ML040830258 | 18 March 2004 | Comment (5) of J.B. Beasley, Snoc, Regarding Best Practices to Establish and Maintain a Safety Conscious Work Environment | |
ML042390328 | 3 July 2004 | Comment (1) of Charles R. Nobles Regarding Vermont Yankee Nuclear Power Plants' Request of a 20% Power Uprate Increase | |
ML053500124 | 9 December 2005 | Comments (1) of David L. Deen on Vermont Yankee Draft Environmental Assessment Re Proposed License Amendment to Increase Maximum Reactor Power Level | |
ML060370012 | 26 January 2006 | Comment (1) of Wendy Barnard Opposing the Operation of VT Yankee at Its Current Capacity | |
ML060410054 | 26 January 2006 | Comment (2) of William M. Coleman, Re Uprate in Vermont Yankee Production Capacity, Findings of No Significant Hazards at Facility | |
ML060410056 | 26 January 2006 | Comment (4) Re Entergy Desire to Uprate Vermont Yankee Aged Reactor, Author Against Uprate | |
ML060410057 | 7 February 2006 | Comment (5) of Emily G. Lewis Opposing the Vermont Yankee Uprate | Probabilistic Risk Assessment |
ML060410059 | 30 January 2006 | Comment (7) of Town of Amherst Opposing the Uprate at the Vermont Yankee Nuclear Reactor, Without Requirement of a Prior Independent Safety Assessment | |
ML060410062 | 7 February 2006 | Comment (8) of Martha Barnard Opposing Proposed Uprate of VT Yankee Nuclear Power Plant | |
ML060410065 | 11 January 2006 | Comment (10) of Joanna and Charles Hamlin Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC Based on Fallacious Assumption That the Reactor Is Brand New | Probabilistic Risk Assessment |
ML060410066 | 1 February 2006 | Comment (11) of Mary Alice Herbert Opposing Proposed Uprate of Vermont Yankee Nuclear Plant | |
ML060410067 | 29 January 2006 | Comment (12) of Peter D'Errico on Risk Assessments in the Draft Safety Evaluation (SE) Released by NRC Regarding Vermont Yankee. NRC Should Revisit Its Decision After Performing an Independent Safety Assessment | |
ML060410070 | 30 January 2006 | Comment (13) of Marcia Bourne Expressing Concern About Experimental Power Ascension Test Which Will Be Conducted While the Plant Is on Line Because There Is Significant Uncertainty of the Plant'S Method of Calculating Stress on Steam Dryer | |
ML060410071 | 8 February 2006 | Comment (14) of Thomas K Matsuda Opposing Vermont Yankee Uprate | Probabilistic Risk Assessment |
ML060410072 | 30 January 2006 | Comment (15) of Nita Harrison on NRC Decision for a Power Uprate by Entergy Nuclear Vermont Yankee. Nrc'S Decision to Allow the Proposed Uprate, Without Independent Safety Assessment, Is Extremely Irresponsible | |
ML060410073 | 8 February 2006 | Comment (16) of Annie Demille Opposing the Proposed VT Yankee Nuclear Power Plant Uprate | |
ML060410075 | 30 January 2006 | Comment (17) of Janet W. and Walter F. Schwarz, Opposing the 20% Power Uprate at the Vermont Yankee Nuclear Power Plant | |
ML060450043 | 10 February 2006 | Comment (21) of Emily Monosson on the NRC Ruling on the Vermont Yankee Uprate, Opposes Rule | |
ML060450044 | 31 January 2006 | Comment (20) of Dorothy Mciver Re Uprate in Vermont Yankee Production Capacity, Findings of No Significant Hazards at Facility | |
ML060450045 | 10 February 2006 | Comment (19) of David Wells Re Uprate in Vermont Yankee Production Capacity, Findings of No Significant Hazards at Facility | |
ML060450049 | 4 February 2006 | Comment (18) of Emilie Hamilton Re in Regard to the Open Comment Period Related to the Vermont Yankee Reactor Proposed 20% Uprate | |
ML060450524 | 9 February 2006 | Comment (24) of Benjamin C. Forbes Regarding the Vermont Yankee Nuclear and Supporting a Comprehensive Independent Safety Assessment | |
ML060450527 | 8 February 2006 | Comment (23) of Jeanne M. Walsh on the Draft Safety Evaluation of the Vermont Yankee Nuclear Power Plant | |
ML060470528 | 8 February 2006 | Comment (22) of Raymond Shadis, Enclosing Petitions and Letters from Massachusetts, Vermont, and New Hampshire on Proposed Power Rate Increase at Entergy Nuclear Vermont Yankee Reactor | |
