Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20210D244 | 24 February 1987 | Vol 1 to Book 25, Reduced Section Properties for Channels | |
ML20211K180 | 19 September 1986 | Rev 1 to Calculation/Problem ROTC-06, Multimode Factor Evaluation Train C | |
ML20211K187 | 10 July 1986 | Test Rept for Static Testing of Train C Beam Clamps & Unistrut Hangers for Comanche Peak Steam Electric Station (Cpses) | |
ML20211K215 | 27 May 1986 | Rev 0 to Calculation/Problem ROTC-02, Procedure to Calculate Anchor Bolt Loads,Train C Conduit 2 Inches & Under | |
ML20212D621 | 4 September 1986 | Test Rept 48422-1, Cable Separation Test Program | |
ML20212D702 | 1 May 1986 | Test Rept 48037-02, Electrical Raceway Separation Verification Testing | |
ML20235F788 | 23 July 1987 | Rev 3 to M-12, Qualification Procedures for Cable Tray Support Evaluation | |
ML20235F820 | 5 May 1987 | Rev 2 to M-27, Thermal Load Evaluation | |
ML20235F855 | 27 July 1987 | Rev 2 to M-38, Siderail Extension Study | |
ML20235F904 | 11 September 1987 | Rev 3 to M-28, Justification of Clip Modelling Procedure | |
ML20235J446 | 11 January 1989 | Rev 1 to Test Rept Demonstration of IE to Non-IE Isolation for RS-232C Serial Data Port | |
ML20236N416 | 9 October 1986 | Rev 3 to LIS-100C, Min Required Gap Between Bldgs | |
ML20236N433 | 1 October 1986 | Rev 4 to LIS-100C, Min Required Gap Between Secondary Walls & Floors Above | |
ML20236N450 | 11 November 1985 | LIS-100C, Min Required Gap Between Containment Wall & Internal Structure | |
ML20236N461 | 5 September 1986 | Rev 0 to LIS-100C, Min Required Gap Between Rcb & Auxiliary Bldg at Approx 900 Ft & Above | |
ML20236N468 | 9 October 1986 | LIS-501C, Turbine Bldg Seismic Displacement | |
ML20236N486 | 5 September 1986 | LIS-520C, Relative Displacement Between Reactor & Auxiliary Bldgs at Elevation 916 Ft | |
ML20244A901 | 16 November 1982 | Partially Withheld Rev 0 to Comanche Peak Steam Electric Station Preoperational Test Procedure 1CP-PT-02-02, 118 Vac Reactor Pressure Sys Inverters | Temporary Modification |
TXX-9332, Cycle 1 Startup Rept | 15 September 1993 | Cycle 1 Startup Rept | Safe Shutdown Boric Acid Shutdown Margin Grab sample Stroke time Pressure Boundary Leakage Power change |