Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000324/FIN-2009002-03 | Failure to Follow Procedures During Reactor Head Disassembly (Section 1R20) | |
05000324/FIN-2010002-01 | Failure to Follow Procedures During Reactor Head Disassembly | |
05000324/FIN-2012004-01 | Failure to Maintain Secondary Containment Operable During an OPDRV Activity | |
05000325/LER-2005-006 | ||
05000325/LER-2012-001 | ||
BSEP 02-0093, Part 2 of 2 - Brunswick, Units 1 and 2 - Submittal of Technical Specification Bases Changes for Revisions 21 and 22 (Units 1 and 2) and Revision 23 (Unit 1 Only) | 8 May 2002 | Part 2 of 2 - Brunswick, Units 1 and 2 - Submittal of Technical Specification Bases Changes for Revisions 21 and 22 (Units 1 and 2) and Revision 23 (Unit 1 Only) |
BSEP 02-0114, Submittal of Technical Specification Bases Changes Revisions 24 & 25 | 5 June 2002 | Submittal of Technical Specification Bases Changes Revisions 24 & 25 |
BSEP 02-0124, Application for Amendment to Licenses DPR-71 & DPR-62 to Revise Technical Specifications Section 3.1.7 to Reflect Modifications as Result of Transition to GE14 Fuel Design | 24 July 2002 | Application for Amendment to Licenses DPR-71 & DPR-62 to Revise Technical Specifications Section 3.1.7 to Reflect Modifications as Result of Transition to GE14 Fuel Design |
BSEP 02-0174, Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit | 7 November 2002 | Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit |
BSEP 03-0036, Response to Request for Additional Information Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ration Safety Limit | 17 February 2003 | Response to Request for Additional Information Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ration Safety Limit |
BSEP 03-0054, Submittal of Technical Specification Bases Changes Revisions 27 & 28 | 28 March 2003 | Submittal of Technical Specification Bases Changes Revisions 27 & 28 |
BSEP 03-0148, Request for License Amendment Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ration Safety Limits and Revision to References in Technical Specification 5.6.5, Core Operating Limits Report | 31 October 2003 | Request for License Amendment Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ration Safety Limits and Revision to References in Technical Specification 5.6.5, Core Operating Limits Report |
BSEP 03-0155, Response to RAI Regarding Core Flow Operating Range Expansion | 20 November 2003 | Response to RAI Regarding Core Flow Operating Range Expansion |
BSEP 04-0046, Submittal of Technical Specification Bases Changes | 29 March 2004 | Submittal of Technical Specification Bases Changes |
BSEP 04-0065, Units, 1 and 2 - Submittal of Technical Specification Bases Changes | 4 June 2004 | Units, 1 and 2 - Submittal of Technical Specification Bases Changes |
BSEP 04-0098, Request for License Amendments Deletion of Hydrogen and Oxygen Analyzer Requirements Consolidated Line Item Improvement Process (TSTF-447, Revision 1) | 26 July 2004 | Request for License Amendments Deletion of Hydrogen and Oxygen Analyzer Requirements Consolidated Line Item Improvement Process (TSTF-447, Revision 1) |
BSEP 05-0082, Submittal of Technical Specification Bases Changes | 22 June 2005 | Submittal of Technical Specification Bases Changes |
BSEP 05-0102, Request for License Amendment Revised Main Steam Isolation Valve Leakage Limit | 11 August 2005 | Request for License Amendment Revised Main Steam Isolation Valve Leakage Limit |
BSEP 06-0129, Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel | 22 January 2007 | Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel |
BSEP 07-0110, BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval. | 25 October 2007 | BNP-TR-014, Rev. 1, IST Program Plan Fourth Ten-Year Inspection Interval. |
