ML052290451

From kanterella
Jump to navigation Jump to search

RAI License Amendment Request to Adopt Generic Changes to Standard TSs
ML052290451
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/02/2005
From: Michelle Honcharik
NRC/NRR/DLPM/LPD4
To: Edington R
Nebraska Public Power District (NPPD)
Honcharik M, NRR/DLPM, 301-415-1774
References
TAC MC6760
Download: ML052290451 (6)


Text

September 2, 2005 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO ADOPT GENERIC CHANGES TO STANDARD TECHNICAL SPECIFICATIONS (TAC NO. MC6760)

Dear Mr. Edington:

Nebraska Public Power District (the licensee) requested the Nuclear Regulatory Commission (NRC) staffs approval for an amendment to revise the Cooper Nuclear Station Technical Specifications regarding the adoption of NRC-approved Technical Specification Task Force (TSTF) Travelers TSTF-222-A, TSTF-275-A, TSTF-300-A, and portions of TSTF-225 incorporated in the latest issued version of BWR/4 Standard Technical Specifications (NUREG-1433, Revision 3).

The NRC staff has reviewed the information provided in the April 13, 2005, submittal and has determined that the additional information identified in the enclosed request for additional information (RAI) is required in order for the NRC staff to complete its review. As agreed upon with Ronald E. Rodgers on August 11, 2005, the licensee will respond to the RAI within 30 days from the date of this letter.

Sincerely,

/RA by M.Fields for M.Honcharik/

Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

RAI cc w/encl: See next page

Mr. Randall K. Edington September 2, 2005 Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO ADOPT GENERIC CHANGES TO STANDARD TECHNICAL SPECIFICATIONS (TAC NO. MC6760)

Dear Mr. Edington:

Nebraska Public Power District (the licensee) requested the Nuclear Regulatory Commission (NRC) staffs approval for an amendment to revise the Cooper Nuclear Station Technical Specifications regarding the adoption of NRC-approved Technical Specification Task Force (TSTF) Travelers TSTF-222-A, TSTF-275-A, TSTF-300-A, and portions of TSTF-225 incorporated in the latest issued version of BWR/4 Standard Technical Specifications (NUREG-1433, Revision 3).

The NRC staff has reviewed the information provided in the April 13, 2005, submittal and has determined that the additional information identified in the enclosed request for additional information (RAI) is required in order for the NRC staff to complete its review. As agreed upon with Ronald E. Rodgers on August 11, 2005, the licensee will respond to the RAI within 30 days from the date of this letter.

Sincerely,

/RA by M.Fields for M.Honcharik/

Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

RAI cc w/encl: See next page DISTRIBUTION:

PUBLIC PDIV-1 Reading RidsNrrDlpmLpdiv1 (DTerao)

RidsNrrPMMHoncharik RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (KKennedy)

RJenkins APal DDuvigneaud RidsNrrDlpmDpr RidsNrrDeDpr ACCESSION NO: ML052290451 OFFICE PDIV-2/PE PDIV-1/PM PDIV-1/LA EEIB-B/SC PDIV-1/SC NAME DDuvigneaud MFields for MHoncharik DBaxley RJenkins DTerao DATE 8/29/05 8/30/05 8/29/05 9/2/05 9/2/05 OFFICIAL RECORD COPY

Cooper Nuclear Station cc:

Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Michael T. Boyce Nuclear Assett Manager Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P. O. Box 499 Columbus, NE 68602-0499 Mr. Paul V. Fleming Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Cheryl K. Rogers, Program Manager Nebraska Health & Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P. O. Box 95007 Lincoln, NE 68509-5007 Mr. Mike Wells, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 State Emergency Management Agency P. O. Box 116 Jefferson City, MO 65101 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street Suite D Des Moines, IA 50309 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321

Enclosure REQUEST FOR ADDITIONAL INFORMATION ISSUES RELATED TO THE LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS - ADOPTION OF GENERIC CHANGES TO STANDARD TECHNICAL SPECIFICATIONS COOPER NUCLEAR STATION DOCKET NO. 50-298 1.

The proposed note 2 to surveillance requirement (SR) 3.8.2.1 states that SR 3.8.1.11 is considered to be met without the ECCS initiation signals OPERABLE when the ECCS initiation signals are not required to be OPERABLE per Table 3.3.5.1-1. This is not consistent with TSTF 300-A, Rev. 0 which states SR 3.8.1.12 and SR 3.8.1.19 are not required to be met when associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, ECCS - Shutdown.

a.)

The proposed note states that SR 3.8.1.11 is considered to be met. Provide a justification for this modification. In addition, explain what does "considered to be met" mean? Also, provide the status of SR 3.8.1.11 during "ECCS -

Shutdown."

b.)

Explain why the proposed note did not include the statement that associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, ECCS -

Shutdown.

2.

In Section 4.3 of the amendment request, you stated that although the DG is not required to start in response to ECCS initiation signals, the DG is still required to meet the other attributes of SR 3.8.1.11 when associated ECCS initiation signals are not required to be operable per TS Table 3.3.5.1-1. Provide which attributes will be met and how this SR will be performed.