ML060480375 | 14 February 2006 | Comment (26) of William C. Pearson Opposing Proposed Entergy Vermont Yankee Uprate | |
ML060480378 | 5 February 2006 | Comment (27) of Nancy Crompton Opposing Entergy'S Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power | |
ML060480379 | 5 February 2006 | Comment (28) on Proposed Uprate to VT Yankee Power Plant in Vernon, VT | |
ML060480380 | 3 February 2006 | Comment (29) Opposing Proposed 20% Uprate for Vermont Yankee | |
ML060480382 | 5 February 2006 | Comment (30) of J. Levy and Fellow Residents Opposing Vermont Yankee 20% Power Increase Without an Independent Safety Assessment | |
ML060480383 | 5 January 2005 | Comment (31) of Carol E. Cone Opposing Vermont Yankee Proposed 20% Uprate in Power Output, 20 Year License Extension, & Expansion of High-Level Waste Storage Capacity | |
ML060480385 | 5 February 2006 | Comment (32) of Allison Page and Alejandro Levins, Regarding Increase of Operations at Vermont Yankee | |
ML060480386 | 3 February 2006 | Comment (33) of Mariquita Vitztham, Writing to Urge You to Conduct Comprehensive Independent Safety Assessment on the Vermont Yankee Nuclear Power Plant Using the Same Methodology Scope That Was Used with the Maine Yankee Reactor | |
ML060480387 | 5 February 2006 | Comment (34) of Sue Reed Opposing 20% Uprate to Vermont Yankee Power Plant in Vernon, Vermont | |
ML060480397 | 4 February 2006 | Comment (35) of Doris Lake Regarding an Independent Safety Assessment at Vermont Yankee | |
ML060480399 | 14 February 2006 | Comment (36) of Lois Barber Opposing Uprate of Vermont Yankee Without Requirement of Prior Independent Safety Assessment | |
ML060480400 | 6 February 2006 | Comment (46) of Victor and Mary Burdo Opposing Entergy'S Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power | |
ML060480402 | 4 February 2006 | Comment (37) of Kenneth A. Shearer Opposing a 20% Uprate to the VT Yankee Nuclear Plant in Vernon, VT | |
ML060480404 | 6 February 2006 | Comment (38) of Robert Santway Re Decision to Approve Uprate at Vermont Yankee Nuclear Reactor | |
ML060480407 | 6 February 2006 | Comment (39) of Anne P. Tobey Opposing Vermont Yankee Uprate Without Prior Independent Safety Assessment | |
ML060480410 | 2 February 2006 | Comment (40) of Margaret P. Bartenhagen on Proposed Uprate for the Vermont Yankee Nuclear Power Station. Independent Engineering Assessment of Plant Should Be Required Before an Uprate Is Granted Due to Listed Reason | |
ML060480411 | 4 February 2006 | Comment (41) of Teresa Caldwell Opposing 20% Uprate to Vermont Yankee Without Prior Independent Safety Assessment | |
ML060480412 | 5 February 2006 | Comment (42) Lou Waronker Opposing the 20% Uprate as Proposed by Entergy, for Vermont Yankee | |
ML060480413 | 6 February 2006 | Comment (43) of Sarah Kotkov on Entergy'S Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power | |
ML060480416 | 8 February 2006 | Comment (44) of Maureen Ippolito and Jeff Young Opposing Entergy'S Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power | |
ML060480418 | 15 February 2006 | Comment (45) of Suzanne Maisner Opposing Entergy'S Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power | |
ML060540079 | 5 February 2006 | Comment (47) of Rita Pickette Strongly Objecting to Entergy'S Push to Uprate Aging Vermont Yankee Facility for a 20% Increase in the Production of Electrical Power | |
ML060540080 | 8 February 2006 | Comment (48) of Jane Michaud Opposing Entergy'S Proposed Power Uprate at Vermont Yankee | |
ML060540106 | 8 February 2006 | Comment (49) of Gyuri Kepes Re Vermont Yankee NRC Open Comment Period | Chernobyl |
ML060600078 | 6 February 2006 | Comment (50) of Jesse Lepkoff Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC | |
ML060600080 | 5 February 2006 | Comment (52) of Linda and Robert Hecker Opposing the Proposed 20% Energy Uprate at Vermont Yankee and to Request an Independent Safety Assessment | Probabilistic Risk Assessment |