Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000000/LER-1975-004, Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept13 January 1975Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept
05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event5 June 1985Forwards LER 85-035-00 Re Physical Security Event
05000000/LER-1985-078, Forwards Revised LER 85-078-01 Re Physical Security Event22 November 1985Forwards Revised LER 85-078-01 Re Physical Security Event
05000000/LER-1985-083, Forwards LER 85-083-01.Rept Contains Safeguards Info3 October 1986Forwards LER 85-083-01.Rept Contains Safeguards Info
05000000/LER-1986-008, Forwards LER 86-008-0016 October 1986Forwards LER 86-008-00
05000000/LER-1986-018, Forwards LER 86-018-0014 March 1986Forwards LER 86-018-00
05000000/LER-1986-031, Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)13 June 1986Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-045, Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)8 September 1986Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)
05000000/LER-1986-049, Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)29 September 1986Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)
05000000/LER-1986-054, Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)7 October 1986Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-055, Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)10 October 1986Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)
05000277/LER-1979-002, Forwards LER 79-002/01T-022 January 1979Forwards LER 79-002/01T-0Fire Watch
05000277/LER-1981-002, Forwards LER 81-002/01T-019 January 1981Forwards LER 81-002/01T-0
05000277/LER-1981-013, Forwards LER 81-013/01T-0.Provides Narrative Description of 810203 Occurrence Re Failure of Valves to Meet Seismic Qualification Requirements18 February 1981Forwards LER 81-013/01T-0.Provides Narrative Description of 810203 Occurrence Re Failure of Valves to Meet Seismic Qualification Requirements
05000277/LER-1981-028, Forwards LER 81-028/01T-0.Detailed Event Analysis Also Submitted11 May 1981Forwards LER 81-028/01T-0.Detailed Event Analysis Also SubmittedEarthquake
05000277/LER-1982-011, Forwards LER 82-011/01T-0.Detailed Event Analysis Submitted11 June 1982Forwards LER 82-011/01T-0.Detailed Event Analysis Submitted
05000277/LER-1982-021, Forwards LER 82-021/03L-0.Detailed Event Analysis Encl25 August 1982Forwards LER 82-021/03L-0.Detailed Event Analysis EnclFuel cladding
05000277/LER-1982-027, Forwards LER 82-027/01T-0.Detailed Event Analysis Encl24 September 1982Forwards LER 82-027/01T-0.Detailed Event Analysis Encl
05000277/LER-1982-035, Forwards Revised LER 82-035/01X-1.Revised Detailed Event Analysis Encl8 December 1982Forwards Revised LER 82-035/01X-1.Revised Detailed Event Analysis Encl
05000277/LER-1982-036, Forwards LER 82-036/01T-0.Detailed Event Analysis Submitted8 November 1982Forwards LER 82-036/01T-0.Detailed Event Analysis Submitted
05000277/LER-1982-041, Forwards LER 82-041/01T-0.Detailed Event Analysis Submitted22 December 1982Forwards LER 82-041/01T-0.Detailed Event Analysis Submitted
05000277/LER-1983-001, Forwards LER 83-001/01T-0.Detailed Event Analysis Submitted18 January 1983Forwards LER 83-001/01T-0.Detailed Event Analysis Submitted
05000277/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted8 April 1983Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted
05000278/LER-1978-019, Forwards LER 78-019/01T-016 October 1978Forwards LER 78-019/01T-0
05000278/LER-1980-026, Forwards LER 80-026/01T-026 November 1980Forwards LER 80-026/01T-0
05000278/LER-1982-008, Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted18 June 1982Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted8 February 1983Forwards LER 83-002/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted25 March 1983Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted10 February 1983Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-007, Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted17 March 1983Forwards LER 83-007/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-011, Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted21 April 1983Forwards LER 83-011/01T-0.Detailed Event Analysis Submitted
05000278/LER-1983-012, Forwards LER 83-012/-01T-0.Detailed Event Analysis Encl9 May 1983Forwards LER 83-012/-01T-0.Detailed Event Analysis EnclWeld Overlay
0CAN108807, Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting17 October 1988Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 MeetingSafe Shutdown
Earthquake
2CAN038910, Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort29 March 1989Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation EffortExemption Request
3F0789-05, Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala7 July 1989Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala
3F1285-12, Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl20 December 1985Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl
A01328, Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-0725 November 1987Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07Hot Short
A02375, Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring10 June 1982Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring
A02468, Comments on Draft Branch Technical Position Re Radwaste Classification10 May 1982Comments on Draft Branch Technical Position Re Radwaste Classification
A02477, Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-07374 June 1982Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737
A02608, Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests30 July 1982Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests
A02611, Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 82091719 July 1982Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917
A02644, Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III30 July 1982Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III
A04790, Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid30 September 1985Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee PaidReactor Vessel Water Level
Anchor Darling
Exemption Request
Backfit
A04820, Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity25 June 1985Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube IntegrityForeign Material Exclusion
A04824, Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided11 October 1985Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 ProvidedHydrostatic
Backfit
A04858, Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid13 September 1985Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee PaidProbabilistic Risk Assessment
Exemption Request
A04880, Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 25 August 1985Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2Backfit
A04906, Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed5 July 1985Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities ListedFire Barrier
Systematic Assessment of Licensee Performance
A05276, Forwards Safety & Safeguards Insp Fees for 841223-85033023 October 1985Forwards Safety & Safeguards Insp Fees for 841223-850330