Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
HBL-10-005, Revision 8 to the Defueled Safety Analysis Report, Revision 26 to the Quality Assurance Plan, and Revision 3 to the Technical Specifications Bases3 March 2010Revision 8 to the Defueled Safety Analysis Report, Revision 26 to the Quality Assurance Plan, and Revision 3 to the Technical Specifications BasesFitness for Duty
Grab sample
Offsite Dose Calculation Manual
Nondestructive Examination
Emergency Lighting
Condition Adverse to Quality
Annual Radioactive Effluent Release Report
Process Control Program
Stress corrosion cracking
Safeguards Contingency Plan
Commercial Grade
Fuel cladding
Fire Protection Program
Grace period
Backfit
HBL-12-003, Revision 9 to the Defueled Safety Analysis Report and Revision 28 to the Quality Assurance Plan21 February 2012Revision 9 to the Defueled Safety Analysis Report and Revision 28 to the Quality Assurance PlanFitness for Duty
Grab sample
Offsite Dose Calculation Manual
Nondestructive Examination
Condition Adverse to Quality
Annual Radioactive Effluent Release Report
Process Control Program
Stress corrosion cracking
Safeguards Contingency Plan
Commercial Grade
Fuel cladding
Fire Protection Program
Grace period
Backfit
HBL-14-003, Revision 10 to the Defueled Safety Analysis Report and Revision 31 to Quality Assurance Plan4 February 2014Revision 10 to the Defueled Safety Analysis Report and Revision 31 to Quality Assurance PlanOffsite Dose Calculation Manual
Nondestructive Examination
Condition Adverse to Quality
Annual Radioactive Effluent Release Report
Process Control Program
Safeguards Contingency Plan
Commercial Grade
Fire Protection Program
Grace period
Backfit
Overexposure
HBL-16-001, Revision 11 to the Defueled Safety Analysis Report and Revision 33 to the Quality Assurance Plan29 January 2016Revision 11 to the Defueled Safety Analysis Report and Revision 33 to the Quality Assurance PlanOffsite Dose Calculation Manual
Nondestructive Examination
Annual Radioactive Effluent Release Report
Commercial Grade
Fire Protection Program
Grace period
Backfit
HBL-18-001, Revision 12 to the Defueled Safety Analysis Report, Revision 2 of the License Termination Plan, and Revisions 34, 35, and 36 to the Humboldt Bay Quality Assurance Plan23 February 2018Revision 12 to the Defueled Safety Analysis Report, Revision 2 of the License Termination Plan, and Revisions 34, 35, and 36 to the Humboldt Bay Quality Assurance PlanOffsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Exemption Request
Chernobyl
Fuel cladding
Fire Protection Program
Backfit
Fatality
L-20-005, ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-1 to 2.6-203 September 2020ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-1 to 2.6-20Earthquake
L-21-005, Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11, November 20214 November 2021Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11, November 2021High winds
Ultimate heat sink
Non-Destructive Examination
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Finite Element Analysis
Decommissioning Funding Plan
Tornado-Generated Missile
Aging Management
Tornado Missile Protection
Design basis earthquake
Annual Radiological Environmental Operating Report
Safeguards Contingency Plan
License Renewal
Earthquake
Commercial Grade
Control of Heavy Loads
Turbine Missile
Fuel cladding
Liquid penetrant
Fire Watch
ML03364044715 December 2003Independent Spent Fuel Storage Installation License Application, Safety Analysis Report, Figure 2.6-43 Log of Trench GMX-T2.
ML04086072231 March 2004Defueled Safety Analysis Report, Revision 5Shutdown Margin
Loop seal
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Emergency Lighting
Feedwater Heater
Stress corrosion cracking
Earthquake
Fuel cladding
Fire Protection Program
Scaffolding
Backfit
Siren
ML06033048126 January 2006Humboldt Bay Independent Spent Fuel Storage Installation Final Safety Analysis Report Update, Revision 0
ML20073K74024 February 2020Defueled Safety Analysis Report (Dsar), Revision 13Fire Protection Program
Backfit
ML20073K74931 January 2020License Termination Plan (Ltp), (DSAR, Appendix A), Revision 3Offsite Dose Calculation Manual
Coatings
Annual Radioactive Effluent Release Report
Exemption Request
Chernobyl
Fuel cladding
Backfit
Fatality
ML20281A4073 September 2020ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-21 to 2.6-44Coatings
Earthquake
ML20281A4083 September 2020ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-45 to 2.6-46
ML20281A4093 September 2020ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-86 to 2.6-120Earthquake
ML20281A4113 September 2020ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-47 to 2.6-85Earthquake
ML20281A4123 September 2020ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Except 2.6 FiguresHigh winds
Ultimate heat sink
Non-Destructive Examination
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Tornado-Generated Missile
Aging Management
Tornado Missile Protection
Design basis earthquake
Annual Radiological Environmental Operating Report
Stress corrosion cracking
Safeguards Contingency Plan
License Renewal
Earthquake
Commercial Grade
Control of Heavy Loads
Turbine Missile
Fuel cladding
Liquid penetrant
Fire Watch
Water rod
ML21314A0058 November 2021ISFSI, Final Safety Analysis Report (FSAR) Update, Figure 2.2-2B, Site Plan, Revision 10, August 2021