Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
ML13081A09830 June 2011Updated Final Safety Analysis Report, Revision 16. Chapter 10, Steam & Power Conversion System.Arizona Public ServiceOffice of Nuclear Reactor Regulation
ML17303B14827 May 1988Forwards Description of Plant Design Characteristics & Responses to Items Discussed in Generic Ltr 88-03, Steam Binding of Auxiliary Feedwater Pumps. Procedures Discussed in Place & Will Be MaintainedArizona Public Service
Van Brunt E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
ML17304B33023 May 1989Forwards Response to 890407 Request for Info Re Backfits & Installation CostArizona Public Service
Conway W
Jordan E
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
ML17305A91125 June 1990Responds to Generic Ltr 90-04, Status of Implementation of Generic Safety Issues.Arizona Public Service
Conway W
Office of Information Resources Management
ML20058M3446 August 1990Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at PlantNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Richards S
ML20128N63728 February 1993Auxiliary Feedwater System RISK-BASED Inspection Guide for the Palo Verde Nuclear Power PlantBattelle Memorial Institute
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Vo T
Gore B
Moffitt N
PACIFIC NORTHWEST NATION
Sloan J
Bumgardner J
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-0317 February 1988NRC Generic Letter 1988-003: Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1990-0425 April 1990NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective ActionsPartlow J
Office of Nuclear Reactor Regulation