ML080520616

From kanterella
Revision as of 20:17, 30 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Nine Mile Point, Unit 2 - Tech Spec Pages for Amendment 122 Revision to Drywell Spray Nozzle Testing Frequency
ML080520616
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/11/2008
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
David, Marshall - DORL 415-1547
Shared Package
ML080170156 List:
References
TAC MD6280
Download: ML080520616 (2)


Text

-4-(1) Maximum Power Level Nine Mile Point Nuclear Station, LLC, is authorized to operate the facility at reactor core. power levels not in excess of 3467 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained In Appendix A and the Environmental Protection Plan contained In Appendix B. both of which are attached hereto, as revised through Amendment No. 122 are hereby incorporated into this license. Nine Mile Point Nu.i.lear Station, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.*(3) Fuel Storage and Handling (Section 9.1., SSER 4).a. Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three containers high.b. When not in the reactor vessel, no more than three fuel assemblies shall be allowed outside of their shipping containers or storage racks in the New Fuel Vault or Spent Fuel Storage Facility., c. The above three fuel assemblies shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping contairier array and approved storage rack locations.

d. The New Fuel Storage Vault shall have no more than ten fresh.fuel assemblies uncovered at any one time.(4) Turbine System MainLenance Program (Section 3.5,1.3.10,SERI The operating licensee shall submit for NRC apprc'val by October 31, 1989, a turbine system maintenance program based on the manufacturer's calculations of missile generation probabilities.(Submitted by NMPC letter dated October 30, 1989, from C.D. Terry and approved by NRC letter dated March 15, 1990, from Robert Martin to Mr. Lawrence Burkhardt, i1l).The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition ft; discussed.

Renewed License No. NPF.69 Arenire_t N:). ,122 RHR Dyrwell Spray 3.6.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1 Verify each RHR drywell spray subsystem 31 days manual and power operated valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the-correct position.SR 3.6.1.6.2 Verify, by administrative means, that 92 days each required RHR pump is OPERABLE.SR 3.6.1.6.3 Verify each drywell spray nozzle is Following unobstructed.

maintenance that could result in nozzle blockage NMP2 3.6.1.6-2 Amendment 94, 122