Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000271/LER-1982-025, Forwards LER 82-025/03L-029 December 1982Forwards LER 82-025/03L-0
05000271/LER-1983-001, Forwards LER 83-001/01T-021 January 1983Forwards LER 83-001/01T-0
05000271/LER-1983-003, Forwards LER 83-003/03L-09 February 1983Forwards LER 83-003/03L-0
05000271/LER-1983-004, Forwards LER 83-004/03L-018 February 1983Forwards LER 83-004/03L-0
05000271/LER-1983-005, Forwards LER 83-005/01P-04 February 1983Forwards LER 83-005/01P-0
05000271/LER-1983-006, Forwards Updated LER 83-006/01X-017 March 1983Forwards Updated LER 83-006/01X-0
05000271/LER-1983-007, Forwards LER 83-007/03L-025 March 1983Forwards LER 83-007/03L-0
05000271/LER-1983-008, Forwards LER 83-008/03L-018 April 1983Forwards LER 83-008/03L-0
05000271/LER-1983-010, Forwards LER 83-010/03L-021 April 1983Forwards LER 83-010/03L-0
05000271/LER-1983-012, Forwards LER 83-012/01P-012 April 1983Forwards LER 83-012/01P-0
05000271/LER-1995-019, Notifies of Cancellation of LER 95-019.Util Determined That Classification of Reactor Bldg Doors as Vital Fire Doors in Error.Design Basis of Reactor Bldg Doors as Airlock Doors, Not Vital Fire Doors5 June 1996Notifies of Cancellation of LER 95-019.Util Determined That Classification of Reactor Bldg Doors as Vital Fire Doors in Error.Design Basis of Reactor Bldg Doors as Airlock Doors, Not Vital Fire Doors
05000271/LER-1996-012, Forwards LER 96-012-01,previously Submitted on 970729.LER Contained Error Re Supplemental Rept & Expected Submission Date6 August 1997Forwards LER 96-012-01,previously Submitted on 970729.LER Contained Error Re Supplemental Rept & Expected Submission Date
05000271/LER-1997-012, Forwards LER 97-012-00,previously Submitted W/Incorrect Revision Number on Pages Two & Three6 June 1997Forwards LER 97-012-00,previously Submitted W/Incorrect Revision Number on Pages Two & Three
05000271/LER-1998-019, Forwards LER 98-019-01,as Defined by NUREG-1022,rev 1, Section 2.9.Rept Is Being Reissued Due to Typo on Cover Ltr Submitted with Rept on 981105.Cover Ltr Provided Incorrect LER Number.Encl Rept Date Also Changed to 98111212 November 1998Forwards LER 98-019-01,as Defined by NUREG-1022,rev 1, Section 2.9.Rept Is Being Reissued Due to Typo on Cover Ltr Submitted with Rept on 981105.Cover Ltr Provided Incorrect LER Number.Encl Rept Date Also Changed to 981112
05000309/LER-1980-001, Forwards LER 80-001/01T-121 March 1980Forwards LER 80-001/01T-1
05000309/LER-1982-017, Forwards LER 82-017/03L-03 June 1982Forwards LER 82-017/03L-0
05000309/LER-1982-018, Forwards LER 82-018/03L-023 July 1982Forwards LER 82-018/03L-0
05000309/LER-1982-019, Forwards LER 82-019/01T-029 July 1982Forwards LER 82-019/01T-0
05000309/LER-1982-020, Forwards LER 82-020/03L-020 July 1982Forwards LER 82-020/03L-0
05000309/LER-1989-002, Forwards LER 89-002-01.Suppl Documents Addl Info & That Evaluation of Reported Conditions Completed Per 10CFR2128 June 1989Forwards LER 89-002-01.Suppl Documents Addl Info & That Evaluation of Reported Conditions Completed Per 10CFR21
05000309/LER-1996-033, Advises That Delivery Date for New Controllers for Pressurizer Proportional Heaters Changed from Feb 1997 to Mar 1997 Due to Delivery Problems,In Response to LER 96-0337 February 1997Advises That Delivery Date for New Controllers for Pressurizer Proportional Heaters Changed from Feb 1997 to Mar 1997 Due to Delivery Problems,In Response to LER 96-033
05000309/LER-1997-001, Informs That LER 97-001-00 Re Cable Separation Issues Should Have Been Transmitted by 970210.Due to Complexity of Issue, Rept Has Been Delayed & Expected to Be Transmitted No Later than 97021810 February 1997Informs That LER 97-001-00 Re Cable Separation Issues Should Have Been Transmitted by 970210.Due to Complexity of Issue, Rept Has Been Delayed & Expected to Be Transmitted No Later than 970218
05000309/LER-1997-004, Forwards Comments on Preliminary Accident Sequence Precursor Analysis of Operational Condition Discovered at Myaps on 970122 & Reported in LER 97-00415 October 1997Forwards Comments on Preliminary Accident Sequence Precursor Analysis of Operational Condition Discovered at Myaps on 970122 & Reported in LER 97-004
BVY-90-058, Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 90071817 May 1990Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 900718
BVY-90-071, Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)20 July 1990Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)
BVY-90-072, Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 198927 June 1990Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 1989
BVY-90-078, Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs17 July 1990Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs
BVY-90-082, Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines24 July 1990Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines
BVY-90-084, Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 199024 July 1990Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 1990Shutdown Margin
BVY-90-085, Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 199015 August 1990Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 1990
BVY-90-086, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 90070624 August 1990Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 900706
BVY-90-087, Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld28 August 1990Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld
