(4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproducts and special nuclear materials as may be produced by the operation of McGuire Nuclear Station, Units I and 2, and; (6)
Pursuant to the Act and 10 CFR Parts 30 and 40, to receive, possess and process for release or transfer such byproduct material as may be produced by the Duke Training and Technology Center.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:.
(1)
Maximum Power Level The licensee is authorized to operate the facility at a reactor core full steady state power level of 3411 megawatts thermal (100%).
(2)
Technical Specifications The Technical Specifications contained In Appendix A, as revised through Amendment No. 240 are hereby Incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21 (d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation.
Duke shall complete these activities no later than June 12,2021, and shall notify the NRC In writing when implementation of these activities is complete and can be verified by NRC Inspection.
The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be Included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following Issuance of this renewed operating license.
Until that update is complete, Duke may make changes to the programs described In such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
Renewed License No. NPF-9 Amendment No. 240 (4) Pursuant to the Act and 10 CFR Parts 30, 40.and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproducts and special nuclear materials as may be produced by the operation of McGuire Nuclear Station, Units I and 2; and, (6)
Pursuant to the Act and 10 CFR Parts 30 and 40, to receive, possess and process for release or transfer such byproduct material as may be produced by the Duke Training andTechnology Center.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and Is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter In effect; and is subject to the additional conditions specified or incorporated below:.
(1)
Maximum Power Level The licensee Is authorized to operate the facility at a reactor core full steady state power level of 341.1 megawatts thermal (100%).
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 222 are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation.
Duke shall complete these activities no later than March 3, 2023, and shall notify the NRC in writing when Implementation of these activities Is complete and can be verified by NRC inspection.
The Updated Final Safety Analysis Report supjlement as revised on December 16, 2002, described above, shall be Included In the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following issuance of this renewed operating license.
Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59, and otherwise complies with the requirements in that section.
Renewed License No. NPF-17 Amendment No. 222
ECCS -
Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.4 Verify each ECCS pump's developed head at the test In accordance with flow point is greater than or equal to the required the Inservice developed head.
Testing Program SR 3.5.2.5 Verify each ECCS automatic valve in the flow path that is 18 months not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.5.2.6 Verify each ECCS pump starts automatically on an actual 18 months or simulated actuation signal.
SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, each 18 months position stop is in the correct position.
Centrifugal Charging Safety Injection Pump Injection Throttle Pump Throttle Valve Number Valve Number N1480 N1488 N1481 N1489 N1482 N1490 N1483 N1491 SR 3.5.2.8 Verify, by visual inspection, that the ECCS containment 18 months sump strainer assembly and the associated enclosure are not restricted by debris and show no evidence of structural distress or abnormal corrosion.
McGuire Units 1 and 2 3.5.2-3 Amendment Nos. 240, 222