Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000413/LER-1950-412, Forwards Rept Summarizing Review Results of Interunit Electrical Interfaces,Which Was Part of Corrective Action for LER 50-412/85-51.Item Also Identified in Insp Repts 50-413/85-35 & 50-414/85-3213 March 1986Forwards Rept Summarizing Review Results of Interunit Electrical Interfaces,Which Was Part of Corrective Action for LER 50-412/85-51.Item Also Identified in Insp Repts 50-413/85-35 & 50-414/85-32
05000413/LER-1986-037, Forwards LER 86-037-00 Re Inoperable Ice Condenser Lower Inlet Doors Due to Personnel Error.Event of No Significance to Health & Safety of Public.Previous LER Numbered 86-037 Changed to 86-033 by29 August 1986Forwards LER 86-037-00 Re Inoperable Ice Condenser Lower Inlet Doors Due to Personnel Error.Event of No Significance to Health & Safety of Public.Previous LER Numbered 86-037 Changed to 86-033 by
05000413/LER-1987-011, Forwards LER 87-011-03 Re Shutdown Due to Diesel Generator Inoperability Because of Mfg Deficiency.Ler 87-011-01,dtd 870506 Should Have Been Rev 2 & Did Not Include Changes from 870413 Submittal10 June 1987Forwards LER 87-011-03 Re Shutdown Due to Diesel Generator Inoperability Because of Mfg Deficiency.Ler 87-011-01,dtd 870506 Should Have Been Rev 2 & Did Not Include Changes from 870413 Submittal
05000413/LER-1987-036, Advises That LER 87-36 Re Operation of Nuclear Svc Water Sys Will Be Delayed to Allow for Proper Review & Consideration of Info Recently Gathered by Util.Ler Originally Due on 870930.Rept Will Be Submitted on 87102330 September 1987Advises That LER 87-36 Re Operation of Nuclear Svc Water Sys Will Be Delayed to Allow for Proper Review & Consideration of Info Recently Gathered by Util.Ler Originally Due on 870930.Rept Will Be Submitted on 871023
05000413/LER-1987-037, Advises That Submittal of LER 87-037-00,re Itt Grinnell mini-stiff Pipe Clamps Found Broken Due to Improper Heat Treatment,Will Be Delayed Until 871215 to Allow for Analysis & Review of Pertinent Info12 November 1987Advises That Submittal of LER 87-037-00,re Itt Grinnell mini-stiff Pipe Clamps Found Broken Due to Improper Heat Treatment,Will Be Delayed Until 871215 to Allow for Analysis & Review of Pertinent Info
05000413/LER-1987-041, Resubmitted Ltr Forwarding LER 87-041-004 January 1988Resubmitted Ltr Forwarding LER 87-041-00
05000413/LER-1990-025, Notifies of Missed Commitment & Change in Commitment Re LER 90-025 & Insp Repts 50-413/90-09 & 50-414/90-09.Prior Commitment Is Being Changed to Allow Continued Use of Vendor Methodology24 December 1997Notifies of Missed Commitment & Change in Commitment Re LER 90-025 & Insp Repts 50-413/90-09 & 50-414/90-09.Prior Commitment Is Being Changed to Allow Continued Use of Vendor Methodology
05000413/LER-1995-001, Forwards LER 95-001 Re TS 3.0.3 Entry Due to Both Trains of CR Ventilation Inoperable22 May 1995Forwards LER 95-001 Re TS 3.0.3 Entry Due to Both Trains of CR Ventilation Inoperable
05000413/LER-1995-003, Forwards Rev to LER 95-003 Re Failure to Perform TS Surveillance Due to Unanticipated Interaction of Sys8 September 1995Forwards Rev to LER 95-003 Re Failure to Perform TS Surveillance Due to Unanticipated Interaction of Sys
05000413/LER-1996-001, Submits Modification to Commitment Contained in LER-96-0014 December 1996Submits Modification to Commitment Contained in LER-96-001
05000413/LER-1997-008, Forwards LER 97-008-00 Re Inadequate Solid State Protection Sys Surveillance Testing.Event Considered to Be No Significance W/Respect to Health & Safety of Public11 December 1997Forwards LER 97-008-00 Re Inadequate Solid State Protection Sys Surveillance Testing.Event Considered to Be No Significance W/Respect to Health & Safety of Public
05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept17 May 1999Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept
