.000 112.278 112.278 1763.000 112.275 112.275 1764.000 112.272 112.272 1765.000 112.269 112.269 . 1766.000 112.266 112.266 1767.000 112.262 112.262 1768.000 112.259 112.259 1769.000 112.255 112.255 1770.000 112.251 112.251 1771.000 112.248 112.248 1772.000 112.244 112.244 1773.000 112.241 112.241 1774.000 112.237 112.237 1775.000 112.233 112.233 1776.000 112.230 112.230 1777.000 112.226 112.226 1778.000 112.223 112.223 1779.000 112.219 112.219 1780.000 112.215 112.215 1781.000 112.212 112.212 1782.000 112.208 112.208 1783.000 112.204 112.204 1784.000 112.201 112.201 1785.000 112.197 112.197 1786.000 112.193 112.193 1787.000 112.190 H2.190 1788.000 112.186 112.186 1789.000 112.182 112.182 1790.000 112.178 112.178 1791.000 112.175 112.175 1792.000 112.171 112.171 1793.000 112.167 112.167 1794.000 112.163 112.163 1795.000 112.160 112.160 1796.000 112.156 112.156 1797.000 112.152 112.152 1798.000 112.148 112.148 1799.000 112.144 112.144 1800.000 112.141 112.141 1801.000 *112.137 112.137 1802.000 112.133 112.133 1803.000 112.129 112.129 1804.000 112.125 112.125 1805.000 112.121 112.121 1806.000 112.118 112.118 1807.000 112.114 112.114 1808.000 112.110 112.110 1809.000 112.106 112.106 1810.000 112.102 112.102 1811.000 112.098 112.098 1812.000 112.094 112.094 1813.000 112.090 112.090 1814.000 112.086 112.086 1815.000 112.082 112.082 1816.000 112.079 112.079 1817.000 112.075 112.075 1818.000 112.071 112.071 1819.000 112.067 112.067 1820.000 112.063 112.063 1821.000 112.059 112.059 1822.000 112.055 112.055 1823.000 112.051 112.051 1824.000 112.047 112.047 1825.000 112.043 112.o43 1826.000 112.039 112.039 1827.000 112.035 112.035 1828.000 112.030 112.030 1829.000 112.026 112.026 1830.000 112.022 112.022 1831.000 112.018 112.018 1832.000 112.014 112.014 1833.000 112.010 112.010 1834.000 112.007 112.007 1835.000 112.003 112.003 1836.000 112.000 112.000 1837.000 111.996 111.996 1838.000 111.993 111.993 1839.000 111.989 111.989 1840.000 111.986 111.986 1841.000 111.982 111.982 1842.000 111.979 111.979 1843.000 111.975 111.975 1844.000 111.972 111.972 1845.000 111.968 111.968 Attachment 1 Page 77 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery I A 48-Hour Coping Study DCMCCIA2 30 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage(V) Voltage (V)

Voltage (V) Time V-V+ Time V-V+

  • Time V-V+ Time V-V+ 1846.000 111.965 111.965 1847.000 111.961 111.961 1848.000 111.957 111.957 1849.000 111.954 111.954 1850.000 111.950 111.950 1851.000 111.947 111.947 1852.000 111.943 111.943 1853.000 111.939 111.939 1854.000 111.935 111.935 1855.000 111.931 111.931 1856.000 111.927 111.927 1857.000 111.923 111.923 1858.000 111.919 111.919 1859.000 111.914 111.914 1860.000 111.910 111.910 1861.000 lll.906 111.906 1862.000 111.902 111.902 1863.000 111.897 111.897 1864.000 111.893 111.893 1865.000 111.889 111.889 1866.000 111.884 111.884 1867.000 111.880 111.880 1868.000 111.876 111.876 1869.000 111.871 111.871 1870.000 111.867 111.867 1871.000 111.862 111.862 1872.000 111.858 111.858 1873.000 111.853 111.853 1874.000 111.849 111.849 1875.000 111.844 111.844 "1876.000 111.840 111.840 1877.000 111.835 111.835 1878.000 111.831 111.831 1879.000 111.826 111.826 1880.000 111.821 111.821 1881.000 111.817 111.817 1882.000 111.812 111.812 1883.000 111.807 111.807 1884.000 111.803 111.803 1885.000 111.798 111.798 1886.000 111.793 111.793 1887.000 111.789 111.789 1888.000 111.784 111.784 1889.000 111.779 111.779 1890.000 111.774 111.774 1891.000 111.769 111.769 1892.oo"o 111.764 111.764 1893.000 111.760 111.760 1894.000 111.755 111.755 1895.000 111.750 111.750 1896.000 111.745 111.745 1897.000 111.741 111.741 1898.000 111.736 111.736 1899.000 111.731 111.731 1900.000 111.727 111.727 1901.000 111.722 111.722 1902.000 111.717 111.717 1903.000 111.712 111.712 1904.000 111.707 111.707 1905.000 111.703 111.703 1906.000 111.698 111.698 1907.000 111.693 111.693 1908.000 111.688 111.688 1909.000 111.683 111.683 1910.000 111.678 111.678 1911.000 111.673 111.673 1912.000 111.668 111.668 1913.000 m:663 111.663 1914.000 111.658 111.658 1915.000 111.653 111.653 1916.000 111.648 111.648 1917.000 111.642 111.642 1918.000 111.637 111.637 1919.000 111.632 111.632 1920.000 111.627 111.627 1921.000 111.622 111.622 1922.000 111.616 111.616 1923.000 111.611 111.611 1924.000 111.606 111.606 1925.000 111.600 111.600 1926.000 111.595 111.595 1927.000 111.589 111.589 1928.000 111.584 111.584 1929.000 111.579 111.579 1930.000 111.573 111.573 1931.000 111.567 111.567 1932.000 111.562 111.562 1933.000 111.556 111.556 1934.000 111.551 111.551 1935.000 111.545 111.545 1936.000 111.539 111.539 1937.000 111.534 111.534 1938.000 111.528 111.528 i939.000 111.522 111.522 1940.000 111.516 111.516 1941.000 111.510 111.510 1942.000 111.505 111.505 1943.000 111.499 lll.499 1944.000 lll~493 111.493 1945.000 111.487 111:487 1946.000 lll.481 111.481 1947.000 lll.475 111.475 1948.000 111.469 111.469 1949.000 111.462 111.462 1950.000 111.456 111.456 1951.000 lll.450 111.450 1952.000 111.444 111.444 1953.000 lll.438 111.438 1954.000 111.431 111.431 1955.000 111.425 111.425 1956.000 111.419 111.419 1957.000 111.412 111.412 1958.000 111.406 111.406 1959.000 111.399 111.399 1960.000 111.393 111.393 1961.000 111.386 111.386 1962.000 111.380 111.380 1963.000 111.373 111.373 1964.000 111.367 111.367 1965.000 111.360 111.360 1966.000 111.353 111.353 1967.000 111.346 111.346 1968.000 111.340 111.340 1969.000 111.333 111.333 1970.000 111.326 111.326 1971.000 111.318 111.318 1972.000 111.309 111.309 1973.000 lll.299 111.299 1974.000 111.290 111.290 1975.000 111.281 111.281 1976.000 111.271 111.271 1977.000 lll.262 111.262 1978.000 lll.252 111.252 1979.000 111.242 lll.242 1980.000 111.233 111.233 1981.000 111.223 111.223 1982.000 111.213 111.213 1983.000 111.203 111.203 1984.000 111.192 111.192 1985.090 111.182 111.182 1986.000 111.172 111.172 1987.000 111.161 111.161 1988.000 111.151 111.151 1989.000 111.140 111.140 1990.000 111.129 111.129 1991.000 111.119 lll.119 1992.000 111.108 111.108 1993.000 111.097 111.097 Attachment 1 Page 78 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCCIA2 / 31 11-17-2018 KCICONSULT Base Nonna! Voltage(V)

Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1994.000 111.085 111.085 1995.000 111.074 111.074 1996.000 111.063 111.063 1997.000 Ill.OSI 111.051 1998.000 111.039 111.039 1999.000 111.028 111.028 2000.000 111.016 111.016 2001.000 111.004 111.004 2002.000 110.992 110.992 2003.000 110.980 110.980 2004.000 110.967 110.967 2005.000 110.955 110.955 2006.000 110.942 110.942 2001.090 110.929 110.929 2008.000 110.916 110.916 2009.000 110.903 110.903 2010.000 110.890 110.890 2011.000 110.877 110.877 2012.000 110.864 110.864 2013.000 110.850 110.850 2014.000 110.836 110.836 2015.000 110.822 110.822 2016.000 110.808 110.808 2017.000 110.794 110.794 2018.000 110.780 110.780 2019.000 110.765 110.765 2020.000 110.751 110.751 2021.000 110.736 110.736 2022.000 110.721 110.721 2023.000 110.706 110.706 2024.000 110.691 110.691 2025.000 110.683 110.683 2026.000 110.675 110.675 2027.000 110.666 110.666 2028.000 110.658 110.658 2029.000 1*10.649 110.649 2030.000 110.641 110.641 "2031.000 110.632 110.632 2032.000 110.624 110.624 2033.000 110.615 110.615 2034.000 110.607 110.607 2035.000 110.598 110.598 2036.000 110.589 110.589 2037.000 110.580 110.580 2038.000 110.572 110.572 2039.000 110.563 110.563 2040.000 110.554 110.554 2041.000 110.545 110.545 2042.000 110.536 110.536 2043.000 110.527 110.527 2044.000 110.518 110.518 2045.000 110.509 110.509 2046.000 110.500 110.500 2047.000 110.490 110.490 2048.000 110.481 110.481 2049.000 110.472 110.472 2050.000 110.462 110.462 2051.000 110.453 110.453 2052.000 110.444 110.444 2053.000 110.434 110.434 2054.000 1\0.425 110.425 2055.000 110.415 110.415 2056.000 110.405 110.405 2057.000 110.396 110.396 2058.000 110.386 110.386 2059.000 110.376 110.376 2060.000 110.366 110.366 2061.000 110.356 l 10.356 2062.000 110.346 110.346 2063.000 110.336 110.336 2064.000 110.326 110.326 2065.000 110.316 110.316 2066.000 110.306 110.306 2067.000 110.296 110.296 2068.000 110.286 110.286 2069.000 110.275 *110.275 2070.000 110.265 110.265 2071.000 110.255 *110.255 2072.000 110.244 110.244 2073.000 110.234 110.234 2074.000 110.223 110.223 2075.000 110.212 110.212 2076.000 110.202 110.202 2077.000 110.191 110.191 2078.000 110.180 110.180 2079.000 110.169 110.169 2080.000 110.158 110.158 2081.000 110.147 110.147 2082.000 110.136 110.136 2083.000 110.125 110.125 2084.000 110.114 110.114 2085.000 110.102 110.102 2086.000 110.087 110.087 2087.000 110.072 110.072 2088.000 110.056 110.056 2089.000 110.041 110.041 2090.000 110.025 110.025 2091.000 110.009 110.009 2092.000 109.993 109.993 2093.000 109.977 109.977 2094.000 109.961 109.961 2095.000 109.944 109.944 2096.000 109.925 109.925 2097.000 109.919 109.919 2098.000 109.911 109.911 2099.000 109.904 109.904 2100.000 109.897 109.897 2101.000 109.889 109.889 2102.000 109.881 109.881 2103.000 109.874 109.874 2104.000 109.866 109.866 2105.000 109.859 109.859 2106.000 109.851 109.851 2107.000 109.843 109.843 2108.000 109.836 109.836 2109.000 109.828 109.828 2110.000 109.820 109.820 2111.000 109.813 109.813 2112.000 109.805 109.805 2113.000 109.797 109.797 2114.000 109.789 109.789 2115.000 109.782 109.782 2116.000 109.774 109.774 2117.000 109.766 109.766 2118.000 109.758 109.758 2119.000 109.750 109.750 2120.000 109.745 109.745 2121.000 109.742 109.742 2122.000 109.738 109.738 2123.000 109.734 109.734 2124.000 109.731 109.731 2125.000 109.727 109.727 2126.000 109.723 109.723 2127.000 109.719 109.719 2128.000 109.716 109.716 2129.000 109.712 109.712 2130.000 109.708 109.708 2131.000 109.704 109.704 2132.000 109.700 109.700 2133.000 109.696 109.696 2134.000 109.693 109.693 2135.000 109.689 109.689 2136.000 109.685 109.685 2137.000 109.681 109.681 2138.000 109.677 109.677 2139.000 109.673 109.673 2140.000 109.669 109.669 2141.000 109.664 109.664 Attachment 1 Page 79 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV 1 Battery IA 48-Hour Coping sn,dy DCMCC1A2 32 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) \ Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ ----2142.000 109.660 109.660 2143.000 109.656 109.656 2144.000 109.652 109.~52 2145.000 109.648 109.648 2146.000 109.644 109.644 2147.000 109.639 109.639 2148.000 109.635 109.635 2149.000 109.631 109.631 2150.000 109.626 109.626 2151.000 109.622 109.622 2152.000 109.618 109.618 2153.000 109.613 109.613 ; 2154.000 109.609 109.609 2155.000 109.604 109.604 2156.000 109.600 109.600 2157.000 109.595 109.595 2158.000 109.591 109.591 2159.000 109.586 109.586 2160.000 109.582 109.582 2161.000 109.577 109.577 2162.000 109.572 109.572 2163.000 109.568 109.568 2164.000 109.563 109.563 2165.000 109.558 109.558 2166.000 109.553 109.553 2167.000 109.548 109.548 2168.000 109.543 109.543 2169.000 109.539 109.539 217.0.000

-109.534 109.534 2171.000 109.529 109.529 2172.000 109.524 109.524 2173.000 109.519 109.519 2174.000 109.513 109.513 2175.000 109.508 109.508 2176.000 109.503 109.503 2177.000 109.498 109.498 2178.000 109.493 109.493 2179.000 109.487 109.487 2180.000 109.482 109.482 2181.000 109.477 109.477 2182.000 109.471 109.471 2183.000 109.466 109.466 2184.000 109.461 109.461 2185.000 109.455 109.455 2186.000 109.450 109.450 2187.000 109.444 109.444 2188.000 109.438 109.438 2189.000 109.433 109.433 2190.000 109.427 109.427 2191.000 109.421 109.421 2192.000 109.415 109.415 2193.000 109.410 109.410 2194.000 109.404 109.404 2195.000 109.398 109.398 2196.000 109.392 109.392 2197.000 109.386 109.386 2198.000 109.380 109.380 2199.000 109.374 109.374 2200.000 109.367 109.367 2201.000 109.361 109.361 2202.000 109.355 109.355 2203.000 109.349 109.349 2204.000 109.342 109.342 2205.000 109.336 109.336 2206.000 109.329 109.329 2207.000 109.323 109.323 2208.000 109.316 109.316 2209.000 109.310 109.310 2210.000 109.303 109.303 -2211.000 109.296 109.296 2212.000 109.290 109.290 2213.000 109.283 109.283 2214.000 109.276 109.276 2215.000 109.267 109.267 2216.000 109.257 109.257 2217.000 109.247 109.247 2218.000 109.237 109.237 2219.000 109.226 109.226 2220.000 109.215 109.215 2221.000

  • 109.204 109.204 2222.000 109.193 109.193 2223.000 109.181 109.181 2224.000 109.169 109.169 2225.000 109.157 109.157 2226.000 109.145 109.145 2227.000 109.133 109.133 2228.000 109.120 109.120 2229.000 109.107 109.107 2230.000 109.094 109.094 2231.000 109.081 109.081 2232.000 109.067 109.067 2233.000 109.054 109.054 2234.000 109.039 109.039 2235.000 109.025 109.025 2236.000 109.011 109.011 2237.000 108.996 108.996 2238.000 108.981 108.981 2239.000 108.965 . 108.965 2240.000 108.949 108.949 2241.000 108.933 108.933 2242.000 108.917 108.917 2243.000 108.900 108.900 2244.000 108.883 108.883 2245.000 108.866 108.866 2246.000 108.848 108.848 2247.000
  • 108.830 108.830 2248.000 108.811 108.811 2249.000 108.792 108.792 2250.000 108.773 108.773 2251.000 108.753 108.753 2252.000 108.733 108.733 2253.000 108.714 108.714 2254.000 108.702 108.702 2255.000 108.690 108.690 2256.000 108.678 108.678 2257.000 108.666 108.666 2258.000 108.654 108.654 2259.000 108.642 108.642 2260.000 108.629 108.629 2261.000 108.617 108.617 2262.000 108.605 108.605 2263.000 108.592 108.592 2264.000 108.579 108.579 2265.000 108.567 108.567 2266.000 108.554 108.554 2267.000 108.541 108.541 2268.000 108.528 108.528 2269.000 108.514 108.514 2270.000 108.501 108.501 2271.000 108.488 108.488 2272.000 108.474 108.474 2273.000 108.461 108.461 2274.000 108.447 108.447 2275.000 108.433 108.433 2276.000 108.419 108.419 2277.000 108.405 108.405 2278.000 108.390 108.390 2279.000 108.376 108.376 2280.000 108.361, 108.361 2281.000 108.346 108.346 2282.000 108.331 108.331 2283.000 108.316 108.316 2284.000 108.301 108.301 2285.000 108.285 108.285 2286.000 108.270 108.270 2287.000 108.254 108.254 2288.000 108.239 108.239 2289.000 108.223 108.223 Attachment 1 Page 80 of 85 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.5 ET AP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIAIRCIC-48 CPS SBO Study Config.: DIV I Battery IA 48-Hour Coping Study DCMCC 1A2 33 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 2290.000 108.207 108.207 2291.000 108.191 108.191 2292.000 108.175 108.175 2293.000 108.158 108.158 2294.000 108.142 108.142 2295.000 108.125 108.125 2296.000 108.109 108.109 2297.000 108.092 108.092 2298.000 108.075 108.075 2299.000 108.058 108.058 2300.000 108.040 108,040 2301.000 108.023 108.023 2302.000 108.005 108.005 2303.000

  • 107.991 107.991 2304.000 , 107.980 107.980 2305.000 107.968 107.968 2306.000 107.957 107.957 2307.000 107.946 107.946 2308.000 107.934 107.934 2309.000 107.923 107.923 2310.000 107.911 107.911 2311.000 107.900 107.900 2312.000 107.888 107.888 2313.000 107.877 107.877 2314.000 107.865 107.865 2315.000 107.854 107.854 2316.000 107.842 107.842 2317.000 107.830 107.830 2318.000 107.819 107.819 2319.000 107.807 107.807 2320.000 107.795 107.795 . 2321.000 107.784 107.784 2322.000 107.772 107.772 2323.000 107.760 107:760 2324.000 107.748 107.748 2325.000 107.737 107.737 2326.000' 107.725 107.725 2327.000 107.713 107.713 2328.000 107.701 107.701 2329.000 107.689 107.689 2330.000 107.677 107.677 2331.000 107.665 107.665 2332.000 107.653 107.653 2333.000 107.642 107.642 2334.000 107.630 107.630 2335.000 107.618 107.618 2336.000 107.606 107.606 2337.000 107.594 107.594 2338.000 107.581 107.581 2339.000 107.,569 107.569 2340.000 107.557 107.557 2341.000 107.545 107.545 2342.000 107.533 107.533 2343.000 107.521 107.521 2344.000 107.509 107.509 2345.000 107.496 107.496 2346.000 107.484 107.484 2347.000 107.472 107.472 2348.000 107.460 107.460 2349.000 107.447 107.447 2350.000 107.435 107.435 2351.000 107.423 107.423 2352.000 107.410 107.410 2353.000 107.398 107.398 2354.000 107.385 107.385 2355.000 107.373 107.373 2356.000 107.361 107.361 2357.000 107.348 107.348 2358.000 107.336 107.336 2359.000 107.323 107.323 2360.000 107.310 107.310 2361.000 107.294 107.294 2362.000 107.279 107.279 2363.000 107.264 107.264 2364.000 107.249 107.249 2365.000 107.233 107.233 2366.000
  • 107.218 107.218 2367.000 107.202 107.202 2368.000 107.186 107.186 2369.000 107.171 107.171 2370.000 107.155 107.155 2371.000 107.139 107.139 2372.000 107.123 107.123 2373.000 107.108 107.108 2374.000 107.092 107.092 2375.000 107.075 107.075 2376.000 107.059 107.059 2377.000 107.043 107.043 2378.000 107.025 107.025 2379.000 107.011 107.011 2380.000 106.996 106.996 2381.000 106.980 106.980 2382.000 106.964 106.964 2383.000 106.947 106.947 2384.000 106.931 106.931 2385.000 106.914 106.914 2386.000 106.897 106.897 2387.000 106.880 106.880 2388.000 106.863 106.863 2389.000 106.845 106.845 2390.000 106.827 106.827 2391.000 106.809 106.809 2392.000 106.791 106.791 2393.000 106.772 106.772 2394.000 -106.754 106.754 2395.000 106.734 106.734 2396.000 106.715 106.715 2397.000 106.696 106.696 2398.000 106.676 106.676 2399.000 106.655 106.655 2400.000 106.635 106.635 2401.000 106.614 106.614 2402.000 106.593 106.593 2403.000 106.572 106.572 2403.333 106.565 119.654 Attachment 1 Page 81 of 85 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs ETAP Project: Clinton Flex Study 14 .1. ON Location:

KC! Contract:

Engineer:

Sadar Hussain Study Case: BS1A1RCIC-48 DIV 1 Battery lA 48-Hour Coping Study Project File: CPS SBO Study O~tput Report: BATT 1A2 Sizing 48 Hr Discharged Battery Ca1mcity -DWIBA.1TJ..l.2 2500 2000 1500 IOOO .( 500 V 1000 1500 Time(.i/111.)

2000 Date: SN: Attachment 1 Page 82 of 85 11-17-2018 KCICONSULT Revision:

Base Config. : Normal 2500 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater t~n 4 Hrs Project: Clinton Flex Study Location:

KCI Contract:

Engineer:

Badar Hussain DIV 1 Battery 1A 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT 1A2 Sizing 48 Hr -DJVIB.-l.TTIA.2 130 125 120 llO 105 ETAP 14.1.0N Study Case: BSlAlRCIC-48 Battery Voltage Date: SN: Attachment 1 Page 83 of 85 11-17-2018 KCICONSULT Revision:

Base Config. : Normal 100+--+--+--+--+--+--+----i---,l--l--+--+--+--+--+-+--+--+----i----i--+--+--+--+--+--1 1000 ISOO 2000 2SOO Ttm,:(.\lin.)

\

EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Project: . Clinton Flex Study Loe a tion: KCI Contract:

Engineer:

Badar Hussain DIV 1 Battery lA 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT 1A2 Sizing 48 Hr -DCAICCIA.2 40 30 ..,.... 10 ,lio 1oho ETAP 14.1.0N Study Case: BSlAlRCIC-48 Bus Load 15~0 Time(J/i11.)

2obo Date: SN: Attachment 1 Page 84 of 85 11-17-2018 KCICONSULT Revision:

Base Config; : Normal 2500 EC 626319 10.5 ETAP Reports for CASE 1.2 Division 1 DC Loads with 1 SRV Open Contiriuously for greater than 24 Hrs and with RCIC for greater than 4 Hrs Project: .Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain DIV 1 Battery l{\ 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT 1A2 Sizing 48 Hr -DCAICCI,U 130 125 120 110 IOS ETAP 14.1.0N Study Case: BS1A1RCIC-4 8 Bus Voltage Date: SN: Attachment 1 Page 85 of 85 11-17-2018 KC I CONSULT Revision:

Base Config. : Normal IOO+---+---+---+---+--+--+--!---,f--1--+--+--+---+---+---+--+--+--!---,f--l--+--+---+---+---I IOOO 1500 2000 2SOO Time(.\{UL)

EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Lo~ds with 1 SRV Open Continuously for greater than 24 Hrs Project: Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain Filename:

CPS SBO Study DIV 2 Batteiy 1B 48-Hour Coping Study Number of Buses: Number of Converters:

Number of Branches:

Number of Batteries:

Number of Loads: Unit System: Project File: Output File: Voltage Reg. 0 Charger 0 Cable Batteiy Motor 0 English CPS SBO Study ETAP 14.1.0N Study Case: BS IB-48 Electrical Transient Analyzer Program Batterv Sizing Calcnlation Batteiy ID: DIV II BATT 1B Duty Cycle Categoiy:

Normal Duty Cycle from: DC Load Flow Calculation Load Duration:

Duty Cycle Span Diversity Factor: 100 % Load Total 2 2 UPS Inverter DC Converter 0 0 0 Impedance Tie PD Total 0 0 Static Load Lumped Load Composite CSD. 7 0 0 C:\Badar\CLINTON DC\CPS SBO Study\BATT 1B Sizing 48 Hr.DB IS ( Page: Date: 11-17-2018 SN: KCICONSULT Revision:

Base Config.: Normal Total 0 Total 7 Attachment 1 Page 1 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.l.ON Study Case: BSIB-48 Page: Date: SN: Revision:

Config.: DIV 2 Battery 1B 48-Hour Coping Study Bus and Connected Load Data Bus Connected Load ID V ID Type V FLA DCMCCIB 125.00 1BLoad(Os-ls)

Static Load 120.00 383.50 DCMCCIB 125.00 IBLoad(ls-60s)

Static Load 120.00 244.80 DCMCCIB 125.00 1BLoad(60s-lh)

Static Load 120.00 226.20 DCMCCIB 125.00 IBLoad(lh-24h)

Static Load 120.00 42.09 DCMCCIB 125.00 IBLoad(24h-48h)

Static Load 120.00 42.09 DCMCCIB 125.00 1B ADS(lh-24h)

Static Load 120.00 0.38 DCMCCIB 125.00 1B ADS(24h-48h)

Static Load 120.00 0.38 2 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 2 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KCI Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BS IB-48 Page: Date: SN: Revision:

Config.: DIV 2 Battery 1B 48-Hour Coping Study Cable Input Data 3 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 3 of 58 Cable Connected Buses ohms or micro H / 1000 ft per Conductor ID From To Length(ft)

IDC03A/B BATT1BBUS DCMCC 1B Cable resistance listed at the specified temperature

  1. /Phase 10.0 T(OC) 90 R L 0.10100 0.00 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Location:

Contract:

Engineer:

Clinton Flex Study KC! Badar Hussain Filename:

CPS SBO Study DIV 2 Battety 1B 48-Hour Coping Study CKT/Branch ID IDCOJA/B Type Cable ETAP 14.1.0N Study Case: BSIB-48 Branch/ Converter/

UPS Connections Connected Bus ID From Bus BATTIBBUS DCMCC 1B Page: 4 Date: 11-17-2018 SN: KCICONSULT Revision:

Base Config.: Nonna! Impedance To Bus (ohm) (%) JOO MVAb 0.00239 1667.90 Attachment 1 Page 4 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BS IB-48 Page: Date: SN: Revision:

Config.: DIV 2 Battery 1B 48-Hour Coping Study t1 (s) Duty Cycle Load ID: 1BADS(lh-24h)

Constant Current Load Non-Random Load Random Load t2 (s) Amp Duration (s) . Amp 3600.000 86599.980 0.38 t1 (s) Load ID: 1B ADS(24h-48h)

Constant Current Load Non-Random Load Random Load t2 (s) Amp Duration (s) Amp 86599.980 90199.980 0.38 t1 (s) Load ID: lBLoad(Os-ls)

Constant Current Load Non-Random Load Random Load t2 (s) Amp Duration (s) Amp 0.000 1.000 383.50 tl (s) Load ID: 1BLoad(lh-24h)

Constant Current Load Non-Random Load Random Load t2. (s) Amp Duration (s) Amp 3600.000 86599.980 42.09 Load ID: 1BLoad(ls-60s)

Constant Current Load Non-Random Load Random Load t1 (s) 1.000 t2 (s) 60.000 Amp 244.80 Duration (s) Amp 5 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 5 of 58 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously Project: Clinton Flex Study Location:

KC! Contract:

Engineer:

Badar Hussain Filename:

CPS SBO Study DIV 2 Battery 1B 48-Hour Coping Study tl (s) for greater than 24 Hrs

  • ETAP 14.1.0N Study Case: BSIB-48 Load ID: IBLoad(24h-48h)

Constant Current Load Non-Random Load Random Load t2 (s) Amp Duration (s) Amp 86599.980 90199.980 42.09 Load ID: 1BLoad(60s-lh)

Constant Current Load Non-Random Load Random Load ti (s) 60.000 t2 (s) 3600.000 Amp 2i6.20 Duration (s) Amp Page: Date: SN: Revision:

Config.: 6 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 6 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports.for

_CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BS IB-48 Page: Date: SN: Revision:

Config.: DIV 2 Battery 1B 48-Hour Coping Study Battery ID: DIV II BATT 1B Method: Load Flow Calculation Battery Load Profile for Sizing Non-Random Load Random Load ti t2 ti 12 (s) (s) Amp (s) (s) Amp 0.000 60.000 383.50 0.000 0.000 0.00 60.000 3600.000 226.20 3600.000 90199.980 42.47 90199.980 0.00 Battery Load Profile for Discharge Non-Random Load Random Load ti 12 ti t2 (s) (s) Amp (s) (s) Amp 0.000 I.ODO 383.50 0.000 0.000 0.00 I.ODO 60.000 244.80 60.000 3600.000 226.20 3600.000 90199.980 42.47 90199.980 0.00 7 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 7 of 58 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Location:

Contract:

Engineer:

Filename:

Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BS IB-48 DIV 2 Battery 1B 48-Hour Coping Study Time 1.75 1.00 147.00 15.00 120.50 30.00 JOO.SO 60.00 76.00 120.00 52.00 180.00 40.00 240.00 31.20 300.00 27.50 480.00 18.88 720.00 13.38 960.00 10.70 1200.00 8.74 1440.00 7.40 1920.00 5.70 2400.00 4.70 2880.00 4.00 1.78 MFR: C&D Tech Model: CPS LCR-17 Type: Time vs amp No of Plates: 17 Capacity:

1200 AH I Min. A Rate: 1176 Battery Characteristics V/Cell: 2.063 Rp: 0.001384 Resistance/Positive Plate Temp: 25 °C Batte_ry sizes given in the library are used. Ampere per Positive Plate as a Function of Time (minutes) and Voltage (volts) 1.81 # 1.85 1.90 1.95 ---------------

127.25 107.13 82.50 49.35 21.00 108.25 94.63 75.38 47.15 20.74 92.63 83.25 68.38 44.10 19.10 71.63 66.25 56.75 38.19 18.60 49.88 47.00 41.63 29.70 18.00 38.50 36.63 33.00 24.89 14.70 31.63 30.25 27.50 20.00 12.00 26.75 24.80 23.63 17.75 10.80 18.50 17.88 16.75 13.46 8.90 13.13 12.75 12.13 10.00 6.65 10.34 10.10 9.35 7.85 5.35 8.50 8.30 7.74 6.60 4.60 7.30 7.15 6.70 5.65 4.10 5.64 5.50 5.24 4.56 3.30 4.62 4.58 4.38 3.80 2.80 3.88 3.85 3.70 3.25 2.45 # Indicates the curve used in battery sizing.

  • The ampere *value is missing in the battery library and this value was estimated based on user entered library data. Page: Date: SN: Revision:

Config.: 8 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 8 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP ,14.1.0N Study Case: BSIB-48 Page: Date: SN: Revision:

Config.: DIV 2 Battery I B 48-Hour Coping Study Section Size for Non-Rand.