BSEP 08-0050, Response to Request for Additional Information Regarding Fourth 10-Year Inservice Testing (1ST) Program Update | 23 April 2008 | Response to Request for Additional Information Regarding Fourth 10-Year Inservice Testing (1ST) Program Update |
BSEP 09-0019, Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 2 | 27 October 2009 | Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 2 |
BSEP 10-0052, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report | 29 April 2010 | Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report |
BSEP 11-0108, Response to Integrated Inspection Report Nos.: 05000325/2011004 and 05000324/2011004 | 14 December 2011 | Response to Integrated Inspection Report Nos.: 05000325/2011004 and 05000324/2011004 |
BSEP 16-0078, Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit | 26 September 2016 | Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit |
BSEP 16-0110, Request for Alternatives in Support of the Fifth 10-Year Inservice Testing (IST) Program | 14 December 2016 | Request for Alternatives in Support of the Fifth 10-Year Inservice Testing (IST) Program |
BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 29 June 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 | 3 October 2017 | Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 |
BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan | 19 February 2018 | Fifth 10-Year Inservice Testing Program Plan |
BSEP-89-0678, Annual Rept Re Functional Summaries of Procedures,Plant Mods & Tests or Experiments Conducted in 1988 | 31 December 1988 | Annual Rept Re Functional Summaries of Procedures,Plant Mods & Tests or Experiments Conducted in 1988 |
BSEP-90-0804, Annual Rept of Procedures & Plant Mods,Per 10CFR50.59 for 1989 | 31 December 1989 | Annual Rept of Procedures & Plant Mods,Per 10CFR50.59 for 1989 |
BSEP-92-0050, Annual Rept Per 10CFR50.59 for 1991. Rept Contains Tests & Experiments Conducted in 1991 But Not Described in Fsar | 31 December 1992 | Annual Rept Per 10CFR50.59 for 1991. Rept Contains Tests & Experiments Conducted in 1991 But Not Described in Fsar |
BSEP-92-0057, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/92-35 & 50-325/92-35.Corrective Actions:Rhr Sys Operating Procedure Revised to Require Second Operator to Monitor RPV Level & CR Activity Study to Be Performed | 28 December 1992 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/92-35 & 50-325/92-35.Corrective Actions:Rhr Sys Operating Procedure Revised to Require Second Operator to Monitor RPV Level & CR Activity Study to Be Performed |
BSEP-94-0018, Forwards Description of Util Hardware Mod Designed to Satisfy Requested Actions of NRC Bulletin 93-003.Util Reviewed NRC Info Notice 93-089 & Determined Design Problems Do Not Apply to Facility | 26 January 1994 | Forwards Description of Util Hardware Mod Designed to Satisfy Requested Actions of NRC Bulletin 93-003.Util Reviewed NRC Info Notice 93-089 & Determined Design Problems Do Not Apply to Facility |
BSEP-94-0308, Provides Response to NRC Staff Request for Info Re NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers | 8 August 1994 | Provides Response to NRC Staff Request for Info Re NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers |
BSEP-94-0413, Application for Amends to Licenses DPR-62 & DPR-71,proposing Ts,Increasing Instrument Surveillance Test Intervals & Allowable out-of-service Times | 28 October 1994 | Application for Amends to Licenses DPR-62 & DPR-71,proposing Ts,Increasing Instrument Surveillance Test Intervals & Allowable out-of-service Times |
BSEP-95-0112, Forwards Supplemental Info Re 931028 Request for License Amends to Increase Instrument Surveillance Test Intervals & Allowable out-of-svc Times Addressed in TS 3/4.3,as Result of Discussions W/Nrc During 950208 Meeting & 950216 Telcon | 22 March 1995 | Forwards Supplemental Info Re 931028 Request for License Amends to Increase Instrument Surveillance Test Intervals & Allowable out-of-svc Times Addressed in TS 3/4.3,as Result of Discussions W/Nrc During 950208 Meeting & 950216 Telcon |
