05000271/LER-1982-025, Forwards LER 82-025/03L-0 | 29 December 1982 | Forwards LER 82-025/03L-0 | |
05000271/LER-1983-001, Forwards LER 83-001/01T-0 | 21 January 1983 | Forwards LER 83-001/01T-0 | |
05000271/LER-1983-003, Forwards LER 83-003/03L-0 | 9 February 1983 | Forwards LER 83-003/03L-0 | |
05000271/LER-1983-004, Forwards LER 83-004/03L-0 | 18 February 1983 | Forwards LER 83-004/03L-0 | |
05000271/LER-1983-005, Forwards LER 83-005/01P-0 | 4 February 1983 | Forwards LER 83-005/01P-0 | |
05000271/LER-1983-006, Forwards Updated LER 83-006/01X-0 | 17 March 1983 | Forwards Updated LER 83-006/01X-0 | |
05000271/LER-1983-007, Forwards LER 83-007/03L-0 | 25 March 1983 | Forwards LER 83-007/03L-0 | |
05000271/LER-1983-008, Forwards LER 83-008/03L-0 | 18 April 1983 | Forwards LER 83-008/03L-0 | |
05000271/LER-1983-010, Forwards LER 83-010/03L-0 | 21 April 1983 | Forwards LER 83-010/03L-0 | |
05000271/LER-1983-012, Forwards LER 83-012/01P-0 | 12 April 1983 | Forwards LER 83-012/01P-0 | |
05000271/LER-1995-019, Notifies of Cancellation of LER 95-019.Util Determined That Classification of Reactor Bldg Doors as Vital Fire Doors in Error.Design Basis of Reactor Bldg Doors as Airlock Doors, Not Vital Fire Doors | 5 June 1996 | Notifies of Cancellation of LER 95-019.Util Determined That Classification of Reactor Bldg Doors as Vital Fire Doors in Error.Design Basis of Reactor Bldg Doors as Airlock Doors, Not Vital Fire Doors | |
05000271/LER-1996-012, Forwards LER 96-012-01,previously Submitted on 970729.LER Contained Error Re Supplemental Rept & Expected Submission Date | 6 August 1997 | Forwards LER 96-012-01,previously Submitted on 970729.LER Contained Error Re Supplemental Rept & Expected Submission Date | |
05000271/LER-1997-012, Forwards LER 97-012-00,previously Submitted W/Incorrect Revision Number on Pages Two & Three | 6 June 1997 | Forwards LER 97-012-00,previously Submitted W/Incorrect Revision Number on Pages Two & Three | |
05000271/LER-1998-019, Forwards LER 98-019-01,as Defined by NUREG-1022,rev 1, Section 2.9.Rept Is Being Reissued Due to Typo on Cover Ltr Submitted with Rept on 981105.Cover Ltr Provided Incorrect LER Number.Encl Rept Date Also Changed to 981112 | 12 November 1998 | Forwards LER 98-019-01,as Defined by NUREG-1022,rev 1, Section 2.9.Rept Is Being Reissued Due to Typo on Cover Ltr Submitted with Rept on 981105.Cover Ltr Provided Incorrect LER Number.Encl Rept Date Also Changed to 981112 | |
05000309/LER-1980-001, Forwards LER 80-001/01T-1 | 21 March 1980 | Forwards LER 80-001/01T-1 | |
05000309/LER-1982-017, Forwards LER 82-017/03L-0 | 3 June 1982 | Forwards LER 82-017/03L-0 | |
05000309/LER-1982-018, Forwards LER 82-018/03L-0 | 23 July 1982 | Forwards LER 82-018/03L-0 | |
05000309/LER-1982-019, Forwards LER 82-019/01T-0 | 29 July 1982 | Forwards LER 82-019/01T-0 | |
05000309/LER-1982-020, Forwards LER 82-020/03L-0 | 20 July 1982 | Forwards LER 82-020/03L-0 | |
05000309/LER-1989-002, Forwards LER 89-002-01.Suppl Documents Addl Info & That Evaluation of Reported Conditions Completed Per 10CFR21 | 28 June 1989 | Forwards LER 89-002-01.Suppl Documents Addl Info & That Evaluation of Reported Conditions Completed Per 10CFR21 | |
05000309/LER-1996-033, Advises That Delivery Date for New Controllers for Pressurizer Proportional Heaters Changed from Feb 1997 to Mar 1997 Due to Delivery Problems,In Response to LER 96-033 | 7 February 1997 | Advises That Delivery Date for New Controllers for Pressurizer Proportional Heaters Changed from Feb 1997 to Mar 1997 Due to Delivery Problems,In Response to LER 96-033 | |
05000309/LER-1997-001, Informs That LER 97-001-00 Re Cable Separation Issues Should Have Been Transmitted by 970210.Due to Complexity of Issue, Rept Has Been Delayed & Expected to Be Transmitted No Later than 970218 | 10 February 1997 | Informs That LER 97-001-00 Re Cable Separation Issues Should Have Been Transmitted by 970210.Due to Complexity of Issue, Rept Has Been Delayed & Expected to Be Transmitted No Later than 970218 | |
