Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.24 May 2018Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.Aging Management
L-2014-000, Response to Fifth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed....22 March 2018Response to Fifth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed....
L-2015-172, Response to Request for Additional Information for Relief Request No. 15 for the Fourth 10-Year Inservice Inspection Interval -8 July 2015Response to Request for Additional Information for Relief Request No. 15 for the Fourth 10-Year Inservice Inspection Interval -
L-2015-186, License Renewal (Lr) Reactor Vessel Internals (Rvi) Inspection Program, Response to Request for Additional Information (RAI-8)15 July 2015License Renewal (Lr) Reactor Vessel Internals (Rvi) Inspection Program, Response to Request for Additional Information (RAI-8)Aging Management
L-2015-189, License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement6 October 2015License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement
L-2015-225, Inservice Inspection Plan - Fifth Inspection Interval Relief Request No. 1, Response to Request for Additional Information15 September 2015Inservice Inspection Plan - Fifth Inspection Interval Relief Request No. 1, Response to Request for Additional InformationAging Management
L-2015-226, Unit 4 - Response to Request for Additional Information for Relief Requests Nos. 16 and 17 - Fourth 10-Year Inservice Inspection Interval25 September 2015Unit 4 - Response to Request for Additional Information for Relief Requests Nos. 16 and 17 - Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
L-2015-254, Response to NRC Request for Information Per 10CFR50.54(f) Re Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident Emergency Preparedness - Phase 2 Staffing Assessment28 September 2015Response to NRC Request for Information Per 10CFR50.54(f) Re Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident Emergency Preparedness - Phase 2 Staffing AssessmentSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
FLEX
Fukushima Dai-Ichi
Minimum staff
L-2015-275, Fifth Ten-Year Inservice Inspection (Isi), Response to Request for Additional Information (RAI) for Relief Request No. 213 November 2015Fifth Ten-Year Inservice Inspection (Isi), Response to Request for Additional Information (RAI) for Relief Request No. 2
L-2015-284, Inservice Inspection Program, Fifth Ten Year Interval, Response to Request for Additional Information for Relief Request No. 34 December 2015Inservice Inspection Program, Fifth Ten Year Interval, Response to Request for Additional Information for Relief Request No. 3Coatings
Nondestructive Examination
L-2015-286, Response to Request for Additional Information Regarding Proposed Changes to Technical Specification (TS) to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents - License.17 November 2015Response to Request for Additional Information Regarding Proposed Changes to Technical Specification (TS) to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents - License.
L-2015-293, Response to Request for Additional Information Regarding License Amendment Request No. 237, Application to Revise Technical Specification Figure 3.1-2, Boric Acid Tank Minimum Volume7 December 2015Response to Request for Additional Information Regarding License Amendment Request No. 237, Application to Revise Technical Specification Figure 3.1-2, Boric Acid Tank Minimum VolumeBoric Acid
Shutdown Margin
L-2016-013, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness - Phase 2-SGI-Staffing..20 January 2016Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Emergency Preparedness - Phase 2-SGI-Staffing..Fukushima Dai-Ichi
L-2016-056, Response to Request for Additional Information Regarding License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement25 March 2016Response to Request for Additional Information Regarding License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient MeasurementShutdown Margin
L-2016-064, Response to Request for Additional Information Re License Amendment Request No. 237, Application to Revise Technical Specification Figure 3.1-2, Boric Acid Tank Minimum Volume29 March 2016Response to Request for Additional Information Re License Amendment Request No. 237, Application to Revise Technical Specification Figure 3.1-2, Boric Acid Tank Minimum VolumeBoric Acid
L-2016-116, Response to Request for Additional Information Regarding License Amendment Request 236, Revision to TS to Adopt Risk Informed Completion Time TSTF-505, Revision 1,Provide Risk-Informed Extended Completion Times.16 June 2016Response to Request for Additional Information Regarding License Amendment Request 236, Revision to TS to Adopt Risk Informed Completion Time TSTF-505, Revision 1,Provide Risk-Informed Extended Completion Times.Anticipated operational occurrence
Probabilistic Risk Assessment
Functionality Assessment
Large early release frequency
L-2016-136, Second Response to Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide...11 August 2016Second Response to Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide...Mission time
Surveillance Frequency Control Program
Large early release frequency
L-2016-137, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage...15 December 2016Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage...
