Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20024H6258 March 1991Reactor Containment Bldg Integrated Leak Rate Test (910202- 0305) Braidwood Unit 1.
ML20064A63930 June 1990Startup Test Rept Unit 2 Cycle 2Shutdown Margin
ML20072E51112 August 1994Reactor Containment ILRT Comm Ed Braidwood Nuclear Power Station Unit 1
ML20078Q3579 February 1995Reactor Containment Bldg ILRT Braidwood Nuclear Power Generating Station Unit 2,941027-1109
ML20082H12431 July 1991Unit 1,Cycle 3 Startup Test Rept, Dtd Jul 1991Shutdown Margin
ML20086S77528 July 1995Table 2-10 Summary of Test Dimensional Measurement Results
ML20092H22717 January 1992Reactor Containment Bldg Integrated Leak Rate Test (910912- 1116)Packing leak
ML20094G74530 April 1984Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints
ML20098F54430 September 1984Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip RestraintsFinite Element Analysis
ML20100F93716 November 1995Reactor Containment Bldg Integrated Leak Rate Test for Braidwood Nuclear Power Generating StationPacking leak
ML20133N02127 August 1985Electrical Cable Separation Verification Testing
ML20137Z82730 November 1984Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal SwitchEarthquake
ML20141D98728 February 1986Rev 0 to ASME Code Evaluation of Braidwood Unit 2 Nozzle F to Include Effects of Proposed Grindouts
ML20147G24329 February 1988Cycle 1 Startup ReptBoric Acid
Flow Induced Vibration
ML20151X13528 October 1983Rept of Irradiation & DBA TestingBoric Acid
Coatings
ML20153C74731 August 1988Cycle 1 Startup Rept Final SupplBoric Acid
Flow Induced Vibration
Reverse polarity
ML20195G63731 May 1988Cycle 1 Startup Rept SupplSafe Shutdown
Power change
Flow Induced Vibration
ML20206U2142 April 1987Results of in-place Testing for Control Room Ventilation Recirculation Filter Units
ML20214L06619 August 1986Reactor Containment Bldg Integrated Leakage Rate Test for Braidwood Unit 1,Preoperation Test on 860521-29
ML20215D0277 July 1986Rev 0 to Test Rept of Results of Pressurizer Control TestStroke time
Scaffolding
ML20236X8697 December 1987Reactor Containment Bldg Integrated Leakage Rate Test: Braidwood Nuclear Station Unit 2 Preoperational Test 870906-11