TAC:MC6760
From kanterella
Revision as of 21:37, 27 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
TAC - MC6760, Control Rod SCRAM Time Testing, Clarify Requirement for EDG Start Signal on RPV Level - LOW, LOW, LOW During RPV Cavity FLOOD-UP, Eliminate DG LOCA-START SRS While in S/D When No ECCS is Required, Fuel Movement with Inoperable Refueling Equipment Interlocks(Approved, Closed) 29 September 2005 - 3 May 2006 | |
---|---|
Request for: TSTF-222 - Control Rod SCRAM Time Testing, TSTF-275 - Clarify Requirement for EDG Start Signal on RPV Level - LOW, LOW, LOW During RPV Cavity FLOOD-UP, TSTF-300 - Eliminate DG LOCA-START SRS While in S/D When No ECCS is Required, TSTF-225 - Fuel Movement with Inoperable Refueling Equipment Interlocks Approved, Closed | |
Initiation
| |
From | |
MONTHYEARNLS2005093, Response to NRC Request for Additional Information License Amendment Request to Adopt Generic Changes to Standard Technical Specifications, Cooper Nuclear Station2005-09-29029 September 2005
[table view]Response to NRC Request for Additional Information License Amendment Request to Adopt Generic Changes to Standard Technical Specifications, Cooper Nuclear Station ML0609004412006-03-30030 March 2006 Technical Specification Pages, Change Request for Various Sections ML0607300192006-03-30030 March 2006 Issuance of Amendment Technical Specification Change Request for Various Sections ML0611001622006-04-18018 April 2006 Corrected Technical Specification Page 3.9-1 Re Refueling Operations ML0610703082006-04-18018 April 2006 Letter, Correction to Amendment, Various TS Changes ML0612403772006-05-0303 May 2006 Correction to Amendment No. 218, Technical Specification Page 3.1-12 ML0612300512006-05-0303 May 2006 Correction to Amendment No. 218 2006-03-30 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MC6760&oldid=1150515"