L-2016-141, Response to Request for Additional Information on Fifth Ten-Year Lnservice Inspection (Isi) Interval Relief Request No. 427 July 2016Response to Request for Additional Information on Fifth Ten-Year Lnservice Inspection (Isi) Interval Relief Request No. 4Probabilistic Risk Assessment
L-2016-161, Documentation of Response to Request for Request for Additional Information Regarding the Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)11 August 2016Documentation of Response to Request for Request for Additional Information Regarding the Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Boric Acid
High Radiation Area
Safe Shutdown Earthquake
Locked High Radiation Area
FLEX
Tornado Generated Missile
Tornado Missile Protection
Spent Fuel Pool Instrumentation
L-2016-172, Response to Request for Additional Information Regarding License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection Interval1 September 2016Response to Request for Additional Information Regarding License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection IntervalIncorporated by reference
Surveillance Frequency Control Program
Earthquake
L-2016-183, Supplemental Information for License Amendment Request 246, Changes to Technical Specification 3/4.7.5, Control Room Emergency Ventilation System (CREVS)4 October 2016Supplemental Information for License Amendment Request 246, Changes to Technical Specification 3/4.7.5, Control Room Emergency Ventilation System (CREVS)
L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)3 November 2016Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
L-2016-204, Response to Request for Additional Information 7 Regarding License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection Interval10 November 2016Response to Request for Additional Information 7 Regarding License Amendment Request 242, Changes to Snubber Surveillance Requirements, Snubber Testing Program Plan - Fifth Inspection Interval
L-2016-213, Response to Request for Additional Information Regarding License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps15 November 2016Response to Request for Additional Information Regarding License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps
L-2017-013, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS)27 January 2017Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS)Safe Shutdown
Functionality Assessment
Condition Adverse to Quality
Surveillance Frequency Control Program
L-2017-034, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report14 March 2017Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report
L-2017-042, Response to Request for Additional Information Regarding License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time16 February 2018Response to Request for Additional Information Regarding License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion TimeProbabilistic Risk Assessment
Large early release frequency
L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS)31 March 2017Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS)Safe Shutdown
Surveillance Frequency Control Program
Recently irradiated fuel
L-2017-063, Response to Third Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide ...27 April 2017Response to Third Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide ...
L-2017-086, Response to Request for Additional Information Regarding License Amendment Request 250, Modify Technical Specifications for Auxiliary Feedwater Actuation on Bus Stripping and on Trip of All Main Feedwater Pump Breakers18 May 2017Response to Request for Additional Information Regarding License Amendment Request 250, Modify Technical Specifications for Auxiliary Feedwater Actuation on Bus Stripping and on Trip of All Main Feedwater Pump Breakers
L-2017-098, Supplement to Florida Power & Light Company Letter L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control...24 May 2017Supplement to Florida Power & Light Company Letter L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control...Safe Shutdown
Surveillance Frequency Control Program
L-2017-149, Updated Final Response to NRC Generic Letter 2004-0229 December 2017Updated Final Response to NRC Generic Letter 2004-02Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Design basis earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
L-2017-151, Response to Request for Additional Information Regarding License Amendment Request 249: Elimination of Certain Technical Specification Reporting Requirements, Revised Action for Emergency Core Cooling System, and Changes.4 October 2017Response to Request for Additional Information Regarding License Amendment Request 249: Elimination of Certain Technical Specification Reporting Requirements, Revised Action for Emergency Core Cooling System, and Changes.Boric Acid
Surveillance Frequency Control Program
Fuel cladding
L-2017-168, Response to Fourth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed..30 October 2017Response to Fourth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed..Safe Shutdown
High winds
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Large early release frequency
Fire Protection Program
Very Early Warning Fire Detection
L-2017-188, Supplemental Information for License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications to Licensee Controlled Documents19 October 2017Supplemental Information for License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications to Licensee Controlled DocumentsProbabilistic Risk Assessment
Fuel cladding
L-2018-001, Supplement to Response to Fourth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide..15 February 2018Supplement to Response to Fourth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide..Hot Short
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Fire Protection Program
Very Early Warning Fire Detection
L-2018-061, Response to Fifth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed....22 March 2018Response to Fifth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed....