05000413/LER-1997-011, Forwards LER 97-011-00 Re ESF Actuation Due to RCS Leakage from Loop Drain Valves.Event Considered to Be of No Significance W/Respect to Health & Safety of Public29 January 1998Forwards LER 97-011-00 Re ESF Actuation Due to RCS Leakage from Loop Drain Valves.Event Considered to Be of No Significance W/Respect to Health & Safety of Public
05000413/LER-1997-012, Forwards LER 97-012-00 Re RTD & Incore Thermocouple Cross Calibrations Being Performed Incosistent W/Ts Requirements. Event Considered to Be of No Significance W/Respect to Health & Safety of Public29 January 1998Forwards LER 97-012-00 Re RTD & Incore Thermocouple Cross Calibrations Being Performed Incosistent W/Ts Requirements. Event Considered to Be of No Significance W/Respect to Health & Safety of Public
05000413/LER-1998-001, Forwards LER 98-001-00 Re Both Trains of Control Room Area Ventilation Inadvertently Disabled During Restoration.Ltr Contains Commitments to Perform Corrective Actions5 March 1998Forwards LER 98-001-00 Re Both Trains of Control Room Area Ventilation Inadvertently Disabled During Restoration.Ltr Contains Commitments to Perform Corrective Actions
05000413/LER-1998-002, Forwards LER 98-002-00,incorrectly Set Valve Leads to Elevated Condensate Storage Sys Temperature,Causing Condition Outside Design Basis of Plant.Planned Corrective Actions Section of Rept Contain Commitments8 June 1998Forwards LER 98-002-00,incorrectly Set Valve Leads to Elevated Condensate Storage Sys Temperature,Causing Condition Outside Design Basis of Plant.Planned Corrective Actions Section of Rept Contain Commitments
05000413/LER-1998-005, Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl11 June 1998Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl
05000413/LER-1998-006, Forwards LER 98-006-00,re Missed TS Surveillance on Pressurizer Heater Emergency Power Supply Testing. Commitments Made within Ltr,Encl12 June 1998Forwards LER 98-006-00,re Missed TS Surveillance on Pressurizer Heater Emergency Power Supply Testing. Commitments Made within Ltr,Encl
05000413/LER-1998-007, Forwards LER 98-007-00,concerning Missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue29 June 1998Forwards LER 98-007-00,concerning Missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue
05000413/LER-1998-009, Forwards LER 98-009-00,concerning Unit Entering TS 3.0.3 Due to Inadequate Testing of Auxiliary Bldg Filtered Exhaust Sys20 August 1998Forwards LER 98-009-00,concerning Unit Entering TS 3.0.3 Due to Inadequate Testing of Auxiliary Bldg Filtered Exhaust Sys
05000413/LER-1998-010, Forwards LER 98-010-00,re Pinhole Leak in AFW Nozzle Tempering Line.Commitments Are Contained in Planned Corrective Action Section of Rept23 July 1998Forwards LER 98-010-00,re Pinhole Leak in AFW Nozzle Tempering Line.Commitments Are Contained in Planned Corrective Action Section of Rept
05000413/LER-1998-011, Forwards LER 98-011-00 Re Two Inoperable Refueling Water Storage Tank Level Channels on Each Unit Due to Lightning Activity.Commitments Made by Util Are Contained in Planned Corrective Action Section of LER20 August 1998Forwards LER 98-011-00 Re Two Inoperable Refueling Water Storage Tank Level Channels on Each Unit Due to Lightning Activity.Commitments Made by Util Are Contained in Planned Corrective Action Section of LER
05000413/LER-1998-012, Forwards LER 98-012-00 Re Entry Into TS 3.0.3 Due to Inoperability of Both Trains of CR Ventilation Caused by Improper Sys Isolation5 August 1998Forwards LER 98-012-00 Re Entry Into TS 3.0.3 Due to Inoperability of Both Trains of CR Ventilation Caused by Improper Sys Isolation
05000413/LER-1998-013, Forwards LER 98-013-01 Re Operation Outside of Tech Specs Due to Analyzing Grab Samples at Incorrect Lower of Detection.Two Regulatory Commitments Contained in Planned Corrective Actions Section of Rept3 September 1998Forwards LER 98-013-01 Re Operation Outside of Tech Specs Due to Analyzing Grab Samples at Incorrect Lower of Detection.Two Regulatory Commitments Contained in Planned Corrective Actions Section of ReptGrab sample
