Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000133/LER-1978-003, Forwards LER 78-003/01T-011 October 1978Forwards LER 78-003/01T-0
05000133/LER-1982-004, Forwards LER 82-004/03L-030 June 1982Forwards LER 82-004/03L-0
05000133/LER-1982-005, Forwards LER 82-005/03L-016 July 1982Forwards LER 82-005/03L-0
05000133/LER-1982-006, Forwards LER 82-006/03L-020 July 1982Forwards LER 82-006/03L-0
DCL-85-336, Lists New Address for Util Washington,Dc Ofc.Telephone Number Remains Unchanged31 October 1985Lists New Address for Util Washington,Dc Ofc.Telephone Number Remains Unchanged
DCL-85-357, Submits Organizational Changes & Appointments Re Nuclear Related Activities within Facilities & Electric Resources Development Dept.Purpose of Reorganization Is to Consolidate Under Vice President Resources to Support Operations3 December 1985Submits Organizational Changes & Appointments Re Nuclear Related Activities within Facilities & Electric Resources Development Dept.Purpose of Reorganization Is to Consolidate Under Vice President Resources to Support Operations
DCL-86-186, Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed30 June 1986Informs of Reorganization & Reinstatement of Util Onsite Project Engineering Group.Changes Listed
DCL-87-006, Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler12 January 1987Requests That Technical Correspondence Be Addressed to Author at Listed Address,Per Encl .Encl NRC Re Results of Peebles Electrical Machines Insp Mistakenly Addressed to Jo Schuyler
DCL-88-100, Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed21 April 1988Forwards Rev 4 to Humboldt Bay Power Plant Unit 3 Safstor QA Plan. Revs Listed
DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages30 May 1989Requests Renewal of Approval of QA Programs for Radioactive Matl Packages
DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form28 July 1989Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form
HBL-85-024, Forwards Fee for 850425 Application to Dispose of Low Level Radwaste5 June 1985Forwards Fee for 850425 Application to Dispose of Low Level Radwaste
HBL-85-028, Submits Fourteenth Quarterly Status Rept Re Safstor Decommissioning,Per Board 820216 Order.Related Correspondence8 July 1985Submits Fourteenth Quarterly Status Rept Re Safstor Decommissioning,Per Board 820216 Order.Related Correspondence
HBL-85-030, Forwards Memo Rept,Flood Hydrology for Decommissioning of Humboldt Bay Power Plant Unit 3, in Response to Item 3 of 850214 Request for Addl Info Re Safstor Decommissioning of Facility11 July 1985Forwards Memo Rept,Flood Hydrology for Decommissioning of Humboldt Bay Power Plant Unit 3, in Response to Item 3 of 850214 Request for Addl Info Re Safstor Decommissioning of Facility
HBL-85-031, Responds to NRC Re Violations Noted in Insp Rept 50-133/85-02.Corrective Actions:Temporary Procedure Revised to Define Fuel Disassembly/Decontamination Area & Clean Table Area as Separate Work Locations12 July 1985Responds to NRC Re Violations Noted in Insp Rept 50-133/85-02.Corrective Actions:Temporary Procedure Revised to Define Fuel Disassembly/Decontamination Area & Clean Table Area as Separate Work LocationsHigh Radiation Area
HBL-85-035, Forwards Complete Response to Item 75 of NRC 850123 & 0214 Requests for Addl Info Re Safstor Decommissioning of Facility.Util Response to NRC Questions on Safstor Decommissioning Complete30 July 1985Forwards Complete Response to Item 75 of NRC 850123 & 0214 Requests for Addl Info Re Safstor Decommissioning of Facility.Util Response to NRC Questions on Safstor Decommissioning Complete
HBL-85-041, Forwards Annual Rept of Facility Changes for 1984, Per 10CFR50.59.Complete Records for Each Mod,Including Written Safety Evaluations,Maintained at Plant4 September 1985Forwards Annual Rept of Facility Changes for 1984, Per 10CFR50.59.Complete Records for Each Mod,Including Written Safety Evaluations,Maintained at Plant
HBL-85-046, Discusses Investigation of Shipment of Solidified/ Encapsulated Filters for Which Notification of Receipt Not Received within 20 Days After Transfer.Caused by Personnel Change at Burial Site & Change of Broker Address1 October 1985Discusses Investigation of Shipment of Solidified/ Encapsulated Filters for Which Notification of Receipt Not Received within 20 Days After Transfer.Caused by Personnel Change at Burial Site & Change of Broker Address
HBL-85-047, Forwards Four State of CA Documents Supporting Util Safstor Decommissioning Environ Plan7 October 1985Forwards Four State of CA Documents Supporting Util Safstor Decommissioning Environ PlanGrab sample