Load Calculation Results (I Strings) Section Size for Rand. Load 9 11-17-2018 KCICONSULT Base Normal # t start 0.000 tend 1.000 Size/String 3.580 3.427 7.166 Total Size # t start 0.000 tend 0.000 Size/String 0.000 Total Size 2 3 0.000 60.000 0.000 1503.333 3.580 3.427 7.166 0.000 Attachment 1 Page 9 of 58 EC 626319 Project: Location:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP 14.1.0N Page: KC! Date: 10 11-17-2018 Attachment 1 Page 10 of 58 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Filename:

CPS SBO Study DIV 2 Battery 1B 48-Hour Coping Study Change in Load Load Period Duration Time to End of Period of Section Study Case: BSIB-48 Non-Random Loads (I Strings) Capacity at T Min Rate (RT) Required Section Size (Positive Plates/String) (amperes) (amperes) (minutes) (minutes) (Str*Amp/PP)

  • ='. '*t -~~." Pos. Val11esSection I -First period only -If A2 is greater than Al, go to Section 2. Al=384 Al-0=384 Ml=! T=Ml=l io1.1 Section 1 Sub-Total:

Total: Section 2 -First two periods only -If A3 is greater than A2, go to Section 3. Al=384 Al-0=384 Ml=! 2 A2=226 A2-AI~l57 M2=59 T=Ml+M2=60 T=M2=59 66.3 66.6 Section 2 Sub-Total:

Total: Section 3 -First three periods only -If A4 is greater than A3, go to Section 4. Al=384 2 A2=226 3 *A3=42 Al-0=384 Ml=! T=Ml+M2+M3=1,503 A2-Al=-157 M2=59 T=M2+M3=1,502 A3-A2~184 M3=1,443 T=M3=1,443 6.9 6.9 7.1 Section 3 Sub-Total:

Total: 3.58 3.58 3.58 5.79 -2.36 5.79 -2.36 3.43 55.78 -22.87 -25.75 55.78 -48.62 7.17 Revision:

Base Config.: Normal Required Total Section Size (Positive Plates) 3.58 3.58 3.58 5.79 5.79 3.43 55.78 55.78 7.17 -2.36 -2.36 -22.87 -25.75 -48.62 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.1.0N Study Case: BS IB-48 Page: Date: SN: Revision:

Config.: DIV 2 Battery 1B 48-Hour Coping Study Battery ID: Duty Cycle Category:

Load Duration:

Voltage Requirements: .J System: Battery: Correction Factors (%): Temperature Ill.I Battery Sizing Summary Page DIV II BATT 1B Normal Duty Cycle Span Nominal Voltage = 125.00 Maximum System Voltage Deviation

= 120 % Minimum System Yoltage Deviation

= 80 % Battery Charge Voltage= 2.30 V /Cell Battery Minimum Discharge Voltage= 1.81 V/Cell Temperature

= 16 'C (Battery minimum temperature)

Desirable Number of Cells = 58 Design Margin 100 Aging 100 Initial Capacity , 100 Calculated BatterySize Based on the Curve for 17 Plates: Required Number of Positive Plates Per String Total Max. Non-Rand.

Load: 7.166 7.166 Max Rand. Load: 0.000 0.000 Uncorrected:

7.166 7.166 Total III.I Corrected:

7.958 7.958 (Corrected by multiplying coiTection factor) Recommended Number of Total Plates per String: 17 Number of cells: Number of Strings: Rated Voltage: Rated Capacity:

Existing Battery: Number of Strings: Number of Positive Plates per String: Number of Total Positive Plates: 58 119.65 1200 Difference in Total Positive Plates between Existing and Required:

8 8 0.042 II 11-17-2018 KCICONSULT Base Normal Attachment 1 Page 11 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study KC! Badar Hussain CPS SBO Study ETAP 14.LON Study Case: BSIB-48 Page: Date: SN: Revision:

Config.: DIV 2 Batteiy 1B 48-Hour Coping Study Battery ID: Batterv Discharge Summarv Page DIV II BATT 1B Number of cells: Number of Strings: Rated Voltage: Rated Capacity:

Duty Cycle Category:

Load Duration:

Voltage Requirements:

System: Battery: 58 119.65 1200AH Nonna! Duty Cycle Span Nominal Voltage = 125.00 Maximum System Voltage Deviation

= 120 % Minimum System Voltage Deviation

80 % ' Batteiy Charge Voltage = 2.30 V /Cell Batteiy Minimum Discharge Voltage = LSI V/Cell Temperature

16 °C (Batteiy minimum temperature)

  • Voltage Drop Calculation Parameters:

Time Step = 1.00 Minute Maximum Voltage Limit = 100.0 % Voltage Drop Calculation Parameters:

Load Duty Cycle -No One-minute Span Correction Factors (%): Temperature Aging 111.1 100 Initial Capacity Total 100 Ill.I r 12 11-17-2018 KCICONSULT Base Nonna! Attachment 1

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs V ETAP Clinton Flex Study Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Batterv Discharge Tabulation Discharj!e Discharl!e 11-17-2018 Attachment 1 . Page 13 of 58 KCICONSULT Base Normal Current Capacity Voltal!e (V) Current Capacity VoltaJ!e (V) Time (Amp) (Amp-Hour)

V-*v+ Time (Amp) (Amp-Hour)

V-V+ 0.000 383.5 119.48 119.654 110.037 0.017 244.8 119.58 110.037 111.852 1.000 226.2 123.59 111.843 112.091 2.000 226.2 127.36 112.084 112.084 3.000 226.2 131.13 112.077 112.077 4.000 226.2 134.90 112.070 112.070 5.000 226.2 138.67 112.062 112.062 6.000 226.2 142.44 112.055 112.055 7.000 226.2 146.21 112.048 112.048 8.000 226.2 149.98 112.041 112.041 9.000 226.2 153.75 112.034 112.034 10.000 226.2 157.52 112.027 112.027 11.000 226.2 161.29 112.020 112.020 12.000 226.2 165.06 112.013 112.013 13.000 226.2 168.83 112.006 112.006 14.000 226.2 I7i.60 111.999 111.999 15.000 226.2 176.37 111.992 111.992 16.000 226.2 180.14 111.983 111.983 17.000 226.2 183.91 111.975 111.975 18.000 226.2 187.68 111.966 111.966 19.000 226.2 191.45 111.957 111.957 20.000 226.2 195.22 111.948 111.948 21.000 226.2 198.99 111.938 111.938 22.000 226.2 202.76 111.929 111.929 23.000

  • 226.2 206.53 111.920 111.920 24.000 226.2 210.30 111.910 111.910 25.000 226.2 214.07 111.900 111.900 26.000 226.2 217.84 111.891 111.891 27.000 226.2 221.61 111.88! 111.881 28.000 226.2 225.38 111.871 111.871 29.000 226.2 229.15 111.860 111.860 30.000 226.2 232.92 111.850 111.850 31.000 226.2 236.69 111.840 111.840 32.000 226.2 240.46 111.829 111.829 33.000 226.2 244.23 111.818 111.818 34.000 226.2 248.00 111.807 111.807 35.000 226.2 251.77 111.796 111.796 36.000 226.2 255.54 111.785 111.785 37.000 226.2 259.31 111.774 111.774 38.000 226.2 263.08 111.762 111.762 39.000 '226.2 266.85 111.750 111.750 40.000 226.2 270.62 111.738 111.738 41.000 226.2 274.39 111.726 111.726 42.000 226.2 278.16 111.714 111.714 43.000 226.2 281.93 111.702 111.702 44.000 226.2 285.70 111.689 111.689 45.000 226.2 2~9.47 111.671 111.671 46.000 226.2 293.24 111.646 111.646 47.000 226.2 297.01 111.621 111.621 48.000 226.2 300.78 111.596 111.596 49.000 226.2 304.55 111.571 111.571 50.000 226.2 308.32 111.545 111.545 51.900 226.2 312.09 111.519 111.519 52.000 226.2 315.86 111.493 111.493 53.000 226.2 319.63 111:467 111.467 54.000 226.2 323.40 111.441 111.441 55.000 226.2 327.17 111.414 111.414 56.000 226.2 330.94 111.388 111.388 57.000 226.2 334.71 111.362 111.362 58.000 226.2 338.48 111.336 111.336 59.000 226.2 342.25 111.310 111.310 60.000 42.5 346.02 111.284 114.437 61.000 42.5 346.73 114.432 114.432 62.000 42.5 347.44 114.427 114.427 63.000 42.5 348.15 114.422 114.422 64.000 42.5 348.85 114.417 114.417 65.000 42.5 349.56 114.412 114.412 66.000 42.5 350.27 114.407 114.407 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Discharge Discharge 2 11-17-2018 KClCONSULT Base Normal Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ ----67.000 42.5 350.98 114.402 114.402 68.000 42.5 351.69 114.397 114.397 69.000 42.5 352.39 114.392 114.392 70.000 42.5 353.10 114.385 114.385 71.000 42.5 353.81 114.375 114.375 72.000 42.5 354.52 114.365 114.365 73.000 42.5 355.22 114.355 114.355 74.000 42.5 355.93 114.345 114.345 75.000 42.5 356.64 114.335 114.335 76.000 42.5 357.35 114.325 114.325 77.000 42.5 358.06 114.316 114.316 78.000 42.5 358.76 114.306 114.306 79.000 42.5 359.47 114.296 114.296 80.000 42.5 360.18 114.286 114.286 81.000 42.5 360.89 114.277 114.277 82.000 42.5 361.59 114.267 114.267 83.000 42.5 362.30 114.257 114.257 84.000 42.5 363.01 114.248 114.248 85.000 42.5 363.72 114.238 114.238 86.000 42.5 '364.43 114.228 114.228 87.000 42.5 365.13 114.219 114.219 88.000 42.5 365.84 114.209 114.209 89.000 42.5 366.55 114.200 114.200 90.000 42.5 367.26 114.190 114.190 91.000 42.5 367.97 114.181 114.181 92.000 . 42.5 368.67 114.171 114.171 93.000 42.5 369.38 114.162 114.162 94.000 42.5 .' 370.09 114.152 114.152 95.000 42.5 370.80 114.143 114.143 96.000 42.5 371.50 114.134 114.134 97.000 42.5 372.21 114.124 114.124 98.000 42.5 372.92 114.115 114.115 99.000 42.5 373.63 114.106 114.106 100.000 42.5 374.34 114.096 114.096 101.000 42.5 375.04 114.087 114.087 102.000 42.5 375.75 114.078 114.078 103.000 42.5 376.46 114.068 114.068 104.000 42.5 377.17 114.059 114.059 105.000 42.5 377.87 114.050 114.050 106.000 42.5 378.58 114.041 114.041 107.000 42.5 379.29 114.032 114.032 108.000 42.5 380.00 114.023 114.023 109.000 42.5 380.71 114.014 114.014 110.000 42.5 381.41 114.004 114.004 111.000 42.5 382.12 113.995 113.995 112.000 42.5 382.83 113.986 113.986 113.000 42.5 383.54 113.977 113.977 114.000 42.5 384.24 113.971 113.971 115.000 42.5 384.95 113.969 113.969 116.000 42.5 385.66 113.968 113.968 117.000 42.5* 386.37 113.966 113.966 118.000 42.5 387.08 113.964 113.964 119.000 42.5 387.78 113.963 113.963 120.000 42.5 388.49 113.961 113.961 121.000 42.5 389.20 113.960 113.960 122.000 42.5 389.91 113.958 113.958 *123.000 42.5 390.61 113.956 113.956 124.000 42.5 391.32 113.955 113.955 125.000 42.5 392.03 113.953 113.953 126.000 42.5 392.74 113.951 113.951 127.000 42.5 393.~5 113.950 113.950 128.000 42.5 394.15 113.948 113.948 129.000 42.5 394.86 113.946 113.946 130.000 42.5 395.57 113.945 113.945 131.000 42.5 396.28\ 113.943 113.943 132.000 42.5 396.98 113.941 113.941 133.000 42.5 397.69 113.940 113.940 134.000 42.5 398.40 113.938 113.938 135.000 42.5 399.11 113.936 113.936 136.000 42.5 399.82 113.935 113.935 137.000 42.5 400.52 113.933 113.933 138.000 42.5 401.23 113.931 113.931 Attachment 1 Page 14 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

-10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Batteiy 1B 48-Hour Coping Study Discharge Discharge 3 I 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V)

  • Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 139.000 42.5 401.94 113.930 113.930 140.000 42.5 402.65 113.928 113.928 141.000 42.5 403.35 113.926 113.926 142.000 42.5 404.06 113.925 113.925 143.000 42.5 404.77 113.923 113.923 144.000 42.5 405.48 113.921 113.921 145.000 42.5 406.19 113.920 113.920 146.000 42.5 406.89 113.918 113.918 147.000 42.5 407.60 113.916 113.916 148.000 42.5 408.31 113.915 113.915 149.000 42.5 409.02 113.913 113.913 150.000 42.5 409.72 113.911 113.911 151.000 42.5 410.43 113.909 113.909 152.000 42.5 411.14 113.908 113.908 153.000 42.5 411.85 113.906 113.906 154.000 42.5 412.56 113.904 113.904 155.000 42.5 413.26 113.903 113.903 156.000 42.5 413.97 113.901 113.901 157.000 42.5 414.68 113.899 113.899 158.000 42.5 415.39 113.897 113.897 159.000 42.5 416.09 113.896 113.896 160.000 42.5 416.80 113.894 113.894 161.000 42.5 417.51 113.892 113.892 162.000 42.5 418.22 113.890 113.890 163.000 42.5 418.93 113.889 113.889 164.000 42.5 419.63 113.887 113.887 165.000 42.5 420.34 113.885 113.885 166.000 42.5 421.05 113.883 113.883 167.000 42.5 421.76 113.882 113.882 168.000 42.5 422.46 .-113.880 113.880 169.000 42.5 423.17 113.878 113.878 170.000 42.5 423.88 113.876 113.876 171.000 42.5 424.59 113.875 113.875 172.000 42.5 425.30 113.873 113.873 173.000 42.5 426.00 113.871 113.871 174.000 42.5 426.71 113.869 113.869 175.000 42.5 427.42 113.868 113.868 176.000 42.5 428.13 113.866 113.866 177.000 42.5 428.83 113.864 113.864 178.000 42.5 429.54 113.862 113.862 179.000 42.5 430.25 113.860 113.860 180.000 42.5 430.96 113.859 113.859 181.000 42.5 431.67 . 113.857 113.857 182.000 42.5 432.37 113.856 113.856 183.000 42.5 433.08 113.855 113.855 184.000 42.5 433.79 113.855 113.855 185.000 42.5 434.50 113.854 113.854 186.000 42.5 435.20 113.854 113.854 187.000 42.5 435.91 113.854 113.854 188.000 42.5 436.62 113.853 113.853 189.000 42.5 437.33 113.853 113.853 190.000 42.5 438.04 113.852 113.852 191.000 42.5 438.74 113.852 113.852 192.000 42.5 439.45 113.851 113.851 193.000 42.5 440.16 113.851 113.851 194.000 42.5 440.87 113.851 113.851 195.000 42.5 441.57 113.850 113.850 196.000 42.5 442.28 113.850 113.850 197.000 42.5 442.99 113.849 113.849 198.000 42.5 443.70 113.849 113.849 199.000 42.5 444.41 113.848 113.848 200.000 42.5 445.11 113.848 113.848 201.000 42.5 445.82 113.847 113.847 202.000 42.5 446.53 113.847 113.847 203.000 42.5 447.24 113.847 113.847 204.000 42.5 447.94 113.846 113.846 205.000 42.5 448.65 113.846 113.846 206.000 42.5 449.36 113.845 113.845 207.000 42.5 450.07 113.845 113.845 208.000 42.5 450.78 113.844 113.844 209.000 42.5 451.48 113.844 113.844 210.000 42.5 452.19 113.843 113.843 Attachment 1 Page 15 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSJB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Discharge Discharge.

4 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 211.000 42.5 452.90 113.843 113.843 212.000 42.5 453.61 113.842 113.842 213.000 42.5 454.31 113.842 113.842 214.000 42.5 455.02 113.842 113.842 215.000 42.5 455.73 113.841 113.841 216.000 42.5 456.44 113.841 113.841 217.000 42.5 457.15 113.840 113.840 218.000 42.5 457.85 113.840 113.840 219.000 42.5 458.56 113.839 113.839 220.000 42.5 459.27 113.839 113.839 221.000 42.5 459.98 113.838 113.838 222.000 42.5 460.68 113.838 113.838 223.000 42.5 461.39 113.837 113.837 224.000 42.5 462.10 113.837 113.837 225.000 42.5 462.81 113.836 113.836 226.000 42.5 463.52 113.836 113.836 227.000 42.5 464.22 113.835 113.835 228.000 42.5 464.93 113.835 113.835 229.000 42.5 465.64 113.835 113.835 230.000 42.5 466.35 113.834 113.834 231.000 42.5 467.05 113.834 113.834 232.000 42.5 467.76 113.833 113.833 233.000 42.5 468.47 113.833 113.833 234.000 42.5 469.18 113.832 113.832 235.000 42.5 469.89 113.832 113.832 236.000 42.5 470.59 113.831 113.831 237.000 42.5 471.30 113.831 113.831 238.000 42.5 472.01 113.830 113.830 239.000 42.5 472.72 113.830 113.830 240.000 42.5 473.42 113.829 113.829 241.000 42.5 474.13 113.829 113.829 242.000 42.5 474.84 113.828 113.828 243.000 42.5 475.55 113.828 113.828 244.000 42.5 476.26 113.827 113.827 245.000 42.5 476.96 113.826 113.826 246.000 42.5 477.67 113.825 113.825 247.000 42.5 478.38 113.824 113.824 248.000 42.5 479.09 113.824 113.824 249.000 42.5 479.79 113.823 113.823 250.000 42.5 480.50 113.822 113.822 251.000 42.5 481.21 113.821 113.821 252.000 42.5 481.92 113.820 113.820 253.000 42.5 482.63 113.820 113.820 254.000 42.5 483.33 113.819 113.819 255.000 42.5 484.04 113.818 113.818 256.000 42.5 484.75 113.817 113.817 257.000 42.5 485.46 113.817 113.817 258.000 42.5 486.16 113.816 113.816 259.000 42.5 486.87 113.815 113.815 260.000 42.5 487.58 113.814 113.814 261.000 42.5 488.29 113.813 113.813 262.000 42.5 489.00 113.812 113.812 263.000 42.5 489.70 113.812 113.812 264.000 42.5 490.41 113.811 113.811 265.000 42.5 491.12 113.810 113.810 266.000 42.5 491.83 113.809 113.809 267.000 42.5 492.53 113.808 113.808 268.000 42.5 493.24 113.808 113.808 269.000 42.5 493.95 113.807 113.807 270.000 42.5 494.66 113.806 113.806 271.000 42.5 495.37 113.805 113.805 272.000 42.5 496.07 113.804 113.804 273.000 42.5 496.78 113.804 113.804 274.000 42.5 497.49 113.803 113.803 275.000 42.5 498.20 . 113.802 113.802 276.000 42.5 498.90 113.801 113.801 277.000 42.5 499.61 113.800 113.800 278.000 42.5 500.32 113.799 113.799 279.000 42.5 501.03 113.799 113.799 280.000 42.5 501.74 113.798 113.798 281.000 42.5 502.44 113.797 . 113.797 282.000 42.5 503.15 113.796 113.796 Attachment 1 Page 16 of 58 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs

  • Project: Clinton Flex Study ETAP Page: 5 ' Location:

KCI 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hnssain Study Case: BSIB-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal DIV 2 Battery 1B 48-Hour Coping Study Discharee Discharee Current Capacity Voltaee(V)

Current Capacity Voltaee(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ ----283.000 42.5 503.86 113.795 113.795 284.000 42.5 504.57 113.794 113.794 285.000 42.5 505.27 113.794 113.794 286.000 42.5 505.98 113.793 113.793 287.000 42.5 506.69 113.792 113.792 288.000 42.5 507.40 113.791 113.791 289.000 42.5 508.11 113.790 113.790 290.000 42.5 508.81 113.789 113.789 291.000 42.5 509.52 113.788 113.788 292.000 42.5 510.23 113.788 113.788 293.000 42.5 510.94 113.787 113.787 294.000 42.5 511.65 113.786 113.786 295.000 42.5 512.35 113.785 113.785 296.000 42.5 513.06 113.784 113.784 297.000 42.5 513.77 113.783 113.783 298.000 42.5 514.48 113.782 113.782 299.000 42.5 515.18 113.782 113.782 300.000 42.5 515.89 113.781 113.781 301.000 42.5 516.60 113.780 113.780 302.000 42.5 517.31

  • 113.779 113.779 303.000 42.5 518.02 113.778 113.778 304.000 42.5 518.72 113.777 113.777 305.000 42.5 519.43 113.776 113.776 306.000 42.5 520.14 113.775 113.775 307.000 42.5 520.85 113.775 113.775 308.000 42.5 521.55 113.774 113.774 309.000 42.5 522.26 113.773 113.773 310.000 42.5 522.97 113.772 113.772 311.000 42.5 523.68 113.771 113.771 312.000 42.5 524.39 113.770 113.770 313.000 42.5 525.09 113.769 113.769 314.000 42.5 525.80 113.768 113.768 315.000 42.5
  • 526.51 113.767 113.767 316.000 42.5 527.22 113.767 113.767 317.000 42.5 527.92 113.766 113.766 318.000 42.5 528.63 113.765 113.765 319.000 42.5 529.34 113.764 113.764 320.000 42.5 530.05 113.763 113.763 321.000 42.5 530.76 113.762 113.762 322.000 42.5 531.46 113.761 113.761 323.000 42.5 532.17 113.760 113.760 324.000 42.5 532.88 113.759 113.759 325.000 42.5 533.59 113.758 113.758 326.000 42.5 534.29 113.758 113.758 327.000 42.5 535.00 113.757 113.757 328.000 42.5 535.71 113.756 113.756 329.000 42.5 536.42 113.755 113.755 330.000 42.5 537.13 113.754 113.754 331.000 42.5 537.83 113.753 113.753 332.000 42.5 538.54 113.752 113.752 333.000 42.5 539.25 113.751 113.751 334.000 42.5 539.96 113.750 113.750 335.000 42.5 540.66 113.749 113.749 336.000 42.5 541.37 113.748 113.748 337.000 42.5 542.08 113.747 113.747 338.000 42.5 542.79 113.746 113.746 339.000 42.5 543.50 113.745 113.745 340.000 42.5 544.20 113.745 113.745 341.000 42.5 544.91 113.744 113.744 342.000 42.5 545.62 113.743 113.743 343.000 42.5 546.33 113.742 113.742 344.000 42.5 547.03 113.741 113.741 345.000 42.5 547.74 113.740 113.740 346.000 42.5 548.45 113.739 113.739 347.000 42.5 549.16 113.738 113.738 348.000 42.5 549.87 113.737 ll3.737 349.000 42.5 550.51 ll3.736 ll3.736 350.000 42.5 551.28 113.735 113.735 351.000 42.5 551.99 113.734 113.734 352.000 42.5 552.70 113.733 113.733 353.000 42.5 553.40 113.732 113.732 354.000 42.5 554.11 113.731 113.731 Attachment 1 Page 17 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Discharge Discharge 6 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 355.000 42.5 554.82 113.730 113.730 356.000 42.5 555.53 113.729 113.729 / 357.000 42.5 556.24 113.728 113.728 358.000 42.5 556.94 113.727 113.727 359.000 42.5 557.65 113.726 113.726 360.000 42.5 558.36 113.725 113.725 361.000 42.5 559.07 113.724 113.724 362.000 42.5 559.77 113.723 113.723 363.000 42.5 560.48 113.722 113.722 364.000 42,5 561.19 113.721 113.721 365.000 42.5 561.90 113.720 113.720 366.000 42.5 562.61 113.719 113.719 367.000 42.5 563.31 113.718 113.718 368.000 42.5 564.02 113.717 113.717 369.000 42.5 564.73 113.716 113.716 370.000 42.5 565.44 113.715 113.715 371.000 42.5 566.14 113.714 113.714 372.000 42.5 566.85 113.713 113.713 373.000 42.5 567.56 113.712 113.712 374.000 42.5 568.27 113.711 113.711 375.000 42.5 568.98 113.710 113.710 376.000 42.5 569.68 113.709 113.709 377.000 42.5 510-}9 113.705 113.705 378.000 42.5 571.10 113.702 113.702 379.000 42.5 571.81 113.698 113.698 380.000 42.5 572.51 113.694 113.694 381.000 42.5 573.22 113.690 113.690 382.000 42.5 573.93 113.686 113.686 383.000 42.5 574.64 113.683 113.683 384.000 42.5 575.35 113.679 113.679 385.000 42.5 576.05 113.675 113.675 386.000 42.5 576.76 113.671 113.671 387.000 42.5 577.47 113.668 113.668 388.000 42.5 578.18 113.664 113.664 389.000 42.5 578.88 113.660 113.660 390.000 42.5 579.59 113.656 113.656 391.000 42.5 580.30 113.652 113.652 392.000 42.5 581.01 113.649 113.649 393.000 42.5 581.72 113.645 113.645 394.000 42.5 582.42 113.641 113.641 395.000 42.5 583.13 113.637 113.637 396.000 42.5 583.84 113.633 113.633 397.000 42.5 584.55 113.630 113.630 398.000 42.5 585.25 113.626 113.626 399.000 42.5 585.96 113.622 113.622 400.000 42.5 586.67 113.618 113.618 401.000 42.5 587.38 113.614 113.614 402.000 42.5 588.09 113.611 113.611 403.000 42.5 588.79 113.607 113.607 404.000 42.5 589.50 113.603 113.603 405.000 42.5 590.21 113.599 113.599 406.000 42.5 590.92 113.595 113.595 407.000 42.5 591.62 113.591 113.591 408.000 42.5 592.33 113.588 113.588 409.000 42.5 593.04 113.584 ** 113.584 410.000 42.5 593.75 113.580 113.580 411.000 42.5 594.46 113.576 113.576 412.000 42.5 595.16 113.572 113.572 413.000 42.5 595.87 113.568 113.568 414.000 42.5 596.58 113.565 113.565 415.000 42.5 597.29 113.561 113.561 416.000 42.5 597.99 113.558 113.558 417.000 42.5 598.70 113.556 113.556 418.000 42.5 599.41 113.553 113.553 419.000 42.5 600.12 113.551 113.551 420.000 42.5 600.83 113.548 113.548 421.000 42.5 601.53 113.546 113.546 422.000 42.5 602.24 113.543 113.543 423.000 42.5 602.95 113.541 113.541 424.000 42.5 603.66 113.538 113.538 425.000 42.5 604.36 113.536 113.536 426.000 42.5 605.07 113.533 113.533 Attachment 1 Page 18 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for_greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Discharge Discharge 7 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 427.000 42.5 605.78 113.531 113.531 428.000 42.5 606.49 113.528 113.528 429.000 42.5 607.20 113.525 113.525 430.000 42.5 607.90 113.523 113.523 431.000 42.5 608.61 113.520 113.520 432.000 42.5 609.32 113.517 113.517 433.000 42.5 610.03 113.515 113.515 434.000 42.5 610.73 113.512 113.512 435.000 42.5 611.44 113.509 113.509 436.000 42.5 612.15 113.507 113.507 437.000 42.5 612.86 113.504 113.504 438.000 42.5 613.57 113.501 113.501 439.000 42.5 614.27 113.498 113.498 440.000 42.5 614.98 113.495 113.495 441.000 42.5 615.69 113.492 113.492 442.000 42.5 616.40 113.489 113.489 443.000 42.5 617.10 113.487 113.487 444.000 42.5 617.81 113.484 113.484 445.000 42.5 618.52 113.481 113.481 446.000 42.5 619.23 113.478 . 113.478 447.000 42.5 619.94 113.475 113.475 448.000 42.5 620.64 113.472 113.472 449.000 42.5 621.35 113.469 113.469 450.000 42.5 622.06 113.466 113.466 451.000 42.5 622.77 113.462 113.462 452.000 42.5 623.47 113.459 113.459 453.090 42.5 624.18 113.456 113.456 454.000 42.5 624.89 113.453 113.453 455.000 42.5 625.60 113.450 113.450 456.000 42.5 626.31 113.447 113.447 457.000 42.5 627.01 113.443 113.443 458.000 42.5 627.72 113.440 113.440 459.000 42.5 628.43 113.437 113.437 460.000 42.5 629.14 113.433 113.433 461.000 42.5 629.84 113.430 113.430 462.000 42.5 630.55 113.427 113.427 463.000 42.5 631.26 113.423 113.423 464.000 42.5 631.97 113.420 113.420 465.000 42.5 632.68 113.416 113.416 466.000 42.5 633.38 113.413 113.413 467.000 42.5 634.09 113.409 113.409 468.000 42.5 634.80 113.406 113.406 469.000 42.5 635.51 113.402 113.402 470.000 42.5 636.21 113.399 113.399 471.000 42.5 636.92 113.395 113.395 472.000 42.5 637.63 113.391 113.391 473.000 42.5 638.34 113.388 113.388 474.000 42.5 639.05) 113.384 113.384 475.000 42.5 639.75 113.382 113.382 476.000 42.5 640.46 113.378 113.378 477.000 42.5

  • 641.17 113.373 113.373 478.000 42.5 641.88 113.369 113.369 479.000 42.5 642.58 113.365 113.365 480.000 42.5 643.29 113.361 113.361 481.000 42.5 644.00 113.357 113.357 482.000 42.5 644.71 113.352 113.352 483.000 42.5 645.42 113.348 113.348 484.000 42.5 646.12 113.344 113.344 485.000 42.5 646.83 113.340 113.340 486.000 42.5 647.54 113.335 113.335 487.000 42.5 648.25 113.331 113.331 488.000 42.5 648.96 113.327 113.327 489.000 42.5 649.66 113.323 113.323 490.000 42.5 650.37 113.318 113.318 491.000 42.5 651.08 113.314 113.314 492.000 42.5 651_.79 113.310 113.310 493.000 42.5 652.49 113.305 113.305 494.000 42.5 653.20 113.301 113.301 495.000 42.5 653.91 113.297 113.297 496.000 42.5 654.62 113.293 113.293 497.000 42.5 655.33 113.288 113.288 498.000 42.5 656.03 113.284 113.284 Attachment 1 Page 19 of 58 EC 626319 I Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: 8 11-17-2018 KCICONSULT Base Normal DIV 2 Battery 1B 48-Hour Coping Study Discharge Discharge Current Capacity Voltage(V)

Current Capacity Voltage (V) Time (Amp) (Amp-Hou.-)

V-V+ Time (Amp) (Amp-Hou.-)

V-V+ 499.000 42.5 656.74 113.280 113.280 500.000 42.5 657.45 113.276 113.276 501.000 42.5 658.16 113.271 113.271 502.000 42.5 658.86 113.267 113.267 503.000 42.5 659.57 113.263 113.263 504.000 42.5 660.28 113.258 *

  • 113.258 505.000 42.5 660.99 113.254 113.254 506.000 42.5 661.70 113.250 113.250 507.000 42.5 662.40 113.246 113.246 508.000 42.5 663.11 113.241 113.241 509.000 42.5 663.82 113.237 113.237 510.000 42.5 664.53 113.233 113.233 511.000 42.5 665.23 113.228 113.228 512.000 42.5 665.94 113.224 113.224

,513.000 42.5 666.65 113.220 113.220 514.000 42.5 667.36 113.215 113.215 515.000 42.5 668.07 113.211 113.211 516.000 42.5 , 668.77 113.207 113.207 517.000 42.5 669.48 113.203 113.203 518.000 42.5 670.19 113.198 113.198 I 519.000 42.5 670.90 . 113.194 1_13.194 520.000 42.5 671.60 113.190 113.190 521.000 42.5 672.31 113.185 113.185 522.000 42.5 673.02 113.181 113.181 523.000 42.5 673.73 . 113.177 113.177 524.000 42.5 674.44 113.172 113.172 525.000 42.5 675.14 113.168 113.168 526.000 42.5 675.85 113.164 113.164 527.000 42.5 676.56 113.159 113.159 528.000 42.5 677.27 113.155 113.155 529.000 42.5 677.97 113.151 113.151 530.000. 42.5 678.68 113.146 113.146 531.000 42.5 679.39 113.142 113.142 532.000 42.5 680.10 113.138 113.138 533.000 42.5 680.81 113.133 113.133 534.000 42.5 681.51 113.129 113.129 535.000 42.5 682.22 113.125 113.125 536.000 42.5 682.93 113.120 113.120 537.000 42.5 683.64 . 113.116 113.116 538.000 42.5 684.34 113.112 113.112 539.000 42.5 685.05 113.108 113.108 540.000 42.5 685.76 113.106 113.106 541.000 42.5 686.47 113.103 113.103 542.000 42.5 687.18 113.101 113.101 543.000 42.5 687.88 113.099 113.099 544.000 42.5 688.59 113.097 113.097 545.000 42.5 689.30 113.094 113.094 546.000 42.5 690.01 113.092 113.092 547.000 42.5 690.71 113.090 113.090 548.000 42.5 691.42 113.087 113.087 549.000 42.5 692.13 113.085 113.085 550.000 42.5 692.84 113.083 113.083 551.000 42.5 693.55 113.080 113.080 552.000 42.5 65?4.25 113.078 113.078 553.000 42.5 694.96 113.076 113.076 554.000 42.5 695.67 113.073 113.073 555.000 42.5 696.38 113.071 113.071 556.000 42.5 697.08 113.069 113.069 557.000 42.5 697.79 113.066 113.066 558.000 42.5 698.50 113.064 113.064 559.000 42.5 699.21 113.062 113.062 560.000 42.5 699.92 113.059 113.059 561.000 42.5 700.62 113.057 113.057 562.000 42.5 701.33 113.055 113.055 563.000 42.5 702.04 113.052 113.052 564.000 42.5 702.75 113.050 113.050 565.000 42.5 703.45 113.048 113.048 566.000 42.5 704.16 113.045 113.045 567.000 42.5 704.87 113.043 113.043 568.000 42.5 705.58 113.040 113.040 569.000 42.5 706.29 113.038 113.038 570.000 42.5 706.99 113.036 113.036 Attachment 1 Page 20 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study . ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Dischar2e Dischar2e 9 11-17-2018 KCICONSULT Base Nonna! Current Capacity Volta2e (V) Current Capacity Volta2e (V) Time (Amp) (Amp-Hool")

v-V+ Time (Amp) (Amp-Hool")