L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations3 April 2018Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
L-2018-075, Response to Request for Additional Information Regarding License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications ...27 March 2018Response to Request for Additional Information Regarding License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications ...Probabilistic Risk Assessment
Fire Protection Program
L-2018-118, Response to Sixth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed..12 June 2018Response to Sixth Request for Additional Information Regarding License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed..Internal Flooding
Probabilistic Risk Assessment
Very Early Warning Fire Detection
L-2018-124, Response to Request for Additional Information Regarding License Amendment Request 235, Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Isolation Functions12 June 2018Response to Request for Additional Information Regarding License Amendment Request 235, Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Isolation Functions
L-2018-136, L-2018-136-Attachment 16 Enclosure 1 - Letter Regarding Turkey Point Power: Mcgregor Smith Ranger House Potential Restoration Project8 August 2018L-2018-136-Attachment 16 Enclosure 1 - Letter Regarding Turkey Point Power: Mcgregor Smith Ranger House Potential Restoration Project
L-2018-136, L-2018-136-Attachment 19 Enclosure 1 - Expert Report of Ron Seagraves for Southern Alliance for Clean Energy, Et Al. V. Florida Power & Light Co., Case No. 1:16-cv-23017 (S.D Fla.)8 August 2018L-2018-136-Attachment 19 Enclosure 1 - Expert Report of Ron Seagraves for Southern Alliance for Clean Energy, Et Al. V. Florida Power & Light Co., Case No. 1:16-cv-23017 (S.D Fla.)
L-2018-136, L-2018-136-Attachment 20 Enclosure 1 - E-Mail Result of Least Tern Survey at Turkey Point8 August 2018L-2018-136-Attachment 20 Enclosure 1 - E-Mail Result of Least Tern Survey at Turkey Point
L-2018-136, L-2018-136-Attachment 20 Enclosure 2 - E-Mail St. Lucie Power Plant Discussing 2017 and 2018 Data Summary8 August 2018L-2018-136-Attachment 20 Enclosure 2 - E-Mail St. Lucie Power Plant Discussing 2017 and 2018 Data Summary
L-2018-136, L-2018-136-Attachment 21 Enclosure 1 - Eastern Indigo Stake (Drymarchon Couperi) M-Rc Survey Form Dated 06/20/20138 August 2018L-2018-136-Attachment 21 Enclosure 1 - Eastern Indigo Stake (Drymarchon Couperi) M-Rc Survey Form Dated 06/20/2013
L-2018-136, L-2018-136-Attachment 21 Enclosure 2 - Eastern Indigo Snake (Drymarchon Couperi) M-Rc Survey Form Dated 10/19/20168 August 2018L-2018-136-Attachment 21 Enclosure 2 - Eastern Indigo Snake (Drymarchon Couperi) M-Rc Survey Form Dated 10/19/2016
L-2018-136, L-2018-136-Attachment 22 Enclosure 1 - FPL Response to NRC RAI No. SS-FWS-38 August 2018L-2018-136-Attachment 22 Enclosure 1 - FPL Response to NRC RAI No. SS-FWS-3
L-2018-136, L-2018-136-Attachment 22 Enclosure 2 - 01/31/2017 Letter Submitting 2016 Annual Report for the Federal Fish & Wildlife Endangered Species Permit8 August 2018L-2018-136-Attachment 22 Enclosure 2 - 01/31/2017 Letter Submitting 2016 Annual Report for the Federal Fish & Wildlife Endangered Species Permit