Accidental discharge
HBL-85-048, Provides 15th Quarterly Status Rept in Response to ASLB 820216 Memorandum & Order.Related Correspondence7 October 1985Provides 15th Quarterly Status Rept in Response to ASLB 820216 Memorandum & Order.Related Correspondence
HBL-85-050, Forwards Rev 1 to Custodial Safstor Physical Security Plan. Rev Withheld (Ref 10CFR73.21)22 October 1985Forwards Rev 1 to Custodial Safstor Physical Security Plan. Rev Withheld (Ref 10CFR73.21)
HBL-85-052, Responds to Generic Ltr 85-18 Requesting That All Licensees & Applicants for Operator Licenses Provide NRC W/Schedule for Conducting Operator Exams for Remainder of FY85 Through FY89.No Exams Planned at Plant1 November 1985Responds to Generic Ltr 85-18 Requesting That All Licensees & Applicants for Operator Licenses Provide NRC W/Schedule for Conducting Operator Exams for Remainder of FY85 Through FY89.No Exams Planned at Plant
HBL-85-057, Responds to NRC Addressing Potential Deficiency in Elma Engineering,Inc Equipment.Util Not Using & Does Not Plan to Use Power Supply Since Facility in Decommissioning Process9 December 1985Responds to NRC Addressing Potential Deficiency in Elma Engineering,Inc Equipment.Util Not Using & Does Not Plan to Use Power Supply Since Facility in Decommissioning Process
HBL-85-058, Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3)12 December 1985Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3)
HBL-85-059, Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included13 December 1985Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included
HBL-85-061, Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively20 December 1985Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively
HBL-86-004, Forwards No Significant Hazards Determination,Per Generic Ltr 86-03,supporting 831216 License Amend Request LAR 83-01, Amending License DPR-7 to Delete Requirements of Item E.2e of 760521 Order for Mod of License Re Seismic Network7 March 1986Forwards No Significant Hazards Determination,Per Generic Ltr 86-03,supporting 831216 License Amend Request LAR 83-01, Amending License DPR-7 to Delete Requirements of Item E.2e of 760521 Order for Mod of License Re Seismic NetworkEarthquake
HBL-86-005, Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan13 March 1986Forwards Rev 1 to Tech Specs for Decommissioning of Humboldt Bay Power Plant Unit 3. Rev Incorporates Util Commitments in Response to Questions During NRC Review of Decommissioning Plan
HBL-86-006, Forwards Rev 1 to Safstor QA Program & Description of Rev14 March 1986Forwards Rev 1 to Safstor QA Program & Description of Rev
HBL-86-018, Suppls 840730 Decommissioning Amend Request for License DPR-7 to Perform Mods Re Upgrading Spent Fuel Storage Pool, Pool Cover & Redundant Level Monitors & Replacing Stack Monitor to Reflect possession-only Status16 May 1986Suppls 840730 Decommissioning Amend Request for License DPR-7 to Perform Mods Re Upgrading Spent Fuel Storage Pool, Pool Cover & Redundant Level Monitors & Replacing Stack Monitor to Reflect possession-only Status
HBL-86-019, Forwards Rev 2 to Safstor QA Plan. Section 2.0 Revised to Reflect Applicable Organization Changes,Section 3.1.3, Insps Added to Describe Applicable Insp Requirements & Section 3.1.4, Nonconformance Control Revised23 May 1986Forwards Rev 2 to Safstor QA Plan. Section 2.0 Revised to Reflect Applicable Organization Changes,Section 3.1.3, Insps Added to Describe Applicable Insp Requirements & Section 3.1.4, Nonconformance Control Revised
HBL-86-020, Forwards Errata to 860313 Rev 1 to Proposed Safstor Tech Specs,Including Revised Figure VII-1, Offsite Organization Chart & Page VII-1023 May 1986Forwards Errata to 860313 Rev 1 to Proposed Safstor Tech Specs,Including Revised Figure VII-1, Offsite Organization Chart & Page VII-10
HBL-86-023, Requests Approval for Offsite Disposal of Listed Very Low Radwastes as Produced,W/O Individual Authorization.Util Will Sample Wastes & Monitor Radioactivity Per NRC Approved 831027 & 840407 Transmittals.Fee Paid17 June 1986Requests Approval for Offsite Disposal of Listed Very Low Radwastes as Produced,W/O Individual Authorization.Util Will Sample Wastes & Monitor Radioactivity Per NRC Approved 831027 & 840407 Transmittals.Fee Paid
HBL-86-026, Forwards Comments on Des for Decommissioning of Humboldt Bay Power Plant,Unit 3.Fission Chamber Strings Cut Up to Separate Chambers & Minimize Stored Waste Vol14 August 1986Forwards Comments on Des for Decommissioning of Humboldt Bay Power Plant,Unit 3.Fission Chamber Strings Cut Up to Separate Chambers & Minimize Stored Waste Vol