V-V+ 571.000 42.5 707.70 113.033 113.033 572.000 42.5 708.41 113.031 113.031 573.000 42.5 709.12 113.028 113.028 574.000 42.5 709.82 113.026 113.026 575.000 42.5 710.53 113.023 113.023 576.000 42.5 711.24 113.021 113.021 577.000 42.5 711.95 113.019 113.019 578.000 42.5 712.66 113.016 113.016 579.000 42.5 713.36 113.014 113.014 580.000 42.5 714.07 113.011 113.011 581.000 42.5 714.78 113.009 113.009 582.000 42.5 715.49 113.006 113.006 583.000 42.5 716.19 113.004 113.004 584.000 42.5 716.90 113.002 113.002 585.000 42.5 717.61 112.999 112.999 586.000 42.5 718.32 112.997 112.997 587.000 42.5 719.03 112.994 112.994 588.000 42.5 719.73 112.992 112.992 589.000 42.5 720.44 112.989 112.989 590.000 42.5 721.15 112.987 112.987 591.000 42.5 721.86 112.984 112.984 592.000 42.5 722.56 112.982 112.982 593.000 42.5 723.27 112.979 112.979 594.000 42.5 723.98 112.977 112.977 595.000 42.5 724.69 112.974 112.974 596.000 42.5 725.40 112.972 112.972 597.000 42.5 726.10 112.969 112.969 598.000 42.5 726.81 112.967 112.967 599.000 42.5 727.52 112.964 112.964 600.000 42.5 728.23 112.962 112.962 601.000 42.5 728.93 112.959 112.959 602.000 42.5 729.64 112.957 112.957 603.000 42.5 730.35 112.954 112.954 604.000 42.5 731.06 112.952 112.952 605.000 42.5 731.77 112.949 112.949 606.000 42.5 732.47 112.947 112.947 607.000 42.5 733.18 112.944 '112.944 608.000 42.5 733.89 112.942 112.942 609.000 42.5 734.60 112.939 112.939 610.000 42.5 735.30 112.937 112.937 611.000 42.5 736.01 112.934 112.934 612.000 42.5 736.72 112.932 112.932 613.000 42.5 737.43 112.931 112.931 614.000 42.5 738.14 112.929 112.929 615.000 42.5 738.84 112.927 112.927 616.000 42.5 739.55 112.925 112.925 617.000 42.5 740.26 112.923 112.923 618.000 42.5 740.97 112.922 112.922 619.000 42.5 741.67 112.920 112.920 620.000 42.5 742.38 112.918 112.918 621.000 42.5 743.09 112.916 112.916 622.000 42.5 743.80 112.914 112.914 623.000 42.5 744.51 112.912 . 112.912 624.000 42.5 745.21 112.911 112.911 625.000 42.5 745.92 112.909 112.909 626.000 42.5 746.63 112.907 112.907 627.000 42.5 747.34 112.905 112.905 628.000 42.5 748.04 112.903 112.903 629.000 42.5 748.75 112.901 112.901 630.000 42.5 749.46 112.899 112.899 631.000 42.5 750.17 112.898 112.898 632.000 42.5 750.88 112.896 112.896 633.000 42.5 751.58 112.894 112.894 634.000 42.5 752.29 112.892 112.892 635.000 42.5 753.00 112.890 1'12.890 636.000 42.5 753.71 112.888 112.888 637.000 42.5 754.41 112.886 112.886 638.000 42.5 755.12 112.884 112.884 639.000 42.5 755.83 112.882 112.882 640.000 42.5 756.54 112.881 112.881 641.000 42.5 757.25 112.879 112.879 642.000 42.5 757.95 112.877 112.877 Attachment 1 Page 21 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Batteiy 1B 48-Hour Coping Study Discharge Discharge 10 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current -Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

y. V+ 643.000 42.5 758.66 112.875 112.875 644.000 42.5 759.37 112.873 112.873 645.000 42.5 760.08 112.871 112.871 646.000 42.5 760.78 112.869 112.869 647.000 42.5 761.49 112.867 112.867 648.000 42.5 762.20 112.865 112.865 649.000 42.5 762.91 112.863 112.863 650.000 42.5 763.62 112.861 112.861 651.000 42.5 764.32 112.859 112.859 652.000 42.5 765.03 112.857 112.857 653.000 42.5 765.74 112.855 112.855 654.000 42.5 766.45 112.853 112.853 655.000 42.5 767.15 112.852 112.852 656.000 42.5 767.86 112.850 112.850 657.000 42.5 768.57 112.848 112.848 658.000 42.5 769.28 112.846 112.846 659.000 42.5 769.99 112.844 112.844 660.000 42.5 770.69 112.842 112.842 661.000 42.5 771.40 112.840 112.840 662.000 42.5 772.11 112.838 112.838 663.000 42.5 772.82 112.836 112.836 664.000 42.5 773.52 112.834 112.834 665.000 42.5 774.23 112.832 112.832 666.000 42.5 774.94 112.830 112.830 667.000 42.5 775.65 112.828 112.828 668.000 42.5 776.36 112.826 112.826 669.000 42.5 777.06 112.824 112.824 670.000 42.5 777.77 112.821 112.821 671.000 42.5 778.48 112.819 112.819 672.000 42.5 779.19 112.817 112.817 673.000 42.5 779.89 . 112.815 112.815 674.000 42.5 780.60 112.813 112.813 675.000 42.5-781.31 112.811 112.811 676.000 42.5 782.02 112.809 112.809 677.000 42.5 782.73 112.807 112.807 678.000 42.5 783.43 112.805 112.805 679.000 42.5 784.14 112.803 112.803 680.000 42.5 784.85 112.801 112.801 681.000 42.5 785.56 112.799 112.799 682.000 42.5 786.27 112.797 112.797 683.000 42.5 786.97 112.795 112.795 684.000 42.5 787.68 112.792 112.792 685.000 42.5 788.39
  • 112.789 112.789 686.000 42.5 789.10 112.787 112.787 687.000 42.5 789.80 112.784 112.784 688.000 42.5 790.51 112.781 112.781 689.000 42.5 791.22 112.778 112.778 690.000 42.5 791.93 112.775 112.775 691.000 42.5 792.63 112.773 112.773 692.000 42.5 793.34 112.770 112.770 693.000 42.5 794.05 112.767 112.767 694.000 42.5 794.76 11.2.764 112.764 695.000 42.5 795.47 112.761 112.761 696.000 42.5 796.17 112.759 112.759 697.000 42.5 796.88 112.756 112.756 698.000 42.5 797.59 112.753 112.753 699.000 42.5 798.30 112.750 112.750 700.000 42.5 799.01 112.747 112.747 701.000 42.5 799.71 112.744 112.744 702.000 42.5 800.42 112.742 112.742 703.000 42.5 801.13. 112.739 112.739 704.000 42.5 801.84 112.736 112.736 705.000 42.5 802.54 112.733 112.733 706.000 42.5 803.25 112.730 112.730 707.000 42.5 803.96 112.727 112.727 708.000 42.5 804.67 112.724 112.724 709.000 42.5 805.38 112.721 112.721 710.000 42.5 806.08 112.719 112.719 711.000 42.5 806.79 112.716 112.716 712.000 42.5 807.50 112.713 112.713 713.000 42.5 808.21 112.710 112.710 714.000 42.5 808.91 112.707 112.707 Attachment 1 Page 22 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study rase: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery I B 48-Hour Coping Study Discharge Discharge 11 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-H~ur)

V-V+ 715.000 42.5 809.62 112.704 112.704 716.000 42.5 810.33 112.701 112.701 717.000 42.5 811.04 112.698 112.698 718.000 42.5 811.75 112.695 112.695 719.000 42.5 812.45 112.692 112.692 720.000 42.5 813.16 112.689 112.689 721.000 42.5 813.87 112.686 112.686 722.000 42.5 814.58 112.683 112.683 723.000 42.5 815.28 112.680 112.680 724.000 42.5 815.99 112.677 112.677 725.000 42.5 816.70 112.674 112.674 726.000 42.5 817.41 112.671 112.671 727.000 42.5 818.12 112.669 112.669 728.000 42.5 818.82 112.666 112.666 729.000 42.5 819.53 112.663 112.663 730.000 42.5 820.24 112.660 112.660 731.000 42.5 820.95 112.657 112.657 732.000 42.5 821.65 112.653 112.653 733.000 42.5 822.36 112.650 112.650 734.000 42.5 823.07 112.647 112.647 735.000 42.5 823.78 112.644 112.644 736.000 42.5 824.49 112.641 112.641 737.000 42.5 825.19 112.638 112.638 738.000 42.5 825.90 112.635 112.635 739.000 42.5 826.61 112.632 112.632 740.000 42.5 827.32 112.629 112.629 741.000 42.5 828.02 112.626 112.626 742.000 42.5 828.73 112.623 112.623 743.000 42.5 829.44 112.620 112.620 744.000 42.5 830.15 112.617 112.617 745.000 42.5 830.86 112.614 112.614 746.000 42.5 831.56 112.611 112.611 747.000 42.5 832.27 112.608 112.608 748.000 42.5 832.98 112.605 112.605 749.000 42.5 833.69 112.601 112.601 750.000 42.5 834.39 112.598 112.598 751.000 42.5 835.10 112.595 112.595 752.000 42.5 835.81 112.592 112.592 753.000 42.5 836.52 112.589 112.589 754.000 42.5 837.23 112.586 112.586 155.000 42.5 837.93 112.583 112.583 756.000 42.5 838.64 112.579 112.579 757.000 42.5 839.35 112.576 112.576 758.000 42.5 840.06 112.573 112.573 159.000 42.5 840.76 112.570 112.570 760.000 42.5 841.47 112.567 112.567 761.000 42.5 842.18 112.564 112.564 762.000 42.5 842.89 112.560 112.560 763.000 42.5 843.60 112.557 112.557 764.000 42.5 844.30 112.554 112.554 165.000 42.5 845.01 112.551 112.551 766.000 42.5 845.72 112.548 112.548 767.000 42.5 846.43 112.546 112.546 768.000 42.5 847.13 112.543 112.543 769.000 42.5 847.84 112.541 112.541 770.000 42.5 848.55 112.538 112.538 771.000 42.5 849.26 112.535 112.535 772.000 42.5 849.97 112.533 112.533 773.000 42.5 850.67 112.530 112.530 774.000 42.5 851.38 112.528 112.528 115.000 42.5 852.09 112.525 112.525 776.000 42.5 852.80 112.522 112.522 777.000 42.5 853.50 112.520 112.520 778.000 42.5 854.21 112.517 112.517 779.000 42.5 854.92 112.514 112.514 780.000 42.5 855.63 112.512 112.512 781.000 42.5 856.34 112.509 112.509 782.000 42.5 857.04 112.506 112.506 783.000 42.5 857.75 112.504 112.504 784.000 42.5 858.46 112.501 112.501 785.000 42.5 859.17 112.498 112.498 786.000 42.5 859.87 112.496 112.496 Attachment 1 Page 23 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14 .. 1.0N Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Dischar2e Dischar2e 12 11-17-2018 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Volta2e (V) .Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 787.000 42.5 860.58 112.493 112.493 788.000 42.5 861.29 112.490 112.490 789.000 42.5 862.00 112.487 112.487 790.000 42.5 862.71 112.484 112.484 791.000 42.5 863.41 112.481 112.481 792.000 42.5 864.12 112.478 112.478 793.000 42.5 864.83 112.475 112.475 794.000 42.5 865.54 112.472 112.472 795.000 42.5 866.24 112.469 112.469 796.000 42.5 866.95 112.466 112.466 797.000 42.5 867.66 112.463 112.463 798.000 42.5 868.37 112.460 112.460 799.000 42.5 869.08 112.457 112.457 800.000 42.5 869.78 112.454 112.454 801.000 42.5 870.49 112.450 112.450 802.000 42.5 871.20 112.447 112.447 803.000 42.5 871.91 112.444 112.444 804.000 42.5 872.61 112.441 112.441 805.000 42.5 873.32 112.438 112.438 806.000 42.5 874.03 112.435 112.435 807.000 42.5 874.74 112.431 112.431 808.000 42.5 875.45 112.428 112.428 809.000 42.5 876.15 112.425 112.425 810.000 42.5 876.86 112.422 112.422 811.000 42.5 877.57 112.418 112.418 812.000 42.5 878.28 112.415 112.415 813.000 42.5 878.98 112.412 112.412 814.000 42.5 879.69 112.409 112.409 815.000 42.5 880.40 112.405 112.405 816.000 42.5 881.11 112.402 112.402 817.000 42.5 881.82 112.399 112.399 818.000 42.5 ' 882.52 112.395 112.395 819.000 42.5 883.23 112.392 112.392 820.000 42.5 883.94 112.389 112.389 821.000 42.5 884.65 112.385 112.385 822.000 42.5 885.35 112.382 112.382 823.000 42.5 886.06 112.379 112.379 824.000 42.5 886.77 112.375 112.375 825.000 42.5 887.48 112.372 112.372 826.000 42.5 888.19 112.368 112.368 827.000 42.5 888.89 112.365 112.365 828.000 42.5 889.60 112.361 112.361 829.000 42.5 890.31 112.358 112.358 830.000 42.5 891.02 112.354 112.354 831.000 42.5 891.72 112.351 112.351 832.000 42.5 892.43 112.347 112.347 833.000 42.5 893.14 112.344 112.344 834.000 42.5 893.85 112.340 112.340 835.000 42.5 894.56 112.337 112.337 836.000 42.5 895.26 112.333 112.333 837.000 42.5 895.97 112.330 112.330 838.000 42.5 896.68 112.326 112.326 839.000 42.5 897.39 112.323 112.323 840.000 42.5 898.09 112.320 -112.320 841.000 42.5 898.80 112.316 112.316 842.000 42.5 899.51 112.313 112.313 843.000 42.5 900.22 112.310 112.310 844.000 42.5 900.93 112.306 112.306 845.000 42.5 901.63 112.303 112.303 846.000 42.5 902.34 112.300 112.300 847.000 42.5 903.05 112.296 112.296 848.000 42.5 903.76 112.293 112.293 849.000 42.5 904.46 112.i89 112.289 850.000 42.5 905.17 112.286 112.286 851.000 42.5 905.88 112.282 112.282 852.000 42.5 906.59 112.279 112.279 853.000 42.5 907.30 112.276 112.276 854.000 42.5 908.00 112.272 112.272 855.000 42.5 908.71 112.268 112.268 856.000 42.5 909.42 112.265 112.265 857.000 42.5 910.13 112.261 112.261 858.000 42.5 910.83 112.258 112.258 Attachment 1 Page 24 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCl Date: SN: Badar Hussain Study Case: BSIB-48 R,evision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Discharge Discharge 13 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

y. V+ Time (Amp) (Amp-Hour)
y. V+ 859.000 42.5 911.54 112.254 112.254 860.000 42.5 912.25 112.251 112.251 861.000 42.5 912.96 112.247 112.247 862.000 42.5 913.67 112.243 112.243 863.000 42.5 914.37 112.240 112.240 864.000 42.5 915.08 112.236 112.236 865.000 42.5 915.79 112.232 112.232 866.000 42.5 916.50 112.229 112.229 867.000 42.5 917.20 112.225 112.225 868.000 42.5 917.91 112.221 112.221 869.000 4Z:5 918.62 112.218 112.218 870.000 42.5 919.33 112.214 112.214 871.000 42.5 920.04 112.210 112.210 872.000 42.5 920.74 112.206 112.206 873.000 42.5 921.45 112.202 112.202 874.000 42.5 922.16 112.199 112.199 875.000 42.5 922.87 112.195 112.195 876.000 42.5 923.57 112.191 112.191 877.000 42.5 924.28 112.187 112.187 878.000 42.5 924.99 112.183 112.183 879.000 42.5 925.70 112.179 112.179 880.000 42.5 926.41 112.175 112.175 881.000 42.5 927.11 112.171 112.171 882.000 42.5 927.82 112.167 112.167 883.000 42.5 928.53 112.163 112.163 884.000 42.5 929.24 112.159 112.159 885.000 42.5 929.94 112.155 112.155 886.000 42.5 930.65 112.151 112,151 887.000 42.5 931.36 112.147 112.147 888.000 42.5 932.0.7 112.143 112.143 889.000 42.5 932.78 112.139 112.139 890.000 42.5 933.48 112.135 112.135 891.000 42.5 934.19 112.131 112.131 892.000 42.5 934.90 112.127 112.127 893.000 42.5 935.61 112.123 112.123 894.000 42.5 *936.32 112.119 112.119 895.000 42.5 937.02 112.114 112.114 896.000 42.5 937.73 112.110 112.110 897.000 42.5 938.44 112.106 112.106 898.000 42.5 939.15 112.102 112.102 899.000 42.5 939.85 112.097 112.097 900.000 42.5 940.56 112.093 112.093 901.000 42.5 941.27 112.089 112.089 902.000 42.5 941.98 112.084 112.084 903.000 42.5 942.69 112.080 112.080 904.000 42.5 943.39 112.076 112.076 905.000 42.5 944.10 112.071 112.071 906.000 42.5 944.81 112.067 112.067 907.000 42.5 945.52 112.062 112.062
  • 908.000 42.5 946.22 112.058 112.058
  • 909.000 42.5 946.93 112.053 112.053 910.000 42.5 947.64 112.049 112.049 911.000 42.5 948.35 112.044 112.044 912.000 42.5 949.06 112.040 112.040 913.000 42.5 949.76 112.035 112.035 914.000 42.5 950.47 112.031 112.031 915.000 42.5 951.18 112.026 112.026 916.000 42.5 951.89 112.021 112.021 917.000 42.5 952.59 112.017 112.017 918.000 42.5 953.30 112.012 112.012 919.000 42.5 954.01 112.007 112.007 920.000 42.5 954.72 112.003 112.003 921.000 42.5 955.43 111.998 111.998 922.000 42.5 956.13 111.993 111.993 923.000 42.5 956.84 111.988 111.988 924.000 42.5 957.55 111.983 111.983 925.000 42.5 958.26 111.978 111.978 926.000 42.5 958.96 111.974 111.974 927.000 42.5 959.67 111.969 111.969 928.000 42.5 960.38 111.963 111.963 929.000 42.5 961.09 111.957 111.957 930.000
  • 42.5 961.80 111.950 111.950 Attachment 1 Page 25 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery I B 48-Hour Coping Study Discharge Discharge 14 11-17-2018 Attachment 1 Page 26 of 58 KCICONSULT Base Nonna! Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

Y-Y+ Time (Amp) (Amp-Hour)

Y-Y+ 931.000 42.5 962.50 111.944 111.944 932.000 42.5 963.21 111.937 111.937 933.000 42.5 963.92 111.931 111.931 934.000 42.5

  • 964.63 111.924 111.924 935.000 42.5 965.33 111.918 111.918 936.000 42.5 966.04 111.911 111.911 937.000 42.5 966.75 111.904 111.904 938.000 42.5 967.46 111.898 111.898 939.000 42.5 968.17 111.891 111.891 940.000 42.5 968.87 111.884 111.884 941.000 42.5 969.58 111.877 111.877 942.000 42.5 970.29 111.870 111.870 943.000 42.5 971.00 111.863 111.863 944.000 42.5 971.70 111.856 111.856 945.000 42.5 972.41 111.849 111.849 946.000 42.5 973.12 111.842 111.842 947.000 42.5 973.83 111.834 111.834 948.000 42.5 974.54 111.827 111.827 949.000 42.5 975.24 111.820 111.820 950.000 42.5 975.95 111.812 111.812 951.000 42.5 976.66 111.805 111.805 ,952.000 42.5 977.37 111.797 111.797 953.000 42.5 978.07 111.790 111.790 954.000 42.5 978.78 111.782 111.782 955.000 42.5 979.49 111.774 111.774 956.000 42.5 980.20 111.766 111.766 957.000 42.5 980.91 111.759 111.759 958.000 42.5 981.61 111.751 111.751 959.000 42.5 982.32 111.743 111.743 960.000 42.5 983.03 111.735 111.735 961.000 42.5 983.74 111.726 111.726 962.000 42.5 984.44 111.718 111.718 963.000 42.5 985.15 111.710 ll 1.710 964.000 42.5 985.86 l ll:702 111.702 965.000 42.5 986.57 111.693 111.693 966.000 42.5 987.28 111.685 111.685 967.000 42.5 987.98 111.676 111.676 968.000 42.5 988.69 111.668 111.668 969.000 42.5 989.40 lll.659 111.659 970.000 42.5 990.11 lll.650 111.650 971.000 42.5 990.81 111.641 ll 1.641 972.000 42.5 991.52 111.632 111.632 973.000 42.5 992.23 l l!.623 ll 1.623 974.000 42.5 992.94 111.614 111.614 975.000 42.5 993.65 lll.605 ll 1.605 976.000 42.5 994.35 111.596 111.596 977.000 42.5 995.06 lll.586 111.586 978.000 42.5 995.77 111.577 111.577 979.000 42.5 996.48 111.567 111.567 980.000 42.5 997.18 111.558 111.558 981.000 . 42.5 997.89 lll.548 ll 1.548 982.000 42.5 998.60 111.538 111.538 983.000 42.5 999.31 111.528 111.528 984.000 42.5 1000.02 111.518 111.518 985.000 42.5 1000.72 111.508 111.508 986.000 42.5 1001.43 111.498 111.498 987.000 42.5 1002.14 ,111.488 111.488 988.000 42.5 1002.85 111.478 111.478 989.000 42.5 1003.55 111.467 ll 1.467 990.000 42.5 1004.26 111.457 111.457 991.000 42.5 1004.97 111.447 ll 1.447 992.000 42.5 1005.68 111.441 111.441 993.000 42.5 1006.39 111.435 111.435 994.000 42.5 1007.09 111.429 111.429 995.000 42.5 1007.80 111.423 111.423 996.000 42.5 1008.51 111.417 111.417 997.000 42.5 1009.22 lll.411 111.411 998.000 42.5 1009.92 111.404 111.404 999.000 42.5 1010.63 lll.398 lll.398 1000.000 42.5 1011.34 111.392 111.392 1001.000 42.5 1012.05 lll.386 lll.386 1002.000 42.5 1012.76 111.379 111.379 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs
  • Project: Clinton Flex Study ETAP Page: 15 14.1.0N Location:

KC! Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Study Case: BSIB-48 Revision:

Base Filename:

CPS SBO Study Config.: Normal DIV 2 Battery I B 48-Hour Coping Study Discharge Discharge Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1003.000 42.5 1013.46 111.373 111.373 1004.000 42.5 1014.17 111.367 111.367 1005.000 42.5 1014.88 111.360 111.360 1006.000 42.5 1015.59 lll.354 111.354 1007.000 42.5 1016.29 lll.348 111.348 1008.000 42.5 1017.00 lll.341 111.341 1009.000 42.5 1017.71 111.335 111.335 1010.000 42.5 1018.42 111.328 111.328 1011.000 42.5 1019.13 111.322 111.322 1012.000 42.5 1019.83 111.315 111.315 1013.000 42.5 1020.54 lll.309 111.309 1014.000 42.5 1021.25 111.302 111.302 1015.000 42.5 1021.96 111.296 111.296 1016.000 42.5 1022.67 111.289 111.289 1017.000 42.5 1023.37 lll.282 111.282 1018.000 42.5 1024.08 lll.276 111.276 1019.000 42.5 1024.79 111.269 111.269 1020.000 42.5 1025.50 111.262 111.262 1021.000 42.5 1026.20 lll.255 111.255 1022.000 42.5 1026.91 111.248 111.248 1023.000 42.5 1027.62 111.242 111.242 1024.000 42.5 1028.33 111.235 111.235 1025.000 42.5 1029.04 111.228 111.228 1026.000 42.5 1029.74 111.221 111.221 1027.000 42.5 1030.45 lll.214 111.214 1028.000 42.5 1031.16 111.207 111.207 1029.000 42.5 1031.87 lll.200 111.200 1030.000 42.5 1032.57 111.193 111.193 1031.000 42.5 1033.28 111.186 111.186 1032.000 42.5 1033.99 111.179 111.179 1033.000 42.5 1034.70 111.171 111.171 1034.000 42.5 1035.41 111.164 111.164 1035.000 42.5 1036.11 111.157 111.157 1036.000 42.5 1036.82 111.150 Ill.ISO 1037.000 42.5 1037.53 111.143 111.143 1038.000 42.5 1038.24 lll.135 111.135 1039.000 42.5 1038.94 111.128 111.128 1040.000 42.5 1039.65 111.121 111.121 1041.000 42.5 1040.36 lll.113 111.113 1042.000 42.5 1041.07 111.106 111.106 1043.000 42.5 1041.78 111.098 111.098 1044.000 42.5 1042.48 111.091 111.091 1045.000 42.5 1043.19 111.083 111.083 1046.000 42.5 1043.90 111.076 111.076 1047.000 42.5 1044.61 111.068 111.068 1048.000 42.5 1045.31 111.060 111.060 1049.000 42.5 1046.02 111.053 111.053 1050.000 42.5 1046.73 111.045 111.045 1051.000 42.5 1047.44 111.037 111.037 1052.000 42.5 1048.15 111.030 111.030 1053.000 42.5 1048.85 111.022 111.022 1054.000 42.5 1049.56 111.014 111.014 1055.000 42.5 1050.27 111.006 111.006 1056.000 42.5 1050.98 110.998 110.998 1057.000 42.5 1051.68 110.990 110.990 1058.000 42.5 1052.39 110.982 110.982 1059.000 42.5 1053.10 110.974 110.974 1060.000 42.5 1053.81 110.966 110.966 1061.000 42.5 1054.52 110.958 110.958 1062.000 42.5 1055.22 110.950 110.950 1063.000 42.5 1055.93 110.942 110.942 1064.000 42.5 1056.64 110.931 110.931 1065.000 42.5 1057.35 110.920 110.920 1066.000 42.5 1058.05 110.909 110.909 1067.000 42.5 1058.76 110.898 110.898 1068.000 42.5 1059.47 110.887 110.887 1069.000 42.5 1060.18 110.876 110.876 1070.000 42.5 1060.89 110.864 110.864 1071.000 42.5 1061.59 110.853 110.853 1072.000 42.5 1062.30 110.842 110.842 1073.000 42.5 1063.01 110.830 110.830 1074.000 42.5 1063.72 110.818 110.818 Attachment 1 Page 27 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study l Config.: DIV 2 Battery 1B 48-Hour Coping Study Dischare:e Dischare:e 16 11-17-2018 KCJCONSULT Base Normal Current Capacity Voltae:e (V) Current Capacity Voltae:e (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1075.000 42.5 1064.42 110.807 110.807 1076.000 42.5 1065.13 110.795 110.795 1077.000 42.5 1065.84 110.783 110.783 1078.000 42.5 1066.55 110.771 110.771 1079.000 42.5 1067.26 110.759 110.759 1080.000 42.5 1067.96 110.747 110.747' 1081.000 42.5 1068.67 110.735 110.735 1082.000 42.5 1069.38 110.722 110.722 1083.000 42.5 1070.o9 110.710 110.710 1084.000 42.5 1070.79 110.697 110.697 1085.000 42.5 1071.50 110.685 110.685 1086.000 42.5 1072.21 110.672 110.672 1087.000 42.5 1072.92 110.659 110.659 1088.000 42.5 1073.63 110.646 110.646 1089.000 42.5 1074.33 110.633 110.633 1090.000 42.5 1075.04 110.620 110.620 1091.000 42.5 1075.75 110.607 110.607 1092.000 42.5 1076.46 110.593 110.593 1093.000 42.5 1077.16 110.580 110.580 1094.000 42.5 1077.87 110.566 110.566 1095.000 42.5 1078.58 110.553 110.553 1096.000 42.5 1079.29 110.539 110.539 1097.000 42.5 1080.00 110.525 110.525 1098.000 42.5 1080.70 110.511 110.511 1099.000 42.5 1081.41 110.497 110.497 1100.000 42.5 1082.12 110.483 110.483 1101.000 42.5 1082.83 110.469 110.469 1102.000 42.5 1083.53 110.454 110.454 a-' 1103.000 42.5 1084.24 110.440 110.440 1104.000 42.5 1084.95 110.427 110.427 1105.000 42.5 1085.66 110.421 110.421 1106.000 42.5 1086.37 110.415 110.415 1107.000 42.5 1087.07 110.408 110.408 1108.000 42.5 1087.78 110.402 110.402 1109.000 42.5 1088.49

  • 110.396 110.396 1110.000 42.5 1089.20 110.390 110.390 llll.000 42.5 1089.90 110.384 110.384 lll2.000 42.5 1090.61 110.378 110.378 lll3.000 42.5 1091.32 110.372 110.372 1114.000 42.5 1092.03 110.366 110.366 lll5.000 42.5 1092.74 110.359 110.359 lll6.000 42.5 1093.44 110.353 110.353 lll7.000 42.5 1094.15 110.347 110.347 lll8.000 42.5 1094.86 110.341 110.341 lll9.000 42.5 1095.57 110.335 110.335 1120.000 42.5 1096.27 110.328 110.328 1121.000 42.5 1096.98, 110.322 110.322 1122.000 42.5 1097.69 110.316 110.316 1123.000 42.5 1098.40 110.310 110.310 1124.000 42.5 1099.11 110.303 110.303 1125.000 42.5 1099.81 110.297 110.297 1126.000 42.5 1100.52 110.291 110.291 1127.000 42.5 1101.23 110.284 110.284 1128.000 42.5 1101.94 110.278 110.278 1129.000 42.5 1102.64 110.272 110.272 1130.000 42.5 1103.35 110.265 110.265 1131.000 42.5 1104.06 110.259 110.259 1132.000 42.5 1104.77 110.253 110.253 1133.000 42.5 1105.48 110.246 110.246 1134.000 42.5 1106.18 110.240 110.240 1135.000 42.5 1106.89 110.233 110.233 1136.000 42.5 1107.60 110.227 110.227 1137.000 42.5 1108.31 110.221 110.221 1138.000 42.5 1109.01 110.214 110.214 1139.000 42.5 1109.72 110.208 110.208 1140.000 42.5 1110.43 110.200 110.200 1141.000 42.5 1111.14 110.198 110.198 1142.000 42.5 1111.85 110.195 110.195 1143.000 42.5 lll2.55 110.192 110.192 1144.000 42.5 1113.26 110.189 110.189 1145.000 42.5 1113.97 110.186 110.186 1146.000 42.5 1114.68 110.183 110.183 Attachment 1 Page 28 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery I B 48-Hour Coping Study Dischare;e Discharge 17 11-17-2018 KCICONSULT Base Nonna! Current Capacity Voltae;e(V)

