Issue date | Title | Topic | |
---|---|---|---|
ML20024H625 | 8 March 1991 | Reactor Containment Bldg Integrated Leak Rate Test (910202- 0305) Braidwood Unit 1. | |
ML20064A639 | 30 June 1990 | Startup Test Rept Unit 2 Cycle 2 | Shutdown Margin |
ML20072E511 | 12 August 1994 | Reactor Containment ILRT Comm Ed Braidwood Nuclear Power Station Unit 1 | |
ML20078Q357 | 9 February 1995 | Reactor Containment Bldg ILRT Braidwood Nuclear Power Generating Station Unit 2,941027-1109 | |
ML20082H124 | 31 July 1991 | Unit 1,Cycle 3 Startup Test Rept, Dtd Jul 1991 | Shutdown Margin |
ML20086S775 | 28 July 1995 | Table 2-10 Summary of Test Dimensional Measurement Results | |
ML20092H227 | 17 January 1992 | Reactor Containment Bldg Integrated Leak Rate Test (910912- 1116) | Packing leak |
ML20094G745 | 30 April 1984 | Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints | |
ML20098F544 | 30 September 1984 | Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip Restraints | Finite Element Analysis |
ML20100F937 | 16 November 1995 | Reactor Containment Bldg Integrated Leak Rate Test for Braidwood Nuclear Power Generating Station | Packing leak |
ML20133N021 | 27 August 1985 | Electrical Cable Separation Verification Testing | |
ML20137Z827 | 30 November 1984 | Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal Switch | Earthquake |
ML20141D987 | 28 February 1986 | Rev 0 to ASME Code Evaluation of Braidwood Unit 2 Nozzle F to Include Effects of Proposed Grindouts | |
ML20147G243 | 29 February 1988 | Cycle 1 Startup Rept | Boric Acid Flow Induced Vibration |
ML20151X135 | 28 October 1983 | Rept of Irradiation & DBA Testing | Boric Acid Coatings |
ML20153C747 | 31 August 1988 | Cycle 1 Startup Rept Final Suppl | Boric Acid Flow Induced Vibration Reverse polarity |
ML20195G637 | 31 May 1988 | Cycle 1 Startup Rept Suppl | Safe Shutdown Power change Flow Induced Vibration |
ML20206U214 | 2 April 1987 | Results of in-place Testing for Control Room Ventilation Recirculation Filter Units | |
ML20214L066 | 19 August 1986 | Reactor Containment Bldg Integrated Leakage Rate Test for Braidwood Unit 1,Preoperation Test on 860521-29 | |
ML20215D027 | 7 July 1986 | Rev 0 to Test Rept of Results of Pressurizer Control Test | Stroke time Scaffolding |
ML20236X869 | 7 December 1987 | Reactor Containment Bldg Integrated Leakage Rate Test: Braidwood Nuclear Station Unit 2 Preoperational Test 870906-11 |