HBL-86-027, Forwards Radioactive Effluent Releases & Waste Disposal, Jan-June 1986 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Eureka,Ca,Annual Rept 198528 August 1986Forwards Radioactive Effluent Releases & Waste Disposal, Jan-June 1986 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Eureka,Ca,Annual Rept 1985
HBL-86-029, Notifies That No Operator Licensing Exams Planned for Facility,As Util in Process of Decommissioning & Placing Unit in Safstor Mode for long-term Storage,Per Generic Ltr 86-14.Related Correspondence24 September 1986Notifies That No Operator Licensing Exams Planned for Facility,As Util in Process of Decommissioning & Placing Unit in Safstor Mode for long-term Storage,Per Generic Ltr 86-14.Related Correspondence
HBL-86-032, Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested20 October 1986Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested
HBL-86-035, Forwards Alternatives & Issues for Extended Storage of Spent Nuclear Fuel from Humboldt Bay Power Plant,Unit 3 & Extended Fuel Storage in Existing Onsite Humboldt Bay Unit 3 Storage Pool. Ack of Receipt Requested29 October 1986Forwards Alternatives & Issues for Extended Storage of Spent Nuclear Fuel from Humboldt Bay Power Plant,Unit 3 & Extended Fuel Storage in Existing Onsite Humboldt Bay Unit 3 Storage Pool. Ack of Receipt Requested
HBL-86-039, Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21)17 November 1986Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21)
HBL-87-002, Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan20 January 1987Forwards Response to 861230 Request for Addl Info on Emergency Plan Supporting Util Proposed Safstor Decommissioning Plan
HBL-87-006, Forwards Public Version of Rev 7 to Corporate Emergency Response Plan Implementing Procedure 3.2, Corporate Communications Dept & County of Humboldt Contingency Plan, Nuclear Reactor,Humboldt Bay. W/870310 Release Memo26 February 1987Forwards Public Version of Rev 7 to Corporate Emergency Response Plan Implementing Procedure 3.2, Corporate Communications Dept & County of Humboldt Contingency Plan, Nuclear Reactor,Humboldt Bay. W/870310 Release Memo
HBL-87-015, Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly Containers20 March 1987Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly ContainersHigh Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Emergency Lighting
Process Control Program
Fire Protection Program
HBL-87-020, Forwards Change Pages for Rev 1 to Facility Physical Security Plan to More Accurately Describe Certain Provisions of Plan.Encl Withheld (Ref 10CFR73.21)30 April 1987Forwards Change Pages for Rev 1 to Facility Physical Security Plan to More Accurately Describe Certain Provisions of Plan.Encl Withheld (Ref 10CFR73.21)
HBL-87-047, Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide30 July 1987Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide
HBL-87-051, Forwards Rev 2 to Physical Security Plan & Changes.Changes Do Not Decrease Effectiveness of Plan & Submitted Per 10CFR50.54(p).Plan & Changes Withheld (Ref 10CFR73.21)18 August 1987Forwards Rev 2 to Physical Security Plan & Changes.Changes Do Not Decrease Effectiveness of Plan & Submitted Per 10CFR50.54(p).Plan & Changes Withheld (Ref 10CFR73.21)
HBL-87-052, Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of Responses21 August 1987Forwards Responses to NRC 870723 Request for Addl Info Re Safstor Tech Specs.Revised Set of Tech Specs Will Be Submitted After NRC Review of ResponsesOffsite Dose Calculation Manual
Fuel cladding
HBL-87-054, Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 198628 August 1987Forwards Repts Entitled Radioactive Effluent Releases & Waste Disposal from Humboldt Bay Power Plant Unit 3 for Jan-June 1987 & Environ Radiation Study in Vicinity of Humboldt Bay Power Plant,Annual Rept 1986
HBL-87-066, Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info16 November 1987Forwards Rev 3 to Proposed Tech Specs for Safstor.Revs Reflect Util 870821 Response to NRC Request for Addl Info
HBL-88-026, Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested16 March 1988Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested
HBL-88-055, Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination6 June 1988Requests NRC Concurrence to Utilize Security Seals on Spent Fuel Storage Pool at Plant.Use of Seals Will Simplify Annual Physical Inventory of Spent Fuel Stored in Pool & Minimize Radiation Exposures to Workers & Contamination