ML18017B176

From kanterella
Revision as of 18:55, 9 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Part 21 Rept Re Lack of Stud Base Qualification for Angle Arc Shield.Evaluation Will Be Completed by 801001
ML18017B176
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 07/11/1980
From: CHIANGI N J
CAROLINA POWER & LIGHT CO.
To:
References
REF-PT21-80-250-000 SH-N-2118, NUDOCS 8007230247
Download: ML18017B176 (1)


Text

i TTACHED S A P T PART 21 IDBFIFICATION NO,.DATE OF LETtER DATE DISTRIBUTED DISTRIBUTION:

REACTOR (R)IE FILES AD/ROI (2)AD/RCI (2)REGIONS I, I I, I I I, IV,V VENDOR BR, R-IV~LOB/l'PA NS 5715 AEOD l'%602 NRR/DOE NRlVKI-NRR/DST NRR/DOL WRQRAbBl~016 CENiRAL FILES (CHRON)PDR LPDR TERA ACTION: FUEL CYCLE R l"ATERIALS (N IE FILES AD/FPBI REGIONS I, I I, I I I, IV,V VENDOR BR, R-IV YKS/FG"8 SS-396 LOB/N'A M'8 5715 AEOD PNB 7602 CEIL RAL FILES 016 CENTRAL FILES (CHRON)PDR LPDR TERA SAFEGUARDS (S)IE FILES AD/SG AD/ROI REGIONS I,II,III,IV,V VENDOR BR, R-IV NRR/DOL MTS I SG SS-881 LOB/(PA NS 5715 AEOD NB 7602 CENTRAL FILES 016 CEI'8 RAL FILES (ChRON)CE%RAL FILES SS-396 PDR LPDR TERA T UN T-R Yi 359 f 0~~F'~~-P g-zz-a-ao;COj%'AN lÃE4 c IKKET N0, S'~o'-P'o i o-goo 4o-g<'RIGIIWL REPORT SUPPIEIBITARY PRELININARY EVALUATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR FOLLOWUP AS SENT BELOW', k4'SS OTHER ROI SG FFMSI RB!;7/9/80