05000413/LER-1998-014, Forwards LER 98-014-00 Concerning Misinterpretation of TSs Resulting in Failure to Perform DG Surveillance Requirement within Required Surveillance Interval2 September 1998Forwards LER 98-014-00 Concerning Misinterpretation of TSs Resulting in Failure to Perform DG Surveillance Requirement within Required Surveillance Interval
05000413/LER-1998-015, Forwards LER 98-015-00 Re TS Required Shutdown & Operation Prohibited by TS Associated W/Ice Condenser.Rept Will Be Revised by 9810152 September 1998Forwards LER 98-015-00 Re TS Required Shutdown & Operation Prohibited by TS Associated W/Ice Condenser.Rept Will Be Revised by 981015
05000413/LER-1998-016, Forwards LER 98-016-00 Re Plant Being in Condition Outside Design Basis Due to Discovery of Missing Interlock.One Regulatory Commitment Is Contained in Planned Corrective Actions Section of LER19 November 1998Forwards LER 98-016-00 Re Plant Being in Condition Outside Design Basis Due to Discovery of Missing Interlock.One Regulatory Commitment Is Contained in Planned Corrective Actions Section of LER
05000413/LER-1998-019, Forwards LER 98-019-00 Re Inoperable Standby Shutdown Facility in Excess of TS AOT Due to Mispositioned Breakers. One Regulatory Commitment Is Contained in Planned Corrective Actions Section of Rept28 January 1999Forwards LER 98-019-00 Re Inoperable Standby Shutdown Facility in Excess of TS AOT Due to Mispositioned Breakers. One Regulatory Commitment Is Contained in Planned Corrective Actions Section of Rept
05000413/LER-1999-001, Forwards LER 99-001-00,re Inoperable Refueling Water Storage Tank Level Channels Resulting in Operation Outside Design Basis.Commitments Are Provided in Planned Corrective Action Section of LER17 March 1999Forwards LER 99-001-00,re Inoperable Refueling Water Storage Tank Level Channels Resulting in Operation Outside Design Basis.Commitments Are Provided in Planned Corrective Action Section of LER
05000413/LER-1999-002, Forwards LER 99-002-00,re Three RHR Sys Valves Which Did Not Meet Edf Response Time Requirements.Commitments Made by Util Are Listed in Planned Corrective Actions Section29 March 1999Forwards LER 99-002-00,re Three RHR Sys Valves Which Did Not Meet Edf Response Time Requirements.Commitments Made by Util Are Listed in Planned Corrective Actions Section
05000413/LER-1999-003, Forwards LER 99-003-00 Re Inoperability of Eight Ice Condenser Inlet Doors Caused by Ice/Frost Buildup That Could Restrict Door Movement.Rept Contains No New Regulatory Commitments5 April 1999Forwards LER 99-003-00 Re Inoperability of Eight Ice Condenser Inlet Doors Caused by Ice/Frost Buildup That Could Restrict Door Movement.Rept Contains No New Regulatory Commitments
05000413/LER-1999-005, Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 99042915 April 1999Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429
05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 99060710 May 1999Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607
05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section26 May 1999Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section
05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach8 July 1999Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach
05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept19 July 1999Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept
05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units22 July 1999Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units
05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment16 August 1999Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory CommitmentMissed surveillance