BSEP-96-0123, Application for Amends to Licenses DPR-62 & DPR-71,revising TS to Allow Uprate of Facilities to 105% of Rated Thermal Power.Proprietary & Nonproprietary Versions of GE Power Uprate SAR for Bsep... Encl.Proprietary GE Rept Withheld | 2 April 1996 | Application for Amends to Licenses DPR-62 & DPR-71,revising TS to Allow Uprate of Facilities to 105% of Rated Thermal Power.Proprietary & Nonproprietary Versions of GE Power Uprate SAR for Bsep... Encl.Proprietary GE Rept Withheld |
BSEP-96-0300, Responds to RAI Re TS to Allow Uprate of Units to 105% of Rated Thermal Power | 7 August 1996 | Responds to RAI Re TS to Allow Uprate of Units to 105% of Rated Thermal Power |
BSEP-97-0125, Application for Amends to Licenses DPR-71 & DPR-62,revising Definitions for ECCS Response Time,Isolation Sys Response Time & Reactor Protection Sys Response Time | 27 March 1997 | Application for Amends to Licenses DPR-71 & DPR-62,revising Definitions for ECCS Response Time,Isolation Sys Response Time & Reactor Protection Sys Response Time |
BSEP-97-0135, Application for Amends to Licenses DPR-71 & DPR-62,revising Requirements for Instrumentation Response Time Testing Associated W/Rps,Isolation Actuation Sys & ECCS | 11 April 1997 | Application for Amends to Licenses DPR-71 & DPR-62,revising Requirements for Instrumentation Response Time Testing Associated W/Rps,Isolation Actuation Sys & ECCS |
BSEP-97-0209, Forwards Addl Plant Specific Info to Support Review of Proposed Strainer Replacements,In Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs | 5 June 1997 | Forwards Addl Plant Specific Info to Support Review of Proposed Strainer Replacements,In Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs |
BSEP-97-0355, Responds to 970702 RAI Re Conversion to Improved TS for Plant | 8 August 1997 | Responds to 970702 RAI Re Conversion to Improved TS for Plant |
BSEP-97-0419, Application for Amends to Licenses DPR-71 & DPR-62,revising Certain Instrumentation Allowable Values,Per NUREG-1433,Rev 1 | 28 October 1997 | Application for Amends to Licenses DPR-71 & DPR-62,revising Certain Instrumentation Allowable Values,Per NUREG-1433,Rev 1 |
BSEP-97-0443, Suppl to Application for Amends to Licenses DPR-71 & DPR-62, Converting Current TS to Improved Ts,As Contained in Rev 1 of NUREG-1433.Rev a to Improved TS & Revised Responses to 970808 & 970911 RAIs Also Encl | 13 October 1997 | Suppl to Application for Amends to Licenses DPR-71 & DPR-62, Converting Current TS to Improved Ts,As Contained in Rev 1 of NUREG-1433.Rev a to Improved TS & Revised Responses to 970808 & 970911 RAIs Also Encl |
BSEP-98-0090, Provides Comments on Draft SE Re Conversion to Improved Tech Specs.Encl 2 Provides Draft SE pages,marked-up to Reflect Comments as Well as Addl Editorial Comments | 21 April 1998 | Provides Comments on Draft SE Re Conversion to Improved Tech Specs.Encl 2 Provides Draft SE pages,marked-up to Reflect Comments as Well as Addl Editorial Comments |
BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 | 5 August 1999 | Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 |
ENS 40833 | High Presure Coolant Injection System Inoperable Due to Maintenance | |
IR 05000324/1982010 | 1 April 1982 | IE Insp Repts 50-324/82-10 & 50-325/82-10 on 820119-21. Noncompliance Noted:Failure to Follow Procedures,Failure to Meet Commitments of TMI Action Item I.C.6,failure to Take Corrective Action & Failure to Implement Procedures |
IR 05000324/1986001 | 5 March 1986 | Insp Repts 50-324/86-01 & 50-325/86-01 on 860101-31. Violation Noted:Failure to Accomplish Activities Affecting Quality in Accordance W/Drawings |