Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20210D24424 February 1987Vol 1 to Book 25, Reduced Section Properties for Channels
ML20211K18019 September 1986Rev 1 to Calculation/Problem ROTC-06, Multimode Factor Evaluation Train C
ML20211K18710 July 1986Test Rept for Static Testing of Train C Beam Clamps & Unistrut Hangers for Comanche Peak Steam Electric Station (Cpses)
ML20211K21527 May 1986Rev 0 to Calculation/Problem ROTC-02, Procedure to Calculate Anchor Bolt Loads,Train C Conduit 2 Inches & Under
ML20212D6214 September 1986Test Rept 48422-1, Cable Separation Test Program
ML20212D7021 May 1986Test Rept 48037-02, Electrical Raceway Separation Verification Testing
ML20235F78823 July 1987Rev 3 to M-12, Qualification Procedures for Cable Tray Support Evaluation
ML20235F8205 May 1987Rev 2 to M-27, Thermal Load Evaluation
ML20235F85527 July 1987Rev 2 to M-38, Siderail Extension Study
ML20235F90411 September 1987Rev 3 to M-28, Justification of Clip Modelling Procedure
ML20235J44611 January 1989Rev 1 to Test Rept Demonstration of IE to Non-IE Isolation for RS-232C Serial Data Port
ML20236N4169 October 1986Rev 3 to LIS-100C, Min Required Gap Between Bldgs
ML20236N4331 October 1986Rev 4 to LIS-100C, Min Required Gap Between Secondary Walls & Floors Above
ML20236N45011 November 1985LIS-100C, Min Required Gap Between Containment Wall & Internal Structure
ML20236N4615 September 1986Rev 0 to LIS-100C, Min Required Gap Between Rcb & Auxiliary Bldg at Approx 900 Ft & Above
ML20236N4689 October 1986LIS-501C, Turbine Bldg Seismic Displacement
ML20236N4865 September 1986LIS-520C, Relative Displacement Between Reactor & Auxiliary Bldgs at Elevation 916 Ft
ML20244A90116 November 1982Partially Withheld Rev 0 to Comanche Peak Steam Electric Station Preoperational Test Procedure 1CP-PT-02-02, 118 Vac Reactor Pressure Sys InvertersTemporary Modification
TXX-9332, Cycle 1 Startup Rept15 September 1993Cycle 1 Startup ReptSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Stroke time
Pressure Boundary Leakage
Power change