Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000333/LER-2013-006 | 1 OF 6 | |
ENS 41987 | Automatic Reactor Scram on Low Reactor Vessel Water Level During Planned Maintenance | |
ENS 50532 | High Pressure Core Injection Degraded Accident Mitigation Capability | |
IR 05000333/1985022 | 28 September 1985 | Insp Rept 50-333/85-22 on 850715-0831.No Violation Noted. Major Areas Inspected:Ler Review,Operational Safety Verification,Surveillance Observations,Maint Observations & Followup on Plant Trips |
IR 05000333/1987013 | 12 May 1987 | Insp Rept 50-333/87-13 on 870406-09.No Violations or Deviations Noted.Major Areas Inspected:Procedure Review,Test Witnessing & Preliminary Results Evaluation of Periodic Containment Integrated Leak Rate Test.Tables Encl |
IR 05000333/1987026 | 3 February 1988 | Insp Rept 50-333/87-26 on 871201-880111.Violations Noted. Major Areas Inspected:Operational Safety Review,Surveillance & Maint Observations,Followup of Plant Trip,Ie Bulletin & ESF Actuation & Review of Missed Surveillance Tests |
IR 05000333/1993082 | 8 December 1993 | Insp Rept 50-333/93-82 on 931004-21.No Violations Noted. Major Areas Inspected:Mgt Programs & Oversight,Assessment/ Improvement Programs,Problem Identification & Resolution & Engineering & Technical Support |
IR 05000333/1998003 | 18 August 1998 | Insp Rept 50-333/98-03 on 980601-0712.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support |
IR 05000333/1998004 | 10 September 1998 | Insp Rept 50-333/98-04 on 980713-0823.Violations Noted.Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Rept Also Covers Results of Announced Security & Emergency Prepardness Insps by Region Based Specialists |
IR 05000333/1998008 | 10 February 1999 | Insp Rept 50-333/98-08 on 981123-990110.No Violations Noted. Major Areas Inspected:Operations,Egineering,Maintenance & Plant Support |
IR 05000333/1999004 | 18 June 1999 | Insp Rept 50-333/99-04 on 990412 to 0529.Non Cited Violations Noted.Major Areas Inspected:Operations,Maint & Engineering |
IR 05000333/2004003 | 30 July 2004 | IR 05000333-04-003 on 04/01/2004 - 06/30/2004 for James A. FitzPatrick Nuclear Power Plant; Licensed Operator Requalification |
IR 05000333/2004004 | 8 November 2004 | IR 05000333-04-004; on 07/01/2004 - 09/30/2004; James A. FitzPatrick Nuclear Power Plant; Fire Protection |
IR 05000333/2004005 | 2 February 2005 | IR 05000333-04-005, on 10/01/2004 -12/31/2004, James A. FitzPatrick Nuclear Power Plant; Post Maintenance Testing, Problem Identification and Resolution, Event Follow-up |
IR 05000333/2005005 | 26 October 2005 | IR 05000333-05-005; 07/01/2005 - 09/30/2005; James A. FitzPatrick Nuclear Power Plant; Event Response, and Cross Cutting Aspects of Findings |
IR 05000333/2005006 | 1 February 2006 | IR 05000333-05-006; 10/01/2005 - 12/31/2005; James A. FitzPatrick Nuclear Power Plant; Evaluation of Changes, Tests or Experiments, Maintenance Effectiveness, and Maintenance Risk Assessment and Emergent Work Control |
IR 05000333/2020002 | 10 August 2020 | Integrated Inspection Report 05000333/2020002 |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
JAFP-01-0133, ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation | 7 April 1995 | ITS: 3.3.4.1 Anticipated Transient Without Scram Recirulation Pump Trip (ATWS-RPT) Instrumentation |
JAFP-02-0098, Part 7 of 7, James A. FitzPatrick Nuclear Power Plant - Revision J to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications, Bases | 26 April 2002 | Part 7 of 7, James A. FitzPatrick Nuclear Power Plant - Revision J to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications, Bases |
JAFP-02-0124, Revision K to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications | 11 June 2002 | Revision K to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications |
JAFP-04-0083, Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio | 4 June 2004 | Proposed License Amendment Re Safety Limit Minimum Critical Power Ratio |
JAFP-04-0158, Follow-up Response to Request for Additional Information and Revision to Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) | 27 September 2004 | Follow-up Response to Request for Additional Information and Revision to Proposed License Amendment to Safety Limit Minimum Critical Power Ratio (SLMCPR) |
JAFP-09-0086, Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function | 31 July 2009 | Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function |
JAFP-10-0050, Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio | 21 April 2010 | Proposed Change to the Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio |
JAFP-11-0046, 2011 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal | 6 April 2011 | 2011 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal |
JAFP-11-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425, Revision 3, James A. F | 22 July 2011 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425, Revision 3, James A. FitzP |
JAFP-13-0115, Application to Revise Technical Specifications for Technical Specification Low Pressure Safety Limit | 8 October 2013 | Application to Revise Technical Specifications for Technical Specification Low Pressure Safety Limit |
JAFP-14-0047, Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio | 1 May 2014 | Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio |
JAFP-15-0047, 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal | 8 April 2015 | 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal |
JAFP-17-0051, LER 17-03-00 for FitzPatrick Regarding Inadvertent Isolation of the High Pressure Coolant Injection System | 5 June 2017 | LER 17-03-00 for FitzPatrick Regarding Inadvertent Isolation of the High Pressure Coolant Injection System |
JAFP-17-0083, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 29 August 2017 | James a Fitzpatrick, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | 2 October 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 |
JAFP-18-0012, Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | 22 January 2018 | Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 |
JAFP-19-0105, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (Rwcu)... | 6 November 2019 | Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (Rwcu)... |
JAFP-20-0026, Response to Request for Additional Information to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | 31 March 2020 | Response to Request for Additional Information to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation |
JAFP-21-0022, Technical Requirements Manual Specifications - Redacted | 29 March 2022 | Technical Requirements Manual Specifications - Redacted |