05000309/LER-1997-004, Forwards Comments on Preliminary Accident Sequence Precursor Analysis of Operational Condition Discovered at Myaps on 970122 & Reported in LER 97-004 | 15 October 1997 | Forwards Comments on Preliminary Accident Sequence Precursor Analysis of Operational Condition Discovered at Myaps on 970122 & Reported in LER 97-004 | |
BVY-90-058, Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 900718 | 17 May 1990 | Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 900718 | |
BVY-90-071, Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) | 20 July 1990 | Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) | |
BVY-90-072, Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 1989 | 27 June 1990 | Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 1989 | |
BVY-90-078, Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs | 17 July 1990 | Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs | |
BVY-90-082, Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines | 24 July 1990 | Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines | |
BVY-90-084, Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 1990 | 24 July 1990 | Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 1990 | Shutdown Margin |
BVY-90-085, Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 1990 | 15 August 1990 | Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 1990 | |
BVY-90-086, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 900706 | 24 August 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 900706 | |
BVY-90-087, Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld | 28 August 1990 | Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld | |
BVY-90-094, Responds to Generic Ltr 90-03 Re Vendor Interface Program for safety-related Components.Both Elements in Generic Ltr Included in Station Procedures.Previous NRC Evaluations Found in Program Acceptable | 27 September 1990 | Responds to Generic Ltr 90-03 Re Vendor Interface Program for safety-related Components.Both Elements in Generic Ltr Included in Station Procedures.Previous NRC Evaluations Found in Program Acceptable | |
BVY-90-095, Forwards Summary of Results of Investigation of Allegation Re Contractor,Per .All Allegations Unsubstantial, Except for Allegation Re Rework of ASME Section VII Vessels | 4 October 1990 | Forwards Summary of Results of Investigation of Allegation Re Contractor,Per .All Allegations Unsubstantial, Except for Allegation Re Rework of ASME Section VII Vessels | |
BVY-90-096, Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 15 Core Operating Limits Rept | 11 October 1990 | Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 15 Core Operating Limits Rept | |
BVY-90-097, Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage | 4 October 1990 | Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage | |
BVY-90-100, Provides Info Re Practice of Monitoring Turbine Bldg Roof Vent Effluents During Accident Condition,Per | 12 October 1990 | Provides Info Re Practice of Monitoring Turbine Bldg Roof Vent Effluents During Accident Condition,Per | |
BVY-90-103, Suppls 890331 & 0630 Responses to NRC Bulletin 88-010, Molded Case Circuit Breakers | 22 October 1990 | Suppls 890331 & 0630 Responses to NRC Bulletin 88-010, Molded Case Circuit Breakers | |
BVY-90-104, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-09.Corrective Action:Procedure AP 0155, Current Sys & Valve Breaker Lineup & Identification, Revised | 29 October 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-271/90-09.Corrective Action:Procedure AP 0155, Current Sys & Valve Breaker Lineup & Identification, Revised | |
