Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000254/FIN-2009006-02 | Failure to Provide Adequate Electrical Coordination for Control Circuit | Safe Shutdown | |
05000254/FIN-2009403-01 | Licensee-Identified Violation | ||
05000254/FIN-2009403-02 | Licensee-Identified Violation | ||
05000254/FIN-2010003-01 | Loss of Power to Freeze Seal Machines During OPDRV | Significance Determination Process | |
05000254/FIN-2010003-02 | PCIS Relay Common Neutral Broken | ||
05000254/FIN-2010003-03 | Incorrect Wind Direction on NARS Form | Time of Discovery Nuclear Accident Reporting System | |
05000254/FIN-2010003-04 | MODE Change without Required RPS Instrument | ||
05000254/FIN-2010004-01 | Unit 2 Manual Scram | ||
05000254/FIN-2010004-02 | Licensee-Identified Violation | ||
05000254/FIN-2010005-01 | Failure to Update the UFSAR for Fire Protection Documents | Incorporated by reference | |
05000254/FIN-2010005-02 | Failure to Update the UFSAR for Fire Protection Documents | Incorporated by reference | |
05000254/FIN-2010005-03 | Licensee-Identified Violation | ||
05000254/FIN-2010402-01 | Security | ||
05000254/FIN-2010503-01 | (Traditional Enforcement) Changes to EAL Basis Decreased the Effectiveness of the Plan without Prior NRC Approval | ||
05000254/FIN-2010503-02 | Changes to EAL Basis Decreased the Effectiveness of the Plan without Prior NRC Approval. | ||
05000254/FIN-2011002-01 | MSIV RPS Limit Switch Preconditioning | ||
05000254/FIN-2011002-02 | Unit 1/2 EDG Output Breaker Failure to Unit 2 | ||
05000254/FIN-2011002-03 | None | Safe Shutdown Fire Protection Program | |
05000254/FIN-2011003-01 | RWCU Pumps Tripped on Low Flow | ||
05000254/FIN-2011003-02 | Wrong Limit Error During Surveillance | ||
05000254/FIN-2011004-01 | Turbine Building Differential Pressure Indicating Positive | Significance Determination Process | |
05000254/FIN-2011004-02 | Valve Out of Position in Radwaste | ||
05000254/FIN-2011004-03 | Non-Safety Related Main Steam Modification Failure | Downpower | |
05000254/FIN-2011004-04 | Failure to Appropriately Inspect Safety-Related Room Cooler | ||
05000254/FIN-2011004-05 | Transition from Emergency Operating Procedure to Appendix R Safe Shutdown Procedure-Time Zero Issue | Safe Shutdown | |
05000254/FIN-2011004-06 | Licensee-Identified Violation | Grace period | |
05000254/FIN-2011005-01 | Licensee-Identified Violation | Fire Protection Program Grace period | |
05000254/FIN-2011009-01 | Non-Conservative Calibration Tolerance Limits for Electrical Relay Settings | ||
05000254/FIN-2011009-02 | Failure to Perform Required In-Service Testing of Shutdown Cooling Suction Valves | ||
05000254/FIN-2011009-03 | Safety-Related Battery Charger Testing and Maintenance Procedures Did Not Include Steps for Electrolytic Capacitor Replacement | ||
05000254/FIN-2011009-04 | Tornado Missile Protection of the Emergency Diesel Generator Air Intake and Exhaust | Safe Shutdown Tornado Missile Tornado Missile Protection Earthquake | |
05000254/FIN-2011009-05 | Diesel Generator Technical Specification Frequency and Voltage Variation not Considered in Loading Calculations | ||
05000254/FIN-2011009-06 | Failure to Update the FSAR With the Safety Analysis Performed In Response to GL 2008-01 | ||
05000254/FIN-2011009-07 | Failure to Ensure that RHR Would Be Capable to Respond to a LOCA at Mode 3 | Significance Determination Process | |
05000254/FIN-2011403-01 | Security | ||
05000254/FIN-2011403-02 | Security | ||
05000254/FIN-2012002-01 | Failure to Follow Clearance Order Instructions | ||
05000254/FIN-2012002-02 | Licensee-Identified Violation | ||
05000254/FIN-2012003-01 | Bus Energized With Grounding Device Installed | ||
05000254/FIN-2012003-02 | Procedure Noncompliance Impacting Reliability of HPCI | Probabilistic Risk Assessment | |
05000254/FIN-2012003-03 | Failure to Identify Design Deficiency in Vendor Product | ||
05000254/FIN-2012003-04 | Licensee-Identified Violation | ||
05000254/FIN-2012004-01 | Unit 1 HPCI Steam Line Drain Valve THROUGH-BODY Leak | ||
05000254/FIN-2012004-02 | Control Room HVAC Rcu Head Bolts Not Torqued | ||
05000254/FIN-2012004-03 | Licensee-Identified Violation | Safe Shutdown | |
05000254/FIN-2012004-04 | Licensee-Identified Violation | ||
05000254/FIN-2012005-01 | Diesel Generator Technical Specification Frequency and Voltage Variation Not Considered in Loading Calculations | ||
05000254/FIN-2012005-02 | Failure to Follow Surveillance Procedure | ||
05000254/FIN-2012005-03 | Both Unit 1 Core Spray Subsystems Inoperable | ||
05000254/FIN-2012005-04 | Licensee-Identified Violation |