Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000254/LER-1998-008, Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed12 March 1998Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, ListedSafe Shutdown
05000254/LER-1998-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr16 March 1998Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr
05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed12 August 1998Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed
05000254/LER-1998-012, Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal29 May 1998Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal
05000254/LER-1998-014, Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr5 April 1998Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr
05000254/LER-1998-015, Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr27 April 1998Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr
05000254/LER-1998-017, Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 98082522 July 1998Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 980825
05000254/LER-1998-018, Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed27 July 1998Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed
05000254/LER-1998-019, Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made14 October 1998Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made
05000254/LER-1998-020, Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed11 September 1998Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed
05000254/LER-1998-021, Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed15 October 1998Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed
05000254/LER-1998-022, Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed29 October 1998Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed
05000254/LER-1998-023, Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided6 November 1998Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided
05000254/LER-1998-024, Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided20 November 1998Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided
05000254/LER-1998-025, Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed1 December 1998Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed
05000254/LER-1999-001, Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions12 May 1999Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions
05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed29 July 1999Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed
05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee7 October 1999Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee
05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action12 October 1999Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action
05000265/LER-1982-006, Forwards LER 82-006/03L-01 June 1982Forwards LER 82-006/03L-0
05000265/LER-1982-007, Forwards LER 82-007/03L-03 June 1982Forwards LER 82-007/03L-0
05000265/LER-1982-008, Forwards LER 82-008/03L-09 June 1982Forwards LER 82-008/03L-0
05000265/LER-1982-010, Forwards LER 82-010/03L-014 July 1982Forwards LER 82-010/03L-0
05000265/LER-1982-011, Forwards LER 82-011/01T-028 July 1982Forwards LER 82-011/01T-0
05000265/LER-1982-012, Forwards LER 82-012/03L-02 August 1982Forwards LER 82-012/03L-0
05000265/LER-1982-014, Forwards LER 82-014/03L-027 August 1982Forwards LER 82-014/03L-0
05000265/LER-1982-015, Forwards LER 82-015/03L-023 August 1982Forwards LER 82-015/03L-0
05000265/LER-1982-016, Forwards LER 82-016/03L-023 August 1982Forwards LER 82-016/03L-0
05000265/LER-1982-017, Forwards LER 82-017/03L-021 October 1982Forwards LER 82-017/03L-0
05000265/LER-1982-019, Forwards LER 82-019/03L-04 November 1982Forwards LER 82-019/03L-0
05000265/LER-1982-020, Forwards LER 82-020/03L-029 October 1982Forwards LER 82-020/03L-0
05000265/LER-1982-021, Forwards LER 82-021/03L-08 November 1982Forwards LER 82-021/03L-0
05000265/LER-1982-023, Forwards LER 82-023/03L-030 November 1982Forwards LER 82-023/03L-0
05000265/LER-1983-001, Forwards LER 83-001/03L-07 January 1983Forwards LER 83-001/03L-0
05000265/LER-1983-002, Forwards LER 83-002/03L-024 January 1983Forwards LER 83-002/03L-0
05000265/LER-1983-003, Forwards LER 83-003/03L-024 January 1983Forwards LER 83-003/03L-0
05000265/LER-1983-004, Forwards LER 83-004/03L-04 February 1983Forwards LER 83-004/03L-0
05000265/LER-1983-005, Forwards LER 83-005/03L-04 April 1983Forwards LER 83-005/03L-0
05000265/LER-1985-007, Responds to NRC Re Violations Noted in Insp Rept 50-265/85-18.Corrective Actions:Four Pressure Transmitters Will Be Returned to Original Configuration by 851031 & Work Request Sys Revised.Rev 1 to LER 85-007 Encl2 August 1985Responds to NRC Re Violations Noted in Insp Rept 50-265/85-18.Corrective Actions:Four Pressure Transmitters Will Be Returned to Original Configuration by 851031 & Work Request Sys Revised.Rev 1 to LER 85-007 EnclAnchor Darling
05000265/LER-1987-004, Informs That 870309 LER 87-004-00 Cover Ltr Misnumbered LER as 86-004-00.Correction Requested20 March 1987Informs That 870309 LER 87-004-00 Cover Ltr Misnumbered LER as 86-004-00.Correction Requested
05000265/LER-1988-062, Advises That Cover Ltr to LER 88-062 Inadvertently Refers to LER 88-028 & Requests That Ltr Be Be Attached to Rept29 September 1989Advises That Cover Ltr to LER 88-062 Inadvertently Refers to LER 88-028 & Requests That Ltr Be Be Attached to Rept
05000265/LER-1992-005, Forwards LER 92-005-01 Re Event That Occurred on 920125 at Quad Cities Unit 2.Encl LER Rescinds Design Changes, P04-1(2)-92-009,as Corrective Action8 July 1997Forwards LER 92-005-01 Re Event That Occurred on 920125 at Quad Cities Unit 2.Encl LER Rescinds Design Changes, P04-1(2)-92-009,as Corrective Action
05000265/LER-1993-018, Forwards LER 93-018-01.Motor 1-1301-49 Replaced W/Improved Motor.Documented Review of Station Trending Program Will Be Initiated to Evaluate How Program Failed to Identify Adverse Trends25 March 1994Forwards LER 93-018-01.Motor 1-1301-49 Replaced W/Improved Motor.Documented Review of Station Trending Program Will Be Initiated to Evaluate How Program Failed to Identify Adverse Trends
05000265/LER-1993-022, Informs of Cancellation of Commitment Contained in LER 93-022.RCIC Bed Plate Drain Lines Do Not Need to Be Rerouted Based on Check Valve Insp Frequency & Addition of Ball Valves6 April 1998Informs of Cancellation of Commitment Contained in LER 93-022.RCIC Bed Plate Drain Lines Do Not Need to Be Rerouted Based on Check Valve Insp Frequency & Addition of Ball Valves
05000265/LER-1994-001, Forwards LER 94-001-00.IST Procedures Revised to Incorporate Interim Procedure Requirements & RCIC Pump Tested Using Revised Procedures21 February 1994Forwards LER 94-001-00.IST Procedures Revised to Incorporate Interim Procedure Requirements & RCIC Pump Tested Using Revised Procedures
05000265/LER-1994-002, Forwards LER 94-002-00.OGCP 4-1 Will Be Revised to Clarify Specific Requirements for Independent Rod Verification28 February 1994Forwards LER 94-002-00.OGCP 4-1 Will Be Revised to Clarify Specific Requirements for Independent Rod Verification
05000265/LER-1994-008, Informs of Commitments Being Made Re LER 94-008,rev 016 May 1994Informs of Commitments Being Made Re LER 94-008,rev 0Unanalyzed Condition
05000265/LER-1994-010, Forwards LER 94-010 Re Unplanned Scram from Position 48 to 00 During Instrument Maint Surveillance8 August 1995Forwards LER 94-010 Re Unplanned Scram from Position 48 to 00 During Instrument Maint SurveillanceShutdown Margin
05000265/LER-1995-001, Informs of Commitments Being Made by Ltr Re Suppl Info Concerning LER 95-00129 March 1995Informs of Commitments Being Made by Ltr Re Suppl Info Concerning LER 95-001
05000265/LER-1995-003, Forwards LER 95-003 Re Shutdown Cooling Not Being Available31 July 1995Forwards LER 95-003 Re Shutdown Cooling Not Being Available