05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER25 August 1999Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER
05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1 September 1999Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents CommitmentMissed surveillance
05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept27 September 1999Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept
05000414/LER-1986-033, Forwards LER 86-033-00 Re Phase a Containment Isolation, for Unit 2.LER 86-037-00 Inadvertently Submitted on 860808 as Being Applicable to Unit 1.Number Will Be Reassigned to Next LER Applicable to Unit 118 August 1986Forwards LER 86-033-00 Re Phase a Containment Isolation, for Unit 2.LER 86-037-00 Inadvertently Submitted on 860808 as Being Applicable to Unit 1.Number Will Be Reassigned to Next LER Applicable to Unit 1
05000414/LER-1995-001, Forwards LER 95-001-01,concerning Reactor Trip Due to Closure of Msiv.Rept Revised to Reflect Change to Corrective Actions Implemented16 October 1997Forwards LER 95-001-01,concerning Reactor Trip Due to Closure of Msiv.Rept Revised to Reflect Change to Corrective Actions Implemented
05000414/LER-1996-003, Informs That Cover Sheet to LER 96-003,inadvertently Denoted Incorrectly Docket Number.Nrc Rept Forms 366 & 366A Correctly Identified Correct Docket Number11 September 1996Informs That Cover Sheet to LER 96-003,inadvertently Denoted Incorrectly Docket Number.Nrc Rept Forms 366 & 366A Correctly Identified Correct Docket Number
05000414/LER-1998-002, Forwards LER 98-002-01 Re Violation of Auxiliary Bldg Filtered Exhaust Ventilation Sys Tech Specs 3.7.7 Due to Exceeding Allowable Outage Time of TS Action Requirements for 2A Auxiliary Bldg Filtered Exhaust Sys21 May 1998Forwards LER 98-002-01 Re Violation of Auxiliary Bldg Filtered Exhaust Ventilation Sys Tech Specs 3.7.7 Due to Exceeding Allowable Outage Time of TS Action Requirements for 2A Auxiliary Bldg Filtered Exhaust Sys
05000414/LER-1998-003, Forwards LER 98-003-00,re Violation of TS 2.2.1.Commitments Made within Ltr Are Contained in Planned Corrective Actions Section of Rept12 August 1998Forwards LER 98-003-00,re Violation of TS 2.2.1.Commitments Made within Ltr Are Contained in Planned Corrective Actions Section of Rept
05000414/LER-1998-004, Forwards LER 98-004-00 Re de-energization of Vital Bus & Actuation of LTOP Caused by Error During Tagout.Commitments Are Contained in Planned Corrective Actions Section of LER6 October 1998Forwards LER 98-004-00 Re de-energization of Vital Bus & Actuation of LTOP Caused by Error During Tagout.Commitments Are Contained in Planned Corrective Actions Section of LER
05000414/LER-1998-005, Forwards LER 98-005-01 Re Violation of Tech Spec 3.6.5.3,due to Inoperability of Condenser Inlet Doors,Caused by Ice/ Frost Buildup Restricting Door Movement.Ler Has Been Revised to Perform More Limited Direct Visual Insp2 March 1999Forwards LER 98-005-01 Re Violation of Tech Spec 3.6.5.3,due to Inoperability of Condenser Inlet Doors,Caused by Ice/ Frost Buildup Restricting Door Movement.Ler Has Been Revised to Perform More Limited Direct Visual Insp
05000414/LER-1998-006, Forwards LER 98-006-00 Re Rod Control Sys Malfunction Due to Failed Card Leading to Manual Reactor Trip.Commitments Are Provided in Planned Corrective Action Section of LER19 November 1998Forwards LER 98-006-00 Re Rod Control Sys Malfunction Due to Failed Card Leading to Manual Reactor Trip.Commitments Are Provided in Planned Corrective Action Section of LER
05000414/LER-1998-007, Forwards LER 98-007-00,re Inoperability of Overtemperature & Overpower Delta Temp Functions.Commitments Are Provided in Planned Corrective Action Section of Attached Rept25 February 1999Forwards LER 98-007-00,re Inoperability of Overtemperature & Overpower Delta Temp Functions.Commitments Are Provided in Planned Corrective Action Section of Attached Rept