MONTHYEARML0707102932007-03-13013 March 2007 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for a Hearing for Revision to the Technical Specifications Concerning the Emergency Core Cooling System Sump Project stage: Other ML0709406862007-03-27027 March 2007 Response to a Request for Additional Information Regarding License Amendment Request Revising Commitments to USNRC Regulatory Guide 1.82, Revision 0, Sumps for Emergency Core Cooling and Containment Spray Systems And.. Project stage: Response to RAI ML0711401732007-04-13013 April 2007 Response to Request for Additional Information Re License Amendment Revising Commitments to Regulatory Guide 1.82, Rev. 0, Sumps for Emergency Core Cooling & Containment Spray Systems. Project stage: Response to RAI ML0714100722007-05-0303 May 2007 License Amendment Request Revising Commitments to USNRC Regulatory Guide 1.82, Revision 0, Sumps for Emergency Core Cooling and Containment Spray Systems and Technical Specification Surveillance Requirement (SR) 3.5.2.8. Project stage: Request ML0711001602007-05-0404 May 2007 Issuance of License Amendments 240 & 222 Regarding Sump Modifications Project stage: Approval ML0712402662007-05-0404 May 2007 Tech Spec Pages for Amendments 240 & 222 Regarding Sump Modifications Project stage: Other 2007-04-13
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML22146A1872022-06-0101 June 2022 FRN for Issuance of Exemption ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20098C9852020-06-22022 June 2020 FRN for Issuance of Exemptions ML19238A3692019-09-0303 September 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 09/10/2019 ML18278A2802018-10-10010 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 ML16355A2612016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 NRC-2016-0273, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 20172016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 ML16271A0922016-09-28028 September 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 ML16148A0892016-06-23023 June 2016 Exemption from the Requirements of Title 10 CFR 74.19(c) ML16148A0932016-06-23023 June 2016 FRN for Exemption from the Requirements of Title 10 of the Code of Federal Regulations Part 74.19(c) NRC-2016-0049, FRN for Exemption from the Requirements of Title 10 of the Code of Federal Regulations Part 74.19(c) (CAC Nos. MF6693 and MF6694)2016-06-23023 June 2016 FRN for Exemption from the Requirements of Title 10 of the Code of Federal Regulations Part 74.19(c) (CAC Nos. MF6693 and MF6694) ML16154A4072016-06-21021 June 2016 Federal Register Exemption Notice Regarding Acceptance Criteria for Emergency Core Cooling Systems ML16145A2252016-06-0707 June 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: June 7, 2016 NRC-2016-0107, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: June 7, 20162016-06-0707 June 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: June 7, 2016 NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 20162016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16131A7952016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16029A3812016-02-29029 February 2016 Federal Register Notice for Environmental Assessment ML16033A4002016-02-29029 February 2016 Environmental Assessment and Finding of No Significant Impact ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML15196A6162015-08-13013 August 2015 Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2 - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order NRC-2015-0192, Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2 - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order2015-08-13013 August 2015 Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2 - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order ML15196A3862015-08-0404 August 2015 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access To.. ML15216A5802015-07-30030 July 2015 Federal Register Notice: McGuire Generating Station, Units 1 and 2 - Withdrawal of an Amendment Request Revision to Technical Specification 3.7.7, Nuclear Service Water System ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15007A2932015-01-21021 January 2015 Federal Register Notice on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Fe