Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
3F0102-05, Special Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 12 | 22 January 2002 | Special Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 12 |
3F0104-03, Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13 | 27 January 2004 | Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13 |
3F0188-13, Responds to Violations Noted in SALP Insp Rept 50-302/87-27. Corrective Actions:Util Will Initiate six-shift Rotation If Enough Operator Licenses Obtained to Reduce Operator Overtime | 18 January 1988 | Responds to Violations Noted in SALP Insp Rept 50-302/87-27. Corrective Actions:Util Will Initiate six-shift Rotation If Enough Operator Licenses Obtained to Reduce Operator Overtime |
3F0188-19, Special Rept 87-05:during Refuel IV Outage,Steam Generator Eddy Current Testing Revealed Defective tubes.Pre-outage Planning Developed 6% Random Sampling Insp Plan That Would Be Completed on a Steam Generator | 20 January 1988 | Special Rept 87-05:during Refuel IV Outage,Steam Generator Eddy Current Testing Revealed Defective tubes.Pre-outage Planning Developed 6% Random Sampling Insp Plan That Would Be Completed on a Steam Generator |
3F0191-02, Forwards Supplemental Rept on Eddy Current Testing Performed During Refuel 7 in Response to Verbal Request by NRC During Telcon Held to Discuss Details of Steam Generator Tube Plugging Rept | 10 January 1991 | Forwards Supplemental Rept on Eddy Current Testing Performed During Refuel 7 in Response to Verbal Request by NRC During Telcon Held to Discuss Details of Steam Generator Tube Plugging Rept |
3F0203-07, Twenty-Day Response to Order EA-03-009 for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | 26 February 2003 | Twenty-Day Response to Order EA-03-009 for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors |
3F0294-01, Responds to & Provides Addl Info Re OTSG Indications | 4 February 1994 | Responds to & Provides Addl Info Re OTSG Indications |
3F0296-08, Provides Brief Discussion of Facility Refueling Outage 10 Activities of Mutual Interest | 14 February 1996 | Provides Brief Discussion of Facility Refueling Outage 10 Activities of Mutual Interest |
3F0306-01, Special Report 06-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 14 | 8 March 2006 | Special Report 06-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 14 |
3F0388-02, Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl | 21 March 1988 | Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl |
3F0392-01, Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl | 24 March 1992 | Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl |
3F0392-02, Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 920430 | 30 March 1992 | Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 920430 |
3F0398-06, Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL | 30 March 1998 | Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL |
3F0496-04, Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications | 8 April 1996 | Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications |
3F0506-03, License Amendment Request 264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity | 25 May 2006 | License Amendment Request #264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity |
3F0508-03, Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15 | 30 May 2008 | Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15 |
3F0591-11, Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications | 31 May 1991 | Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications |
3F0595-05, TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld | 31 May 1995 | TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld |
3F0595-07, OTSG Tube ISI Refuel Outage 9 12 Month Rept | 30 June 1995 | OTSG Tube ISI Refuel Outage 9 12 Month Rept |
3F0599-02, Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790 | 5 May 1999 | Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790 |
3F0698-25, Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl | 16 June 1998 | Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl |
3F0698-28, Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG | 18 June 1998 | Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG |
3F0698-33, Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis | 30 June 1998 | Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis |
3F0791-06, Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992 | 18 July 1991 | Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992 |
3F0792-02, Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629 | 10 July 1992 | Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629 |
3F0794-02, Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc | 8 July 1994 | Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc |
3F0896-11, OTSG Tube ISI Refuel Outage 10 90-Day Rept | 31 August 1996 | OTSG Tube ISI Refuel Outage 10 90-Day Rept |
3F0896-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process | 12 August 1996 | Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process |
3F0896-26, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 960430 | 29 August 1996 | Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 960430 |
3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 | 20 August 1999 | Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 |
3F0904-03, Response to NRC Request for Additional Information Regarding Special Report 03-01 | 9 September 2004 | Response to NRC Request for Additional Information Regarding Special Report 03-01 |
3F0996-06, Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing | 11 September 1996 | Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing |
3F0996-13, Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc | 23 September 1996 | Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc |
3F1108-02, Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information | 18 November 2008 | Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information |
3F1202-03, Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection | 2 December 2002 | Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection |
3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl | 5 December 1995 | Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl |
IR 05000302/1988001 | 10 March 1988 | Insp Rept 50-302/88-01 on 871216-880211.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Review of Special Repts |
IR 05000302/1988021 | 5 August 1988 | Insp Rept 50-302/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry, Corrosion Control & Pipe Thinning |
IR 05000302/1989006 | 25 April 1989 | Insp Rept 50-302/89-06 on 890225-0331.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mod, Review of 10CFR21 Repts & Followup of Onsite Events |
IR 05000302/2003006 | 26 January 2004 | IR 05000302-03-006, on 12/27/03 - 12/27/03, Crystal River Unit 3 and Exercise for Enforcement Discretion |
IR 05000302/2007005 | 29 January 2008 | IR 05000302-07-005; on 10/01- 12/31/2007; Crystal River, Unit 3; NRC Integrated Inspection Report |
IR 05000302/2009005 | 25 January 2010 | IR 05000302-09-005; 10/01/2009 -12/31/2009; Crystal River Unit 3; Followup of Events and Notices of Enforcement Discretion |
IR 05000302/2009006 | 28 September 2009 | IR 05000302-09-006; 07/27/2009 - 08/14/2009; Crystal River Nuclear Plant, Unit 3; License Renewal Inspection |
IR 05000302/2011003 | 19 July 2011 | IR 05000302-11-003, on 04/01/2011-06/30/2011; Crystal River Unit 3; Routine Integrated Report |
ML020440614 | 6 February 2002 | Exam 50-302/2002-301 Final SRO Written Exam with Answers |
ML020510576 | 6 February 2002 | Exam 50-302/2002-301 Draft SRO Written Exam |
ML020930796 | 3 April 2002 | Summary of Conference Call with Florida Power Corp. Regarding 2001 Steam Generator Tube Inspection Results 9TAC MB3015) |
ML022830834 | 19 September 2002 | Part 3 of 4 - Babcock & Wilcox Crosstraining Course |
ML030300506 | 17 January 2003 | Consolidated License Application for Framatome Anp, Inc, Model 51032-1 Shipping Container, Table of Contents - Appendix IV, Page IV-63 |
ML051190330 | 26 April 2005 | Steam Generator Inspection Presentation |