RS-01-112, Registration of Use of Cask to Store Spent Fuel at Dresden, Units 1, 2 & 3 | 11 June 2002 | Registration of Use of Cask to Store Spent Fuel at Dresden, Units 1, 2 & 3 | |
RS-02-002, Registration of Use of Cask to Store Spent Fuel | 28 January 2002 | Registration of Use of Cask to Store Spent Fuel | |
RS-02-009, Completion of Power Uprate Modifications | 15 March 2002 | Completion of Power Uprate Modifications | |
RS-02-015, Communications with NRC Re Quad Cities, Unit 1 Jet Pump Hold Down Beam Replacement Activities & Continued Operation of Quad Cities, Unit 2 & Dresden, Units 2 & 3 | 18 January 2002 | Communications with NRC Re Quad Cities, Unit 1 Jet Pump Hold Down Beam Replacement Activities & Continued Operation of Quad Cities, Unit 2 & Dresden, Units 2 & 3 | |
RS-02-026, Update Concerning Jet Pump Hold Down Beam Activities | 6 February 2002 | Update Concerning Jet Pump Hold Down Beam Activities | |
RS-02-033, Relief Request for Alternative Rules for Corrective Measures If Leakage Occurs at Bolted Connections During System Pressure Tests | 14 February 2002 | Relief Request for Alternative Rules for Corrective Measures If Leakage Occurs at Bolted Connections During System Pressure Tests | |
RS-02-034, Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes | 13 February 2002 | Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes | |
RS-02-035, Supplemental Information Supporting the Request for Exemption from the Secondary Offsite Accident Liability Insurance Requirement of 10 CFR 140.11(a)(4) | 13 February 2002 | Supplemental Information Supporting the Request for Exemption from the Secondary Offsite Accident Liability Insurance Requirement of 10 CFR 140.11(a)(4) | |
RS-02-055, Response to Commission Order to Modify License for Interim Safeguards & Security Measures | 15 March 2002 | Response to Commission Order to Modify License for Interim Safeguards & Security Measures | |
RS-02-067, Power Uprate Ascension Test Report | 25 March 2002 | Power Uprate Ascension Test Report | Shutdown Margin Flow Induced Vibration |
RS-02-071, Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power Plants | 9 April 2002 | Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power Plants | Safe Shutdown Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Incorporated by reference Condition Adverse to Quality Process Control Program Operability Determination Maintenance Rule Program Liquid penetrant Fire Protection Program Early Warning Fire Detection |
RS-02-082, Station'S Response to Request for Additional Information Re Heavy Loads Handling | 12 April 2002 | Station'S Response to Request for Additional Information Re Heavy Loads Handling | |
RS-02-093, Registration of Use of Cask to Store Spent Fuel | 15 May 2002 | Registration of Use of Cask to Store Spent Fuel | |
RS-02-104, Registration of Use of Cask to Store Spent Fuel | 3 June 2002 | Registration of Use of Cask to Store Spent Fuel | |
RS-02-111, Registration of Use of Cask to Store Spent Fuel | 11 June 2002 | Registration of Use of Cask to Store Spent Fuel | |
RS-02-123, Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. | 18 July 2002 | Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-02-124, Additional Information Regarding Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Reactor Vessel Steam Dome Pressure - High) | 8 July 2002 | Additional Information Regarding Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Reactor Vessel Steam Dome Pressure - High) | Reactor Vessel Water Level |
RS-02-125, Letter from Patrick R. Simpson Subject: Supplement to Response to Request for Additional Information Regarding Heavy Loads Handling | 8 July 2002 | Letter from Patrick R. Simpson Subject: Supplement to Response to Request for Additional Information Regarding Heavy Loads Handling | Safe Shutdown Earthquake Operating Basis Earthquake Control of Heavy Loads |
RS-02-128, Request for Exemption from Certain Requirements of 10 CFR 55.59 | 2 July 2002 | Request for Exemption from Certain Requirements of 10 CFR 55.59 | Job Performance Measure Exemption Request |
RS-02-129, Revision to Request for Exemption from 10CFR 55.59 | 8 July 2002 | Revision to Request for Exemption from 10CFR 55.59 | Enforcement Discretion Job Performance Measure Exemption Request |
RS-02-140, Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e | 1 August 2002 | Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e | |
RS-02-146, Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e | 14 August 2002 | Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e | |
RS-02-148, Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan | 27 August 2002 | Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan | |
RS-02-151, Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High) | 16 August 2002 | Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High) | Reactor Vessel Water Level Scram Discharge Volume |