Current Capacity Voltage (V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1147.000 42.5 1115.38 110.180 110.180 1148.000 42.5 1116.09 110.177 110.177 1149.000 42.5 1116.80 110.174 110.174 1150.000 42.5 1117.51 110.171 110.171 1151.000 42.5 1118.22 110.168 110.168 1152.000 42.5 1118.92 110.165 110.165 1153.000 42.5 1119.63 110.162 110.162 1154.000 42.5 1120.34 110.159 110.159 1155.000 42.5 1121.05 110.156 110.156 1156.000 42.5 1121.75 110.153 110.153 1157.000 42.5 1122.46 110.150 110.150 1158.000 42.5 1123.17 110.147 110.147 1159.000 42.5 1123.88 110.144 110.144 1160.000 42.5 1124.59 110.140 110.140 1161.000 42.5 1125.29 110.137 110.137 1162.000 42.5 1126.00 110.134 110.134 1163.000 42.5 1126.71 110.131 110.131 1164.000 42.5 1127.42 110.127 110.127 . 1165.000 42.5 1128.12 110.124 110.124 1166.000 42.5 1128.83 . 110.121 110.121 1167.000 42.5 1129.54 110.118 110.118 1168.000 42.5 1130.25 110.114 110.114 1169.000 42.5 1130.96 110.111 110.111 1170.000 42.5 1131.66 110.108 110.108 1171.000 42.5 1132.37 110.104 110.104 1172.000 42.5 1133.08 110.101 110.101 1173.000 42.5 1133.79 110.097 110.097 1174.000 42.5 1134.49 110.094 110.094 1175.000 42.5 1135.20 110.090 110.090 1176.000 42.5 1135.91 110.087 110.087 1177.000 42.5 1136.62 110.083 110.083 1178.000 42.5 1137.33 110.080 110.080 1179.000 42.5 1138.03 110.076 110.076 1180.000 42.5 1138.74* 110.073 110.073 1181.000 42.5 1139.45 110.069 110.069 1182.000 42.5 1140.16 110.066 110.066 1183.000 42.5 1140.86 110.062 110.062 1184.000 42.5 1141.57 110.058 110.058 1185.000 42.5 1142.28 110.055 110.055 1186.000 42.5 1142.99 110.051 110.051 1187.000 42.5 1143.70 110.047 110.047 1188.000 42.5 1144.40 110.043 110.043 1189.000 42.5 1145.11 110.040 110.040 1190.000 42.5 1145.82 110.036 110.036 1191.000 42.5 1146.53 110.032 110.032 1192.000 42.5 1147.23 110.028 110.028 1193.000 42.5 1147.94 110.024 110.024 1194.000 42.5 1148.65 110.020 110.020 1195.000 42.5 1149.36 110.016 110.016 1196.000 42.5 1150.o? 110.012 110.012 1197.000 42.5 1150.77 110.008 110.008 1198.000 42.5 1151.48 110.004 110.004 1199.000 42.5 1152.19 110.000 110.000 1200.000 42.5 1152.90 109.996 109.996 1201.000 42.5 1153.60 109.992 109.992 1202.000 42.5 1154.31 109.988 109.988 1203.000 42.5 1155.02 109.984 109.984 1204.000 42.5 1155.73 109.980 109.980 1205.000 42.5 1156.44 109.976 109.976 1206.000 42.5 1157.14 109.971 109.971 1207.000 42.5 1157.85 109.967 109.967 1208.000 42.5 1158.56 109.963 109.963 1209.000 42.5 1159.27 109.959 109.959 1210.000 42.5 1159.97 109.954 109.954 1211.000 42.5 1160.68 109.950 109.950 1212.000 42.5 1161.39 109.945 109.945 1213.000 42.5 1162.10 109.941 109.941 1214.000 42.5 1162.81 109.937 109.937 1215.000 42.5 1163.51 109.932 109.932 1216.000 42.5 1164.22 109.928 109.928 1217.000 42.5 1164.93 109.922 109.922 1218.000 42.5 1165.64 109.917 109.917 Attachment 1 Page 29 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery I B 48-Hour Coping Study Discharge Discharge 18 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1219.000 42.5 1166.35 109.911 109.911 1220.000 42.5 1167.05 109.906 109.906 1221.000 42.5 1167.76 109.899 109.899 1222.000 42.5 1168.47 109.893 109.893 1223.000 42.5 1169.18 109.886 109.886 1224.000 42.5 1169.88 109.880 109.880 1225.000 42.5 1170.59 109.873 109.873 1226.000 42.5 1171.30 109.866 109.866 1227.000 42.5 1172.01 109.859 109.859 1228.000 42.5 1172.72 109.852 109.852 1229.000 42.5 1173.42 109.845 109.845 1230.000 42.5 1174.13 '109.838 109.838 1231.000 . 42.5 1174.84 109.830 109.830 1232.000 42.5 1175.55 109.823 109.823 1233.000 42.5 1176.25 109.815 109.815 1234.000 42.5 1176.96 109.807 109.807 1235.000 42.5 1177.67 109.800 109.800 1236.000 42.5 1178.38 109.792 109.792 1237.000 42.5 1179.09 109.784* 109.784 1238.000 42.5 1179.79 109.775 109.775 1239.000 42.5 1180.50 109.767 109.767 1240.000 42.5 1181.21 109.759 109.759 1241.000 42.5 1181.92 109.750 109.750 1242.000 42.5 1182.62 109.741 109.741 1243.000 42.5 1183.33 109.732 109.732 1244.000 42.5 1184.04 109.723 109.723 1245.000 42.5 1184.75 109.714 109.714 1246.000 42.5 1185.46 109.705 109.705 1247.000 42.5 1186.16 109.695 109.695 1248.000 42.5 1186.87 109.686 109.686 1249.000 42.5 1187.58 109.676 109.676 1250.000 42.5 1188.29 109.666 109.666 1251.000 42.5 1188.99 109.656 109.656 1252.000 42.5 1189.70 109.646 109.646 1253.000 42.5 1190.41 109.635 109.635 1254.000 42.5 1191.12 109.625 109.625 1255.000 42.5 1191.83 109.614 109.614 1256.000 42.5 1192.53 109.603 109.603 1257.000 42.5 1193.24 109.591 109.591 1258.000 42.5 1193.95 109.580 109.580 1259.000 42.5 1194.66 109.568 109.568 1260.000 42.5 1195.36 109.556 109.556 1261.000 42.5 1196.07 109.544 109.544 1262.000 42.5 1196.78 109.532 109.532 1263.000 42.5 1197.49 109.524 109.524 1264.000 42.5 1198.20 109.515 109.515 1265.000 42.5 1198.90 109.5Q7 109.507 1266.000 42.5 1199.61 109.499 109.499 1267.000 42.5 1200.32 109.490 109.490 1268.000 42.5 1201.03 109.482 109.482 1269.000 42.5 1201.73 109.473 109.473 1270.000 42.5 1202.44 109.465 109.465 1271.000 42.5 1203.15 109.456 109.456 1272.000 42.5 1203.86 109.447 109.447 1273.000 42.5 1204.57 109.439 109.439 1274.000 42.5 1205.27 109.430 109.430 1275.000 42.5 1205.98 109.421 109.421 1276.000 42.5 1206.69 109.412 109.412 1277.000 42.5 1207.40 109.403 109.403 1278.000 42.5 1208.10 109.394 109.394 1279.000 42.5 1208.81 109.385 109.385 1280.000 42.5 1209.52 109.376 109.376 1281.000 42.5 1210.23 109.367 109.367 1282.000 42.5 1210.94 109.357 109.357 1283.000 42.5 1211.64 109.348 109.348 1284.000 42.5 1212.35 109.339 109.339 1285.000 42.5 1213.06 109.329 109.329 1286.000 42.5 1213.77 109.320 109.320 1287.000 42.5 1214.47 109.310 109.310 1288.000 42.5 1215.18 109.300 109.300 1289.000 42.5 1215.89 109.291 109.291 1290.000 42.5 1216.60 109.280 109.280 Attachment 1 Page 30 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KCI Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Batteiy 1B 48-Hour Coping Study Discharge Discharge 19 11-17-2018 KCICONSULT Base Normal Current Capacity Voltage (V) Current Capacity Voltage (V) Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hom*)

V-V+ 1291.000 42.5 1217.31 109.270 109.270 1292.000 42.5 1218.01 109.260 109.260 1293.000 42.S 1218.72 109.249 109.249 1294.000 42.S 1219.43 109.239 109.239 1295.000 42.S 1220.14 109.228 109.228 1296.000 42.5 1220.84 109.218 109.218 1297.000 42.S 1221.55 109.207 109.207 1298.000 42.5 1222.26 109.196 109.196 1299.000 42.5 1222.97 109.185 109.185 1300.000 42.5 1223.68 109.174 109.174 1301.000 42.5 1224.38 109.163 109.163 1302.000 42.5 1225.09 109.152 109.152 1303.000 42.5 1225.80 109.141 109.141 1304.000 42.5 1226.51 109.130 109.130 1305.000 42.5 1227.21 109.119 109.119 1306.000 42.5 1227.92 109.107 109.107 1307.000 42.5 1228.63 109.096 109.096 1308.000 42.5 1229.34 109.084 109.084 1309.000 42.5 1230.05 109.073 109.073 1310.000 42.5 1230.75 109.061 109.061 1311.000 42.5 1231.46 109.049 109.049 1312.000 42.5 1232.17 109.037 109.037 1313.000 42.5 1232.88 109.025 109.025 1314.000 42.5 1233.58 109.013 109.013 1315.000 42.5 1234.29 109.001 109.001 1316.000 42.5 1235.00 108.989 108.989 1317.000 42.5 1235.71 108.977 108.977 1318.000 42.5 1236.42 108.964 108.964 1319.000 42.5 1237.12 108.952 108.952 1320.000 42.5 1237.83 108.940 108.940 1321.000 42.S 1238.54 108.928 108.928 1322.000 42.S 1239.25 108.919 108.919 1323.000 42.5 1239.95 108.909 108.909 1324.000 42.5 1240.66 108.900 108.900 1325.000 42.5* 1241.37 108.891 108.891 1326.000 42.5 1242.08 108.882 108.882 1327.000 42.5 1242.79 108.873 108.873 1328.000 42.5 1243.49 108.864 108.864 1329.000 42.5 1244.20 108.854 108.854 1330.000 42.5 1244.91 108.845 108.845 1331.000 42.5 1245.62 108.836 108.836 1332.000 42.5 1246.32 108.827 108.827 1333.000 42.5 1247.03 108.818 108.818 1334.000 42.5 1247.74 108.808 108.808 1335.000 42.5 1248.45 108.799 108.799 1336.000 42.S 1249.16 108.790 108.790 1337.000 42.5 1249.86 108.780 108.780 1338.000 42.5 1250.57 108.771 108.771 1339.000 42.5 1251.28 108.762 108.762 1340.000 42.5 1251.99 108.752 108.752 1341.000 42.5 1252.69 108.743 108.743 1342.000 42.S 1253.40 108.734 108.734 1343.000 42.5 1254.11 108.724 108.724 1344.000 42.5 1254.82 108.715 108.715 1345.000 42.5 1255.53 108.706 108.706 1346.000 42.S 1256.23 108.696 108.696 1347.000 42.5 1256.94 108.687 108.687 1348.000 42.5 1257.65 108.677 108.677 1349.000 42.S 1258.36 108.668 108.668 1350.000 42.5 1259.06 108.658 108.658 1351.000 42.5 1259.77 108.649 108.649 1352.000 42.5 1260.48 108.639 108.639 1353.000 42.5 1261.19 108.630 108.630 1354.000 42.5 1261.90 108.620 108.620 1355.000 42.5 1262.60 108.611 108.611 1356.000 42.5 1263.31 108.601 108.601 1357.000 42.5 1264.02 108.591 108.591 1358.000 42.5 1264.73 108.582 108.582 1359.000 42.5 1265.43 108.572 108.572 1360.000 42.5 1266.14 108.563 108.563 136).000 42.5 1266.85 108.553 108.553 1362.000 42.5 1267.56 108.543 108.543 Attachment 1 Page 31 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery I B 48-Hour Coping Study Discharge Discharge 20 11-17-2018 KCICONSULT

  • Base Normal Current Capacity Voltage (V) Current Capacity Voltage(V)

Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1363.000 42.5 1268.27 108.534 108.534 1364.000 42.5 1268.97 108.524 108.524 1365.000 42.5 1269.68 108.514 108.514 1366.000 42.5 1270.39 108.505 108.505 1367.000 42.5 1271.10 108.495 108.495 1368.000 42.5 1271.80 108.485 108.485 1369.000 42.5 1272.51 108.475 108.475 1370.000 42.5 1273.22 108.466 108.466 1371.000 42.5 1273.93 108.456 108.456 1372.000 42.5 1274.64 108.446 108.446 1373.000 42.5 1275.34 108.436 108.436 1374.000 42.5 1276.05 108.426 108.426 1375.000 42.5 1276.76 108.416 108.416 1376.000 42.5. 1277.47 108.407 108.407 1377.000 42.5 1278.17 108.397 108.397 1378.000 42.5 1278.88 108.387 108.387 1379.000 42.5 1279.59 108.377 108.377 1380.000 42.5 1280.30 108.367 108.367 1381.000 42.5 1281.01 108.357 108.357 1382.000 42.5 1281.71 108.347 108.347 1383.000 42.5 1282.42 108.337 108.337 1384.000 42.5 1283.13 108.327 108.327 1385.000 42.5 1283.84 108.317 108.317 1386.000 42.5 1284.54 108.307 108.307 1387.000 42.5 1285.25 108.297 108.297 1388.000 42.5 1285.96 108.287 108.287 1389.000 42.5 1286.67 108.276 108.276 1390.000 42.5 1287.38 108.265 108.265 1391.000 42.5 1288.08 108.253 108.253 1392.000 42.5 1288.79 108.241 108.241 1393.000 42.5 1289.50 108.229 108.229 1394.000 42.5 1290.21 108.218 108.218 1395.000 42.5 1290.91 108.206 108.206 1396.000 42.5 1291.62 108.194 108.194 1397.000 42.5 1292.33 108.182 108.182 1398.000 42.5 1293.04 108.170 108.170 1399.000 42.5 1293.75 108.158 108.158 1400.000 42.5 1294.45 108.146 108.146 1401.000 42.5 1295.16 108.133 108.133 1402.000 42.5 1295.87 108.121 108.121 1403.000 42.5 1296.58 108.109 108.109 1404.000 42.5 1297.29 108.097 108.097 1405.000 42.5 1297.99 108.085 108.085 1406.000 42.5 1298.70 108.072 108.072 1407.000 42.5 1299.41 108.060 108.060 1408.000 42.5 1300.12 108.047 108.047 1409.000 42.5 1300.82 108.035 108.035 1410.000 42.5 1301.53 108.022 108.022 1411.000 42.5 1302.24 108.010 108.010 1412.000 42.5 1302.95 107.997 107.997 1413.000 42.5 1303.66 107.985 107.985 1414.000 42.5 1304.36 107.972 107.972 1415.000 42.5 1305.07 107.959 107.959 1416.000 42.5 1305.78 107.947 107.947 1417.000 42.5 1306.49 107.934 107.934 1418.000 42.5 1307.19 107.921 107.921 1419.000 42.5 1307.90 107.908 107.908 1420.000 42.5 1308.61 107.895 107.895 1421.000 42.5 1309.32 107.882 107.882 1422.000 42.5 1310.03 107.869 107.869 1423.000 42.5 1310.73 107.856 107.856 1424.000 42.5 1311.44 107.843 107.843 1425.000 42.5 1312.15 107.830 107.830 1426.000 42.5 1312.86 107.817 107.817 1427.000 42.5 1313.56 107.803 107.803 1428.000 42.5 1314.27 107.790 107.790 1429.000 42.5 1314.98 107.777 107.777 1430.000 42.5 1315.69 107.764 107.764 1431.000 42.5 1316.40 107.750 107.750 1432.000 42.5 1317.10 107.737 107.737 1433.000 42.5 1317.81 107.723 107.723 1434.000 42.5 1318.52 107.710 107.710 Attachment 1 Page 32 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: 14.1.0N KC! Date: SN: Badar Hussain Study Case: BSIB-48 Revision:

CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Dischar2e Dischar2e 21 11-17-2018 KCICONSULT Base Normal Current Capacity Volta2e (V) Current Capacity Volta2e(V)

' Time (Amp) (Amp-Hour)

V-V+ Time (Amp) (Amp-Hour)

V-V+ 1435.000 42.5 1319.23 107.696 107.696 1436.000 42.5 1319.93 107.682 107.682 1437.000 42.5 1320.64 107.669 107.669 1438.000 42.5 1321.35 107.655 107.655 1439.000 42.5 1322.06 107.641 107.641 1440.000 42.5 1322.77 107.627 107.627 1441.000 42.5 1323.47 107.613 107.613 1442.000 42.5 1324.18 107.599 107.599 1443.000 42.5 1324.89 107.585 107.585 1444.000 42.5 1325.60 107.571 107.571 1445.000 42.5 1326.30 107.557 107.557 1446.000 42.5 1327.01 107.543 107.543 1447.000 42.5 1327.72 107.529 107.529 1448.000 42.5 1328.43 107.515 107.515 1449.000 42.5 1329.14 107.500 107.500 1450.000 42.5 1329.84 107.486 107.486 1451.000 42.5 1330.55 107.472 107.472 1452.000 42.5 1331.26 107.4_57 107.457 1453.000 42.5 1331.97 107.443 107.443 1454.000 42.5 1332.67 107.428 107.428 1455.000 42.5 1333.38 107.414 107.414 1456.000 42.5 1334.09 107.399 107.399 1457.000 42.5 1334.80 107.384 107.384 1458.000 42.5 1335.51 107.369 107.369 1459.000 42.5 1336.21 107.355 107.355 1460.000 42.5 1336.92 107.340 107.340 1461.000 42.5 1337.63 107.325 107.325 1462.000 42.5 1338.34 107.310 107.310 1463.000 42.5 1339.04 107.295 107.295 1464.000 42.5 1339.75 107.278 107.278 1465.000 42.5 1340.46 107.262 107.262 1466.000 42.5 1341.17 107.246 107.246 1467.000 42.5 1341.88 107.235 107.235 1468.000 42.5 1342.58 107.226 107.226 1469.000 42.5 1343.29 107.217 107.217 1470.000 42.5 1344.00 107.208 107.208 1471.000 42.5 1344.71 107.199 107.199 1472.000 42.5 1345.41 107.190 107.190 1473.000 42.5 1346.12 107.181 107.181 1474.000 42.5 1346.83 107.171 107.171 1475.000 42.5 1347.54 107.162 107.162 1476.000 42.5 1348.25 107.153 107.153 1477.000 42.5 1348.95 107.144 107.144 1478.000 42.5 1349.66 107.134 107.134 1479.000 42.5 1350.37 107.125 107.125 1480.000 42.5 1351.08 107.115 107.115 1481.000 42.5 1351.78 107.105 107.105 1482.000 42.5 1352.49 107.096 107.096 1483.000 42.5 1353.20 107.086 107.086 1484.000 42.S 1353.91 107.076 107.076 1485.000 42.5 1354.62 107.066 107.066 1486.000 42.5 1355.32 107.056 107.056 1487.000 42.5 1356.03 107,047 107.047 1488.000 42.5 1356.74 107.036 107.036 1489.000 42.5 1357.45 107.026 107.026 1490.000 42.5 1358.15 107.016 107.016 1491.000 42.5 1358.86 107.006 107.006 1492.000 42.5 1359.57 106.996 106.996 1493.000 42.5 1360.28 106.985 106.985 1494.000 42.5 1360.99 106.975 106.975 1495.000 42.5 1361.69 106.964 106.964 1496.000 42.5 1362.40 106.954 106.954 1497.000 42.5 1363.11 106.943 106.943 1498.000 42.5 1363.82 106.932 106.932 1499.000 42.5 1364.52 106.922 106.922 15oq.ooo 42.5 1365.23 106.911 106:911 1501.000 42.5 1365.94 106.900 106.900 1502.000 42.5 1366.65 106.889 106.889 1503.000 42.5 1367.36 106.878 106.878 1503.333 0.0 1367.59 106.874 119.654

  • This voltage result was obtained using extrapolated battery data. Attachment 1 Page 33 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study Bus Voltage Tabulation During Battery Discharge BATT IBBUS 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time V-V+ Time V-V+ 0.000 119.654 110.037 0.017 110.037 111.852 I.ODO 111.843 112.091 2.000 112.084 ll2.084 3.000 . 112.077 112.077 4.000 112.070 112.070 5.000 112.062 112.062 6.000 112.055 112.055 7.000 112.048 112.048 8.000 112.041 ll2.041 9.000 112.034 112.034 10.000 112.027 112.027 II.ODO 112.020 ll2.020 12.000 ll2.013 ll2.013 13.000 112.006 112.006 14.000 111.999 111.999 15.000 111.992 ll 1.992 16.000 111.983 ll 1.983 17.000 111.975 111.975 18.000 111.966 111.966 19.000 111.957 111.957 20.000 111.948 111.948 21.000 111.938 111.938 22.000 111.929 111.929 23.000 111.920 111.920 24.000 111.910 111.910

  • 25.000 111.900 111.900 26.000 111.891 111.891 27.000 111.881 111.881 28.000 111.871 .Jll.871 29.000 111.860 111.860 30.000 111.850 111.850 31.000 111.840 111.840 32.000 111.829 111.829 33.000 111.818 111.818 34.000 111.807 111.807 35.000 111.796 111.796 36.000 111.785 111.785 37.000 111.774 111.774 38.000 111.762 111.762 39.000 111.750 111.750 40.000 111.738 111.738 41.000 111.726 111.726 42.000 111.714 111.714 43.000 111.702 111.702 44.000 111.689 111.689 45.000 111.671 111.671 46.000 111.646 111.646 47.000 111.621 111.621 48.000 111.596 111.596 49.000 111.571 111.571 50.000 111.545 111.545 SI.ODO 111.519 111.519 52.000 111.493 111.493 53.000 111.467 111.467 54.000 111.441 111.441 55.000 111.414 111.414 56.000 111.388 111.388 57.000 111.362 111.362 58.000 111.336 111.336 59.000 111.310 111.310 60.000 111.284 114.437 61.000 114.432 114.432 62.000 114.427 114.427 63.000 114.422 114.422 64.000 114.417 114.417 65.000 114.412 114.412 66.000 114.407 114.407 67.000 ll4.402 114.402 68.000 114.397 114.397 69.000 114.392 114.392 70.000 114.385 114.385 71.000 114.375 114.375 72.000 114.365 114.365 73.000 114.355 114.355 74.000 114.345 114.345 75.000 114.335 114.335 76.000 114.325 114.325 77.000 114.316 114.316 78.000 114.306 114.306 79.000 114.296 114.296 80.000 114.286 114.286 81.000 114.277 114.277 82.000 114.267 114.267 83.000 114.257 114.257 84.000 114.248 114.248 85.000 114.238 114.238 86.000 114.228 114.228 87.000 114.219 114.219 88.000 114.209 114.209 89.000 114.200 114.200 90.000 114.190 114.190 91.000 114.181 114.181 92.000 114.171 114.171 93.000 114.162 114.162 94.000 114.152 114.152 95.000 "114.143 114.143 96.000 114.134 114.134 97.000 114.124 114.124 98.000 114.115 114.115 I 99.000 114.106 114.106 100.000 114.096 114.096 101.000 114.087 114.087 102.000 114.078 114.078 103.000 114.068 114.068 104.000 114.059 114.059 105.000 114.050 114.050 106.000 114.041 114.041 107.000 114.032 114.032 108.000 114.023 114.023 109.000 114.014 114.014 110.000 114.004 114.004 111.000 113.995 113.995 112.000 ( 113.986 113.986 113.000 113.977 113.977 114.000 113.971 113.971 115.000 113.969 113.969 116.000 113.968 113.968 117.000 113.966 113.966 118.000 113.964 113.964 119.000 113.963 113.963 120.000 113.961 113.961 121.000 113.960 113.960 122.000 113.958 113.958 123.000 113.956 113.956 124.000 113.955 113.955 125.000 113.953 113.953 126.000 113.951 113.951 127.000 113.950 113.950 128.000 113.948 113.948 129.000 113.946 113.946 130.000 113.945 113.945 131.000 113.943 113.943 132.000 113.941 113.941 133.000 113.940 113.940 134.000 113.938 113.938 Attachment 1 Page 34 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: otv 2 Battery 1B 48-Hour Coping Study BATT 1BBUS 2 11-17-2018 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 135.000 113.936 113.936 136.000 113.935 113.935 137.000 113.933 113.933 138.000 113.931 113.931 139.000 113.930 113.930 140.000 113.928 113.928 141.000 113.926 113.926 142.000 113.925 113.925 143.000 113.923 113.923 144.000 113.921 113.921 145.000 113.920 113.920 146.000 113.918 113.918 147.000 113.916 113.916 148.000 113.915 113.915 149.000 113.913 113.913 150.000 113.911 113.911 151.000 113.909 113.909 152.000 113.908 113.908 153.000 113.906 113.906 154.000 113.904 113.904 155.000 113.903 113.903 156.000 113.901 113.901 157.000 113.899 113.899 158.000 113.897 113.897 159.000 113.896 113.896 160.000 113.894 113.894 161.000 113.892 113.892 162.000 113.890 113.890 163.000 113.889 113.889 164.000 113.887 113.887 165.000 113.885 113.885 166.000 113.883 113.883 167.000 113.882 113.882 168.000 113.880 113.880 169.000 113.878 113.878 170.000 113.876 113.876 171.000 113.875 113.875 172.000 113.873 113.873 173.000 113.871 113.871 174.000 113.869 113.869 175.000 113.868 113.868 176.000 113.866 113.866 177.000 113.864 113.864 178.000 113.862 113.862 179.000 113.860 113.860 180.000 113.859 113.859 181.000 113.857 113.857 182.000 113.856 113.856 183.000 113.855 113.855 184.000 113.855 113.855 185.000 113.854 113.854 186.000 113.854 113.854 187.000 113.854 113.854 188.000 113.853 113.853 189.000 113.853 113.853 190.000 113.852 113.852 191.000 113.852 113.852 192.000 113.851 113.851 193.000 113.851 113.851 194.000 113.851 113.851 195.000 113.850 113.850 196.000 113.850 113.850 197.000 113.849 113.849 198.000 113.849 113.849 199.000 113.848 113.848 200.000 113.848 113.848 201.000 113.847 113.847 202.000 113.847 113.847 203.000 113.847 113.847 204.000 113.846 113.846 205.000 113.846 113.846 206.000 113.845 113.845 207.000 113.845 113.845 208.000 113.844 113.844 209.000 113.844 113.844 210.000 113.843 113.843 211.000 113.843 113.843 212.000 113.842 113.842 213.000 113.842 113.842 214.000 113.842 113.842 215.000 113.841 113.841 216.000 113.841 113.841 217.000 113.840 113.840 218.000 113.840 113.840 219.000 113.839 113.839 220.000 113.839 113.839 221.000 113.838 113.838 222.000 113.838 113.838 223.000 113.837 113.837 224.000 113.837 113.837 225.000 113.836 113.836 226.000 113.836 113.836 227.000 113.835 113.835 228.000 113.835 113.835 229.000 113.835 113.835 230.000 113.834 113.834 231.000 113.834 113.834 232.000 113.833 113.833 233.000 113.833 113.833 234.000 113.832 113.832 235.000 113.832 113.832 236.000 113.831 113.831 237.000 113.831 113.831 238.000 113.830 113.830 239.000 113.830 113.830 240.000 113.829 113.829 241.000 113.829 113.829 242.000 113.828 113.828 243.000 113.828 113.828 244.000 113.827 113.827 245.000 113.826 113.826 246.000 113.825 113.825 247.000 113.824 113.824 248.000 113.824 113.824 249.000 113.823 113.823 250.000 113.822 113.822 251.000 113.821 113.821 252.000 113.820 113.820 253.000 113.820 113.820 254.000 113.819 113.819 255.000 113.818 113.818 256.000 113.817 113.817 257.000 113.817 113.817 258.000 113.816 113.816 259.000 113.815 113.815 260.000 113.814 113.814 261.000 113.813 113.813 262.000 113.812 113.812 263.000 113.812 113.812 264.000 113.811 113.811 265.000 113.810 113.810 266.000 113.809 113.809 267.000 113.808 113.808 268.000 113.808 113.808 269.000 113.807 113.807 270.000 113.806 113.806 271.000 113.805 113.805 272.000 113.804 113.804 273.000 113.804 113.804 274.000 113.803 113.803 275.000 113.802 113.802 276.000 113.801 113.801 277.000 113.800 113.800 278.000 113.799 113.799 279.000 113.799 113.799 280.000 113.798 113.798 281.000 113.797 113.797 282.000 113.796 113.796 Attachment 1 Page 35 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Sn1dyCase:

BSIB-48 CPS SBO Study Config.:

  • DIV 2 Batteiy 1B 48-Hour Coping Sn1dy BATTIBBUS 3 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 283.000 113.795 113.795 284.000 113.794 113.794 285.000 113.794 113.794 286.000 113.793 113.793 287.000 113.792 113.792 288.000 113.791 113.791 289.000 113.790 113.790 290.000 113.789 113.789 291.000 113.788 113.788 292.000 113.788 113.788 293.000 113.787 113.787 294.000 113.786 113.786 295.000 113.785 113.785 296.000 113.784 113.784 297.000 113.783 113.783 298.000 113.782 113.782 299.000 113.782 113.782 300.000 113.781 113.781 301.000 113.780 113.780 302.000 113.779 113.779 303.000 113.778 113.778 304.000 113.777 113.777 305.000 113.776 113.776 306.000 113.775 113.775 307.000 113.775 113.775 308.000 113.774 113.774 309.000 113.773 113.773 310.000 113.772 113.772 311.000 113.771 113.771 312.000 113.770 113.770 313.000 113.769 113.769 314.000 113.768 113.768 315.000 113.767 113.767 316.000 113.767 113.767

  • 317.000 113.766 113.766 318.000 113.765 113.765 319.000 113.764 113.764 320.000 113.763 113.763 321.000 113.762 113.762 322.000 113.761 113.761 323.000 113.760 113.760 324.000 113.759 113.759 325.000 113.758 113.758 326.000 113.758 113.758 327.000 113.757 113.757 328.000 113.756 113.756 329.000 113.755 113.755 330.000 113.754 113.754 331.000 113.753 113.753 332.000 113.752 113.752 333.000 113.751 113.751 334.000 113.750 113.750 335.000 113.749 113.749 336.000 113.748 113.748 337.000 113.747 113.747 338.000 113.746 113.746 339.000 113.745 113.745 340.000 113.745 113.745 341.000 113.744 113.744 342.000 113.743 113.743 343.000 113.742 113.742 344.000 113.741 113.741 345.000 113.740 113.740 346.000 113.739
  • 113.739 347.000 113.738 113.738 348.000 113.737 113.737 349.000 113.736 113.736 350.000 113.735 113.735 351.000 113.734 113.734 352.000 113.733 113.733 353.000 113.732 113.732 354.000 113.731 113.731 355.000 113.730 113.730 356.000 113.729 113.729 357.000 113.728 113.728 358.000 113.727 113.727 359.000 113.726 113.726 360.000 113.725 113.725 361.000 113.724 113.724 362.000 113.723 113.723 363.000 113.722 113.722 364.000 113.721 113.721 365.000 113.720 113.720 366.000 113.719 113.719 367.000 113.718 113.718 368.000 113.717 113°.717 369.000 113.716 113.716 370.000 113.715 113.715 371.000 113.714 '113.714 372.000 113.713 113.713 373.000 113.712 113.712 374.000 113.711 113.711 375.000 113.710 113.710 376.000 113.709 113.709 377.000 113.705 113.705 378.000 113.702 113.702 379.000 113.698 113.698 380.000 113.694 113.694 381.000 113.690 113.690 382.000 113.686 113.686 383.000 113.683 113.683 384.000 113.679 113.679 385.000 113.675 113.675 386.000 113.671 113.671 387.000 113.668 113.668 388.000 113.664 113.664 389.000 113.660 113.660 390.000 113.656 113.656 391.000 113.652 113.652 392.000 113.649 113.649 393.000 113.645 113.645 394.000 113.641 113.641 395.000 113.637 113.637 396.000 113.633 113.633 397.000 113.630 113.630 398.000 113.626 113.626 399.000 113.622 113.622 400.000 113.618 113.618 401.000 113.614 113.614 402.000 113.611 113.611 403.000 113.607 113.607 404.000 113.603 113.603 405.000 113.599 113.599 406.000 113.595 113.595 407.000 113.591 113.591 408.000 113.588 113.588 409.000 113.584 113.584 410.000 113.580 113.580 411.000 113.576 113.576 412.000 113.572 113.572 413.000 113.568 113.568 414.000 113.565 113.565 415.000 113.561 113.561 416.000 113.558 113.558 417.000 113.556 113.556 418.000 113.553 113.553 419.000 113.551 113.551 420.000 113.548 113.548 421.000 113.546 113.546 422.000 113.543 113.543 423.000 113.541 113.541 424.000 113.538 113.538 425.000 113.536 113.536 426.000 113.533 113.533 427.000 113.531 113.531 428.000 113.528 113.528 429.000 113.525 113.525 430.000 113.523 113.523 Attachment 1 Page 36 of 58 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously Attachment 1 for greater than 24 Hrs Page 37 of 58 '\. Project: Clinton Flex Study ETAP Page: 4 Location:

KC! 14.1.0N Date: 11-17-2018 Contract:

S_N: KCICONSULT Engineer:

Badar Hussain Revision:

Base Study Case: BSIB-48 Filename:

CPS SBO Study Config.: Normal DIV 2 Battery 1B 48-Hour Coping Study BATT lBBUS Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 431.000 113.520 113.520 432.000 113.517 113.517 433.000 113.515 113.515 434.000 113.512 113.512 435.000 113.509 113.509 436.000 113.507 113.507 437.000

  • 113.504 113.504 438.000 113.501 113.501 439.000 113.498 113.498 440.000 113.495 113.495 441.000 113.492 113.492 442.000 113.489 113.489 443.000 113.487 113.487 444.000 113.484 113.484 445.000 113.481 113.481 446.000 113.478 113.478 447.000 113.475 113.475 448.000 113.472 113.472 449.000 113.469 113.469 450.000 113.466 113.466 451.000 113.462 113.462 452.000 113.459 113.459 453.000 113.456 113.456 454.000 113.453 113.453 455.000 113.450 113.450 456.000 113.447 113.447 457.000 113.443 113.443 458.000 113.440 113.440 459.000 113.437 113.437 460.000 113.433 113.433 461.000 113.430 113.430 462.000 113.427 113.427 463.000 113.423 113.423 464.000 113.420 113.420 465.000 113.416 113.416 466.000 113.413 113.413 467.000 113.409 113.409 468.000 113.406 113.406 469.000 113.402 113.402 470.000 113.399 113.399 471.000 113.395 113.395 472.000 113.391 113.391 473.000 113.388 113.388 474.000 113.384 113.384 475.000 113.382 113.382 476.000 113.378 113.378 477.000 113.373 113.373 478.000 113.369 113.369 479.000 113.365 113.365 480.000 113.361 113.361 481.000 113.357 113.357 482.000 113.352 113.352 483.000 113.348 113.348 484.000 113.344 113.344 485.000 113.340 113.340 486.000 113.335 113.335 487.000 113.331 113.331 488.000 113.327 113.327 489.000 113.323 113.323 490.000 113.318 113.318 491.000 113.314 113.314 492.000 113.310 113.310 493.000 113.305 113.305 494.000 113.301 113.301 495.000 113.297 113.297 496.000 113.293 113.293 497.000 113.288 113.288 498.000 113.284 113.284 499.000 113.280 113.280 500.000 113.276 113.276 501.000 113.271 113.271 502.000 113.267 113.267 503.000 113.263 113.263 504.000 113.258 113.258 505.000 113.254 113.254 506.000 113.250 113.250 507.000 113.246 113.246 508.000 113.241 li3.241 509.000 113.237 113.237 510.000 113.233 113.233 511.000 113.228 113.228 512.000 113.224 113.224 513.000 113.220 113.220 514.000 113.215 113.215 515.000 113.211 113.211 516.000 113.207 113.207 517.000 113.203 113.203 518.000 113.198 113.198 519.000 113.194 113.194 520.000 113.190 113.190 521.000 113.185 113.185 522.000 113.181 113.181 523.000 113.177 113.177 524.000 113.172 113.172 525.000 113.168 113.168 526.000 113.164 113.164 527.000 113.159 113.159 528.000 113.155 113.155 529.000 113.151 113.151 530.000 113.146 113.146 531.000 113.142 113.142 532.000 113.138 113.138 533.000 113.133 113.133 534.000 113.129 113.129 535.000 113.125 113.125 536.000 113.120 113.120 537.000 113.116 113.116 538.000 113.112 113.112 539.000 113.108 113.108 540.000 113.106 113.106 541.000 113.103 113.103 542.000 113.101 113.101 543.000 113.099 113.099 544.000 113.097 113.097 545.000 113.094 113.094 546.000 113.092 113.092 547.000 113.090 113.090 548.000 113.087 113.087 549.000 113.085 113.085 550.000 113.083 113.083 551.000 113.080 113.080 552.000 113.078 113.078 553.000 113.076 113.076 554.000 113.073 113.073 555.000 113.071 113.071 556.000 113.069 113.069 557.000 113.066 113.066 558.000 113.064 113.064 559.000 113.062 113.062 560.000 113.059 113.059 561.000 113.057 113.057 562.000 113.055 113.055 563.000 113.052 113.052 564.000 113.050 113.050 565.000 113.048 113.048 566.000 113.045 113.045 567.000 113.043 113.043 568.000 113.040 113.040 569.000 113.038 113.038 570.000 113.036 113.036 571.000 113.033 113.033 572.000 113.031 113.031 573.000 113.028 113.028 574.000 113.026 113.026 575.000 113.023 113.023 576.000 113.021 113.021 577.000 113.019 113.019 578.000 113.016 113.016 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study BATT1BBUS 5 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 579.000 113.014 113.014 580.000 113.011 113.011 581.000 113.009 113.009 582.000 113.006 113.006 583.000 113.004 113.004 584.000 113.002 113.002 585.000 112.999 112.999 586.000 112.997 112.997 587.000 112.994 112.994 588.000 112.992 112.992 589.000 112.989 112.989 590.000 112.987 112.987 591.000 112.984 112.984 592.000 112.982 112.982 593.000 112.979 112.979 594.000 112.977 112.977 595.000 112.974 112.974 596.000 112.972 112.972 597.000 112.969 112.969 598.000 112.967 112.967 599.000 112.964 112.964 600.000 112.962 112.962 . 601.000 112.959 112.959 602.000 112.957 112.957 603.000 112.954 112.954 604.000 112.952 112.952 605.000 112.949 112.949 606.000 112.947 112.947 607.000 112.944 112.944 608.000 112.942 112.942 609.000 112.939 112.939 610.000 112.937 112.937 611.000 112.934 112.934 612.000 112.932 112.932 613.000 112.931 112.931 614.000 112.929 112.929 615.000 112.927 112.927 616.000 112.925 112.925 617.000 112.923 112.923 618.000 112.922 112.922 619.000 112.920 112.920 620.000 112.918 112.918 621.000 112.916 112.916 622.000 112.914 112.914 623.000 112.912 112.912 624.000 112.911 112.911 625.000 112.909 112.909 626.000 112.907 112.907 627.000 112.905 112.905 628.000 112.903 112.903 629.000. 112.901 112.901 630.000 112.899 112.899 631.000 112.898 112.898 632.000 112.896 112.896 633.000 112.894 112.894 634.000 112.892 112.892 635.000 112.890 112.890 636.000 112.888 112.888 637.000 112.886 112.886 638.000 112.884 112.884 639.000 112.882 112.882 640.000 112.881 112.881 641.000 112.879 112.879 642.000 112.877 112.877 643.000 112.875 112.875 644.000 112.873 112.873 645.000 112.871 112.871 646.000 112.869 112.869 *647.000 112.867 112.867 648.000 112.865 112.865 649.000 112.863 112.863 650.000 112.861 112.861 651.000 112.859 112.859 652.000 112.857 112.857 653.000 112.855 112.855 654.000 112.853 112.853 655.000 112.852 112.852 656.000 112.850 112.850 657.000 112.848 112.848 658.000 112.846 112.846 659.000 112.844 112.844 660.000 112.842 112.842 661.000 112.840 112.840 662.000 112.838 112.838 663.000 112.836 112.836 664.000 112.834 112.834 665.000 112.832 112.832 666.000 112.830 112.830 667.000 112.828 112.828 668.000 112.826 112.826 669.000 112.824 112.824 670.000 112.821 112.821 671.000 112.819 112.819 672.000 112.817 112.817 673.000 112.815 112.815 674.000 112.813 112.813 675.000 112.811 112.811 676.000 112.809 112.809 677.000 . 112.807 112.807 678.000 112.805 112.805 679.000 112.803 112.803 680.000 112.801 112.801 681.000 112.799 112.799 682.000 112.797 112.797 683.000 112.795 112.795 684.000 112.792 112.792 685.000 112.789 112.789 686.000 112.787 112.787 687.000 112.784 112.784 688.000 112.781 112.781 689.000 112.778 112.778 690.000 112.775 112.775 691.000 112.773 112.773 692.000 112.770 112.770 693.000 112.767 112.767 694.000 112.764 112.764 695.000 112.761 112.761 696.000 112.759 112.759 697.000 112.756 112.756 698.000 112.753 112.753 699.000 112.750 112.750 700.000 112.747 112.747 701.000 112.744 112.744 702.000 112.742 112.742 703.000 112.739 112.739 704.000 112.736 112.736 705.000 112.733 112.733 706.000 112.730 112.730 707.000 112.727 112.727 708.000 112.724 112.724 709.000 112.721 112.721 710.000 112.719 112.719 711.000 112.716 112.716 712.000 112.713 112.713 713.000 112.710 112.710 714.000 112.707 112.707 715.000 112.704 112.704 716.000 112.701 112.701 717.000 112.698 112.698 718.000 112.695 112.695 719.000 112.692 112.692 720.000 112.689 112.689 721.000 112.686 112.686 722.000 112.683 112.683 723.000 112.680 112.680 724.000 112.677 112.677 725.000 112.674 112.674 726.000 112.671 112.671 Attachment 1 Page 38 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study BATT lBBUS 6 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 727.000 112.669 112.669 728.000 112.666 112.666 729.000 112.663 112.663 730.000 112.660 112.660 731.000 112.657 112.657 732.000 112.653 112.653 733.000 112.650 112.650 734.000 112.647 112.647 735.000 112.644 112.644 736.000 112.641 112.641 737.000 112.638 112.638 738.000 112.635 112.635 739.000 112.632 112.632 740.000 112.629 112.629 741.000 112.626 112.626 742.000 112.623 112.623 743.000 112.620 112.620 . 744.000 112.617 112.617 745.000 112.614 112.614 746.000 112.611 112.611 747.000 112.608 112.608 748.000 112.605 112.605 749.000 112.601 112.601 750.000 112.598 112.598 751.000 112.595 112.595 752.000 112.592 112.592 753.000 112.589 112.589 754.000 112.586 112.586 755.000 112.583 112.583 756.000 112.579 112.579 757.000 112.576 112.576 758.000 112.573 112.573 759.000 112.570 112.570 760.000 112.567 112.567 761.000 112.564 112.564 762.000 112.560 112.560 763.000 112.557 112.557 764.000 112.554 112.554 765.000 112.551 112.551 766.000 112.548 112.548 767.000 112.546 112.546 768.000 112.543

  • 112.543 769.000 112.541 112.541 770.000 112.538 112.538 771.000 112.535 112.535 772.000 112,533 112.533 773.000 112.530 112.530 774.000 112.528 112.528 775.000 112.525 112.525 776.000 112.522 112.522 777.000 112.520 112.520 778.000 112.517 112.517 779.000 112.514 112.514 780.000 112.512 112.512 781.000 112.509 112.509 782.000 112.506 112.506 783.000 112.504 112.504 784.000 112.501 112.501 785.000 112.498 112.498 786.000 112.496 112.496 787.000 112.493 112.493 788.000 112.490 112.490 789.000 112.487 112.487 790.000 112.484 112.484 791.000 112.481 112.481 792.000 112.478 112.478 793.000 112.475 112.475 794.000 112.472 112.472 795.000 112.469 112.469 796.000 112.466 112.466 797.000 112.463 112.463 798.000 112.460 112.460 799.000 112.457 112.457 800.000 112.454 112.454 801.000 112.450 112.450 802.000 112.447 112.447 803.000 112.444 112.444 804.000 112.441 112.441 805.000 112.438 112.438 806.000 112.435 112.435 807.000 112.431 112.431 808.000 112.428 112.428 809.000 112.425 112.425 810.000 112.422 112.422 811.000 112.418 112.418 812.000 112.415 112.415 813.000 112.412 112.412 814.000 112.409 112.409 \ 815.000 112.405 112.405 816.000 112.402 112.402 817.000 112.399 112.399 818.000 112.395 112.395 819.000 112.392 112.392 820.000 112.389 112.389 821.000 112.385 112.385 822.000 112.382 112.382 823.000 112.379 112.379 824.000 112.375 112.375 825.000 112.372 112.372 826.000 112.368 112.368 827.000 112.365 112.365 828.000 112.361 112.361 829.000 112.358 112.358 830.000 112.354 112.354 831.000 112.351 112.351 832.000 112.347 112.347 833.000 112.344 112.344 834.000 112.340 112.340 835.000 112.337 112.337 836.000 112.333 112.333 837.000 p2.330 112.330 838.000 112.326 112.326 839.000 112.323 112.323 840.000 112.320 112.320 841.000 112.316 112.316 842.000 112.313 112.313 843.000 112.310 112.310 844.000 112.306 112.306 845.000 112.303 112.303 846.000 112.300 112.300 847.000 112.296 112.296 848.000 112.293 112.293 849.000 112.289 112.289 850.000 112.286 112.286 851.000 112.282 112.282 852.000 112.279 112.279 853.000 112.276 112.276 854.000 112.272 112.272 855.000 112.268 112.268 856.000 112.265 112.265 857.000 112.261 112.261 858.000 112.258 112.258 859.000 112.254 112.254 860.000 112.251 112.251 861.000 112.247 112.247 862.000 112.243 112.243 863.000 112.240 112.240 864.000 112.236 112.236 865.000 112.232 112.232 866.000 112.229 112.229 867.000 112.225 112.225 868.000 112.221 112.221 869.000 112.218 112.218 870.000 112.214 112.214 871.000 112.210 112.210 872.000 112.206 112.206 873.000 112.202 112.202 874.000 112.199 112.199 Attachment 1 Page 39 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study BATTIBBUS 7 11-17-2018 K_CICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 875.000 112.19.5 112.195 876.000 112.191 112.191 877.000 112.187 112.187 878.000 112.183 112.183 879.000 112.179 112.179 880.000 112.175 112.175 881.000 112.171 112.171 882.000 112.167 112.167 883.000 112.163 112.163 884.000 112.159 112.159 885.000 112.155 112.155 886.000 112.151 112.151 887.000 112.147 112.147 888.000 112.143 112.143 889.000 112.139 112.139 890.000 112.135 112.135 891.000 112.131 112.131 892.000 112.127 112.127 893.000 112.123 112.123 894.000 112.119 112.119 895.000 112.114 112.114 896.000 112.110 112.110 897.000 112.106 112.106 898.000_ 112.102 112.102 899.000 112.097 112.097 900.000 112.093 112.093 901.000 112.089 112.089 902.000 112.084 112.084 903.000 112.080 112.080 904.000 112.076 112.076 905.000 112.071 112.071 906.000 112.067 112.067 907.000 112.062 112.062 908.000 112.058 112.058 909.000 112.053 112.053 910.000 112.049 112.049 911.000 112.044 112.044 912.000 112.040 112.040 913.000 112.035 112.035 914.000 112.031 112.031 915.000 112.026 112.026 916.000 112.021 112.021 917.000 112.~17 112.017 918.000 112.012 112.012 919.000 112.007 112.007 920.000 112.003 112.003 921.000 111.998 111.998 922.000 111.993 111.993 923.000 111.988 111.988 924.000 111.983 111.983 925.000 111.978 111.978 926.000 111.974 111.974 927.000 111.969 111.969 928.000 ill.963 111.963 929.000 111.957 111.957 930.000 111.950 111.950 931.000 111.944 111.944 932.000 111.937 111.937 933.000 111.931 111.931 934.000 111.924 111.924 935.000 111.918 111.918 936.000 111.911 111.911 937.000 111.904 111.904 938.000 111.898 111.898 939.000 111.891 111.891 940.000 111.884 111.884 941.000 111.877 111.877 942.000 111.870 111.870 943.000 111.863 111.863 944.000 111.856 111.856 945.000 111.849 111.849 946.000 111.842 111.842 947.000 111.834 111.834 948.000 111.827 111.827 949.000 111.820 111.820 950.000 111.812 111.812 951.000 111.805 111.805 952.000 111.797 111.797 953.000 111.790 111.790 954.000 111.782 111.782 955.000 111.774 111.774 956.000 111.766 111.766 957.000 111.759 111.759 958.000 111.751 111.751 959.000 111.743 111.743 960.000 111.735 111.735 961.000 111.726 111.726 962.000 111.718 111.718 963.000 111.710 111.710 964.000 111.702 111.702 965.000 111.693 111.693 966.000 111.685 111.685 967.000 111.676 111.676 968.000 111.668 111.668 969.000 111.659 111.659 970.000 111.650 111.650 971.000 111.641 111.641 972.000 111.632 111.632 973.000 111.623 111.623 974:ooo 111.614 111.614 975.000 111.605 111.605 976.000 111.596 111.596 977.000 111.586 111.586 978.000 111.577 111.577 979.000 111.567 111.567 980.000 111.558 111.558 981.000 111.548 111.548 982.000 111.538 111.538 983.000 111.528 111.528 984.000 111.518 111.518 985.000 111.508 111.508 986.000 111.498 111.498 987.000 111.488 111.488 988.000 111.478 111.478 989.000 111.467 111.467 990.000 111.457 111.457 991.000 111.447 111.447 992.000 111.441 111.441 993.000 111.435 111.435 994.000 111.429 111.429 995.000 111.423 111.423 996.000 111.417 111.417 997.000 111.411 111.411 998.000 111.404 111.404 999.000 111.398 111.398 1000.000 111.392 111.392 1001.000 111.386 111.386 1002.000 111.379 111.379 1003.000 111.373 111.373 1004.000 111.367 ll l.367 1005.000 111.360 111.360 1006.000 111.354 111.354 1007.000 111.348 111.348 1008.000 111.341 111.341 10'19.000 111.335 111.335 1010.000 111.328 111.328 1011.000 111.322 111.322 1012.000 111.315 111.315 1013.000 111.309 111.309 1014.000 111.302 111.302 1015.000 111.296 111.296 1016.000 111.289 111.289 1017.000 111.282 111.282 1018.000 111.276 111.276 1019.000 111.269 111.269 1020.000 111.262 111.262 1021.000 111.255 111.255 1022.000 111.248 111.248 Attachment 1 Page 40 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study BATT1BBUS 8 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time *V-V+ Time V-V+ 1023.000 111.242 111.242 1024.000 111.235 111.235 1025.000 111.228 111.228 1026.000 111.221 111.221 1027.000 111.214 111.214 1028.000 111.207 111.207 1029.000 111.200 111.200 1030.000 111.193 111.193 1031.000 111.186 111.186 1032.000 111.179 111.179 1033.000 111.171 111.171, 1034.000 111.164 111.164 1035.000 111.157 111.157 1036.000 111.150 111.150 1037.000 111.143 111.143 1038.000 111.135 111.135 1039.000 111.128 111.128 1040.000 111.1~1 111.121 1041.000 111.113 111.113 1042.000 111.106 111.106 1043.000 111.098 111.098 1044.000 111.091 111.091 1045.000 111.083 111.083 1046.000 111.076 111.076 1047.000 111.068 111.068 1048.000 111.060 111.060 1049.000 111.053 111.053 1050.000 111.045 111.045 1051.000 111.037 111.037 1052.000 111.030 111.030 1053.000 111.022 111.022 1054.000 111.014 111.014 1055.000 111.006 111.006 1056.000 110.998 110.998 1057.000 110.990 110.990 1058.000 110.982 110.982 1059.000 110.974 110.974 1060.000 110.966 110.966 1061.000 110.958 110.958 1062.000 110.950 110.950 1063.000 110.942 110.942 1064.000 110.931 110.931 1065.000 110.920 110.920 1066.000 110.909 110.909 1067.000 110.898 110.898 1068.000 110.887 110.887 1069.000 110.876 110.876 1070.000 110.864 110.864 1071.000 110.853 110.853 1072.000 110.842 110.842 1073.000 110.830 110.830 1074.000 110.818 110.818 1075.000 110.807 110.807 1076.000 110.795 110.795 1077.000 110.783 110.783 1078.000 110.771 110.771 1079.000 110.759 110.759 1080.000 110.747 110.747 1081.000 110.735 110.735 1082.000 110.722 110.722 1083.000 110.710 110.710 1084.000 110.697 110.697 1085.000 110.685 110.685 1086.000 . 110.672 110.672 1087.000 110.659 110.659 1088.000 110.646 110.646 1089.000 110.633 110.633 1090.000 110.620 110.620 1091.000 110.607 110.607 1092.000 110.593 110.593 1093.000 110.580 110.580 1094.000 110.566 110.566 1095.000 110.553 110.553 1096.000 110.539 110.539 1097.000 110.525 110.525 1098.000 110.511 110.511 1099.000 110.497 110.497 1100.000 110.483 110.483 1101.000 110.469 110.469 1102.000 110.454 110.454 1103.000 110.440 110.440 1104.000 110.427 110.427 1105.000 110.421 110.421 1106.000 110.415 110.415 1107.000 110.408 110.408 1108.000 110.402 110.402 1109.000 110.396 110.396 1110.000 110.390 110.390 1111.000 110.384 110.384 l112.000 110.378 110.378 1113.000 110.372 110.372 1114.000 110.366 110.366 1115.000 110.359 110.359 1116.000 110.353 110.353 1117.000 110.347 110.347 1118.000

  • 110.341 110.341 1119.000 110.335 110.335 1120.000 110.328 110.328 1121.000 110.322 110.322 1122.000 110.316 110.316 1123.000 110.310 110.310 1124.000 110.303 110.303 1125.000 110.297 110.297 1126.000 110.291 110.291 1127.000 110.284 110.284 1128.000 110.278 110.278 1129.000 110.272 110.272 1130.000 110.265 110.265 1131.000 110.259 110.259 1132.000 110.253 110.253 1133.000 110.246 110.246 1134.000 110.240 110.240 1135.000 110.233 110.i33 1136.000 110.227 110.227 1137.000 110.221 110.221 1138.000 110.214 110.214 1139.000 110.208 110.208 1140.000 110.200 110.200 1141.000 110.198 110.198 1142.000 110.195 110.195 1143.000 110.192 110.192 1144.000 110.189 110.189 1145.000 110.186 110.186 1146.000 110.183 110.183 1147.000 110.180 110.180 1148.000 110.177 110.177 1149.000 110.174 110.174 1150.000 110.171 110.171 1151.000 110.168 110.168 1152.000 110.165 110.165 1153.000 110.162 110.162 1154.000 110.159 110.159 1155.000 110.156 110.156 1156.000 110.153 110.153 1157.000 110.150 110.150 1158.000 110.147 110.147 1159.000 110.144 110.144 1160.000 110.140 110.140 1161.000 110.137 110.137 1162.000 110.134 110.134 1163.000 110.131 110.131 . 1164.000 110.127 110.127 1165.000 110.124 110.124 1166.000 110.121 110.121 1167.000 110.118 110.118 1168.000 110.114 110.114 1169.000 110.111 110.111 1170.000 110.108 110.108 Attachment 1 Page 41 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study BATTIBBUS 9 11-17-2018 KCICONSULT

Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1171.000 110.104 110.104 1172.000 110.101 110.101 1173.000 110.097 110.097 1174.000 110.094 110.094 1175.000 110.090 110.090 1176.000 110.087 110.087 1177.000 110.083 110.083 1178.000 110.080 110.080 1179.000 110.076 110.076 1180.000 110.073 110.073 1181.000 110.069 110.069 1182.000 110.066 110.066 1183.000 ll0.062 ll0.062 1184.000 ll0.058 110.058 1185.000 110.055 110.055 1186.000 110.051 ll0.051 ll87.000 110.047 ll0.047 1188.000 ll0.043 ll0.043 1189.000 110.040 110.040 1190.000 110.036 ll0.036 1191.000 110.032 ll0.032 ll92.000 110.028 110.028 1193.000 110.024 110.024 1194.000 110.020 110.020 1195.000 ll0.016 110.016 1196.000 ll0.012 110.012 1197.000 110.008 110.008 1198.000 110.004 110.004 1199.000 110.000 110.000 1200.000 109.996 109.996 1201.000 109.992 109.992 1202.000 109.988 109.988 1203.000 109.984 109.984 1204.000 109.980 109.980 1205.000 109.976 109.976 1206.000 109.97.1 109.971 1207.000 109.967 109.967 1208.000 109.963 109.963 1209.000 109.959 109.959 1210.000 109.954 109.954 1211.000 109.950 109.950 1212.000 109.945 109.945 1213.000 109.941 109.941 1214.000 109.937 109.937 1215.000 109.932 109.932 1216.000 109.928 109.928 1217.000 109.922 109.922 1218.000 109.917 109.917 1219.000 109.911 109.911 1220.000 109.906 109.906 1221.000 109.899 109.899 1222.000 109.893 109.893 1223.000 109.886 109.886 . 1224.000 109.880 . 109.880 1225.000 109.873 109.873 1226.000 109.866 109.866 1227.000 109.859 109.859 1228.000 109.852 109.852 1229.000 109.845 109.845 1230.000 109.838 109.838 1231.000 109.830 109.830 1232.000 109.823 109.823 1233.000 109.815 109.815 1234.000 109.807 109.807 1235.000 109.800 109.800 1236.000 109.792 109.792 1237.000 109.784 109.784 1238.000 109.775 109.775 1239.000 109.767 109.767 1240.000 109.759 109.759 1241.000 109.750 109.750 1242.000 109.741 109.741 1243.000 109.732 109.732 1244.000 109.723 109.723 1245.000 109.714 109.714 1246.000 109.705 109.705 1247.000 109.695 109.695 1248.000 109.686 109.686 1249.000 109.676 109.676 1250.000 109.666 109.666 1251.000 109.656 109.656 1252.000 109.646 109.646 1253.000 109.635 109.635 1254.000 109.625 109.625 1255.000 109.614 109.614 1256.000 109.603 109.603 1257.000 109.591 109.591 1258.000 109.580 109.580 1259.000 109.568 109.568 1260.000 109.556 109.556 1261.000 109.544 109.544 1262.000 109.532 109.532 1263.000 109.524 109.524 1264.000 109.515 109.515 1265.000 109.507 109.507 1266.000 109.499 109.499 1267.000 109.490 109.490 1268.000 109.482 109.482 1269.000 109.473 109.473 1270.000 109.465 109.465 1271.000 109.456 109.456 1272.000 109.447 109.447 1273.000 109.439 109.439 1274.000 109.430 109.430 1275.000 109.421 109.421 1276.000 109.412 109.412 1277.000 109.403 109.403 1278.000 109.394 109.394 1279.000 109.385 109.385 1280.000 109.376 109.376 1281.000 109.367 109.367 1282.000 109.357 109.357 1283.000 109.348 109.348 1284.000 109.339 109.339 1285.000 109.329 109.329 1286.000 109.320 109.320 1287.000 109.310 109.310 1288.000 109.300 109.300 1289.000 109.291 109.291 1290.000 109.280 '109.280 1291.000 109.270 109.270 1292.000 109.260 109.260 1293.000 109.249 109.249 1294.000 109.239 109.239 1295.000 109.228 109.228 1296.000 109.218 109.218 1297.000 109.207 109.207. 1298.000 109.196 109.196 1299.000 109.185 109.185 1300.000 109.174 109.174 1301.000 109.163 109.163 1302.000 109.152 109.152 1303.000 109.141 109.141 1304.000 109.130 109.130 1305.000 109.119 109.119 1306.000 109.107 109.107 1307.000 109.096 109.096 1308.000 109.084 109.084 1309.000 109.073 109.073 1310.000 109.061 109.061 1311.000 109.049 109.049 1312.000 109.037 109.037 1313.000 109.025 109.025 1314.000 109.013 109.013 1315.000 109.001 109.001 1316.000 108.989 108.989 1317.000 108.977 108.977 1318.000 108.964 108.964 Attachment 1 Page 42 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Batteiy 1B 48-Hour Coping Study BATTlBBUS 10 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage(V)

Time V-V+ Time V-, V+ Time v-V+ Time V-V+ 1319.000 108.952 108.952 1320.000 108.940 108.940 1321.000 108.928 108.928 1322.000 108.919 108.919 1323.000 108.909 108.909 1324.000 108.900 108.900 1325.000 108.891 108.891 1326.000 108.882 108.882 1327.000 108.873 108.873 1328.000 108.864 108.864 1329.000 108.854 108.854 1330.000 108.845 108.845 1331.000 108.836 108.836 1332.000 108.827 108.827 1333.000 108.818 108.818 1334.000 108.808 108.808 1335.000 108.799 108.799 1336.000 108.790 108.790 1337.000 108.780 108.780 1338.000 108.771 108.771 1339.000 108.762 108.762 1340.000 108.752 108.752 1341.000 108.743 108.743 1342.000 108.734 108.734 1343.000 108.724 108.724 1344.000 108.715 108.715 1345.000 108.706 108.706 1346.000 .1 108.696 108.696 1347.000 108.687 108.687 1348.000 108.677 108.677 1349.000 108.668 108.668 1350.000 108.658 108.658 1351.000 108.649 108.649 1352.000 108.639 108.639 1353.000 108.630 108.630 1354.000 108.620 108.620 1355.000 108.611 108.611 1356.000 108.601 108.601 1357.000 108.591 108.591 1358.000 108.582 108.582 1359.000 108.572 108.572 1360.000 108.563 108.563 1361.000 108.553 108.553

  • 1362.000 108.543 108.543 1363.000 108.534 108.534 1364.000 108.524 108.524 1365.000 108.514 108.514 1366.000 108.505 108.505 1367.000 108.495 108.495 1368.000 108.485 108.485 1369.000 108.475 108.475 1370.000 108.466 108.466 1371.000 108.456 108.456 1372.000
  • 108.446 108.446 1373.000 108.436 108.436 1374.000 108.426 108.426 ,, 1375.000 108.416 108.416 1376.000 108.407 108.407 1377.000 108.397 108.397 1378.000 108.387 108.387 1379.000 108.377 108.377 1380.000 108.367 108.367 1381.000 108.357 108.357 1382.000 108.347 108.347 1383.000 108.337 108.337 1384.000 108.327 108.327 1385.000 108.317 108.317 1386.000 108.307 108.307 1387.000 108.297 108.297 1388.000 108.287 108.287 1389.000 108.276 108.276 1390.000 108.265 108.265 1391.000 108.253 108.253 1392.000 108.241 108.241 1393.000 108.229 108.229 1394.000 108.218 108.218 1395.000 108.206 108.206 13%.000 108.194 108.194 1397.000 108.182 108.182 1398.000 108.170 1.08.170 1399.000 108.158 108.158 1400.000 108.146 108.146 1401.000 108.133 108.133 1402.000 108.121 108.121 1403.000 108.109 108.109 1404.000 108.097 108.097 1405.000 108.085 108.085 1406.000 108.072 108.072 1407.000 108.060 108.060 1408.000 108.047 108.047 1409.000 108.035 108.035 1410.000 108.022 108.022 1411.000 108.010 108.010 1412.000 107.997 107.997 1413.000 107.985 107.985 1414.000 107.972 107.972 1415.000 107.959 107.959 1416.000 107.947 107.947 1417.000 107.934 107.934 1418.000 107.921 107.921 1419.000 107.908 107.908 1420.000 107.895 107.895 1421.000 107.882 107.882 1422.000 107.869 107.869 1423.000 107.856 107.856 1424.000 107.843 107.843 1425.000 107.830 107.830 1426.000 107.817 107.817 1427.000 107.803 107.803 1428.000 107.790 107.790 1429.000 107.777 107.777 1430.000 107.764 107.764 1431.000 107.750 107.750 1432.000 107.737 107.737 1433.000 107.723 107.723 1434.000 107.710 107.710 1435.000 107.696 107.696 1436.000 107.682 107.682 1437.000 107.669 107.669 1438.000 107.655 107.655 1439.000 107.641 107.641 1440.000 107.627 107.627 1441.000 107.613 107.613 1442.000 107.599 107.599 1443.000 107.585 107.585 1444.000 107.571 107.571 1445.000 107.557 107.557 1446.000 107.543 107.543 1447.000 107.529 107.529 1448.000 107.515 107.515 1449.000 107.500 107.500 1450.000 107.486 107.486 1451.000 107.472 107.472 1452.000 107.457 107.457 1453.000 107.443 107.443 1454.000 107.428 107.428 1455.000 107.414 107.414 1456.000 107.399 107.399 1457.000 107.384 107.384 1458.000 107.369 107.369 1459.000 107.355 107.355 1460.000 107.340 107.340 1461.000 107.325 107.325 1462.000 107.310 107.310 1463.000 107.295 107.295 1464.000 107.278 107.278 1465.000 107.262 107.262 1466.000 107.246 107.246 Attachment 1 Page 43 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: 11 11-17-2018 KCICONSULT Base Normal DIV 2 Battery 1B 48-Hour Coping Study BATT 1BBUS Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time v-V+ Time V-V+ Time V-V+ Time V-V+ 1467.000 107.235 107.235 1468.000 107.226 107.226 1469.000 107.217 107.217 1470.000 107.208 107.208 1471.000 107.199 107.199 1472.000 107.190 107.190 1473.000 107.181 107.181 1474.000 107.171 107.171 1475.000 107.162 107.162 1476.000 107.153 107.153 1477.000 107.144 107.144 1478.000 107.134 107.134 1479.000 107.125 107.125 1480.000 107.115 107.115 1481.000 107.105 107.105 1482.000 107.096 107.096 1483.000

  • 107.086 107.086 1484.000 107.076 107.076 1485.000 107.066 107.066 1486.000 107.056 107.056 1487.000 ,107.047 107.047 1488.000 107.036 107.036 1489.000 107.026 107.026 1490.000 107.016 107.016 1491.000 107.006 107.006 1492.000 106.996 106.996 1493.000 106.985 106.985 1494.000 106.975 106.975 1495.000 106.964 106.964 1496.000 106.954 106.954 1497.000 106.943 106.943 1498.000 106.932 106.932 1499.000 106.922 106.922 1500.000 106.911 106.911 1501.000 106.900 106.900 .1502.000 106.889 106.889 1503.000 106.878 106.878 1503.333 106.874 119.654 '-DCMCCIB Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 0.000 119.654 109.122 0.017 109.121 111.267 1.000 111.259 111.551 2.000 111.544 111.544 3.000 111.537 111.537 4.000 111.529 111.529 5.000 111.522 111.522 6.000 111.515 111.515 7.000 111.508 111.508 8.000 111.501 111.501 9.000 111.494 111.494 10.000 111.487 111.487 11.000 111.480 111.480 12.000 111.473 111.473 13.000 111.466 111.466 14.000 111.459 111.459 15.000 111.452 111.452 16.000 111.443 111.443 17.000 111.434 111.434 18.000 111.426 111.426 19.000 111.417 111.417 20.000 111.408 111.408 21.000 111.398 111.398 22:000 111.389 111.389 23.000 111.380 111.380 24.000 111.370 111.370 25.000 111.360 111.360 26.000 111.350 111.350 27.000 111.341 111.341 28.000 111.330 111.330 29.000 111.320 111.320 30.000 111.310 111.310 31.000 111.299 111.299

  • 32.000 111.289 111.289 33.000 111.278 111.278 34.000 111.267 111.267 35.000 111.256 111.256 36.000 111.245 111.245 37.000 111.233 111.233 38.000 111.222 111.222 39.000 111.210 111.210 40.000 111.198 111.198 41.000 111.186 111.186 42.000 111.174 111.174 43.000 111.161 111.161 44.000 111.149 111.149 45.000 111.131 111.131 46.000 111.106 111.106 47.000 111.081 111.081 48.000 111.056 111.056 49.000 111.031 111.031 50.000 111.005 111.005 51.000 110.979 110.979

'52.000 110.953 110.953 53.000 110.927 110.927 54.000 110.900 110.900 55.000 110.874 t"I0.874 56.000 110.848 110.848 57.000 110.822 110.822 58.000 110.796 110.796 59.000 110.770 110.770 60.000 110.744 114.335 61.000 114.330 114.330 62.000 114.326 114.326 63.000 114.321 114.321 64.000 114.316 114.316 65.000 114.311 114.311 66.000 114.306 114.306 67.000 114.301 114.301 68.000 114.296 114.296 69.000 114.291, 114.291 70.000 114.283 114.283 71.000 114.274 114.274 72.000 114.264 114.264 73.000 114.254 114.254 74.000 114.244 114.244 75.000 114.234 114.234 76.000 114.224 114.224 77.000 114.214 114.214 78.000 114.204 114.204 79.000 114.195 114.195 80.000 114.185 114.185 81.000 114.175 114.175 82.000 114.166 114.166 83.000 114.156 114.156 84.000 114.146 114.146 85,000 114.137 114.137 86.000 114.127 114.127 87.000 114.117 114.117 88.000 114.108 114.108 89.000 114.098 114.098 90.000 114.089 114.089 Attachment 1 Page 44 of 58 EC 626319 Project: Location:

Contract:.