ML14303A3812014-10-31031 October 2014 Biweekly Sholly FRN - Application and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 12, 2014 ML14247A1542014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 20142014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 ML14037A4142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 NRC-2014-0028, Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 20142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML12213A6352012-08-0101 August 2012 Federal Register Notice - Individual Notice of Consideration ML12213A6302012-08-0101 August 2012 Letter - Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Propose No Significant Hazards Consideration Determination, and Opportunity for Hearing NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations NRC-2011-0216, September 20, 2011 Applications and Amendments to Facility Operating License Involving No Significant Hazards Considerations2011-09-0808 September 2011 September 20, 2011 Applications and Amendments to Facility Operating License Involving No Significant Hazards Considerations ML11251A0092011-09-0808 September 2011 September 20, 2011 Applications and Amendments to Facility Operating License Involving No Significant Hazards Considerations ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 ML11158A2302011-07-0707 July 2011 SUNSI Individual Notice NRC-2011-0100, McGuire Nuclear Station, Units 1 and 2, and Oconee Nuclear Station, Units 1, 2, and 3 - Individual SUNSI Notice (TAC Nos. ME4529, ME4530, ME4531, ME4532, ME4533, ME4534, and ME4535)2011-06-30030 June 2011 McGuire Nuclear Station, Units 1 and 2, and Oconee Nuclear Station, Units 1, 2, and 3 - Individual SUNSI Notice (TAC Nos. ME4529, ME4530, ME4531, ME4532, ME4533, ME4534, and ME4535) ML11158A2532011-06-30030 June 2011 Individual SUNSI Notice ML11171A4212011-06-30030 June 2011 Withdrawal of Amendment Requests (TACs ME4852, ME4853,(Catawba) ME4854, ME4855,(McGuire) ME4856, ME4857, and ME4858 (Oconee)) ML11171A4522011-06-30030 June 2011 Notice of Withdrawal of Application for Amendment to Facility Operating License NRC-2011-0127, McGuire Nuclear Station, Units 1 and 2 - Notice of Withdrawal of Application for Amendments to Renewed Facility Operating Licenses (TAC Nos. ME4256, ME4257, ME4258 and ME4259)2011-05-26026 May 2011 McGuire Nuclear Station, Units 1 and 2 - Notice of Withdrawal of Application for Amendments to Renewed Facility Operating Licenses (TAC Nos. ME4256, ME4257, ME4258 and ME4259) ML11136A0162011-05-26026 May 2011 Withdrawal of Amendment Requests ML11136A0172011-05-26026 May 2011 Notice of Withdrawal of Application for Amendments to Renewed Facility Operating Licenses 2022-06-01
[Table view] Category:Letter
MONTHYEARIR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31
[Table view] |
Text
March 13, 2007Mr. G. R. PetersonVice President McGuire Nuclear Station Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING FOR REVISION TO THE TECHNICAL SPECIFICATIONS CONCERNING THE EMERGENCY CORE COOLING SYSTEM SUMP (TAC NOS. MD4748 AND MC4749)
Dear Mr. Peterson:
Enclosed is a copy of a "Notice of Consideration of Issuance of Amendments to FacilityOperating Licenses, proposed no significant hazards consideration determination, and Opportunity for a Hearing," related to the application dated March 8, 2007. The proposed amendments would revise the McGuire Nuclear Station, Units 1 and 2, TechnicalSpecification 3.5.2.8, and the associated Bases and authorizes changes to the Updated Final Safety Analysis Reports concerning modifications to the emergency core cooling system sump.This Notice has been forwarded to the Office of Federal Register for publication. Sincerely,/RA/John F. Stang, Senior Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-369 and 50-370
Enclosure:
Federal Register Noticecc w/encl: See next page
ML070710293OFFICENRR/LPL2-1/PMNRR/LPL2-1/LANRR/LPL2-1/BCNAMEJStangMO'BrienEMarinos DATE3/12/073/12/073/13/07 McGuire Nuclear Station, Units 1 & 2 cc:
Mr. G. R. PetersonVice President McGuire Nuclear Station Duke Power Company LLC 12700 Hagers Ferry Road Hunterville, NC 28078Ms. Lisa F. VaughnAssociate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202County Manager of Mecklenburg County720 E. Fourth St.
