Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
3F0102-05, Special Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 1222 January 2002Special Report 02-01: Results of the Once Through Steam Generator (OTSG) Tube Inservice Inspection Conducted During Refueling Outage 12
3F0104-03, Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 1327 January 2004Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13
3F0188-13, Responds to Violations Noted in SALP Insp Rept 50-302/87-27. Corrective Actions:Util Will Initiate six-shift Rotation If Enough Operator Licenses Obtained to Reduce Operator Overtime18 January 1988Responds to Violations Noted in SALP Insp Rept 50-302/87-27. Corrective Actions:Util Will Initiate six-shift Rotation If Enough Operator Licenses Obtained to Reduce Operator Overtime
3F0188-19, Special Rept 87-05:during Refuel IV Outage,Steam Generator Eddy Current Testing Revealed Defective tubes.Pre-outage Planning Developed 6% Random Sampling Insp Plan That Would Be Completed on a Steam Generator20 January 1988Special Rept 87-05:during Refuel IV Outage,Steam Generator Eddy Current Testing Revealed Defective tubes.Pre-outage Planning Developed 6% Random Sampling Insp Plan That Would Be Completed on a Steam Generator
3F0191-02, Forwards Supplemental Rept on Eddy Current Testing Performed During Refuel 7 in Response to Verbal Request by NRC During Telcon Held to Discuss Details of Steam Generator Tube Plugging Rept10 January 1991Forwards Supplemental Rept on Eddy Current Testing Performed During Refuel 7 in Response to Verbal Request by NRC During Telcon Held to Discuss Details of Steam Generator Tube Plugging Rept
3F0203-07, Twenty-Day Response to Order EA-03-009 for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors26 February 2003Twenty-Day Response to Order EA-03-009 for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
3F0294-01, Responds to & Provides Addl Info Re OTSG Indications4 February 1994Responds to & Provides Addl Info Re OTSG Indications
3F0296-08, Provides Brief Discussion of Facility Refueling Outage 10 Activities of Mutual Interest14 February 1996Provides Brief Discussion of Facility Refueling Outage 10 Activities of Mutual Interest
3F0306-01, Special Report 06-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 148 March 2006Special Report 06-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 14
3F0388-02, Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl21 March 1988Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl
3F0392-01, Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl24 March 1992Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl
3F0392-02, Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 92043030 March 1992Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 920430
3F0398-06, Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL30 March 1998Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL
3F0496-04, Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications8 April 1996Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications
3F0506-03, License Amendment Request 264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity25 May 2006License Amendment Request #264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity
3F0508-03, Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 1530 May 2008Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15
3F0591-11, Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications31 May 1991Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications
3F0595-05, TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld31 May 1995TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld
3F0595-07, OTSG Tube ISI Refuel Outage 9 12 Month Rept30 June 1995OTSG Tube ISI Refuel Outage 9 12 Month Rept
3F0599-02, Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.7905 May 1999Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790
3F0698-25, Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl16 June 1998Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl
3F0698-28, Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG18 June 1998Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG
3F0698-33, Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis30 June 1998Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis
3F0791-06, Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 199218 July 1991Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992
3F0792-02, Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 92062910 July 1992Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629
3F0794-02, Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc8 July 1994Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc
3F0896-11, OTSG Tube ISI Refuel Outage 10 90-Day Rept31 August 1996OTSG Tube ISI Refuel Outage 10 90-Day Rept
3F0896-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process12 August 1996Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process
3F0896-26, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 96043029 August 1996Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 960430
3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 320 August 1999Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3
3F0904-03, Response to NRC Request for Additional Information Regarding Special Report 03-019 September 2004Response to NRC Request for Additional Information Regarding Special Report 03-01
3F0996-06, Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing11 September 1996Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing
3F0996-13, Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc23 September 1996Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc
3F1108-02, Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information18 November 2008Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information
3F1202-03, Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection2 December 2002Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection
3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl5 December 1995Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl
IR 05000302/198800110 March 1988Insp Rept 50-302/88-01 on 871216-880211.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mods & Review of Special Repts
IR 05000302/19880215 August 1988Insp Rept 50-302/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry, Corrosion Control & Pipe Thinning
IR 05000302/198900625 April 1989Insp Rept 50-302/89-06 on 890225-0331.Violations Noted. Major Areas Inspected:Plant Operations,Security,Radiological Controls,Lers & Nonconforming Operations Repts,Facility Mod, Review of 10CFR21 Repts & Followup of Onsite Events
IR 05000302/200300626 January 2004IR 05000302-03-006, on 12/27/03 - 12/27/03, Crystal River Unit 3 and Exercise for Enforcement Discretion
IR 05000302/200700529 January 2008IR 05000302-07-005; on 10/01- 12/31/2007; Crystal River, Unit 3; NRC Integrated Inspection Report
IR 05000302/200900525 January 2010IR 05000302-09-005; 10/01/2009 -12/31/2009; Crystal River Unit 3; Followup of Events and Notices of Enforcement Discretion
IR 05000302/200900628 September 2009IR 05000302-09-006; 07/27/2009 - 08/14/2009; Crystal River Nuclear Plant, Unit 3; License Renewal Inspection
IR 05000302/201100319 July 2011IR 05000302-11-003, on 04/01/2011-06/30/2011; Crystal River Unit 3; Routine Integrated Report
ML0204406146 February 2002Exam 50-302/2002-301 Final SRO Written Exam with Answers
ML0205105766 February 2002Exam 50-302/2002-301 Draft SRO Written Exam
ML0209307963 April 2002Summary of Conference Call with Florida Power Corp. Regarding 2001 Steam Generator Tube Inspection Results 9TAC MB3015)
ML02283083419 September 2002Part 3 of 4 - Babcock & Wilcox Crosstraining Course
ML03030050617 January 2003Consolidated License Application for Framatome Anp, Inc, Model 51032-1 Shipping Container, Table of Contents - Appendix IV, Page IV-63
ML05119033026 April 2005Steam Generator Inspection Presentation