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KCI 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCClB 12 11-17-2018 KCICONSULT

Base Normal Voltage (V) Voltage(V)

Voltage (V) Voltage (V)

Time V-V+ Time V-V+ Time V-V+ Time V-V+ 91.000 114.079 114.079 92.000 114.070 114.070 93.000 114.060 114.060 94.000 114.051 114.051 95.000 114.Q41 114.041 96.000 114.032 114.032 97.000* 114.023 114.023 98.000 114.013 114.013 99.000 114.004 114.004 100.000 113.995 113.995 101.000 113.986 113.986 102.000 113.976 113.976 103.000 113.967 113.967* 104.000 113.958 113.958 105.000 113.949 113.949 106.000 113.940 113.940 107.000 113.930 113.930 108.000 113.921 113.921 109.000 113.912 113.912 110.000 113.903 113.903 111.000 113.894

  • 113.894 112.000 113.885 113.885 113.000° 113.876 113.876 114.000 113.870 113.870 115.000 113.868 113.868 116.000 113.866 113.866 117.000 113.865 113.865 118.000 113.863 113.863 119.000 113.861 113.861 120.000 113.860 113.860 121.000 113.858 113.858 122.000 113.857 113.857 123.000 113.855 113.855 124.000 113.853 113.853 125.000 113.852 113.852 126.000 113.850 113.850 127.000 113.848 113.848 128.000 113.847 113.847 129.000 113.845 113.845 130.000 113.843 113.843 131.000 113.842 113.842
  • 132.000 113.840 113.840 133.000 113.838 113.838 134.000 113.837 113.837 135.000 113.835 113.835 136.000 113.833 113.833 137.000 113.832 113.832 138.000 113.830 113.830 139.000 113.828 113.828 140.000 113.827 113.827 141.000 113.825 113.825 142.000 113.823 113.823 143.000 113.822 113.822 144.000 113.820 113.820 145.000 113.818 113.818 146.000 113.817 113.817 147.000 113.815 113.815 148.000 113.813 113.813 149.000 113.811 113.811 150.000 113.810 113.810 151.000 113.808 113.808 152.000 113.806 113.806 153.000 113.805 113.805 154.000 113.803 113.803 155.000 113.801 113.801 156.000 113.799 113.799 157.000 113.798 113.798 158.000 113.796 113.796 159.000 113.794 113.794 160.000 113.793 113.793 161.000 113.791 113.791 162.000 113.789 113.789 163.000 113.787 113.787 164.000 113.786 113.786 165.000 113.784 113.784 166.000 113.782

'113.782 167.000 113.780 113.780 168.000 113.779 113.779 169.000 113.777 113.777 170.000 113.775 113.775 171.000 113.773 113.773 172.000 113.771 113.771 173.000 113.770 113.770 174.000 113.768 113.768 175.000 113.766 113.766 176.000 113.764 113.764 177.000 113.763 113.763 178.000 113.761 113.761 179.000 113.759 113,759 180.000 113.757 113.757 181.000 113.755 113.755 182.000 113.754 113.754 183.000 113.754 113.754 184.000

  • 113.753 113.753 185.000 113.753 113.753 186.000 113.753 113.753 187.000 113.752 113.752 188.000 113.752 113.752 189.000 113.751 113.751 190.000 113.751 113.751 191.000 113.750 113.750 192.000 113.750 113.750 193.000 113.750 113.750 . 194.000 113.749 113.749 195.000 113.749 113.749 196.000 113.748 113.748 197.000 113.748 113.748 198.000 113.747 113.747 199.000 113.747 113.747 200.000 113.747 113.747 201.000 113.746 113.746 202.000 113.746 113.746 203.000 113.745 113.745 204.000 113.745 113.745 205.000 113.744 113.744 206.000 113.744 113.744 207.000 113.743 113.743 208.000 113.743 113.743 209.000 113.742 113.742 210.000 113.742 113.742 211.000 113.742 113.742 212.000 113.741 113.741 213.000 113.741 113.741 214.000 113.740 113.740 215.000 113.740 113.740 216.000 113.739 113.739 217.000 113.739 113.739 218.000 113.738 113.738 219.000 113.738 113.738 220.000 113.737 113.737 221.000 113.737 113.737 222.000 113.736 113.736 223.000 113.736 113.736 224.000 113.735 113.735 225.000 113.735 113.735 226.000 113.735 " 113.735 227.000 113.734 113.734 228.000 113.734 113.734 229.000 113.733 113.733 230.000 113.733 113.733 231.000 113.732 113.732 *232.000 113.732 113.732 233.000 113.731 113.731 234.000 113.731 113.731 235.000 113.730 113.730 236.000 113.730 113.730 237.000 113.729 113.729 238.000 113.729 113.729 Attachment 1 Page 45 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ET AP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCCIB 13 11-17-2018 KCICONSULT Base Normal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-Vt Time V-V+ 239.000 113.728 113.728 240.000 113.728 113.728 241.000 113.727 113.727 242.000 113.727 113.727 243.000 113.726 113.726 244.000 113.725 113.725 245.000 113.725 113.725 246.000 113.724 113.724 247.000 113.723 113.723 248.000 113.722 113.722 249.000 113.721 113.721 250.000 113.721 113.721 251.000 113.720 113.720 252.000 113.719 113.719 253.000 113.718 113.718 254.000 113.717 113.717 255.000 113.717 113.717 256.000 113.716 113.716 257.000 113.715 113.715 258.000 113.714 113.714 259.000 113.713 113.713 260.000 113.713 113.713 261.000 113.712 113.712 262.000 113.711 113.711 263.000 113.710 113.710 264.000 113.709 113.709 265.000 113.709 113.709 266.000 113.708 113.708 267.000 113.707 113.707 268.000 113.706 113.706 269.000 113.705 113.705 270.000 113.705 113.705 271.000 113.704 113.704 272.000 113.703 113.703 273.000 113.702 113.702 274.000 113.701 113.701 275.000 113.700 113.700 276.000 113.700 113.700 277.000 113.699 113.699 278.000 113.698 113.698 279.000 113.697 113.697 280.000 113.696 113.696 281.000 113.695 113.695 282.000 113.695 113.695 283.000 113.694 113.694 284.000 113.693 113.693 285.000 113.692 113.692 286.000 113.691 113.691 287.000 113.690 113.690 288.000 113.690 113.690 289.000 113.689 113.689 290.000 113.688 113.688 291.000 113.687 113.687 292.000 113.686 113.686 293.000 113.685 113.685 294.000 113.684 113.684 295.000 113.684 113.684 296.000 113.683 113.683 297.000 113.682 113.682 298.000 113.681 113.681 299.000 113.680 113.680 300.000 113.679 113.679 301.000 113.678 113.678 302.000 113.678 113.678 303.000 113.677 113.677 304.000 113.676 113.676 305.000 113.675 113l75 306.000 113.674 113.674 307.000 113.673 113.673 308.000 113.672 113.672 309.000 113.671 113.671 310.000* 113.670 113.670 311.000 113.670 113.670 *312.000 113.669 113.669 313.000 113.668 113.668 314.000 113.667 113.667 315.000 113.666 113.666 316.000 113.665 113.665 317.000 113.664 113.664 318.000 113.663 113.663 319.000 113.662 113.662 320.000 113.662 113.662 321.000 113.661 113.661 322.000 113.660 113.660 323.000 113.659 113.659 324.000 113.658 113.658 325.000 113.657 113.657 326.000 113.656 113.656 327.000 113.655 113.655 328.000 113.654 113.654 329.000 113.653 113.653 330.000 113.652 113.652 331.000 113.652 113.652 332.000 113.651 113.651 333.000 113.650 113.650 334.000 113.649 113.649 335.000 113.648 113.648 336.000 113.647 113.647 337.000 113.646 113.646 338.000 113.645 113.645 339.000 113.644 113.644 340.000 113.643 113.643 341.000 113.642 113.642 342.000 113.641 113.641 343.000 113.640 113.640 344.000 113.639 113.639 345.000 113.638 113.638 346.000 113.637 113.637 347.000 113.636 113.636 348.000 113.636 113.636 349.000 113.635 113.635 350.000 113.634 113.634 351.000 113.633 113.633 352.000 113.632 113.632 353.000 113.631 113.631 354.000 113.630 113.630 355.000 113.629 113.629 356.000 113.628 113.628 357.000 113.627 113.627 358.000 113.626 113.626 359.000 113.625 113.625 360.000 113.624 113.624 361.000 113.623 113.623 362.000 113.622 113.622 363.000 113.621 113.621 364.000 113.620 113.620 365.000 113.619 113.619 366.000 113.618 113.618 367.000 113.617 113.617 368.000 113.616 113.616 369.000 113.615 113.615 370.000 113.614 113.614 371.000 113.613 113.613 372.000 113.612 113.612 373.000 113.611 113.611 374.000 113.610 113.610 375.000 113.609 113.609 376.000 113.608 113.608 377.000 113.604 113.604 378.000 113.600 113.600 379.000 113.596 113.596 380.000 113.593 113.593 381.000 113.589 113.589 382.000 113.585 113.585 383.000 113.581 113.581 384.000 113.577 113.577 385.000 113.574 113.574 386.000 113.570 113.570 Attachment 1 Page 46 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery I B 48-Hour Coping Study DCMCC 1B 14 11-17-2018 KCICONSULT Base Nonna! Voltage (V) ".oltage (V) Voltage (V) Voltage (V) Time V-V+ Time y. V+ Time V-V+ Time V-V+ 387.000 113.566 113.566 388.000 113.562 113.562 389.000 113.559 113.559 390.000 113.555 113.555 391.000 113.551 113.551 392.000 113.547 113.547 393.000 113.543 113.543 394.000 113.540 113.540 395.000 113.536 *113.536 396.000 113.532 113.532 397.000 113.528 113.528 398.000 113.524 113.524 399.000 113.521 113.521 400.000 113.517 113.517 401.000 113.513 113.513 402.000 113.509 113.509 403.000 113.505 113.505 404.000 113.501 113.501 405.000 113.498 113.498 406.000 113.494 113.494 407.000 113.490 113.490 408.000 113.486 113.486 409.000 113.482 113.482 410.000 113.479 113.479 411.000 113.475 113.475 412.000 113.471 113.471 413.000 113.467 113.467 414.000 113.463 113.463 415.000 113.459 113.459 416.000 113.457 113.457 417.000 113.454 113.454 418.000 113.452 113.452 419.000 113.450 113.450 420.000 113.447 113.447 421.000 113.445 113.445 422.000 113.442 113.442 423.000 113.440 113.440 424.000 113.437 113.437 425.000 113.434 113.434 426.000 113.432 113.432 427.000 113.429 113.429 428.000 113.427 113.427 429.000 113.424 113.424 430.000 113.421 113.421 431.000 113.419 113.419 432.000 113.416 113.416 433.000 113.413 113.413 434.000 113.411 113.411 435.000 113.408 113.408 436.000 113.405 113.405 437.000 113.402 113.402 438.000 113.400 113.400 439.000 113.397 113.397 440.000 113.394 113.394 441.000 113.391 113.391 442.000 113.388 113.388 443.000 113.385 113.385 444.000 113.382 113.382 445.000 113.379 113.379 446.000 113.376 113.376 447.000 113.373 113.373 448.000 113.370 113.370 449.000 113.367 113.367 450.000 113.364 113.364 451.000 113.361 113.361 452.000 113.358 113.358 453.000 113.355 113.355 454.000 113.352 113.352 455.000 113.348 113.348 456.000 113.345 113.345 457.000 113.342 113.342 458.000 113.339 113.339 459.000 113.335 113.335 460.000 113.332 113.332 461.000 113.329 113.329 462.000 113.325 113.325 463.000 113.322 113.322 464.000 113.318 113.318 465.000 113.315 113.315 466.000 113.311 113.311 467.000 113.308 113.308 468.000 113.304 113.304 469.000 113.301 113.301 470.000 113.297 113.297 471.000 113.293 113.293 472.000 113.290 113.290 473.000 113.286 113.286 474.000 113.283 113.283 475.000 113.280 113.280 476.000 113.276 113.276 477.000 113.272 113.272 478.000 113.268 113.268 479.000 113.264 113.264 480.000 113.259 113.259 481.000 113.255 113.255 482.000 113.251 113.251 483.000 113.247 113.247 484.000 113.242 113.242 485.000 113.238 113.238 486.000 113.234 113.234 487.000 113.230 113.230 488.000 113.225 113.225 489.000 113.221 113.221 490.000 113.217 113.217 491.000 113.213 113.213 492.000 113.208 113.208 493.000 113.204 113.204 494.000 113.200 113.200 495.000 113.196 113.196 496.000 113.191 113.191 497.000 113.187 113.187 498.000 113.183 113.183 499.000 113.178 113.178 500.000 113.174 113.174 501.000 113.170 113.170 502.000 113.166 113.166 503.000 113.161 113.161 504.000 113.157 113.157 505.000 113.153 113.153 506.000 113.148 113.148 507.000 113.144 113.144 508.000 113.140 113.140 509.000 113.136 113.136 510.000 113.131 113.131 511.000 113.127 113.127 512.000 113.123 113.123 513.000 113.118 113.118 514.000 113.114 113.114 515.000 113.110 113.110 516.000 113.105 113.105 517.000 113.101 113.101 518.000 113.097 113.097 519.000 113.093 113.093 520.000 113.088 113.088 521.000 113.084 113.084 522.000 113.080 113.080 523.000 113.075 113.075 524.000 113.071 113.071 525.000 113.067 113.067 526.000 113.062 113.062 527.000 113.058 113.058 528.000 113.054 113.054 529.000 113.049 113.049 530.000 113.045 113.045 531.000 113.041 113.041 532:000 113.036 113.036 533.000 113.032 113.032 534.000 113.028 113.028 Attachment 1 Page 47 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for. CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.l.ON Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCCIB 15 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) T\me V-V+ Time V-V+ Time., v-V+ Time V-V+ 535.000 113.023 113.023 536.000 113.019 113.019 537.000 113.015 113.015 538.000 113.010 113.010 539.000 113.007 113.007 540.000 _113.004 113.004 541.000 113.002 113.002 542.000 113.000 113.000 543.000 112.998 112.998 544.000 112.995 112.995 545.000 112.993 112.993 546.000 112.991 112.991 547.000 112.988 112.988 548.000 112.986 112.986 549.000 112.984 112.984 550.000 112.981 112.981 551.000 112.979 112.979 552.000 112.977 112.977 553.000 112.974 112.974 554.000 112.972 112.972 555.000 112.970 112.970 556.000 112.967 112.967 557.000 112.965 112.965 558.000 112.963 112.963 559.000 112.960 112.960 560.000 112.958 112.958 561.000 112.956 112.956 562.000 112.953 112.953 563.000 112.951 112.951 564.000 112.949 112.949 565.000 112.946 112.946 566.000 112.944 112.944 567.000 112.941 112.941 568.000 112.939 112.939 569.000 112.937 112.937 570.000 112.934 )12.934 571.000 112.932 112.932 572.000 112.929 112.929 573.000 112.927 112.927 574.000 112.924 112.924 575.000 112.922 112.922 576.000 112.920 112.920 577.000 112.917 112.917 578.000 112.915 112.915 579.000 112.912 112.912 580.000 112.910. 112.910 581.000 112.908 112.908 582.000 112.905 112.905 583.000 112.903 112.903 584.000 112.900 112.900 585.000 112.898 112.898 586.000 112.895 112.895 587.000 112.893 112.893 588.000 112.890 112.890 589.000 112.888 112.888 590.000 112.885 112.885 591.000 112.883 112.883 592.000 112.880 112.880 593.000 112.878 112.878 594.000 112.876 112.876 595.000 112.873 112.873 596.000 112.871 112.871 597.000 112.868 112.868 598.000 112.866 112.866 599.000 112.863 .112.863 600.000 112.861 112.861 601.000 112.858 112.858 602.000 112.856 112.856 603.000 112.853 112.853 604.000 112.850 112.850 605.000 112.848 112.848 606.000 112.845 112.845 607.000 112.843 112.843 608.000 112.840 112.840 609.000 112.838 112.838 610.000 112.835 112.835 611.000 112.833 112.833 612.000 112.831 112.831 613.000 112.829 112.829 614.000 112.827 112.827 615.000 112.826 112.826 616.000 112.824 112.824 617.000 112.822 112.822 618.000 112.820 112.820 619.000 112.818 112.818 620.000 112.816 112.816 621.000 112.815 112.815 622.000 112.813 112.813 623.000 112.811 112.811 624.000 112.809 112.809 625.000 112.807 112.807 626.000 112.805 112.805 627.000 112.804 112.804 628.000 112.802 112.802 629.000 112.800 112.800 630.000 112.798 112.798 631.000 112.796 112.796 632.000 112.794 112.794 633.000 112.792 112.792 634.000 112.791 112.791 635.000 112.789 112.789 636.000 112.787 I 112.787 637.000 112.785 112.785 638.000 112.783 112.783 639.000 112.781 112.781 640.000 112.779 112.779 641.000 112.777 112.777 642.000 112.775 112.775 643.000 112.773 112.773 644.000 112.772 112.772 645.000 112.770 112.770 646.000 112.768 112.768 647.000 112.766 112.766 648.000 112.764 112.764 649.000 112.762 112.762 650.000 112.760 112.760 651.000 112.758 112.758 652.000 112.756 112.756 653.000 112.754 112.754 654.000 112.752 112.752 655.000 112.750 112.750 656.000 112.748 . 112.748 657.000 112.746 112.746 658.000 112.744 112.744 659.000 112.742 112.742 660.000 112.740 112.740 661.000 112.738 112.738 662.000 112.736 112.736 663.000 112.734 112.734 664.000 112.732 112.732 665.000 112.730 112.730 666.000 112.728 112.728 667.000 112.726 112.726 668'000 112.724 112.724 669.000 112.722 112.722 670.000 112.720 112.720 671.000 112.718 112.718 672.000 112.716 112.716 673.000 112.714 112.714 674.000 112.712 112.712 675.000 112.710 112.710 676.000 112.708 112.708 677.000 112.706 112.706 678.000 112.704 112.704 679.000 112.702 112.702 680.000 112.699 112.699 681.000 112.697 112.697 682.000 112.695 112.695 Attachment 1 Page 48 of 58 EC 626319 Project: Locatipn:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS_SB(? Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCCIB 16 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 683.000 112.693 112.693 684.000 112.691 112.691 685.000 112.688 112.688 686.000 112.685 112.685 687.000 112.682 112.682 688.000 112.680 112.680 689.000 112.677 112.677 690.000 112.674 112.674 691.000 112.671 112.671 692.000 112.668 112.668 693.000 112.666 112.666 694.000 112.663 112.663 695.000 112.660 112.660 696.000 112.657 112.657 697.000 112.654 112.654 698.000 112.651 112.651 699.000 112.649 112.649 700.000 112.646 112.646 701.000 112.643 112.643 702.000 112.640 112.640 703.000 112.637 112.637 704.000 112.634 112.634 705.000 112.632 112.632 706.000 112.629 112.629 707.000 112.626 112.626 708.000 112.623 112.623 709.000 112.620 112.620 710.000 112.617. 112.617 711.000 112.614 112.614 712.000 112.611 112.611 713.000 112.608 112.608 714.000 112.605 112.605 715.000 112.603 112.603 716.000 112.600 112.600 717.000 112.597 112.597 718.000 112.594 112.594 719.000 112.591 112.591 720.000 112.588 112.588 721.000 112.585 112.585 722.000 112.582 112.582 723.000 112.579 112.579 724.000 112.576 112.576 725.000 112.573 112.573 726.000 112.570 112.570 727.000 112.567 112.567

  • 728.000 112.564 112.564 729.000 112.561 112.561 730.000 112.558 112.558 731.000 112.555 112.555 732.000 112.552 112.552 733.000 112.549 112.549 734.000 112.546 112.546 735.000 112.543 112.543 736.000 112.540 112.540 737.000 112.537 112.537 738.000 112.534 112.534 739.000 112.531 112.531 740.000 112.528 112.528 741.000 112.525 112.525 742.000 112.522 112.522 743.000 112.519 112.519 744.000 112.515 112.515 745.000 112.512 112.512 746.000 112.509 112.509 747.000 112.506 112.506 748.000 112.503 112.503 749.000 112.500 112.500 750.000 112.497 112.497 751.000 112.494 112.494 752.000 112.491 112.491 753.000 112.487 112.487 754.000 112.484 112.484 755.000 112.481 112.481 756.000 112.478 112.478 757.000 112.475 112.475 758.000 112.472 112.472 759.000 112.469 112.469 760.000 112.465 112.465 761.000 112.462 112.462 762.000 112.459 112.459 763.000 112.456 112.456 764.000 112.453 112.453 765.000 112.450 112.450 766.000 112.447 112.447 767.000 112.444 112.444 768.000 112.442 i12.442 769.000 112.439 112.439 770.000 112.437 112.437 771.000 112.434 112.434 772.000 112.431 112.431 773.000 112.429 112.429 774.000 112.426 112.426 775.000 112.424 112.424 776.000 112.421 112.421 777.000 112.418 112.418 778.000 112.416 112.416 779.000 112.413 112.413 780.000 112.410 112.410 781.000 112.408 112.408 782.000 112.405 112.405 783.000 112.402 112.402 784.000 112.400 112.400 785.000 112.397 112.397 786.000 112.394 112.394 787.000 112.392 112.392 788.000 112.389 112.389 789.000 112.386 112.386 790.000 112.383 112.383 791.000 112.380 112.380 792.000 112.377 112.377 793.000 112.374 112.374 794.000 112.371 . 112.371 795.000 112.368 112.368 796.000 112.365 112.365 797.000 112.362 112.362 798.000 112.358 112.358 799.000 112.355 112.3~5 800.000 112.352 112.352 801.000 112.349 112.349 802.000 112.346 112.346 803.000 112.343 112.343 804.000 112.340 112.340 805.000 112.336 112.336 806.000 112.333 112.333 807.000 112.330 112.330 808.000 112.327 112.327 809.000 112.324 112.324 810.000 112.320 112.320 811.000 112.317 112.317 812.000 112.314 112.314 813.000 112.311 112.311 814.000 112.307 112.307 815.000 112.304 112.304 8i6.ooo 112.301 112.301 817.000 112.297 112.297 818.000 112.294 112.294 819.000 112.291 112.291 820.000 112.287 112.287 821.000 112.284 112.284 822.000 112.281 112.281 823.000 112.277 112.277 824.000 112.274 112.274 825.000 112.270 112.270 826.000 112.267 112.267 827.000 112.263 112.263 828.000 112.260 112.260 829.000 112.257 112.257 830.000 112.253 112.253 Attachment 1 Page 49 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCClB 17 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage(V)

Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 831.000 112.250 112.250 832.000 112.246 112.246 833.000 112.242 112.242 834.000 112.239 112.239 835.000 112.235 112.235 836.000 112.232 112.232 837.000 112.228 112.228 838.000 112.225 112.225 839.000 112.222 112.222 840.000 112.218 112.218 841.000 112.215 112.215 842.000 112.212 112.212 843.000 112.208 112.208 844.000 112.205 112.205 845.000 112.202 112.202 846.000 112.198 112.198 847.000 112.195 112.195 848.000 112.191 112.191 849.000 112.188 112.188 850.000 112.185 112.185 851.000 112.181 112.181 852.000 112.178 112.178 853.000 112.174 112.174 854.000 112.171 112.171 855.000 112.167 112.167 856.000 112.164 112.164 857.000 112.160 112.160 858.000 112.156 112.156 859.000 112.153 112.153 860.000 112.149 112.149 861.000 112.146 112.146 862.000 112.142 112.142 863.000 112.138 112.138 864.000 112.135 112.135 865.000 112.131 112.131 866.000 112.127 112.127 867.000 112.124 112.124 868.000 112.120 112.120 869.000 112.116 112.116 870.000 112.112 112.112 871.000 112.109 112.109 872.000 112.105 112.105 873.000 112.101 112.101 874.000 112.097 112.097 875.000 112.093 112.093 876.000 112.090 112.090 877.000 112.086 112.086 878.000 112.082 112.082 879.000 112.078 112.078 880.000 112.074 112.074 881.000 112.070 112.070 882.000 112.066 112.066 883.000 112.062 112.062 884.000 112.058 112.058 885.000 112.054 112.054 886.000 112.050 112.050 887.000 112.046 112.046 888.000 112.042 112.042 889.000 112.038 112.038 890.000 112.034 112.034 891.000 112.030 112.030 892.000 112.025 112.025 893.000 112.021 112:021 894.000 112.017 112.017 895.000 112.013 112.013 896.000 112.009 112.009 897.000 112.004 112.004 898.000 112.000 112.000 899.000 111.996 111.996 900.000 111.992 111.992 901.000 . 111.987 111.987 902.000 111.983 111.983 903.000 111.979 111.979 904.000 111.974 111.974 905.000 111.970 111.970 906.000 111.965 111.965 907.000 111.961 111.961 908.000 111.956 111.956 909.000 111.952 111.952 910.000 111.947 111.947 911.000 111.943 111.943 912.000 111.938 111.9~8 913.000 111.934 111.934 914.000 111.929 111.929 915.000 111.925 111.925 916.000 111.920 111.920 917.000 111.915 111.915 918.000 111.911 111.911 919.000 111.906 111.906 920.000 111.901 111.901 921.000 111.896 111.896 922.000 111.892 111.892 923.000 111.887 111.887 924.000 111.882 111.882 925.000 111.877 111.877 926.000 111.872 111.872 927.000 111.867 111.867 928.000 111.862 111.862 929.000 111.855 111.855 930.000 111.849 111.849 I 931.000 111.843 111.843 932.000 111.836 111.836 933.000 111.830 111.830 934.000 111.823 111.823 l ( 935.000 111.816 ,111.816 936.000 111.810 111.810 937.000 111.803 111.803 938.000 111.796 111.796 939.000 111.789 111.789 940.000 lil.783 111.783 941.000 111.776 111.776' 942.000 111.769 111.769 943.000 111.762 111.762 944.000 111.755 111.755 945.000 111.747 111.747 946.000 111.740 111.740 947.000 111.733 111.733 948.000 111.726 111.726 949.000 111.718 111.718 950.000 111.711 111.711 951.000 111.703 111.703 952.000 111.696 111.696 953.000 111.688 111.688 954.000 111.681 111.681 955.000 111.673 111.673 956.000 111.665 111.665 957.000 111.657 111.657 958.000 111.649 111.649 959.000 111.641 111.641 960.000 111.633 111.633 961.000 111.625 111.625 962.000 111.617 111.617 963.000 111.609 111.609 964.000 111.600 111.600 965.000 111.592 111.592 966.000 111.583 111.583 967.000 II 1.575

  • 111.575 968.000 111.566 111.566 969.000 111.557 111.557 970.000 111.549 111.549 971.000 111.540 111.540 972.000 111.531 111.531 973.000 111.522 111.522 974.000 111.513 111.513 975.000 111.504 111.504 976.000 111.494 111.494 977.000
  • 111.485 111.485 978.000 111.475 111.475 Attachment 1 Page 50 of 58
  • EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs ' Project: Clinton Flex Study ETAP Page: 18 Location:

KC! 14.1.0N Date: 11-17-2018 Contract:

SN: KCICONSULT Engineer:

Badar Hussain Revision:

Base sn,dy Case: BSIB-48 Filename:

CPS SBO Study Config.: Normal DIV 2 Batteiy 1B 48-Hour Coping Study DCMCClB Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 979.000 111.466 111.466 980.000 lll.456 111.456 981.000 111.447 111.447 982.000 111.437 111.437 2,83.000 111.427 111.427 984.000 111.417 111.417 985.000 111.407 111.407 986.000 111.397 111.397 987.000 111.387 111.387 988.000 111.376 111.376 989.000 111.366 111.366 990.000 111.355 111.355 991.000 111.346 111.346 992.000 111.340 111.340 993.000 111.334 111.334 994.000 111.328 111.328 995.000 111.321 111.321 996.000 111.315 111.315 997.000 111.309 111.309 998.000 111.303 111.303 999.000 111.297 111.297 1000.000 111.291 111.291 1001.000 111.284 111.284 1002.000 111.278 111.278 1003.000 lll.272 111.272 1004.000 111.265 111.265 1005.000 111.259 111.259 1006.000 111.253 111.253 1007.000 111.246 111.246 1008.000 lll.240 111.240 1009.000 111.233 111.233 1010.000 111.227 111.227 1011.000 lll.220 111.220 1012.000 111.214 111.214 1013.000 111.207 111.207 1014.000 111.201 111.201 1015.000 lll.194 lll.194 1016.000 lll.187 11!.187 1017.000 11 l.181 11!.181 1018.000 lll.174 111.174 1019.000 lll,167 111.167 1020.000 111.161 111.161 1021.000 lll.154 111.154 1022.000 111.147 111.147 1023.000 111.140 111.140 1024.000 lll.133 111.133 1025.000 111.126 lll.126 1026.000 111.119 111.119 1027.000 lll.112 11 l.112 1028.000 lll.105 lll.105 1029.000 111.098 111.098 1030.000 111.091 111.091 1031.000 111.084 111.084 1032.000 111.077 111.077 1033.000 111.070 111.070 1034.000 111.063 111.063 \ 1035.000 111.056 111.056 1036.000