RS-02-155, Response to NRC Inspection Items Regarding Concrete Expansion Anchors | 11 September 2002 | Response to NRC Inspection Items Regarding Concrete Expansion Anchors | |
RS-02-158, Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures | 12 September 2002 | Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures | |
RS-02-168, Request for License Amendment Related to Heavy Loads Handling | 26 September 2002 | Request for License Amendment Related to Heavy Loads Handling | Safe Shutdown Design basis earthquake Control of Heavy Loads Affidavit |
RS-02-175, Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements | 10 October 2002 | Request for Technical Specification Changes Related to Main Steam Safety Valve Operability Requirements | |
RS-02-187, Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25) | 25 October 2002 | Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25) | VT-2 Liquid penetrant Through-Wall Leak |
RS-02-197, Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads Handling | 11 November 2002 | Reply to Request for Comments on Draft Response to Task Interface Agreement Concerning the Reactor Building Crane and Heavy Loads Handling | Safe Shutdown |
RS-02-208, Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 1 | 13 December 2002 | Completion of Power Uprate Modifications for Dresden, Unit 3 and Quad Cities, Unit 1 | |
RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode | 20 December 2002 | Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode | Scram Discharge Volume Fuel cladding |
RS-03-014, Power Uprate Ascension Test Report | 23 January 2003 | Power Uprate Ascension Test Report | Shutdown Margin Flow Induced Vibration |
RS-03-016, Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 27 January 2003 | Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-023, Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit | 31 January 2003 | Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
RS-03-026, Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System | 31 January 2003 | Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System | |
RS-03-036, Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | 14 February 2003 | Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | Hydrostatic Squib |
RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function | 28 March 2003 | Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio |
RS-03-051, Additional Information Supporting Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit | 7 March 2003 | Additional Information Supporting Request for License Amendment Regarding Minimum Critical Power Ratio Safety Limit | Anticipated operational occurrence Minimum Critical Power Ratio |
RS-03-053, Additional Information Supporting the Request for License Amendment Related to Application of Alternatives Source Term | 28 March 2003 | Additional Information Supporting the Request for License Amendment Related to Application of Alternatives Source Term | Boric Acid |
RS-03-061, Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure | 24 March 2003 | Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure | Fitness for Duty Nuclear Accident Reporting System Severe Accident Management Guideline |
RS-03-063, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term | 21 March 2003 | Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term | Severe Accident Management Guideline |
RS-03-068, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 26 March 2003 | Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-070, Additional Information Supporting the Request for License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | 28 March 2003 | Additional Information Supporting the Request for License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | |
RS-03-073, Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units | 31 March 2003 | Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units | |
RS-03-088, Clarification of Commitment Regarding Request for Relief | 30 April 2003 | Clarification of Commitment Regarding Request for Relief | |
RS-03-095, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 6 May 2003 | Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-101, Additional Information Regarding Inservice Inspection Program Relief Request I4R-02 | 29 May 2003 | Additional Information Regarding Inservice Inspection Program Relief Request I4R-02 | Probabilistic Risk Assessment Large early release frequency |
RS-03-105, Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | 16 May 2003 | Additional Information Supporting Request or License Amendment to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | |
RS-03-110, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty | 3 June 2003 | Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty | |