Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20052E395 | 4 May 1982 | Fay C WEC Energy Group | Revises 820414 Response to IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Correction to Figure 14.3.4-1 Caused Error in Response to Items 3 & 4.Revised Figure Encl | Request |
ML20064L899 | 11 February 1983 | Fay C WEC Energy Group | Advises That Installation of Addl Supports for Auxiliary Feedwater Sys Piping & Components Rescheduled to June 1983, Due to Conflicts W/Other Plant Mods | Other |
ML20067D631 | 15 December 1982 | Fay C WEC Energy Group | Comments on Technical Evaluation Rept Re Seismic Qualification of Auxiliary Feedwater Sys,Per 821112 Request. Recommendation to Acquire Complete SSE Level of Seismic Capacity Constitutes Unnecessary & Expensive Backfit | Other |
ML20080B553 | 31 January 1984 | Fay C WEC Energy Group | Provides Addl Info Re Status of Auxiliary Feedwater Sys Mods Implemented in Response to Generic Ltr 81-14.Last Remaining Mod Involves Replacement of Battery Rack Support Straps & Should Be Completed by Oct 1984 | Other |
ML20091J858 | 23 May 1984 | WEC Energy Group Falk R Hann R | Emergency Operating Procedure Validation Procedure | Other |
ML20100J089 | 4 December 1984 | Fay C WEC Energy Group | Provides Final Responses to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Support Straps on Battery Racks Replaced as Scheduled in | Other |
ML20116D298 | 22 April 1985 | Fay C WEC Energy Group | Notifies That Installation of Low Suction Pressure Automatic Trips on Auxiliary Feedwater Pumps Expected to Be Completed by 860131,in Response to NRC Request for Commitment Date | Request |
ML20206S686 | 16 September 1986 | Office of Nuclear Reactor Regulation Colburn T | Forwards Safety Evaluation & Technical Evaluation Rept on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Addl Info Requested Re Diesel Generator Room Flooding | Approval |
ML20206S709 | 16 September 1986 | Office of Nuclear Reactor Regulation | Safety Evaluation on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys (Afws). Reasonable Assurance Exists That Afws Will Perform Required Safety Function Following SSE | Approval |
ML20206S749 | 31 May 1986 | Chris Miller Brookhaven National Laboratory Philippacopoulo Liu Q | Evaluation of Structural Aspects Re Point Beach Plant | Other |
ML20209H297 | 21 January 1987 | Office of Nuclear Reactor Regulation Colburn T | Advises That Mods to Protect Diesel Generator Voltage Regulator Cabinets from Fire Protection Sprinkler Operation Adequately Address NRC Concerns Identified in 860916 Safety Evaluation,Per Util | Approval |
ML20215N840 | 31 October 1986 | Fay C WEC Energy Group | Advises of Features & Mods to Diesel Generator Room Air Exhaust Duct Louvers & Diesel Generator Voltage Regulator Cabinets in Response to Concerns Expressed in 860916 Safety Evaluation Re Util Compliance W/Generic Ltr 81-14 | Other |