Charlotte, NC 28202Mr. C. Jeffrey Thomas Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, NC 28078Senior Resident Inspectorc/o U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, NC 28078Dr. John M. BarryMecklenburg County Department of Environmental Protection 700 N. Tryon St Charlotte, NC 28202Mr. Peter R. Harden, IVVP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road, 12th Floor Charlotte, NC 28210NCEM REP Program Manager4713 Mail Service Center Raleigh, NC 27699-4713Mr. Leonard G. GreenAssistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602Mr. R.L. Gill, Jr., ManagerNuclear Regulatory Issues &
Industry Affairs Duke Energy Corporation 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202Division of Radiation ProtectionNC Dept of Environment, Health & Natural
Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721Mr. T. Richard PuryearOwners Group (NCEMC)
Duke Energy Corporation 4800 Concord Road York, SC 29745Mr. Henry BarronGroup Vice President, Nuclear Generation
& Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006Ms. Kathryn B. NolanSenior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202 7590-01-PUNITED STATES NUCLEAR REGULATORY COMMISSIONDUKE POWER COMPANY LLC, ET AL.DOCKET NOS. 50-369 AND 50-370 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TOFACILITY OPERATING LICENSES, PROPOSED NO SIGNIFICANT HAZARDSCONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARINGThe U.S. Nuclear Regulatory Commission (the Commission) is consideringissuance of an amendment to Facility Operating License Nos. NPF-9 and NPF-11 issued to Duke Power Company LLC, et al., for operation of the McGuire Nuclear Station, Units 1 and 2, located in Mecklenburg County, North Carolina. The proposed amendments would approve changes to the current licensing basesfor the McGuire Nuclear Station, Units 1 and 2, emergency core cooling system containment
sump strainers. Before issuance of the proposed license amendment, the Commission will havemade findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made a proposed determination that the amendment requestinvolves no significant hazards consideration. Under the Commission's regulations in Title 10 of the CODE OF FEDERAL REGULATIONS (10 CFR), Part 50, Section 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previouslyevaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:1. Does the proposed amendment involve a significant increase in the probability orconsequences of an accident previously evaluated?Response: No.
Implementation of the proposed amendment does not significantly increase theprobability or the consequences of an accident previously evaluated. The ECCS
[emergency core cooling system] containment sump functions in the mitigation of a Loss of Coolant Accident (LOCA). It is not an accident initiator.Commitments to Regulatory Guide 1.82, Rev 0, as currently described in the UFSAR[Updated Final Safety Analysis Report], are being revised to establish appropriateexceptions associated with the modified ECCS sump strainer design. This modified ECCS containment sump assembly, consisting of a complex geometry, and crediting all effective strainer surface area, was designed using the methodology contained in NEI 04-07, "Pressurized Water Reactor Sump Performance Evaluation Methodology," Rev 0, and the associated NRC [Nuclear Regulatory Commission] Safety Evaluation Report.Removal of the implied licensing basis requirement to physically separate thecontainment sump into two halves or provide ECCS train separation within the same containment sump will not impact the assumptions made in Chapter 15 of the McGuire UFSAR. There are no changes in any failure mode or effects analysis associated with this change. Since there are no credible failures which could result in the introduction of debris within the strainer assembly, the need to provide this physical separation is not warranted.Although the configurations of the existing ECCS containment sump trash racks andscreen and the replacement sump strainer assemblies are different, they serve the same fundamental purpose of passively removing debris from the sump's suction supply of the supported system pumps. Removal of trash racks does not impact the adequacy of the pump NPSH [net positive suction head] assumed in the safety analysis. Likewise, the change does not reduce the reliability of any supported systems or introduce any new system interactions. The greatly increased surface area of the modified strainer is designed to reduce head loss.Thus, based on the above, the proposed change does not involve a significant increasein the probability or consequences of an accident previously evaluated.2. Does the proposed amendment create the possibility of a new or different kind ofaccident from any accident previously evaluated?