  • 111.048 111.048 1037.000-111.041 111.041 1038.000 111.034 111.034 1039.000 111.027 111.027 1040.000 111.019 111.019 1041.000 111.012 111.012 1042.000 111.004 111.004 1043.000 110.997 110.997 1044.000 110.989 110.989 1045.000 110.982 110.982 1046.000 110.974 110.974 1047.000 110.967 110.967 1048.000 110.959 110.959 1049.000 110.951 110.951 1050.000 110.944 110.944 1051.000 110.936 110.936 1052.000 110.928 110.928 1053.000 110.920 110.920 1054.000 110.912 110.912 1055.000 110.905 110.905 1056.000 110.897 110.897 1057.000 110.889 110.889 1058.000 110.881 110.881 1059.000 110.873 110.873 1060.000 110.865 110.865 1061.000 110.857 110.857 1062.000 110.848 110.848 1063.000 110.840 110.840 1064.000 110.830 110.830 1065.000 110.819 110.819 1066.000 110.808 110.808 \ 1067.000 110.797 110.797 1068.000 110.786 1 110.786 1069.000 110.774 110.774 1070.000 110.763 110.763 1071.000 110.752 110.752 1072.000 110.740 110.740 1073.000 110.729 110.729 1074.000 110.717 110.717 1075.000 110.705 110.705 1076.000 110.694 110.694 1077.000 110.682 110.682 1078.000 110.670 110.670 1079.000 110.658 110.658 1080.000 110.645 110.645 1081.000 110.633 110.633 1082.000 110.621 110.621 1083.000 110.608 110.608 1084.000 110.596 110.596 1085.000 110.583 110.583 1086.000 110.571 110.571 1087.000 110.558 110.558 1088.000 110.545 110.545 1089.000 110.532 110.532 1090.000 110.519 110.519 1091.000 110.505 110.505 1092.000 110.492 110.492 1093.000 110.479 110.479 1094.000 110.465 110.465 1095.000 110.451 110.451 1096.000 110.438 110.438 1097.000 110.424 110.424 1098.000 110.410 110.410 1099.000 110.396 110.396 1100.000 110.382 110.382 1101.000 110.367 110.367 1102.000 110.353 110.353 1103.000 110.338 110.338 1104.000 110.325 110.325 1105.000 110.319 110.319 1106.000 110.313 110.313 1107.000 110.307 110.307 1108.000 110.301 110.301 1109.000 110.295 110.295 1110.000 110.289 110.289 lll 1.000 110.283 110.283 1112.000 110.276 110.276 1113.000 110.270 110.270 1114.000 110.264 110.264 l115.000 110.258 110.258 1116.000 110.252 110.252 1117.000 110.246 110.246 1118.000 110.239 110.239 l119.000 110.233 110.233 1120.000 110.227 110.227 1121.000 110.221 110.221 1122.000 110.214 110.214 1123.000 110.208 110.208 1124.000 110.202 110.202 1125.000 110.196 110.196 1126.000 110.189 110.189 0 Attachment 1 Page 51 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCC lB 19 11-17-2018 KCICONSULT Base Nonna! Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1127.000 110.183 110.183 1128.000 110.177 110.177 1129.000 110.170 110.170 1130.000 110.164 110.164 1131.000 110.158 110.158 1132.000 110.151 110.151 1133 .. 000 110.145 110.145 1134.000 110.138 110.138 1135.000 110.132 110.132 1136.000 110.126 110.126 1137.000 110.119 110.119 1138.000 110.113-110.113 1139.000 110.106 110.106 1140.000 110.099 110.099 1141.000 110.096 110.096 1142.000 *110.093 110.093 1143.000 110.091 110.091 1144.000 110.088 110.088 1145.000 110.085 110.085 1146.000 110.082 110.082 1147.000 110.079 110.079 1148.000 110.076 110.076 1149.000 110.073 110.073 1150.000 110.070 110.070 1151.000 110.067 110.067 1152.000 110.064 110.064 1153.000 110.061 110.061 1154.000

  • 110.058 110.058 1155.000 110.055 110.055 1156.000 110.052 110.052 1157.000 110.048 110.048 1158.000 110.045 110.045 1159.000 110.042 110.042 1160.000 110.039 110.039 1161.000 110.036 110.036 1162.000 110.033 110.033 1163.000 110.029 110.029 1164.000 110.026 110.026 1165.000 110.023 110.023 1166.000 110.019 110.019 1167.000 110.016 110.016 1168.000 110.013 110.013 1169.000 110.010 110.010 1170.000 110.006 110.006 1171.000 110.003 110.003 1172.000 109.999 109.999 1173.000 109.996 109.996 1174.000 109.992 109.992 1175.000 109.989 109.989 1176.000 109.986 109.986 1177.000 109.982 109.982 1178.000 109.978 109.978 1179.000 109.975 109.975 1180.000 109.971 109.971 1181.000 109.968 109.968 1182.000 109.964 109.964 1183.000 109.960 109.960 1184.000 109.957 109.957 1185.000 109.953 109.953 1186.000 109.949 109.949 1187.000 109.946 109.946 1188.000 109.942 109.942 1189.000 109.938 109.938 1190.000 109.934 109.934 1191.000 109.931 109.931 1192.000 109.927 109.927 1193.000 109.923 109.923 1194.000 109.919 109.919 1195.000 109.915 109.915 1196.000 109.911 109.911 1197.000 109.907 109.907 1198.000 109.903 109.903 1199.000 109.899 109.899 1200.000 109.895 109.895 1201.000 109.891 109.891 1202.000 109.887 109.887 1203.000 109.883 109.883 1204.000 109.878 109.878 1205.000 109.874 109.874 1206.000 109.870 109.870 1207.000 109.866 109.866 1208.000 109.861 109.861 1209.000 109.857 109.857 1210.000 109.853 109.853
  • 1211.000 109.848 109.848 1212.000 109.844 109.844 1213.000 109.840 109.840 1214.000 109.835 109.835 1215.000 109.831 109.831 1216.000 109.826 109.826 1217.000 109.821 109.821 1218.000 109.815 109.815 1219.000 109.810 109.810 1220.000 109.804 109.804 1221.000 109.798 109.798 1222.000 109.791 109.791 1223.000 109.785 109.785 1224.000 109.778 109.778 1225.000 109.771 109.771 1226.000 109.765 109.765 1227.000 109.758 109.758. 1228:0oo 109.751 109.751 1229.000 109.743 109.743 1230.000 109.736 109.736 1231.000 109.729 109.729 1232.000 109.721 109.721 1233.000 109.714 109.714 1234.000 109.706 109.706 1235.000 109.698 109.698 1236.000 109.690 109.690 1237.000 109.682 109.682 1238.000 109.674 109.674 1239.000 109.666 109.666 1240.000 109.657 109.657 1241.000 109.649 109.649 1242.000 109.640 109.640 1243.000 109.631 109.631 1244.000 109.622 109.622 1245.000 109.613 109.613 1246.000 109.603 109.603 1247.000 109.594 109.594 1248.000 109.584 109.584 1249.000 109.575 109.575 1250.000 109.565 109.565 1251.000 109.555 109.555 1252.000 109.544 109.544 1253.000 109.534 109.534 1254.000 109.523 109.523 1255.000 109.512 109.512 1256.000 109.501 109.501 1257.000 109.490 109.490 1258.000 109.479 109.479 1259.000 109.467 109.467 1260.000 109.455 109.455 1261.000 109.443 109.443 1262.000 109.431 109.431 1263.000 109.422 109.422 1264.000 109.414 109.414 1265.000 109.406 109.406 1266.000 109.397 109.397 1267.000 109.389 109.389 1268.000 109.380 109.380 1269.000 109.372 109.372 1270.000 109.363 109.363 1271.000 109.355 109.355 1272.000 109.346 109.346 1273.000 109.337 109.337 1274.000 109.328 109.328 Attachment 1 Page 52 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Config.: DIV 2 Battery 1B 48-Hour Coping Study DCMCC 1B 20 11-17-2018 KCICONSULT Base Nonnal Voltage(V)

Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time V-V+ Time V-V+ 1275.000 109.320 109.320 1276.000 109.311 109.311 1277.000 109.302 109.302 1278.000 109.293 109.293 1279.000 109.284 109.284 1280.000 109.274 109.274 1281.000 109.265 109.265 1282.000 109.256 109.256 1283.000 109.247 109.247 1284.000 109.237 109.237 1285.000 109.228 109.228 1286.000 109.218 109.218 1287.000 109.209 109.209 1288.000 109.199 109.199 1289.000 109.189 109.189 1290.000 109.179 109.179 1291.000 109.169 109.169 1292.000 109.158 109.158 129iooo 109.148 109.148 1294.000 109.137 109.137 1295.000 109.127 109.127 1296.000 109.116 109.116 1297.000 109.105 109.105 1298.000 109.095 109.095 1299.000 109.084 109.084 1300.000 109.073 109.073 1301.000 109.062 109.062 1302.000 109.051 109.051 1303.000 109.040 109.040 1304.000 109.028 109.028 1305.000 109.017 109.017 1306.000 109.006 109.006 1307.000 108.994 108.994 i308.000 108.983 108.983 1309.000 108.971 108.971 1310.000 108.959 108.959 1311.000 108.948 108.948 1312.000 108.936 108.936 1313.000 108.924 108.924 1314.000 108.912 108.912 1315.000 108.900 108.900 1316.000 108.888 108.888 1317.000 108.875 108.875 1318.000 108.863 108.863 1319.000 108.851 108.851 1320.000 108.838 108.838 1321.000 108.826 108.826 1322.000 108.817 108.817 1323.000 108.808 108.808 1324.000 108.799 108.799 1325.000 108.790 108.790 1326.000 108.781 108.781 1327.000 108.771 108.771 1328.000 108.762 108.762 1329.000 108.753 108.753 1330.000 108.744 108.744 1331.000 108.735 108.735 1332.000 108.725 108.725 1333.000 108.716 108.716 1334.000 108.707 108.707 1335.000 108.698 108.698 1336.000 108.688 108.688 1337.000 108.679 108.679 1338.000 108.670 108.670 1339.000 108.660 108.660 1340.000 108.651 108.651 1341.000 108.642 108.642 1342.000 108.632 108.632 1343.000 108.623 108.623 1344.000 108.614 108.614 1345.000 108.604 108.604 1346.000 108.595 108.595 1347.000 108.585 108.585 1348.000 108.576 108.576 1349.000 108.566 108.566 1350.000 108.557 108.557 1351.000 108.547 108.547 1352.000 108.538 108.538 1353.000 108.528 108.528 1354.000 108.519 108.519 1355.000 108.509 108.509 1356.000 108.500 108.500 1357.000 108.490 108.490 1358.000 108.480 108.480 1359.000 108.471 108.471 1360.000 108.461 108.461 1361.000 108.452 108.452 1362.000 108.442 108.442 1363.000 108.432 108.432 1364.000 108.423 108.423 1365.000 108.413 108.413 1366.000 108.403 108.403 1367.000 108:393 108.393 1368.000 108.384 108.384 1369.000

  • 108.374 108.374 1370.000 108.364 108.364 1371.000 108.354 108.354 1372.000 108.345 108.345 1373.000 108.335 108.335 1374.000 108.325 108.325 1375.000 108.315 108.315 1376.000 108.305 108.305 1377.000 108.295 108.295 1378.000 108.285 108.285 1379.000 108.276 108.276 1380.000 108.266 108.266 1381.000 108.256 108.256 1382.000 108.246 108.246 1383.000 108.236 108.236 1384.000 108.226 108.226 1385.000 108.216 108.216 1386.000 108.206 108.206 1387.000 108.196 108.196 1388.000 108.186 108.186 1389.000 108.175 108.175 1390.000 108.163 108.163 1391.000 108.152 108.152 1392.000 108.140 108.140 1393.000 108.128 108.128 1394.000 108.116 108.116 1395.000 108.104 108.104 1396.000 108.092 108.092 1397.000 108.080 108.080 1398.000 108.068 108.068 1399.000 108.056 108.056 1400.000 108.044 108.044 1401.000 108.032 108.032 1402.000 108.020 108.020 1403.000 108.008 108.008 1404.000 107.995 107.995 1405.000 107.983 107.983 1406.000 107.971 107.971 1407.000 107.958 107.958 1408.000 107.946 107.946 1409.000 107.934 107.934 1410.000 107.921 107.921 1411.000 107.909 107.909 1412.000 107.896 107.896 1413.000 107.883 107.883 1414.000 107.871 107.871 1415.000 107.858 107.858 1416.000 107.845 107.845 1417.000 i07.832 107.832 1418.000 107.820 107.820 1419.000 107.807 107.807 1420.000 107.794 107.794 1421.000 107.781 107.781 1422.000 107.768 107.768 Attachment 1 Page 53 of 58 EC 626319 Project: Location:

Contract:

Engineer:

Filename:

10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Clinton Flex Study ETAP Page: KC! 14.1.0N Date: SN: Badar Hussain Revision:

Study Case: BSIB-48 CPS SBO Study Coilfig.:

DIV 2 Battery 1B 48-Hour Coping Study DCMCClB 21 11-17-2018 KCICONSULT Base Normal Voltage (V) Voltage (V) Voltage (V) Voltage (V) Time V-V+ Time V-V+ Time v-V+ Time V-V+ 1423.000 107.755 107.755 1424.000 107.742 107.742 1425.000 107.728* 107.728 1426.000 107.715 107.715 1427.000 107.702 107.702 1428.000 107.689 107.689 1429.000 107.675 107.675 1430.000 107.662 107.662 1431.000 107.649 107.649 1432.000 107.635 107.635 1433.000 107.622 107.622 1434.000 107.608 107.608 1435.000 107.595 107.595 1436.000 107.581 107.581 1437.000 107.567 107.567 1438.000 107.553 107.553 1439.000 107.540 107.540 1440.000 107.526 107.526 1441.000 107.512 .107.512 1442.000 107.498 107.498 1443.000 107.484 107.484 1444.000 107.470 107.470 1445.000 107.456 107.456 1446.000 107.442 107.442 1447.000 107.428 107.428 1448.000 107.413 107.413 1449.000 107.399 107.399 1450.000 107.385 107.385 1451.000 107.370 107.370 1452.000 107.356 107.356 1453.000 107.341 107.341 1454.000 107.327 107.327 1455.000 107.312 107.312 1456.000 107.298 107.298 1457.000 107.283 107.283 1458.000 107.268 107.268 1459.000 107.253 107.253 1460.000 107.238 107.238 1461.000 107.223 107.223 1462.000 107.209 107.209 1463.000 107.193 107.193 1464.000 107.177 107.177 1465.000 107.161 107.161 1466.000 107.145 107.145 1467.000 107.133 107.133 1468.000 107.125 107.125 1469.000 107.116 107.116 1470.000 107.107 107.107 1471.000 107.098 107.098 1472.000 107.088 107.088 1473.000 107.079 107.079 1474.000 107.070 107.070 1475.000 107.061 107.061 1476.000 107.052 107.052 1477.000 107.042 107.042 1478.000 107.033 107.033 1479.000 107.023 107.023 1480.000 107.014 107.014 1481.000 107.004 107.004 1482.000 106.994 106.994 1483.000 106.985 106.985 1484.000 106.975 106.975 1485.000 106.965 106.965 1486.000 106.955 106.955 1487.000 106.945 106.945 1488.000 106.935 106.935 1489.000 106.925 106.925 1490.000 106.915 106.915 1491.000 106.905 106.905 1492.000 106.894 106.894 1493.000 106.884 106.884 1494.000 106.873 106.873 1495.000 IQ6.863 106.863 1496.000 106.852 106.852 1497.000 106.842 106.842 1498.000 106.831 106.831 1499.000 106.820 106.820 1500.000 106.809 106.809 1501.000 106.798 106.798 1502.000 106.787 106.787 1503.000 106.776 106.776 1503.333 106.773 119.654 Attachment 1 Page 54 of 58 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Location:

Contract:

Engineer:

Clinton Flex Study KCI Badar Hussain DIV 2 Battery lB 48-Hour Coping Study Project File: CPS SEO Study Output Report: BATT lB Sizing 48 Hr I ! ~800 ETAP 14.1.0N Study Case: BSlB-48 Disrh:iri:c,1 Battery Capacity \000 T1111.rt',f11t.J Date: SN: Attachment 1 Page 55 of 58 11-16-2018 KCICONSULT Revision:.

Base Config.: Normal EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs ETAP Project: Clinton Flex Study 14 .1. ON Location:

KCI Contract:

Engineer:

Badar Hussain Study Case:* BSlB-4 8 DIV 2 Battery 18 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT lB Sizing 48 Hr Battery Voltage -DIV 11 BATT IB 130 125 120 110 105 Date:' SN: Attachment 1 Page 56 of 58 11-16-2018 KCICONSULT Revision:

Base Config. : Normal 100+----t---+--+----t---+---+---+--+---+---+---+---+--+----t---+---+---+---+---+---l so [000 mm:(.\li11.)

1500 2000 EC 626319 10.6 ETAP Reports for CASE 2.1 Division-2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Clinton Flex Study Location:

KCI Contract:

Engineer:

Badar Hussain DIV 2 Battery lB 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT lB Sizing 48 Hr -DCMCCIB 50 40 30 -20 10 s!o ETAP 14.l.ON Study Case: BSlB-48 Bus Load 1obo Time(Jlbt) 1500 Date: SN: Attachment 1 Page 57 of 58 11-16-2018 KC I CONSULT Revision:

Base Config. : Normal 2000 EC 626319 10.6 ETAP Reports for CASE 2.1 Division 2 DC Loads with 1 SRV Open Continuously for greater than 24 Hrs Project: Clinton Flex Study Loca ti~n: KCI Contract:

Engineer:

Badar Hussain DIV 2 Battery lB 48-Hour Coping Study Project File: CPS SBO Study Output Report: BATT lB Sizing 48 Hr -DCMCCJB 130 125 120 110 105 ETAP 14.1.0N Study Case: BSlB-48 Bus Voltage Date: SN: Attachment 1 Page 58 of 58 11-16-2018 KCICONSULT Revision:

Base Config. : Normal 100;---1---+---+---+--+---;---+---+---+--+---t---+----+---+---+---+---+--+----if----l 500 1000 Timl!{)./i11.)

1500 2000 Attachment 2 EC 626319 Attachment 2 Page 1 of 9 DIVISION 1 and DIVISION 2 DC Bus Loading Profile (Specific to the SOP Cases Associated with November 30, 2018 Regulatory

-Conference)

Prepared by: _S_te_v_e_Q~u_ee_n

__ &;_~:&~~4

___ "/U~~~~-'-1_1_/1_8_/1_8 Reviewed by: Jared Peterson ~/ 11/18/19

1.0 Purpose

EC 626319 Attachment 2 Page 2 of 9 This attachment details the Division 1 and Division 2 battery loads on the 1DC13E and 1 DC14E 125 VDC MCCs following a postulated loss of offsite power (LOOP) resulting in a loss of all AC power. The postulated Extended Loss of AC Power (ELAP) occurs during a specific Mode 4 plant configuration that was present on 5/14/18 at 00:30 (Ref. IR 4138790).

The load sequencing and procedurally driven load shedding that would have occurred are credited and documented in Enclosure 1 of this Attachment.

Specifically, the primary purpose of this attachment is to develop the load profiles for the following cases. These load profiles are used as inputs to the ETAP battery coping time analysis performed in Attachment 1 of this EC. CASE 1.1: Division 1 DC Loads with 1 SRV Open Continuously for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

CASE 1.2: Division 1 DC Loads with 1 SRV Open Continuously for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and with RCIC on Continuously at T=20 hours The Division 1 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Additionally, RCIC loads are included on the battery starting at T=20 hours. Procedurally drive_n load shedding is credited within the first hour. Loads that were out of service are not included.

CASE 2.1: Division 2 DC Loads with 1 SRV Open Continuously for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The Division 2 battery supplies the loads present at the start of the postulated ELAP plus the load of 1 SRV open continuously.

Procedurally driven load shedding is credited within the first hour. Loads that were out of service are not included.

For comparison, the load profile tables in Enclosure 1 also document the normal Division 1 and Division 2 Design Loads on the 1DC13E and 1DC 14E 125VDC buses. The design basis loads are from design basis calculations 19-0-28 and 19-0-29, These calculations showed that both the Division 1 and Division 2 battery coping times were > 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with design basis loads (i.e., bus voltage remained > 105 VDC). A secondary purpose of this attachment is to compare the amp-hours used in each of the above cases to the amp-hours used in the design cases. This comparison'allows for a simple, conservative method of determining if a battery would last for> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for each case. 2.0 Assumptions 2.1 DC loads are shed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the loss of all DIVISION 1 and DIVISION 2 AC power as required by procedure checklist 4200.01 C002. Loads are conservatively assumed to be shed at T=1 hour for modeling purposes.

2.2 Both the DIVISION 1 and 2 DGs are considered not recoverable at T=1 hour. Therefore, the DG control panels (CK#13/14) are shed per 4200.01 C002. If either diesel is recoverable, then these loads are not shed and AC power is restored; therefore, the assumption is conservative.

2.3 The load for a single SRV is assumed to be 0.377 amps. This is 1/7 of the ADS load shown

  • on Enclosure 1 for 19-0-28 and 19-0-29 design calculations.

The ADS load includes 7 SRVs and the ADS driver cards. Further, GE drawing 11201130 shows that a single SRV uses 18 watts at 125 V which is 0.144 amps. Additionally, the pick-up test data in Attachment 3 shows that actual, tested pick-up current is around 0.1 amps. Therefore, 0.377 amps is greater than either the value required to hold or cycle an SRV solenoid which makes this assumption conservative.

EC 626319 Attachment 2 Page 3 of 9 2.4 For each CASE, one SRV is assumed to be open throughout the event (> 24 hrs.). Its solenoid valve will therefore draw load from a battery continuously.

EC 624344 Rev. 0 shows that at the decay* heat levels present at the end of the refueling outage, pressure control is not required until about 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after T=O and would take only intermittent use of one SRV. The peak current required to open an SRV solenoid valve lasts less than 1 second. Therefore, assuming that one SRV is continuously open is conservative.

2.5 If the amp-hours consumed for the SOP cases (CASE 1.1, 1.2, and 2.1) are less than the amp-hours consumed for the design case (those from 19-0-28 and 19-0-29), then the battery will last longer than the times assumed in the SOP cases. This is conservative because the design cases do not use 100% of the battery capacity.

The testing performed in reference 3.4 and 3.5 showed that both batteries have more than 100% of capacity (the references show DIV 1 at 104% and DIV 2 at 119%). ETAP analysis in Attachment 1 uses full battery capacity and will show signifi,cantly longer times than this simple comparison.

2.6 For CASE 1.2, RCIC is assumed to be manually started at T=20 hours and then operated continuously for the remainder of the case. T=20 hours was chosen as a starting point. Reference

3.7 shows

that this is about 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to when TAF would be reached and thus a reasonable starting time for RCIC if it were used. 3.0 References

3.1 Calculation

19-0-28 Rev. 015 -Review of Division 1 DC System Review 1 A. 3.2 Calculation 19-0-29 Rev. 013-Review of DIV II Direct Current (DC). 3.3 CPS Procedure 4200.01 C002 -DC Load Shedding During a SBO. 3.4 Work Order (WO) 01910395-01 completed 5-4-18 -DIV 1 Battery 1DC01 E Modified Performance Test. 3.5 Work Order (WO) 01705484-01 completed 5-27-17 -DIV 2 Battery 1DC02E Modified Performance Test. 3.6 IR 4138790 3.7 EC624344 Evaluation of RPV Heat-Up, Pressurization and Water Level During Mode 4 Rev. 0 3.8 Procedure Checklist 4200.01C002

-DC Load Shedding During an SBO Rev. Sa 3.9 'GE Drawing 11201130 Interface Control, Safety Relief Valve, Rev. 4 4.0 Methodology The DIVISION 1 and DIVISION 2 load profiles are developed in Enclosure 1 of this attachment as follows: 1. DC Loads on DIVISION 1 and DIVISION 2 DC buses are the design loads listed in References 3.1 and 3.2. The design basis loads and load profiles are tabulated in Enclosure

1.
  • 2. The loads that were out of service or would not have started in thls specific plant condition (on 5/14/18) are identified and removed from the buses. 3. The loads that would have been shed at T=1 hour using Reference 3.3 are identified and credited as shed loads. 4. Based on the above, the load profiles for CASE (1.1, 1.2, 2, 1) are created. 5. The amp-hours used for the design basis cases (a 4-hour SBO) and for CASES 1.1, 1.2, and 2.1 are calculated.

The method of calculation is: a) Sum the current (amps) for each time frame at the bottom of the Enclosure 1 tables. b) Multiply the summed current by the load duration to calculate amp-hours for each time frame at the bottom of the Enclosure 1 tables.

EC 626319 Attachment 2 Page 4 of 9 c) Sum the amp-hours for all time frames to determine the total amp-hours consumed for each case. Results are shown at the bottom of Table 1 an.d 2 in Enclosure

1. 6. Compare the CASE 1.1, 1.2, and 2.1 total amp-hours to the design case total hours. If the amp-hours are less than the design cases then the specific CASE (1.1, 1.2, or 2.1) would have had adequate battery capacity.

If, not, then additional analysis using actual battery capacity and ET AP will show more margin and may show that the CASE is acceptable (see assumption 2.5) The sequence of events used to develop the load profiles for each case (CASES 1.1, 1.2, and 2.2) in Enclosure 1 is as follows: Time Event Basis and notes INITIAL The station is coming out of a refueling outage with the RPV at < Initial plant conditions defined in CONDITIONS 2 psig and approximately 100 F. Power is supplied by offsite EC62344 Rev. 0 (station) power. Procedure 4200.10 (SBO) or A long-term supply of pressurized air is provided to the SRV 4306.01 (ELAP) provides basis solenoid valves from backup air bottles. and instructions for backup air Both the DIVISION 1 and DIVISION 2 battery banks are fully bottles. charged when AC power is lost. Steps 5.1.8, 5.4.1, and 8.1.4 of executed procedure 3514.01 C005 documents that the 1 E swing charger was lined up to mainta.in the DIVISION 1 battery charged. There were no out of service components associated with the DIVISION 2 battery charger so its normal charger was lined up to maintain a charge. RCIC is not initially available because the RCIC turbine steam supply lines have not been drained INTIAL An SRV can be controlled on DIV 1 from the remote DIV 1 DG -The associated DG CONDITIONS shutdown panel per 4411.09 panel is energized and loads the (DIVISION

1) DIVISION 1 DC bus through CKT#13/14 since the associated The following DIVISION 1 Components that would impact the DC breaker was not tagged out. DIVISION 1 battery are Out of Service: See signed off procedure step -.DIVISION 1 Diesel Generator (maintenance) 5.4.2 from 3514.01 C005 and step -DIVISION 1 Inverter (maintenance) 8.1.1 from 3509.01 C001 in -RCIC (COMPT 6A, 68, 78, and 10D) Enclosure 2 for the following:

-Post-Accident Sampling (CKT # 28) a. DIV 1 Inverter -COMPT2A is OFF; therefore, the associated inverter load is not on the DIVISION 1 DC bus. b. CKT# 28 is OFF so the Post Accident Sampling System Shunt Trip Bypass load is not on the DIV 1 DC bus C. The SRVs are not operational from the DIV 1 switches in the control room because CKT # 23 is OFF. This also prevents RCIC from automatically

_, starting and loading the DIV 1 bus.

Time Event INITIAL The following DIVISION 2 Components that would impact the CONDITIONS DIVISION 2 battery are Out of Service (DIVISION

2) -DIVISION 2 Diesel Generator (air start valves closed) T=O All offsite power is lost (LOOP) resulting in a station black out (neither the Division 1 or Division 2 diesels start) For conservative bus loading purposes, -1 SRV is assumed to be manually opened at T=O to T >24 hours using the DIVISION 1 or DIVISION 2 switches.

T=O to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> The DIVISION 1 batteries are loaded with the design basis loads as shown on Enclosure 1 except for the following loads which are out of service: -DIVISION 1 Inverter (COMPT2A)

-RCIC (COMPT6A, 68, 78, and 10D)) T=1 hour Operators complete DC load shedding per the requirements of procedure check list 4200.01 C002. As a result, the following loads are removed from the DC buses by T=1 hour: DIVISION 1: CKT#7, 13/14, 26, 30, 32, 33, 18, and 36 DIVISION 2: CKT# 15, 16, 10, 13/14, 17, 18, 20, 22, 24, 26, 30, and 32 T=20 hours RCIC is started and operated for the remainder for the remainder of the event. T> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> For the purposes of battery capacity evaluations, loads remain on the buses. 5.0 Results EC 626319 Attachment 2 Page 5 of 9 Basis and notes IR4138790 EC 624344 Rev O shows an SRV is not required to control pressure until T=Bhrs (point at which RPV pressure increases to 100 psig). Therefore, assuming continuous operation of an SRV is conservative for battery coping time evaluations.

19-D-28 Revision 15 19-D-29 Revision 13 No record was found showing that the DIVISION 1 DG panel was tagged out of service; therefore, it is assumed to load the DC bus through CKT#13/14.

4200.01 C002 RCIC is operated only for DIVISION 1 CASE 1.2 to assess coping time. 1. The detailed load profiles for CASE 1.1, 1.2, 2.1, and the design basis case were developed and are shoym in Enclosure

1. 2. The amp-hours for each CASE (up tp 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) and the design basis case (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) are also provided at the bottom of the tables in Enclosure
1. 6.0 Conclusions For the specific Mode 4 plant configuration that was present on 5/14/18 at 00:30: 1. The Division 1 battery could have maintained 1 SRV open continuously and supplied the loads that would have been present during a postulated ELAP for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This remains true even if RCIC were operated for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. 2. The Division 2 battery requires additional analysis to determine if it would have maintained 1 SRV open continuously for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and supplied the loads that would have been present during a postulated ELAP (see Attachment 1 of this EC). 3. Performing a detailed evaluation using ETAP and crediting actual battery capacity instead of design battery capacity would result in durations significantly longer than those in the above conclusions. This more detailed evaluation is perfo~med in Attachment 1 of this EC using the load profiles in Enclosure
1.