BVY-90-094, Responds to Generic Ltr 90-03 Re Vendor Interface Program for safety-related Components.Both Elements in Generic Ltr Included in Station Procedures.Previous NRC Evaluations Found in Program Acceptable27 September 1990Responds to Generic Ltr 90-03 Re Vendor Interface Program for safety-related Components.Both Elements in Generic Ltr Included in Station Procedures.Previous NRC Evaluations Found in Program Acceptable
BVY-90-095, Forwards Summary of Results of Investigation of Allegation Re Contractor,Per .All Allegations Unsubstantial, Except for Allegation Re Rework of ASME Section VII Vessels4 October 1990Forwards Summary of Results of Investigation of Allegation Re Contractor,Per .All Allegations Unsubstantial, Except for Allegation Re Rework of ASME Section VII Vessels
BVY-90-096, Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 15 Core Operating Limits Rept11 October 1990Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 15 Core Operating Limits Rept
BVY-90-097, Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage4 October 1990Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage
BVY-90-100, Provides Info Re Practice of Monitoring Turbine Bldg Roof Vent Effluents During Accident Condition,Per12 October 1990Provides Info Re Practice of Monitoring Turbine Bldg Roof Vent Effluents During Accident Condition,Per
BVY-90-103, Suppls 890331 & 0630 Responses to NRC Bulletin 88-010, Molded Case Circuit Breakers22 October 1990Suppls 890331 & 0630 Responses to NRC Bulletin 88-010, Molded Case Circuit Breakers
BVY-90-104, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-09.Corrective Action:Procedure AP 0155, Current Sys & Valve Breaker Lineup & Identification, Revised29 October 1990Responds to NRC Re Violations Noted in Insp Rept 50-271/90-09.Corrective Action:Procedure AP 0155, Current Sys & Valve Breaker Lineup & Identification, Revised
BVY-90-108, Informs of Change Re Aspect of Valve Replacement Effort Implemented Under 10CFR50.59 Affecting Bases of SER Issued in Support of License Amend.Resilient Seats for Feedwater Check Valves Removed2 November 1990Informs of Change Re Aspect of Valve Replacement Effort Implemented Under 10CFR50.59 Affecting Bases of SER Issued in Support of License Amend.Resilient Seats for Feedwater Check Valves Removed
BVY-90-110, Forwards Uitl Fitness for Duty Policy Per NRC 901026 Request.W/O Encl7 November 1990Forwards Uitl Fitness for Duty Policy Per NRC 901026 Request.W/O EnclFitness for Duty
BVY-90-114, Forwards MT Varno Re Fitness for Duty Program Insp,Per Requirements of 10CFR50.4(a)19 November 1990Forwards MT Varno Re Fitness for Duty Program Insp,Per Requirements of 10CFR50.4(a)Fitness for Duty
BVY-90-115, Advises That Util Will Respond to Violations Noted in SSFI Rept 50-271/90-80 by 901130,per 901031 Telcon W/Nrc21 November 1990Advises That Util Will Respond to Violations Noted in SSFI Rept 50-271/90-80 by 901130,per 901031 Telcon W/Nrc
BVY-90-117, Advises That Required Actions Re Generic Ltr 88-14, Instrument Air Supply Problems Affecting Safety-Related Equipment, Implemented26 November 1990Advises That Required Actions Re Generic Ltr 88-14, Instrument Air Supply Problems Affecting Safety-Related Equipment, Implemented
BVY-90-119, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-80.Corrective Actions:Initiated Augmented Surveillance of RHRSW Motor Cooling Discharge Lines & Performed PRA Re Increase in Chance of Valve Malfunction28 November 1990Responds to NRC Re Violations Noted in Insp Rept 50-271/90-80.Corrective Actions:Initiated Augmented Surveillance of RHRSW Motor Cooling Discharge Lines & Performed PRA Re Increase in Chance of Valve Malfunction
BVY-90-122, Submits 30-day Response to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Plant Design Does Not Include Isolation Condenser14 December 1990Submits 30-day Response to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Plant Design Does Not Include Isolation Condenser
BVY-90-123, Forwards Response to Violations Noted in Insp Rept 50-271/90-11 Re Personnel Access Control Program.Response Withheld (Ref 10CFR2.790)14 December 1990Forwards Response to Violations Noted in Insp Rept 50-271/90-11 Re Personnel Access Control Program.Response Withheld (Ref 10CFR2.790)Time of Discovery
BVY-90-125, Advises That Util Intends to Install Containment Overpressure Protection Capability by Means of Passive Hardened Wetwell Vent During Next Refueling Outage Scheduled for Mar 199231 December 1990Advises That Util Intends to Install Containment Overpressure Protection Capability by Means of Passive Hardened Wetwell Vent During Next Refueling Outage Scheduled for Mar 1992
BVY-90-126, Responds to NRC Re Violations,Deviation & Weaknesses Noted in Insp Rept 50-271/90-10 on 900813-1009. Corrective Actions:Procedure AP 0140 Reviewed & Evaluation Process for Equipment Qualification Will Be Reviewed27 December 1990Responds to NRC Re Violations,Deviation & Weaknesses Noted in Insp Rept 50-271/90-10 on 900813-1009. Corrective Actions:Procedure AP 0140 Reviewed & Evaluation Process for Equipment Qualification Will Be ReviewedCondition Adverse to Quality
BVY-90-127, Suppls 900927 Response to Generic Ltr 90-03 Re Ongoing Process for Updating safety-related Equipment Vendor Manuals.Process Completion Delayed Beyond End of 1990 Due to Identification of Addl Equipment Manuals31 December 1990Suppls 900927 Response to Generic Ltr 90-03 Re Ongoing Process for Updating safety-related Equipment Vendor Manuals.Process Completion Delayed Beyond End of 1990 Due to Identification of Addl Equipment Manuals