Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19209A81521 August 1979Forwards 790831 Petition to Suspend Proceedings,Submitted by Intervenors Citizens Against Nuclear Power,Il Valley Citizens Against Nuclear Power,Citizens United for Responsible Energy & Society Against Nuclear Environ
ML19209C2907 September 1979FOIA Request for Supplemental Records & Files Defined in FOIA-79-264 & Citizens Against Nuclear Power Petition for Suspension of Revocation Fo Facility LicenseEarthquake
ML19248D5986 July 1979FOIA Request for All Documents Pertinent to Facility Const Delays
ML19249D71715 July 1979Expresses Concern Over Radwaste & Urges Halt to Plant Before Operation Begins
ML19260C43221 August 1979Forwards 790821 Petition to Institute Proceeding to Suspend or Revoke CP
ML19276G88521 August 1979Forwards Petition by Citizens Against Nuclear Power,Il Valley Citizens Against Nuclear Power,Citizens United for Responsible Energy & Appleseed for NRC to Institute Proceeding to Suspend &/Or Revoke License
ML19290F10020 February 1980Comments on Proposed Export to Philippines by Westinghouse. Urges NRC to Make Health & Safety of Nearby Residents Prime Consideration.Nrc Should Recommend Refusal to License Vendor for Const at Bataan
ML20023D03326 July 1982Requests Investigation of Region III Inadequate Investigative Oversight Re QA Breakdown & Possible Criminal Falsification at Zack Co,Hvac Contractor at Facilities.At Howard & s Marello Allegations Discussed
ML20023D03927 July 1982Offers Assistance & Cooperation in Investigating Zack Co. Suggestions Discussed
ML20023D06613 August 1982Requests That Region III Monitor CF Braun Activities in Independent Review of HVAC Sys at Facilities & That T Howard & s Marello Experience & Knowledge Be Utilized in Review Process.Util 820813 Ltr to CF Braun & Co Encl
ML20023D13813 August 1982Advises That at Howard & SS Marello Do Not Object to Selection of CF Braun to Conduct Third Party Investigation of Charges Against Zack Co,Subj to Listed Conditions.Related Info EnclLiquid penetrant
Flow Induced Vibration
ML20023D14016 August 1982Comments on 820811 Meeting W/Nrc & Util Re CF Braun Audit of Facilities.Cf Braun Should Rept Directly to NRC & Should Audit All Critical Areas at Facilities
ML20023D1474 September 1982Discusses Concerns on Behalf of at Howard & s Marello,For NRC Consideration in Review of CF Braun Final Proposal to Conduct Independent Review of HVAC Sys at Facilities,Per 820824 Meeting
ML20027A8085 July 1982Forwards Request to Institute Show Cause Proceeding & Other Relief for Filing W/Nrc
ML20028A02112 November 1982Comments on CF Braun 821109 Analysis of Util HVAC Sys.Nrr Approval Should Wait for in-depth Review of Serious QA Breakdown as Well as HVAC Sys Weaknesses
ML20028B52719 November 1982Submits Interim Rept Re CF Braun Independent Analysis of HVAC Sys.Requests Further Specific Info Not Included or Discovered to Complete Final Rept
ML20028C34530 November 1982Recommends NRC Refrain from Issuing full-power License on Basis of CF Braun Co 821027 Rept.Braun Rept Neither Statistically Valid,Nor Judgmentally Sound.Rept Fails to Provide Grounds for full-power AuthorizationNondestructive Examination
ML20028D86215 December 1982Petitions NRC to Revoke Facility OL Until Both Main Recirculation Pumps & All Other Parts of RCS Are Operating at Full Capacity
ML20070F13915 December 1982Submits Petition to Revoke OL Until Main Recirculation Pumps & All Other Parts of RCS Are Capable of Operating at Full Power & Order Investigation & Open Public Hearing Into Causes of Stuck Discharge Valve on Recirculation Pump a
ML20071D59314 January 1983FOIA Request for NRC Records Reviewing CF Braun Audit of HVAC Sys at Facilities.Waiver of Fees Requested
ML20073D82314 February 1983FOIA Request for Documents Re NRC Investigation of T Howard & Morella Allegations Concerning Facilities
ML20073G12015 February 1983FOIA Request for Drafts,Insp Evaluation Repts & Comments on J Keppler 820719 Rept Re Special Safety Insp of Facility During May-Jul 1982
ML20078P03831 October 1983Forwards Joint Intervenors Application for Stay & Request for Action Prior to or Concurrent W/Scheduled 831108 Vote Re Reinstatement of Suspended Low Power License
ML20082M67129 November 1983Petition for Emergency Relief Concerning Unsafe Conditions Re Integrated Leak Rate Testing of Us Nuclear Power Reactor Containments.Severe Errors,Defects & Loopholes Exist in Current Methodology
ML20087N91629 November 1983Notifies of Unsafe Condition Re Ability of Primary Containment of Unit 1 to Fulfill Design Function & Provide Level of Containment of Reactor Fission Products Mandated by Law & Tech Specs
ML20090J5446 January 1984FOIA Request for All Documentation Re Integrated Leak Rate Tests at Facilities
ML20090J56229 November 1983Marked-up Petition for Emergency Relief Re Primary Containment Leak Rate.Annual Integrated Leak Rate Testing Followed Unapproved ANS Proposed Std
ML20151X9371 July 1988FOIA Request for Le Phillips 880407 Memo to Ma Ring
ML20205E40815 July 1986FOIA Request for Raw Data & Relevant Computer Programs for 1982-1983 Facility Type a Integrated Leak Rate Tests
ML20212A72825 July 1986Requests Institution of Proceeding to Revoke Util OL for Failure to Comply w/10CFR50.54(q) & (s) & App E Requiring Maint of Effective Emergency Plan.Radiological Accident Plan EnclChernobyl
ML20215K2794 September 1986FOIA Request for Six Categories of Documents Re 1982 Civil Penalty & Ofcs of Investigations & Inspector & Auditor Investigations of Listed Facilities
ML20244B0018 March 1989Lists Facts to Consider for Action to Fix or Close GE Reactors Once & for All
ML20245D6618 August 1988Submits Listed Comments in Response to Re Safety Practice to Schedule Nuclear Plant Operating & Maint Personnel for 16 H Shifts &/Or Excessive Overtime