7.0 Enclosures

1. Division 1 and 2 Load Profiles (Table 1 and 2) 2. Excerpts from Implemented Procedures Showing Key Equipment Status EC 626319 Attachment 2
  • Page 6 of 9 DIV 1 DC Bus Loading (fwf: 19-0-21 n.v t5 Att~clummt
3) RCIC RCIC COMPTor Loads Loads Circuit LOADID (8-11 (11-60 ,eo) seo) CKTl1 480VS\./GRBUS 1A(1AP11E)

NA NA CKTl2 4160V S'w'GR BUS 1A1 NA NA CKTl3 480VS'w'GRB1JSA NA NA CKTl4 :i,p72fDISTR PANEL ISHt.fH TRI NA NA CKT17 EMPG LTGCAB 164 NA NA CKTl13114 OGCONTPtL Fl..12.JA NA NA CKTll16 RSS PMEL 1C61-P001 NA NA CJ<T017 RXRECRCPMP1A NA NA CKTl6 COOT PM.. 1H13-P661 NA NA CKTl20 PANEL 1ll13-P861 NA NA CKTll2t PANEL 1Hl3-P601 NA NA CKTl22 --i NA NA CKT123 NA NA CKT123 PM. NA NA CKT124 M NA NA CKTl25 NA NA CKTl26 NA NA CKTl27 U\I Bl.DGfCCE1(St-UNT NA NA CKT128 POST ACCO SAfio'FILSYSTEM NA .NA CKT12S DAMPEAMCCA(SHUNTTR!P)

NA NA CKT130 CONT PNl 'V113-P601 NA NA CKTl31 ocr,r,:c "OC13E (SH.JNT TRlP) NA NA CKTl32 PANEL 1H13..P661(LOOCCARO NA NA CKT133 PANEL 1H13-P-B61(RPSA)

NA NA CKTll18 OPT ISOL PNI.. 1PL56JAlB NA NA CKT136 PANEL G36-P0021R\,'CUJ NA NA COMPT2A 1111 NA NA COMPT6A NA NA COMPT6B NA NA COMPT7B NA NA COMPTm 1,0.040 55000 t--~_TOTAL

~= 10.U40 ss.uoo 0.092 0.74S Enclosure 1 Table 1: Division 1 DC Bus Loading Profile for Significance Determination Process (SDP) Evaluation-CASES 1.1 and CASE 1.2 CASEL1 CASE 1.2 Design loads per 19-D-28 Rev 15 Attachment 3 toads for SOP EvaluatJon (1SRV for >24hrs, No RQC) Loads for SOP Evaluation (1 SRV for T >24 hrs, RCIC Contlnusouly Starting at T*20 hrs) (Load Amps at 120 VOC} (LO.!ld Amps at 120 VDC} (Load Amps at 120 VDC) RCIC RCIC Contlnu Conllnuous Contlnuous Continuous RCIC RCIC RCIC Continuous Continu Continuous Continuous Loads Loads Translen DUS Load Continuous Transient Continous Load Load Loads@ RCICLoads Loads@ Loads@ RCICLoad Transient DUS Load Load ("15-18 (18-"45 tload Load (T*6Ds to 1

  • Load Load Load (Tc60sto CT*1hr to T > T*20 hrs @ Tc20hrs y .. zo tus y .. zoh.rs (T*20 to
  • Load Load (Ta60s to CT*lhrto seo) ... , 10-lsec) (1*60 lul (T*l-4 hrs) (0-lseo) (1-60sec)

Talhr) 24hrs) (8-11seo)

(11-60:sec) r15-1a (18-"45 T>24 hrs) (0-1:sec)

(1-60 f .. lhr) T>24 hrs) s*cl s*cl s*cl secl NA NA 4.527 o:m 0.737 0.737 4.527 0.737 0.737 0.737 NA NA NA NA NA 4.527 0.737 0.737 0.737 NA NA 27.253 3.015 3.015 3.0ts 27.253 3.015 3.015 3.015 NA NA NA NA NA 27.253 3.015 3.ms 3.015 NA NA 4.823 107" 1.079 1.079 4.823 1.079 1.079 t07S NA NA NA NA NA 4.823 1079 1079 1079 NA NA 0.000 0.00'.l 0.000 0.000 0.000 0.000 0.000 0.000 NA NA NA NA NA 0.000 0.00'.l 0.000 0.000 NA NA 52000 52000 52000 0.000 52.800 52000 52000 0.000 NA NA NA NA NA 52800 52800 52800 0.000 NA NA 156.621 39.538 27.118 27.118 156.621 39.538 27.118 0.000 NA NA NA NA NA 156.621 39.538 27.ll8 0.000 NA NA 2.038 2.038 2.038 2.038 2038 2.038 2.038 2.038 NA NA NA NA NA 2.038 2.038 2.038 2.038 NA NA 6.646 0.214 0.214 0.214 6.646 0.214 0.214 0.214 NA NA NA NA NA 6.646 0.214 0.214 0.214 NA NA 1600 1600 1600 1600 1600 1600 1600 1600 NA NA NA NA NA 1600 1600 1600 1600 NA NA 1863 1363 1383 1363 1863 1.363 1383 1363 NA NA NA NA NA 1863 1363 1363 1363 NA NA 1100 1.100 1100 1.100 1m 1100 1m i.m NA NA NA NA NA 1100 1.100 1100 1100 NA NA 1.092 1092 1092 1092 1092 1092 1092 1092 NA NA NA NA NA 1092 1092 1092 1092 NA NA 2.640 2.640 2.640 2.640 0.377 0.377 0.377 0.377 NA NA NA NA NA 0.377 0.377 0.377 0.377 NA NA 5.920 5.920 0.000 0.CXIJ 0.000 0.000 0.000 0.000 NA NA NA NA NA 0.000 0.000 O.OOJ 0.000 NA NA 1500 0.000 0.000 O.OOJ 1500 0.000 0.000 0.000 NA NA NA NA NA 1.500 0.000 0.000 0.000 NA NA 0.500 0.000 0.000 0.000 0.500 0.000 0.000 0.000 NA NA NA NA NA 0.500 0.000 O.CXIJ 0.000 NA NA 0.800 0.800 0.800 0.800 0.800 0.800 0.000 0.000 NA NA NA NA NA 0.800 0.800 0.800 0.000 NA NA -1500 0.000 0.000 0.000 1500 0.000 0.CXXJ 0.000 NA NA NA NA NA 1500 0.000 0.000 0.000 NA NA 8.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 NA NA NA NA NA 0.000 0.000 0.000 0.000 NA NA 1500 0.000 O.OOJ 0.000 1500 0.000 0.000 0.000 NA NA NA NA NA 1500 0.000 0.000 0.000 NA NA 0.640 0.640 0.640 0.640 0.640 0.640 0.640 0.000 NA NA NA NA NA 0.640 0.640 0.640 0.000 NA NA 3.480 O.OOJ 0.000 0.000 3.480 0.000 0.000 0.000 NA NA NA NA NA 3.480 0.000 0.000 0.000 NA NA 0.800 0.000 0.000 0.800 0.800 0.000 0.800 0.000 NA NA NA NA NA 0.800 0.800 0.800 0.000 NA NA 6.753 0.153 0.153 0.153 6.753 0.153 0.153 0.000 NA NA NA NA NA 8.753 0.153 0.153 0.000 NA NA 1864 1864 1864 1884 1884 1884 1884 0.000 NA NA NA NA NA 1864 1884 1884 0.000 NA NA 0.134 0.000 0.000 0.000 0.134 0.000 0.000 0.000 NA NA NA NA NA 0.134 0.000 0.000 0.000 NA NA 38.830 38.830 38.830 36.830 0.000 0.000 0.000 0.000 NA NA NA NA NA 0.000 0.000 0.000 0.000 57.318 14.600 0.000 0.000 0.000 0.000 0.000 O.OOJ 0.000 0.000 NA NA 57.318 14.800 0.000 0.000 0.000 0.000 0.000 67.632 14.800 0.000 0.000 0.000 O.CXIJ 0.000 0.000 0.000 0,000 NA NA 67.632 14.800 0.000 0.000 0.000 0.000 0.000 56.389 14.800 0.000 0.000 0.000 O.CXIJ 0.000 0.000 0.000 0.000 NA NA 56.389 14.800 0.000 0.000 0.000 0.000 O.OOJ NA NA NA NA 55000 55.000 0.000 0.000 0.000 0.000 110.040 55.000 NA NA NA NA 0.000 0.000 "',,, qq.4uu ~j.244 1 3 132.303 4U.lU::1 z8 1.z-j1 10. 36. 1U 12.615 110.UQO s,.wu 11:fl.::lj~

qq.40u 280.23 100.230 S6.810 1 ".hl5 0.151 0.333 0.093 2561 189.688 420.JOS O.D78 1730 SS.197 2SD.145 0.092 0.749 0.151 0.333 0.078 17"0 S5.lS7 2S0.145 I I I I I I TOTAL Ar-HRS ISDt-1=-0ADS F~R 24 HO~AS wl RCJC S~ARTING at ~20 hrs-_, 608.534 ,----~ Load Shod @ T*1 lu Pe, 4200.01 MJ MJ MJ MJ YES YES NO MJ MJ MJ NO NO NO NO NO NO YES NO NO NO YES NO YES YES YES YES NO NO NO NO NO EC 626319 Attachment2 Page 7 of 9 t-I I I Notes (See De-sign lnputs and Assumptions fo, fwthor details) load Sh@,d OM 4200. 01C002. load Shedc!M" 4200.01CX02 SAV, CKT1123is0Ff.

load Shed..,., 4200.01C002.

CKT1t28isOFF.

l_oad5h@,dDH420Q.QOX)2.

load Shed DM 4200. 01C002. load5Mdcer4200.0"C002 loac1ShedDef4200.00l02 Load Shed.--4200. 01C002 COMPT2A Is OFF DIV 1rMM"ter RC!C Is cu: of setvice. Assumed retlmled lo sMlice for CASE 12 I T i i _____ _,_

DIV 2 DC Bus Loading (Ref: 19-D-29 Rev 13 Attachment

3) J Enclosure 1 Table 2: Division 2 DC Bus Loading Profile for Significance Determination Process (SDP) Evaluation-CASE 2.1 Design Loads per 19-D-29 Rev 13 Attachment 3 (Load Amps at 120 VDC) Case2.l Loads used for SDP Evaluation (1 SRV for >24 hours) (Load Amps at 120 VDC) Transient Continuous Transient Conti nous Load Shed COM PT or Continuous Load Continuous Load Continuous Load Continuous Load EC 626319 Attachment2 Page 8 of9 LOAD ID -Load Load Load Load

@T=l hr Notes 1--c_1_rcu_it-+--------------+--"(IO--'l=-s:..:e:..:c.,_)

-+--'("'l-6..:..:.0.::.se-'-c"")-+_!T_=6_o_s_t_o_T_=1_h_r_)+--(T-=_1h_r_t_o_T_=4_h_rs_)-l---'("'O--'l'-'s-'e""cl'-l--'("'l--=60.:c..:c.sec=)--+-(T_=60_s_t_o_T_=1_h_r_)

+-(T_=_1_hr_t_o_T_>_2_4_h_rs_J

+-Pe.ccr_4-=2.c.00:..:*.c..01 c+----------------------t-COMPT3A INVERTER 1C71-5001B 35.550 35.550 35.550 35.550 35.550 35.550 35.550 35.550 Inverter load 35.55 at lOOVDC per 19-0-29 Atttachment 3 CKT/11 480V SWGR BUS 18 5.848 0.856 0.856 0.856 5.848 0.856 0.856 0.856 1----,--j------------+-----+-----+------+-------+-----1------+-------+--------+----1---------------------;-

CKTlf2/#4 4160V SWGR BUS 181 27.253 3.015 3.015 3.015 27.253 3.015 3.015 3.015 1---'--j------------+-----+-----+------+-------+-----1------+-------+--------+----1---------------------;-

CKTla 480V SWGR BUS B 4.788 1.044 1.044 1.044 4.788 1.044 1.044 1.044 1-----j-----------~-+-----+-----+------+-------+-----1------+-------+--------+----1---------------------;-

CKTl/15 EMRG LTG CAB 165 59.100 59.100 59.100 0.000 59.100 59.100 59.100 0.000 YES Load Shed per 4200.01C002.

CKT#l6 EMRG LTG CAB 166 33.800 33.800 33.800 0.000 33.800 33.800 33.800 0.000 YES Load Shed per 4200.01C002.

I--C::;KT=lll::;O:.....+------=E:.:.M:.:;R:.::G-=LTC..G=--=CA-'B=-1::;88:.=._

__ --+_4.:.:6:.:;.600=-l---4:.:6=.60=0-+---'4:.::6:.:.6:.::00=----+----=o.:.::o:.::oo=-----1--'4:.::6:.:.6:.::00=----+--4.:.:6:.:;.6:..:0:.::0_+---'4:.::6:.::.6.::.00=----+---o:..:.o;:.o:..:o:....._--+

__ Y:..:ES:.::..._i-=Lo.::.*;:.d:..:S:..:h:..:e:.::d..cp-=e'-r4-=2:..:0.::.0*:..:0c..1C:..:O:..:Oc..2.'------------l-CKT#l3/#14 DG CONT PNL 1PL12JB 123.621 39.638 26.938 26.938 123.621 39.638 26.938 0.000 YES Load Shed per4200.01C002.

See Assumption 2.2. CKT#l7 RC RECIRC PMP 18 6.646 0.214 0.214 0.214 6.646 0.214 0.214 0.000 YES Load Shed per 4200.01C002.

I--C::;KT=#c..18:.....+----'F..CIR.:.:E:..:P..c.R:..:O..c.T-=D..:;IS:..:TR=P.:.cN:.::L

__ --+---'l:::O:.:;.ooo=-1--...:l::O=.o:.::oo.::....-+----=1:.::o:..:.o:.::oo=----+-----=l::O.:.:.oo=o--+----=1:.:.o:..:.oo:.::o=----+----'l:::O:.:;.o:..:oo:.::...--+----=1=0:.::.oo:.::o=----+---o:..:.o;:.oo:.=._

__ +-_Y:..:ES:.::..._1-=L.::.oa::;d:..:S:..:h:..:e:.::d..cp-=e'-r4-=2:..:0.::.0.:..:0c..lC:..:O:..:Oc..2*:.....-----------l-CKT#l9 PANEL 1H13-P662 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 CKTl/20 PANEL 1Hl3-P851 2.063 2.063 2.063 2.063 2.063 2.063 2.063 0.000 YES Load Shed per 4200.01C002.

CKTl/21 PANEL 1H13-P601 0.640 0.640 0.640 0.640 0.640 0.640 0.640 0.640 CKTl/22 OPTISOLPNL1PL571A/B 0.720 0.720 0.720 0.720 0.720 0.720 0.720 0.000 YES LoadShedper4200.0lC002.

t-----j---,------~--+-----+-----+------+-------+-----1------+-------+-------+----1---~-----------------i-1--C::cKT=!12::;3:.....+.....;A:..:D::;S::,.f:.::SR:.:.V:..S;:.O:..V:..:S:..:(L::1:..:H::;13:..*:..P6:..:6:::2=Cl._--+--=2:.::.64..:.0:.._+-=2.:.::64..::0=----+----'2=*640;:.:.::....._+-

__ ::;2.:.::64..::0=-----1--'o:C.3::;77:..:...._1----=.0.:.::3.:.c77:.....--+--0:::*::;37:..:7

__ +-----'o:.:.3::;77:..:.._

__ +-----+=S.::*::.e:..:As::;s:.::u=m,,,p-=1ti:.::o.:.:n*:..a:::n.:.:d:..:O:..:e:.::*csige.;1n_;;ln"'1p:..:'U:.:.tc..Se::;ct:.:;i:.::o:..:ns:..f:.::o.:..rS::;Rc:.;V:..:*c..*

---;-CKT!l23 PANEL1Hl3*P662C (ADS LOGIC) 5.920 5.920 0.000 0.000 5.920 5.920 0.000 0.000 CKTl/24 PANEL 1Hl3-P851 1.222 1.222 1.222 1.222 1.222 1.222 1.222 0.000 YES Load Shed per4200.01C002.

CKTll25 DRWL CLGFAN 1B/10/S 1.500 0.000 0.000 0.000 1.500 0.000 0.000 0.000 CKT#26 PANEL1Hl3-P662 1.613 L613 1.613 1.613 l".613 1.613 1.613 0.000 YES Load Shed per4200.01C002.

t------if-------------+-----1--=:.::cc-+-------t---==---+-----+-~---1--==---1-------1----+---~------------------i-CKT!I27 OVQ03CB 0.500 0.000 0.000 0.000 0.500 0.000 0.000 0.000 1--c""KT"-#2=8-+------=-ov.:..01=0...:Ac..B

____ +-.....:.o.:::soo;:.:..-1--=o::.:.o:..:o.::.o_+-_...:occ.o:..:ooc.:...._ __ c:.o:..:.o.:.oo:......_-1-_~o:::.s.:.oo:......-+-.:.o.c:.oo:..:o:......-1--.....:.o:..:.o.:.oo:....._+--......:o.:..:.ooc:.o:......_ ___ .....; __________________

---1-cKT1129 DAMPERS OVQOSYB/OVQOSYB 1.000 0.000* 0.000 0.000 i.ooo 0.000 0.000 0.000 1-...:..:==:...-1-====.:..:::====='-+----===----+--==-+---'=='--+---==--+----'==--1--.....:.==-----+--=::..:..--+---'==----+----l----------------------l-1--C::cKT=ll;:.30:.....4--

__ ...:C:..:O:..:N:..:T..c.P..:.N:..:L:..:lH=l3:...*:..P6:..:0:::l

__ --+_.:;.o::.640..:.:.._1--...:.::0.:.::64..:.0=----+----'o:.: . .:.640=---+----=-0.:.::640..:.:..

__ 4--_o:..:.c..640=--1----=-0.:.::640..:.:.._+-

__ o:::*.:.64.:..:0:......_+-

__ o:..:.o;:.o:..:o:....._--+

__ Y:..:ES:.::..._i-=Lo:::a::;d:..;S:..:h.:.:e:::d..cP..ce.c...r 4-=2:..:0.::.0*:..:0c..lC::;00=2*:.....-----------l-CKTlal PANEL1Hl3P662(BACKUPSCRAM) 6.750 0.150 0.150 0.150 6.750 0.150 0.150 0.150 I--C::CKT=ll:::32=---+-...:..:PA:..:N:..:E:::L:..:l::.;H:.::13:..*.:..P.::;66::2:..,(.:.ILO:..G:::l:.::C).__+-....::0:.:.8::.00=--+-.::0.:::80.:.0=----+---'0:.:.8:::0::0:....._+-

__ .::;0.:::8.:.00=-----1--'o:::.8:::0::0:.....+-::.0.:.:8.:.00=---1---0:::*.:.800::::.._--+---'o:.:.o::;o::o:....._--+--Y:.:E:.::S_-+=L::.oa:::d:..;S:..:h:..:e:::d..cP:..:*.:..r4-=2::0:.::0.:.::0.:.lC::;0:.::0.:.2.'------------t-CKTn33 SHUNTTRIP@

1DC14E & 1AP61E 5.190 0.000 0.000 0.000 5.190 0.000 0.000 0.000 t-----j-----~------+-----+-----+------+-------+-----1------+-------+--------+----1---------------------i-CKT II 34 RSS PNL1C61-P0010 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 i----~-----------1===~-l-===+=====~-:--~~==a:p====j=a====j=a==~--:--~----+----t------------------,-

1 TOTALAMPS 385.740 247.061 228.441 88.941 383.477 244.798 226.178 42.468 ___ ..:_;i, ______ S:...UccB:...T:..:0:.:1::cA:cL.:..AM::c::P_*,H_:O::-_Ucc:.:RScf-....:O:;.:.l::0.:..7_.1..........:4:..:.04;..:9:_-+--=22=.4.:..:.6:::34:..:..._..i.._.....:2::6.:;6.:.::8::;23:__..1.-_.::;0.:.::10;:.7:.....-+--'4.:.:.0:::12=--,----=222=.40..:.::.:8:......_,--:.::9.:..76:..:.7:..:64:..:..._--!----+--------------------~

I I I I I I I I I 1 TOTAL AMP-HRS (DESIGN LOADS FOR 4 HOURS)=! 495.613 I I TOTAL AMP-HRS (SOP LOADS FOR 24 HOURS)=! 1203.291 I Enclosure 2-Excerpts from Implemented Procedures Showirig Key Equipment Status Discussion Signed off step from 3509.01 C001 showing that CKT#23 in Division 1 is OFF. This prevents DIV 1 switches from actuating SRVs from the control room. The Remote Shutdown Panel was not removed from service so SRVs can still be actuated on DIV 1 from the RSP.

  • NOTE: This circuit also OFF also prevents RCIC from automatically starting.

Signed off step from 3514.01 COOS showing that CKT#28 for PASS is OFF (no load on DIV 1 bus). \ Signed off step from 3514.01 COOS showing that DIV 1 Inverter is out of service (COMPT2A is OFF/no Inverter.

load on DIV 1) Signed off step from 3509.01 C001 showing that the inverter DC input switch is OFF. 5.3~ 5.4 .62 5.~ Excerpt At 125VDC MCC lA (1DC13EJ, Cubicle 12A Dist Panel: Turn OFF Ckt ff23, Control Panel 1H13-P661B, Bus A ADS & SRV Solenoids and NSPS Control Power. At DC MCC 1A-12A (1DC13E), 125VDC Distribution Panel lA, turn OFF Ckt ff28, Post Accident Sample System Shunt Trip Bypass. A Div 1 NSPS Inverter Outage is planned, .2E. } a Div 1 DC Outage is planned, Yes ____./ <:ir NIA if performed in 5.4.l.3. ------De-energize Div 1 NSPS Bus per. CPS 3509.0lCOOl, Division 2 NSPS Bus (1C71-P001A)

Outage (ITS LCO 3.8.8 and 3.8.10) 8 .1, Do-enorgi.zing Di.v 1 NSPS Bus (1C71-P001A) 8.1 At NSPS Inverter lA (1C7l-S001A):

,.._::pE-(7

_!f_ 6:) Verify IN SYNC lamp (P3) (green) is illuminated.

Momentarily depress the BYPASS SOURCE TO LOAD (S202) push-button.

Verify the BYPASS SOURCE SUPPLYING LOAD lamp (P2) (red) is illuminated.

Verify the AC OUTPUT VOLTAGE is within 117.6 -124.0 VAC. µr ~+<< (0c:£-f .. 61 Position the MANUAL BYPASS SIUTCH (S-1) from Q. NORMAL OPERATION to BYPASS TO LOAD position. ~/c Position DC INPUT circuit breaker (B-1) to OPF.____.2d:___---

EC 626319 Attachment 2 Page 9 of 9 Attachment 3 EC 626319

  • Attachment 3 Page 1 of 7 SRV Solenoid Minimum Pick-up and Drop-out Voltage Test Prepared by: Steve Queen. -&~ / 11/13/18 Reviewed by: Jared Peterso~ "/ 11/13/18,

1.0 Purpose

EC 626319 Attachment 3 Page 2 of 7 Determine the minimum pick-up and drop-out voltage required at various temperatures for the solenoid valves on the Clinton Safety Relief Valves (SRVs) using test data. Specifically, from a test performed on a spare Clinton SRV: a. Determine if supply pressure to the SRV solenoid valve affects drop-out and pick-up voltages.

b. Determine the minimum required pick-up and drop-out voltages required up to EQ accident temperature of 330 F by extrapolating pick-up and drop-out test data obtained at room temperature.

2.0 Assumptions

and Limitations . . 2.1 The pick-up and drop-out voltages determined in this Attachment are for use in non-design basis assessments only. 3.0 Design Inputs 3.1 Solenoid Valve inlet pressure:

135 psig to 165 psig (Reference 4.1) 3.2 EQ Accident temperature (LOCA/MSLB):

330 F (Reference 4.2) 3.3 Seitz Model 6A39 Solenoid Parameters (Reference 4.2) Voltage Rating: 125 voe Power Consumption:

22 Watts Coil Resistance:

620 +/- 5% ohms @ 20 C, 710 +/- 5% ohms @ 57 C Holding Current: 0.18 +/- 10% amps 3.4 Enclosure 1 SRV Test Results (performed under PO 01922580, Contract 00078389 Release 00106) 4.0 References 4.1 CPS Procedure 3214.01 Section 8.1.2.5.4 4.2 EQ-CL065 Rev 8, Environmental Qualification of Seitz Solenoid Valve Model # 6A39 4.3 All About Circuits, Chapter 12-Physics of Conductors and Insulators (excerpt in Enclosure

2) 5.0 Methodology and Calculations 5.1 Test to Determine Pick-up and Drop-out Voltages and Currents at Room Temperature On 11/8/18, pick-up and drop-out voltage tests were performed on a Dikkers SRV Air Block and Solenoid Assembly at room temperature (72 F). The SRV was a Clinton spare maintained at
  • NWS Technologies.

Each of the two solenoids on the SRV, labeled M1 and M2, were tested with and without nitrogen pressure supplied to the solenoid valve block. The first set of tests were performed a O psig and the second set at 165 psig which is the maximum pressure supplied to the solenoid valve when installed in the plant (Design Input 3.1). A detailed description of the testing and the test results are provided in Enclosure 1 of this attachment.

This analysis uses the highest pick-up and drop out voltages from all tests. Selecting higher solenoid terminal voltages is conservative because it requires a higher voltage supply source. I From Enclosure 1, pick-up voltages are lower at the higher solenoid valve supply pressure while. the drop-out voltages are not significantly affected.

The highest pick-up voltage is from solenoid M2 Run #1 (not pressurized) and the highest drop-out voltage is from solenoid M2 Run #2 (pressurized).

The test results are summarized as follows:

Max Tested SRV Solenoid Valve Pick-up and Drop-out Voltages at 72 F (from Enclosure

1) Pick-up Drop-out (Volts DC) (Volts DC) 60.1 13.6 EC 626319 Attachment 3 Page 3 of 7 The resistance data and voltages determined from the testing are used to calculate the minimum current required to pick-up and drop-out the solenoid valve. Since the magnetic field required to pick-up or drop-out the solenoid valve block components is based on fixed forces (i.e., friction, weight, etc.), the current required to establish the magnetic field will be the same regardless of temperature.

Using Ohms law and the resistance of 614 ohms at 72 F (from Enclosure 1), the current required is as follows (rounded up): Resistance

@ 72 F Volts Current Ohms (V) (l=V/R) Max Tested Pick-up 614 60.1 0.098 Max Tested Drop-out 614 13.6 0.023 5.2 Determine Pick-up and Drop-out Voltages at Higher Temperatures Resistance values for conductors change with temperature based on the conductor's temperature coefficient of resistance (0). The formula for temperature effects on resistance is as follows (Ref 4.3): R = Rref x [1 + a x (T -Tref)] (EQUATION

1) Where, R= Conductor resistance at temperature T (ohms) Rref = Conductor resistance at Tref= 614 ohms (Enclosure 1 tested resistance@

72 F) * . T = Conductor temperature (Celsius)

Tref = Reference temperature=

22.2 C (Enclosure 1 test temperature of 72 F) a = the temperature coefficient for copper= 0.004041 (Enclosure

2) Knowing the constant current required (calculated in Section 5.1), allows use of the formula to determine the required pick-up and drop out voltages at higher temperatures.

Section 6.0 provides a table of results calculated at various temperatures.

( 6.0 Results The results of this analysis are as follows: EC 626319 Attachment 3 Page 4 of7 1. SRV Solenoid pick-up voltages are lower when the solenoid valve air block is supplied with pressure.

2. SRV Solenoid drop-out voltages are not significantly affected by solenoid valve air supply pressure.

I 3. The maximum required pickup and drop out voltages from testing two SRV solenoids at 72 F can. be extended to higher temperatures.

The results are shown below: Table 1-Temperature Corrected Pickup and Drop-out voltages for SRV Solenoids Temp Corrected Pick-Up Drop-Out Pick-Up Drop-Out Temperature Resistance Current Current (V=lxR) (V=lxR) Notes (Equation

1) (Section 5.1) (_Section 5.1) degF degC ohms amps amps VDC VDC 72.0 22.2 614.0 0.097 0.023 60.1 13.6 Ref. Test Temperature (Enclosure
1) 131.0 55.0 695.4 0.097 . 0.023 67.5 16.0 212.0 100.0 807.0 0.097 0.023 78.3 18.6 300.0 148.9 928.4 0.097 0.023 90.1 21.4 330.0 165.6 969.7 0.097 0.023 94.1 22.3 EQAccident Temperature (Ref 4.2) 7 .0 Conclusions The SRV solenoid pick-up and drop-out voltages determined in Table 1 above are based on test data taken at room temperature and extrapolated to higher temperatures.

These voltages could be used to assess the capability of the solenoids to actuate at depleted battery voltages for design basis evaluations.

8.0 Enclosures

1. Test Results and Setup from NWS Testing on 11/8/18 2. Excerpt from All About Circuits Chapter 12-Physics of Conductors and Insulators Enclosure 1: Test Results and Setup from NWS Testing on 11/8/18 (Tested PO 01922580 and contract 00078389-Release# 00106) Clinton Power Station Dikkers MSSRV Solenoid Testing EC 626319 Attachment 3 Page 5 of 7 NWS Technologies, LlC performed pick-up and drop-out voltage test on a Dikkers SRV Air Block and Solenoid Assembly.

Each SRV has 2 solenoids labeled as Ml and M2. The scope of work consisted of determining the lowest DC voltage at which the valve \*.rill pick-up and drop-out.

Testing was performed on 11/8/2018 using a spare Clinton SRV. Data sheets will be provided separate from this report. The valve was mounted to the repair stand. Voltage testing was performed with no pressure supplied to the air block. Starting at O VDC, voltage was increased until the solenoid activated.

This was performed 3 times for each solenoid.

Then voltage \*.ras set to 125VDC. With the solenoid energized, voltage was decreased until the solenoid deactivated.

This was performed 3 times for each solenoid.

Temperature and resistance were also measured during this test. Solenoid temperature remained between 71°f and 72"'f. Resistance remained at 613 Q and 614 n for each test. Results Ml -Pick.:.up voltage, not pressurized Run #1-51.4 VDC Run #2 -51.9 VDC Run #3 -51.6 VDC Ml -Drop-out voltage, not pressurized Run #1-12.7 VDC Run #2 -12.S VDC Run #3 -12.4 voe M2 -Pick-up voltage, not pressurized Run #1-60.1 VDC Run #2 -58.8 VDC Run #3 -58.2 VDC M2-Drop-out voltage, not pressurized Run #1-12.4 VDC Run #2 -12.6 VDC Run #3 -12.9 VDC The air manifold was then mounted to the air valve and pressure v,ras supplied using gaseous N2. Testing pressure was set at 165 psig. Starting at O \/DC, voltage was increased until the solenoid activated.

This was performed 3 times fur each solenoid.

Then voltage was increased to 125VDC. Voltage was decreased until the solenoid deactivated.

This \*.ras performed 3 times for each solenoid.

Temperature and resistance were also measured during this test. Solenoid temperature remained at 72°f. Resistance remained at 614 a for each test. Results Ml-Pick-up voltage@ 165 psig Run #1-41.0 VDC Run #2 -42.0 voe Run #3 -42.0 VDC Mi -Drop-out voltage @ 165 psig Run #1-12.6 VDC Run #2 -12.5 VDC Run #3 -13.0 VDC M2 -Pick-up voltage@ 165 psig Run #1-45.0 VDC Run #2-45.0 VDC Run #3 -44.8 VDC M2 -Drop-out voltage @ 165 psig Run #1-12.7 VDC Run#2-13.6VDC Run #3 -12.8 VDC All testing \*.ras performed outside of the NWS 0A program and final certification of the valve/ solenoid will be performed at a later date. John Reese NWS Operations 11/8/18 EC 626319 Attachment 3 Pag e 6 of 7 Enclosure 1: Test Results and Setup from NWS Testing on 11/8/18 C li nton D i kkers MSSRV Voltage Test Data Ml Pick-up voe T ("Fl R(Ol PS I G Ml Drop-out voe T (" F l R(Ol PSIG Run 1 S1.4 71 614 0 Run 1 12.7 71 614 0 --------------------Run 2 51.9 71 614 0 Run 2 12.8 71 614 0 --------------------Run 3 51.6 71 614 0 Run 3 12.4 71 614 0 --------------------M2 Pick-up voe T (" Fl R(Ol PS I G M2 Drop-out voe T (" Fl R(Ol PS I G Run 1 60.1 71 613 0 Run 1 12.4 72 614 0 --------------------Run 2 58.8 72 614 0 Run 2 12.6 72 614 0 --------------------Run 3 58.2 72 614 0 Run 3 12.9 72 614 0 --------------------Ml P i ck-up voe T (" Fl R(Ol PS I G Ml Drop-ou t voe T (" F) R(Ol PS I G Run 1 41.0 72 614 165 Run 1 12.6 72 614 165 ----------------Run 2 42.0 72 614 165 Run 2 12.5 72 614 165 ----------------Run 3 42.0 72 614 165 Run 3 13.0 72 614 165 ----------------M2 Pick-up voe T (" Fl R(Ol PS I G M2 Drop-out voe T ("Fl R (Ol PS I G Run 1 45.0 72 614 165 Run 1 12.7 72 614 165 --------------------Run 2 45.0 72 614 165 Run 2 13.6 72 6 1 4 165 --------------------Run 3 44.8 72 614 165 Run 3 12.8 72 614 165 --------------------Dikkers SRV Actuator Air Block Solenoids 10 Gallon Accumulator EC 626319 Attachment 3 Page 7 of 7 Enclosure 2: Excerpt from All About Circuits Chapter 12-Physics of Conductors and Insulators Temperature Coefficient of Resistance Chapter 12 -Physics Of Conductors And Insulators You rmgtlt ha~-e noticed on the talb!e for specific resistances that all figures were specified at a ternp<frature of 200 Celsius. [f )'OU susp,ected that this meant specific resistance of a materia[ may change wi!h. temperature, you were right! Resistance

'o'alues for conductors at any temperature other than the standard temperature (usua.111y specffied at 20 Cel!sius) on the specific resistance table must be deterrnlned through ~*et another formula: R = Ria' LI + o.(f -T,,t>)] Where, R =' Conductor resistance at temperature "T" Rrot = Conductor resistance at reference temperature T rer, usually 20° C, but sometimes rf C. a= Temperature coefllcient of resistance for lhe conductor material.

T = Conductor temperature in degrees Celcius. T rer= Reference temperature that o. is specified at for lhe oonductor material.

The *al'pha" (a) constant is known as the temperature coefficient of resistance, and s~mh*o[izes the resistance change factor per degree of temperature change. Just as all materials have a certa[n specific resistance (at 2!0," C), they also change resistance accordingtotemp-erature by certain amolfflts.

For pure metals, tltis coefficiem is a positive number, meaning that resistance increases wil:h increasing temperature.

Fortlte elements carbon, silicon, and germanlurn, this coefficient is a negati'.*e numb.fr, meaning that resistance deC!c'aseswith increasing temperature.

For some metal aU011s, the temperature coefficient of resistance is ver,r close to zero, meaning that the resistance hardly change.s at all wi!h variations in temperature ( a good propert'J' if you want to build a precision resistor out of metal wire!}. The following tab I e gives the temperature coefficients of resistance for several common metals, beth JJi!Ire and alloy: TEJ.!PER-\TIJRE COEFFIC!ElffS Of RESISTMKE, AT 20 DEGREES C hbterial Elem:nt/Alloy "Glpha" per degree Celsi.1.1s; h'i.ckel --------Elerrer;t


0.005866 Iron----------

El:.'Di!nt


0.0<l5671 ibl:,bdlen1.1m


Elem:n.t -~-------------

0.004579 Tun9s;t..,.~


Elem:nt ---------------

0.004403 Alunil'll'.;m


Elemant ---------------

0.00430B Coppe~ --------Elerrer;t


0.~1 Silver-----~--

Elem:nt ---------------

0.003819 Platin'.!Jll


Elerr,:l'lt


0.003729 Gold----------

Ele.."P.l'lt


0.003715 Zi.nc ----------

El:.'lli!nt


0.003847 Steel*---------

Alloy----------------

0.003 IHchrcm;a


Alloy ----------------

0.0;)017 lfichrcm:

V -----Alloy ----------------

0.0<l013 ~l:ln9ani.n


Alloy------------+/-

0.00e015 Constcrnlbcn


Alloy---------------

-0.0<le074

  • = St~l alloy at 99.5 percent i.rcn, 0.5 percent carbon