Response: No.The proposed amendment will not create the possibility of a new or different kind ofaccident. The ECCS containment sump strainer serves as a passive component of the ECCS accident mitigation system. It is, therefore, not an accident initiator. The modified design requirements result in a strainer that performs the same functions in the same manner as the original design, such that no different kind of accident is created.A change to McGuire Technical Specification Surveillance Requirement [SR] 3.5.2.8does not alter the nature of events postulated in the Safety Analysis Report nor do they introduce any unique precursor mechanisms. Therefore, the proposed changes will not create the possibility of a new or different kindof accident from any accident previously evaluated.3. Does the proposed amendment involve a significant reduction in the margin ofsafety?Response: No.
Margin of safety is related to the confidence in the ability of the fission product barriersto perform their design functions during and following an accident situation. These barriers include the fuel cladding, the reactor coolant system, and the containment system. The performance of the containment system, fuel cladding, and the reactor coolant system will not be impacted by the proposed change.Duke's [the licensee's] evaluation concludes that there are no credible failuremechanisms applicable to the modified ECCS containment sump strainer design. The revised design requirements result in enhanced strainer performance under more conservative debris loading assumptions.The proposed change to Technical Specification SR 3.5.2.8 will have no effect on themanner in which safety limits, limiting safety system settings, or limiting conditions for operation are determined nor will there be any effect on those plant systems necessary to assure the accomplishment of protective functions. The proposed change does not adversely affect the fuel, fuel cladding, Reactor Coolant System, or containmentintegrity.Thus, it is concluded that the proposed changes do not involve a significant reduction inthe margin of safety.The NRC staff has reviewed the licensee's analysis and, based on this review, itappears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed determination. Anycomments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 daysafter the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance. Should the Commission make a final No SignificantHazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently.Written comments may be submitted by mail to the Chief, Rulemaking, Directives andEditing Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this Federal Register notice. Written comments may also be delivered toRoom 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m.
to 4:15 p.m. Federal workdays. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. The filing of requests for hearing and petitions for leave to intervene is discussed below. Within 60 days after the date of publication of this notice, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes toparticipate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's PDR, located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System's (ADAMS)
Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition forleave to intervene is filed by the above date, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order.As required by 10 CFR 2.309, a petition for leave to intervene shall set forth withparticularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: 1) the name, address and telephone number of the requestor or petitioner; 2) the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding;
- 3) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and 4) the possible effect of any decision or order which may be entered in the proceeding on the requestors/petitioner's interest. The petition must also identify the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue of law or fact to beraised or controverted. In addition, the petitioner/requestor shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner/requestor must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner/requestor who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.Those permitted to intervene become parties to the proceeding, subject to anylimitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing.If a hearing is requested, the Commission will make a final determination on the issue ofno significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment.Nontimely requests and/or petitions and contentions will not be entertained absent adetermination by the Commission or the presiding officer of the Atomic Safety and Licensing Board that the petition, request and/or the contentions should be granted based on a balancingof the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).A request for a hearing or a petition for leave to intervene must be filed by: 1) first classmail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; 2) courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff; 3) E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, HEARINGDOCKET@NRC.GOV; or 4) facsimile transmissionaddressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, Attention: Rulemakings and Adjudications Staff at (301) 415-1101, verification number is (301) 415-1966. A copy of the request for hearing and petition for leave to intervene should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by email to OGCMailCenter@nrc.gov. A copy of therequest for hearing and petition for leave to intervene should also be sent to the, attorney for the licensee Ms. Lisa F. Vaughn, Associate General Counsel and Managing Attorney, Duke Energy Carolinas, LLC, 526 South Church St., EC07H, Charlotte, NC 28202.For further details with respect to this action, see the application for amendment datedMarch 8, 2007, which is available for public inspection at the Commission's PDR, located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not haveaccess to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-4737,or by e-mail to pdr@nrc.gov.Dated at Rockville, Maryland, this 13th day of March 2007. FOR THE NUCLEAR REGULATORY COMMISSION/RA/Leonard N. Olshan, Sr. Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation