2008/04/22-Entergy's Nineteenth Supplemental Disclosure
ML081210179
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/22/2008
From: Teplinsky E
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-271-LR, ASLBP 06-849-03-LR, RAS M-35
Download: ML081210179 (6)


Text

J DOCKETED USNRC April 22, 2008 (2:58pm) April 22, 2008 OFFICE OF SECRETARY RULEMAKINGS AND UNITED STATES OF AMERICA ADJUDICATIONS STAFF NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ))Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271-LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR

)(Vermont Yankee Nuclear Power Station) )ENTERGY'S NINETEENTH SUPPLEMENTAL DISCLOSURE Pursuant to 10 C.F.R. § 2.336(d), Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. ("Entergy")

hereby supplements its disclosures as follows. Entergy is providing to each party and to the State of New Hampshire, by separate cover, one (1) compact disk. This disk contains subsequently obtained or developed non-proprietary documents identified as relevant to the admitted contentions.

In addition, one (1) disk containing documents that contain proprietary information is being provided to NEC and DPS pursuant to the Non-Disclosure Agreements executed by these parties.Respectfully Submitted, Elina Teplinsky*

PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, N.W.Washington, DC 20037-1128 Tel. (202) 663-9009 Counsel for Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.Dated: April 22, 2008*Admitted in Virginia only. Practice limited to federal nuclear energy regulatory matters.400807044vl

-O3s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.(Vermont Yankee Nuclear Power Station)))))))Docket No. 50-271-LR ASLBP No. 06-849-03-LR CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Nineteenth Supplemental Disclosures" dated April 22, 2008, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 2 2 nd day of April, 2008.*Administrative Judge Alex S. Karlin, Esq., Chairman Atomic Safety and Licensing Boardw Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ask2 (,rc_.gov2

  • Administrative Judge Dr. Thomas S. Elleman Atomic Safety and Licensing Board 5207 Creedmoor Road, #101, Raleigh, NC 27612.Office of Commission Appellate Adjudication Mail Stop 0-16 C1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
  • Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 rewt(iW;nrc.gov
  • Secretary Att'n: Rulemakings and Adjudications Staff Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001r hearin gdocket(nrc.gov Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 4 00807044vi
  • Lloyd Subin, Esq.*Mary Baty, Esq.*Steven C. Hamrick, Esq.*David E. Roth, Esq.Office of the General Counsel Mail Stop 0- 15 D21 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 LBS3@anrc.gov; mcb I (lnrc.gov; schI m-c.gov;der(4ýiii'c.gov
  • Anthony Z. Roisman, Esq.National Legal Scholars Law Firm 84 East Thetford Road Lyme, NH 03768* Peter C. L. Roth, Esq.Senor Assistant Attorney General Environmental Protection Bureau 33 Capitol Street Concord, NH 03301 Peter. Roth6'2dloj .nh.gcov*Marcia Carpenter Law Clerk to Judge Alex S. Karlin, Esq.Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 MXC7(_.7 nrc.gov*Ronald A. Shems, Esq.*Karen Tyler, Esq.Shems, Dunkiel, Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 rstie.gM_

sdksla w.com ktyIer(ihsdkslaw.com

  • Sarah Hofmann, Esq.Director of Public Advocacy Department of Public Service 112 State Street -Drawer 20 Montpelier, VT 05620-2601 Sarah .ho fnann({i)state.vt.us Elina Teplinsky 400807044vl 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ))Entergy Nuclear Vermont Yankee, LLC ) Docket No. 50-271 -LR and Entergy Nuclear Operations, Inc. ) ASLBP No. 06-849-03-LR

)(Vermont Yankee Nuclear Power Station) )Certification of Supplemental Disclosure Affidavit of H. Michael Metell County of Windham )) ss.State of Vermont )I, H. Michael Metell, being duly sworn, state: I am the License Renewal Project Manager for Entergy Nuclear Operations, Inc. My business address is 320 Governor Hunt Road, P.O. Box 250, Vernon, VT 05354. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. ("Entergy").

To the best of my knowledge, information and belief, Entergy's thirteenth supplemental disclosure in the above captioned proceeding discloses all documents or information required to be disclosed that were developed or obtained subsequent to the previous disclosure and have been identified as relevant to the admitted contentions.

Further, to the best of my knowledge, information and belief, these disclosures are accurate and complete as of this date.4007710260 Further the affiant sayeth not.Subscribed and sworn to before me this t_ day of April, 2008 Notary Pub My commission expires: Z, -/0 2-0 /..Dov,.,,.. .............OT."0AR".4 'C , .)'-,i "" .5 2 400771026v0 Vermont Yankee License Renewal Proceeding Proprietary Log for Documents Determined Relevant and Responsive to NEC Contentions Supplement 19 Disclosure, April 22, 2008 No. Type of Document Date Entity Claiming Document Title Document Proprietary Status 1 Calculations July 2007 Structural Integrity Environmental Fatigue Evaluation of Reactor Recirculation Inlet Nozzle and Vessel Associates, Inc. Shell/Bottom Head 2 Report December 2007 Structural Integrity Summary Report of Plant-Specific Environmental Fatigue Analyses for the Vermont Associates, Inc. Yankee Nuclear Power Station 400807050vl