BVY-90-108, Informs of Change Re Aspect of Valve Replacement Effort Implemented Under 10CFR50.59 Affecting Bases of SER Issued in Support of License Amend.Resilient Seats for Feedwater Check Valves Removed | 2 November 1990 | Informs of Change Re Aspect of Valve Replacement Effort Implemented Under 10CFR50.59 Affecting Bases of SER Issued in Support of License Amend.Resilient Seats for Feedwater Check Valves Removed | |
BVY-90-110, Forwards Uitl Fitness for Duty Policy Per NRC 901026 Request.W/O Encl | 7 November 1990 | Forwards Uitl Fitness for Duty Policy Per NRC 901026 Request.W/O Encl | Fitness for Duty |
BVY-90-114, Forwards MT Varno Re Fitness for Duty Program Insp,Per Requirements of 10CFR50.4(a) | 19 November 1990 | Forwards MT Varno Re Fitness for Duty Program Insp,Per Requirements of 10CFR50.4(a) | Fitness for Duty |
BVY-90-115, Advises That Util Will Respond to Violations Noted in SSFI Rept 50-271/90-80 by 901130,per 901031 Telcon W/Nrc | 21 November 1990 | Advises That Util Will Respond to Violations Noted in SSFI Rept 50-271/90-80 by 901130,per 901031 Telcon W/Nrc | |
BVY-90-117, Advises That Required Actions Re Generic Ltr 88-14, Instrument Air Supply Problems Affecting Safety-Related Equipment, Implemented | 26 November 1990 | Advises That Required Actions Re Generic Ltr 88-14, Instrument Air Supply Problems Affecting Safety-Related Equipment, Implemented | |
BVY-90-119, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-80.Corrective Actions:Initiated Augmented Surveillance of RHRSW Motor Cooling Discharge Lines & Performed PRA Re Increase in Chance of Valve Malfunction | 28 November 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-271/90-80.Corrective Actions:Initiated Augmented Surveillance of RHRSW Motor Cooling Discharge Lines & Performed PRA Re Increase in Chance of Valve Malfunction | |
BVY-90-122, Submits 30-day Response to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Plant Design Does Not Include Isolation Condenser | 14 December 1990 | Submits 30-day Response to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Plant Design Does Not Include Isolation Condenser | |
BVY-90-123, Forwards Response to Violations Noted in Insp Rept 50-271/90-11 Re Personnel Access Control Program.Response Withheld (Ref 10CFR2.790) | 14 December 1990 | Forwards Response to Violations Noted in Insp Rept 50-271/90-11 Re Personnel Access Control Program.Response Withheld (Ref 10CFR2.790) | Time of Discovery |
BVY-90-125, Advises That Util Intends to Install Containment Overpressure Protection Capability by Means of Passive Hardened Wetwell Vent During Next Refueling Outage Scheduled for Mar 1992 | 31 December 1990 | Advises That Util Intends to Install Containment Overpressure Protection Capability by Means of Passive Hardened Wetwell Vent During Next Refueling Outage Scheduled for Mar 1992 | |
BVY-90-126, Responds to NRC Re Violations,Deviation & Weaknesses Noted in Insp Rept 50-271/90-10 on 900813-1009. Corrective Actions:Procedure AP 0140 Reviewed & Evaluation Process for Equipment Qualification Will Be Reviewed | 27 December 1990 | Responds to NRC Re Violations,Deviation & Weaknesses Noted in Insp Rept 50-271/90-10 on 900813-1009. Corrective Actions:Procedure AP 0140 Reviewed & Evaluation Process for Equipment Qualification Will Be Reviewed | Condition Adverse to Quality |
BVY-90-127, Suppls 900927 Response to Generic Ltr 90-03 Re Ongoing Process for Updating safety-related Equipment Vendor Manuals.Process Completion Delayed Beyond End of 1990 Due to Identification of Addl Equipment Manuals | 31 December 1990 | Suppls 900927 Response to Generic Ltr 90-03 Re Ongoing Process for Updating safety-related Equipment Vendor Manuals.Process Completion Delayed Beyond End of 1990 Due to Identification of Addl Equipment Manuals | |